CONSTRUCTION NOTICE Date: May 15, 2017 Attention: Beauridge Resident Re: Beaumont Neighbourhood Renewal – Beauridge Stage 1 Park-Aid Asphalt and Maintenance Ltd. (Park-Aid) has been retained by the Town of Beaumont for 2017 Neighbourhood Renewal. Weather permitting, on Tuesday May 18, 2017, Park-Aid will commence marking, cutting, removing and replacing sidewalks/curb and gutters, selected driveway aprons, and catch basin installation in your neighbourhood. Concrete sidewalks and traffic will be affected. This work will restrict and limit access and sidewalks may be closed and marked with appropriate signage. It is typical that once concrete is placed, it will require time to cure and harden before allowing traffic back onto the surface. The duration of the work for Stage 1 will take approximately 28 days depending on weather. See attached Staging map. Please respect the “no parking” signs and park your vehicle/s in an appropriate location/s to help us work safely and timely. This work will proceed in a timely manner. Once the concrete has been completed the neighbourhood will experience a new top lift of pavement that will involve cold milling of the existing asphalt pavement and repaving. Letters will be handed out prior to asphalt milling and paving at a later date. Garbage pick-up will continue normally (Thursdays) and we ask that you bring your garbage to the end of your driveway. Should you require assistance please call Park-Aid (per below Dean Waddington). ParkAid will ensure the garbage gets from the end of you driveway to the garbage truck. *Please advise Park-Aid as soon as possible if you have an irrigation system on your property (Dean Waddington 780-236-2365) to avoid any damage to your system. Sidewalk replacements typically are in close proximity to residential irrigation lines. We strive to minimize the impact to residences during these types of projects. However, we do expect some inconveniences and ask for residences to be patient. As well, please speak with your children about the potential dangers of heavy equipment and construction areas. We provide excellent safety measures and signage as well as worker education. However, any additional help to protect our children is always greatly appreciated. We are looking forward to a successful project this season. Should you have any questions or concerns please feel free to contact Park-Aid (per below) or approach our on-site staff and ask for a supervisor. We’re always open to discussion to assist residents during the completion of the project. Many thanks for your assistance during this construction season. Park-Aid Service Center for any concerns or additional work please call 780-469-7533. Dean Waddington Project Manager Park-Aid Asphalt and Maintenance Ltd. 780-236-2365
5522
MARSEILLE ST
5404 5520 5518 5516 5514 5512 5510 5508 5506 5504 5502 5412 5410 5408 5406
5615
5402
5524
5611
5612
5606
5609
5610
5604
5607
5608
5602
5605
5606
5521 5608
5605
5601
5611
5608
5609
5603 5612 5610 5608 5606 5604
5610
5605 5604 5602
5604
5603
5406
5603
5505
5308
5407
NUE
5602
5614
5510
5508
5311 5506
5506 5504 5502
5504
5404
5502
54 STR EET
5604
5508
5403
5606 5604
56 AVE
5405 5606
5306 5304 5302
5601
5503
5307 5305
5014
5012
56 STREET
T
EE TR
55 STREET
NUE
m
5303
5010 5008
55 AVE
50
5605 5603
5301
5503 5016
25
5607
5601 5309
5505
START OF STAGE 1
0
5609
5608
5602
5617 5615 5613 5611 5609 5607 5605
5610
5603
5601
5404 5402
5612
5607
5606
5605
5507
5608
5700
5609
5607
56 AVENUE
5610
5611
53 STREET
5519
5517 5515
5613
5611
5614
54 STREET
5607
5613
END OF STAGE 1
55 STREET
5523
56 STREET
56A STREET
57 AVENUE 5610
AS
FILENAME: 215-17002-F05.DWG WORKING DRAWINGS
5613
5609
56
SOURCE: W:\0215-TOWN OF BEAUMONT\0215-17002-2017 NEIGHBOURHOOD RENEWAL\3.0 DESIGN PROCESS\3.3 ACAD\3.3.3
5701
SCALE 1:2500
75
TOWN OF BEAUMONT 2017 NEIGHBOURHOOD RENEWAL BEAURIDGE OVERALL LOCATION PLAN - STAGE 1