Hot Projects in Bay Area Houston!
League City •
Completed - UTMB Health League City campus expansion - $82 million - 142,000 SF hospital.
•
Under construction- $156 million expansion project -- 700-space parking garage, 33,000 SF clinical building and additional 123,000 SF.
•
Master campus plan is 3.5 million SF. Plan includes constructing medical office buildings, a comprehensive ambulatory medical center and education/research/office facilities, logistics facilities and a parking garage. (3 phases over 25 years) Construction view from I-45
Construction view from Walker Street
Overview of UTMB Health League City campus with construction on-going
Now open - MD Anderson on League City UTMB Health campus. 197,000 SF. $112 million investment.
Epicenter League City Proposed development
A mixed-use development on 100 acres -could include new hotels and a convention center complex, restaurants, shops and facilities for special events, amateur and professional sports. Predevelopment agreement approved.
Gulf Freeway (I-45) at the League City Parkway
Proposed: New and larger sportsplex to be built on 106 acres on the west end of Ervin Avenue, west of I-45.
Proposed: Professional Park at NinetySix, 13,000 SF medical professional office building – planned at 835 League City Parkway.
Planned: Shoppes at FM 646, 828 W. FM 646
Recent completion: 29,000 SF office professional bldg. at League City Pkwy and Tuscan Lakes Blvd.
19,700 SF retail building planned. FM 270 at LC Pkwy.
Pinnacle Park 100+-acre mixed-use town center development underway on Gulf Freeway between League City Parkway and FM 646. Cabela’s and Memorial Hermann anchor the development. Phase 2: 35 acre mixed-use in progress.
Memorial Hermann -- 47,000 SF Convenient Care Center on a 13-acre site.
Fairfield Inn and Suites, 64,000 SF, 110 rooms. Construction underway.
Pinnacle Park View of phase ll at completion
Abuelo’s
• • • • •
Abuelo’s Mexican Restaurants Salata Sakura Japanese Sushi & Grill Little Bella Mia casual Italian kitchen Black Bear Diner -- coming soon!
Pinnacle Park Phase lll planned
• •
• • •
Approx. 80,000 SF of retail 30,000 SF of office Structured parking component.
Pedestrian-friendly Water features and green areas.
New restaurants in the area …
Red River Cantina on E. Main St. 8,800 SF
Marketplace at Ninety-Six Phase II under construction. • • •
38 acre retail project League City Parkway and Hobbs Road 123,000 SF Kroger Phase II underway -63,800 SF of retail space, restaurants, professional office space and medical buildings
Phase II at Marketplace at Ninety-Six – 1st building just completed
Red River Barbeque & Grill – 10,000 SF on E. Main St.
Restaurant and 300-seat outdoor beer garden on FM 646
Lots of new construction on the League City Parkway at Lawrence Road near CCISD’s Education Village!
10,000 SF is preleasing!
Marina Bend at Clear Creek – 203 units
Waterfront development: Riverbend at Clear Creek 59 ac. development. Proposed is retail, office, restaurants, 90-slip marina, townhomes and a boutique hotel. Phase II: • hotel franchise has been awarded – details later! • Another luxury multifamily project
Ph. 1: luxury multifamily -
Residential development underway in League City – Hidden Lakes – 800 homes on 350 acres. 100 ac. for commercial development. 50% complete. Bay Colony West – 1774 homes. 860 not yet built Veranda Townhomes – South Shore. 218 townhomes on 26 acres. Cypress Bay on Marina Bay Drive – 60 homes. Beacon Island – 25 home sites from the $800’s. Undeveloped tracts approved for 69 patio homes, 95 townhomes, 301 mid-rise and 385 high-rise multi-family units Magnolia Creek – 1200 homes; 400 not yet built. Westwood – 1300 homes; 960 not yet built. Bay View – 375 homes; 178 not yet built. Coastal Point – 552 lots. 202 acres master planned. 1 mile south of League City Parkway, north of FM 646 and 1 mile east of South Shore Blvd. Just starting …. TownHarbour Estates – 75 lots on Clear Lake just off Lakeside Dr. Davis Road development – 90 lots on 30 acres from the $800’s Proposed development – Pedregal – 1,025 homes. NWC of Hobbs Rd. and FM 517 Lakes of Bay Colony – 120 homes Westland Ranch – 1,000 homes. North of FM 517, south of League City Pkwy., west of Bay Area Blvd. In Galveston County: Proposed is South Lakes – 1,500 lots. Between FM 646 and FM 517, west side of FM 3436.
This Grand Parkway segment will meet up with the Gulf Freeway, at the FM 646 junction.
8.3 miles in Galveston County (League City) and 1.0 Mile in Brazoria County (Alvin)
This segment will meet up with the Gulf Freeway, at the FM 646 junction.
Galveston UTMB - $1.2 billion in nearly 200 new construction projects.
UTMB’s Health Education Center – for seminars, simulations and classes.
Completed project -- $438 million, 765,000 SF new Jennie Sealy Hospital
Former Falstaff Brewery 313,000 SF, built in 1905 ……
In Texas City … 800,000 SF redevelopment! Palais Royal, World Gym, Booker T’s Wrestling Academy, Tuscany Salons, Stuttgarden Tavern, Altitude Trampoline Park, Right Move Storage. Planned: indoor race track
In Galveston … Planned: 110-room Hotel RL, World Gym, climatecontrolled facility and offices, event center plus retail.
Port of Galveston is home port to: Carnival Cruise Line - Carnival Freedom, Carnival Valor / Dream, Carnival Vista, Royal Caribbean International - Vision / Enchantment of the Seas, Liberty of the Seas, and Disney Cruise Line - Disney Wonder. Port of Galveston is the No. 4 busiest port in North America & 7th busiest port in the world! A third cruise terminal is in the works.
Texas City new Crystal Lagoon at Balmoral in NE Houston
70 acre mixed-use development – including a 12-acre Crystal Lagoon pool –THE LARGEST IN TEXAS More than 4,500 homes are planned at Lago Mar, 2,033 acres. 1st phase of 520 homes sites is well underway. $162.5M in projects going on at College of the Mainland
35 acres will be sold off to retail, hotel and condo developers.
Dickinson
New restaurant on FM 517 -- Marais (Cajuninspired steak & seafood restaurant)
Work has started - Bayou Bend Estates, 58 acres for gated community on Dickinson Bayou. Deep-water access, 51 residential lots Underway: Bayou Maison – FM 517 at Golf Rd. 4 phases totaling 157 homes. Marina will be built for this development.
Arcadia Station - 900 homes planned on 350 acres fronting FM 517 at Cemetery Road NOAH’S Event Venue, 8,700 SF, along the Gulf Freeway near FM 517 at Cedar Oaks
Hotel – Restaurants – Commercial Development opportunity at Cedar Oaks, a 17-acre development bordered by Dickinson Bayou along the Gulf Freeway, just south of FM 517.
Dickinson
Gulf Coast Public Market
Penny’s Beer Garden is open on 1001 FM 646 North - small beer garden & local craft beers, wine, and vendors Grumpy McGregor’s Brewery opening this fall on SH 3
Public space, shopping venues – fresh & prepared foods, local arts and crafts, entertainment. SH 3 close to FM 517 intersection. Planned; construction not yet started. Eugene Kranz Junior High School on FM 3436; 280,000 SF on 40 acres.
Flying Rhino
Commercial land adjacent to the school is available.
Flying Rhino Brewing Co. to open on FM 517 next year
Friendswood Virgata Commons
Rendering Under construction on 14 acres – new commercial center on S. Friendswood Dr. near FM 518 at FM 528, a retail and office project. •
Ph. I: 20,000 SF of retail space - 85% preleased to Orangetheory Fitness, MOD Pizza, and others. Outparcels: Chipotle Mexican Grill and Chick-fil-A.
•
Ph. II: Begins in early 2020 - features an additional 30,000 SF of retail and office space.
New! Magnolia Plaza - recently completed in downtown. Two commercial buildings - 6,250 SF for lease, with the first ready for occupancy. Real Time New! Bergamos Spa Retreat - $6.5M renovation. It’s the largest freestanding spa in TX at 22,000 SF. 313 E. Edgewood Dr.
Bergamos Spa Retreat
Friendswood Shadowbend Business Park
West Parkwood Place $4.75 million professional and retail center Under construction: Two 10,000 SF buildings at 1501 W. Parkwood Ave. • Phase II begins after Phase l is leased.
Under construction: 10,000 SF development in downtown Friendswood at 105 East Shadowbend. Two commercial buildings available for retail and office tenants
New! The Beldon – a 55+ community at 555 N. Friendswood Dr.
Friendswood rendering
Tannos Land Holdings - under construction downtown at 505 S. Friendswood Dr. – 2019 completion expected. • 4-story, 63,400 SF office building • $10M investment • Retail and restaurants ground floor • Office space on upper floors
Real time
Under construction - Garage Ultimate at 4650 FM 2351. A 139,000 SF condominium development … 130 units - for sale - prices starting at $80,000.
Friendswood and surrounding area
Recent completion - Rancho Mexican Restaurant - $1.2M 5,000 SF at 2131 W. Parkwood Ave. Industry Park on FM 2351 near Hope Village Rd. Seven industrial-zoned parcels for land lease, BTS or purchase ranging from .8 to 2.5 acres in size.
Ellis Business Park
16310 Beamer Rd
Ellis Business Park - office/warehouse lease space located on 21 acres. The project consists of 5 buildings with the main building housing a two story office and a craneready shop + two 10,000 SF office/warehouse lease space buildings.
Ellington Airport ‌ a multi-purpose commercial and general aviation facility and also a joint reserve military base. All five of the military branches are represented as well as the Texas Air National Guard.
Ellington Airport New airport tower
Approximately 658 acres available for development in Ellington Airport. Best uses: office, aviation, institutional and industrial.
•
New Air Traffic Control Tower - $10.3M investment – ready for the next generation aircraft/spacecraft!
•
New training center, logistics center, battle command center and $30-$40M hangar
•
New public hangars -- $60-$70M investment
Ellington Airport U. S. Coast Guard Sector Houston-Galveston command center. $57 million investment. 117,000 SF. More than 350 work at this regional facility.
Lone Star Flight Museum $35 million, 130,000 SF project. Includes gift shop, auditorium, exhibit hall & vintage aircraft displays.
Opportunity! Looking for two restaurant operators!
Ellington Airport ‌exciting opportunities!
The Federal Aviation Administration (FAA) has granted the city of Houston a Launch Site License that enables Ellington Airport to establish itself as a launch site for Reusable Launch Vehicles (RLV), making it ‌ the 10th
commercial spaceport in the United States and the only one adjacent to a major metropolitan area.
The mission of the Houston Spaceport is to create a focal point for aerospace innovation with a cluster of aerospace companies that will lead the nation in the transition from a government-driven to a commercially-driven space program.
The Future of Air Travel? • • •
Suborbital Aircraft Hypersonic (Mach 5+) aircraft taking off and landing at Ellington. Ability to cut 11 hour flights (Paris to Tokyo) to less than 3 hours
Houston Aerospace Support Center (HASC) Intuitive Machines to provide lunar landers to the moon. $77.2M contract!
HASC building at Ellington
53,000 SF
Intuitive Machines is developing and testing its LOX-Methane In-Space propulsion System
Also located in the HASC building … San Jacinto College’s EDGE Center will offer four initial training programs: • composites manufacturing and repair technician • aerospace electrical assembly technician • aerospace structures technician Phase 1 • mechatronics potential • industrial automation technician plan
Phase l Development Future Phases of Development
Houston The Reserve at Clear Lake City
372 acres for 740+ new homes, a recreation/community center and numerous parks and green belts. Villas to large estates starting from the $300’s. More than 500 homes have been sold. Expected completion by 2020.
Clear Lake Marketplace 300,000 SF of retail under construction at Clear Lake City Blvd. and El Dorado Blvd. Anchor tenant: 100,683 SF HEB Commercial development at the entrance to The Reserve at Clear Lake City
Recently completed commercial/retail center at Clear Point Crossing
~16 ac. Boulevard Shops at the Reserve Clear Lake City (commercial site) to be developed on Space Center Blvd. Mixed-use development with 5 pad sites and 80,000 – 200,000 SF for larger users.
New! The Fordham at Baywood, 55+ community at 5353 Space Center Blvd.
Doctors United surgery center
Houston & Pasadena •
Doctors United surgery center on 5.25 acres on the northwest corner of BW 8 and Preston Road.
•
Sacred Oak Medical Center at 11500 Space Center Blvd., 80-bed specialty behavioral hospital.
•
Sacred Oak Medical Center
Heartis Clear Lake – assisted living and memory care on SH3 near Pineloch
Heartis Heartis
Under construction on Clear Lake City Blvd. near SH 3 - 30,000 SF small hospital, an urgent care clinic and a women’s imaging center.
Pasadena The Market at Crenshaw Market at Crenshaw – • 168,924 SF development on 23 ac •
BW 8 between Crenshaw Rd & Fairmont Pkwy in Pasadena.
•
Phase II under construction: My Salon Suites, Burgerim, Tuesday Morning, James Avery, Salata
James Avery ‘Discovery Store’ - only one in Houston area selling leather handbags and limited-edition, out-ofretirement designs
Pasadena
New hotels and multi-family on and near the Beltway Holiday Inn Express & Suites
Candlewood Suites Fairfield Inn
Marriott Residence Inn Hilton Home2 Suites
Hilton Home2 Suites
Newest multi-family: • Hawthorne at Pasadena, 294 luxury units at BW 8 near Crenshaw. •
Preserve at Baywood Apartments, 192 units at Red Bluff & Genoa Red Bluff Rd. Ph.2
•
Crenshaw Grand, 264 luxury units on Crenshaw Rd.
Pasadena 4 recently completed restaurants at Pasadena Pavilion, BW 8 / Vista Red Robin, Chuy’s, Razoo’s & Outback Steakhouse
Plus 2 more! Saltgrass Steakhouse on BW 8 near Spencer Hwy.
Pappas Barbeque - Beltway 8 at Pasadena Blvd.
Pasadena Proposed: Preston Place on 8.8 acres – BW 8 / Preston Rd / Genoa Red Bluff Rd. Ideal for restaurants, retail, medical and office facilities.
An opportunity for a developer! Corner of Pasadena Blvd. and Southmore Blvd.
Restaurant Depot, a wholesale cash and carry grocery and foodservice supplier building a 60,000 SF facility near BW 8 .
rendering
San Jacinto College Center for Petrochemical, Energy, and Technology (CPET) building –opens soon ~ 140,000 SF.
San Jacinto College
Classes for process technology, instrumentation, nondestructive testing, electrical, and analyzer tech programs plus large spaces for industry and community meetings. Parkway Trails under construction -K. Hovhanian building 410 homes on 145 acres – 60’ & 65’ lots. Red Bluff Rd. / Center St. / Fairmont Pkwy.
Beltway 8 / Sam Houston tollway widening will add 4 lanes each direction. $192.7million project. Construction has begun.
Ship channel bridge will be widened to 4 lanes each direction. $823 million project.
La Porte The Legacy at La Porte
Home2 Suites now open at SH 146 and Fairmont Pkwy. MRC Global’s new 493,272 SF complex on SH 146 in La Porte at Port Crossing Commerce Center
Two new residential projects! The Legacy at La Porte, a multi-family project with 294 units (1,2,3 bdrm) Fairmont Lakes North, a patio home community, are planned for the NEC of SH 146 and Wharton Weems Blvd.
La Porte New development on 400 ac. - Bay Area Blvd. between Spencer Hwy. and W. Fairmont Parkway
Morgan’s Landing -• •
235-acres ~600 single family homes – Beazer Homes & Taylor Morrison • Model Homes on the ground.$200’s - $500’s • Amenities: rec center, community pool, lap pool, splash pad, dog park. Plus … Multifamily on 19 ac. Senior living on 7.5 ac. Opportunity: 134 acres for retail and commercial
Maritime, Manufacturing and Industrial Activity Bayport Container Terminal – Port of Houston spending approx. $1 billion to complete the container terminal. Barbour’s Cut Terminal – POH spending $600 to $700 million to rebuild the terminal.
Port Houston’s newest ship-to-shore cranes stand nearly 30 stories tall with a boom length of 211 ft. able to load and unload vessels up to 22 containers wide.
New Neopanamax cranes – nearly 30 stories high –able to load/unload vessels up to 22 containers wide.
BILLION$$$$ of new projects are in the pipeline to be built along the Houston Ship Channel from Galveston to the Turning Basin. BAHEP’s Specialty Chemical Industry is one of the fastest growing industries in the region. specialty chemical - petrochemical - natural gas processing - manufacturing Major economic driver responsible for over 35,000 direct jobs, contributing over $45B in capital investments Recent plant expansions coming online will create opportunities for growth in the region Related areas of growth include advanced manufacturing, distribution/warehousing, and logistics Approx. 6 indirect jobs are created for every 1 job in manufacturing!
Major Industrial Investments •Bayport Polymers, LLC – joint venture of Total SA, Nova Chemicals and Borealis AG. Under construction: Polyethylene unit. $800M investment. 1,750 construction jobs; 25+ permanent jobs •LyondellBasell … is building a $700 million manufacturing plant in La Porte for HDPE production. expanding capacity at La Porte’s ethylene plant -- $500 million investment for all Houstonarea projects and lots of jobs! plans to build ethers unit at Bayport to produce oxy-fuels. •Enterprise Products Partners just completed the ethane export facility at Morgan’s Point.
world’s largest refrigerated
•Air Liquide will build a new liquid hydrogen plant at its La Porte industrial gas facility to meet increasing product demand from several customer markets. It’s expected to be online in 2021.
•Air Products plans a $20 million expansion in La Porte. 20 new jobs. Expected to be online 2021.
More investments to our region ‌ Kinder Morgan -- new storage facilities in Pasadena on the ship channel. $106 million investment. Kinder Morgan’s BOSTCO (Battleground Oil Specialty Terminal) site – a $485 million projectIntercontinental Terminals Company, an affiliate of Mitsui & Co., purchased 180 waterfront acres in Pasadena to expand services. $150 million tank terminal with shipdocking facilities and 10 tanks. Oiltanking Partners -- $44 million on an expansion at its terminal on the Houston Ship Channel. Magellan Midstream Partners and LB C Tank Terminals -- $95 million crude oil storage and pipeline facility. Magellan Midstream Partners and Valero Energy Corp. -- joint venture a marine terminal on the Houston Ship Channel in Pasadena. $830 million project.
•LyondellBasell will building the world’s largest propylene oxide and tertiary butyl alcohol plant in Channelview. Capital investment is $2.4 billion! Up to 2,500 construction jobs and 160 permanent jobs. The ethers unit is proposed for Pasadena in the Bayport complex. •Braskem to build in La Porte the largest polypropylene production line in the Americas. $675 million investment. 1,000 development and construction jobs. 50 permanent full-time jobs.
•Enterprise Products Partners building an ethylene export terminal at Morgan’s Point. Staring operations in late 2019. Proposed: •Celanese Corp. $425M in Pasadena. •Next Wave Energy - $569M in Pasadena. 400 construction jobs; 25 permanent. •NextDecade, based in Houston, is proposing to build a $6 billion LNG export facility on Pelican Island. •Ineos - $803M plant in La Porte
Bayport South Business Park on Red Bluff Rd. in Pasadena – Johnson Development has two new buildings underway: 642,994 SF cross-dock on 41+ acres. Expected completion is 4Q 2019. Other building: 248,240 SF cross-dock.
Park 225 at Beltway 8 and SH 225 – Vigavi has underway a BTS for Johnson Controls. 30,000 SF with 7,000 SF office, 40 ton crane capable.
Bayport South Business Park – Under construction by Panattoni Development: 643,000 SF. Crossdock, 36’ clear height. Expected completion is Q1 2020.
Crystal Geyser on Genoa Red Bluff Rd.
Emerson plans an office complex on 26 acres along Beltway 8 near SH 225 in Pasadena.
One of two buildings for FlowServe at Park 225
Port Commerce Business Park on Genoa Red Bluff Road: buildings are in various stages of completion for BTS or lease.
Planned: Gulf Point mixed-use business park -- 43 acres on Gulf Freeway at Scarsdale Blvd. Wycoff Dev. & Const. has available sites for flex, distribution and single tenant users, 5,000 – 500,000 SF. Sale or lease.
United Equities Inc. development near completion: Beltway-225 Business Park in Pasadena. Two buildings, both 10-ton crane ready, 21,000 SF and 18,500 SF with additional 3.6 acre site for BTS.
Gulf Point Independence Logistics Park - 167,892 SF, front load. Available for lease in La Porte.
10025 Porter Rd. Port Place on Preston Rd. in Pasadena. 20,000 SF, 20-ton crane ready is available.
New spec buildings at Park 225 in Pasadena -- 36,954 SF, is under construction
Kinder Morgan recent completion: 82,800 SF, 3-story office building at Park 225 in Pasadena, BW 8 at SH 225. New construction at Bay Oaks Business Park, Genoa Red Bluff near BW 8 in Pasadena: 34,700 SF, 20-ton crane ready office/warehouse. Vigavi built 2 new spec buildings at Bay Oaks, ~ 20,000+ SF, crane-ready. One is sold!
Port Crossing Commerce Center
1912 S. 16th St.
1901 Wharton Weems Blvd.
Energy Commerce Business Park Two buildings under construction at Port Crossing Commerce Center on SH 146 in La Porte -- 3Q 2019 delivery date. • 1912 S. 16th St. – 75,000 to 164,385 SF, rail served, 60’ loading bays, 36’ clear height • 1901 Wharton Weems Blvd. – 50,000 to 252,543 SF, 60’ loading bays, 36’ clear height, dock high
. C
Energy Commerce Business Park on Beltway 8 in Pasadena. Clay Devel. & Const. has two buildings under construction – Phase II: 101,400 SF rear-load and 232,960 SF cross-dock.
Bayport North Logistics Center l & ll under construction – • 9601 New Decade Dr. 103,084 SF, front load • 4100 Malone 233,190 SF, cross-dock Bayport Logistics Park: AVERA Cos. is developing a 143-acre acre industrial complex in Pasadena on Underwood Road in the Bayport Industrial District. Site allows for railserved buildings, 200,000 – 900,000 SF and non-rail-served up to 1,000,000 SF. Avera Cos. has 3 buildings totaling 738,610 SF under construction on 41.5 acres at Bayport North Industrial Park.
Carson Companies Bayport III, phase 2 industrial park in Pasadena at 4311 Malone Dr. • Underway is a 207,000 SF cross-dock warehouse and three 25,000 SF crane-ready buildings.
Under construction at Bay Area Business Park in Pasadena – Phase 3 - 1.33 million SF is being built on 95 acres on Red Bluff Road. • Three buildings: 250,000 SF, 300,000 SF and 784,000 SF (expandable to one million SF). • Availability is anticipated for first quarter of 2020.
Red Bluff Road to FM 518 ~$200 million project Pipeline corridor work begins the end of 2018. Beginning of 2019, bridge work starts. More information here: www.SH146.com
The Towers – 416 luxury multi-family project on 15 acres, 1 to 4 bedrooms at The Commons at Seabrook on SH 146.
The Commons at Seabrook
The Commons at Seabrook - 30,000 SF commercial reserve on 7.7 acres.
5765 Bayport Blvd. preliminary development plan (retail or office) SH 146 at Red Bluff Rd.
Seabrook
The new waterfront restaurant needs a tenant and a name! This is the street side Good opportunity for a restaurant operator ‌. view.
Restaurant - new construction - at Seabrook Marina & Shipyard. Upper level 5,476 SF and 3,200 SF lower level.
Opportunity for developers! Area of interest for future mixed-use development is a combined 67+ acre tract south of Red Bluff Rd. on the east side of SH 146. The site is ideal for multi-family in the back with retail and commercial up front and a possible inner loop road connecting to the expressway.
Seabrook Towne Center Construction has begun on 30 ac. development, SH 146 to Repsdorph
Proposed: Seabrook Marketplace, SEC Repsdorph Rd. at Lakeside Dr.
Seabrook
Under construction: Chesapeake Bay – luxury, active senior community on 12 ac. In Seabrook on Repsdorph Rd.
Holiday Inn Express & Suites -- a new hotel on E. NASA Pkwy in Seabrook
Development opportunity in Seabrook: 15.57 acres available on Clear Lake
Kemah and Clear Lake Shores Marshall’s, Ross Dress for Less, Petco, Ulta …
The Shoppes of Kemah, a $16 million, 79,000 SF retail center – FM 518 near SH 146 in Kemah.
30 acres - Galveston Bay Foundation plans on-site exhibits, offices, classrooms, laboratories, meeting and gathering rooms and exhibit spaces
Opportunity in Kemah – 88 acres will have access to SH 146, FM 518 and League City Pkwy.
University of Houston Clear Lake area – lots of construction! Now open! STEM and Classroom Building, 121,575 SF; $65.7million
Now open! Recreation and Wellness Center, 81,709 SF; $38.2 million
Under construction on Bay Area Blvd. & Middlebrook Dr. – The Middlebrook Apartments. 360 apartments. 20 townhomes, 1-2-3 bedrooms.
Under construction: $22 million, 300bed student housing project on campus
Nassau Bay and Houston Nassau Bay Town Square - $150 million development project on 27 acres. Two more office buildings are planned. Retail centers nearly 100% occupied. Saturn One
Rendering of 150,000 SF medical office building
Houston Methodist Clear Lake expansion! Construction starting soon on 6-story, 150,000 SF $40M medical office building. This is the first phase of a multi-year expansion plan.
The Caroline ‌ luxury apartments and town homes Finger Cos. 334-unit multi-family project on NASA Pkwy.
Independence Plaza at Space Center Houston The Shuttle and 747 Carrier exhibit is open at Space Center Houston! The only one in the world! Space Center Houston is an international space museum and interactive educational center. !
New permanent display coming soon: 5-story tall rocket booster! It was flown twice to ISS.
Historic 1969 Mission Control restored and open to the public!
Webster Recent completion: 60,000 SF medical office building at Clear Lake Regional Medical Center.
Now open! UTMB Health Clear Lake signed a long-term lease for this 373,000 SF hospital. In 2014 it opened as the Bay Area Regional Medical Center.
UTMB Health Clear Lake
Webster Odyssey Park, deed-restricted mixed-use commercial park, on 28 acres for medical, retail, warehouse and distribution. NWC of FM 528 at Genesis Blvd. 1 million SF build-out is expected! New road -- Genesis Boulevard
Just announced ‌ NASA Bypass Business Park, mixed-use master-planned commercial park, on 50 acres for office, office/warehouse, medical and retail. In front of Edgewater development.
It’s open! Approximately 250 jobs. 158,000 SF with a 24-pump gas station
TRU by Hilton on Rogers Ct – 98 rooms – next to Costco and Holiday Inn Express
Coming soon! Urban Air Adventure Park leased the former Home Depot building in Webster. Exclusive Furniture’s new 50,000 SF furniture showroom. Now open!
New restaurants!
OPEN on Bay Area Blvd. in Webster • Hopdoddy • Snooze • Main Squeeze • Mod Pizza
Webster Destination Development 177 acres mixed-use development next to Academy and TopGolf • • • •
Hotel Retail Dining Entertainment
350,000 SF Retail showroom and warehouse. Expected to open for business this fall, 2019. 350 FT jobs.
Webster and Houston
Just behind the Clear Lake Center at I-45 and NASA Parkway: • 48,000 SF Emmons Motor Company on 16 ac. • Mariposa - 180 units on 14 ac. for active adults
Ulta – bigger store – at Baybrook Square coming soon!
Pottery Barn Outlet open soon at Baybrook Village
Baybrook Mall -555,000 SF expansion
Baybrook Mall’s New Power Center
Lifestyle Center at Baybrook Mall
New artifical turf – movies and more!
LifeTime (athletic resort) – now open on 14 acres at Baybrook Mall on Gulfbrook Rd. 120,000 SF
What is fueling retail activity in Houston? boutique fitness tenants and restaurants!
Thanks for visiting Bay Area Houston! If you know of a company wanting to relocate or expand to this region, give us a call – we can help! Call 832.536.3255
Visit HOT PROJECTS often –
things are always changing! Updated 8-14-19 Barbara@BayAreaHouston.com