IND 439 - Mixed Use Programming Matrix
Focus Area 1: Lobby/Waiting ~300 S.F. Building Reception (directory, resident mailboxes) Seating
Focus Area 2: Café (or work café) 800 S.F. Seating
Qty
Ind. Area in S.F 1 1
Focus Area 3: Co-Working Space ~3680 - 4060 s.f. Qty Private Offices Open Office-individual work areas (at least 20 people) Phone / Quiet Rooms (min. of 2) Relaxation Room / Mother's Room Collaborative Space (Pin up & ideation zone Large conference (seats ~14 people, with credenza/storage) Medium Conference (seats 6-8 people with credenza/storage) Office Support - Print, Copy, Mail, Work, Storage Training Room (Flexible Training space)
100 200 Total
Ind. Area in S.F
Qty
Back of House (Kitchen/Office/Storage)
Ext. Area in S.F. 100 200 300
Ext. Area in S.F.
1
550
550
1
250 Total
250 800
8 min.
Ind. Area in S.F Ext. Area in S.F. 100 - 120 800 - 960
20 min.
48
960
2
50
100
flexible
100
100
2
90 - 200
180 - 400
1
350
350
2
270
540
1 1
150 150 500 500 Approximate Total 3680 - 4060 Gender neutral restrooms will be used for Focus areas 1 through 3 - fixture calculations based on code analy
Focus Area 4: Medical Center ~2980 S.F. Receptionist
Qty
Ind. Area in S.F 1
Ext. Area in S.F. 200
200
Waiting area
1
360
360
Offices - physician consultation
3
150
450
Business Office
1
300
300
Exam rooms
9
100
900
Nurses Stations
3
80
240
Minor Surgery
1
150
150
Storage
1
80
80
Staff Lounge
1
120
120
Toilets
3
60 Total
180 2980
Focus Area 5: Wellness Center ~1000 S.F.
Qty
Meeting room(s)
Ind. Area in S.F
Ext. Area in S.F.
flexible
Counseling Offices
500
250 500 Total 1000 Restroom fixtures to be determined by code analysis with type of facility design determined by design team
Focus Area 6:Transitional Housing ~5500 S.F.
2
Qty
Ind. Area in S.F
Ext. Area in S.F.
Staff suite(single user) One bedroom apartment (single occupant or couple)
1
~400
3
~480
Two bedroom apartment (4 people)
1
~650
Common Area/ Laundry Family apartment (parent(s), 2-3 children
1 3
~480 ~750 Total
Must meet residential egress and habitable space codes. Must meet local C-2 zoning ordinance
Support (Un-assignable Miscellaneous) Restrooms (not included above)
Qty
Ind. Area in S.F Ext. Area in S.F. TBD - Code Analysis
400
~5500
Janitor /Storage Room ( 1 per floor) Freight elevator if applicable
1 1
50 80
100 80
Program Summary Total Program - Assignable S.F. Allocated Circulation (12.5%) S.F. Total - Program Summary (Assignable + Circulation) Allocated Un-assignable (12.5%) S.F. mechanical, structure, walls, public toilets, janitor closets, unassigned storage Note: Based on 75% Efficiency 75% Assignable + 12.5% Circulation Factor + 12.5% Miscellaneous Available Gross Building Area (3 floors) 19,325 S.F.
14,260 - 14,640 2415 16,665 - 17,055
2415
19,080 - 19,470
Adjacencies Remote
P| Primary
S| Secondary
R|
Primary building access 1
Primary to others
Adjacencies Remote
Access/Egress
P| Primary
S| Secondary
R|
Access/Egress
Access to back entrance for deliveries 1
Adjacencies Remote
P| Primary
S| Secondary
R|
Access/Egress
P| Primary
Basement S| Secondary
R|
Access/Egress
ysis Adjacencies Remote
Primary to waiting area, toilets
Primary to receptionist, exam rooms, toilets Remote to waiting area Remote to waiting area Primary to nurses stations, secondary to receptionist, waiting area Primary to exam rooms, storage, secondary to offices Primary to exam rooms, storage Remote to waiting area Remote to waiting area Primary to receptionist, waiting area
Adjacencies Remote
P| Primary
S| Secondary
R|
Access/Egress
Floor 2 S| Secondary
R|
Access/Egress
R|
Access/Egress
Primary to counseling offices Primary to meeting room(s) ms Adjacencies Remote
P| Primary
Primary to others Secondary to Common area Secondary to Common area Primary to others Secondary to Common area
Adjacencies Remote
primary to others
P| Primary
S| Secondary
remote
Note: Congregate Style
Views/Daylight
Users
Privacy Needs Physical | Visual | Acoustical
Daylight
FF&E Requirements/Details
Acoustical
Daylight
Physical
Views/Daylight
Users
Privacy Needs Physical | Visual | Acoustical
FF&E Requirements/Details
Users
Privacy Needs Physical | Visual | Acoustical
FF&E Requirements/Details
Daylight
Daylight
Views/Daylight
Acoustical
Daylight
Acoustical
Acoustical Acoustical
Daylight
Views/Daylight
Daylight
Users
Privacy Needs Physical | Visual | Acoustical
FF&E Requirements/Details
Daylight Physical, visual Visual Visual, acoustical
Visual, acoustical Visual
Physical, visual, acoustical
Views/Daylight
Users
Privacy Needs Physical | Visual | Acoustical
FF&E Requirements/Details
Users
Privacy Needs Physical | Visual | Acoustical
FF&E Requirements/Details
Visual privacy Daylight
Views/Daylight
Visual Acoustical daylight
Visual Acoustical
daylight
Visual Acoustical
Daylight daylight
Visual Acoustical Visual Acoustical
Views/Daylight
Users
Privacy Needs Physical | Visual | Acoustical
FF&E Requirements/Details
e Transitional housing is an option. Program to be determined by design teams