David Woshinsky
AIA
LEED AP
ARCHITECTURE AND MASTER PLANNING PORTFOLIO
6F
c
D
re
s 1 2 iD e 6U nt n it i a s lD
scheme 1 - urban boulevard axonometric
6F 10 F
e
6F re si De 36 2 n ti al U n it e s
res iDe nt 139 Uni ial c ts
B
res iDen t ial B 225 Uni ts
10F
6F 6F
6F
re st
1,345 units as shown 1,900 parking spaces 1.41 sp/u
sh e t l a n d pa r k
David Woshinsky AIA LEED AP Nationality: USA Current Location: Boston, MA +1-917-710-0266 woshinsky@hotmail.com
aU ra
nt
Table of Contents
10
B -6
F
G ym
aG e
re si De 24 5 nt ia Un it l a s
14 F 10 F
am
en it
o
re st
2 i B- merc
aU r
is
12
nG ti a in ar
m
Residential 18
m
1 cia B -m e r
Gr oc
Office an t
eX
al
co
il
2
l
co
y re ta
sc
ho
F
Ga r
a
F l ia nt its De n si 8 U re 24
Mixed Use Development
l
m
er y
ne w m ari na
Retail 23
si t e p l a n r e v i e w
/
24 m a r c h 2020 7
Master Planning 24 Competitions 33 Academic 36
MIXED USE DEVELOPMENT
View of construction from southeast
2
Rendered View from East
ASBURY OCEAN CLUB
View of construction from northwest
Asbury Park, NJ USA
Program: 17-story, 500,000 SF mixed-use project with 130 residential units, a 46 unit boutique hotel, 22,000 SF of retail space on a 84,000 SF site, 3 levels of parking, an amenity deck with landscaping, pool, outdoor bar and shared amenities. Design Narrative: The site is the linchpin of the master-planned redevelopment underway in Asbury Park. The project’s natural design aesthetic is inspired by the beach-front location. Floor to ceiling glass and wrap around terraces with glass railings enhance the waterfront views. Wood, concrete and white marble interior finishes feature throughout the project. Activities: I was the project architect for the project, leading the design team from design development through construction administration as the Project Architect, leading the project’s development in Revit, performing on site construction administration, and coordinating project workflow with consultants, client and contractors.
Typical Tower Residential Plan
Rendered view of pool amenity deck
Rendered View of Kitchen/Living Room
Rendered View of Tower & Landscaped Deck
MIXED USE DEVELOPMENT
Photograph of Model Apartment
3
Rendered view of residential lobby
Screen shot of Revit Modelling
Rendered View - Front Entrance
MIXED USE DEVELOPMENT
Level 50 Roof Terrace
4
Tower North-East View
INFINITY I TOWER
Perspective Rendering - Front Facade
Level 11 Pool Deck
Miami, Florida USA
Program: 56-story, 459 residential unit tower, with 60,000 SF of office space and 5,000 SF of retail area on a 44,000 SF site, with 14 levels of parking, and amenity decks on levels 15 and 53. Design Narrative: For this tower in Miami’s high-density downtown Brickell neighborhood, the building is given a unique aesthetic through the use of creative massing, movement within the facades and color variety. There is a large diversity of unit types in the project, including lofts, flats and penthouses, and the typical floor layouts vary as the tower ascends. Office space is provided lining the garage facing the street, to enhance the building’s urban connectivity. Activities: I was involved in the construction documents, condominium documents, building permitting and construction administration phase for the project.
Typical Upper Tower Residential Plan
Tower North-West View
MIXED USE DEVELOPMENT
Tower Construction
5
Color Elevation Drawing
Construction Details Drawing
Facilities Room
MIXED USE DEVELOPMENT 6
Rendered view of project from southwest
PIER 57
Rendering of Terrace Level
New York, NY USA
Program: A redevelopment of a historic vacant pier structure on Manhattan’s west side with 520,000 gross SF in one underground level and four above ground levels. Conversion of the pier from warehouse and marine functions to a fully enclosed 200,000 SF retail market and 170,000 SF office development with a landscaped public rooftop terrace. Design Narrative: The project represents a reclamation of the abandoned pier structure, with the retail market and landscaped roof terrace providing public access to the Hudson River site, which is located near to the High Line and Chelsea Market. As a historic preservation project, the design called for the building exterior to be renovated to its original appearance, while extensive interior reprogramming, structrual MEP and energy enhancments were included. Activities: I was involved in the construction document phase, detailing exterior façade and rooftop pavilion addition.
Ground Floor Plan
Rendered View from North
Section Detail Drawing Rendering of Terrace Level
Section Detail Drawing
MIXED USE DEVELOPMENT
Longitudinal Section Drawing
7
Pavilion Seating Axon
Section Elevation Drawing
Rendering of Pavillion on Terrace Level
MIXED USE DEVELOPMENT
Residential Sky Garden
8
Residential Towers Perspective View
LOT 349 BRICKFIELDS
Design Inspiration
Kuala Lumpur, Malaysia
Program: a mixed-use development of 1,750,000 SF consisting of 3 towers between 35-40-stories (a hotel and service apartment tower, a residential tower and a SOHO tower) on top of a 5 level parking podium with 100,000 SF of retail space on 2 levels, on a 5 acre site. 3 levels of basement parking, facility decks and roof garden amenities were included. Design Narrative: an urban regeneration project , the site is adjacent to the dense urban transportation mixed-development commercial hub of KL Sentral Station and also within the low-density and vibrant residential neighborhood of Brickfields/Little India South. The project design incorporates landscape, public and semi-public open space elements with indoor/outdoor facilities spaces, and focuses on sustainability and connectivity with the urban city fabric. Activities: I was involved in the project’s Conceptual Design, site planning, schematic design and presentations to client.
Front Perspective View
Residential Sky Terrace
Retail Arcade Perspective
Natural Ventilation Diagram
Retail Perspective from Street
MIXED USE DEVELOPMENT
Hotel Pool Deck Perspective
9
Ground Floor Plan
Level One Plan
Facilities Level Plan
MIXED USE DEVELOPMENT
The project’s architectural language features an interweaving organic design aesthetic, which was based on the serai (lemongrass), commonly used in the local Malaysian cuisine.
10
Residential Tower Elevation Detail
Retail/Office Block Perspective from Street
SENTUL EAST PARCEL P
Entry Connection to Commuter Station
South-West Perspective View
Kuala Lumpur, Malaysia
Program: a mixed-use development of 1,360,000 SF on a six acre site, including 272,000 SF of office on eight levels, above 68,000 SF of retail on 2 levels. The proposal also included 2 residential towers of 30 and 34 stories with 692 total units, and 1,900 parking spaces on 2 basement levels and 4 podium levels. Design Narrative: The site planning emphasized a division between the residential towers and podium component of the within the northern portion of the site, and the commercial office and retail on the southern portion. Multiple tower orientations were studied in order to maximize tower views, tower separation and privacy for units. The proposal include a connecting entrance bridge/node which facilitates arrival from the site from the adjacent commuter rail station. Activities: I was involved in Conceptual Design, site analysis and planning, Schematic Design and client presentations.
Ground Floor Plan
MIXED USE DEVELOPMENT
Retail Atrium Perspective View
Entry Connection Node to Commuter Station
11
Facilities Level Plan
Typical Tower Plan
Podium Elevation Studies
© Copyright Arrowstreet Inc.
Rendered View - Southwest Corner
1
_____________________
S2.00
ELEV. HOIST BEAM TBD BASED ON COORDINATION w/ ELEV. MANUFACTURER
2
3D VIEW
3
L
J
T REE S ST RLE CHA FLOOR PLAN - LEVEL 1
1/16" = 1'-0"
1.5
11 3/4 x 32 1/2
11 3/4 x 32 1/2
UP
RETAIL TENANT 10294 SF
11 3/4 x 29
VEST.
27' - 6"
RESTAURANT 2552 SF
02
K
H
G
CORRIDOR ELECTRICAL
ELEV. ELEV.
SERV. ELEV.
CORRIDOR B
LOADING / RECEIVING
TRANSFORMER
F
E
CAFE
VEST.
MECHANICAL GARAGE
D
C
B
A
10/7/2019 11:14:11 AM
05 21' - 0" 21' - 0"
03
FITNESS CENTER
22' - 6"
01
C
22' - 6"
ROOF ANCHOR AS OCCURS, COORD. LOCATIONS w/ ARCH. SEE DETAIL 6/S5.01
STAIR
22' - 6"
26' - 8"
04
BIKE STORAGE
22' - 6"
22' - 6"
22' - 6"
15' - 0"
MIDDLESEX STREET 32'
Ground Floor Plan
RD 07 O C tO b e r 201 9
11 C h a r l e s s t r e e t, m a l d e n , m a
5
11 CHARLES STREET 11 CHARLES STREET, MALDEN MA // 18042
Level 1 // 10/07/19 // Author
#4 CONT. ADD'L REBAR, SEE DETAIL (TYP.)
4
1
_____________________
S2.00
ELEV. HOIST ON COOR MANUFAC
1
_____________________
S5.01
.
16'
TY P.
8'
arrowstreet
6' - 6"
0
5
___________
- 6"
Activities: I was involved in completing the construction documents, exterior façade research and detailing, coordination with consultants and owner.
6
22' - 6"
Design Narrative: The project was planned to be the first mass timber office building in Massachusetts, using glulam columns and beams, and CLT floors. High levels of sustainability were targeted through embodied carbon reduction (wood structure, terra cotta rainscreen cladding), optimized window/wall ratio and MEP systems. Full height floor to ceiling windows allow natural light in to the tenant spaces, and terraces provide tenant access to outdoor spaces.
19' - 0"
Program: A 4-story, 86,000 SF new construction office building with retail, lobby and amenity spaces at ground level, developed using Revit BIM technology, on a 1.1 acre site.
15' - 0"
16' - 6"
Malden, Massachusetts USA
© Copyright Arrowstreet Inc.
Revit Structure 3D View A B
21 CHARLES ST.
PEN
SCALE: 1/8
N.T.S.
15' - 6"
12
Rendered View - West Entry
SI M
OFFICE
M1 BELO
S4.
8 3/8"
CROSS LAMINATED TIMBER PANEL 06 17 19.02
CROSS LAMINATED TIMBER PANEL 06 17 19.02 06 17 19.02
06 18 00.10
9
CROSS LAMINATED TIMBER PANEL
GLUED LAMINATED WOOD BEAM
SECTION DETAIL - L2 WEST BALCONY SF SILL
6
1 1/2" = 1'-0"
SECTION DETAIL - STOREFRONT SILL AT L3 NORTH TERRACE
3
1 1/2" = 1'-0"
05 73 00.12
WOVEN WIRE MESH INFILL PANEL
05 73 00.05
ALUMINUM CHANNEL
SECTION DETAIL - TERRACOTTA AT L4 TER 1 1/2" = 1'-0"
07 54 00.76
07 42 00.21
ALUM EXTRUSION TRIM WITH CLEATED ATTACHMENT
METAL COMPOSITE MATERIAL PANEL
07 42 00.12
METAL PANEL SUPPORT FRAMING
05 73 00.07
ALUMINUM BASE PLATE
07 42 00.02
METAL COMPOSITE MATERIAL PANEL REVEAL
10"
07 54 00.01
05 40 00.02
07 42 40.02
TERRA COTTA RAINSCREEN VERTICAL TRACK
07 42 40.11
TERRA COTTA RAINSCREEN HORIZONTAL GIRT
07 42 40.14
LEVEL 2 18' - 0"
07 42 00.01
8 3/8"
TPO MEMBRANE ROOFING
CONCRETE ROOF PAVER
LAP TPO ROOFING OVER AVB
MEMBRANE UNDERLAYMENT BOARD 07 54 00.15 TAPERED INSULATION - EXTRUDED POLYSTYRENE 07 54 00.08
07 55 00.02
2"
ROOF DRAIN 22 10 00.05
2"
06 16 00.02
COLD-FORMED METAL STUDS
TERRA COTTA RAINSCREEN TILE
2"
6" 2"
FILTER FABRIC SHEET
GLASS-MAT GYPSUM SHEATHING
MINERAL WOOL BLANKET INSULATION 07 21 00.23
BEYOND
MINERAL WOOL BOARD INSULATION
07 21 00.11
ALUM SILL FLASHING W/ CLEATED ATTACHMENT
08 44 10.21
GLASS-MAT GYPSUM SHEATHING
06 16 00.02
METAL COMPOSITE MATERIAL PANEL 07 42 00.01
07 42 00.01
METAL COMPOSITE MATERIAL PANEL
06 17 19.01
CROSS LAMINATED TIMBER FLOOR ASSEMBLY
07 21 00.11
MINERAL WOOL BOARD INSULATION
07 27 00.02
AIR-VAPOR BARRIER
06 16 00.02
GLASS-MAT GYPSUM SHEATHING
05 40 00.02
COLD-FORMED METAL STUDS
07 21 00.23
MINERAL WOOL BLANKET INSULATION
08 44 10.24
ALUMINUM HEAD TRIM
08 44 10.08
SILICONE SHEET MEMBRANE FLASHING INSERTED IN CW POCKET
08 44 10.02
ALUMINUM CURTAIN WALL HEAD
08 80 00.10
INSULATING GLASS
ALUM. Z-GIRT
METAL COMPOSITE MATERIAL PANEL REVEAL 07 42 00.02
© Copyright Arrowstreet Inc.
CROSS LAMINATED TIMBER FLOOR ASSEMBLY 06 17 19.01
ROLLER SHADE - MANUAL 12 24 00.02
5
1
METAL COMPOSITE MATERIAL PANEL 07 42 00.01
MINERAL WOOL BLANKET INSULATION 07 21 00.23
OVERHEAD COILING DOOR HOUSING
08 33 10.30
GALVANIZED STEEL TUBE
05 12 00.75
STEEL BENT PLATE CLIENT:
05 50 00.03
14' - 2" GLUED LAMINATED WOOD COLUMN 06 18 00.01 BEYOND OVERHEAD COILING DOOR 08 33 10.01
SECTION DETAIL - L2 WEST BALCONY EDGE
SECTION DETAIL - LOA
2
1 1/2" = 1'-0"
1 1/2" = 1'-0"
Section Detail 07 42 40.02
TERRA COTTA RAINSCREEN TILE
07 42 40.11
TERRA COTTA RAINSCREEN VERTICAL TRACK
07 42 40.14
TERRA COTTA RAINSCREEN HORIZONTAL GIRT
08 44 10.21
LEVELW/3 CLEATED ATTACHMENT ALUM SILL FLASHING 31' - 6"
07 42 00.01
METAL COMPOSITE MATERIAL PANEL
07 42 00.12
METAL PANEL SUPPORT FRAMING
CONCRETE TOPPING SLAB 03 30 00.05 ACOUSTIC MAT 06 16 26.01
06 17 19.01
3/4" 3"
ARCHITECT:
8 3/8"
CROSS LAMINATED TIMBER FLOOR ASSEMBLY
© Copyright Arrowstreet Inc.
09 21 10.50 GYPSUM WALLBOARD - 5/8" TYPE "X" AT UNDERSIDE OF CLT SLAB 21 10 00.03
06 16 00.02
3"
07 21 00.11
MINERAL WOOL BOARD INSULATION
07 42 00.01
METAL COMPOSITE MATERIAL PANEL
1" 2"
AIR-VAPOR BARRIER
08 90 50.04
COLD-FORMED METAL STUDS
FLASHING BELOW
08 41 10.02
ALUMINUM STOREFRONT HEADER
12 24 00.02
ROLLER SHADE - MANUAL
06 18 00.01
GLUED LAMINATED WOOD COLUMN BEYOND
08 80 00.10
INSULATING GLASS
05 40 00.02
07 42 40.02
CONSULTANTS: 07 42 40.11
TERRA COTTA RAINSCREEN VERTICAL TRACK TERRA COTTA RAINSCREEN HORIZONTAL GIRT
07 42 40.14
MINERAL WOOL BOARD INSULATION
07 21 00.11
1/4" ALUMINUM ANGLE OUTRIGGER
DOWNLIGHT LT15, SEE ELEC DWGS
BIRD MOUTH MOUNTING BRACKET
TERRA COTTA RAINSCREEN CLIP W/SILICONE ISOLATOR 07 42 40.12 ALUM SILL FLASHING W/ CLEATED ATTACHMENT
08 44 10.21
METAL PANEL SUPPORT FRAMING
07 42 00.12
2"
1' - 5"
08 90 50.03
06 16 00.02
COLD-FORMED METAL STUDS
TERRA COTTA RAINSCREEN TILE
COLD-FORMED METAL STUDS
1' - 6"
OF ALUMINUM SILL 08 41EDGE 10.20 ALUMINUM BRAKE METAL CLOSURE 0.125"
2"
05 40 00.02
GLASS-MAT GYPSUM SHEATHING
MINERAL WOOL BLANKET INSULATION 07 21 00.23
SECTION DETAIL - SF HEADER AT METAL SOFFIT - WEST
08 90 50.02
1 1/2" = 1'-0"
SECTION DETAIL - L2 W
1
METAL COMPOSITE MATERIAL PANEL 07 42 00.01
VERTICAL PERFORATED ALUMINUM BLADE
8 1/8"
05 40 00.02
4
METAL COMPOSITE MATERIAL PANEL
07 27 00.02
3"
07 42 00.01
Rendered View - Typical Office Floor
SPRINKLER HEAD - PENDANT
GLASS-MAT GYPSUM SHEATHING
1 1/2" = 1'-0"
AIR-VAPOR BARRIER 07 27 00.02 SILICONE TAPE
07 27 00.11
PROJECT INFORMATION:
3
1 1/2" = 1'-0"
08 44 10.24
SILICONE SHEET MEMBRANE FLASHING
08 44 10.08
2"
21 CHARLE STREET
PLAN DETAIL - VERTICAL FIN AT SLAB EDGE
ALUMINUM HEAD TRIM
INSERTED INTO CURTAIN WALL POCKET
Plan Detail
ALUMINUM CURTAIN WALL HEAD 08 44 10.02 ROLLER SHADE - MANUAL
12 24 00.02
INSULATING GLASS
08 80 00.10
OFFICE
TERRA COTTA RAINSCREEN SYSTEM
07 42 40.01
BEYOND
MALDEN, MA
ISSUANCE:
2
07 28 00.01
SILICONE SHEET MEMBRANE FLASHING
STEEL TUBE
05 12 00.75
SPRAYED FIREPROOFING
07 81 00.01
07 42 40.14
TERRA COTTA RAINSCREEN HORIZONTAL GIRT
07 42 40.11
TERRA COTTA RAINSCREEN VERTICAL TRACK
08 44 10.21
ALUM SILL FLASHING W/ CLEATED ATTACHMENT
MINERAL WOOL BLANKET INSULATION 07 21 00.23
07 42 40.21
INSULATING GLASS
08 80 00.10
ALUMINUM CURTAIN WALL SILL
08 44 10.03
13 STAMP:
07 42 00.01
METAL COMPOSITE MATERIAL PANEL
06 17 19.01
CROSS LAMINATED TIMBER FLOOR ASSEMBLY
07 42 00.12
METAL PANEL SUPPORT FRAMING
LEVEL 4 45' - 0"
BEYOND
08 44 10.21
SILICONE SHEET MEMBRANE FLASHING 08 44 10.08 INSERTED INTO CURTAIN WALL POCKET CONCRETE TOPPING SLAB
03 30 00.05
ACOUSTIC MAT
06 16 26.01
METAL COMPOSITE MATERIAL PANEL 07 42 00.01 CROSS LAMINATED TIMBER FLOOR ASSEMBLY
06 17 19.01
METAL PANEL SUPPORT FRAMING
07 42 00.12
ALUMINUM HEAD TRIM
08 44 10.24
GLASS-MAT GYPSUM SHEATHING
06 16 00.02
COLD-FORMED METAL STUDS
05 40 00.02
ALUMINUM POST
2"
2"
METAL COMPOSITE MATERIAL PANEL 07 42 00.01
8 3/8"
2"
3 3/4"
COLD-FORMED METAL HAT CHANNEL 05 40 00.04
FORMED ALUMINUM CLOSURE. COLOR TO MATCH CURTAIN WALL.
ALUM SILL FLASHING W/ CLEATED ATTACHMENT
10"
08 44 10.08
06 10 00.21
ACOUSTIC MAT 06 16 26.01
CONSTRUCT DOCUMENT
TERRA COTTA RAINSCREEN TILE 2" 1 3/4" REFER TO ELEVATIONS FOR PANEL SIZING
07 42 40.02
1 3/4" 2"
05 40 00.01
WOOD BLOCKING LIQUID APPLIED INSULATIVE COATING
6"
2"
06 16 00.02
COLD-FORMED METAL FRAMING
ALUMINUM CURTAIN WALL JAMB
1 3/4" 2"
3"
6" GLASS-MAT GYPSUM SHEATHING
08 44 10.07
3/4"
07 27 00.02
7 1/2"
07 92 00.04
05 50 00.09
2"
CONCRETE TOPPING SLAB 03 30 00.05
JOINT SEALANT AIR-VAPOR BARRIER
STEEL CLIP ANGLE
2" 1 3/4"
COLUMN VENEER PANELW/EXTERIOR COATING FINISH TO MATCH STRUCTURAL GLULAM COLUMNS
3" = 1'-0"
TERRA COTTA RAINSCREEN CLIP W/SILICONE ISOLATOR
8 1/8"
07 42 40.12
08 80 00.10
SECTION DETAIL - TYP SLAB EDGE AT WIN
1' - 1 1/2"
8 1/8"
INSULATING GLASS
3"
08 41 10.07
1' - 5 1/2"
3"
ALUMINUM STOREFRONT JAMB
05 73 00.06
WOVEN WIRE MESH INFILL PANEL 05 73 00.12 CONCRETE ROOF PAVER 07 55 00.02 BELOW ALUM EXTRUSION TRIM WITH CLEATED ATTACHMENT BELOW
5
07 42 00.21
7 5/8"
8"
08 44 10.24
ALUMINUM HEAD TRIM
07 21 00.11
MINERAL WOOL BOARD INSULATION
07 27 00.02
AIR-VAPOR BARRIER
06 16 00.02
PLAN DETAIL - L2 WEST BALCONY CORNER
2
1 1/2" = 1'-0"
MINERAL WOOL BLANKET INSULATION 07 21 00.23
GLASS-MAT GYPSUM SHEATHING
PLAN DETAIL - EXTERIOR COLUMN CLADDING 05 40 00.02
1 1/2" = 1'-0"
07 21 00.23
06 18 00.10
REVISIONS: TERRA COTTA RAINSCREEN TILE
07 42 40.02
TERRA COTTA RAINSCREEN VERTICAL TRACK
07 42 40.11
No.
Date
TERRA COTTA RAINSCREEN CLIP W/SILICONE ISOLATOR 07 42 40.12
COLD-FORMED METAL STUDS MINERAL WOOL BLANKET INSULATION
MINERAL WOOL BOARD INSULATION
07 21 00.11
AIR-VAPOR BARRIER
07 27 00.02
TERRA COTTA RAINSCREEN HORIZONTAL GIRT
07 42 40.14
Descript
GLUED LAMINATED WOOD BEAM BEYOND
5"
A 3
SECTION DETAIL - TYP SLAB EDGE AT MTL-TERRA COTTA 3" = 1'-0"
Section Detail
Rendered View - Ground Floor Lobby
1
SECTION DETAIL - TYP. SLAB EDGE AT WIN 3" = 1'-0"
L
07 27 00.02
AIR-VAPOR BARRIER
PROJECT NORTH
OFFICE
Side Elevation View
14
Front Facade View
SUSQUEHANA FINANCIAL CENTER
Hagerstown, MD USA
Program: 3-story, 55,000 square foot speculative office building, developed using Revit BIM technology, designed to LEED silver standards for core and shell buildings, on a 3.95 acre site. Design Narrative: A glass curtain wall extends around the entire perimiter of the building allowing natural light to enter into all office spaces through full floor to ceiling double-glazed low-emission windows. However, the monotony of a corporate glass box office building is avoided through the use of angular building footprint and variety in the glazing colors, window sizing, and patterning of horizontal and vertical mullion caps. Activities: I was involved in the design development, construction documents drawings, permitting phase, and in the coordination of engineering consultants for the project.
Front Entrance Detail
Triple Height Atrium
LEED Project Checklist
Project Construction
OFFICE
Elevation Detail
15
Front Perspective View
Revit Screen Shot
Front Persepective View
OFFICE
Interior Atrium View
16
Front Perspective View
AIRASIA CORPORATE HEADQUARTERS
Level 9 Office View
Kuala Lumpur, Malaysia
Program: an RM180 million ($60 million USD) new construction office building for AirAsia, the largest low cost airline in Asia, to be located at the new Low Cost Terminal in Kuala Lumpur. 7-story office tower with approximately 450,000 SF of net area above 3 podium parking levels with approximately 1,900 parking spaces, and employee amenities level. Design Narrative: The innovative design for this new corporate headquarters project is conceived from the inside out. A series of horizontal and vertical atriums create a central connective spine which serves as a focal point for the large open office plan floorplates. The atrium lower level serves as the corporate “living room� with food outlets and lounge areas. Activities: I was involved in the development of Conceptual Design, project coordination, preparation of submittal drawings and presentations to client and authorities.
Cross Section
Rear Perspective View Level 4 Food Court Plan
OFFICE
Entrance Lobby Perspective
17
Atrium Concept Development
Level 6 Office Plan
Level 8 Office Plan
RESIDENTIAL
Front Night Perspective View
18
Front Perspective View
Street View from Northwest
33 BOND ST.
Amenity Deck and Tower View Looking West
Street View from Southwest
Brooklyn, NY USA
Program: A 25-story, 730,000 SF urban residential rental project with 714 units and 65,000 SF of ground level retail in downtown Brooklyn. Amenities include gym, deck, children’s play room and lounge. Design Narrative: The building’s massing is broken into four interlocking distinct components. Two of the volumes start at the ground; one is made of strong vertical brick piers, separated by infills of metal and glass. The second volume invokes a more modern, industrial vocabulary, with a clean white grid and infilled with metal and glass elements. Two additional volumes above include a box broken up by vertical brick piers and a window wall system framed in a white brick box. Activities: I was involved in developing construction documents, with particular focus on exterior facade detailing of window wall, composite panels and precast/brick cladding.
Typical Residential Floor Plan
Street View from Southeast
RESIDENTIAL
Elevation/Wall Section Detail Drawings
19
Residential Entrance Canopy
Residential Lobby
Residential Lounge
RESIDENTIAL
Front Night Perspective View
20
Front Perspective View
Front Elevation
UNIKA RESIDENCES
Miami, FL USA
Program: 15-story, 124-unit residential tower on an 80,000 SF site, including the renovation of an existing office building, and the provision for amenity deck with swimming pool and amenities. Design Narrative: The major design challenge of this project was to design this new condominium tower around an existing two-story office building to remain and be renovated on the site. This led to the L-shaped design of the tower, with garage levels included on lower floors, and an open 5-story height atrium space above a dropoff space on the west side of the project. The building’s contemporary design is highlighted by its varied massing, framing and color pallette. Activities: I was involved in the coordination of the project with consultants, the generation of construction documents, and the permitting process.
Level 8 Facilities Plan
RESIDENTIAL
Level 3 Terrace
21
Level 3 Plan
BRICKELL TOWNHOUSES
Level 1 Living Room View
Miami, FL USA
Program: 8 luxury 3-story, townhouses with rooftop terraces and private garage parking below. Design Narrative: The units in this luxury residential project are custom-designed with world class amenities. Each individual 3 bedroom, 3.5 bath unit has a “skyline” room on the third floor with access to a front terrace and rear terrace containing a summer kitchen and whirlpool spa. This private upper level maximizes Miami’s tropical climate to create a true inside/outside living experience. The eight units are accentuated in the facade trough a series of architectural frames. Activities: I was involved in the construction documents, presentation drawings, permitting phase and public hearing process for the project. Cross Section
RESIDENTIAL
Type C Villa Perspective View
22
Type A Villa Perspective View
YAS ISLAND VILLAS
Abu Dhabi, UAE
Program: 3 villa typologies for the residential portion of the Yas Island development; villa areas were 350 m2, 400 m2 and 450 m2. Design Narrative: These villa typologies were influenced by the traditional Arab residential villas, but re-interpreted with a contermporary architectural flavor. The traditional wind towers found in historic residences in the Emirates were referenced in the building massing, and courtyards were incorporated into the plans. These luxury villas include modern amenities, 3-car garages, maid’s quarters and incorporate sustainable design features. Activities: I was involved in design and preparation of plans in AutoCAD and Adobe Photoshop, sheet layouts, graphic presentations and overall area calculations.
Type A Villa Floor Plans
RETAIL
Front Perspective View
23
Side Perspective View
Front Elevation Cross Section
BRICKELL PLAZA
Miami, FL USA
Program: 2 levels of boutique retail / F&B development a central atrium, with 40,000 SF of retail space and 2 levels of parking above, providing 112 parking spaces. Design Narrative: The design team conceived of a “destination retail” development project with a contemporary and artistic design aesthetic. An LED video screen is featured above the main entrance leading into the central atrium, and the upper two parking levels are hidden from view behind a mosaic art wall, and a screen system with different colors of glass in the foreground. The indoor/outdoor dining concept was integrated with deep terrace spaces at both levels. Activities: I was involved in the project’s site analysis, schematic design, layouts and presentation drawings, for the city’s public approval process for the project.
Level 1 & 2 Plans
6f
re
lb t ia e n it s s id u n r e 393
16f
a
14f 12f
li o
gy m
re si
de 33 9 nt ia l a un it s
14f
10f Pa vi
ga r
ag e
n il re ta
ur an
en
h sc
o
o
l re st
2 ia b- erc co
10f
re sta
e
al ti ts i n d si 8 u re 24
14 f
12f re ta
6F
b -6
b
m
g t in a in e ar m
l
B
B -6
F
Ga r
10F
a
aG e
re si De 24 5 nt ia Un it l a s
14 F 10 F
am
l
m
re st
aU ra
F l ia nt its De n si 8 U re 24
Gy m
6F en it
re ta
h sc
o
o
l re st
2 ia B- erc co
m
aU r
an t
eX
l
co
il
Gr oc
is
G t in a in ar
m
m
1 cia B -m e r
y
nt
er y
waterfront park site seCtion 1,345 units as shown
l
m
er y
ne w m ari na
1,900 parking spaces 1.41 sp/u
1,518 units as shown 2,187 parking spaces
Site Plan Option 1 Axonometric
sh e t l a n d pa r k
si t e p l a n r e v i e w
waterfront park illustrative site plan & areas
evard & areas
res iDen t ial B 225 Uni ts
6F
1 cia b -m e r
10
6F
6F
m
co
gr oc
an t
e
re si De 36 2 nt ia Un it l e s
res iDe nt 139 Uni ial c ts
X is
il
t
au r
c
6F 10 F
F
6f lc t ia s en s id u n it 2 37
D
re
c
16f
14f
e
d l ia nt its de n si 5 u r e 16
d
scheme 1 - urban boulevard axonometric
s 1 2 iD e 6U nt n it ia s lD
waterfront park axonometric
/
1 4 o c to b e r 2 02 0
s h e t l a n d pa r k
Site Plan Option 2 Axonometric site plan review
/
24 m a r c h 2020 7
PARKING SPACES
C BUILDING-D BUILDING-E BUILDING-F TOTAL 0 115 338 171 1,088
0
79
79
75
47
75 45
0
194
464
366
1,900
9
79,420
189,935
149,911
771,849
7
13,054
23,735
3,754
8
23,174
23,735
3,754
8
23,174
41,119
3,754
8
23,174
41,119
21,555
8
23,174
41,119
21,555
5
19,754
41,119
21,555
37,628
21,555
37,628
21,555
37,628
21,555
37,628
21,555
5/2 70’ ht 829 Units
MASTER PLANNING
10 Floors 120’ ht 1,259 Units
21,555
14 Floors 160’ ht 1,345 Units
21,555 21,555 21,555 125,504 126 1.55
248,367
1,345,396
362
248
1,345
1.28
1.47
362,458
- URBAN BOULEVARD
GS:
USE
Office/Retail Office/Retail Grocery / Restaurants
Parking Academic (Existing Gym) cademic (Salem Academy) Academic (Replaces B-3)
ARKING SPACES PER 1,000 SF
GS:
Residential (1,345 Units)
e Xist ing gar age
resiDent ial BUilDinG a
resident ial building a
1.41
270 78 755 29 61
1,193 1.66
Parking
1,900
3,093 1.50
l a n d pa r k
e Xist inG Gar aGe
resi den tial buil ding b
PARKING
ARKING SPACES PER 1,000 SF
T:
resident ial building e
resiDent ial BUilDinG F
24
BUILDING resiDent ial BUilDinG e
resiDent ial BUILDING PROGRAM FOR SCHEME 2 - WATERFRONT BUILDING PROGRAM FOR SCHEME PARK 2 - WATERFRONT PARK
B-1 B-2 B-4 (Partial) U/G Parking Garage B-5 Gym B-6 nti al res iDeNew DSchool G BUi lDin
HABITABLE SPACE
Residential Buildings A,B,C,D,E
BUilDinG B
FOOTPRINT LEVELS FOOTPRINT GSF USE PARKING BUILDING LEVELS GSF USE COMMERCIAL BUILDINGS: COMMERCIAL BUILDINGS: 42,570 B-1 5 214,065 Office/Retail 42,570 5 214,065 Office/Retail 270 104,477 B-2 4 414,864 Office/Retail 104,477 4 414,864 Office/Retail 30,000 30,000 / Restaurants Grocery / Restaurants B-4 (Partial)1 30,000 1 Grocery 30,000 37,648 Parking 92 U/G Parking1 1 37,648 Parking 52,060Garage 3 en tia l52,060 156,219 Parking 755 3 156,219 Parking re siD 11,452 1 inG c11,452 11,452 (Existing Gym) 29 B-5 Gym 1 Academic 11,452 Academic (Existing Gym) BU ilD 4,775 B-6 3 13,224 (Salem Academy) 61 Academy) 4,775 3Academic 13,224 Academic (Salem 20,000 37,060 (Replaces B-3) New School2 20,000 37,060 Academic (Replaces B-3) 2 Academic 265,334 914,532 1,207 265,334 914,532 PARKING720,665 SPACES PER 1,000 SF 720,665 1.67PER 1,000 SF PARKING SPACES HABITABLE SPACE RESIDENTIAL BUILDINGS: RESIDENTIAL BUILDINGS: Residential Varies A,B,C,D,E Varies Buildings
1,518,311 Varies
PARKING re si de bu il nt ia di ng l c
270
e Xisting building 4 outline
92 755 29 61 resident ial building d
1,207 1.67
Site Section Diagram
(1,518 Units) VariesResidential 1,518,311 Residential (1,518 Units)
Residential Parking 887,090 Parking 2,187 Residential Parking 887,090 Parking TOTAL DEVELOPMENT:TOTAL DEVELOPMENT: 3,319,933 3,394 3,319,933 PARKING SPACES PER 1,000 SF PARKING SPACES HABITABLE SPACE 2,238,976 1.52PER 1,000 SF HABITABLE SPACE 2,238,976 * - Existing buildings to *remain - Existing buildings to remain
s h e t l a n d pa r k
si t e p l a n r e v i e w
/
24 m a r c h 20 20 6
2,187
s h e t l a n d pa r k
3,394 1.52
si t e p l a n r e v i e w
/
14 o c to b e r 2020
Master Plan Site Layout Options
SHETLAND PARK MASTER PLAN
site plan review
/
14 o c to b e r 2020
Salem, Massachusetts USA
Program: Master vision plan for redevelopment of 30-acre waterfront industrial site, currently utilized for storage, office and light industrial uses. Design Narrative: Concept plans introduced a road network into the site, selective preservation of the existing industrial, academic and office buildings, and addition of approximately 1,300 residential units, 30,000 SF of retail space, and several acres of waterfront open space. Schemes were developed to generate different options for street grids, parcel sizes and proposed building massings. Activities: I worked with the project and consultant team to develop alternative options for long-term strategies for transformation of the site into a vibrant mixed-use neighborhood, and studied redesign schemes for the existing buildings.
Conversion Study for Existing Mill Building
Salem, Massachusetts
plaza between building 1 and 2 ConCeptual vieW
e xisting condition Image capture: Sep 2018
© 2020 Google
Google Street View
Rendered View - Plaza and Site Improvements
s h e t l a n d pa r k
site plan review
/
1 4 o c to b e r 2 0 2 0
placeMaKing EAST-WEST ROADS THROUGH SITE CONNECTING CITY TO WATERFRONT
additional Marina slips
Rendered View - Streetscape
MASTER PLANNING
looKout decK
widen lynch st
a aRRhus haRboR
sh e t l a n d pa r k
gaLLeRy Deck sanTa baRbaR a waTeRfRonT
Axonometric View - Site Improvements si t e p l a n r e v i e w
/
24 M a r c h 2020 30
25
Rendered view - Residential Plaza
Rendered View - Waterfront Park
MASTER PLANNING 26
Perspective Rendering of Kuala Terengganu City Centre
KUALA TERRENGGANU CITY CENTRE
Land Use Plan
Kuala Terrengganu, Malaysia
Program: Master Plan for the City Centre of Kuala Terengganu, Malaysia. The Master Plan included the development of regional growth patterns for an area of 8,000 hectares encircling the center of the city, and proposals for city-wide initiatives in areas such as planning, transportation and environmental conservation. The project also involved the creation of a master plan layout and Urban Design Guidelines for 180 acres of newly reclaimed land in the City Centre. Design Narrative: The project involved master planning on an overall macro scale down to the detail level of urban design guidelines for the reclaimed land areas, with a multi-disciplinary approach to generate the vision for the project. Activities: I directed the project sub-consultants, including Business, Engineering, Tourism, Property, Transportation and others to ensure project deliverables were completed on time and were consistent with overall project vision.
Sample Plot Development Control Regulations
Tower Placement and Views Diagram
Rendered Illustratitive Site Plan
Perspective rendering of Kuala Terengganu City Centre
MASTER PLANNING
Roads and Open Space Network
Rendered Illustratitive Site Plan
27
Street Frontage Diagrams
Typical Street Section Diagrams
MASTER PLANNING
Transportation Hub Dropoff Conceptual View
28
Waterfront Retail Conceptual Perspective View
PENANG SENTRAL MASTER PLAN
Bus Waiting Area Perspective View
Penang, Malaysia
Program: Masterplan for an integrated multimodal transportation hub and commercial project, including 6,000,000 square feet of development on a 24-acre site. Project includes transportation terminal incorporating, rail, ferry and bus services, a 450,000 square feet retail shopping complex, a hotel tower, two office towers, and four residential towers. Design Narrative: The master plan proposal was highlighted by the idea of an elevated linear waterfront park as a unifying factor and amenity for the multiple uses within the development. This terraced park counteracts the site’s adjacent industrial uses and rests on top of a podium which contains parking, bus, rail, ferry and other infrastructure and utilities. Activities: I was involved in development of Conceptual Design, project coordination, preparation of submittal drawings and presentations to client and authorities.
Ground Floor Plan
Exterior “Green Ramp” Concept
Retail Mall Atrium Perspective View
MASTER PLANNING
Front Plaza and Retail Mall Conceptual View
29
Site Master Plan
Conceptual View of Waterfront
MASTER PLANNING
Conceptual Master Plan Diagrams
30
Street Section Diagrams
City of Miami New Development Perspective View
CITY PLANNING DEPARTMENT
Miami, FL USA
Description and Activities: As a Land Development Technician, I assisted in the design review of new large-scale development proposals within the City of Miami. Our department produced graphic illustrations and written anlalyses of projects applying for development approval, and we met with developers and architects to clarify code requirements and design guidelines. We also produced written material and renderings illustrating developments consistent with good planning principles. There was a large development boom during my tenure at the City, and we were able to enforce positive urban design concepts into many of the large-scale development projects. Principles of New Urbanism were applied, including requiring buildings to line garage and service functions with active habitable space, and create a projectw with appropriate scale and massing for the site.
Neighborhood Revitalization Plans
MASTER PLANNING 31
Waterfront Frontage Regulations Diagram
Master Plan Axonometric Diagram
JUMERIAH LAKE TOWERS EXTENSION
Dubai, UAE
Program: Development of Design Control Regulations for a master plan for 6 parcels of land totaling approximately 31,182 m2, which were part of a master development in Dubai, UAE. Design Narrative: The intention of the plan was to regulate the massing and location of the towers and building podiums in order to create an urban harmony among the buildings, while allowing the towers to have a freedom in their forms. The code required the buildings to have 3 levels of basement parking, 3 levels of podium parking and 44 levels maximum for towers, with mandatory ground level retail and a minimum 7 m promenade mandated on the lake side. Activties: I was involved in the site planning process, preparation of project graphic images and the drafting of the Design Control Regulations document.
Approval Process Diagram
MASTER PLANNING
Public Transportation Diagram Study
32
Conceputal Massing Under Proposed Zoning Code
BRICKELL ZONING STUDY
Miami, FL USA
Description: For this planning exercise, our team conducted an analysis for property owners in the West Brickell neighborhood in downtown Miami to determine the effect of a new city zoning code on their development rights. Through this analysis, we created conceptual development schemes for several sites in the West Brickell area and worked with a team of consultants to review the financial, planning, transportation and legal aspects of the proposed regulatory changes. We presented our findings at a series of public hearings with City Boards which were reviewing the proposed updated zoning ordinance as it went through the adoption process. Activities: I was involved in the analysis of the existing and proposed zoning codes, the generation of graphic models in CAD and Photoshop, creating the presentation materials, and coordinating the consultant team involved in the study.
Individual Lot Massing Studies
COMPETITIONS 33
Campus Verandah and Plaza
Amphitheater and Campus Green
View of Academic Block Atrium
Night view of campus from lake
Main Entrance and Reception
Scale Model
CITY CAMPUS DEVELOPMENT
Putrajaya, Malaysia
Program: Competition entry for an urban university campus on a 6 acre site, to include aproximately 300,000 SF of space for university functions, including classrooms, administrative functions, library, auditorium and student centre, as well as an office building component with an additional 220,000 SF of gross floor area. Design Narrative: Concepts of openness and sustainability drove the design of the project. The academic block massing is broken up to allow natural ventilation and light to permeate through to the interior open atrium, and the large overhanging roof of the central academic block creates a shaded area for student activities as well as protecting the glass facade from solar hear gain. An accsessible green roof serves as an additional amenity and sustainable featue of the proposal. Activities: I was involved in site planning and analysis, floor plan layouts and preparation of presentation materials.
Site Plan - Ground Level
Marina Towers Perspective View
Site Cross Section
COMPETITIONS
Overall Site Perspective View
34
Beach Towers Perspective View
Site Plan
DUBAI PROMENADE TOWERS
Beach Towers Perspective View
Dubai, UAE
Program: Invited competition for 6 luxury residential towers on a new development site in Dubai. There were two tower types, a 40-floor beach tower and a 44-floor marina tower. Our design was the runner-up entry in the competition. Design Narrative: The project aimed to break up the massing of the towers through the insertion of elements such as frames and screens throughout the towers. These elements also contributed to the sustainable features of the towers, as the screening assisted with shading of the tower glazing, and the frames contained landscaped planters spaced throughout the towers. Green roofs were also proposed at the tops of the towers. Activties: I was involved in the preparation of drawings, floor plans, sheet layouts, graphic exhibits and analysis of the project’s sustainability issues. Beach Tower Typical Plan
Marina Tower Typical Plan
COMPETITIONS
Lobby Atrium Perspective View
35
Front Perspective V iew
MIXED-USE DEVELOPMENT
Ground Floor Plan
Amman, Jordan
Program: Scheme for a development company in the Middle East, comprising two 11-story towers on a 16,000 m2 site, with retail, restaurants and a banquet hall on the ground floor. The hotel tower contains 190-keys, and the office tower holds 17,000 m2 of office space. Design Narrative: The concept for this signature destination development was to develop distinct architectural appearances for the two towers, which are unified through a large enclosed garden lobby at the ground level and a sky amenity bridge at the tenth level. The office tower features orthagonal lines with a strong emphasis on horizontalilty, while the hotel tower floors are designed with alternating, undulating walls. Activities: I was involved in the preparation of all floor plans, sections and building tabulations.
Cross Section
PROPOSED BUILDING ELEVATION CONCEPTS & RENDERINGS
METALS & COMPOSITES
CORRUGATED ALUMINIUM
PROPOSED BUILDING ELEVATION CONCEPTS & RENDERINGS
ALUMINUM COMPOSITE MATERIAL (ACM)
METALS & COMPOSITES
COMPOSITE PANELS
PROPOSED BUILDING ELEVATION CONCEPTS & RENDERINGS
METALS & COMPOSITES
CAFETERIA
PROPOSED BUILDING ELEVATION CONCEPTS & RENDERINGS
METALS & COMPOSITES
COMPOSITE MATERIAL AT CAFETERIA
ALUMINUM SHINGLES
ADMINISTRATION
CORRUGATED ALUMINIUM
CORRUGATED METAL AT PARAPET AND MECHANICAL
ALUMINUM COMPOSITE MATERIAL (ACM)
CAFETERIA
ALUMINUM SHINGLES ADMINISTRATION CORRUGATED METALATAT PARAPET AND MECHANICAL
© Copyright Arrowstreet Inc.
ALUMINUM SHINGLES (NO COLOR SHOWN YET) COMPOSITE MATERIAL AT AT ADMINISTRATION CAFETERIA
ALUMINUM SHINGLES
ADMINISTRATION
Exterior Materials Illustration
ARCHITECTURAL PLANS
LEVEL 1
Rendered Views - Southwest Facade 8/12/2019 3:28:43 PM
ACADEMIC
COMPOSITE PANELS
Toilet
Storage
Stair
Preschool Classroom
Toilet
Preschool Classroom Breakout Room
Breakout Room
Preschool Classroom
Preschool Classroom Toilet
36
DOUGLAS & GATES ELEMENTARY SCHOOL Acton, MA
Toilet
Speech & Language
Speech & Language
Toilet
Toilet
Preschool Classroom
USA
Preschool Classroom
Breakout Room
Breakout Room
Preschool Classroom
Preschool Classroom Toilet
Program: New construction project for Acton-Boxborough Regional School District with 175,000 SF building to house 990 K-6 and 130 preschool students.
Preschool Admin/ Waiting Area Preschool Entry
JC
Staff Toilet
Toilet
Sensory
Psychologist
Toilet
Teacher Work Room
Preschool Classroom
Toilet
Copy
Water
CASE Special Education Classroom
Gates Cafeteria
OT/PT Toilet
Lab Storage
STEAM Lab
Stair
CASE Special Education Classroom
Multipurpose Art/Music
Elev.
Preschool IEP Conf. Room
Toilet
0
Stor
Servery
Stair Kitchen
Multipurpose Art/Music
Learning Commons
Elec.
Ramp
Conference Room Gates Admin
IEP Team Conf.
IEP Team Chair
Office
Water
Dry Storage
CORE ACADEMIC SPACES
Receiving/ Supply
Locker
SPECIAL EDUCATION
Workshop
Toilet
Stor
Table Storage
Office
Storeroom Toilet
Sloped Floor
Mechanical & Geothermal
Staff Toilet w/Shower
ART & MUSIC
Sprinkler
MEDIA CENTER
Stair
HE ALTH & PHYSICAL EDUCATION
Lobby Entry
Conf. Room
STEAM Lab Toilet
Girls
Elev.
Lab Storage
IDF
Douglas Admin Douglas Secretary
Water
20'
40'
Douglas Principal
Storage
D O U G L A S & G AT E S E L E M E N TA R Y S C H O O L S
75 Spruce Street, Acton,
Toilet Exam
Nurse Records
80'
Douglas and Gates Schools MA 01720 // 18041.00
Toilet
Douglas Assistant Principal
Boys
Mom’s Room
Storage
Activities: I was involved in the completion of construction documents, spearheading the exterior detail drawings in coorALUMINUM SHINGLES AT ADMINISTRATION (NO COLOR SHOWN YET) ALUMINUM SHINGLES AT ADMINISTRATION dination with the project team, consultants, manufacturers and sustainability objectives.
IDF
Staff Lunch Toilet
Records Gates Assistant Principal
Gates Secretary
Platform
Breakout Lunch
Vestibule
Vestibule
Gates Principal
Douglas Cafeteria
OT/PT Breakout
Elec
Design Narrative: The project has ambitious sustainable design objectives, targeting triple net zero – emissions, water and waste, with on-site geothermal wells and PV panels to offset the building’s energy requirements. The exterior facades are provided with varied massing and materials to create visual interest for different areas of the building, including two tones of brick, ACM panels, diamond shingles, corrugated metal panels and phenolic panels.
Performance Space
Breakout Room
Preschool Director
BCBA
Vest.
DINING & FOOD SERVICE
Gym Office
Health and Wellness for Grades Pre-K to 1
Gym Storage
MEDICAL
Gymnasium for Grades 2 to 6
ADMINISTR ATIVE & GUIDANCE CUSTODIAL & MAINTENANCE
Exam
N
0
20’
40’
80’
Level 1 Floor Plan D ESI G N R E V I E W B OA R D
/
4 M A R C H 2 02 0
LEVEL 1 PROGRAMMING // 07/10/19 // AR
P.1
5 1/8"
EWA-1A
04 20 00.14
7
3" = 1'-0"
PLAN DETAIL - SF JAMB @ ARCH CMU - PERP.
06 10 00.21
05 12 00.50 SEE STRUCT. 07 27 00.02
07 27 00.02 07 92 00.11 BOTH SIDES
07 42 20.11
07 27 00.11 03 45 00.01
07 27 00.11
03 45 00.61
07 42 20.01
5 1/8"
07 92 00.02
07 27 00.02
06 40 20.07
EWA-2A
03 45 00.01
07 42 00.12
03 45 00.01
07 42 00.21
07 92 00.11
03EWA-2A 45 00.61
05 12 00.35
Dwn/Chk By EWA-3B
PLAN DETAIL - SF JAMB @ PHENOLIC PANEL
SEE STRUCT.
03 45 00.01
PLAN DETAIL - SF JAMB @ ACM 3" = 1'-0"
SECTION DETAIL - SF SILL @ PRECAST
1
3" = 1'-0"
F4.1.A
10/15/20
Scale
3" = 1'-0"
07 27 00.02
DRAWING NUMBER: 03 30 00.03
03 30 00.30
13
Rendered View, West Facade
Date
03 45 00.61
07 42 00.21
04 20 00.67
A5.22
04 20 00.67 04 20 00.62
07 42 00.02 F4
07 92 00.11 LEVEL 1 212' - 0" 32 10 00.20
03 30 00.03
03 30 00.30
03 30 00.30
EWA-3B
03 45 00.63
03 30 00.50
F4.1.A
07 81 00.01
5
03 45 00.01
---/---
03 30 00.50
07 21 00.41 07 27 00.02
F4.1.A
07 11 00.01 07 21 00.08
12
PLAN DETAIL - CURVED CW JAMB @ INT. CORNER L2
11
1 1/2" = 1'-0"
10
PLAN DETAIL - CORRUGATED @ ARCH CMU INT. CORN. 1 1/2" = 1'-0"
Exterior Plan & Section Details 4
O SECTION DETAIL - BASE @ PRE-FACED CMU - WINDOW 04 20 00.13
EWA-1A 07 92 00.11
12.8 5 1/8"
EWA-2A
F4.1.R1
PLAN DETAIL - ARCH CMU @ 1 1/2" = 1'-0"
3
1 1/2" = 1'-0"
1 3/8" 3 3/4"
3" = 1'-0"
2
05 12 00.35
3
18041.00
1/2"
3" = 1'-0"
3
1/2" 1"
07 42 00.02
EWA-1A
07 92 00.11
06 40 20.07
EWA-1F
Project No.
O
6 A5.22
F4.1
07 42 10.32
04 20 00.17
EWA-1A
07 27 00.02
1 1/2" = 1'-0"
08 51 10.12
B.8
07 92 00.11
07 42 10.32
SIM
1' - 10"
SECTION DETAIL - CW SILL @ PRECAST
4' - 7"
1' - 4"
08 44 10.07
07 27 00.11 08 80 00.11
SEE STRUCT.
BELOW
4
1 1/2" = 1'-0"
PLAN DETAIL - ARCH CMU INT. CO
08 80 00.11
07 92 00.11
15 A5.22
13
2 A5.21
08 80 00.11
05 12 00.50
07 92 00.11 WINDOW M.O.
08 41 10.98
07 42 10.32
06 10 00.21
07 42 10.32
WINDOW M.O.
08 41 10.03
07 92 00.11 BOTH SIDES
07 27 00.11
07 42 10.32
EWA-3C
08 80 00.11
08 80 00.11
07 92 00.11 BOTH SIDES
1.8
CURTAIN WALL & STOREFRONT DETAILS
A5.22
SECTION DETAIL 1 1/2" = 1'-0"
SIM 2 A5.22
08 41 10.07
08 80 00.11
07 92 00.11 BOTH SIDES 03 45 00.01
3.5
07 42 10.32 07 92 00.11 07 42 10.01
7
PLAN DETAIL - ARCH CMU @ ACM INT. CORNER 1 1/2" = 1'-0"
6
37
EWA-2A
PLAN DETAIL - SF JAMB @ ACM 1 1/2" = 1'-0"
D.8 07 92 00.11
EWA-1E
F4.1.R1
04 20 00.16
06 10 00.21
03 45 00.01 BELOW
04 20 00.17 03 45 00.01 BELOW 07 92 00.02
07 92 00.11 08 41 10.07 08 80 00.11
07 42 10.32
03 45 00.01
08 41 10.07 08 80 00.11
08 41 10.07
06 10 00.21
08 80 00.11
07 92 00.11
07 92 00.02
BELOW
03 45 00.01 BELOW
06 10 00.21
07 92 00.01 7 A5.22
EWA-1B
7 A5.22
07 27 00.02
07 42 10.32
5 1/8"
07 42 10.01
07 92 00.11 06 10 00.21
14 1 3/8"
4 1/2"
07 41 00.01
3 3/4"
3 3/4"
07 42 10.11
08 80 00.11
SECTION DETAIL SECTION - PARAPET 7 1DETAIL 1/2" = 1'-0"
ACADEMIC
07 92 00.11
07 42 10.32
Z.A
4 1/2"
1 3/8"
CTION DETAIL - CW SILL @ ACM
07 92 00.02
5 1/8"
08 41 10.32
4 1/2"
BOTH SIDES
07 42 10.32
DRAWING TITLE:
3 3/4"
07 27 00.11
06 10 00.21
08 44 10.04
4 1/2"
08 44 10.31
07 92 00.02
08 41 10.32
08 80 00.11
08 44 10.04
1
1 1/2" = 1'-0" 1 1/2" = 1'-0"
KEY PLAN
06 10 00.21
5 1/8"
07 92 00.02 08 80 00.11
SECTION DETAIL - BASE -@ PRE-FACED CMU @ ARCH CMU SECTION DETAIL - PARAPET CORR METAL PANEL 28
3" = 1'-0"
1 3/8"
1 3/8"
3 7/8"
4"
07 42 10.32
12 24 00.02
EWA-1F
SECTION DETAIL PARAPET - ACM SECTION DETAIL - SF SILL @- PREFACED SOLDIER COURSE 3 1 1/2" = 1'-0"
6
1 1/2" = 1'-0"
1 1/4"
7 1/2"
F2.1
06 10 00.21 12 24 00.02
08 80 00.11
08 80 00.11
06 40 20.07
SECTION DETAIL - PARAPET - BRICK / ACM BELOW
4" 1 7/8"
23 00 00.41
05 12 00.50 SEE STRUC.
08 04 51 10.11 20 00.17
08 51 10.11
4
05 12 00.51
05 12 00.35 SEE STRUCT.
9 A5.21
07 92 00.11 BOTH SIDES
07 27 00.02
07 42 10.32
2 1/2"
10 A5.21
EWA-1BR
3" = 1'-0"
03 30 00.50
4'-0" IN FROM PERIMETER
2"
SECTION DETAIL - SF HEAD @ PHENOLIC
03 30 00.03
07 81 00.01
05 12 00.35 SEE STRUC.
07 42 10.21 BOTH SIDES
2"
8
3" = 1'-0"
07 27 00.11
SEE STRUCT.
3 7/8"
LEVEL 1 212' - 0"
07 92 00.11
07 42 10.11
4 1/2"
SECTION DETAIL - CW HEAD @ ACM
4 1/2"
3
07 81 00.01
07 42 10.32
05 12 00.50 SEE STRUCT.
3 3/4"
5 1/8"
08 80 00.11
4"
EWA-1A
EWA-2B 07 92 00.11
2"
4 1/2"
9
-0"
7 1/2"
07 21 00.90
08 41 10.03
06 10 00.24
07 92 00.11 04 20 00.15
08 80 00.11
06 40 20.07
04 20 00.67
EWA-1B
08 80 00.11
07 92 00.11 EWA-1GR
07 42 10.32
07BEYOND 81 00.01
9 3/4"
08 41 10.32
ROOF 254' - 0"
07 41 00.01
03 45 00.01 BELOW04 20 00.62
1" 3 5/8" 1"
08 41 10.02
P
07 84 10.10
07 92 00.11
04 20 00.64
08 44 10.02
SEE STRUC.
2 1/8" BEYOND
2' - 0"
07 42 10.32
07 81 00.01
07 92 00.11 BOTH SIDES
07 27 00.02
08 44 10.31 BOTH SIDES
1 7/8"
07 92 00.02
5 1/8"
0704 4220 10.01 00.16
07 27 00.02
07 92 00.02
07 42 10.32
1 3/8"
07 27 00.11
06 10 00.21
07 21 00.31
08 44 10.31 BOTH SIDES
4 1/2"
07 42 10.11
07 92 00.11 BOTH SIDES
04 20 00.64 04 20 00.16 04 20 00.62 07 42 10.01
EWA-1D
ROOF 254' - 0"
07 42 10.11
8"
07 92 00.11 07 92 00.02
7 1/2"
1' - 4"
07 92 00.11
04 20 00.67
07 54 00.16
07 84 10.10 07 42 10.21
3" = 1'-0"
04 20 00.13
07 42 10.32
07 42 10.11
06 10 00.21 05 12 00.75 SEE STRUC.
P.1
07 21 00.90
SECTION DETAIL - SF HEAD@ACM
ROOF 254' - 0"
ERA-1A
1' - 4"
07 27 00.11
07 27 00.11
08 80 00.11
07 84 10.10
07 27 00.02
3 3/4"
1/2" / 1 '-0"
2 1/8"
07 54 00.16
EWA-3B 07 27 00.02
1' - 4"
07 21 00.31
11
07 41 00.01
1 3/8"
0° 45.0
07 41 00.01
07 27 00.02
4"
07 42 20.11
1 3/4"
07 21 00.31
07 42 10.01
08 80 00.11
5 1/8"
1 1/2" = 1'-0"
06 10 00.24 07 42 00.02 05 12 00.35 SEE STRUC.
ERA-1A
08 80 00.11
4 1/2"
SECTION DETAI
07 54 00.01
1.8
10/14/2020 6:07:37 PM
07 42 10.01
05 12 00.35 SEE STRUCT.
08 41 10.32
07 41 00.01
08 41 10.02
07 54 00.16
11
SEE STRUC.
07 54 00.01
06 10 00.24
07 92 00.11 BOTH SIDES
1/2" / 1 '-0"
ERA-1A
08 41 10.32
4 1/2"
07 42 20.01
© Copyright Arrowstreet Inc.
EWA-2A
07 42 10.32 BELOW
07 42 10.32
07 27 00.02
06 10 00.24
07 27 00.02
3/4"
4"
03 45 00.01 BELOW
08 41 10.07
EWA-2A
05 12 00.35
07 92 00.02
07 92 00.02
1"
7 1/2"
06 10 00.21
06 10 00.21
1/2" / 1 '-0"
ERA-1A
08 44 10.06 BELOW
07 54 00.01
EWA-2A
8" 07 54 00.16
5 1/8"
08 44 10.05
BEYOND
1 1/2" = 1'-0"
07 27 00.02
07 92 00.11 0400.51 20 00.16 05 12
05 12 00.50 SECTION DETAIL - BASE @ SHINGLED MTL
12
42 10.11 06 07 10 00.21
1 1/4"
06 10 00.21
07 42 10.11 07 41 00.01 06 10 00.21
07 54 00.01
4"
06 10 00.21
07 27 00.11
06 10 00.21
A
07 54 00.01 06 10 00.24
06 10 00.24
05 12 00.35 SEE STRUC.
1 1/2" = 1'-0"
07 62 00.32
Description
07 42 10.01 41 00.01 07 07 62 00.32
07 21 00.31
07 27 00.02
05 12 00.51 SEE STRUC.
1
Date
T.O. BLOCKING
3" = 1'-0"
No.
1' - 4"
13
3" = 1'-0"
EWA-2A
07 62 00.32
B
PLAN DETAIL - SF JAMB @ ARCH CMU W/CMU
5
1 1/2" = 1'-0"
SECTION DETAIL - PARAPET
REVISIONS:
B
2' - 0"
SECTION DETAIL - SF DOOR @ L2 ROOF ACCESS
6
1 1/2" = 1'-0"
04 20 00.14
SECTION DETAIL - CORRUG PARAPET WALL
4'-0" IN FROM PERIMETER
8"
14
3" = 1'-0"
7
SECTION DETAIL - ROOF - ELEVATOR OVERRUN
3 3/4"
15
PLAN DETAIL - CW JAMB @ ACM
03 30 00.50
3" = 1'-0"
07 92 00.11
BELOW
C.5
PLAN DETAIL - SF JAMB @ PRE-FACED CMU
1 1/2" = 1'-0"
03 45 00.01
03 30 00.03
LEVEL 1 212' - 0"
03 45 00.01 SECTION DETAIL - MECHANICAL ENCLOSURE BASE BELOW
EWA-5A
07 81 00.01
07 27 00.02
1' - 4"
8
07 92 00.11 WINDOW R.O.
03 30 00.30
EWA-1D
1' - 4"
EWA-2A
1 3/8"
07 42 10.32 07 42 10.01
07 81 00.01
2"
07 21 00.11
12
1" 1 3/8"
4"
08 44 10.07
07 42 10.32
03 45 00.01 BELOW
07 81 00.01
07 27 00.11
08 80 00.11
07 42 10.11
3 3/4"
10" 07 92 00.11 BOTH SIDES
LEVEL 2 226' - 0"
AN DETAIL - CW OUTSIDE CORNER
-0"
ROOF 254' - 0"
7
08 44 10.31 BOTH SIDES
04 20 00.13
04 20 00.16
SIM S6.2.A
EWA-1D
1"
Rendered View, Gym Exterior
4
PLAN DETAIL - SF JAMB @ ARCH CMU INT. CORNER 1 1/2" = 1'-0"
3 Rendered View, Media Center PLAN DETAIL - SF JAMB @ PRE-FACED CMU INT. CORN. 1 1/2" = 1'-0"
2
PLAN DETAIL - SF JAM 1 1/2" = 1'-0"