Agua Caliente Elementary School - Case Study

Page 1

Agua Caliente Elementary School: A Reconstruction 2015: Case Study




Client: Palm Springs Unified School District Location: Cathedral City, CA Site Area: 12 Acres Enrollment Capacity: 800 Students Building Area: 75,000 SF Copyright © 2019 BakerNowicki Design Studio, LLP. All rights reserved


Design Team Architecture: BakerNowicki Design Studio, LLP Structural: KNA Consulting Engineers Mechanical: MA Engineers, Inc. Electrical: Johnson Consulting Engineers, Inc. Civil: MSA Landscape Groundlevel Food Service: Orness Design Group, Inc. Estimating: MTA Environmental: Meridian

District Executive Committee: Christine Anderson Superintendent Julie Arthur Executive Director of Facilities Brian Murray Assistant Superintendent of Business Services Mike Swize Assistant Superintendent of Educational Services John Vega Construction Coordinator


two page graphic

Agua Caliente Elemenrary School | Palm Springs Unified School District


MISSION STATEMENT The faculty and staff of Agua Caliente School believe that each child is a unique, valuable individual who is capable of learning and succeeding. We further believe that participation, communication, and cooperation with the home and the community at large are critical for student success in school. Recognizing the special needs of our multicultural, language diverse population, we will practice a variety of instructional strategies. These strategies, while promoting district and state goals for educational development, will facilitate the growth of productive members of a democratic society.

2019 Š BakerNowicki Design Studio | 7


THE DREAM HOMES COMMUNITY

SITE

Agua Caliente Elemenrary School | Palm Springs Unified School District


DREAMING & MODERNISM The local homes, called the Cathedral City Dream Homes at the times, were built circa 1960. Originally offered as affordable, legacy homes, they provided a dream of permanence to residents. In recent decades, the neighborhood has begun what many hope is a transition from a struggling and low socio-economic neighborhood into an emerging neighborhood. Recognizing this, the Palm Springs Unified School District envisioned a school that embodies the best that the Palm Springs Region has to offer for the community. The district commissioned a campus rooted in “Palm Springs Modernism” that speaks to the origins of the neighborhood, inspiring the original vision of permanence and legacy in the heart of the community. The completed campus sparked great excitement within the community. Photos to the right show the celebration put on by the staff, students, and community the day that they moved in.

AFTER

BEFORE

The School District was Inspired by its local Modernist Architectural roots

Parents, Staff, and Students celebrate “Moving in Day” with a Parade & Celebration.

2019 © BakerNowicki Design Studio | 9


13

14

10

5 16 4

11

6 3

15

2 9 17

8 7 1

19

18

12

N Agua Caliente Elemenrary School | Palm Springs Unified School District

SITE PLAN


X 394.9

X 395.7 X

IR AC AZ PL

X

X

X

DENSE TREES

X

X 395.7 GRASS

X

X 394.6

X

X

X

X

624 Broadway, Suite 405, San Diego, California 92101 619.795.2450

X 394.9

www.bndesignstudio.com

X

X

X 394.7

395

X

X 395.1

X 395.9

X

X

X

X 395.6

X

X

X 395.7

X

IRR

X

X

ASPH

X 394.5

395

X

X

PHASE I CONSTRUCTION BOUNDARY

PALM SPRINGS UNIFIED SCHOOL DISTRICT

X X

X

X 394.3

T X

X

IRR

IRR IRR

X 395.4 395

X 395.6

X

DENSE TREES X 394.7

X

X

T X

X

GV

X

X 394.7

X 394.3

X

X 395.8

X

X

IRR IRR

395

X

X

X

X

X

IRR IRR

PHASE I CONSTRUCTION FENCE

X

X

X

X

T

X 395.3

NpuEs O E S PHAw Camres

X 393.2

INTERIM HOUSING RELOS

X

X 394.2

X 394.8

X

X

X 394.8

X

ASPH

X 394.8

X

X

X

N 2,244,000

X 394.3

X

X

X

CO X

X 394.6

X 394.5

X

GV

CO

X

ASPH

X

X

X 393.3

X

CO

X

X

X

X 395.5

X

X

X

X 392.7

X

X 394.5

X

X

X 394.7

X

X 395.3

CO X

X 395.3

X

X

IRR IRR

X 393.6

IRR

CO

X 393.2

X

X 395.6

X 393.2 X 392.7

X

X 394.8

395

X

EV

X 394.5

W

X

X

X 395.6 395

X

X

X 395.3

PLAYGROUND

X

X

X 395.7

X

X

X

CO

X 394.8

X

X 395.5 IRR IRR IRR

X

X 393.7

X 395.3

X

IRR

X

X

X

X

X 395.4

X

X 395.2

X 391.7

X

X

X

X

X

X

X 391.5 X

X 392.2

X 392.8

TABLE

X 394.9 TABLE

UP

DENSE TREES

X

X 391.5

X

X 391.2

X

De ay Fie Pl

X 391.4

X 393.2

X

X 390.7 X

X 395.1

X 391.6

X 395.7 EV X

ASPH

X 395.3

X 393.5

ASPH

X

X 390.6

X

X

IRR

UP

X

X

X

X 393.2

X 390.8

X 391.4

X

X 390.1

X

X

X 389.4

X

IRR IRR

X 392.3

X 390.3

GRASS

105 391.58 X 391.3

DENSE TREES

IRR

X

X

X 394.7

X

X

X 391.6

X

X

X

X

X

X

X 394.3

X

X

X X

X 394.8

POOL DENSE TREES

X 391.8

UP

X

X

X 390.7

X

X 391.8

X

IRR IRR IRR IRR IRR

X X

X 392.7

X

X

IRR IRR

X

X 393.5

X 392.4

X 394.7

X 395.4 PLAYGROUND

X

X 393.5

GRASS

X

395

X

X 394.5

X

X

EVEV

PLAYGROUND

X

X 395.4

X 393.2

X

IRR IRR

X 392.4

X 395.6

X

X

X

X 393.3

X

X

X 392.5

X

PLAYGROUND

X

X 391.7

X

X

X 394.2

X 391.2

X 391.7

X 391.1

X

X

X 392.6

X

X

X 389.9

X 390.4

X 390.6

X 391.6

X X

X

X

IRR IRR IRR X

EV

X

X

X 392.2

X 393.4

X

X 389.8

IRR

X 391.7

X 393.4 X 391.8

X 391.5

X 390.8

X

X 390.7

390

X

X

X

X 390.4

X

X X

GRASS

X 392.6

X 391.3

X

IRR

X 392.8

X

X

X 390.7

GRASS

DENSE TREES

X

X

X 389.7

X

X

X

X

X 391.6

X 392.5 X

X 389.9

X

X

X 391.7

X 390.6

IRR

X

X

X 389.2

X 391.3

X 391.6

ASPH

X

X 390.6

X

X

IRR IRR X

X 392.2

X

X

X 389.8

X 391.6

X

X 389.3

X

X

X

X

DENSE TREES

X

X 388.3

X

X 393.2

X 390.3

X 391.4

X

X

X

X

X 391.7

X 390.6

X 389.6

X

X

X

X

X

390

X 391.3

X

X

MH

A

H

LIC

NLY WO EVIE 04-XXXXXX NR PLA FOR

RI C

X 387.9

X 390.2

E D A RC H N S D E. NO I R W

TE

A

X 388.3

NO.C28042 X P -1 9- 30

OF

C AL I

IDENTIFICATION STAMP DIVISION OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES APPL #

5

X

X 387.3

X 389.5

A

DENSE TREES

X 387.5

E

X

X 388.6

X 390.5

X 390.8 X 390.7

X

X

X 388.7

X

X 389.8 X 391.4

ST

PL AZ AC IR

X

E

X 392.7

X

X

CT T E KI IC

N 2,243,400

X

X

X

X 393.0

X

X

X 390.9

X

X

FO

R

AC

F/LS

SS

DATE:

X

X

X

DENSE TREES

X 392.3

X

N 2,243,600

X 393.4 X

NI

395

N 2,243,800

Wn &O T E S PHAmolitiolds

X 394.7 395

X

X 392.2

X 392.7

X 394.4

X

X 391.6

X

X 392.2

X 392.4

X

X

X

X

X 395.5

ASPH

X

Ne ructu St

X

DENSE TREES

X 392.3

IRR

X

X 392.7

PLAYGROUND

X 395.6

X

X 393.2

X 392.4

X 392.8

X 393.5 X

X

UV

X

X

X 392.6

X 392.6

GRASS

DENSE X

X 395.7

X 393.4

X

X 394.2

X

X

GRASS X 392.7

X X

X 393.4

X

X

X

X

X

39 0

X 396.4

AGUA CALIENTE ELEMENTARY SCHOOL

(E) BUILDING TO BE DEMOLISHED DURING THE PHASE I CONSTRUCTION

X

X 395.8 PLAYGROUND

X

X

X 395.7

X

(E) BUILDING TO REMAIN DURING THE PHASE I CONSTRUCTION

X 395.0

X

IRR

X 395.5

X

X

X

X 394.1

X

X

X 395.5

X

X 389.5

ASPH

X

X 392.1

X 388.3

X 388.4

X 386.9 X

X 388.8

X

390

X

X

X

X 388.1

X 387.8

INTERIM HOUSING

X 387.9 NO.

X

DATE

ISSUE

X

X

X 391.2

X

X 391.4

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Main Entry Bldg A - Admin Bldg B - K / Classrooms Bldg C - Classrooms Library/ Info Center Bldg D - Classrooms Bldg E - Mpr / Food Service Lunch Shelter Student Forum/Performance Student Gardens

PROJECT NO:14012-00 DATE: 04/17/2015 DRAWING

X 389.9

G6.0

11. 12. 13. 14. 15. 16. 17. 18. 19.

PLANNING PROCESS

The project began with an assessment of the 60 year old campus. A feasibility study was commissioned and determined that it was not feasible or desirable to try to ‘fix’ the existing campus of its material and planning defects. Once determined that new construction was required, the campus logistics became a primary driver of the design. Building a new facility on an occupied campus presented multiple challenges for planning, construction and student safety. The phased construction plan allowed students to safely remain on campus while they were afforded the opportunity to observe the construction of an entirely new campus for them. The Architect worked with local law enforcement and community to solve critical community safety issues by 1) Creating a single point of entrance to the campus, 2) Creating a Secure campus and perimeter, and 3) Limiting vehicular access for non-school activities.

Play Area Parking Fields Hardcourts Kindergarten Play Area Retention Basin Bus Drop-Off Parent Drop-Off Kindergarten Drop-Off 2019 © BakerNowicki Design Studio | 11


two page photo



SWBD SWBD

3

5

5

PERFORMANCE

ENTRY COURT

SWBD

LUNCH

2

SWBD

OUTDOOR COLLABORATION

9

OUTDOOR C

CIVIC / LIBRARY 8

ACADEM

ANS

7 SWBD SWBD

6

1

OUTDOOR C

12

4 SWBD SWBD SWBD SWBD SWBD

11

4

Agua Caliente Elemenrary School | Palm Springs Unified School District


FLOOR PLANS & CAMPUS ORGANIZATION 1. 2. 3. 4. 5.

3

COLLABORATION

MIC COURT

10

Administration Library Classrooms Kindergarten Imagination Studio/ Collaboration Room

GARDEN

6. 7. 8. 9. 10. 11. 12.

Multi Purpose Room Band/ Music Classroom Food Services Lunch Shelter Campus Garden Student Drop Off Maintenance

COLLABORATION

Outdoor Collaboration

VIEW

SOCIALIZATION Public Entry

First Floor Plan

MAKER/ LIBRARY

Outdoor Collaboration

ACADEMIC KINDER

Outdoor Collaboration

Courtyards Concept

2019 © BakerNowicki Design Studio | 15


CONNECTIONS

4

6

2 1

1) Administration 2) Lu


6

6 3

5

unch Shelter 3) Library 4) View of the Mt San Jacinto Mountains 5) Academic Court 6) Covered Outdoor Collaboration


Agua Caliente Elemenrary School | Palm Springs Unified School District


2019 © BakerNowicki Design Studio | 19


3

5


ACADEMIC COURTYARD 1) Mt. San Jacinto 2) Administration 3) Classroom Buildings 4) Academic Courtyard 5) Drought Tolerant Landscaping

1 3

2

4


Gymnasium



5

2

3 4

1

LEARNING COMMONS 1) Stacks 2) Reading Loft 3) Reading Nooks 4) Courtyard 5) Second Floor Access 6) Large Overhangs 5

Agua Caliente Elemenrary School | Palm Springs Unified School District

4


6

2019 © BakerNowicki Design Studio | 25


2 4

4

3

1

5

Agua Caliente Elemenrary School | Palm Springs Unified School District


DESERT SUSTAINABILITY

As a desert school, the project uses masonry for both longevity and temperature control. The masonry walls’ thermal mass provides energy storage for the local environments diurnal swings (from hi to low temperatures) releasing heat or cooling when needed. Large overhangs and trellises shield glazing and outdoor spaces from the sun, creating outdoor collaboration spaces. The building envelope includes special reflective insulation and materials employ high solar reflectance to minimize heat gained from the strong sun. Dark Exterior Masonry colors were selected for vertical walls to minimize glare and eye strain common to the desert. Tall windows were carefully located to provide abundant natural light and views to the outdoors, especially to provide visual connect to the towering Mt San Jacinto in the distance.

4

1

5

5

1) Darkly Colored Masonry Thermal Walls 2) Solar Reflective Surfaces 3) Tall, Thermally Efficient Windows 4) Deep Overhangs & Trellises 5) Drought Tolerant Landscaping

2019 Š BakerNowicki Design Studio | 27


5

1

2

Agua Caliente Elemenrary School | Palm Springs Unified School District


WELCOMING RECEPTION 1) Secure Fencing / Campus Entry 2) Lobby 3) Attendance and Reception 4) Main Courtyard 5) Multipurpose Room

3

4

2019 © BakerNowicki Design Studio | 29



NOTES




C O L L A B O R AT I V E INTEGRATED I N N O VAT I V E SUSTAINABLE