Geist Waterfront Park Master Plan

Page 1

GEIST WATERFRONT PARK 2020.02.14 – Final Concept + Phase 1 Program


VISION

20 40


VISION

20 40


VISION

20 40


G

G E

D

C O

B

N A

L

I

L

F M K

J

H

A.

Community building w/ restrooms and multi-purpose room (Phase 2)

B. C. D. E. F. G. H. I. J. K. L. M. N. O.

Beach-side playspace The Beach Fishing pier (Phase 2) Canoe/Kayak launch + storage Flex lawn Overlook Food truck/vendor parking Parking lot w/ bio-swales Bus parking Maintenance building (Phase 2) Gateway feature + fence Welcome station + kiosk Prefabricated restroom building Existing cell tower (to remain)


M

The Beach

M

L K J

H

F

J

N G

I B

E

D

P C

O

A B

A.

Community building w/ restrooms + multi-purpose room (Phase 2)

B. C.

Visitor drop-off points

D. E. F. G. H. I. J. K. L. M. N. O. P.

Beach-side playspace

Beachfront plaza w/ shaded cafĂŠ seating Sand beach Swimming area (The Cove) ADA beach access point Small picnic shelters (typ.) Retaining wall Boardwalk (Phase 2) Fishing pier (Phase 2) Canoe/Kayak launch + storage Overlook Large picnic shelter Prefabricated restroom building Existing cell tower (to remain)


B

K

C L F

A

G D

J

H E

I

A.

Waterfront nature pavilion w/ outdoor fireplace + seating areas

B. C. D. E. F. G. H. I. J. K. L.

Over-water boardwalk Pristine wetland habitats Nature playscape The Creek (bioswale) Outdoor adventure course Restroom/storage building On-street parking Drop-off area Native plantings Overlook Lakefront trail


B

D

A

G

E

H

I

F J

C

A.

Restored native prairie and woodland ecosystems

B.

Overlook w/ views to water

C.

Canoe/kayak access site

D.

Lakefront trail

E.

Pollinator wildflower garden

F.

Paved multi-use trail loops

G. Soft-surface nature trails

K

H.

Picnic shelters (typ.)

I.

Stabilized bank channel

J.

High point

K.

Screening berm (existing)


C

A B


A. Beachside Playspace

MULTI-GENERATIONAL PLAY

NATURE + WATER INSPIRED – FULLY ACCESSIBLE


A. Beachside Playspace

INCLUSIVE SWINGS + SPINNERS


A. Beachside Playspace

BEACH + SAND PLAY


B. Nature Playscape

BOULDERS + NATURAL MATERIALS

“SMALL PARTS”

IN + OVER + UNDER

SENSORY-BASED PLAY


C. Outdoor Adventure

MULTIPLE COURSES

ALL-AGES SKILLS DEVELOPMENT


Primary Trails Secondary Paths Internal Linkages Vehicular Circulation










phase 1


VISION

2

2 1

2

3

PHASING

20 40


PHASE

01

L

E D A

J

B G

F M

Q K

O

Q R

P

N

T

Q

The Beach Beach-side playspace Large picnic shelter Small picnic shelter (typ.) Canoe/Kayak launch + storage Future building location w/ stubbed out utilities

G. Large, prefabricated restroom building (CXT

C

H

I

S

A. B. C. D. E. F.

H. I. J. K. L. M. N. O. P. Q. R. S. T. U.

or similar)

ADA access to beach Large-format block retaining wall Existing cell tower (to remain) Paved parking lot w/ bioswales Overlook plaza Drop-off point Flex lawn / interim stormwater area (to be improved as part of future phase) Food truck/vendor parking Bus parking (turf) Gateway feature + fence Entrance gates Welcome station + kiosk Future location of maintenance barn/yard Temporary construction access road to Phase 2/3 areas


The Beach

CUT FILL


The Beach

S W I M M I N G

A R E A

EXISTING POND BOTTOM

B E A C H


next steps


Schedule: By Phase PHASE 3

PHASE 2

PHASE 1 $14.9 M Max

2020

2024

Open Phase 1

2037

2030

2040

Open Phase 2

Begin design of Phase 2 Begin construction of Phase 1 Permitting + mitigation Begin design of Phase 1

Begin final design of Phase 3 once all dredging is complete Construction complete for all phases


Phase 01: Schedule 2020

Select BOT Team and Owner’s Rep. (optional)

2021

2023

2022

2024

Begin construction

Begin permitting (IDEM, IDNR, IACOE) Begin design documentation Open Geist Waterfront Park Phase 1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.