Jianan zhang portfolio

Page 1


INDEX

2

3



2

3


PUBLIC & OPEN

A/V /V Library

Ut t Utility Multifunc tio ttion Multifunction

Adult lt Library

E ibit bitttion ti Exhibition

Classroom oom m

Daycare Cafe a

View & Space

Parking

CONCEPT:

Public & Open

Exhibition n Site- View

N

Plan

ARCHITECTURE INTERIOR LibraryR

4 Site Plan: 1/32”=1’-0”

01 01

/2

in 64 ft

Section, seriel view

EXTERIOR eading

LANDSCAPE

5


Public space covered by mobile fabric louver, allowing for air flow circulation and transparency and also provide shading when needed.

Interior Space

6

Outdoor public space in between the two buildings

Interior & Exterior

Outdoor public space in between the two buildings

Landscape & Architecture

Transparent enclosure recess from the 2nd surface, leaving void space under the roof and floor.

Void space inbetween the enclosure and the second skin.

Mobile fabric louver, with different transparency.

7


office

office office

office

Return

1st floor

Chidren

control room

Multifunction cafe -4.00 8.0

1 1/2 floor

daycare

8

9

A-A SECTIO 01 NB

08

/2

12 16

in 32 in


Pont CHARLES DE GAULLE

A

A

Quai de la RAPEE

10 la

la

11

AF

F

BV


N

Riverbank Level Plan

01

23

cm

02

.5 57

.5 m

Northeast Elevation

12

13


Program

Current: Isolation

Distribution

Activity

Gallary ry

Freeway gallary

Studio Cafe/Bar/Resturant Children space

Live-work

Live Work

Site cafe/ bar/ restaurant Live-work

cafe/ bar/ restaurant excercise recreation

Studio Riverbank-level

Insider Outsider

Cafe/Bar/Resturant Children space

Children space

Cafe/Bar/Resturant

Gallary

Live-work

Activity

Studio

Attraction:

Freeway level

Gallary

Activity

Southwest Elevation

01 01

14

23 02

03

Site Plan

cm 0m

15


Orientaion N

Maximize Sunlight on the riverbank, minimize shading area

Live-work space, facing the river, blocking the noise from the freeway

Massing

Structure

16

17


B-B SectionA

18

01

23

cm

02

46

m

-A Section

19


20

21


Traffic

Noise

Wind

Sunlight

loading/trash/recycling

lab

Pod restroom

kitchen

electrical break

Pod Pod

break

conference machenical

break

Noise

Pod

entry

Noise

Pod break

conference

Pod event/social

R

R

Angle

Exterior slot Exterior slot

Pods

Noise LESS-tolerant function: Pods & othe fuction

Exterior slot

workshop/machenical

Program

Air handling Unit Louvers outside of south facade

Outdoor, parking

Sound-proof surfaces

Noise tolerant function : utility & workshop

Boiler Chiller Air handling Unit Glazing on the north facade

22

23


stairs

stairs ramp

stairs ramp stairs

Egress is organized by two stairs on each end of the building. The pods part can go through the one on the west end, or get onto

24

25


4th Floor

3rd Floor

2nd Floor

1st Floor

pod break

26

Restroom

Event/Reception

27 Workshop

B-B Section

3/16” scale

A-A Section

3/16” scale


Insulation Stainless Steel Aluminum Louver Aluminum Frame Steel support

Insulated Low-E glass

Brushed stainless steel panel

1/2�Asphalt

1/4� grey FRP wall panel

concrete foundation

28

29


30

31


大式建筑 32

小式建筑 33


34

35


36

37


38

39


40


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.