Utility & Stormwater Management Master Plan Figures

Page 1

S 625 S 625 S T 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 1: Study Area City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse DBO_CityLimits Alberta, Canada Rue Eaglemont Rue Montalet Coloniale Way 57 St 44 St 43 Ave 55 Ave Flow Direction 50 St 50 St 50 Ave 38 St 30 Ave 66 St 66 St
S 625 S 625 S T 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 2: Topography DEM City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Additional_Parcels Ground Elevation (MASL) 701.7 749.8 Alberta, Canada Rue Eaglemont Rue Montalet Coloniale Way 57 St 44 St 43 Ave 55 Ave Flow Direction 50 St 50 St 50 Ave 38 St 30 Ave 66 St 66 St
S 625 S 625 S T 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 3: Existing Land Use Districts City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Land Use Districts Agricultural Holding District Business Light Industrial District Commercial District Conventional Neighborhood District Integrated Neighborhood District Mature Neighborhood District Main Street District Alberta, Canada Rue Eaglemont Rue Montalet Coloniale Way 57 St 44 St 43 Ave 55 Ave 50 St 50 St 50 Ave 38 St 30 Ave 66 St 66 St
S 625 S 625 S T 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 4: Existing Conditions (Assumed) City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Existing / Assumed to be Established Commercial Industrial Institutional Mixed Use Multi-Family Park Residential Road Alberta, Canada Rue Eaglemont Rue Montalet Coloniale Way 57 St 44 St 43 Ave 55 Ave 50 St 50 St 50 Ave 38 St 30 Ave 66 St 66 St
S 625 S 625 S T 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 5: Ultimate Land Use Plan City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Land Use Districts Commercial Environmental Reserve Greenway (Non-MR) High Density Residential Institutional LeBlanc Canal Low Density Residential Medium Density Residential Mixed Use Municipal Reserve Natural Area Public Utility Lot Road School Site SWMF Utility R.O.W Alberta, Canada Rue Eaglemont Rue Montalet Coloniale Way 57 St 44 St 43 Ave 55 Ave 50 St 50 St 50 Ave 38 St 30 Ave 66 St 66 St Centre-Ville Established Residential Future Residential Industrial
S T 625 S T 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 15, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 6: Neighborhoods City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Alberta, Canada Northwest Annexation Lands Chaleureuse Business Park Glenbrae Meadows Beau Meadow Montrose Estates Four Seasons Estates Place Chaleureuse Montrose Business Centre Southwest Annexation Lands Beau Val Beaumont Lakes Lakeview Elan Le Reve Forest Heights Triomphe Estates Ruisseau Goudreau Terrace Brookside Parklane Centre Ville Beauridge Citadel Ridge St. Vital Coloniale Estates Eaglemont Heights Dansereau Meadows Montalet Southlands Municipal Boundary Parcel Watercourse
S 625 S 625 S T 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 7: Development Staging Forecast City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Development Staging Established 2023-2027 2028-2032 2033-2037 2038-2042 2043-2047 2048+ Alberta, Canada Rue Eaglemont Rue Montalet Coloniale Way 57 St 44 St 43 Ave 55 Ave 50 St 50 St 50 Ave 38 St 30 Ave 66 St 66 St
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 8: Existing Water Distribution System - Water Main Size City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Watercourse Parcel Water Reservoir and Pumphouse CRSWSC Watermain Size 150mm 200mm 250mm 300mm 400mm Alberta, Canada CRSWSC Line
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 9: Existing Water Distribution System - Water Main Material City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse CRSWSC Watermain Material AC Concrete (CRSWSC) Copper HDPE PVC Steel Unknown Alberta, Canada CRSWSC Line
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 10: Existing Water Distribution System - Water Main Installation Period City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Watercourse Parcel Water Reservoir and Pumphouse CRSWSC Watermain Installation Period 1960-1969 1970-1979 1980-1989 1990-1999 2000-2009 2010-2019 2020-2023 Alberta, Canada CRSWSC Line
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 12: Existing Water Distribution System - ADD Main Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain ADD Main Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 13: Existing Water Distribution System - ADD Vital Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain ADD Vital Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 14: Existing Water Distribution System - ADD Main & Vital Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain ADD Main & Vital Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 15: Existing Water Distribution System - Fill Main Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Fill Main Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 16: Existing Water Distribution System - PHD Main Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain PHD Main Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 17: Existing Water Distribution System - PHD Vital Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain PHD Vital Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 18: Existing Water Distribution System - PHD Main & Vital Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain PHD Main & Vital Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada

Note:

S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 19: Existing Water Distribution System - MDD+FF Main Available
City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Total Available Flow (Minimum 140 kPa Residual Pressure) Less Than 100 L/s 100 - 180 L/s 180 - 270 L/s More Than 270 L/s Land Use Districts Agricultural Holding District Business Light Industrial District Commercial District Conventional Neighborhood District Integrated Neighborhood District Mature Neighborhood District Main Street District Alberta, Canada FF-DEF-1 FF-DEF-2 FF-DEF-3 FF-DEF-4 FF-DEF-5 FF-DEF-6 FF-DEF-7
FF.
the Legend.
Flow
This node services a commercial site. Main was not evaluated beyond 100 L/s
See note under
FF
270
Main cannot deliver FFs beyond 100 L/s and was therefore not evaluated for 180 L/s
and
L/s FF.
S T 625 S T 625 S T 625 S 625 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 20: Existing Water Distribution System - MDD+FF Vital Available Flow City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Total Available Flow (Minimum 140 kPa Residual Pressure) Less Than 100 L/s 100 - 180 L/s 180 - 270 L/s More Than 270 L/s Land Use Districts Agricultural Holding District Business Light Industrial District Commercial District Conventional Neighborhood District Integrated Neighborhood District Mature Neighborhood District Main Street District Alberta, Canada FF-DEF-1 FF-DEF-2 FF-DEF-3 FF-DEF-4 FF-DEF-5 FF-DEF-6 FF-DEF-7 FF-DEF-8 FF-DEF-9 FF-DEF-10 FF-DEF-11 FF-DEF-12 FF-DEF-13 FF-DEF-14 FF-DEF-17 FF-DEF-15 FF-DEF-16
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 21: Existing Water Distribution System - MDD+FF Main & Vital Available Flow City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Total Available Flow (Minimum 140 kPa Residual Pressure) Less Than 100 L/s 100 - 180 L/s 180 - 270 L/s More Than 270 L/s Land Use Districts Agricultural Holding District Business Light Industrial District Commercial District Conventional Neighborhood District Integrated Neighborhood District Mature Neighborhood District Main Street District Alberta, Canada FF-DEF-8 FF-DEF-10 FF-DEF-11 FF-DEF-13 FF-DEF-14
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 15, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 22: Existing Water Distribution System - Hydrant Coverage City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Watercourse Parcel Hydrant Hydrant Coverage (150m Diameter) Alberta, Canada

Municipal Boundary Detail A Viewport Detail B Viewport Parcel Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain

Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir.

Pressure Zone Main Pressure Zone Northwest Pressure Zone Centre-Ville Pressure Zone Proposed Watermain Size 200mm 250mm 300mm 350mm 450mm 600mm Alberta, Canada

27. 50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000

City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report Scale: 1:25,000

S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Centre-Ville Booster Station Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse West Reservoir and Pumphouse 41 St 38ASt 49 Ave 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 62 St 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 59Ave 55 Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50 Ave 48 St 56 St 51St 56A St 66 St 48Ave 53 Ave 46Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983)
of Beaumont
City
Figure 23: Ultimate Water Distribution System - Option 1 Servicing Concept 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers
See Figure
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse Centre-Ville Booster Station 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont
24: Ultimate Water Distribution System - Option 2 Servicing Concept City of Beaumont Master Plan - Utilities &
Water Management
0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Parcel Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain Pressure Zone Main Pressure Zone Northwest Pressure Zone Centre-Ville Pressure Zone Proposed Watermain Size 200mm 250mm 300mm 350mm 450mm 600mm 750mm Alberta, Canada
Figure
Storm
100% Report
27. 50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000
Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir. See Figure
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Centre-Ville Booster Station Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50 Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 25: Ultimate Water Distribution System - Option 3 Servicing Concept City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Pressure Reducing Valve Existing Watermain Pressure Zone Main Pressure Zone Northwest Pressure Zone Centre-Ville Pressure Zone Proposed Watermain Size 200mm 250mm 300mm 350mm 450mm 750mm Alberta, Canada Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir. See Figure 27. 50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St 62 St 52 Ave 38 St 29 Ave 30Ave 57St 42 St 50 St q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 26: Ultimate Water Distribution System - Pressure Zones City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Pressure Zone Main Pressure Zone Northwest Pressure Zone Centre-Ville Pressure Zone Alberta, Canada
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 55 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 27: Proposed CRSWSC Transmission Main Extension to St. Vital Reservoir City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Detail A Viewport Watercourse Parcel Water Reservoir and Pumphouse Existing Watermain Existing 400mm Transmission Main Proposed 400mm Transmission Main Alberta, Canada CRSWSC Line 50 Ave. 57 St 50Ave DETAIL A VIEWPORT 1:1,000
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52 Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St IrvineCreek LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 28: Ultimate Water Distribution SystemOption 2 - ADD Main & Northwest Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52 Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St IrvineCreek LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 29: Ultimate Water Distribution SystemOption 2 - PHD Main & Northwest Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S 625 S 625 S T 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45St 62 St 52 Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St
LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 30: Ultimate Water Distribution SystemOption 2 - MDD+FF Main Vital & Northwest Available Flow City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Total Available Flow (Minimum 140 kPa Residual Pressure) Less Than 100 L/s 100 - 180 L/s 180 - 270 L/s More Than 270 L/s Land Use Districts Agricultural Holding District Business Light Industrial District Commercial District Conventional Neighborhood District Integrated Neighborhood District Mature Neighborhood District Main Street District Alberta, Canada
IrvineCreek
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52 Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 31: Option 2 Water Distribution System2028-2032 Buildout - ADD Main Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52 Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 32: Option 2 Water Distribution System2028-2032 Buildout - PHD Main Pressure City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Pressure Less Than 280 kPa 280 - 350 kPa 350 - 450 kPa 450 - 550 kPa 550 - 600 kPa More Than 600 kPa Alberta, Canada
S 625 S 625 S T 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45St 62 St 52 Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 33: Option 2 Water Distribution System2028-2032 Buildout - MDD+FF Main & Vital Available Flow City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Water Reservoir and Pumphouse Existing Watermain Land Use Districts Agricultural Holding District Business Light Industrial District Commercial District Conventional Neighborhood District Integrated Neighborhood District Mature Neighborhood District Main Street District Total Available Flow (Minimum 140 kPa Residual Pressure) Less Than 100 L/s 100 - 180 L/s 180 - 270 L/s More Than 270 L/s Alberta, Canada
S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St Centre-Ville Booster Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 35: Option 2 Water Distribution SystemWater Main Staging City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain Proposed Watermain Staging 2023-2027 2028-2032 2033-2037 2038-2042 2043-2047 2048+ Development Staging Established 2023-2027 2028-2032 2033-2037 2038-2042 2043-2047 2048+ Alberta, Canada Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir. See Figure 27. 50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000

This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir in the

development horizon. See Figure 27.

S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 36 Option 2 Water Distribution System - 2023-2027 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Existing Watermain Development Staging 2023-2027 Other Proposed Watermain Size 200mm 250mm 300mm 350mm 450mm 600mm Alberta, Canada Note:
50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000
2023-2027
W-UPG-1B & CRSWSC-FUT-1A W-UPG-1A W-UPG-1C
Watermain west of RR 243 to be sized as required based on short-term development needs.

The Coloniale Estates loop is a development servicing project but is required to be constructed alongside the establishment of the Centre-Ville Pressure Zone to improve fire flows.

Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve

Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir in the 2023-2027 development horizon. See Figure 27.

50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000 W-FUT-2B W-FUT-2A & W-FUT-2D

City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report Scale: 1:25,000

Existing Watermain Watermain Constructed in Previous Development Horizon Development Staging 2028-2032 Other Proposed Watermain Size 300mm 600mm Alberta, Canada

S T 625 S 625 S 625 S T 814 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 62 St 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St Centre-Ville Booster Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 37:
Option 2 Water Distribution System - 2028-2032 Buildout 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers
W-FUT-2A W-FUT-2B W-FUT-2B W-FUT-2C (refer to Detail A and B)

Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir in the 2023-2027 development horizon. See Figure 27.

S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50 Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St Centre-Ville Booster Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 38: Option 2 Water Distribution System - 2033-2037 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain Watermain Constructed in Previous Development Horizons Development Staging 2033-2037 Other Proposed Watermain Size 200mm 300mm 450mm 600mm Alberta, Canada
50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000 W-UPG-3A
W-UPG-3B & W-FUT-3A

Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir in the 2023-2027 development horizon. See Figure 27.

S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St Centre-Ville Booster Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 39: Option 2 Water Distribution System - 2038-2042 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain Watermain Constructed in Previous Development Horizons Development Staging 2038-2042 Other Proposed Watermain Size 300mm 450mm Alberta, Canada
50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000

Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir in the 2023-2027 development horizon. See Figure 27.

S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50 Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St Centre-Ville Booster Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont
40
2
0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain Watermain Constructed in Previous Development Horizons Development Staging 2043-2047 Other Proposed Watermain Size 250mm 300mm 450mm 750mm Alberta, Canada
Figure
: Option
Water Distribution System - 2043-2047 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report
50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000 W-FUT-4B
W-FUT-4B
W-FUT-4B W-UPG-4A W-FUT-4A W-FUT-4C
W-UPG-4B W-FUT-4B

Note: This servicing option assumes that the regional supply feed is extended to the St. Vital Pumphouse and Reservoir in the 2023-2027 development horizon. See Figure 27.

S 625 S 625 S 625 S T 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 IrvineCreek LeBlanc Canal Northwest Reservoir and Pumphouse Main Reservoir and Pumphouse St. Vital Reservoir and Pumphouse 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 54 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 55Ave 57Ave 51Ave 47Ave 46 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50 Ave 48 St 56 St 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 45Ave 43St 64 St 45 St 62 St 52Ave 38 St 29 Ave 30 Ave 57 St 42 St 50 St Centre-Ville Booster Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 41: Option 2 Water Distribution System - 2048+ Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Watercourse Water Reservoir and Pumphouse Centre-Ville Booster Station Isolation Valve Existing Watermain Watermain Constructed in Previous Development Horizons Development Staging 2048+ Other Proposed Watermain Size 250mm 300mm 450mm Alberta, Canada
50 Ave. 55 St 50 Ave 50 Ave. 44 St 50Ave DETAIL A VIEWPORT 1:1,000 DETAIL B VIEWPORT 1:1,000
W-FUT-5B W-FUT-5A
S 625 S T 625 S 625 50 Ave. Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37 Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43Ave 49Ave 44 St St61 35 St 62Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 41Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 42: Existing Wastewater System - Sewer Size City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Beaumont Pump Station Manhole SERTS South Sewer Size 150mm 200mm 250mm 300mm 375mm 450mm 525mm 600mm 750mm 900mm 1050mm 1200mm 1350mm 2100mm Unknown Alberta, Canada SERTS South
S 625 S 625 S 625 50 Ave. Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37 Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43Ave 49Ave 44 St St61 35 St 62Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 41Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 44: Existing Wastewater System - Sewer Material City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Beaumont Pump Station Manhole SERTS South Sewer Material Concrete PVC VCT Unknown Alberta, Canada SERTS South
S 625 S 625 S 625 50 Ave. 50 Ave. Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 41 Ave 47Ave 46 St 56Ave 43Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 45: Existing Wastewater System - Sewer Installation Period City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Beaumont Pump Station Manhole SERTS South Sewer Installation Period 1960-1969 1970-1979 1980-1989 1990-1999 2000-2009 2010-2019 2020-2023 Unknown Alberta, Canada SERTS South

Note: The location of calcite buildup / other obstructions was based on findings from CCTV inspections completed on or after 2016.

S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 46: Existing Wastewater SystemCalcite Buildup / Other Obstructions City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Calcite Buildup / Other Obstructions Manhole Existing Wastewater Sewer Alberta, Canada

Note: This figure was adapted from Figure 4.45 of the ISL Engineering Water and Wastewater Systems: 2018 and Beyond (ISL Engineering and Land Services Ltd., 2018).

S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 47: Existing Wastewater SystemWeeping Tile Connections City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Manhole Existing Wastewater Sewer Weeping Tile Connected to Wastewater Sewer Alberta, Canada
S 625 S T 625 S 625 S 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 48: Existing Wastewater SystemMajor Features City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Parcel Watercourse Manhole Flow-Split Location Storage Sewer SERTS South Trunk Sewer 1 Trunk Sewer 2 Trunk Sewer 3 Trunk Sewer 4 Trunk Sewer 5 Trunk Sewer 6 Trunk Sewer 7 Trunk Sewer 8 SERTS Sewershed Trunk Sewer 1 Sewershed Trunk Sewer 2 Sewershed Trunk Sewer 3 Sewershed Trunk Sewer 4 Sewershed Trunk Sewer 5 Sewershed Trunk Sewer 6 Sewershed Trunk Sewer 7 Sewershed Trunk Sewer 8 Sewershed Alberta, Canada SERTS Storage Sewer 1 Storage Sewer 1 Storage Sewer 2 SERTS Storage Sewer 2 Storage Sewer 4 Storage Sewer 3 Storage Sewer 5 Location 1 (Asset ID: SAN40248_00) Location 2 (Asset ID: SAN40092_00) Location 3 (Asset ID: SAN40021_00) Location 4 (Asset ID: SAN30085_00) Location 5 (Asset ID: SAN20030_00) Flow-Split Location 6 (Asset ID: SAN20094_00)
S T 625 S T 625 S T 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 54Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 51Ave 53St 60 St 47Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 42Ave 66 St 46Ave 40Ave 41Ave 55 St 64 St 49 St 48 St 57Ave 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal Site 1: Coloniale Site 2: Montalet Site 3: Highschool Site 4: Four Seasons Site 5: Lions Site ACRWC Beau Meadow School q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 49: Flow Monitor Locations City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Watercourse Flow Monitor Rain Gauge Manhole Existing Wastewater Sewer Alberta, Canada
S 625 S T 625 S T 625 50 Ave. Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37 Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43Ave 49Ave 44St St61 35 St 62Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 41Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 56: Existing Wastewater SystemDry Weather Flow Results City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Roads Beaumont Pump Station Peak Discharge Relative to Pipe Capacity Less Than 86% Between 86% and 100% Between 100% and 120% Greater than 120% Maximum HGL Elevation Relative to Ground Less Than -3.5m Between -3.5m and -2.6m Between -2.6m and 0.0m Greater than 0.0m Alberta, Canada SERTS South Le Reve Stage 1A Contributions Dansereau Stage 13A Contributions Elan Stage 1 & 2A Contributions Lakeview Stage 1, 3 & 4 Contributions Triomphe Stage 8 Contributions Inflow Poinr t
S T 625 S T 625 S T 625 50 Ave. Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37 Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43Ave 49Ave 44 St St61 35 St 62Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 41Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 57: Existing Wastewater System5-Year 24-Hour Huff Storm Results City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Roads Beaumont Pump Station Peak Discharge Relative to Pipe Capacity Less Than 86% Between 86% and 100% Between 100% and 120% Greater Than 120% Maximum HGL Elevation Relative to Ground Less Than -3.5m Between -3.5m and -2.6m Between -2.6m and 0.0m Greater Than 0.0m Alberta, Canada SERTS South Le Reve Stage 1A Contributions Dansereau Stage 13A Contributions Elan Stage 1 & 2A Contributions Lakeview Stage 1, 3 & 4 Contributions Triomphe Stage 8 Contributions Inflow Point
S 625 S 625 S 625 50 Ave. Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37 Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43Ave 49Ave 44 St St61 35 St 62Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 41Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 58: Existing Wastewater System25-Year 24-Hour Huff Storm Results City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.2 0.4 0.6 0.8 1 0.1 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Roads Beaumont Pump Station Peak Discharge Relative to Pipe Capacity Less Than 86% Between 86% and 100% Between 100% and 120% Greater Than 120% Maximum HGL Elevation Relative to Ground Less Than -3.5m Between -3.5m and -2.6m Between -2.6m and 0.0m Greater Than 0.0m Alberta, Canada SERTS South Le Reve Stage 1A Contributions Dansereau Stage 13A Contributions Elan Stage 1 & 2A Contributions Lakeview Stage 1, 3 & 4 Contributions Triomphe Stage 8 Contributions Inflow Point
S T 625 S T 625 S 814 50 Ave. Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 814 Highway Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 244 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 57Ave 44 Ave 65 St 64 Ave 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 62 St 36 St 54 St 32Ave 48Ave 69 St 42 Ave 53Ave 54Ave 52St 47 St 39St 39Ave 67 St 60Ave 37 Ave 61 Street 34Ave 59Ave 55Ave 51Ave 47 Ave 46 St 56St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 35Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 66 St 59 St 46 Ave 40 Ave 60 St 41 Ave 48 St 45Ave 43St 64 St 58St 45 St 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St Irvine Creek Blackmud Creek LeBlanc Canal Beaumont Pump Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 59: Existing Wastewater System - Proposed Upgrades City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Beaumont Pump Station Manhole Existing Wastewater Sewer Proposed Sewer Size 250mm (Upsize) 300mm (Upsize) 375mm (Upsize) 450mm (Upsize) 525mm (Upsize) 600mm (Upsize) 675mm (Upsize) 900mm (Twin) Upgrade ID ACRWC-WW-UPG-1 ACRWC-WW-UPG-2 WW-UPG-1 WW-UPG-2 WW-UPG-3 Alberta, Canada SERTS South ACRWC-WW-UPG-1 ACRWC-WW-UPG-2 WW-UPG-1 WW-UPG-2 WW-UPG-3
of Beaumont Pump Station
Decommissioning
S 625 S 625 S 625 50 Ave. Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 242 Rge. Rd. 240 41 St 38ASt 65Ave 65 St 64 Ave 47St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 54Ave 39 St 39Ave 60 Ave 37 Ave 61 Street 67 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43Ave 49Ave 44 St St61 35 St 62Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 48 St 56 St 51St 56A St 66 St 46Ave 40 Ave 41Ave 55 St 59 St 62 St 49 St 45Ave 43St 52 St 58 St 64 St 32 Ave 45 St 44Ave 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 60: Existing Wastewater System with Proposed Upgrades - 25-Year 24-Hour Huff Storm Results City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.2 0.4 0.6 0.8 1 0.1 Kilometers Scale: 1:17,000 Municipal Boundary Parcel Watercourse Roads Peak Discharge Relative to Pipe Capacity Less Than 86% Between 86% and 100% Between 100% and 120% Greater Than 120% Maximum HGL Elevation Relative to Ground Less Than -3.5m Between -3.5m and -2.6m Between -2.6m and 0.0m Greater Than 0.0m Alberta, Canada SERTS South Le Reve Stage 1A Contributions Dansereau Stage 13A Contributions Elan Stage 1 & 2A Contributions Lakeview Stage 1, 3 & 4 Contributions Triomphe Stage 8 Contributions Inflow Point

North basin of Le Reve ASP to be serviced by

S T 625 S T 625 S 625 S 814 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St
LeBlanc Canal Le Reve Lift Station Elan Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont
61: Ultimate Wastewater SystemServicing Concept City of Beaumont
& Storm
0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Detail B Viewport Parcel Watercourse Proposed Lift Station Existing Manhole Existing Wastewater Sewer Proposed Forcemain (400mm) Proposed Trunk Sewer to SESS Proposed Wastewater Sewer 300mm 375mm 400mm 450mm 525mm 550mm 600mm 675mm 900mm 1,200mm Alberta, Canada SERTS South
IrvineCreek
Figure
Master Plan - Utilities
Water Management 100% Report
EPCOR SESS DETAIL A VIEWPORT 1:5,000 DETAIL B VIEWPORT 1:5,000
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 55 Ave 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 69 St 42 Ave 52 St St39 39Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 60 Ave 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 62: Ultimate Wastewater SystemCatchment Connections City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Proposed Wastewater Sewer Existing Wastewater Sewer Existing Manhole Catchment Connections Ultimate Buildout Catchments Commercial Industrial Institutional Mixed Use Multi-family; Multi-Family Park Residential Road Alberta, Canada SERTS South
S 625 S 625 S 625 S 814 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St
LeBlanc Canal Le Reve Lift Station Elan Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 64: Ultimate Wastewater System without Upgrades - 25-Year 24-Hour Huff Storm Results City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Proposed Lift Station Proposed Trunk Sewer to SESS Peak Discharge Relative to Pipe Capacity Less Than 86% Between 86% and 100% Between 100% and 120% Greater Than 120% Maximum HGL Elevation Relative to Ground Less Than -3.5m Between -3.5m and -2.6m Between -2.6m and 0.0m Greater Than 0.0m Alberta, Canada SERTS South
IrvineCreek
S T 625 S T 625 S 814 50 Ave. Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 814 Highway Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 244 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 57Ave 44 Ave 65 St 64 Ave 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 62 St 36 St 54 St 32Ave 48Ave 69 St 42 Ave 53Ave 54Ave 52St 47 St 39St 39Ave 67 St 60Ave 37 Ave 61 Street 34Ave 59Ave 55Ave 51Ave 47 Ave 46 St 56St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 35Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 66 St 59 St 46 Ave 40 Ave 60 St 41 Ave 48 St 45Ave 43St 64 St 58St 45 St 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St Irvine Creek Blackmud Creek LeBlanc Canal Le Reve Lift Station Elan Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 65: Ultimate Wastewater SystemProposed Upgrades City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Existing Wastewater Manhole Proposed Lift Station Proposed Trunk Sewer to SESS Proposed Sewer Size 1,200mm (Upsize) Upgrade ID ACRWC-WW-ULT-UPG-1 Alberta, Canada SERTS South ACRWC-WW-ULT-UPG-1
S 625 S 625 S 625 S 814 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 245 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 240 41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40 Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St
LeBlanc Canal Le Reve Lift Station Elan Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 66: Ultimate Wastewater System with Upgrades - 25-Year 24-Hour Huff Storm Results City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Parcel Watercourse Proposed Lift Station Proposed Trunk Sewer to SESS Peak Discharge Relative to Pipe Capacity Less Than 86% Between 86% and 100% Between 100% and 120% Greater Than 120% Maximum HGL Elevation Relative to Ground Less Than -3.5m Between -3.5m and -2.6m Between -2.6m and 0.0m Greater Than 0.0m Alberta, Canada SERTS South
IrvineCreek
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St IrvineCreek LeBlanc Canal Le Reve Lift Station Elan Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 67: Ultimate Wastewater SystemWastewater Sewer Staging City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Proposed Lift Station Existing Wastewater Sewer Proposed Forcemain (2023-2027) Proposed Trunk Sewer to SESS (2038-2042) Proposed Wastewater Sewer Staging 2023-2027 2028-2032 2033-2037 2038-2042 2043-2047 2048+ Development Staging Established 2023-2027 2028-2032 2033-2037 2038-2042 2043-2047 2048+ Alberta, Canada SERTS South
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St IrvineCreek LeBlanc Canal Le Reve Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 68: Ultimate Wastewater System2023-2027 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Watercourse Proposed Lift Station Existing Wastewater Sewer Proposed Forcemain (400mm) Development Staging 2023-2027 Other Proposed Wastewater Sewer 250mm 300mm 375mm 400mm 450mm 525mm 600mm 675mm 900mm 1,050mm 1,200mm Alberta, Canada SERTS South ACRWC-WW-UPG-1 (up to Irvine Creek) ACRWC-WW-UPG-2 WW-UPG-0 DETAIL A VIEWPORT 1:7,500
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St IrvineCreek LeBlanc Canal Le Reve Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 69: Ultimate Wastewater System2028-2032 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Lift Station Constructed in Previous Development Horizon Existing Wastewater Sewer Forcemain Constructed in Previous Development Horizon Wastewater Sewer Constructed in Previous Development Horizon Development Staging 2028-2032 Other Proposed Wastewater Sewer 250mm 300mm 375mm 400mm 450mm 525mm 600mm 675mm 900mm 1,050mm 1,200mm Alberta, Canada SERTS South WW-UPG-1 WW-UPG-2 WW-UPG-3
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St IrvineCreek LeBlanc Canal Le Reve Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 70: Ultimate Wastewater System2033-2037 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Detail A Viewport Watercourse Lift Station Constructed in Previous Development Horizons Existing Wastewater Sewer Forcemain Constructed in Previous Development Horizons Wastewater Sewer Constructed in Previous Development Horizons Development Staging 2033-2037 Other Proposed Wastewater Sewer 250mm 300mm 375mm 400mm 450mm 525mm 600mm 675mm 900mm 1,050mm 1,200mm Alberta, Canada SERTS South DETAIL A VIEWPORT 1:5,000
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St
LeBlanc Canal Le Reve Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 71: Ultimate Wastewater System2038-2042 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Lift Station Constructed in Previous Development Horizons Existing Wastewater Sewer Forcemain Constructed in Previous Development Horizons Wastewater Sewer Constructed in Previous Development Horizons Proposed Trunk Sewer to SESS Development Staging 2038-2042 Other Proposed Wastewater Sewer 250mm 300mm 375mm 400mm 450mm 525mm 600mm 675mm 900mm 1,050mm 1,200mm Alberta, Canada
South
IrvineCreek
SERTS
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St
LeBlanc Canal Le Reve Lift Station Southlands Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 72: Ultimate Wastewater System2043-2047 Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Lift Station Constructed in Previous Development Horizons Existing Wastewater Sewer Forcemain Constructed in Previous Development Horizons Wastewater Sewer Constructed in Previous Development Horizons Proposed Trunk Sewer to SESS Constructed in Previous Development Horizon Development Staging 2043-2047 Other Proposed Wastewater Sewer 250mm 300mm 375mm 400mm 450mm 525mm 600mm 675mm 900mm 1,050mm 1,200mm Alberta, Canada
South
IrvineCreek
SERTS
41 St 38ASt 53 St 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 55 Ave 69 St 42 Ave 52 St St39 39Ave 60 Ave 37Ave 61 Street 67 St 34Ave 66 St 59Ave 57Ave 51Ave 47Ave 46 St 56 St 56 Ave 43Ave 49 Ave 44 St 61 St 35 St 62Ave 58 St 35 Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 48Ave 53 Ave 46 Ave 59 St 40Ave 60 St 41Ave 48 St 45Ave 43St 64 St 45 St Ave54 62 St 52Ave 38 St 29 Ave 30Ave 57St 42 St 50 St IrvineCreek LeBlanc Canal Le Reve Lift Station Southlands Lift Station Elan Lift Station q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: JC WSP Job #: 211-11888-00 Report By: JC, YR, JU Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 73: Ultimate Wastewater System2048+ Buildout City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:25,000 Municipal Boundary Watercourse Lift Station Constructed in Previous Development Horizons Proposed Lift Station Existing Wastewater Sewer Wastewater Sewer Constructed in Previous Development Horizons Forcemain Constructed in Previous Development Horizons Proposed Trunk Sewer to SESS Constructed in Previous Development Horizons Development Staging 2048+ Other Proposed Wastewater Sewer 250mm 300mm 375mm 400mm 450mm 525mm 600mm 675mm 900mm 1,050mm 1,200mm Alberta, Canada
South
SERTS
ACRWC-WW-ULT-UPG-1 (up to Irvine Creek)
S 625 S 625 S 814 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 235 Twp. Rd. 505 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Rge. Rd. 243 Rge. Rd. 240 41 St 38A St 53 St 65Ave 44Ave 65 St 64 Ave 47 St 55 St 61 Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 62 St 36 St 54 St 32Ave 48Ave 55Ave 69 St 42 Ave 54Ave 52 St St39 39Ave 67 St 60Ave 37Ave 61 Street 34Ave 53 Ave 59Ave 57Ave 51Ave 41 Ave 47Ave 46 St 56St 56 Ave 43Ave 49 Ave 44St 61 St 35 St 62Ave 58 St 35Ave 31Ave 63 St 36 Ave 50Ave 51St 56A St 66 St 46Ave 40 Ave 60 St 59 St 48 St 45Ave 43St 64 St 45 St 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St Irvine Creek LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont
Stormwater
Sewer
City of Beaumont Master
- Utilities & Storm Water Management
0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:22,500 Municipal Boundary Parcel Watercourse Manhole SWMF Drainage Storm Culverts Size 150mm 200mm - 250mm 300mm - 375mm 400mm - 450mm 525mm 600mm - 675mm 750mm 900mm 1200mm 1050mm 1800mm Unknown Alberta, Canada
Figure X: Existing
System - Storm
Size
Plan
100% Report
S T 625 S T 625 S T 625 S 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 LeBlancCanal 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure X: Existing Stormwater System - Storm Sewer Material City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Roads Watercourse Manhole SWMF Culverts Storm Pipe Material Concrete PVC HDPE Unknown Alberta, Canada
S T 625 S T 625 S T 625 S 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 54 St 48Ave 55Ave 69 St 42Ave 54Ave 41Ave 39Ave 60 Ave 37Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51Ave 53St 60 St 47 Ave St46 56Ave 49Ave 44 St St61 35 St 62Ave 35Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 40Ave 55 St 64 St 49 St 48 St 45Ave 43 St 52 St 58 St 32Ave 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 42 St 50 St LeBlancCanal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure X: Existing Stormwater System - Storm Sewer Installation Period City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:15,000 Municipal Boundary Parcel Manhole Watercourse SWMF Culverts Storm Sewer Installation Period 1970-1979 1980-1989 1990-1999 2000-2009 2010-2019 2020-present Alberta, Canada
S T 625 S T 625 S 814 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 814 Highway 50302 Rge. Rd. 244A Rge. Rd. 243 Rge. Rd. 241 Rge. Rd. 235 Rge. Rd. 235 Rge. Rd. 240 Rge. Rd. 242A Twp. Rd. 511A Twp. Rd. 505 Rge. Rd. 242 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 240 Rge. Rd. 234 41St 50A Ave 65Ave 44 Ave 65 St 64 Ave 47 St 55 St 43St 37St 72 St 71 St 40 St 38Ave 49 Ave 36 St 54 St 32Ave 69 St 42 Ave 39Ave 54 Ave 38A St 63 St 60 Ave 37Ave 39 St 67 St 59Ave 61 St 57Ave 51Ave 53St 46 St 56 Ave 43Ave 49 St 44St 35 St 62Ave 58 St 35 Ave 31Ave 36Ave 50Ave 48 St 56 St 51 St 56A St 47 Ave 66 St 53 Ave 46Ave 59 St 40 Ave 60 St 41Ave 48Ave 45 Ave 52 St 64 St 45 St 62 St 52Ave 38 St 29 Ave 55Ave 30 Ave 57 St 42 St 50 St CreekIrvine IrvineCreek LeBlanc Canal q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure X: Existing Model Subcatchment Areas By Land Use City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.35 0.7 1.05 1.4 1.75 0.17 Kilometers Scale: 1:30,500 Municipal Boundary Parcel Watercourse SWMF Drainage Storm Culverts Culverts Conveying Offsite Flows Catchment Area Land Use Agricultural Commercial Park Public Utility Urban Services Residential Offsite Agricultural (Drains through City) Offsite Agricultural (Does not drain through City) Alberta, Canada
S 625 S 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 53 St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 56 St 54 St 32Ave 48Ave 55Ave 69 St 42 St 54Ave 39Ave 63 St 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 59Ave 61 St 57 Ave 51Ave 60 St 47Ave St46 56Ave 49Ave 44St 35 St 62Ave 35Ave 31Ave 66 St 36Ave 50Ave 51St 56A St 42Ave 58 St 53Ave 46Ave 41Ave 55 St 64 St 49 St 48 St 45Ave 40Ave 43 St 52 St 52 Ave 45 St 44Ave 62 St 59 St 29Ave 43Ave 30Ave 57 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure X: Minor System 5-Year 4-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse Pumps SWMF Maximum HGL Relative to Manhole Rim Above Rim Between 0m and -1m Lower Than -1m Pipe Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S 625 S 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 53 St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 56 St 54 St 32Ave 48Ave 55Ave 69 St 42 St 54Ave 39Ave 63 St 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 59Ave 61 St 57 Ave 51Ave 60 St 47Ave St46 56Ave 49Ave 44St 35 St 62Ave 35Ave 31Ave 66 St 36Ave 50Ave 51St 56A St 42Ave 58 St 53Ave 46Ave 41Ave 55 St 64 St 49 St 48 St 45Ave 40Ave 43 St 52 St 52 Ave 45 St 44Ave 62 St 59 St 29Ave 43Ave 30Ave 57 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure X: Minor System 5-Year 24-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse Pumps SWMF Maximum HGL Relative to Manhole Rim Above Rim Between 0m and -1m Lower Than -1m Pipe Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S 625 S 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 53 St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 56 St 54 St 32Ave 48Ave 55Ave 69 St 42 St 54Ave 39Ave 63 St 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 59Ave 61 St 57 Ave 51Ave 60 St 47Ave St46 56Ave 49Ave 44St 35 St 62Ave 35Ave 31Ave 66 St 36Ave 50Ave 51St 56A St 42Ave 58 St 53Ave 46Ave 41Ave 55 St 64 St 49 St 48 St 45Ave 40Ave 43 St 52 St 52 Ave 45 St 44Ave 62 St 59 St 29Ave 43Ave 30Ave 57 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 80: Existing Stormwater SystemMinor System 25-Year 24-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse Pumps SWMF Maximum HGL Relative to Manhole Rim Above Rim Between 0m and -1m Lower Than -1m Pipe Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S 625 S 625 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 53 St 65Ave 65 St 64 Ave 38 St 47St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 56 St 54 St 32Ave 48Ave 55Ave 69 St 42 St 54Ave 39Ave 63 St 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 59Ave 61 St 57 Ave 51Ave 60 St 47Ave St46 56Ave 49Ave 44St 35 St 62Ave 35Ave 31Ave 66 St 36Ave 50Ave 51St 56A St 42Ave 58 St 53Ave 46Ave 41Ave 55 St 64 St 49 St 48 St 45Ave 40Ave 43 St 52 St 52 Ave 45 St 44Ave 62 St 59 St 29Ave 43Ave 30Ave 57 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 81: Minor System 100-Year 24-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse Pumps SWMF Maximum HGL Relative to Manhole Rim Above Rim Between 0m and -1m Lower Than -1m Pipe Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S 625 S 625 S T 625 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41St 38A St 65 Ave 57Ave 65 St 64 Ave 47 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 32Ave 48Ave 47 Ave 69 St 42Ave 39Ave 67 St 37Ave 61 Street 39 St 34Ave 53 Ave 59 Ave 55Ave 51Ave 53 St 60 St 46 St 56Ave 49Ave 44 St 61 St 57 St 35 St 66St 62Ave 35Ave 31Ave 60Ave 36 Ave 50Ave 56 St 51St 56A St 63 St 58 St 46Ave 59 St 40Ave 41Ave 55 St 49 St 48 St 54St 45Ave 43 St 52 St 54Ave 64 St 52 Ave 45 St 44Ave 62 St 38 St 29Ave 43Ave 30Ave 42 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 82: Major System 5-Year 4-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse SWMF Swales Maximum Depth (Major System) < 0.15m 0.15m - 0.30m > 0.30m LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Major Flow Path Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Culvert Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S 625 S 625 S T 625 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41St 38A St 65 Ave 57Ave 65 St 64 Ave 47 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 32Ave 48Ave 47 Ave 69 St 42Ave 39Ave 67 St 37Ave 61 Street 39 St 34Ave 53 Ave 59 Ave 55Ave 51Ave 53 St 60 St 46 St 56Ave 49Ave 44 St 61 St 57 St 35 St 66St 62Ave 35Ave 31Ave 60Ave 36 Ave 50Ave 56 St 51St 56A St 63 St 58 St 46Ave 59 St 40Ave 41Ave 55 St 49 St 48 St 54St 45Ave 43 St 52 St 54Ave 64 St 52 Ave 45 St 44Ave 62 St 38 St 29Ave 43Ave 30Ave 42 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 83: Major System 5-Year 24-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse SWMF Swales Maximum Depth (Major System) < 0.15m 0.15m - 0.30m > 0.30m SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Major Flow Path Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Culvert Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00
Alberta, Canada
S 625 S 625 S T 625 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41St 38A St 65 Ave 57Ave 65 St 64 Ave 47 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 32Ave 48Ave 47 Ave 69 St 42Ave 39Ave 67 St 37Ave 61 Street 39 St 34Ave 53 Ave 59 Ave 55Ave 51Ave 53 St 60 St 46 St 56Ave 49Ave 44 St 61 St 57 St 35 St 66St 62Ave 35Ave 31Ave 60Ave 36 Ave 50Ave 56 St 51St 56A St 63 St 58 St 46Ave 59 St 40Ave 41Ave 55 St 49 St 48 St 54St 45Ave 43 St 52 St 54Ave 64 St 52 Ave 45 St 44Ave 62 St 38 St 29Ave 43Ave 30Ave 42 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 17, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 84: Existing Stormwater SystemMajor System 25-Year 24-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse SWMF Swales Maximum Depth (Major System) < 0.15m 0.15m - 0.30m > 0.30m LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Major Flow Path Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Culvert Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S 625 S 625 S T 625 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41St 38A St 65 Ave 57Ave 65 St 64 Ave 47 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 32Ave 48Ave 47 Ave 69 St 42Ave 39Ave 67 St 37Ave 61 Street 39 St 34Ave 53 Ave 59 Ave 55Ave 51Ave 53 St 60 St 46 St 56Ave 49Ave 44 St 61 St 57 St 35 St 66St 62Ave 35Ave 31Ave 60Ave 36 Ave 50Ave 56 St 51St 56A St 63 St 58 St 46Ave 59 St 40Ave 41Ave 55 St 49 St 48 St 54St 45Ave 43 St 52 St 54Ave 64 St 52 Ave 45 St 44Ave 62 St 38 St 29Ave 43Ave 30Ave 42 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 85: Major System 100-Year 24-Hour Storm Event City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse SWMF Swales Maximum Depth (Major System) < 0.15m 0.15m - 0.30m > 0.30m LeBlanc Canal Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Major Flow Path Depth Max/Full Depth ≤ 0.40 0.40 < Max/Full Depth ≤ 0.65 Max/Full Depth > 0.65 Culvert Capacity Qmax/Qcap ≤ 0.86 0.86 < Qmax/Qcap ≤ 1.00 Qmax/Qcap > 1.00 SWMF Capacity Max Full ≤ 70% 70% < Max Full ≤ 100% Max Full > 100% Alberta, Canada
S T 625 S 625 S 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 241 Rge. Rd. 242 Rge. Rd. 240 Twp. Rd. 505 41 St 38A St 53 St 65Ave 65 St 64 Ave 38 St 47 St 61Ave 36 St 37 St 72 St 71 St 40 St 38Ave 50AAve 56 St 54 St 32Ave 48Ave 55Ave 69 St 42 St 54Ave 39Ave 63 St 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 59Ave 46 St 61 St 51Ave 60 St 47Ave 49Ave 44 St 35 St 62Ave 35Ave 31Ave 56 Ave 66 St 36Ave 50Ave 51St 56A St 42Ave 58 St 53Ave 46Ave 40Ave 41Ave 55 St 64 St 49 St 48 St 57Ave 45Ave 43 St 52 St 45 St 44Ave 62 St 52Ave 59 St 29Ave 43Ave 30Ave 57 St 50 St LeBlancCanal Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Elan Ruisseau South Lakeview Issue ID: 1 Issue ID: 2 Issue ID: 3 Issue ID: 5 Issue ID: 6 Issue ID: 7 Issue ID: 8 Issue ID: 9 Issue ID: 10 Issue ID: 11 Issue ID: 12 Issue ID: 13 Issue ID: 14 Issue ID: 15 Issue ID: 16 Issue ID: 17 Issue ID: 18 Issue ID: 19 Issue ID: 20 Issue ID: 21 Issue ID: 22 LID Location A LID Location B LID Location C LID Location D q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 86: Storm System Issues and Potential LID Locations City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.15 0.3 0.45 0.6 0.75 0.07 Kilometers Scale: 1:14,400 Municipal Boundary Parcel Watercourse Manholes Storm Sewers SWMF Drainage Storm Culverts Pump Swales System Issues Potential LID Locations Alberta, Canada
S 625 S T 625 S T 814 S 625 50 Ave. 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 814 Highway Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 235 Twp. Rd. 505 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Rge. Rd. 243 Rge. Rd. 240 41St 38A St 65Ave 65 St 64 Ave St47 55 St 61Ave 37St 72 St 71 St 40 St 49 St 38Ave 50AAve 36 St 54 St 32Ave 48Ave 55Ave 69 St 42Ave 54Ave 39Ave 37 Ave 39 St 61 Street 67 St 34Ave 66 St 59 Ave 57Ave 51 Ave 53St 46 St 56Ave 43 Ave 49Ave 44 St 35 St 62Ave 35 Ave 31Ave 60 Ave 63 St 36Ave 50Ave 56 St 51St 56A St 47Ave 53Ave 59 St 61 St 46Ave 60 St 41 Ave 48 St 40 Ave 45 Ave 43 St 52 St 64 St 58 St 45 St 44 Ave 62 St 52Ave 38 St 29 Ave 30Ave 57 St 42 St 50 St IrvineCreek LeBlanc Canal 1 2 3 4 5 7 8 6 Brookside Four Seasons Citadel Coloniale Pond 3 Coloniale Pond 2W Coloniale Pond 4 Coloniale Pond 6 Coloniale Pond 2A Coloniale Pond 5 Goudreau Terrace Eaglemont Triomphe Place Chaleureuse North Montrose South Forest Heights Pond Caradon Pond Cairns Westbrook Wetlands ParkView Coloniale Pond 1 Coloniale Pond 2E Coloniale Pond 2 Center Coloniale Pond 3A Beaumont Lakes West Montrose North Montalet South Beaumont Lakes East Montalet North Ruisseau North Forest Heights South Dansereau Meadows South Pond Dansereau Meadows Central Pond Place Chaleureuse SWMF Eaglemont Heights Ruisseau South Beau_Val_1 Beau_Val_2 Beau_Val_3 Elan_1 Elan_2 Elan_3 Elan_4 Elan_5 Elan_6 Elan_7 Elan_8 Future_SWMF_1 Future_SWMF_2 Future_SWMF_3 Future_SWMF_4 Future_SWMF_5 Lakeview LeReve_1 LeReve_2 LeReve_3 LeReve_4 Southlands_1 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure X: Ultimate Growth Model City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:24,000 Municipal Boundary Mapped Watercourse Roads Existing SWMF Exisiting Wetland Culvert Conveying Offsite Flows Outfall Pumps Future SWMF Future Underground Storage Tanks Subcatchments Offsite Future Development Future Redevelopment (Centre-Ville) Storm Sewers Future Existing Alberta, Canada
41 St 38A St 65Ave 65 St 64 Ave 55Ave 61Ave 37 St 72 St 71 St 40 St 50A Ave 62 St 36 St 54 St 48Ave 69 St 42Ave 54Ave 41Ave 39Ave 37 Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 38Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 49 St 43 Ave 49Ave 44St St61 57 St 35 St 62Ave 60Ave 35 Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 55 St 59 St 48 St 40 Ave 45 Ave 43St 52 St 58 St 64 St 32Ave 45 St 44 Ave 52Ave 38 St 29Ave 47 St 30Ave 42 St 50 St Irvine Creek LeBlancCanal Beau_Val_1 Elan_2 Elan_3 Lakeview LeReve_3 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 90: Storm System Development Staging 2023 - 2027 City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:22,000 Municipal Boundary Existing Storm Sewers Existing Drainage Swales Existing SWMF Existing Pump FUTURE
INFRASTRUCTURE Proposed Future SWMF Existing SWMF SWMF Catchment Area Proposed Storm Trunk Development Staging 2023-2027 Other Serviced by Existing SWMF Alberta, Canada Serviced by existing Coloniale Pond 4 Serviced by existing Triomphe Pond Serviced by existing Dansereau Meadows Central Pond Serviced by existing Montrose South Pond Serviced by existing Place Chaeureuse Pond Serviced by existing Ruisseau South Pond Serviced by existing Montalet North Pond Serviced by existing Coloniale Pond 1 Development of this area is tied to west lands.
SCENARIO
S 625 S 625 S 814 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 235 Twp. Rd. 505 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Rge. Rd. 243 Rge. Rd. 240 41 St 38A St 65Ave 65 St 64 Ave 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 54 St 48Ave 55Ave 69 St 42Ave 63 St 54Ave 39Ave 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 41Ave 47Ave 46 St 56Ave 43 Ave 49Ave 44 St St61 57 St 35 St 62Ave 35 Ave 31Ave 36 Ave 50Ave 56 St 51St 56A St 66 St 46Ave 60 St 55 St 59 St 62 St 49 St 48 St 40 Ave 45 Ave 43St 52 St 58 St 64 St 32Ave 45 St 44 Ave 52Ave 38 St 29Ave 47St 30Ave 42 St 50 St Irvine Creek LeBlancCanal Beau_Val_1 Beau_Val_2 Beau_Val_3 Elan_2 Elan_3 Lakeview LeReve_3 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 91: Storm System Development Staging 2028 - 2032 City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:22,000 Municipal Boundary Existing Storm Sewers Existing Drainage Swales Existing SWMF Existing Pump FUTURE SCENARIO INFRASTRUCTURE Proposed SWMF Existing SWMF SWMF Catchment Area Storm Trunk Constructed in Previous Development Horizons Proposed Storm Trunk Development Staging 2028-2032 Other Serviced by Existing SWMF Alberta, Canada Based on Le Reve NSR the timing of this area may be tied to west lands. Serviced by existing Coloniale Pond 5 and Coloniale Pond 6 Development of east red parcels (2023-2027) may now proceed Based on Lakeview NSR the timing of this area may be tied to west lands.

Development of this parcel is tied to timing of future north lands. Following Le Reve NSR an easement will be required in the north parcel for development of this area at this stage.

S 625 S 625 S 814 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 235 Twp. Rd. 505 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Rge. Rd. 243 Rge. Rd. 240 41 St 38A St 65Ave 65 St 64 Ave 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 54 St 48Ave 55Ave 69 St 42Ave 63 St 54Ave 39Ave 60Ave 37 Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 41Ave 47Ave 46 St 56Ave 43 Ave 49Ave 44 St St61 57 St 35 St 62Ave 35 Ave 31Ave 36 Ave 50Ave 56 St 51St 56A St 66 St 46Ave 60 St 55 St 59 St 62 St 49 St 48 St 40 Ave 45 Ave 43St 52 St 58 St 64 St 32Ave 45 St 44 Ave 52Ave 38 St 29Ave 47St 30Ave 42 St 50 St Irvine Creek LeBlanc Canal Beau_Val_1 Beau_Val_2 Beau_Val_3 Elan_2 Elan_3 Elan_6 Elan_7 Lakeview LeReve_3 Southlands_1 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 92: Storm System Development Staging 2033 - 2037 City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:22,000 Municipal Boundary Existing Storm Sewers Existing Drainage Swales Existing SWMF Existing Pump FUTURE SCENARIO INFRASTRUCTURE Proposed Future SWMF Existing Future SWMF SWMF Catchment Area Storm Trunk Constructed in Previous Development Horizons Proposed Pump Proposed Storm Trunk Development Staging 2033-2037 Other Serviced by Exisiting SWMF Alberta,
Serviced by existing Coloniale Pond 3A Serviced by existing Beaumont Lakes East Pond
Canada
Development timing is subject to servicing along TWP 505 Development of orange parcel (2028-2032) may now proceed

Development of yellow parcel (2033-2037) may now proceed

Development of orange parcel (2028-2032) may now proceed

41 St 38A St 65Ave 65 St 64 Ave 55Ave 61Ave 37 St 72 St 71 St 40 St 50A Ave 62 St 36 St 54 St 48Ave 69 St 42Ave 54Ave 41Ave 39Ave 37 Ave 61 Street 67 St 39 St 34Ave 53Ave 59Ave 38Ave 57Ave 51 Ave 53St 60 St 47Ave 46 St 56Ave 43 Ave 49Ave 44St St61 57 St 35 St 62Ave 60Ave 35 Ave 31Ave 63 St 36Ave 50Ave 56 St 51St 56A St 66 St 46Ave 55 St 59 St 49 St 48 St 40 Ave 45 Ave 43St 52 St 58 St 64 St 32Ave 45 St 44 Ave 52Ave 38 St 29Ave 47 St 30Ave 42 St 50 St Irvine Creek LeBlanc Canal Beau_Val_1 Beau_Val_2 Beau_Val_3 Elan_2 Elan_3 Elan_6 Elan_7 Future_SWMF_3 Lakeview LeReve_1 LeReve_3 LeReve_4 Southlands_1 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 93: Storm System Development Staging 2038 - 2042 City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:22,000 Municipal Boundary Existing Storm Sewers Existing Drainage Swales Existing SWMF Exisiting Pump FUTURE SCENARIO INFRASTRUCTURE Proposed Future SWMF Existing Future SWMF SWMF Catchment Area Storm Trunk Constructed in Previous Development Horizons Proposed Pump Proposed Storm Trunk Development Staging 2038-2042 Other Alberta, Canada
S 625 S 625 S 814 S T 625 50 Ave. Twp. Rd. 505 Rge. Rd. 243 Rge. Rd. 243 Twp. Rd. 510 Twp. Rd. 510 Twp. Rd. 510 Rge. Rd. 241 Rge. Rd. 235 Twp. Rd. 505 Rge. Rd. 240 Rge. Rd. 240 Rge. Rd. 244 Rge. Rd. 244 Rge. Rd. 242 Rge. Rd. 243 Rge. Rd. 240 41 St 38A St 65Ave 65 St 64 Ave 55 St 61Ave 37 St 72 St 71 St 40 St 38Ave 50A Ave 36 St 48Ave 55Ave 69 St 42Ave 63 St 54Ave 39Ave 60Ave 37 Ave 61 Street 67 St 39 St 54 St 34Ave 53Ave 59Ave 57Ave 51 Ave 53St 41Ave 47Ave 46 St 43 Ave 49Ave 44 St St61 57 St 35 St 62Ave 35 Ave 31Ave 56 Ave 36 Ave 50Ave 56 St 51St 56A St 66 St 46Ave 60 St 59 St 62 St 49 St 48 St 40 Ave 45 Ave 43St 52 St 58 St 64 St 32Ave 52Ave 45 St 44 Ave 38 St 29Ave 47St 30Ave 42 St 50 St Centre-Ville_1 Centre-Ville_2 Centre-Ville_3 Centre-Ville_4 Centre-Ville_5 Centre-Ville_6 Irvine Creek LeBlanc Canal Beau_Val_1 Beau_Val_2 Beau_Val_3 Elan_2 Elan_3 Elan_6 Elan_7 Future_SWMF_3 Future_SWMF_5 Lakeview LeReve_1 LeReve_3 LeReve_4 Southlands_1 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 94: Storm System Development Staging 2043 - 2047 City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.25 0.5 0.75 1 1.25 0.13 Kilometers Scale: 1:22,000 Municipal Boundary Existing Storm Sewers Existing Drainage Swales Existing SWMF Exisiting Pump FUTURE SCENARIO INFRASTRUCTURE Proposed Future SWMF Existing Future SWMF SWMF Catchment Area Proposed Underground Storage Tank Storm Trunk Constructed in Previous Development Horizons Proposed Pump Proposed Storm Trunk Development Staging 2043-2047 Other Alberta, Canada Following Le Reve NSR development of this area may be tied to future northwest lands. Outfall to unnamed waterbody. Following Elan NSR development of this area may be tied to northwest lands.
41 St 38ASt 53 St 65Ave 57Ave 44Ave 65 St 64 Ave 47 St 55 St 55Ave 61 Ave 37St 72 St 71 St 40 St 38Ave 50AAve 62 St 56 St 36 St 54 St 48Ave 69 St 42Ave 54 Ave 52 St 39 St 41Ave 39Ave 37 Ave 61 Street 67 St 34Ave 53 Ave 59Ave 61 St 51 Ave 47 Ave 46 St 43Ave 49Ave 44 St St57 35 St 62Ave 60 Ave 35 Ave 31Ave 56 Ave 63 St 36Ave 50Ave 51St 56A St 66 St 59 St 46 Ave 60 St 49 St 48 St 40 Ave 45Ave 43St 64 St 58 St 32Ave 45 St 52 Ave 38 St 29 Ave 30 Ave 42 St 50 St Centre-Ville_1 Centre-Ville_2 Centre-Ville_3 Centre-Ville_4 Centre-Ville_5 Centre-Ville_6 IrvineCreek LeBlanc Canal Beau_Val_1 Beau_Val_2 Beau_Val_3 Elan_1 Elan_2 Elan_3 Elan_4 Elan_5 Elan_6 Elan_7 Elan_8 Future_SWMF_1 Future_SWMF_2 Future_SWMF_3 Future_SWMF_4 Future_SWMF_5 Lakeview LeReve_1 LeReve_2 LeReve_3 LeReve_4 Southlands_1 Southlands_2 q q Legend q q Study Area KEY MAP 1:1,000,000 Office: Edmonton Reviewed By: JU, MN Date: August 16, 2023 Drawn by: YR WSP Job #: 211-11888-00 Report By: JC, YR Universal Transverse Mercator (Zone 12) North American Datum (1983) City of Beaumont Figure 95: Storm System Development Staging 2048+ City of Beaumont Master Plan - Utilities & Storm Water Management 100% Report 0 0.3 0.6 0.9 1.2 1.5 0.15 Kilometers Scale: 1:27,000 Municipal Boundary Existing Storm Sewers Existing Drainage Swales Existing SWMF Exisiting Pump
SCENARIO INFRASTRUCTURE Proposed Future SWMF Existing Future SWMF SWMF Catchment Area Storage Tank Constructed in Previous Development Horizons Proposed Pump Proposed Storm Trunk Development Staging 2048+ Other Alberta, Canada Outfall to Cawes Lake. Outfall to unnamed waterbody. Development of light green parcels (2043-2047) may now proceed.
FUTURE
Development of light green parcels (2043-2047) may now proceed.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.