ARCHIECTURE PORTFOLIO AYA FAYEZ
ayafayez@aucegypt.edu
Dubai
SEPTEMBER 2014 - PRESENT YEAR 2017
YEAR 2016
aya fayez - architecture portfolio
Professional Work
2 3
YEAR 2015
YEAR 2014
ARCHITECTURAL WORKS Concept - Schematic High-Rise Project
aya fayez - architecture portfolio
Mixed-Use Building Abu Dhabi b+lg+g+8
The design competition aims to produce a high quality residential and retail project. It aims to identify the most suitable architectural practice on the basis of a preliminary concept that addresses the project requirements. In addition, the proposed design approach demonstrates the preliminary design solution and the team’s ability to work in partnership with the client.
-Total Site Area = 19,228 sqm. -Allowed GFA of 43,500 sqm. Broken down as: -Retail 3,800 sqm. -Residential: 39,000 sqm -Nursery: 700 sqm
4
5
ARCHITECTURAL WORKS
ARCHITECTURAL WORKS
Concept high-Rise Project
Concept high-Rise Project
Serviced Apartments Building DHCC, Dubai 2B+G+10
Serviced Apartments Building Al MArjan Island, RAK 2B+G+7
Construction Area: 34,017 SQ.M. Construction Cost: 109,846,762 AED GFA: 22,704 SQ.M. Sellable Area: 18,950 SQ.M.
aya fayez - architecture portfolio
GSA/BUA: 56% GSA/GFA: 83%
6
7
ARCHITECTURAL WORKS Concept super high-Rise Project Residential Building in DCH Plot A.029 2B+G+M+42
The competition was mainly targeting efficiency along with achieving the client facade requirements. My role was among a team of 3 responsible for developing the concept,plans, facades as well as maintain a strict schedule of necessaries.
Parking Floor Plan (NTS)
aya fayez - architecture portfolio
Construction Area: 104,179 SQ.M. Construction Cost: 336,416,054 AED GFA: 67,599 SQ.M.
Level 1 floor plan (NTS)
GSA (W/O BALCONIES) : 54,556 SQ.M. GFA/BUA: 64.89% GSA (W/O BALCONIES)/GFA: 80.70%
8
Typical floor plan (NTS)
9
ARCHITECTURAL WORKS Concept super Highrise Project RESIDENTIAL BUILDING IN DCH ... Plot A.017 B+G+M+32
The competition was mainly targeting efficiency along with achieving the client facade requirements. My role was among a team of 3 responsible for developing the concept,plans, facades as well as maintain a strict schedule of necessaries.
Construction Area: 69,236 SQ.M. Construction Cost: 223,577,117 AED GFA: 45,337 SQ.M.
parking floor plan (NTS)
GSA (W/O BALCONIES) : 37,690 SQ.M. GFA/BUA: 65.48% GSA (W/O BALCONIES)/GFA: 83.13%
aya fayez - architecture portfolio
Level 1 floo plan (NTS)
Typical floor plan (NTS)
10
11
ARCHITECTURAL WORKS
ARCHITECTURAL WORKS
Concept High-Rise Project
Concept High-Rise Project Mixed-Use Apartments Building Dubai Marina 4B+G+27 Construction Area: 34,293 SQ.M. Construction Cost: 110,740,086 AED GFA: 22,410 SQ.M. Sellable Area: 22,797 SQ.M. GSA/BUA: 66% GSA/GFA: 102%
Base. 4 floor plan (NTS)
level 01 floor plan (NTS)
Base. 2 floor plan (NTS)
level 02 floor plan (NTS)
Ground floor plan (NTS)
typical floor plan (NTS)
Serviced Apartments - Dubai, UAE
aya fayez - architecture portfolio
Located on a very prime view on the palm Jumeriah with water view on both sides of the plot. the building was designed such that each bay has a direct view on to the water. Meaning a 1 bedroom apartment has a view on the living area and the bedroom. my role was to develop the plans and the facade as well as maintain a set of very strict building economics. Construction Area: 37,045 SQ.M. Construction Cost: 119,625,714 AED GFA: 25,873 SQ.M. Sellable Area: 24,282 SQ.M. GSA/BUA: 66% GSA/GFA: 94%
12
13
ARCHITECTURAL WORKS
Concept - Schematic super high-Rise Project Residential Apartments Dubai Maritime City, Dubai G+2P+36
The floor plans illustrating the cascade of the building on the left the building concept having flowy lines connecting the building to the landscape area below
My role involved working on the project on the concept stage till the schematics, my role involved Client commnunication as well as developing the drawings and coordinating the SMEP works.
aya fayez - architecture portfolio
Construction Area: 34,017 SQ.M. Construction Cost: 109,846,762 AED GFA: 22,704 SQ.M. Sellable Area: 18,950 SQ.M. GSA/BUA: 56% GSA/GFA: 83%
Lower floor plans (NTS)
14
15
ARCHIECTURAL WORKS
ARCHITECTURAL WORKS
Concept Highrise Project
Concept High-Rise Project
Mixed-Use Building Meydan, Dubai 2B+G+8
Serviced Apartments in DHCC
Among a team our role was to plan and design the prototypical architectural design of a 4-phase master plan in an efficient and timeless manner. the presented building is one in 22 prototypes aiming to serve different areas of the 182 building plots of the master plan. My role was mainly in the planning and development of the plan of the project with a couple of building having their facade designed.
Developing a concept for a serviced apartments building located in one of Dubai thriving areas. The design aims to create a building that serves a tight economic situation as well as create a everlasting impression on the user as well as the surrounding area. My rols was to give design options for the builsign as well as develop the 14 different floor plates of the building.
Basement floor plan (NTS)
aya fayez - architecture portfolio
Ground floor plan (NTS)
First floor plan (NTS)
Typical floor plan (NTS)
16
17
ARCHITECTURAL WORKS Proposal- Detailed Design High-Rise Project
aya fayez - architecture portfolio
Mixed-Use Building Jeddah, KSA b+m+g+7+S
18
19
ARCHITECTURAL WORKS
ARCHITECTURAL WORKS
Concept M id-Rise Project
Concept Mid-Rise Project
Low Cost Apartments Building Jeddah, KSA G+6
Residential Developement Jeddah, KSA G+7
Master Plan Variations Aiming to maximize the internal space between the units and general well-being of the community another option for the mp was studied for possible changes
ground floor plan (NTS) option 01
aya fayez - architecture portfolio
Ground floor plan (NTS)
ground floor plan (NTS) option 02
Typical floor plan - option 02(NTS)
Typical floor plan (NTS) option 02
20
Typical floor plan - option 01(NTS)
21
ARCHITECTURAL WORKS Concept High-Rise Project Mixed-Use Apartments Building RAK G+2P+23
aya fayez - architecture portfolio
Basic Site Analysis
Ground floor plan (NTS)
Podium 2 floor plan (NTS)
Podium 1 floor plan (NTS)
Level 1 floor plan (NTS)
Construction Area: 20,432 SQ.M. Construction Cost: 65,979,757 AED GFA: 14,512 SQ.M. Sellable Area: 12,760 SQ.M. GSA/BUA: GSA/GFA:
63% 88%
22
typical floor plan (NTS)
23
ARCHITECTURAL WORKS
ARCHITECTURAL WORKS
Concept high-Rise Project
Concept - Schematic Low-Rise Project
Mixed-Use Apartments Building Dubai G+2P+12
3 STAR HOTEL in Jeddah, KSA The competition was mainly targeting efficiency along with achieving the client facade requirements. My role was among a team of 3 responsible for developing the concept,plans, facades as well as maintain a strict schedule of necessaries.
Building 01- 10 story building Construction Area: 26,279 SQ.M. Construction Cost: 84,860,150 AED GFA: 16,050 SQ.M. Sellable Area: 15,023 SQ.M. GSA/BUA: 57% GSA/GFA: 94% Building 02- 12 story building Construction Area: 24,159 SQ.M. Construction Cost: 78,014,240 AED GFA: 15,010 SQ.M. Sellable Area: 14,164 SQ.M.
aya fayez - architecture portfolio
GSA/BUA: 59% GSA/GFA: 94%
24
25
ARCHITECTURAL WORKS Concept Highrise Projects Residential Apartments in Sharjah, uae among a team of 2, we developed the concept of one of three residential buildings along the water front in Sharjah, aiming to maximize the view of each bay apartment and creating timeless architecture. my role was to develop the plans and the facade option from three options presented to Client.
Plot Strategy The third plot had a prime location of various wide and narrow water front views.
Podium Variations
aya fayez - architecture portfolio
In the two towers with close proximity to each other and no street / sikka between them; it was suggested to amalgamate the podiums of the two towers creating a generous common space with luxurious amenities and efficient parking
the design manages to provide full and partial views for all the units.
Not only does the living/ Dining area has views, but more like every single bay in the building,
26
27
ARCHITECTURAL WORKS Concept- Detailed Design Villa Project Private Villa, Al Khawaneig, Dubai
aya fayez - architecture portfolio
Located in a privately-owned farm land, the 27,000 SQ.FT. Villa stands in 160,000 sq.ft land. My role in the project involved developing the schematic works until the issue of the construction drawings. The architectural design of the villa is modern framing a spectacular space of outdoor area and a green wall.
Student Work 28
SEPTMEBER 2009-JUNE 2014
29
Re-Envisioning Azbakeya
Recycling the identity (Group Work) - Dr. Basil Kamel & Dr. sherif Mourad The Creative Cluster Activities and context
aya fayez - architecture portfolio
Transportation
Users Distribution
The projects proposed are placed at the locations they are based on the studied contextual activities, such as the famous trade areas, workshops, publishing centres, heritage buildings, theatrical complexes and the downtown CBD
Vision
Deciding on the diverse projects and their well studied locations, various user groups would be attracted to the site. They range from the differently oriented locals to the tourist who may not only be interested in the history but also business
30
Site Plan Development
Al Azbakeya presents all the cultural aspects needed to establish a successful creative economy model from the architectural heritage, the book market, Al attaba trade Node, The National Theatre, The Downtown Central Business District. The proposed functions are complimentary to each sector of the creative economy model to create a creative cluster.
31
City and Heritage Museum
Form generation
Expanding the lungs of the city - Dr. Basil Kamel & Dr. sherif Mourad
Plan Analysis Entry and Exit Points
Light and Air supply Points
Emergency Exit Points
Current Situation
Floor Plans
(Not to Scale)
aya fayez - architecture portfolio
Circulation
Site Layout
Plan at level - 3.5 m (Not to Scale)
32
Plan at level - 8.0 m
Plan at level - 12.5 m
33
Studies
Environmental Analysis
aya fayez - architecture portfolio
Illustrated Reality Theatre Details
Selected Exhibition Space Detail ... Fatimid Gallery illustrated
Structural Details
Sectional Study for the exhibition Spaces
Sections
(Not to Scale)
Section AA
Section Cc
Section BB
34
Section DD
35
Residential Compound
Having to go through many experiences , Right of way section through the different types of roads would illustrate the experience in the place.
Creating a work friendly environment - Dr. Sami Sabry Shaker
Right of way in the 9 m main road
Right of way in the 6 m side road
aya fayez - architecture portfolio
Site Plan Solid and Void
CONCEPT The site conditions and the studies inspired having the site as two entities, where the different clusters form fingers where the common area of one cluster doesn’t correspond to the common area of the cluster on the opposite entity. That is in the notion of creating cluster spaces that are more bound by the units the serve such that their privacy is not invaded. The cluster spaces are designed such that they together with the areas in front of them create abstracted geometrical forms. The Cluster spaces together with the public common area at the centre of the complex form a spine that can act as the main attraction space having greenery, water feature and a common service place ( The club house)
Pedestrian Walkways
Vehicle Roads
Hierarchy of Green Spaces
Natural Features
Public services and Possible Nodes
Studies Starting with two entities as the main building block for the form generation, it was then divided in the different possible cluster configurations that would maximize the utility of the view and the open spaces.
Adding the layers of the location of the view concerning the two different features, the cluster configuration was designed such that each unit has natural ventilation and view in all its vital rooms.
With the cluster configurations set to maximize the view and the ventilation at each unit, the clusters at each entity are designed to be not corresponding to each other, but rather alternating in the cluster and the green areas.
36
Main Section
37
Energy Pavilion
Blow Ups (Not to Scale)
Blinded by the obvious ... trained to be our of balance - dr. Amr Abdel Kawi
Sections (Not to Scale) Sections (Not to Scale)
aya fayez - architecture portfolio
Blow Ups (Not to Scale) Capsuling the essence of energy in an architectural design is not easy. It needs to capture the physical/obvious side of energy; its negative pole. It also needs to capture to the metaphysical/unseen side of energy; its positive pole. And finally there needs to be a moment of realization, of the integration of these two poles creating the so called ‘balance’. To express the different sides of energy, structural systems were used. There are frames that are very rigid and calling to be seen, showing the physical, negative side of energy. On the other hand, Cables are light, made structurally stable through tension forces. These cables are hold the arch, the good side of energy, and preventing it from falling. This light structure illustrates the positive, metaphysical side of energy. Site Layout (Not to Scale)
Floor Plan (Not to Scale)
Structural Details (Not to Scale)
38
39
Three Dimensional manual Modeling
Spiral Seating bench
Curvilinear Exercise
Fragments Exercise
Recycled Material: Cans Collected from AUC Campus Donated Effort
Planar Exercise
Planar Application
Exercises and recycled furniture - Dr. Tammy Gaber
The Design
aya fayez - architecture portfolio
A desk out of Egg
Cartons
the seating organization consists of two main parts; the main seat and the spinal continuation of it. The main seat is of a pentagonal shape, where each side would accomadate one person. there is also a central back which is meant to provide comfort for the seat as wel as add beauty, topography. The spine part acts as an extension, shaped to be used as a coach or multiple seatings. It breaks the symmetry in a very delegate way as well.
40
41
Free Hand Sketches
aya fayez - architecture portfolio
Pen and Ink Sketches
miscellaneous Work 42
workshops/ compeitions/ drawings
43
Tahrir Workshop in Italy
Creating a space for the general public - Dr. Ahmed Mitto
b
ack the
aya fayez - architecture portfolio
p
to
eople
Based on a workshop between 7 Egyptian Architecture Students studying in the American University in Cairo and 21 Italian Architecture Student studying in University of Rome La Sapienza. Forming 7 teams, each with one Egyptian and three Italian students, where each team is supposed to come up with an architectural solution to sustain the role of the Tahrir Square in the light of the 25th of January Revolution
P
edestrian Experience
The final idea of the design is to create the maximum open area for the pedestrian’s use. In addition to having the total area without any vehicle circulation inside as a park, the ground floor of the buildings were designed to be demolished such that a totally opened area is created.
44
45
aya fayez - architecture portfolio
Free Hand Sketches
thank you for your time 46