Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
DOCUMENT PACKAGE
BIOREPOSITORY CONSOLIDATION
MAYO PROJECT: #7R121080
2915 WAREHOUSE VALLEY HIGH DRIVE ROCHESTER, MN 55901
ISSUED:
11/27/13
PACKAGE:
Q-REVIEW FIT - UP PACKAGE
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
Certification
DRAWING ABBREVIATIONS
ABV. A.F.F. ACC. ACC. PML. ACFLR. ACOUS. A.C.T. A.C.P. ADD. ADD'N(L) ADH. ADJ. A/C ALT. ALUM. A.D.A. ANCH. A.B. ANOD. & "L" ANTQ. APT. APPVD. ARCH.
ABOVE ABOVE FINISH FLOOR ACCESS or ACCESSARY (IES) ACCESS PANEL ACCESSIBLE FLOORING ACOUSTICAL ACOUSTICAL CEILING TILE ACOUSTICAL WALL PANEL ADDENDUM ADDITION(AL) ADHESIVE ADJACENT AIR CONDITIONING ALTERNATE ALUMINUM AMERICAN'S WITH DISABILITY ACT
ART. ATT. AUTO. AVG.
ANCHOR(AGE) ANCHOR BOLT ANODIZED AND ANGLE ANTIQUE APARTMENT APPROVED ARCHITECT OR ARCHITECTURAL ARCHITECTURAL WOODWORK ARTWORK ATTACH(ED) (MENT) AUTOMATIC AVERAGE
BQ. B. BSMT. BM. BRG. B.MK. BTWN. BEV. BLK. BLKG. BD. BT. B.S. BOT. BRKT. BRK. BRNZ. BLDG. B.U.R. B.S. B.BD.
BANQUETTE BASE MATERIAL BASEMENT BEAM BEARING BENCH MARK BETWEEN BEVELED BLOCK BLOCKING BOARD BOLT OR BOLTS BOTH SIDES BOTTOM BRACKET BRICK BRONZE BUILDING BUILT UP ROOFING BUILDING STANDARD BULLETIN BOARD
CAB. CPT. CSWRK. C.I. C.I.P. C.B. CALK. CLG. CEM. CTR. C.L. C.T. C.BD. CH. CR. CIRC.
CABINET CARPET CASEWORK CAST IRON CAST IN PLACE CATCH BASIN CAULKING CEILING CEMENT CENTER CENTER LINE CERAMIC TILE CHALK BOARD CHAIR CHROMIUM, CHROME CIRCLE, CIRCULAR CIRCUMFERENCE CLEANOUT CLEAR CLEAR OPENING CLOSET CLOSURE COLD WATER COLUMN COMPOSITE COMPRESSIBLE CONCRETE CONCRETE MASONRY UNIT CONFERENCE CONNECT OR CONNECTION CONSTRUCTION CONTINUED CONTINUOUS CONTRACTOR CONTRACT CONTROL JOINT JOINT CORNER CORNER GUARD CORRIDOR CORRUGATED COUNTER COUNTERSUNK CREDENZA
AWDWK.
C.O. CLR. CLR.OPG. CLO. CLS. C.W. COL. COMP. COMPR. CONC. CMU. CONF. CONNX. CONST. CONT'D. CONT. CONTR. C.J. COR. C.G. CORR. CORRUG. CTR. CSK. CRED.
SHEET INDEX DRAWINGS
DK. DEC. DEM. DMT. DEPT. DET. DIAG. DIA. DIM. DISP. DISPOS. DIST. DO. DIV. DR. D.O. DBL. D.A. DN. D.S. DRAP. DWR. DW. DWG. D.F. D.S.P. D.W. D.X.
EA. E.F. E.W. E. ELAST. ELEC. E.O. E.P. E.W.C. ELEV. ELEVR. EMER. ENCL. E. to E. ENGR. ENTR. ENVL. EQ. EQUIP. EQUIV. EXCAV. EXH. EXIST. EXPAN. EXP. BT. E.J. EXPOS. EXT. EX.
F. FABR. F.O.C. F.O.F. F.O.M. F.O.S. F.O.W. F-F F.M. FAS. FIN. F.F. F.A. F.E. F.E.C. F.H.C. F.H.R. F.P. FRT. FIX. FIXT. FLASH. F.H. F.H.S. FLEX. FLR. F.D. F. MTD. FLUOR. FL. FT. FTG. FDN. FRM. FRMG. F.S. FURN. F.B.O. FUR. FURR. FUT.
DARK DECORATIVE DEMOLITION DEMOUNTABLE DEPARTMENT DETAIL DIAGONAL DIAMETER DIMENSION DISPENSER DISPOSAL or DISPOSER DISTANCE DITTO DIVISION DOOR DOOR OPENING DOUBLE DOUBLE-ACTING DOWN DOWNSPOUT DRAPERY DRAWER DRYWALL DRAIN DRINKING FOUNTAIN DRY STANDPIPE DRYWALL DUPLEX
GA. GALV. G.I. GASK. GA. GEN. GL. G.B. GRD. GRN. GRT. GRV. GRND. GFCI. GT. GYP. GYP. BD.
HVY. HDF. HT. H.P. H.C. H. GRN. HORIZ. H.B. H.W. HR.
HANDRAIL HARDBOARD HARDWARE HARDWOOD HEAD HEATING HEATING, VENTILATING AND AIR CONDITIONING HEAVY HIGH DENSITY FIBERBOARD HEIGHT HIGH POINT HOLLOW CORE HONED GRANITE HORIZONTAL HOSE BIBB HOT WATER HOUR
I.C. INCAN. INCL. INFO. I.D. INSUL. INT. INTM. INV. I.O.C.
IN CONTRACT INCANDESCENT INCLUDE(D)(ING) INFORMATION INSIDE DIAMETER INSULATION INTERIOR INTERMEDIATE INVERT ITEM OF CHARGE
JAN. JAN. CLO. JNT. JTFILL JST. J.B.
JANITOR JANITOR CLOSET JOINT JOINT FILLER JOIST JUNCTION BOX BOX
K.P. KIT. K.O.
KICK PLATE KITCHEN KNOCKOUT
HNDRL. HDBD. HDWR. HDWD. HD. HTG. HVAC
EACH EACH FACE EACH WAY EAST ELASTIC ELECTRIC ELECTRIC OUTLET ELECTRIC PANEL ELECTRIC WATER COOLER ELEVATION ELEVATOR EMERGENCY ENCLOSURE END TO END ENGINEER ENTRANCE ENVELOPE EQUAL EQUIPMENT EQUIVALENT EXCAVATED or EXCAVATION EXHAUST EXISTING EXPANSION EXPANSION BOLT EXPANSION JOINT EXPOSED EXTERIOR EXISTING
FABRIC FABRICATE FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FACE OF WALL FACE TO FACE FACTORY MUTUAL FASTEN, FASTENER FINISH(ED) FINISH FLOOR FIRE ALARM FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FIRE HOSE CABINET FIRE HOSE RACK FIREPROOFING FORE FIRE RETARDANT FIXED FIXTURE FLASHING FLAT HEAD FLAT HEAD SCREW FLEXIBLE FLOOR FLOOR DRAIN FLOOR MOUNTED FLUORESCENT FLUSH FOOT OR FEET FOOTING FOUNDATION FRAME FRAMING FULL SIZE(SCALE) FURNITURE FURNISHED BY OTHERS FURRED FURRING FUTURE
GAGE, GAUGE GALVANIZED GALVANIZED IRON (STEEL) GASKET GAUGE GENERAL GLASS OR GLAZED GRAB BAR GRADE GRANITE GRATE, GRATING GRAVEL GROUND GROUND FAULT CIRCUIT INTERPRETER GROUT GYPSUM GYPSUM BOARD
LAB. LAM. LG. LAT. LAV. L.H. L.H.R. L. LT. LTWT. LIN. LTL. L.L. LKR. LONG'L. LOUV. L.P. LB. MACH. MAINT. MGR. MFGR. MRB. MAS. M.O. MATL. MAX. MECH. M.C. MED. MEMB. MET. M.L. MEZZ. MLWK. MIN. MIR. MISC. MTD. MUL.
LABORATORY LAMINATE LARGE LATERAL LAVATORY LEFT HAND LEFT HAND REVERS LENGTH LIGHT LIGHT WEIGHT LINEAR or LINOLEUM LINTEL LIVE LOAD LOCKER LONGITUDINAL LOUVER(S) LOW POINT POUND MACHINE MAINTENANCE MANAGER MANUFACTURE(ER) MARBLE MASONRY MASONRY OPENING MATERIAL MAXIMUM MECHANICAL MEDICINE CABINET MEDIUM MEMBRANE METAL METAL METAL LATH MEZZANINE MILLWORK MINIMUM MIRROR MISCELLANEOUS MOUNTED MULLION
NAT. NEG. NOM. N. N.I.C. N.T.S. NO.
NATURAL NEGATIVE NORMAL NORTH NOT IN CONTRACT NOT TO SCALE NUMBER
OBSC. OFF. OPNG. OPP. O.H. ORIG. ORN. OZ. O.D. OTOO OVHD. O.HD. O.C.
OBSCURE OFFICE OPENING OPPOSITE OPPOSITE HAND ORIGINAL ORNAMENTAL OUNCE OUTSIDE DIAMETER OUT TO OUT OVERHEAD OVERHEAD DOOR ON CENTER
SAN. S.N.D. SC. SCHED. SCHEM. SEAL. SECT. SEL. SEP. SERV. SVSNK SHT. SH. SHWR. SIM. SNK. SKYLT. SLDR. SM. S.D. S.C.
P. PTD. PR. PNL. P.T.D. P.T.R. PART. BD. PTN. PATT. PAV. P.H. PERM. PC. PERP. PLAS. P.LAM. PL. PL.GL. PLBG.
PAINT PAINTED PAIR PANEL PAPER TOWEL DISPENSER PAPER TOWEL RECEPTACLE PARTICLE BOARD PARTITION PATTERN(ED) PAVING OR PAVEMENT PENTHOUSE PERMANENT PIECE PERPENDICULAR PLASTER PLASTIC LAMINATE PLATE PLATE GLASS PLUMBING
PLYWD. PT. POL. PVC. PORT. PSF. PREFAB. PROD. PROJ. PROP. P.L. PLAM
PLYWOOD POINT POLISH POLYVINYL CHLORIDE PORTABLE POUNDS PER SQUARE FOOT PREFABRICATED PRODUCTION, PRODUCT PROJECT PROPERTY PROPERTY LINE PLASTIC LAMINATE
QUAL. QUAN. Q.T.
QUALITY QUANTITY QUARRY TILE
RADIUS RECEPTACLE REFERENCE REFER TO REFLECTED REFRIGERATOR REINFORCED REINFORCED BAR REMAINDER REMOVE REQUIRED RESILENT RESILENT BASE RETURN AIR REVISION RIGHT HAND RIGHT HAND REVERSE RISER ROOF DRAIN ROOFING ROOM ROUGH OPENING ROUND
RAD. RECEP. REF. RE: REFL. REFR. REINF. REBAR. REM. REMV. REQD. RESIL. R.B. R/A REV. R.H. R.H.R. R. R.D. RFG. RM. R.O. RND.
S. SPKR. SPEC'L. SPECS. SPL. SQ. SF. SQ. IN. STAG. S.S. STD. STA. STL. ST. STOR. STFNT. STRUCT. SUP. SUSP. SYMM. SYST.
SANITARY SANITARY NAPKIN DISPENSER SCALE SCHEDULE SCHEMATIC SEALANT SECTION SELECT SEPARATE SERVICE SERVICE SINK SHEET SHELF or SHELVING SHOWER SIMILAR SINK SKYLIGHT SLIDING DOOR SMALL SOAP DISPENSER SOLID CORE or SEALED CONCRETE SOUTH SPEAKER SPECIAL SPECIFICATIONS SPLASH SQUARE SQUARE FEET SQUARE INCHES STAGGERED STAINLESS STEEL STANDARD STATION STEEL STONE STORAGE STOREFRONT STRUCTURAL SUPPLY SUPPORT SUSPEND(ED) SYMMETRICAL SYSTEM
T.BD. TAN. TECH. TEL. T.V. TEMPD. TEMP. TRZ. THK. THRESH. T.PAV. T.P.H. TOL. T&G T&B T.O.C. T.C. T.O.P. T.O.S. T.O.W. T.B. T.D. TR. T. TYP.
TACKBOARD TANGENT TECHNICAL TELEPHONE TELEVISION TEMPERED TEMPORARY TERRAZZO THICK(NESS) THRESHOLD TILEPAVERS TOILET PAPER HOLDER TOLERANCE TONGUE AND GROOVE TOP AND BOTTOM TOP OF CONCRETE TOP OF CURB TOP OF PAVEMENT TOP OF STEEL TOP OF WALL TOWEL BAR TOWEL DISPENSER TRANSFORM TREAD TYPICAL
U.L. U.C. UNFIN. U.N.O. UR. UTIL.
UNDERWRITERS LABORATORY UNDERCUT UNFINISHED UNLESS NOTED OTHERWISE URINAL UTILITY
VAR. VNR. V.I.F. VERT. VEST. VIN. V.B. V.C.T. V. VOL.
WSCT. W.H. WC. W.H. W.R. W.P. W.S. WT. WLD. W.W.M. W. W.S.P. W.F. WDW. WDWALL W.GL. W/ W/IN W/O WD. W.B. W.PT. W.W.F.
X
WAINSCOT WALL HUNG WATER CLOSET WATER HEATER WATER RESISTANT WATERPROOF WEATHERSTRIPPING WEIGHT WELDED WELDED WIRE MESH WEST WET STANDPIPE WIDE FLANGE (STEEL) WINDOW WINDOW WALL WIRE GLASS WITH WITHIN WITHOUT WOOD WOOD BASE WORKING POINT WOVEN WIRE FABRIC
TIMES OR BY (AS IN 2X4)
OWNER
MECH/ELEC ENGINEERS
MAYO FOUNDATION FACILITIES PROJECT SERVICES 200 FIRST STREET SW ROCHESTER, MN 55905
MEP ASSOCIATES, LLC 2900 43RD ST NW STE 100 ROCHESTER, MN 55901 PHONE: 507/281-1632 FAX: 507/281-6328
CONSTRUCTION MANAGER:
PROJECT MANAGER:
& @ c L o ' " #5 _ 5#
MECHANICAL CONTACT:
PHIL PLONKA PHONE: 507/284-8444 EMAIL: PLONKA.PHIL@MAYO.EDU
ELECTRICAL CONTACT:
LUKE JOHNSON PHONE: 507/281-1632 EMAIL: LUKEJ@MEPASSOCIATES.COM NORM OLSON PHONE: 507/281-1632 EMAIL: NORMO@MEPASSOCIATES.COM
ARCHITECT
STRUCTURAL ENGINEER
RSP ARCHITECTS, LTD. 320 SOUTH BROADWAY STE. B ROCHESTER, MN 55904 PHONE: 507/285-6569 FAX: 612/677-7499
STRUCTURAL DESIGN GROUP 3720 19TH ST. NW, SUITE 210 ROCHESTER, MN 55901 PHONE: 507/529-5310
YARD
STRUCTURAL ENGINEER:
JASEN ANDRING PHONE: 507/292-8664 EMAIL: JASEN.ANDRING@RSPARCH.COM
D001.2 A001.2
JOSH KVASNICKA PHONE: 507/529-5310 EMAIL: JKVASNICKA@SDGMN.COM
CIVIL ENGINEER MCGHIE & BETTS, INC. 1648 THIRD AVENUE SE ROCHESTER, MN 55904 PHONE: 507/289-3919 FAX: 507/289-7333
AND AT CENTERLINE DIAMETER FEET INCHES (OR DITTO) NUMBER ("NUMBER 5") PER ("POUNDS/FOOT") PERPENDICULAR POUNDS ("5 POUNDS")
CIVIL ENGINEER:
DAVID MORRILL PHONE: 507/289-3919 EMAIL: DMORRILL@MCGHIEBETTS.COM
GENERAL NOTES 1. ALL CONTRACTORS ARE RESPONSIBLE TO REVIEW ALL CONSTRUCTION DOCUMENTS AND ARE RESPONSIBLE FOR INFORMATION ON ALL CONSTRUCTION DOCUMENTS. 2. ALL CONTRACTORS AND SUBCONTRACTORS TO COMPLY WITH MAYO CAMPUS STANDARD SPECIFICATIONS AND STANDARD PROCEDURES. 3. THE AVAILABILITY OF ALL MATERIALS DESIGNATED ON PLANS TO MATCH EXISTING SHALL BE VERIFIED BY CONTRACTORS AND SUBCONTRACTORS PRIOR TO ESTIMATE SUBMITTALS. CONTRACTOR TO NOTIFY OWNER IF MATCHING MATERIALS ARE NOT AVAILABLE. ANY SUBSTITUTIONS TO BE REVIEWED AND APPROVED. 4. ALL CUTTING AND PATCHING SHALL BE PERFORMED BY THE GENERAL CONTRACTOR. GENERAL CONTRACTOR SHALL INCLUDE COST OF ALL REQUIRED CUTTING AND PATCHING FOR ALL TRADES IN THEIR ESTIMATE. 5. CONTRACTORS TO PROVIDE TEMPORARY PARTITIONS AND DUST CONTROL AT ALL LOCATIONS WHERE WORK OCCURS IN CORRIDORS AND/OR CANNOT BE CONTAINED WITHIN ROOMS. 6. REMOVAL OF WALLS AND PARTITIONS TO INCLUDE ALL MECHANICAL AND ELECTRICAL ITEMS. DEMOLITION OF THESE ITEMS SHALL EXTEND BACK TO MAIN DISTRIBUTION POINTS UNLESS NOTED OTHERWISE. 7. THE GENERAL CONTRACTOR SHALL PROVIDE MAJOR DAILY CLEAN UP OF THE CONSTRUCTION SITE. ALL OTHER CONTRACTORS OR SUBCONTRACTORS SHALL CLEAN UP THEIR INDIVIDUAL TRASH AND DISPOSE OF IT. MAJOR SHIPPING CONTAINERS AND DEMOLITION ITEMS SHALL BE THE RESPONSIBILITY OF INDIVIDUAL CONTRACTORS OR SUBCONTRACTORS TO REMOVE DAILY. 8. AT CONCLUSION OF PROJECT, ALL CONTRACTORS SHALL REDLINE THE CONSTRUCTION MANAGEMENT OFFICE SET FOR OWNER'S RECORDS SHOWING ALL DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS. 9. FLAME SPREAD CLASSIFICATION OF INSTALLED FINISH MATERIALS SHALL CONFORM TO 2007 MINNESOTA BUILDING CODE (2006 INTERNATIONAL BUILDING CODE) CHAPTER 8.
VARIABLE VENEER VERIFY IN FIELD VERTICAL VESTIBULE VINYL SHEET GOODS VINYL BASE VINYL COMPOSITION TILE VINYL WALL COVERING VOLUME
10. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF THE U.S. GYPSUM PRODUCTS AND SYSTEMS SPECIFICATION BULLETIN OR NATIONAL GYPSUM COMPANY'S LATEST SPECIFICATIONS EXCEPT AS NOTED. ALL GYPSUM BOARD TO BE FIRE RESISTIVE UNLESS NOTED OTHERWISE. 11. ALL WOOD BLOCKING AND CONCEALED LUMBER TO BE FIRE RETARDANT TREATED. 12. ALL HOLES IN FLOORS OR WALLS AS A RESULT OF DEMOLITION SHOULD BE FILLED AND SEALED TO MAINTAIN EXISTING FIRE AND SMOKE RATING OF FLOOR OR WALL SYSTEM ACCORDING TO MAYO STANDARD SPECIFICATION SECTION 07840. 13. IF ASBESTOS OR QUESTIONABLE MATERIAL IS ENCOUNTERED, CONTACT THE MAYO CLINIC CONSTRUCTION MANAGER. MAYO'S ASBESTOS EVALUATION AND ABATEMENT TEAM WILL ADDRESS ANY IDENTIFIED ASBESTOS EXPOSURE. 14. CONTRACTOR, CONSTRUCTION COORDINATOR AND FACILITIES WAREHOUSE TO VERIFY ALL ITEMS TO BE SALVAGED AND RETURNED TO OWNER'S STOCK BEFORE DEMOLITION OCCURS. 15. ALL FURNISHINGS SHALL CONFORM TO 2007 INTERNATIONAL FIRE CODE CHAPTER 8.
17. PREPARE PARTITION SURFACES (PATCH, SKIM COAT, ETC.) AS REQUIRED IN PREPARATION FOR SCHEDULED FINISHES - TYPICAL. 18. ALL CONTRACTORS INCLUSIVE OF SUBCONTRACTORS ARE TO COMPLY WITH THE GUIDELINES OF THE INFECTION CONTROL UNIT IN RELATION TO ALL CONSTRUCTION IN HOSPITAL. CONTRACTORS TO REVIEW GUIDELINES PRIOR TO SUBMITTING ESTIMATES.
KEY PLAN 1
ROOM NAME
KEYNOTE
XX XXXX
A101
2
ELEVATION TAG MULTIPLE VIEW
UP DN
PARTITION TAG
WINDOW TAG
23 1t 1 A101
DN DN
DETAIL TAG EQUIPMENT TAG
234
UP
SIM Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
N I2 L n
I/O MODU LE (FR ON T)
WO rte a W Irtn e a u
I/O MODU LE (FR ON T)
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
UP
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu N I2 L n WO rte a W Irtn e a u O tsu a /h N x2 E Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu
Registration Number Date
C1.2
GRADING AND UTILITY PLAN
3
D101E.2 A100.2 A101.2 A101A.2 A101B.2 A101D.2 A101E.2 A201.2 A210.2 A301.2
3 3 3 3 3 3 3 3 3 3
A320.2 A401.2 A501.2 A502.2 A801.2 A801A.2 A801B.2 A801C.2 A801D.2 A801E.2 A801F.2 A802.2 A803.2 A901.2 A902.2 A903.2 A904.2 A905.2 A910.2 A920.2 A921.2 A922.2
ENLARGED DEMOLITION PLAN - AREA E.1 OVERALL FIRST LEVEL FLOOR PLAN - 100 BUILDING OVERALL FIRST LEVEL FLOOR PLAN - 200 BUILDING ENLARGED FLOOR PLAN - AREA A ENLARGED FLOOR PLAN - AREA B ENLARGED FLOOR PLAN - AREA D ENLARGED FLOOR PLAN - AREA E & E.1 PARTIAL FIRST LEVEL REFLECTED CEILING PLAN REFLECTED CEILING DETAILS DOOR SCHEDULE, DOOR TYPES, WINDOW TYPES, AND PARTITION TYPE INDICATOR VESTIBULE DOOR AND WINDOW DETAILS EXTERIOR ELEVATIONS BUILDING AND WALL SECTIONS BUILDING AND WALL SECTIONS PARTIAL FIRST LEVEL EQUIPMENT PLAN ENLARGED EQUIPMENT PLAN - AREA A ENLARGED EQUIPMENT PLAN - AREA B ENLARGED EQUIPMENT PLAN - AREA C ENLARGED EQUIPMENT PLAN - AREA D ENLARGED EQUIPMENT PLAN - AREA E & E.1 ENLARGED EQUIPMENT PLAN - AREA F & F.1 EQUIPMENT SCHEDULE AND SPECIALTY EQUIPMENTS SCHEDULE FREEZER SCHEDULE INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS TOILET ELEVATIONS AND MOUNTING HEIGHTS MILLWORK DETAILS MOBILE CASEWORK DETAILS MOBILE CASEWORK DETAILS AND INTERIOR DETAILS
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
I001.2 I101.2 I101A.2 I101B.2 I101D.2 I101E.2 I301.2 I301A.2 I301B.2 I301D.2 I301E.2
FINISH, FURNITURE AND FURNITURE PANEL SCHEDULES PARTIAL FIRST LEVEL FINISH PLAN ENLARGED FINISH AND PANEL PLAN - AREA A ENLARGED FINISH AND PANEL PLAN - AREA B ENLARGED FINISH AND PANEL PLAN - AREA D ENLARGED FINISH AND PANEL PLAN - AREA E & E.1 PARTIAL FIRST LEVEL FURNITURE PLAN ENLARGED FURNITURE PLAN - AREA A ENLARGED FURNITURE PLAN - AREA B ENLARGED FURNITURE PLAN - AREA D ENLARGED FURNITURE PLAN - AREA E & E.1
3 3 3 3 3 3 3 3 3 3 3
S001.2 S101.2 S102.2 S301.2
GENERAL STRUCTURAL NOTES AND SCHEDULES FOOTING AND FOUNDATION PLAN FRAMING PLAN VESTIBULE PLANS AND STRUCTURAL DETAILS
3 3 3 3
P001.2
3
P100.2 P101.2 P102.2 P103.2 P201.2 P202.2
PLUMBING AND FIRE PROTECTION SYMBOLS, ABBREVIATIONS, GENERAL NOTES, DETAILS, DIAGRAMS AND SCHEDULES PARTIAL UNDERGROUND PLUMBING PLAN PARTIAL FIRST LEVEL PLUMBING AND FIRE PROTECTION PLAN PARTIAL MEZZANINE PLUMBING AND FIRE PROTECTION PLAN PARTIAL ROOF PLUMBING PLAN PARTIAL FIRST LEVEL PROCESS PIPING PLAN PARTIAL MEZZANINE PROCESS PIPING PLAN
3 3 3 3 3 3
M001.2 M101.2 M102.2 M103.2 M201.2 M202.2 M401.2 M402.2 M501.2 M502.2 M601.2 M701.2
MECHANICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES PARTIAL FIRST LEVEL HVAC PLAN PARTIAL MEZZANINE HVAC PLAN PARTIAL ROOF HVAC PLAN PARTIAL FIRST LEVEL MECHANICAL PIPING PLAN PARTIAL MEZZANINE MECHANICAL PIPING PLAN AIR FLOW DIAGRAM WATER FLOW DIAGRAM CONTROL DIAGRAMS SEQUENCE OF OPERATIONS MECHANICAL DETAILS MECHANICAL SCHEDULES
3 3 3 3 3 3 3 3 3 3 3 3
E001.2 ED101.2 E101.2 E201.2 E202.2 E301.2 E501.2 E502.2 E503.2 E504.2 E505.2 E601.2 E701.2 E702.2
ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES PARTIAL FIRST LEVEL ELECTRICAL DEMOLITION LIGHTING PLAN PARTIAL FIRST LEVEL ELECTRICAL LIGHTING PLAN PARTIAL FIRST LEVEL ELECTRICAL POWER PLAN PARTIAL MEZZANINE ELECTRICAL POWER PLAN PARTIAL FIRST LEVEL ELECTRICAL SIGNAL PLAN ELECTRICAL EQUIPMENT SCHEDULES PANEL SCHEDULES PANEL SCHEDULES PANEL SCHEDULES PANEL SCHEDULES ELECTRICAL ONE-LINE DIAGRAM ELECTRICAL DETAILS ELECTRICAL DETAILS
3 3 3 3 3 3 3 3 3 3 3 3 3 3
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Date
11902 12.13.13
Project For
2915 WAREHOUSE VALLEY HIGH DRIVE PHASE IIFIT - UP PACKAGE PROJECT # 7R121080 Key Plan
AREA A AREA C
AREA B AREA D
AREA F
AREA E.1 AREA E
AREA F.1
Project No.
6287.048.01
Drawn By
JAS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
P 1 P -rw e o
WO rte a W Irtn e a u
WO rte a tu W Irtn e a N I2 L n
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E O tsu a /h N x2 E WO rte a tu W Irtn e a N I2 L n
SIM
(WALL FINISH) (BASE FINISH) (FLOOR FINISH)
FINISH TAG ALL SURFACES
RAMP DOWN
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu
EXIST EXIST EXIST
RAMP DOWN
BUILDING SECTION TAG
EXIST EXIST
1 A101 SIM
N I2 L n O tsu a /h N x2 E
tso fD re A Irn i WO rte a In tu
NORTH ARROW
WO rte a W Irtn e a u
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
P 1 P -rw e o
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:41 PM
WO rte a tu W Irtn e a N I2 L n
ELEVATION / LEVEL TAG
NORTH NORTH
DOOR TAG
101
WALL SECTION TAG
O tsu a /h N x2 E
1 A101
SPOT ELEVATION
tso fD re A Irn i WO rte a In tu
EL. = 100'-0"
SIM
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o
T.O. FOOTING Name Elevation EL. = 96'-0"
1/8" = 1'-0"
DRAWING TITLE
1 A101
P 1 P -rw e o
12
SEE X/XXX
VIEW NAME
WO rte a tu W Irtn e a N I2 L n
MATCH LINE
Cm o m sn o tia cu P 3 P -rw e o P 2 P -rw e o tso fW D re Irtn e a WO rte a tu P 1 P -rw e o A Irn i
O tsu a /h N x2 E
MATCH LINE
3 3
DAVID C. NORBACK
ROOM TAG
(ROOM AREA)
150 SF
AHU-5
COLUMN OR GRID LINE - EXISTING
(ROOM NUMBER)
1
COLUMN OR GRID LINE - NEW
0
101
AHU-4
0
ELEVATION TAG SINGLE VIEW
A101
AHU-3
REVISION REFERENCE
AHU-2
1
(ROOM NAME)
AHU-1
0
DEMOLITION SITE PLAN SITE PLAN
3 3 3
16. NEW UPHOLSTERY MATERIALS MUST BE CALL TB117 COMPLIANT.
DRAWING SYMBOLS 0
SHEET NO. NAME G000.2 COVER SHEET - FIT UP PACKAGE G101.2 FIRST LEVEL FIRE AND LIFE SAFETY PLAN G201.2 FIRST LEVEL CONTROL AREA PLAN
Signature
Registration Number
PROJECT ARCHITECT: MIKE KRAKLAU PHONE: 507/292-8665 EMAIL: MIKE.KRAKLAU@RSPARCH.COM PROJECT CAPTAIN:
YD.
MIKE CRAVEN PHONE: 507/266-8548 EMAIL: CRAVEN.MICHAEL@MAYO.EDU
ISSUE KEY: 1 ISSUED (WITH SIGNATURE) 2 REVISED AND RE-ISSUED (WITH SIGNATURE) 3 NOT FOR CONSTRUCTION - REFERENCE ONLY 4 RE-ISSUED FROM A PRIOR BID PACK - NO REVISIONS
ISSUES
FIT-UP PACKAGE 12/13/13
Note: Not all abbreviations listed below are necessarily used in the drawings; refer elsewhere for abbreviations related to product or material codes.
PROJECT TEAM
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
ENLARGED PLAN OR DETAIL REFERENCE
CPT-01
CPT-02
FINISH TAG WITH EXTENT OF FINISH
FINISH TRANSITION
COVER SHEET - FIT UP PACKAGE
PROJECT AREA
NORTH
G000.2
RATINGS
AHU-3
AHU-2
AHU-1
AHU-4
AHU-5 DN
DN
C
1 HOUR RATED CORRIDOR: FULL HT PARTITION 1 HR RATED CONSTRUCTION, LIMIT PASSAGE OF SMOKE WITH 20 MINUTE DOORS.
CL
1 HOUR RATED CORRIDOR: FULL HT PARTITION 1 HR RATED CONSTRUCTION, LIMIT PASSAGE OF SMOKE.
CN
RATED CORRIDOR NOT REQUIRD: FULL HT PARTITION 1 HR RATED CONSTRUCTION.
CS
1 HOUR RATED CORRIDOR: FULL HT PARTITION 1 HR RATED CONSTRUCTION, MEMBRANE TO LIMIT PASSAGE OF SMOKE FROM RATED CORRIDOR BARRIER/CEILING UP TO DECK
FE FE F FE
FE
FE
ACCESSIBLE ENTRANCE
1 HOUR RATED SMOKE BARRIER WITH 20 MINUTE DOORS
1
1 HOUR RATED FIRE BARRIER WITH 45-60 MINUTE DOORS
1S
1 HOUR RATED FIRE/SMOKE BARRIER WITH 45-60 MINUTE DOORS
2F
2 HOUR RATED FIRE BARRIER
2S
2 HOUR RATED FIRE/SMOKE BARRIER
3
3 HOUR RATED FIRE BARRIER
4
4 HOUR RATED FIRE/SMOKE BARRIER
Consultants
u cin ta n o i s
P o e wr - P 3
P o e wr - P 2 O
2 /N 2 E x a h su t
W
ta re O tu
W
ta re In
L N 2 In
C o mm
P o e wr - P 1
D e fr so t A ri In
W
ta re In
W
ta re O tu
O
2 /N 2 E x a h su t
W
ta re O tu
W
ta re In
L N 2 In
I/O MODULE (FRONT)
S
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
u cin ta n o i s
P o e wr - P 3
P o e wr - P 2
C o mm
P o e wr - P 1
D e fr so t A ri In
W
ta re In
W
ta re O tu
1 HOUR RATED FIRE CEILING ASSEMBLY
2 /N 2 E x a h su t
W
ta re O tu
W
ta re In
L N 2 In
Certification
W
ta re In
W
ta re O tu
O
FE
u cin ta n o i s
P o e wr - P 3
P o e wr - P 2
C o mm
P o e wr - P 1
D e fr so t A ri In
2 HOUR RATED FIRE CEILING ASSEMBLY
u cin ta n o i s
P o e wr - P 3
P o e wr - P 2
C o mm
P o e wr - P 1
D e fr so t A ri In
W
ta re In
W
ta re O tu
O
2 /N 2 E x a h su t
W
ta re O tu
W
ta re In
L N 2 In
FE 1 HOUR RATED BULKHEAD EXTENDING FROM CEILING UP TO DECK
BH
BULKHEAD MEMBRANE TO EXTEND FROM RATED CEILING ASSEMBLY UP TO DECK
FC
1 HOUR RATED FIRE BARRIER (CORRIDOR) EXTENDING FROM FLOOR UP TO RATED CEILING
L N 2 In
FE
BR
u cin ta n o i s
P o e wr - P 3
P o e wr - P 2
C o mm
P o e wr - P 1
D e fr so t A ri In
W
ta re In
W
ta re O tu
O
2 /N 2 E x a h su t
W
ta re O tu
W
ta re In
FE
SYMBOLS
FE
FHC
FIRE HOSE CONNECTION
Date
FIRE ALARM PULL
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
S
Registration Number
FIRE EXTINGUISHER CABINET
SMOKE DETECTORS
11902 12.13.13
EMERGENCY SHOWER EXIT SIGN
35"
EXIT WIDTH IN INCHES
124'
TRAVEL DISTANCE TO NEAREST EXIT
NOTE: THESE PLANS ARE BEING PROVIDED FOR INFORMATION ONLY BY MAYO CLINIC FACILITIES PROJECT SERVICES. FE
DAVID C. NORBACK
FIRE EXTINGUISHER
SD FE
Signature
FE FEC
F
FE
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
Project For
2915 WAREHOUSE VALLEY HIGH DRIVE
2
PHASE IIFIT - UP PACKAGE
PHASE II - FIRST LEVEL FIRE AND LIFE SAFETY ENLARGED PLAN 1/16" = 1'-0"
NORTH
PROJECT # 7R121080
INTERIM LIFE SAFETY MEASURES (ILSM) DESIGN REVIEW ILSM FOR THE SCOPE OF WORK HAVE BEEN REVIEWED AND NO ACTION IS REQUIRED IF A BOX IS CHECKED FOR THE FOLLOWING QUESTIONS BELOW, AN ACTION IS REQUIRED. ACTION REQUIRED X
1
SIGNAGE SHALL BE POSTED IDENTIFYING ALTERNATE EXITS FOR EVERYONE AFFECTED.
LS.01.02.01 EP 2
2
CONTRACTOR SHALL FOLLOW HOT WORKS AND FIREWATCH POLICIES COORDINATED WITH MAYO CLINIC FACILITIES OPERATIONS, WHEN FIRE SYSTEMS ARE AFFECTED.
LS.01.02.01 EP 1,5
3
PROVIDE TEMPORARY BUT EQUIVALENT FIRE ALARM AND DETECTION SYSTEMS FOR USE WHEN THE FIRE SYSTEM IS NOT CONNECTED TO THE CENTRAL FIRE SYSTEM. INSPECT AND TEST TEMPORARY SYSTEMS MONTHLY.
LS.01.02.01 EP 5,12
4
TEMPORARY PARTITION SHALL BE CONSTRUCTED TO MAINTAIN THE INTEGRITY OF THE CONSTRUCTION SITE PERIMETER. TEMPORARY PARTITIONS MUST BE SMOKE TIGHT AND CONSTRUCTED OF LIMITED COMBUSTIBLE MATERIAL.
LS.01.02.01 EP 7
5
ADDITIONAL FIRE FIGHTING EQUIPMENT SHALL BE INSTALLED IN AND /OR AROUND CONSTRUCTION AREA.
LS.01.02.01 EP 6
LIFE SAFETY CODE DEFICIENCIES AFFECTING COMPARTMENTATION FEATURES OR EXITING PLANS OF ADJACENT OCCUPIED AREAS, MAY NEED ADDITIONAL FIRE SAFETY TRAINING OR DRILLS. THIS TRAINING SHALL BE DETERMINED AND PERFORMED BY MAYO SAFETY AND SECURITY. INTERIM LIFE SAFETY DAILY LOG SHALL DOCUMENT:
LS.01.02.01 EP 10,11,13,14
6 X
ELEMENT OF PERFORMANCE
ITEM
7
-
STORAGE, DEBRIS REMOVAL AND HOUSEKEEPING ARE PRACTICED AND PERFORMED TO KEEP CONSTRUCTION AREA AT THE LOWEST FLAMMABLE AND COMBUSTIBLE LOAD. EGRESS ROUTES IN AND AROUND CONSTRUCTION AREA ARE CLEAR OF ALL OBSTRUCTIONS. SURVEILLANCE OF BUILDINGS, GROUNDS, AND EQUIPMENT, GIVING SPECIAL ATTENTION TO CONSTRUCTION AREAS AND STORAGE.
Key Plan
AREA A AREA C AREA F
AREA B AREA D
AREA E.1 AREA E
AREA F.1
Project No.
6287.048.01
Drawn By
LS.01.02.01 EP 9
Checked By
LS.01.02.01 EP 4 LS.01.02.01 EP 8
Date
BUILDING CODE, OCCUPANCY AND EGRESS INFORMATION 2915 WAREHOUSE - 100 BUILDING FIRST LEVEL
PLUMBING CALCULATION BUILDING 100:
PER 2007 MINNESOTA STATE BUILDING CODE (2006 IBC & GREB)
Minimum Number of Fixtures: IBC Chapter 29 and Table 2902.1
OCCUPANCY
HEIGHT INFORMATION ALLOWED ACTUAL
MIXED: FACTORY GROUP (F-1) STORAGE GROUP (S-1)
TYPE OF CONSTRUCTION
IIB - FULLY SPRINKLERED
NOTE: THE ACTUAL "FLOOR ZONE" REFERS TO THE OCCUPIABLE FLOOR AREA
2
2
SPRINKLER INCREASE TOTAL
2
2
BASIC AREA (1ST LEVEL) INCREASE FOR FRONTAGE INCREASE FOR SPRINKLERS SUB-TOTAL INCREASE FOR MULTI-STORY TOTAL
FLOOR OCCUPANCY (TABLE 1004.1.1)
FLOOR AREA (SQ.FT.)
SQ.FTG.PER OCCUPANT (TABLE 1004.1.1)
OCCUPANT LOAD
TN-01-1
FACTORY AREA
4,100
100
41
0 x 0.3 = 0.0
41 x 0.2 = 8.2
TN-01-2
STORAGE AREA
25,731
500
52
0 x 0.3 = 0.0
52 x 0.2 = 10.4
FLOOR ZONE
UP
STORIES
AREA CALCULATIONS ALLOWED
DN
FIRST LEVEL TOTALS
29,831
93
0.0
29,831 SF 29,831 SF 29,831 SF
INCHES PROVIDED
EXIT INCHES REQUIRED VERTICAL
15,500 7,750 31,000 54,250 N/A 54,250
ACTUAL
HORIZONTAL
VERTICAL
HORIZONTAL
0
192 192
18.6
0
JHA MLK/JHA 11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions Water Closets: First Floor:
Calculation 93 / 100 = 1
Lavatories: First Floor:
93 / 100 = 1
Required 1
1
Provided 2
No.
Date
Description
2
Drinking Fountains: First Floor: 93 / 400 1 2 Note: Bottled water dispensers may be substituted for up to 50% of required drinking fountains. Service Sinks:
1 per floor
192
AHU -1
AHU-2
AHU-3
AHU-4
AHU-5
DN DN DN
DN
TOTAL EXIT INCHES PROVIDED
192
UP
L N I2 n WO rte a tu W Irtn e a tsu a /h N x2 E O
PER 2007 MINNESOTA STATE BUILDING CODE (2006 IBC & GREB) Minimum Number of Fixtures: IBC Chapter 29 and Table 2902.1
Cm o m sn o tia cu P 3 P -rw e o
P 2 P -rw e o P 2 P -rw e o
Cm o m sn o tia cu P 3 P -rw e o Cm o m sn o tia cu P 3 P -rw e o Cm o m sn o tia cu P 3 P -rw e o
P 2 P -rw e o WO rte a tu W Irtn e a
L N I2 n
P 1 P -rw e o
D tso fre W Irtn e a WO rte a tu A Irn i
O
tsu a /h N x2 E
WO rte a tu W Irtn e a
L N I2 n
P 1 P -rw e o
D tso fre W Irtn e a A Irn i
WO rte a tu
O
tsu a /h N x2 E
WO rte a tu W Irtn e a
L N I2 n
P 2 P -rw e o
P 1 P -rw e o
D tso fre A Irn i
W Irtn e a WO rte a tu
O
tsu a /h N x2 E
WO rte a tu W Irtn e a
L N I2 n
P 1 P -rw e o
D tso fre W Irtn e a WO rte a tu A Irn i
UP
PLUMBING CALCULATION BUILDING 200: (BASED ON NEXT PHASE TENANT FIT UP) 264 OCCUPANTS
BUILDING CODE, OCCUPANCY AND EGRESS INFORMATION 2915 WAREHOUSE - 200 BUILDING FIRST LEVEL
I/O MODULE (FRONT)
Cm o m sn o tia cu P 3 P -rw e o
P 2 P -rw e o
P 1 P -rw e o
D tso fre A Irn i
W Irtn e a WO rte a tu
O
tsu a /h N x2 E
OCCUPANCY
HEIGHT INFORMATION ALLOWED ACTUAL
MIXED: BUSINESS GROUP (B) STORAGE GROUP (S-1)
TYPE OF CONSTRUCTION
IIB - FULLY SPRINKLERED
NOTE: THE ACTUAL "FLOOR ZONE" REFERS TO THE OCCUPIABLE FLOOR AREA RAMP DOWN
RAMP DOWN
FLOOR ZONE
PROJECT AREA
1
PHASE II - FIRST LEVEL FIRE AND LIFE SAFETY KEY PLAN
2
SPRINKLER INCREASE TOTAL
2
2
SQ.FTG.PER OCCUPANT (TABLE 1004.1.1)
OCCUPANT LOAD
EXIT INCHES REQUIRED VERTICAL
HORIZONTAL
15,500 7,750 31,000 54,250 N/A 54,250
ACTUAL
41,238 SF 41,238 SF 41,238 SF
INCHES PROVIDED VERTICAL
HORIZONTAL
BUSINESS AREA
18,738
100
188
0 x 0.3 = 0.0
188 x 0.2 = 37.6
0
-
TN-01-2
STORAGE AREA
17,295
300
58
0 x 0.3 = 0.0
58 x 0.2 = 11.6
0
-
TN-01-MZ
MECHANICAL AREA
5,205
300
18
18 x 0.3 = 5.4
18 x 0.2 = 3.6
96
-
52.8.6
96
175
41,238
264
5.4
TOTAL EXIT INCHES PROVIDED
NORTH
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
FLOOR AREA (SQ.FT.)
2
BASIC AREA (1ST LEVEL) INCREASE FOR FRONTAGE INCREASE FOR SPRINKLERS SUB-TOTAL INCREASE FOR MULTI-STORY TOTAL
TN-01-1
FIRST LEVEL TOTALS
1" = 60'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:45 PM
FLOOR OCCUPANCY (TABLE 1004.1.1)
STORIES
AREA CALCULATIONS ALLOWED
175
Water Closets: First 50 OCC: Remainder OCC: First Floor Totals: Lavatories: First 80 OCC: REMAINDER OCC: First Floor Totals:
Calculation Required 50 / 25 = 2 2 214 / 50 = 5 5 264 / 37.5 = 7 7
80 / 40 = 2 184 / 80 = 3 264 / 60 = 5
2 3 5
Provided 2 5 7
2 3 5
Drinking Fountains: First Floor: 264 / 100 3 3 Note: Bottled water dispensers may be substituted for up to 50% of required drinking fountains. Service Sinks:
1 per floor
FIRST LEVEL FIRE AND LIFE SAFETY PLAN
G101.2
UP DN
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants AHU-1
AHU-2
AHU-3
AHU-4
AHU-5 DN
DN DN DN
UP
Certification
O
/2 NE xh stu a
W
O rte a tu
W
Irtn e a
L 2 N In
I/O MODULE (FRONT)
mn u ca i to i sn
P e w o -r P 1
P e w o -r P 3
Cm o
O rte a tu W /2 NE xh stu a O O rte a tu W Irtn e a W D fre sto A ri In mn u ca i to i sn
P e w o -r P 1
P e w o -r P 3
P e w o -r P 2
Cm o
L 2 N In Irtn e a W O rte a tu W /2 NE xh stu a O O rte a tu W Irtn e a W D fre sto A ri In mn u ca i to i sn
P e w o -r P 1
P e w o -r P 3
P e w o -r P 2
Cm o
L 2 N In Irtn e a W O rte a tu W /2 NE xh stu a O O rte a tu W Irtn e a W D fre sto A ri In mn u ca i to i sn
P e w o -r P 1
P e w o -r P 3
P e w o -r P 2
Cm o
200-1
100-1
mn u ca i to i sn Cm o
P e w o -r P 1
D fre sto A ri In
W
Irtn e a
W
O rte a tu
O
/2 NE xh stu a
W
O rte a tu
W
Irtn e a
L 2 N In P e w o -r P 3
300-1
P e w o -r P 2
400-1
W
Irtn e a
L 2 N In
P e w o -r P 2
D fre sto A ri In
W
Irtn e a
W
O rte a tu
UP
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota. RAMP DOWN
RAMP DOWN
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
Project For
PROJECT AREA
1
PHASE II - FIRST LEVEL CONTROL AREA PLAN 1" = 30'-0"
NORTH
2915 WAREHOUSE VALLEY HIGH DRIVE PHASE IIFIT - UP PACKAGE
100 BUILDIING HAZARDOUS MATERIALS QUANTITIES LIST
200 BUILDIING HAZARDOUS MATERIALS QUATITIES LIST
PROJECT # 7R121080
Project No.
6287.048.01
Drawn By
JAS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
FIRST LEVEL CONTROL AREA PLAN
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:46 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
G201.2
PROJECT AREA 100 BLDG. A
2915 WAREHOUSE BUILDING
A A A A
NG TI IS EX C. .I. M
200 BLDG.
A
A A
300 BLDG.
400 BLDG.
PROJECT AREA
100 BUILDING
NG
450 BLDG.
Consultants
DI IL BU
500 BLDG.
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number Date
A A
2
PHASE II DEMOLITION SITE PLAN KEY PLAN 1" = 160'-0"
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number
A Date
11902 12.13.13
A
Project For
A
KEYNOTES - PHASE II - DEMOLITION SITE PLAN 1 2 3 4 5
2
REMOVE EXISTING UTILITY CONCRETE SLAB. REMOVE EXISTING PARKING STRIPING. REMOVE EXISTING ASPHALT IN HATCHED AREA FOR REGRADING AND UTILITY WORK - SEE CIVIL DRAWINGS. REMOVE EXISTING STAIR, RAILING, AND FOUNDATIONS. REMOVE EXISTING CHAIN LINK FENCE AND FOUNDATIONS.
2915 WAREHOUSE VALLEY HIGH DRIVE
4
2
PHASE IIFIT - UP PACKAGE
200 BUILDING (EXISTING 2915 BUILDING) 3
PROJECT # 7R121080 Key Plan
AREA A 1
AREA C
AREA B AREA D
AREA E.1 AREA E
2 AREA F
AREA F.1
Project No.
6287.048.01
Drawn By
JHA
3 Checked By
MLK/JHA
5 Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
2
1
Š Copyright RSP Architects 2013. All rights reserved.
Revisions
A
No.
3
2
Date
Description
300 BUILDING (N.I.C.)
A A
PROJECT AREA
1
DEMOLITION SITE PLAN
PHASE II - DEMOLITION SITE PLAN 1" = 20'-0"
NORTH
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:38 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
D001.2
PROJECT AREA
PROJECT AREA RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
100 BLDG. A A A A A
Consultants
M NG TI IS EX C. .I.
200 BLDG.
I BU
A
I LD NG
A A
300 BLDG.
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
500 BLDG. 400 BLDG.
100 BUILDING
450 BLDG.
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
A
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
A Signature
DAVID C. NORBACK
Registration Number
A
2
Date
PHASE II - 2915 BUILDING - SITE PLAN KEY PLAN 1" = 160'-0"
11902 12.13.13
Project For
NORTH
A A G 20' - 0" 10' - 0"
10' - 0"
14' - 3 1/2"
2915 WAREHOUSE VALLEY HIGH DRIVE
8' - 3"
1.1 2.1
9'
2.1
" -0
PHASE IIFIT - UP PACKAGE
1.4 TYP
2.2
'81
200 BUILDING
0"
PROJECT # 7R121080
9' " -0
1.2
2.4
2.1
20' - 0"
2.3
NEW VESTIBULE ADDITION
1.3
Key Plan
2.1
AREA A AREA C
AREA B AREA D
AREA F
1.4
AREA E.1 AREA E
AREA F.1
TYP
5' 13
1.4
0"
TYP
Project No.
2.2
'18
3 A001.2
6287.048.01
Drawn By
0"
JHA
Checked By
MLK/JHA
1.2 EQ
'18 '18
1
1.1
0"
0"
3
Š Copyright RSP Architects 2013. All rights reserved.
PHASE II - ENLARGED LIQUID NITROGEN TANK PLAN
Revisions
1/4" = 1'-0"
No.
Date
Description
NORTH
1"
A
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
'29
EQ
Date
9' " -0
1.4
KEYNOTES - PHASE II - SITE PLAN
TYP
1.2
300 BUILDING (N.I.C.)
1.2 1.3 1.4
NEW STEEL STAIRS AND LANDING - SEE FLOOR PLAN FOR ADDITIONAL DETAILS. EXTENT OF NEW / PATCHED ASPHALT FROM REGRADING AND UTILITY WORK - SEE CIVIL DRAWINGS NEW CONCRETE STOOP - SEE STRUCTURAL DRAWINGS NEW PARKING STRIPING - TYPICAL.
2.1 2.2 2.3 2.4
NEW 6' HIGH CHAIN LINK FENCE AND GATES. NEW CONCRETE NITROGEN TANK FOUNDATION SYSTEM - SEE STRUCTURAL DRAWINGS NEW ASPHALT PAVING - SEE CIVIL DRAWINGS NITROGEN TANK BY OTHERS.
'99 0"
A A
1.1
KEYNOTES - PHASE II - ENLARGED SITE PLAN
PROJECT AREA 1
SITE PLAN
PHASE II - 2915 BUILDING - SITE PLAN 1" = 20'-0"
NORTH
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:33 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A001.2
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
LIQUID NITROGEN STORAGE AREA DETAIL:
LIQUID NITROGEN STORAGE AREA
BENCHMARK ELEVATION = 1086.51 (NAVD88)
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
J 8 9
2
7
2
7
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
1 1 6
Signature
6
DAVID C. NORBACK
Registration Number
3
3
Date
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
5 4
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
Project For
5
2
2915 WAREHOUSE VALLEY HIGH DRIVE PHASE IIFIT - UP PACKAGE
1
PROJECT # 7R121080 Key Plan AREA E.1
Project No.
6287.048.01
Drawn By
1
JAS, BCS
Checked By
PARTIAL FIRST LEVEL DEMOLITION PLAN - OPTION 3 1/4" = 1'-0"
NORTH
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
DEMOLITION PLAN LEGEND:
DEMOLITION PLAN GENERAL NOTES: 1. SEE MECHANICAL DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, LIGHTING, ELECTRICAL CONDUIT, ETC. DEMOLITION AND/OR PROTECTION.
EXISTING PARTITION TO REMAIN
2. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS.
4. ALL FIRE SAFETY EQUIPMENT AND THE ASSOCIATED CONDUIT AND WIRING SYSTEM SHALL NOT BE HARMED DURING DEMOLITION AND/OR CONSTRUCTION AND SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. NOTIFY BUILDING SECURITY AND MAYO CONSTRUCTION MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING CONSTRUCTION IN ELEVATOR LOBBIES, PUBLIC CORRIDORS OR RESTROOMS. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.
EXISTING PARTITION, CASEWORK, SHELVING, EQUIPMENT TO BE REMOVED
Description
KEYNOTES - PHASE II - DEMOLITION PLAN 1 2 3 4
EXISTING DOOR AND FRAME TO REMAIN
3. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES. IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY.
Date
5 6 7 8 9
REMOVE EXISTING CONCRETE RAMP, FOUNDATION WALLS, GUARD RAILS AND FOOTINGS. REMOVE EXISTING OVERHEAD DOORS, OPERATORS, AND HARDWARE. REMOVE EXISTING RAILING. REMOVE EXISTING TOILET ROOM, WALLS, FIXTURES, PARTITIONS, CEILINGS, AND FLOORING. REMOVE EXISTING DOOR, FRAME, AND HARDWARE. EXISTING DOCK LEVELER TO REMAIN. REMOVE EXISTING DOCK SEALS, AND HEAD CURTAIN - PRIME EXISTING WALL AT UNFINISHED, UNCOVERED WALL LOCATIONS. REMOVE EXISTING CONCRETE STAIRS AND FOUNDATIONS. REMOVE EXISTING HOLLOW METAL WINDOW.
EXISTING DOOR AND FRAME TO BE REMOVED
ROOM NAME
1
ROOM TAG
KEYNOTE
6. ALL DIMENSIONS TO EXISTING ELEMENTS ARE FOR REFERENCE ONLY AND SHOULD BE FIELD VERIFIED. 7. THE INTENT OF THIS DEMOLITION IS TO PROVIDE A CLEAN AND CLEAR AREA FOR NEW CONSTRUCTION AND FINISHES AS INDICATED ON THESE ARCHITECTURAL DRAWINGS. A. DEMOLISH DASHED WALLS, MILLWORK, OR MISCELLANEOUS ITEMS. RELATED FRAMING, BRACING, AND ANCHORS MUST BE REMOVED. PROVIDE RELATED MECHANICAL/ELECTRICAL FOR THIS WORK. B. DEMOLISH FINISHES ON EXISTING WALLS OR SURFACES TO REMAIN WHERE NEW FINISHES ARE SCHEDULED. C. DEMOLISH FLOOR FINISHES AND BASE AS NOTED OR WHERE NEW FLOOR FINISHES AND BASE ARE SCHEDULED, INCLUDING ADHESIVES. D. DEMOLISH CEILINGS AND SOFFITS AS REQUIRED TO PROVIDE THE NEW CEILING LAYOUT (SEE CEILING PLAN). COORDINATE WORK INCLUDING THAT REQUIRED FOR MECHANICAL/ELECTRICAL. E. EXISTING WALLS AND SURFACES NOTED TO REMAIN, BUT DAMAGED PRIOR TO OR DURING DEMOLITION, MUST BE REPAIRED TO ACCEPT NEW FINISHES.
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:39 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
ENLARGED DEMOLITION PLAN - AREA E.1
D101E.2
FLOOR PLAN GENERAL NOTES
J
1. LOCATION OF EQUIPMENT OR ANY OTHER ITEMS THAT MAY INTERFERE WITH THE LIGHTING, STRUCTURAL, OR MECHANICAL SYSTEMS, SHALL BE CAREFULLY COORDINATED AND DISCREPANCIES BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. 2. PLUMBING FITTINGS OTHER THAN THOSE IN THE FUME HOODS OR FUME HOOD BASE CABINETS SHALL BE SUPPLIED AND INSTALLED BY MECHANICAL CONTRACTOR. ALL PLUMBING FITTINGS SHALL HAVE FINAL CONNECTION BY MECHANICAL CONTRACTOR.
AREA B
AREA E.1 3. ALL PLUMBING SYSTEM HANGERS AND FASTENERS SHALL BE PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR.
DN
1
STORAGE 1-115
VESTIBULE 1-123
CUSTODIAL
COMM RM 1-121
COMM RM 1-120
OFFICE 1-119
STORAGE 1-118
CONFERENCE 1-117
4. ALL EXPOSED PIPING AND CONDUIT SHALL BE PAINTED TO MATCH THE ADJACENT SURFACE. 5. ALL PLAN DIMENSIONS LOCATING INTERIOR WALLS ARE TO: a: FACE OF EXISTING WALL SYSTEM UNLESS NOTED OTHERWISE. b: FACE OF GYPSUM BOARD UNLESS NOTED OTHERWISE. c: CENTERLINE OF BUILDING GRID.
OFFICE 1-116 VESTIBULE 1-101
1-124
OFFICE 1-103
6. ALL ELEVATION MEASUREMENTS ARE IN REFERENCE TO THE FINISHED FLOOR.
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
7. SEE LIFE SAFETY PLANS, SHEETS "G101.2" FOR ALL RATED PARTITION LOCATIONS. 8. EXISTING PENETRATIONS IN RATED PARTITIONS TO BE FIRESTOPPED & SEALED. NEW MECHANICAL / ELECTRICAL PENETRATIONS TO BE FIRESTOPPED & SEALED. ALL SUBCONTRACTORS TO USE THE SAME FIRESTOPPING SYSTEM.
STORAGE 1-125
COMMON 1-102
ENVIRONMENTAL SERVICES
LACTATION 1-126
Consultants
9. PROVIDE CONTROL JOINTS IN EXTERIOR GYPSUM WALL ASSEMBLY AT COLUMNS AND PILASTERS.
1-122
PLAN LEGEND:
WOMEN'S TOILET
EXISTING PARTITION TO REMAIN
WOMEN'S TOILET 1-127
OFFICE 1-106
1-201
OFFICE 1-105
C31-PL
OFFICE 1-104
STORAGE 1-100
MEN'S TOILET
1
AREA E.1
AREA E
1i
EQUIPMENT TAG
NEW PARTITON
A
SPECIALITY EQUIPMENT TAG
101
DOOR TAG
NEW DOOR, REFER TO DOOR SCHEDULE
CONFERENCE 1-107
COMMON 1-109
MICROBIOME
1i
1
ROOM NAME
COUNTERTOP TAG
EXISTING DOOR AND FRAME TO REMAIN
1-128
AREA B
KEYNOTE
NEW PARTITION AS SCHEDULED, SEE MAYO SPECIFICATIONS SECTION 09200 FOR PARTITION CONSTRUCTION
ROOM TAG
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
CORRIDOR 1-108 OFFICE 1-110
1-204
OFFICE 1-111
Signature
DAVID C. NORBACK
Registration Number Date
MECH RM 1-112
?
11902 12.13.13
Project For
OFFICE 1-113
?
STORAGE 1-100
2915 WAREHOUSE VALLEY HIGH DRIVE
OPEN OFFICE 1-205
BREAK ROOM 1-114
PHASE IIFIT - UP PACKAGE PROJECT # 7R121080
AREA E Key Plan
AREA F.1
AREA A AREA C AREA F
AREA B AREA D
AREA E.1 AREA E
AREA F.1
Project No.
6287.048.01
Drawn By
Author
Checked By
Checker
Date
11/27/13
ELECTRICAL 1-150
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
1.2
© Copyright RSP Architects 2013. All rights reserved.
Revisions
ELECTRICAL
No.
1-150A
KEYNOTES - PHASE II - FLOOR PLAN 1.1 1.2 1.3 1.4
STORAGE 1-100
1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24
1
TYPICAL UTILITY FENCE - SEE ELEVATION 11/A922.2 OVERHEAD UTILITY FENCE BRIDGE ABOVE - SEE ELEVATION 14/A922.2. OVERHEAD 3 1/4" x 1 5/8" UNISTRUT CROSS BRACING AT 10'-0" A.F.F. DASHED LINES INDICATE ADJUSTABLE PLASTIC LAMINATE SHELVING ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE WALL CABINETS ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE MICROWAVE SHELVING AND CABINET ABOVE - SEE ELEVATIONS AND DETAIL 10/A920.2 MOBILE CASEWORK UNIT - SEE ELEVATIONS AND DETAILS (A921.2) COAT ROD AND SHELF - SEE DETAIL 15/A922.2. STAINLESS STEEL SINK - SEE MECHANICAL DRAWINGS A.V. CABINET - SEE DETAIL 15/A920.2. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS FACE OF NEW WALL TO BE ALIGNED WITH FACE OF EXISTING WALL OR COLUMN. PLASTIC LAMINATE PIPETTE RACK - SEE ELEVATIONS AND DETAIL 12/A920.2 PLASTIC LAMINATE CUSTOM MOBILE BENCH - SEE ELEVATIONS PLASTIC LAMINATE UTILITY CABINET - SEE ELEVATIONS AND DETAIL 11/A920.2 WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS STAINLESS STEEL SINK AND TOP W/ DRAINBOARD - SEE MECHANICAL DRAWINGS STANDARD LAB COAT HOOK STRIP - SEE DETAIL 18/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FLOOR DRAIN - SEE MECHANICAL DRAWINGS. WALL MOUNTED TOILET - SEE MECHANICAL DRAWINGS WALL MOUNTED URINAL - SEE MECHANICAL DRAWINGS ELECTRIC WATER COOLER - COORDINATE W/ MECHANICAL & ELECTRICAL STAINLESS STEEL SINK AND TOP - SEE MECHANICAL DRAWINGS
1/8" = 1'-0"
NORTH
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
Description
KEYNOTES - PHASE II - FLOOR PLAN
PARTIAL FIRST LEVEL FLOOR PLAN - 100 BUILDING
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:34 PM
Date
1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47
CEILING MOUNTED CURTAIN TRACK - SEE REFLECTED CEILING PLAN (A201.2) MOP SINK - SEE DETAIL 14/A920.2 AND MECHANICAL DRAWINGS SAFETY SHOWER AND EYE WASH - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS EXISTING DOCK LEVELER. EXISTING PIT ANGLES CAST INTO EXISTING CONCRETE. LAMINATED DOCK BUMPER - KELLY DOCK SYSTEMS - B410-14F. NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSS-L WITH HEAD CURTAIN OR EQUAL. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16 - SEE ELEVATIONS FOR BASE CABINET DETAIL EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21 - SEE ELEVATIONS FOR BASE CABINET DETAIL GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. 3 3/4" DEEP EQUIPMENT LIFT PIT - VERIFY PIT SIZE WITH CAM WOOD OR JOE SCHNEIDER NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL. HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSH WITH HEAD CURTAIN OR EQUAL. NEW 36" DEEP CUSTOM MOBILE CASEWORK UNIT. PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 21/A920.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. - SEE ELEVATIONS NEW VINYL STRIP DOOR. SAFE-T MODEL SD 8-50-UL. NEW 5" REINFORCED CONCRETE UPON COMPLETION OF UNDGROUND WORK - COORDINATE WITH PLUMBING - SEE DETAIL 12/A502.2. 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK - SEE ELEVATIONS SURFACE MOUNTED FIRE EXTINGUISHER.
OVERALL FIRST LEVEL FLOOR PLAN - 100 BUILDING
A100.2
F
G
H
I
J
VESTIBULE 1-211E
DN
AREA A
1
AREA B
AREA B
AREA E.1
1.38 1.45
CONFERENCE COAT CLOSET
1-211D
LOADING DOCK
CUSTODIAL 1-124
1-210
BREAK ROOM
1-213
KIT PRODUCTION
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
1-209
1-221
STORAGE
OPERATIONS SHOP
OFFICE
1-222
1-221A
OFFICE PROCESSING LAB 1-212 EXISTING SLAB
2
LACTATION NEW SLAB
1-126
11' - 0"
Certification
OFFICE 1-211B
1-214
AREA A
OPEN OFFICE
1.38
CORRIDOR
1-211
ADA RESTROOM
OFFICE
1-215
1-212A
1-200-3
CONFERENCE
COPY/PRINT
OFFICE
OFFICE
OFFICE
1-211A
1-211F
1-211G
1-211H
1-211J
MEN'S TOILET
WOMEN'S TOILET
1-203
AREA A AREA C
3
AREA A AREA D
AREA B
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
WOMEN'S TOILET 1-127
1-201
ENVIRONMENTAL SERVICES
MEN'S TOILET
1-202
1-128
Signature
DAVID C. NORBACK
Registration Number
CORRIDOR
AREA C
AREA B
1-200-1
AREA D
AREA D
I/O MODULE (FRONT)
AREA B
AREA E
AREA E.1
1.45 Date
AREA E
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
SERVER 1-208A Signature
DAVID C. NORBACK
W a te r Ou t
W a te r In
L N2 In
11' - 0"
MICROBIOME
Po we r - P2
1-200-4
PRC IMAGING
LAB 1-207
1-240
Date
1-208
1.38
11902 12.13.13
Project For
Po we r - P2
Po we r - P3
Po we r - P1
Co mmu n i a c tio n s
Po we r - P3
EXISTING SLAB
NEW SLAB
1-205B
EXISTING SLAB
W a te r In W a te r Ou t O2 /N2 Exh au st W a te r Ou t W a te r In De fro st Ai r In Po we r - P2
Po we r - P1
Co mmu n i a c tio n s
OFFICE
SPVR 1-205A
2915 WAREHOUSE VALLEY HIGH DRIVE
Po we r - P2
Po we r - P1
Po we r - P3
11' - 0"
Co mmu n i a c tio n s
De fro st Ai r In
W a te r In
W a te r Ou t
O2 /N2 Exh au st
W a te r Ou t
W a te r In
L N2 In
Po we r - P3
1.1
1.2
11' - 0"
4
1-200-2
29' - 9 1/2"
NEW SLAB
CORRIDOR
Po we r - P2
EXISTING SLAB L N2 In
9' - 6"
Po we r - P1
De fro st Ai r In
W a te r In
W a te r Ou t
O2 /N2 Exh au st
NEW SLAB
W a te r Ou t
W a te r In
L N2 In Co mmu n i a c tio n s
De fro st Ai r In
W a te r In
W a te r Ou t
11' - 0"
Registration Number
1-204
O2 /N2 Exh au st
W a te r Ou t
W a te r In
L N2 In
RESEARCH STORAGE
Po we r - P1
Po we r - P3
Co mmu n i a c tio n s
De fro st Ai r In
W a te r In
W a te r Ou t
1.3
CORRIDOR
O2 /N2 Exh au st
TYP.
1-125
1-211C
CUSTODIAL
1.1
1.38
STAIR
STAIR 1-230
COLD ROOM 1-207D
OPEN OFFICE
1-206
SPVR OFFICE
SPVR OFFICE
1-207C
PHASE IIFIT - UP PACKAGE
1-205
11' - 0"
1-207A
5
FUTURE LAB
TYP.
1.3
OPEN OFFICE
1-232
PROJECT # 7R121080
1-207B
DATA
11' - 0"
1-231
Key Plan
AREA C
AREA C
AREA F
AREA D
AREA D
AREA F
AREA F
AREA D
AREA F.1
AREA E
AREA E
AREA F.1
AREA A
AREA F.1
11' - 0"
AREA C
1.1
RESEARCH STORAGE
RESEARCH STORAGE
1-240
1-240
AREA F
AREA B AREA D
AREA E.1 AREA E
AREA F.1
1.2
6
Project No.
31' - 3 1/2"
4' - 6" 11' - 0"
12' - 0" 1.3
1.1
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
1.27
1.1
1.1
1.1
12' - 0"
Drawn By
12' - 0"
12' - 0"
1.2
1.3
1.2
TYP.
MLK/JHA
Date
1-150 1.2
TCM
Checked By
ELECTRICAL
1.2
6287.048.01
31' - 3 1/2"
31' - 1 1/4"
8' - 0"
1.2
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions
7
No.
Date
Description
ELECTRICAL 1-150A
1
AREA F
PARTIAL FIRST LEVEL FLOOR PLAN - 200 BUILDING
AREA F.1
1/8" = 1'-0"
FLOOR PLAN GENERAL NOTES
PLAN LEGEND:
1. LOCATION OF EQUIPMENT OR ANY OTHER ITEMS THAT MAY INTERFERE WITH THE LIGHTING, STRUCTURAL, OR MECHANICAL SYSTEMS, SHALL BE CAREFULLY COORDINATED AND DISCREPANCIES BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY.
EXISTING PARTITION TO REMAIN
1 C31-PL
2. PLUMBING FITTINGS OTHER THAN THOSE IN THE FUME HOODS OR FUME HOOD BASE CABINETS SHALL BE SUPPLIED AND INSTALLED BY MECHANICAL CONTRACTOR. ALL PLUMBING FITTINGS SHALL HAVE FINAL CONNECTION BY MECHANICAL CONTRACTOR.
5. ALL PLAN DIMENSIONS LOCATING INTERIOR WALLS ARE TO: a: FACE OF EXISTING WALL SYSTEM UNLESS NOTED OTHERWISE. b: FACE OF GYPSUM BOARD UNLESS NOTED OTHERWISE. c: CENTERLINE OF BUILDING GRID. 6. ALL ELEVATION MEASUREMENTS ARE IN REFERENCE TO THE FINISHED FLOOR. 7. SEE LIFE SAFETY PLANS, SHEETS "G101.2" FOR ALL RATED PARTITION LOCATIONS. 8. EXISTING PENETRATIONS IN RATED PARTITIONS TO BE FIRESTOPPED & SEALED. NEW MECHANICAL / ELECTRICAL PENETRATIONS TO BE FIRESTOPPED & SEALED. ALL SUBCONTRACTORS TO USE THE SAME FIRESTOPPING SYSTEM. 9. PROVIDE CONTROL JOINTS IN EXTERIOR GYPSUM WALL ASSEMBLY AT COLUMNS AND PILASTERS.
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:36 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
COUNTERTOP TAG
1.1 1.2 1.3 1.4
1i
EQUIPMENT TAG
1.5 1.6
NEW PARTITON
A
SPECIALITY EQUIPMENT TAG
101
DOOR TAG
1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24
NEW DOOR, REFER TO DOOR SCHEDULE
1i
ROOM NAME
KEYNOTE
EXISTING DOOR AND FRAME TO REMAIN
3. ALL PLUMBING SYSTEM HANGERS AND FASTENERS SHALL BE PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR. 4. ALL EXPOSED PIPING AND CONDUIT SHALL BE PAINTED TO MATCH THE ADJACENT SURFACE.
KEYNOTES - PHASE II - FLOOR PLAN
1 ROOM TAG
NEW PARTITION AS SCHEDULED, SEE MAYO SPECIFICATIONS SECTION 09200 FOR PARTITION CONSTRUCTION
TYPICAL UTILITY FENCE - SEE ELEVATION 11/A922.2 OVERHEAD UTILITY FENCE BRIDGE ABOVE - SEE ELEVATION 14/A922.2. OVERHEAD 3 1/4" x 1 5/8" UNISTRUT CROSS BRACING AT 10'-0" A.F.F. DASHED LINES INDICATE ADJUSTABLE PLASTIC LAMINATE SHELVING ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE WALL CABINETS ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE MICROWAVE SHELVING AND CABINET ABOVE - SEE ELEVATIONS AND DETAIL 10/A920.2 MOBILE CASEWORK UNIT - SEE ELEVATIONS AND DETAILS (A921.2) COAT ROD AND SHELF - SEE DETAIL 15/A922.2. STAINLESS STEEL SINK - SEE MECHANICAL DRAWINGS A.V. CABINET - SEE DETAIL 15/A920.2. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS FACE OF NEW WALL TO BE ALIGNED WITH FACE OF EXISTING WALL OR COLUMN. PLASTIC LAMINATE PIPETTE RACK - SEE ELEVATIONS AND DETAIL 12/A920.2 PLASTIC LAMINATE CUSTOM MOBILE BENCH - SEE ELEVATIONS PLASTIC LAMINATE UTILITY CABINET - SEE ELEVATIONS AND DETAIL 11/A920.2 WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS STAINLESS STEEL SINK AND TOP W/ DRAINBOARD - SEE MECHANICAL DRAWINGS STANDARD LAB COAT HOOK STRIP - SEE DETAIL 18/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FLOOR DRAIN - SEE MECHANICAL DRAWINGS. WALL MOUNTED TOILET - SEE MECHANICAL DRAWINGS WALL MOUNTED URINAL - SEE MECHANICAL DRAWINGS ELECTRIC WATER COOLER - COORDINATE W/ MECHANICAL & ELECTRICAL STAINLESS STEEL SINK AND TOP - SEE MECHANICAL DRAWINGS
KEYNOTES - PHASE II - FLOOR PLAN 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47
CEILING MOUNTED CURTAIN TRACK - SEE REFLECTED CEILING PLAN (A201.2) MOP SINK - SEE DETAIL 14/A920.2 AND MECHANICAL DRAWINGS SAFETY SHOWER AND EYE WASH - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS EXISTING DOCK LEVELER. EXISTING PIT ANGLES CAST INTO EXISTING CONCRETE. LAMINATED DOCK BUMPER - KELLY DOCK SYSTEMS - B410-14F. NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSS-L WITH HEAD CURTAIN OR EQUAL. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16 - SEE ELEVATIONS FOR BASE CABINET DETAIL EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21 - SEE ELEVATIONS FOR BASE CABINET DETAIL GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. 3 3/4" DEEP EQUIPMENT LIFT PIT - VERIFY PIT SIZE WITH CAM WOOD OR JOE SCHNEIDER NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL. HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSH WITH HEAD CURTAIN OR EQUAL. NEW 36" DEEP CUSTOM MOBILE CASEWORK UNIT. PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 21/A920.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. - SEE ELEVATIONS NEW VINYL STRIP DOOR. SAFE-T MODEL SD 8-50-UL. NEW 5" REINFORCED CONCRETE UPON COMPLETION OF UNDGROUND WORK - COORDINATE WITH PLUMBING - SEE DETAIL 12/A502.2. 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK - SEE ELEVATIONS SURFACE MOUNTED FIRE EXTINGUISHER.
NORTH
OVERALL FIRST LEVEL FLOOR PLAN - 200 BUILDING
A101.2
F
G
H 2 A101A.2
1.32
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
1.31
Consultants
10"
2' - 10"
2' - 0"
1 1.38
NEW SLAB
1.38
EXISTING SLAB
2' - 2"
DN
1.19
1.43
7 1/4"
11' - 0 3/8"
7' - 9 3/4"
LOADING DOCK
7 1/4"
Signature
DAVID C. NORBACK
1-213 A901.2
1.41
OPERATIONS SHOP
C31-PL
1.34
7
1.34 1.19
X1 1.4
X1
16
1-221A
5
2 1
15
2
A901.2
12' - 0"
A901.2
1.16
1.33
5' - 0"
1.33 1.28 6
1.16
A901.2
17
1.33 5' - 0"
1' - 8 1/2"
X1
1.33
1.9
C31-PL
1.4
1.27
Date
12.13.13
1' - 10 1/2" Signature 19
A901.2
20
1.4
B
2
1.7
9' - 2"
1.4
1.14
11
1.34
11902 12.13.13
Project For
1-212
2' - 7"
1.14
Registration Number Date
PROCESSING LAB
A901.2
DAVID C. NORBACK
2' - 2 1/2"
10
1.12
1.7
4' - 0 1/4"
1-221A
2
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
2
OFFICE
2
9' - 9 3/4"
A905.2
Registration Number
A901.2
4' - 2 1/2"
3 18
1-222
8' - 0"
1.30
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
PALLET STORAGE
24' - 3"
16
1.4
A901.2
1.4
1.5
1.41
C31-PL
1.34
KIT PRODUCTION 1-221
A905.2
1.33
4
2
7' - 0"
19
A905.2
A905.2
X1
1.39
3' - 5"
Certification
18
8' - 7"
3' - 11 1/4"
1.33
8' - 7"
2' - 4"
17
3' - 9"
1.33
7' - 10 3/4"
1.36
3' - 11 1/4"
1.7
1.29
1.37
7 1/4"
3' - 9"
1.37
1.4
5' - 0"
1.37
3' - 11 1/4"
4' - 4"
1.33
1.35
EXISTING SLAB NEW SLAB
6' - 8 1/2"
A901.2
1.19
2' - 10"
CUSTODIAL
1.7
1-214
1.34
4' - 9"
8
1.7
9
A901.2
X 3 1.17
ADA RESTROOM
1-212A
14
1.7
1.28
1.34
2915 WAREHOUSE VALLEY HIGH DRIVE
7' - 0"
A901.2
1-215 1.7
15
1.4
B
1.4
2
RESEARCH STORAGE
PHASE IIFIT - UP PACKAGE
1-240
2' - 3"
1.16 1.18
W5 1-212C
1-212B
6' - 3 1/2" 6' - 10"
1.1
7 1/4"
16' - 3 1/4"
6' - 0"
E
16' - 3"
5"
B
2
PROJECT # 7R121080
2 E
1.42
B
2
E
B
2
3
3
Key Plan
W5
E
2
1
E
E
2
2
AREA A
PHASE II - FLOOR PLAN - AREA A Project No.
1/4" = 1'-0"
NORTH
3' - 7 1/2"
3' - 8"
2.2
2.1
4 TREADS
1' - 0"
KEYNOTES - PHASE II - ENLARGED FLOOR PLAN
8' - 2"
2.3 DN DN
1 1/2"
3"
1
4' - 6"
1 1/2" 2.4
2
TCM, BCS MLK/JHA
Date
1 A502.2
3"
Drawn By Checked By
5' - 8" 2' - 0 1/2"
6287.048.01
2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10
STEEL STAIR STRINGER (BELOW) - PAINT - SEE SECTION FOR DETAILS. HOLLOW METAL HANDRAILS - PAINT - SEE SECTION FOR DETAILS. HOLLOW METAL GUARD RAIL - PAINT - SEE SECTION FOR DETAILS. OPEN GRATED STEEL LANDING AND TREADS. CONCRETE STOOP - SEE STRUCTURAL DRAWINGS. STEEL COLUMNS - PAINT - SEE STRUCTURAL DRAWINGS. CAST IN PLACE CONCRETE STAIRS - SEE SECTION FOR DETAILS - SEE STRUCTURAL DRAWINGS. ALUMINUM METAL HANDRAIL - PAINT - SEE SECTION FOR DETAILS. ADHERE GYPSUM BOARD TO EXISTING CMU WALL. CARD READER - SEE ELECTRICAL
KEYNOTES - PHASE II - FLOOR PLAN 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24
TYPICAL UTILITY FENCE - SEE ELEVATION 11/A922.2 OVERHEAD UTILITY FENCE BRIDGE ABOVE - SEE ELEVATION 14/A922.2. OVERHEAD 3 1/4" x 1 5/8" UNISTRUT CROSS BRACING AT 10'-0" A.F.F. DASHED LINES INDICATE ADJUSTABLE PLASTIC LAMINATE SHELVING ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE WALL CABINETS ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE MICROWAVE SHELVING AND CABINET ABOVE - SEE ELEVATIONS AND DETAIL 10/A920.2 MOBILE CASEWORK UNIT - SEE ELEVATIONS AND DETAILS (A921.2) COAT ROD AND SHELF - SEE DETAIL 15/A922.2. STAINLESS STEEL SINK - SEE MECHANICAL DRAWINGS A.V. CABINET - SEE DETAIL 15/A920.2. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS FACE OF NEW WALL TO BE ALIGNED WITH FACE OF EXISTING WALL OR COLUMN. PLASTIC LAMINATE PIPETTE RACK - SEE ELEVATIONS AND DETAIL 12/A920.2 PLASTIC LAMINATE CUSTOM MOBILE BENCH - SEE ELEVATIONS PLASTIC LAMINATE UTILITY CABINET - SEE ELEVATIONS AND DETAIL 11/A920.2 WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS STAINLESS STEEL SINK AND TOP W/ DRAINBOARD - SEE MECHANICAL DRAWINGS STANDARD LAB COAT HOOK STRIP - SEE DETAIL 18/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FLOOR DRAIN - SEE MECHANICAL DRAWINGS. WALL MOUNTED TOILET - SEE MECHANICAL DRAWINGS WALL MOUNTED URINAL - SEE MECHANICAL DRAWINGS ELECTRIC WATER COOLER - COORDINATE W/ MECHANICAL & ELECTRICAL STAINLESS STEEL SINK AND TOP - SEE MECHANICAL DRAWINGS
KEYNOTES - PHASE II - FLOOR PLAN 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47
CEILING MOUNTED CURTAIN TRACK - SEE REFLECTED CEILING PLAN (A201.2) MOP SINK - SEE DETAIL 14/A920.2 AND MECHANICAL DRAWINGS SAFETY SHOWER AND EYE WASH - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS EXISTING DOCK LEVELER. EXISTING PIT ANGLES CAST INTO EXISTING CONCRETE. LAMINATED DOCK BUMPER - KELLY DOCK SYSTEMS - B410-14F. NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSS-L WITH HEAD CURTAIN OR EQUAL. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16 - SEE ELEVATIONS FOR BASE CABINET DETAIL EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21 - SEE ELEVATIONS FOR BASE CABINET DETAIL GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. 3 3/4" DEEP EQUIPMENT LIFT PIT - VERIFY PIT SIZE WITH CAM WOOD OR JOE SCHNEIDER NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL. HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSH WITH HEAD CURTAIN OR EQUAL. NEW 36" DEEP CUSTOM MOBILE CASEWORK UNIT. PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 21/A920.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. - SEE ELEVATIONS NEW VINYL STRIP DOOR. SAFE-T MODEL SD 8-50-UL. NEW 5" REINFORCED CONCRETE UPON COMPLETION OF UNDGROUND WORK - COORDINATE WITH PLUMBING - SEE DETAIL 12/A502.2. 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK - SEE ELEVATIONS SURFACE MOUNTED FIRE EXTINGUISHER.
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
ENLARGED FLOOR PLAN AREA A
PHASE II - ENLARGED FIRST LEVEL SOUTHWEST STAIR PLAN 1/2" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:38 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A101A.2
KEYNOTES - PHASE II - FLOOR PLAN
CEILING MOUNTED CURTAIN TRACK - SEE REFLECTED CEILING PLAN (A201.2) MOP SINK - SEE DETAIL 14/A920.2 AND MECHANICAL DRAWINGS SAFETY SHOWER AND EYE WASH - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS EXISTING DOCK LEVELER. EXISTING PIT ANGLES CAST INTO EXISTING CONCRETE. LAMINATED DOCK BUMPER - KELLY DOCK SYSTEMS - B410-14F. NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSS-L WITH HEAD CURTAIN OR EQUAL. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16 - SEE ELEVATIONS FOR BASE CABINET DETAIL EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21 - SEE ELEVATIONS FOR BASE CABINET DETAIL GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. 3 3/4" DEEP EQUIPMENT LIFT PIT - VERIFY PIT SIZE WITH CAM WOOD OR JOE SCHNEIDER NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL. HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSH WITH HEAD CURTAIN OR EQUAL. NEW 36" DEEP CUSTOM MOBILE CASEWORK UNIT. PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 21/A920.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. - SEE ELEVATIONS NEW VINYL STRIP DOOR. SAFE-T MODEL SD 8-50-UL. NEW 5" REINFORCED CONCRETE UPON COMPLETION OF UNDGROUND WORK - COORDINATE WITH PLUMBING - SEE DETAIL 12/A502.2. 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK - SEE ELEVATIONS SURFACE MOUNTED FIRE EXTINGUISHER.
1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47
3' - 1 1/2"
6' - 4"
1' - 10"
3' - 1 1/2"
4' - 5 1/2"
4' - 5 1/2" A401.2
1' - 10"
1 A501.2
1 A501.2
3
2.5
W7
2 A501.2
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
2.6
TYP
2 A501.2 6' - 6"
1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24
1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33
1' - 10"
1.5 1.6
TYPICAL UTILITY FENCE - SEE ELEVATION 11/A922.2 OVERHEAD UTILITY FENCE BRIDGE ABOVE - SEE ELEVATION 14/A922.2. OVERHEAD 3 1/4" x 1 5/8" UNISTRUT CROSS BRACING AT 10'-0" A.F.F. DASHED LINES INDICATE ADJUSTABLE PLASTIC LAMINATE SHELVING ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE WALL CABINETS ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE MICROWAVE SHELVING AND CABINET ABOVE - SEE ELEVATIONS AND DETAIL 10/A920.2 MOBILE CASEWORK UNIT - SEE ELEVATIONS AND DETAILS (A921.2) COAT ROD AND SHELF - SEE DETAIL 15/A922.2. STAINLESS STEEL SINK - SEE MECHANICAL DRAWINGS A.V. CABINET - SEE DETAIL 15/A920.2. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS FACE OF NEW WALL TO BE ALIGNED WITH FACE OF EXISTING WALL OR COLUMN. PLASTIC LAMINATE PIPETTE RACK - SEE ELEVATIONS AND DETAIL 12/A920.2 PLASTIC LAMINATE CUSTOM MOBILE BENCH - SEE ELEVATIONS PLASTIC LAMINATE UTILITY CABINET - SEE ELEVATIONS AND DETAIL 11/A920.2 WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS STAINLESS STEEL SINK AND TOP W/ DRAINBOARD - SEE MECHANICAL DRAWINGS STANDARD LAB COAT HOOK STRIP - SEE DETAIL 18/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FLOOR DRAIN - SEE MECHANICAL DRAWINGS. WALL MOUNTED TOILET - SEE MECHANICAL DRAWINGS WALL MOUNTED URINAL - SEE MECHANICAL DRAWINGS ELECTRIC WATER COOLER - COORDINATE W/ MECHANICAL & ELECTRICAL STAINLESS STEEL SINK AND TOP - SEE MECHANICAL DRAWINGS
4' - 0"
1.1 1.2 1.3 1.4
12' - 7"
KEYNOTES - PHASE II - FLOOR PLAN
Certification
2
2.8
A401.2
3' - 0"
W6
W5
3 TREADS AT 12"
2.7
4
A401.2
15' - 6"
9' - 11"
2.8
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Date
PHASE II - ENLARGED VESTIBULE ROOF PLAN
3
1/4" = 1'-0"
EQ
1-211E
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
6' - 0"
Registration Number
KEYNOTES - PHASE II - ENLARGED FLOOR PLAN
3' - 9" 7 A502.2
1-211E
11902
VESTIBULE
2.10 EQ
DAVID C. NORBACK
Registration Number
DN
3 2 A101B.2 A101B.2
Signature
1
2.9
2.1 2.2 2.3 2.4 2.5 2.6 2.7
2.9
VESTIBULE
2.8 2.9 2.10
1-211E
STEEL STAIR STRINGER (BELOW) - PAINT - SEE SECTION FOR DETAILS. HOLLOW METAL HANDRAILS - PAINT - SEE SECTION FOR DETAILS. HOLLOW METAL GUARD RAIL - PAINT - SEE SECTION FOR DETAILS. OPEN GRATED STEEL LANDING AND TREADS. CONCRETE STOOP - SEE STRUCTURAL DRAWINGS. STEEL COLUMNS - PAINT - SEE STRUCTURAL DRAWINGS. CAST IN PLACE CONCRETE STAIRS - SEE SECTION FOR DETAILS - SEE STRUCTURAL DRAWINGS. ALUMINUM METAL HANDRAIL - PAINT - SEE SECTION FOR DETAILS. ADHERE GYPSUM BOARD TO EXISTING CMU WALL. CARD READER - SEE ELECTRICAL
Date
11902 12.13.13
Project For
1
PHASE II - ENLARGED VESTIBULE FLOOR PLAN
2
I
2915 WAREHOUSE VALLEY HIGH DRIVE J
1/2" = 1'-0"
PHASE IIFIT - UP PACKAGE
1-211M
1 5"
1.10 22' - 3 1/2"
5"
OFFICE 1-211-4
OFFICE 1-211-10
OFFICE 1-211-11
PROJECT # 7R121080
27' - 3 1/2"
1.8
2 12
1.4 12' - 0"
1-211D
5"
B
1.4
CONFERENCE
11' - 3"
OFFICE 1-211-5
7' - 0"
B
2
Key Plan A901.2
13
14
A905.2
AREA B
1-243
1-210
5"
1-211D
1-210
2
ENTRY
8
1.4
2
B
OFFICE 1-211-9
A902.2
7
OFFICE 1-211-12
1-209
2
1-209
B
Project No.
2
B
Drawn By
9' - 0 3/4"
1.47 A902.2
OFFICE
2
5
14
16' - 2"
1-211C 1.6
A902.2
B
2
5"
CLERICAL 1-211-1
1-211C
C31-PL
1.5
Checked By
1.9
1.5
OFFICE 1-211-7
OFFICE 1-211-2
OFFICE 1-211-8
OFFICE 1-211-13
1.4
1.4
2
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
8' - 0"
A902.2
CONFERENCE
3
4
12
12
1.4
1.10 O
O
5"
5' - 0"
5"
8' - 11 1/4"
5"
8' - 11 1/4"
5"
8' - 11 1/4"
5"
8' - 11 1/4"
5"
5' - 10 1/2"
4 1/4"
3' - 7"
1' - 3 1/2"
ENVIRONMENTAL SERVICES
5"
Description
6' - 6" 1.16
3' - 0"
1"
22
1.21
21
A902.2
WOMEN'S TOILET
5"
2
1.21
1-201 O
2
1-202
9' - 0"
Date
1" 19
1-202
5"
No.
3' - 0"
O
2
5"
15' - 6 1/2"
Revisions
2
1" 1"
3' - 7"
1-203
1' - 0"
5"
1.21
2
5"
5"
10' - 0"
1.22
5"
1-211L
5"
1.21
3' - 0"
1-203
1.4
1.21
18
1.16
MEN'S TOILET
13
1.4
1.4
SIM. A902.2
13
13
11
17
5"
SIM. A902.2
12
E
20
2
A30-PL
1.4
2
A902.2
A902.2
1.20
2' - 10"
6' - 6" 1-200-3 B
1-211J
5"
1.16
10
B
1-211A
2
2
1-211H
9' - 0"
A902.2
10' - 0"
2
OFFICE
2
1-211G
B
1-212A
2
OFFICE
B
© Copyright RSP Architects 2013. All rights reserved.
1.21
2' - 10 3/4"
2
1-212A
B
1-211F
OFFICE
1.21
2' - 10 3/4"
B
15
1-211J
B
B
1.20
5' - 5 1/2"
COPY/PRINT
1-211H
3' - 0"
5"
1-211G
1-211K
4
2 16
16' - 9"
1-211F
1-211A
OFFICE
2
5"
2
1-211B
B
1-211
5"
3' - 9"
B
OFFICE
CORRIDOR
OPEN OFFICE
P 4
5' - 0"
O
2
1.4
5' - 0"
A902.2
9' - 0 3/4"
1
P
2' - 10"
1.47
SIM.
11/27/13
B
5"
B
2
MLK/JHA
1.6
1-211B
2
TCM, BCS
Date
15' - 9 1/2"
1
6287.048.01
A902.2
2
2
E
2
1.4
OFFICE 1-211-3
B 1.4
OFFICE 1-211-6
A902.2
BREAK ROOM
3' - 1 1/4" B
5"
B
COAT CLOSET
1-201
9' - 2"
5"
9' - 0"
CORRIDOR B
1.23
2
2
69' - 7 3/4" 1.42
E
B
B
1-200-1
2
2
6
1.42
E
28' - 10"
B
2
B
E
2
3
1.23
E 3
2
B
A902.2
E
2 W5
2
ENLARGED FLOOR PLAN AREA B
W5 1.17
1
2
B
B 3
PHASE II - FLOOR PLAN - AREA B 1/4" = 1'-0"
NORTH C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:41 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A101B.2
G.7
H
I A902.2
2
8' - 11 1/4"
4 1/4"
6' - 0 1/4"
6' - 0"
2
1' - 1 3/4"
4 1/4"
10 1/2"
4 1/4"
14' - 1 1/4"
5"
5' - 2"
10 1/4"
4 1/4"
5' - 0 1/4"
6' - 0"
4 1/4"
1.42
B
E
6' - 0 1/4"
B
E
2
3
1.23
5' - 0 1/4" 4 1/4"
1.42
E
B
3
1-200-1
4 1/4"
6' - 0 1/4"
9
6' - 0"
6' - 0 1/4" 4 1/4"
1.42
E
2
2
11"
11"
4 1/4"
B
2
18' - 0 1/2"
4 1/4" B
E
2
3
4 1/4"
E
2
3
E
2
1.28
1.7
1.7
2
1.7 1.46
LAB
1.7
1.17
1.7
1-207
LAB
5"
1-207
3
5' - 0"
1-240
A903.2
1.7
8
1-208
5" 5
1-207 9
1.7
7 1/4"
5"
A903.2
6
7
A903.2
12' - 6"
5"
3' - 4 1/4"
5"
1.4
A903.2
C31-PL
2' - 0 1/4"
3' - 5 3/4"
5' - 6"
3
5' - 6" 1.4
1.7
1.46
1.7
1.7
PRC IMAGING
1.4 1
B
2
A904.2
Signature
1-208
13
1.46
A903.2
B
1.46
5"
4"
10' - 4 1/4"
1.14
B
1.7
1.7
5"
10
Registration Number
4
A904.2
B
LAB
1.4
2
12.13.13
1.4
1-207 1.7
Signature
1.7
DAVID C. NORBACK
2' - 10"
5"
3
1.7
5' - 7"
10' - 4"
5"
1.28
1.7 8' - 0"
5"
1.7
5' - 1"
1.7
11
5"
23' - 4" 3
1.4
1.15
1.7
1.12
12
1.18 1-207B
3
3
SPVR OFFICE
1-230 A904.2
3
5
B
B 3
6
B
1.4
3
7' - 5 1/2"
1-207D
1.4
E
SPVR OFFICE
WORKSTATION 1-207B-1
5"
1-207C
B
9' - 11 1/4"
STAIR
2' - 0 1/2"
1-207A
B
13' - 11 7/64"
3
4 1/4"
B
1-207C
COLD ROOM
8' - 0"
5"
1-207D
7' - 7 3/4"
1.47 1.47
B
A904.2
1-207
B
1.18
5"
16 A922.2
3
1.16
5"
Project For
B
1.7
LAB 17 A922.2
5" 3
B
12.13.13
6' - 10"
1.46
Date
B 1' - 4"
1.17
8
5"
2915 WAREHOUSE VALLEY HIGH DRIVE
2 STAIR
1-207A
1-206 1.18
5
SIM. A904.2
WORKSTATION 1-207B-2
PHASE IIFIT - UP PACKAGE
6
2
1.4
B 5"
5"
2 1.4 10' - 0"
B
FUTURE LAB
2
WORKSTATION 1-207B-3
1-232
B
1
A905.2
2
2 OPEN OFFICE
5 WORKSTATION 1-207B-4
12' - 1 3/4"
1.12
2' - 3"
2' - 3" 1.16
1-207B
WORKSTATION 1-207B-5
1.16 1.4
PROJECT # 7R121080
WORKSTATION 1-207B-7
1.4
3
Key Plan A905.2
DATA 1-231
11902
5"
A904.2
1.7
2' - 7"
5' - 1"
7
5"
1.17
5"
2' - 9 1/4"
1' - 8 3/4"
1' - 9"
1.16
1.46
5' - 0"
5' - 0"
1.28
1.7
2' - 10"
3 1/2"
1' - 9"
2' - 10"
Registration Number
1.16
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
2
9' - 9 1/4"
4' - 8"
18' - 11 3/4"
B
2
4
5"
A904.2
1.7
4"
1.7
1.7
9
1.7
1.47
4' - 8"
1.7
7' - 5"
7' - 2"
7' - 2"
7' - 2"
1.7
DAVID C. NORBACK
Date
1.28
2
2 1.4
3
1.24
5' - 0"
5' - 0"
1.11
X
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
1.4
1.7
3
Certification
B
23' - 11 3/4"
12
1.18
6' - 2"
A903.2
1.7
10
A903.2
1.46 1.28
25' - 0"
1-208A
1.7
B
1.7
LAB
2 1.25
1.7
4
11
5"
B
9' - 6 1/2"
2 10' - 4 1/4"
1-208A
1.7
1.17
Consultants
SERVER
8' - 2"
5' - 0"
FREEZER STORAGE
1.28
33' - 2 1/2"
7' - 10"
1.4
2
1.4
3' - 7 1/2"
5' - 4"
A903.2
1.14
2
1.4
3' - 6"
3
1.7
5"
3
1.7
1.4 1
3
B
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
23' - 4"
1.4
B
5' - 0"
2 B 1' - 6"
B
E
B
1.4
1.17
8' - 2"
1.12
E
5' - 4 1/4"
1.12
1.16
1.12
5' - 4"
3' - 5"
1.7
1.12
10' - 4 1/4"
3
1-207E
5"
2
2
W5
W5
E
E
1' - 2 1/2"
W5
2
5"
2 E
A903.2
10' - 9 1/2"
1' - 1 3/4"
4 1/4" 4 1/4"
6' - 10"
4 1/4"
CORRIDOR
E
4
5 AREA D
WORKSTATION 1-207B-6
1.4
Project No.
6287.048.01
Drawn By
TCM, BCS
Checked By
MLK/JHA
Date
1
PHASE II - FLOOR PLAN - AREA D 1/4" = 1'-0"
NORTH
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
KEYNOTES - PHASE II - FLOOR PLAN 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24
TYPICAL UTILITY FENCE - SEE ELEVATION 11/A922.2 OVERHEAD UTILITY FENCE BRIDGE ABOVE - SEE ELEVATION 14/A922.2. OVERHEAD 3 1/4" x 1 5/8" UNISTRUT CROSS BRACING AT 10'-0" A.F.F. DASHED LINES INDICATE ADJUSTABLE PLASTIC LAMINATE SHELVING ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE WALL CABINETS ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE MICROWAVE SHELVING AND CABINET ABOVE - SEE ELEVATIONS AND DETAIL 10/A920.2 MOBILE CASEWORK UNIT - SEE ELEVATIONS AND DETAILS (A921.2) COAT ROD AND SHELF - SEE DETAIL 15/A922.2. STAINLESS STEEL SINK - SEE MECHANICAL DRAWINGS A.V. CABINET - SEE DETAIL 15/A920.2. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS FACE OF NEW WALL TO BE ALIGNED WITH FACE OF EXISTING WALL OR COLUMN. PLASTIC LAMINATE PIPETTE RACK - SEE ELEVATIONS AND DETAIL 12/A920.2 PLASTIC LAMINATE CUSTOM MOBILE BENCH - SEE ELEVATIONS PLASTIC LAMINATE UTILITY CABINET - SEE ELEVATIONS AND DETAIL 11/A920.2 WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS STAINLESS STEEL SINK AND TOP W/ DRAINBOARD - SEE MECHANICAL DRAWINGS STANDARD LAB COAT HOOK STRIP - SEE DETAIL 18/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FLOOR DRAIN - SEE MECHANICAL DRAWINGS. WALL MOUNTED TOILET - SEE MECHANICAL DRAWINGS WALL MOUNTED URINAL - SEE MECHANICAL DRAWINGS ELECTRIC WATER COOLER - COORDINATE W/ MECHANICAL & ELECTRICAL STAINLESS STEEL SINK AND TOP - SEE MECHANICAL DRAWINGS
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:42 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
Date
Description
KEYNOTES - PHASE II - FLOOR PLAN 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47
CEILING MOUNTED CURTAIN TRACK - SEE REFLECTED CEILING PLAN (A201.2) MOP SINK - SEE DETAIL 14/A920.2 AND MECHANICAL DRAWINGS SAFETY SHOWER AND EYE WASH - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS EXISTING DOCK LEVELER. EXISTING PIT ANGLES CAST INTO EXISTING CONCRETE. LAMINATED DOCK BUMPER - KELLY DOCK SYSTEMS - B410-14F. NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSS-L WITH HEAD CURTAIN OR EQUAL. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16 - SEE ELEVATIONS FOR BASE CABINET DETAIL EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21 - SEE ELEVATIONS FOR BASE CABINET DETAIL GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. 3 3/4" DEEP EQUIPMENT LIFT PIT - VERIFY PIT SIZE WITH CAM WOOD OR JOE SCHNEIDER NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL. HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSH WITH HEAD CURTAIN OR EQUAL. NEW 36" DEEP CUSTOM MOBILE CASEWORK UNIT. PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 21/A920.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. - SEE ELEVATIONS NEW VINYL STRIP DOOR. SAFE-T MODEL SD 8-50-UL. NEW 5" REINFORCED CONCRETE UPON COMPLETION OF UNDGROUND WORK - COORDINATE WITH PLUMBING - SEE DETAIL 12/A502.2. 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK - SEE ELEVATIONS SURFACE MOUNTED FIRE EXTINGUISHER.
ENLARGED FLOOR PLAN AREA D
A101D.2
K J
21' - 2 1/2" 5"
4 A101E.2
J
20' - 9 1/2" 1.23
1.40
1.40
1.41
1.41
B
2
DN
1.13
1-100C
6 1/4"
1
1.4
1.26
3
Z 9' - 8"
5"
2
7' - 1 3/4"
1.7
1.7
E
1.13
1.29
VESTIBULE
2
1.29
1-121
1-123
B
2 CUSTODIAL
LOADING DOCK
7 1/4"
1-123
1.7
1.12
7' - 0"
10' - 5 1/2"
1-100D
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
Z 4
X1
Consultants
4
7
A905.2
10
1.7
B
2
1.44
1.44
10' - 0"
1-124
2
1-125
STORAGE
E 1.28 1.9
C31-PL
1-125
2
1.4
B
9
1-126
5"
LACTATION A902.2 1-126 B
8' - 6"
20 21
1-127
1.16
Date
3' - 10"
2 WOMEN'S TOILET
Signature
6' - 6"
5"
1-205A
1-205
E
O
5" 3' - 10"
29
2
O A902.2
1.21 31
2' - 8"
2
5"
4 1/4"
8' - 0"
2 MEN'S TOILET 1-128
1.16
1-128
1' - 6"
7' - 9 3/4" P
2915 WAREHOUSE VALLEY HIGH DRIVE
O
2 OPEN OFFICE
30
6' - 6"
28
5"
10' - 0"
P
13
B
5"
12.13.13
Project For
1.4
1.4
Date
27
SPVR 1-205A
2
1.4
1-205
2
E
2
PHASE IIFIT - UP PACKAGE
PHASE II - FLOOR PLAN - AREA E.1 1/4" = 1'-0"
NORTH
22
5
A905.2
11902
1-122
5"
12
DAVID C. NORBACK
Registration Number
2
2 A905.2
26
P
2
12.13.13
1-127
1.21 A902.2
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
25 24
DAVID C. NORBACK
Registration Number
O
2
1-205B
1-122
1.5
P
2' - 8"
A905.2
2
1-205B
Signature
1.9
2
1.4
OFFICE
2
C25-PL 23 4' - 7"
E
2
B
ENVIRONMENTAL SERVICES
39' - 6 3/4"
5"
2
1.4
7' - 0"
1.16
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
5"
1' - 6"
3 4' - 6"
10' - 0"
L
5"
E
A905.2
1-204
40' - 5 3/4"
10' - 0"
Certification
8
MICROBIOME
4
2
1.47
1.7
1-204
5' - 10"
B
1.13
2
B
11
A905.2
5' - 0 1/2"
6
5"
1-124
PROJECT # 7R121080
23
1.4 1.4 B
Key Plan
2
AREA E.1 AREA E
Project No.
6287.048.01
Drawn By
1
TCM, BCS
Checked By
PHASE II - FLOOR PLAN - AREA E 1/4" = 1'-0"
5' - 11"
MLK/JHA
Date
11/27/13
NORTH 2' - 11 1/2"
1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24
1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47
CEILING MOUNTED CURTAIN TRACK - SEE REFLECTED CEILING PLAN (A201.2) MOP SINK - SEE DETAIL 14/A920.2 AND MECHANICAL DRAWINGS SAFETY SHOWER AND EYE WASH - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS EXISTING DOCK LEVELER. EXISTING PIT ANGLES CAST INTO EXISTING CONCRETE. LAMINATED DOCK BUMPER - KELLY DOCK SYSTEMS - B410-14F. NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSS-L WITH HEAD CURTAIN OR EQUAL. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16 - SEE ELEVATIONS FOR BASE CABINET DETAIL EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21 - SEE ELEVATIONS FOR BASE CABINET DETAIL GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. 3 3/4" DEEP EQUIPMENT LIFT PIT - VERIFY PIT SIZE WITH CAM WOOD OR JOE SCHNEIDER NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL. HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 NEW DOCK SEAL WITH HEAD CURTAIN - KELLEY MODEL DSH WITH HEAD CURTAIN OR EQUAL. NEW 36" DEEP CUSTOM MOBILE CASEWORK UNIT. PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 21/A920.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. - SEE ELEVATIONS NEW VINYL STRIP DOOR. SAFE-T MODEL SD 8-50-UL. NEW 5" REINFORCED CONCRETE UPON COMPLETION OF UNDGROUND WORK - COORDINATE WITH PLUMBING - SEE DETAIL 12/A502.2. 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK - SEE ELEVATIONS SURFACE MOUNTED FIRE EXTINGUISHER.
2 A502.2 1' - 0"
1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33
11"
1.5 1.6
TYPICAL UTILITY FENCE - SEE ELEVATION 11/A922.2 OVERHEAD UTILITY FENCE BRIDGE ABOVE - SEE ELEVATION 14/A922.2. OVERHEAD 3 1/4" x 1 5/8" UNISTRUT CROSS BRACING AT 10'-0" A.F.F. DASHED LINES INDICATE ADJUSTABLE PLASTIC LAMINATE SHELVING ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE WALL CABINETS ABOVE - SEE ELEVATIONS AND DETAILS DASHED LINES INDICATE MICROWAVE SHELVING AND CABINET ABOVE - SEE ELEVATIONS AND DETAIL 10/A920.2 MOBILE CASEWORK UNIT - SEE ELEVATIONS AND DETAILS (A921.2) COAT ROD AND SHELF - SEE DETAIL 15/A922.2. STAINLESS STEEL SINK - SEE MECHANICAL DRAWINGS A.V. CABINET - SEE DETAIL 15/A920.2. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS FACE OF NEW WALL TO BE ALIGNED WITH FACE OF EXISTING WALL OR COLUMN. PLASTIC LAMINATE PIPETTE RACK - SEE ELEVATIONS AND DETAIL 12/A920.2 PLASTIC LAMINATE CUSTOM MOBILE BENCH - SEE ELEVATIONS PLASTIC LAMINATE UTILITY CABINET - SEE ELEVATIONS AND DETAIL 11/A920.2 WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS STAINLESS STEEL SINK AND TOP W/ DRAINBOARD - SEE MECHANICAL DRAWINGS STANDARD LAB COAT HOOK STRIP - SEE DETAIL 18/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FLOOR DRAIN - SEE MECHANICAL DRAWINGS. WALL MOUNTED TOILET - SEE MECHANICAL DRAWINGS WALL MOUNTED URINAL - SEE MECHANICAL DRAWINGS ELECTRIC WATER COOLER - COORDINATE W/ MECHANICAL & ELECTRICAL STAINLESS STEEL SINK AND TOP - SEE MECHANICAL DRAWINGS
© Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
2.1 2.3
4' - 6"
1.1 1.2 1.3 1.4
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
KEYNOTES - PHASE II - FLOOR PLAN
5' - 5"
KEYNOTES - PHASE II - FLOOR PLAN
2' - 11 1/2"
2.4
DN
DN
KEYNOTES - PHASE II - ENLARGED FLOOR PLAN 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10
STEEL STAIR STRINGER (BELOW) - PAINT - SEE SECTION FOR DETAILS. HOLLOW METAL HANDRAILS - PAINT - SEE SECTION FOR DETAILS. HOLLOW METAL GUARD RAIL - PAINT - SEE SECTION FOR DETAILS. OPEN GRATED STEEL LANDING AND TREADS. CONCRETE STOOP - SEE STRUCTURAL DRAWINGS. STEEL COLUMNS - PAINT - SEE STRUCTURAL DRAWINGS. CAST IN PLACE CONCRETE STAIRS - SEE SECTION FOR DETAILS - SEE STRUCTURAL DRAWINGS. ALUMINUM METAL HANDRAIL - PAINT - SEE SECTION FOR DETAILS. ADHERE GYPSUM BOARD TO EXISTING CMU WALL. CARD READER - SEE ELECTRICAL
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:45 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
4
PHASE II - PARTIAL FIRST LEVEL NORTHWEST STAIR PLAN
ENLARGED FLOOR PLAN AREA E & E.1
1/2" = 1'-0"
A101E.2
F
G
H
I
J
VESTIBULE 1-211E
1
1
OPERATIONS SHOP
KIT PRODUCTION
1-222
1-221
12
15
1-210
1-124
17
WAP
S
CUSTODIAL
CONFERENCE LOADING DOCK
SD
COAT CLOSET
4
3 SD
S
OPEN OFFICE
6
3 2
1-211
S
OS
OFFICE
OFFICE 15
1-221A
18
2
SD
4
OS
S
1-211A
15
1-211J
OFFICE
1-211F
1-211H
OS
OFFICE 1-212A
OS 20 2
SD
9
1-203
1-201
2
OS
4
MEN'S TOILET
OS
1-128
OS
1-200-1
S
13
SD
13
OS
S
14 SD
4
13
4
SERVER
S
7
SD
13
1-208A
S
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
ENVIRONMENTAL SERVICES
8' - 1"
3
Date
7
2 WAP
RESEARCH STORAGE
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
15
11 4
4' - 0"
4
DAVID C. NORBACK
Registration Number
1-202
1-240
Certification
2
CORRIDOR SD
2
OS
2
1-127
OS
2
OS 4
13
7
WOMEN'S TOILET
OS 2
WOMEN'S TOILET
9
MEN'S TOILET 2
5
3
OS
2
20
S
4
S
SD
OS
1' - 6" 1' - 0"
ADA RESTROOM 1-215
OS
1-211G
2
2
SD
OFFICE
CONFERENCE
4
SD
OFFICE COPY/PRINT
OS
1
SD
7 A210.2
SD
OS
S
1-126 19
1-211B
S
1-214
S
WAP
LACTATION
OFFICE
CUSTODIAL
Consultants
1-125
WAP
5 3
2
STORAGE
3
1-212
WAP
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
2
OS 10
PROCESSING LAB
1-123
1-209
SD
1-211C
VESTIBULE
S
SD
OS
S
BREAK ROOM
S
3
1
OS
5
1-211D
1-213 SD
OS
4
Signature
DAVID C. NORBACK
S S SD
S
S
SD
SD
S
SD
S
Registration Number
SD
SD
LAB 15
1-207
4
4
15
WAP
1-208 S
S SD
SD
OS
4
S SD
OS
4
16
CORRIDOR 1-200-4
OS
Date
MICROBIOME
PRC IMAGING
12.13.13
1-204 Project For
OFFICE 1-200-2
15
CORRIDOR
4
11902
S
SD
1-205B
S
SD
4
4
SPVR
7
SPVR OFFICE
16
OS
1-207A
1-207C
1
1-205A
2
SPVR OFFICE
1 A210.2
2915 WAREHOUSE VALLEY HIGH DRIVE
OS STAIR
STAIR 1-230
1-206
2
2
WAP S
COLD ROOM
FUTURE LAB
OS
1-207D
SD
OS
WAP
1-232 S
4
5
S
S
S
SD
SD
SD
SD
SD
PHASE IIFIT - UP PACKAGE
4
1-205
OPEN OFFICE
S
OPEN OFFICE S
1-207B
SD
S
OS
SD
OS
OS
DATA
OS
4
4
PROJECT # 7R121080
1-231
Key Plan WAP
AREA A AREA C AREA F
6 WAP S SD
S
S
SD
S
SD
S
SD
SD
1
S SD
RESEARCH STORAGE
S SD
S
1
ELECTRICAL SD
1-150
1-240
OS
OS
AREA D
AREA E.1 AREA E
AREA F.1
WAP
1
1
AREA B
OS
SD
S
Project No.
6287.048.01
Drawn By
JAS
Checked By
MLK/JHA
Date
7
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
ELECTRICAL 1-150A
1
11/27/13
© Copyright RSP Architects 2013. All rights reserved.
Revisions
PARTIAL FIRST LEVEL REFLECTED CEILING PLAN - OPTION 2
No.
1/8" = 1'-0"
Date
Description
SD
NORTH REFLECTED CEILING PLAN GENERAL NOTES:
REFLECTED CEILING PLAN LEGEND
1. GENERAL CONTRACTOR TO COORDINATE ALL WORK OF ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC. NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON ARCHITECTS DRAWINGS. 2. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING, MECHANICAL DUCTS, STRUCTURAL ELEMENTS AND ANY OTHER APPLICABLE ITEMS. INSTALL NEW PLUMBING, MECHANICAL FANS, DUCTS, CONDUITS, AND OTHER RELATED ITEMS SO AS NOT TO CONFLICT WITH LUMINARIES.
SPRINKLER HEAD S SD
SPEAKER SMOKE DETECTOR
3. VERIFY ALL RECESS DEPTHS OF FIXTURES AGAINST A.C. DUCTS, PIPES, BEAMS, ETC. BEFORE ORDERING FIXTURES. SUBMIT SHOP DRAWINGS OF ALL FIXTURES TO ARCHITECT AND ENGINEER FOR APPROVAL.
EXIT SIGN
4. REMOVE ALL OBSTRUCTIONS FROM CEILING, INCLUDING ABANDONED CONDUITS, WIRES, DUCK WORK, ETC. NOT SCHEDULED FOR REUSE.
FIRE ALARM
5. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION OF VARIOUS ABOVE-CEILING ELEMENTS ARE TO BE FOUND IN HVAC, PLUMBING, FIRE PROTECTION, ELECTRICAL AND LIGHTING DRAWINGS. REFER TO ENGINEERING DRAWINGS FOR FULL WORK SCOPE ON DIFFUSERS, RETURNS, SPRINKLERS, LIGHT SWITCHES, THERMOSTATS, FIRE ALARMS, STROBES, ETC.
OS
OCCUPANCY SENSOR NEW SUSP. CEILING TILE AND GRID SYSTEM
6. REFER TO ENGINEERING DRAWINGS FOR ALL LIFE SAFETY DEVICES REQUIRED BY CODE AND ALL EMERGENCY LIGHT FIXTURES. ARCHITECTURAL DRAWINGS SHALL GOVERN LOCATION OF THESE DEVICES.
EXISTING SUSP. CEILING TILE AND GRID SYSTEM TO REMAIN
7. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS WITH MAIN CEILING GRID RUNNERS, DUCTS, STRUCTURES, HVAC AND/OR ELECTRICAL CONDUIT, PRIOR TO FRAMING FOR LIGHTS. ANY DISCREPANCIES BETWEEN ARCHITECT'S CEILING GRID LOCATION AND ACTUAL FIELD CONDITIONS ARE TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING.
LIGHT FIXTURE - SEE ELECTRICAL
8. INSTALL LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER OVER LOUVER, LENS, BAFFLE, AND THE LIKE, TO AVOID FIXTURE SOILING OR DAMAGE. FIXTURES SHALL BE KEPT CLEAN AND AS NEW. LAMPS SHALL BE NEW AT PROJECT COMPLETION.
DIFFUSER - SEE MECHANICAL
9. SWITCHES, THERMOSTATS, STROBES AND OTHER ELECTRICAL DEVICES ARE TO ALIGN ALONG THEIR CENTERLINE, WHEN DEVICES OCCUR IN THE PROXIMITY OF WALL OUTLETS. ALIGN OUTLETS WITH DEVICES ABOVE.
RETURN AIR GRILLE - SEE MECHANICAL
12. FIRE SAFETY MUST BE MAINTAIN FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE STARS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES. NOTIFY BUILDING FACILITIES MANAGER OF DAMAGED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. 13. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS.
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:45 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
18 19 20
NO CEILING IN THIS AREA - PAINT STRUCTURE AND DECK (PT-7) SUSPENDED ACOUSTICAL CEILING TILE SYSTEM AT 8' - 0" A.F.F. SUSPENDED ACOUSTICAL CEILING TILE SYSTEM AT 9' - 0" A.F.F. SUSPENDED ACOUSTICAL CEILING TILE SYSTEM AT 10' - 0" A.F.F. GYPSUM BOARD CEILING AT 9'-0" A.F.F. - PAINTED (PT-?) SLOPED GYPSUM BOARD CEILING - SEE DETAIL 7/A210.2 NEW BULKHEAD AT 9'-10" A.F.F. - SEE DETAIL 1/A210.2 RECESSED GYP. BOARD LIGHT COVE - SEE DETAIL 2/A210.2 GYPSUM BOARD SOFFIT - SEE DETAIL 3/A210.2 NEW CEILING MOUNTED CURTAIN (C-1) AND TRACK. SUSPENDED ACOUSTICAL CEILING TILE SYSTEM AT 12' - 0" A.F.F. BOTTOM OF BULKHEAD AT 8'-1 1/4" A.F.F. - SEE DETAIL 5/A210.2 BOTTOM OF BULKHEAD AT 6'-0 1/4" A.F.F. - SEE DETAIL 5/A210.2 DASHED LINE INDICATES OVERHEAD SERVICE CARRIER - SEE DETAIL 6/A210.2 EMERGENCY SHOWER. GYPSUM BOARD CEILING AT 12'-0" A.F.F. - SEE STRUCTURAL DRAWINGS FOR CEILING FRAMING AND HEADER. GYPSUM BOARD CEILING AT 9'-2" A.F.F. NEW BULKHEAD AT 9'-2" A.F.F. - SEE DETAIL 4/A210.2 CEILING HUNG TOILET PARTION PILASTER - SEE DETAIL ?????.
SD
S
LINEAR DIFFUSER - SEE MECHANICAL
10. LIGHT FIXTURES, EXIT SIGNS, SPRINKLERS AND OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.N.O. 11. ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF GYB. BD. OR CEILING TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES.
KEYNOTES - REFLECTED CEILING PLAN 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 17
AP
ACCESS PANEL
PARTIAL FIRST LEVEL REFLECTED CEILING PLAN
A201.2
3 5/8" STEEL STUDS SUSPENDED FROM STRUCTURE ABOVE
3 5/8" STEEL STUD FRAMING
3 5/8" STEEL STUD FRAMING AT 16" O.C. ATTACH TO STRUCTURE ABOVE AS REQUIRED 3 5/8" STEEL STUD FRAMING AT 16" O.C. ATTACH TO STRUCTURE ABOVE AS REQUIRED
PARTITION AS SCHEDULED 5/8" GYP. BD.
5/8" GYP. BD. CEILING - SEE REFLECTED CEILING PLANS
3' - 2"
LIGHT FIXTURE - REFER TO ELECTRICAL
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
5/8" GYPSUM BOARD LT.GA. METAL FRAMING
2"
4 1/4"
SUSPENDED ACT 8'-0" A.F.F.
2"
SUSPENDED A.C.T. 10'-0" A.F.F.
GYP. BD CEILING 9'-0" A.F.F.
9"
BOTTOM OF BULKHEAD 9'-10" A.F.F.
ACT AS SCHEDULED - SEE REFLECTED CEILING PLANS
1
2"
4 1/4"
4 1/4"
1' - 0"
5/8" GYP. BD ON 3 5/8" LT. GA. METAL FRAMING
1' - 8 3/4"
Consultants
A.C.T. AS SCHEDULED - SEE REFLECTED CEILING PLANS
BOTTOM OF BULKHEAD 9'- 0" A.F.F. 5/8" GYP. BD.
METAL BEAD ( TYP. )
PHASE II - TYPICAL BULKHEAD DETAIL
2
1 1/2" = 1'-0"
PHASE II - LIGHT COVE DETAIL IN RESTROOM
3
1 1/2" = 1'-0"
PHASE II - SOFFIT DETAIL AT RECEPTION AREA 1 1/2" = 1'-0"
4
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
PHASE II - BULKHEAD DETAIL AT RECEPTION AND OPEN OFFICE 1 1/2" = 1'-0"
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota. ARMSTRONG EXPOSED TEE GRID SYSTEM
Signature
DAVID C. NORBACK
Registration Number
SUSPENDED A.C.T. 10'-0" A.F.F.
Date
VARIES
3 A210.2
ARMSTRONG LOCKING ANGLE MOLDING (LAM) AND REVERSE WALL ANGLE AS REQUIRED
12.13.13
Project For
4 A210.2
SEE R.C.P. ARMSTRONG QUIKSTIX TEE FRAMING AND REQUIRED SUPPORT BRACING
EXISTING CEILING
V.I.F.
1/4" THREADED ROD, TYP.
10' - 8 3/4"
BOTTOM OF BULKHEAD VARIES SEE R.C.P.
12' - 2"
CEILING BAFFLE, TYP
V.I.F.
1/4" THREADED ROD ANCHOR BOLT, TYP.
5/8" GYPSUM BOARD
2915 WAREHOUSE VALLEY HIGH DRIVE
ARMSTRONG LOCKING ANGLE MOLDING (LAM) PARTITION AS SCHEDULED
QUICK CONNECT, TYP
PHASE IIFIT - UP PACKAGE
B22 UNI-STRUT WIREMOLD 4000
1' - 11"
5
PHASE II - BULKHEAD DETAIL AT CORRIDOR # 1-200-1 1 1/2" = 1'-0"
11902
6
PHASE II - DETAIL AT SERVICE CARRIER 1 1/2" = 1'-0"
7
PHASE II - SECTION AT RECEPTION AREA 1/4" = 1'-0"
PROJECT # 7R121080
Project No.
6287.048.01
Drawn By
BCS, JAS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
REFLECTED CEILING DETAILS
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:46 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A210.2
NOTE 2 NOTE 2 KP KP KP KP KP KP KP KP KP KP KP
6"
SEE SCHEDULE
TYPE W - FULL HEIGHT (TO DECK OR BEAM ABOVE)
7' - 0"
DESCRIPTION:
3' - 0"
FG - ALUMINUM FULL GLASS INSULATED
FG1 - ALUMINUM FULL GLASS
2' - 9"
18 GAUGE X 1 5/8" METAL STUDS AT 16" O.C.
F - FLUSH SOLID CORE QUARTER SLICED WALNUT WOOD DOOR STAIN
MAX.
3' - 7"
N - NARROW LITE SOLID CORE QUARTER SLICED WALNUT STAIN
G - HALF GLASS SOLID CORE QUARTER SLICED WALNUT STAIN
5/8" TYPE GYPSUM WALLBOARD 8 ' -0 "
7 ' -0 "
SEE SCHEDULE
SEE SCHEDULE
GL-2
7 ' -0 "
SEE SCHEDULE
MAX.
3' - 7"
GL-2
GL-2
7 ' -0 "
GL-3
2' - 9"
5/8" TYPE GYPSUM WALLBOARD
SEE SCHEDULE
PA3 EDPA1 ST1 PA2 PR2 PR2 PR2 PP1 PA1 PP1 PA2 PA2 PA1 PA2 PA1 PA2 PA1 PA4 PA4 PA2 ST3 PA2 PA2 PA1 PA1 PA1 PA1 EDPA2 PA1 PA1 PA1 PA1 PA2 PA2 EL6 PA1 PA2 PA2 PA1
T - FLUSH HOLLOW METAL PAINT
OC - OVERHEAD COILING
PTN TYPE
STUD WIDTH
PTN WIDTH
W
8"
9 1/4"
STC RATING W/O W/ INSUL INSUL
FIRE RATING
UL DESIGN
NOTES PROVIDE DEFLECTION HEAD AT TOP OF WALL - SEE DETAIL 1/A301.1
40
TYPE W1 - FULL HEIGHT (TO DECK OR BEAM ABOVE) DESCRIPTION: CERAMIC TILE 5/8" TILE BACKER BOARD
KP KP KP KP
FRAME TYPES
WINDOW TYPES
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
SIM
4"
1' - 5 1/2" 1 1/4" G2
5 A301.2
3 A301.2
7 A301.2
G2
3 A301.2 G2
6 A301.2
KP CR
5/8" GYPSUM WALLBOARD, TYPE "X"
6' - 0" PTN TYPE
GL-2
W1 7' - 0"
3' - 0"
STUD WIDTH
PTN WIDTH
STC RATING W/O W/ INSUL INSUL
FIRE RATING
UL DESIGN
2' - 6"
KP NOTE 1
1 1/4"
8"
F1 - WELDED HOLLOW METAL - PAINT
KP KP
F3 - WOOD FRAME WALNUT - STAIN
NOTES
Certification
9 1/4"
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
TYPE X - FULL HEIGHT (TO DECK OR BEAM ABOVE)
4' - 6"
2"
3' - 0"
Consultants
3" ACOUSTIC INSULATION
1 1/4"
SEE SCHED
2"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
8" METAL STUD AT 16" O.C.
5' - 0"
2' - 0"
8/A320.2 9/A320.2 8/A320.2 9/A320.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 3/A301.2 3/A301.2 1/A301.2 2/A301.2 3/A301.2 3/A301.2 3/A301.2 3/A301.2 3/A301.2 3/A301.2 3/A301.2 3/A301.2 2/A320.1 3/A320.1 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 3/A301.2 3/A301.2 1/A301.2 2/A301.2 2/A320.1 3/A320.1 1/A301.2 2/A301.2 1/A301.2 2/A301.2 1/A301.2 2/A301.2 14/A301.2 15/A301.2
1 3/4"
HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM WD HM WD WD WD WD AL HM HM HM HM WD HM AL HM HM HM HM
6"
2' - 2"
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F3 F1 F3 F3 F3 F3 W7 F1 F1 F1 F1 F3 F1 W8 F1 F1 F1 F1
COMMENTS
1 3/4" 7' - 0 3/4"
No No Yes No No No No No No No No No No No No No No No No Yes Yes No Yes No No No No No No Yes No No No No No No Yes No No No No
JAMB
2' - 2"
HM HM HM WD HM WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD AL WD WD WD WD WD WD AL WD WD WD WD
OC OC T G T F F F F F F F G N F N F G F G G F F F N F F F F FG F F F F F N FG 1 F G G F
HEAD
SEE SCHED
3' - 0"
DESCRIPTION: 5/8" TYPE GYPSUM WALLBOARD
4"
1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4"
TYPE MATL.
7 ' -0 "
10' - 0" 10' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 2" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0"
PAIR
SEE SCHED 2' - 0"
3' - 0"
SEE SCHEDULE
8' - 0" 8' - 0" 6' - 0" 3' - 0" 3' - 6" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 4' - 6" 4' - 6" 3' - 0" 5' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 6' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 6' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
MATL.
6' - 11 1/2"
TYPE
SEE SCHED 3"
3' - 0"
7 ' -0 "
T
SEE SCHEDULE
LOADING DOCK LOADING DOCK ENVIRONMENTAL SERVICES VESTIBULE CUSTODIAL STORAGE LACTATION WOMEN'S TOILET MEN'S TOILET WOMEN'S TOILET ENVIRONMENTAL SERVICES MEN'S TOILET MICROBIOME OPEN OFFICE SPVR OFFICE SPVR OFFICE LAB SPVR OFFICE LAB LAB PRC IMAGING SERVER BREAK ROOM COAT CLOSET CONFERENCE OFFICE OFFICE CONFERENCE VESTIBULE COPY/PRINT OFFICE OFFICE OFFICE OPEN OFFICE ENTRY VESTIBULE OFFICE PROCESSING LAB PROCESSING LAB OFFICE
H
SEE SCHED
3' - 0"
SEE DOOR SCHEDULE1 1/4"
1-120 1-120 1-122 1-123 1-124 1-125 1-126 1-127 1-128 1-201 1-202 1-203 1-204 1-205 1-205A 1-205B 1-207A 1-207 1-207C 1-207 1-207 1-208 1-208A 1-209 1-210 1-211A 1-211B 1-211C 1-211D 1-211E 1-211F 1-211G 1-211H 1-211J 1-211 1-243 1-211E 1-212A 1-212 1-212 1-221A
W
SEE SCHED
3' - 0"
7 ' -0 "
1-100C 1-100D 1-122 1-123 1-124 1-125 1-126 1-127 1-128 1-201 1-202 1-203 1-204 1-205 1-205A 1-205B 1-207A 1-207B 1-207C 1-207D 1-207E 1-208 1-208A 1-209 1-210 1-211A 1-211B 1-211C 1-211D 1-211E 1-211F 1-211G 1-211H 1-211J 1-211K 1-211L 1-211M 1-212A 1-212B 1-212C 1-221A
ROOM NAME
SEE SCHED
SEE SCHEDULE
NO.
SCALE: 1" = 1'-0"
2"
ROOM NO.
SPECS. FIRE LABEL HDWR.
PARTITION TYPES - MASONRY AND CONCRETE
SCALE: 1/4" = 1'-0"
7 ' -0 "
DOOR
DOOR TYPES
SEE SCHEDULE
DOOR SCHEDULE - PHASE II FIT UP FRAME
4 A301.2
18 GAUGE X 1 5/8" METAL STUDS AT 16" O.C.
LINE OF FINISHED FLOOR
Signature
DAVID C. NORBACK
6" ACOUSTIC INSULATION
W5- HOLLOW METAL WINDOW FRAME
Registration Number 5/8" TYPE GYPSUM WALLBOARD
Date
DOOR SCHEDULE NOTES: 1. PROVIDE WEATHER STRIPPING, THRESHOLD, CYLINDER, OVERHEAD STOP AND EXTERIOR PULL PER SPECIFICATIONS.
GLASS TYPES:
PANEL TYPES:
GL-1 - 1" INSULATED, CLEAR, LOW E GLAZING
PL-1 - 1" INSULATED CLEAR ANODIZED METAL PANEL.
GL-2 - 1/4" CLEAR TEMPERED GLASS
2. PROVIDE ALL REQUIRED DOOR HARDWARE INCLUDING BUT NOT LIMITED TO ELECTRICAL OPERATOR AND (1) 3 BUTTON CONTROLLER.
PTN TYPE
STUD WIDTH
PTN WIDTH
X
6"
7 1/4"
X1
6"
7 1/4"
STC RATING W/O W/ INSUL INSUL
FIRE RATING
UL DESIGN
PROVIDE DEFLECTION HEAD AT TOP OF WALL - SEE DETAIL 1/A301.1
40
GL-3 - 1" INSULATED, TEMPERED, CLEAR, LOW E GLAZING 44
WINDOW TYPES SCALE: 1/4" = 1'-0"
NOTES
PROVIDE DEFLECTION HEAD AT TOP OF WALL - SEE DETAIL 1/A301.1
DESCRIPTION:
LINE OF VESTIBULE FINISHED FLOOR
7 A320.2
3/8" 2"
3' - 0"
3' - 0"
2" 3/8"
6' - 4 3/4" R.O.W.
2' - 6 1/8"
2" 2"
2"
3 A320.2
GL-2
GL-2
2"
PTN WIDTH
STC RATING W/O W/ INSUL INSUL
FIRE RATING
UL DESIGN
3' - 0"
12.13.13
3' - 0"
2"
NOTES
1 HR
11 5/8"
2915 WAREHOUSE VALLEY HIGH DRIVE
TYPE Z - FULL HEIGHT FURRING AND RIGID INSULATION ON CONRETE MASONRY UNIT DESCRIPTION: 5/8" GYPSUM WALLBOARD 3 5/8" METAL STUD AT 16" O.C.
LINE OF BUILDING FINISHED FLOOR
W7 - ALUMINUM STOREFRONT - THERMALLY BROKEN - CLEAR ANODIZED
STUD WIDTH
Y 12' - 1 1/2"
GL-2
LINE OF VESTIBULE FINISHED FLOOR
W6 - ALUMINUM STOREFRONT - THERMALLY BROKEN - CLEAR ANODIZED
11902
1/2" 1 A320.2
2' - 3 1/2"
3/8" 9' - 11" R.O.H.
10' - 8 5/8"
GL-2
GL-2
PTN TYPE
2"
GL-3
GL-2
GL-2
2 A320.2
2"
GL-3
LINE OF VESTIBULE FINISHED FLOOR
W5 - ALUMINUM STOREFRONT - THERMALLY BROKEN - CLEAR ANODIZED
9' - 10 1/4"
2" 4' - 5 1/4" 2" 2 A320.2
3 A320.2
2"
3/8" 2" 8" 4' - 5 1/4"
7' - 11 1/2"
GL-3
SIM.
GL-2
7 A320.2
2"
W8 - ALUMINUM STOREFRONT - CLEAR ANODIZED
PHASE IIFIT - UP PACKAGE
2" RIGID INSULATION (POLYISOCYANURATE) EXISTING NON-LOAD BEARING CONCRETE MASONRY UNIT
2"
7 A320.2
GL-3
2" 11 5/8"
2"
GL-3
GL-3
GL-2
DAVID C. NORBACK
Project For
6' - 0"
5 A320.2
GL-2
2' - 2 1/4"
GL-3
2" 2' - 4"
GL-3
8' - 0 1/4" R.O.H.
5' - 11 1/4"
GL-3
GL-3
4' - 8"
4' - 8"
GL-3
MP-1
1 A320.2
3/8"
GL-3
7 A320.2
GL-3
GL-3
GL-3
4' - 8"
GL-3
GL-3
6 A320.2
12' - 8 1/4"
GL-3
3/8"
GL-3
5 A320.2
2"
GL-3
2" 2' - 4"
GL-3
GL-3
3/8"
GL-3
2"
GL-3
8' - 9 1/4"
1 A320.2
MP-1
1 A320.2 8' - 10" R.O.H.
2" 3/8" 4' - 5 1/4"
6 A320.2
5 A320.2
5 A320.2
3/8"
4 EQUAL SPACES
2" 3/8"
4 1/2"
4 EQUAL SPACES
2" 2' - 4"
7' - 3 1/4"
7' - 4" R.O.H.
14' - 5 1/8"
4' - 8"
3/8" 2"
2"
3/8" 2" 2' - 4"
14' - 5 1/8"
2"
4 1/2" 14' - 11 5/8"
2" 11 5/8" 2"
4 1/2"
2' - 3 1/2" 1' - 1"
14' - 11 5/8" 15' - 0" R.O.W.
2' - 3"
Signature
STANDARD NON-LOAD BEARING CONCRETE MASONRY UNIT
2' - 2 1/4"
2" 2' - 11" 2" SIM.
4' - 5 3/4"
2" 2' - 11"
3/8"
2' - 3"
2' - 7"
4 1/2"
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Date
8' - 8"
4' - 5 3/4"
11' - 7" 15' - 0" R.O.W.
12.13.13
Registration Number
TYPE Y - CONCRETE MASONRY UNITS
11902
PTN TYPE
Z
STUD WIDTH
PTN WIDTH
UL DESIGN
FIRE RATING
17 7/8"
NA
NA
STC RATING W/O W/ INSUL INSUL
NOTES
PROJECT # 7R121080
GENERAL NOTES 1.
PROVIDE DEFLECTION TRACK TO ALLOW FOR 1" DEFLECTION IN STRUCTURAL SYSTEM AT TOP OF ALL INTERIOR PARTITIONS EXTENDING FROM TOP OF SLAB TO UNDERSIDE OF STRUCTURE.
2.
PROVIDE CONTROL JOINTS AT JUNCTURE OF ALL FLOOR SUPPORTED WALLS WITH BULKHEAD & SOFFITS SUPPORTED FROM DECK ABOVE.
3.
PROVIDE U.L. APPROVED JOINT ASSEMBLY AT PERIMETER OF ALL FIRE RATED PARTITIONS.
4.
ALL MAYO STANDARD STEEL STUD PARTIONS FOR THIS PROJECT SHALL BE A MINIMUM OF 22 GAUGE STUDS, UNLESS NOTED OTHERWISE.
5 3/4" 1/4"
2 1/2"
2 1/2"
1/4"
1/4"
4 7/8"
1/2" HARDWOOD GLAZING STOP
4 7/8"
4 7/8"
5 3/4"
4 7/8"
3/16"
2"
3 5/16"
1/4" GLAZING
1/4"
7/16"
7/16"
1/2"
DOUBLE STUDS AT JAMBS (TYPICAL)
3/4"
3/8"
3/8"
JAMB ANCHORS 3 PER JAMB
2"
HARDWOOD DOOR FRAME / STOP
1/8"
SEE PLANS FOR PARTITION TYPE
1/4" SHIM SPACE
PHASE II - WOOD SIDELIGHT SILL DETAIL
4
3" = 1'-0"
DOUBLE 3 5/8" METAL STUDS AT DOOR JAMB
DOOR - SEE SCHEDULE
5/8" GYPSUM BOARD
3" = 1'-0"
2
3/4"
PHASE II - TYPICAL DOOR JAMB DETAIL
3
3" = 1'-0"
2 3/4"
PHASE II - WOOD DOOR JAMB DETAIL (HEAD SIM) 3" = 1'-0"
7 1/4"
1/2"
BOX BEAM HEADER - BY STEEL STUD SUPPLIER
DOUBLE STUDS AT JAMBS (TYPICAL)
1/2"
2"
JAMB ANCHORS 3 PER JAMB
1/2"
HOLLOW METAL FRAME
2 1/2"
1/4"
2 1/2"
3" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:49 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
4
CONSTRUCT PARTITION FROM FLOOR TO 24" ABOVE CEILING
3" = 1'-0"
48
CONSTRUCT PARTITION FROM FLOOR UP TO 48" A.F.F.
2 1/2"
1/4" 2 1/2"
8
PHASE II - HOLLOW METAL (7 1/4" WALL) DOOR HEAD DETAIL
1/2" HARDWOOD GLAZING STOP 1/4" X 1/4" REVEAL
3" = 1'-0"
9
3" = 1'-0"
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
6
PARTITION TYPE INDICATOR LEGEND
2X BLOCKING 3/4" HARDWOOD FRAME
3 5/16"
1/2" X 2" HARDWOOD STOP
8 1/4"
PHASE II - HOLLOW METAL (7 1/4" WALL) DOOR JAMB DETAIL
JAS, BCS
1/4"
1 3/4" WOOD DOOR
8 1/4"
5 3/4"
7
PHASE II - WOOD SIDELIGHT MULLION DETAIL
1/4"
1/4" GLAZING
DOOR - SEE DOOR SCHEDULE
1/4"
PHASE II - WOOD SIDELIGHT JAMB DETAIL
CONSTRUCT FIRE RATED PARTITION FROM FLOOR DECK/STRUCTURE ABOVE. SEE LIFE SAFETY PLANS FOR EXTENT
1/4"
HOLLOW METAL FRAME
DOOR - SEE DOOR SCHEDULE
1/4" GLAZING
3
2 1/2"
Drawn By
PARTITION SUBSCRIBT NOTES
CONSTRUCT PARTITION FROM FLOOR TO 6" ABOVE CEILING
2 1/2"
1/2"
1/4" SHIM SPACE 2X BLOCKING
DEFINES HEIGHT TO TERMINATE PARTITION; REFER TO NOTES, THIS SHEET, OR SEE CONSTRUCTION DOCUMENTS FOR SPECIAL HEIGHTS
6287.048.01
5 3/4"
JAMB ANCHORS 3 PER JAMB
1/2" HARDWOOD GLAZING STOP
1/4"
5
4"
1/2"
3/4"
1/2"
6" METAL STUDS -SEE PARTITION TYPES.
2"
L TRIM FINISHED END
6" METAL STUDS -SEE PARTITION TYPES.
1i
2
1/4"
1/2"
NOVAWALL EXTRUSION
HARDWOOD FRAME / STOP 1/4" GLAZING
3/4" 1 1/2" 3/4"
DOUBLE 3 5/8" METAL STUDS AT DOOR JAMB
2 3/4"
5 3/4"
5/8" GYPSUM BOARD NOVAWALL - FABRIC: AWC-1 3 5/8" METAL STUDS - SEE FLOOR PLAN FOR PARTITION TYPES
1
PARTITION TYPE INDICATOR: REFER TO REFERENCE STANDARDS #3520.01-.04 OR SEE CONSTRUCTION DOCUMENTS FOR SPECIAL PARTITION TYPES
CONSTRUCT PARTITION FROM FLOOR TO UNDERSIDE OF CEILING
7 1/4"
5/8" GYP. BD.
1i
1
1/4"
5/8" GYP. BD.
INDICATES NEW PATITION CONSTRUCTION (REFER TO PARTITION TYPE INDICATOR)
1 3/4"
3 5/8" METAL STUDS - SEE FLOOR PLAN FOR PARTITION TYPES
1/2"
HOLLOW METAL FRAME
DEFINES TOP OF LOW PARTITION: REFER TO NOTES THIS SHEET, OR SEE CONSTRUCTION DOCUMENTS FOR SPECIAL CONDITIONS
1
5 3/4"
PHASE II - TYPICAL DOOR HEAD DETAIL
PARTIAL HEIGHT WALLS SHALL BE BRACED TO EXISTING STRUCTURE. SEE STRUCTURAL DRAWINGS FOR DESIGN CRITERIA.
1/4" GLAZING 1/2" HARDWOOD GLAZING STOP
1/2"
5 3/4"
5.
2X BLOCKING
2X BLOCKING
HOLLOW METAL FRAME
Project No.
3/4" HARDWOOD FRAME
L-TRIM FINISHED END
5/8"
2" 5/8"
3/4" SHIM / BLOCKING
DOOR - SEE SCHEDULE
1
MITER CORNERS - TYP
3/4"
3 5/8" METAL STUDS -SEE PARTITION TYPES.
3 5/8" STEEL STUD FRAMING
HEADER BY STEEL STUD SUPPLIER
1 3/4" WOOD DOOR
4"
5/8" GYP. BD.
1/2"
5/8" GYP. BD.
PHASE II - WOOD SIDELIGHT / DOOR MULLION DETAIL 3" = 1'-0"
DOOR SCHEDULE, DOOR TYPES, WINDOW TYPES, AND PARTITION TYPE INDICATOR
A301.2
3/4"
UNIT DIMENSION
4 1/2"
4 1/2"
ALUMINUM WINDOW FRAME
2"
EXTERIOR
THERMALLY BROKE ALUMINUM DOOR
UNIT DIMENSION
ALUMINUM DOOR STOP
1
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
INTERIOR
1 3/4"
2"
1 3/4"
CLEAR ANODIZED ALUMINUM WINDOW SYSTEM
CLEAR ANODIZED ALUM. WINDOW / DOOR FRAME W/ THERMO-BREAK
INTERIOR
EXTERIOR
ALUMINUM THRESHOLD BELOW
Consultants
ALUMINUM ENTRANCE FRAMING
ALUMINUM DOOR - SEE DOOR SCHEDULE ON SHEET A301
1" INSULATED GLAZING
PHASE II - ALUMINUM WINDOW MULLION (VERTICAL SIM.)
2
3" = 1'-0"
PHASE II - ALUMINUM DOOR / WINDOW HEAD DETAIL
3
3" = 1'-0"
PHASE II - DOOR / WINDOW MULLION (HINGE)
Certification
3" = 1'-0"
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number
6 1/2"
4 1/2"
7 1/2"
Date
6 1/2"
4 1/2"
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
1' - 6 1/2" PRECAST CONCRETE SILL STONE BELOW (ST-2)
11902
7 1/2"
1" INSULATED, TEMPERED, CLEAR, LOW E GLAZING 1" INSULATED, TEMPERED, CLEAR, LOW E GLAZING
2"
ANONDIZED ALUMINUM WINDOW SYSTEM 1/2" SEALANT JOINT
ANODIZED ALUMINUM WINDOW SYSTEM 1/2" WOOD SHIM
10 3/4"
2"
3/8" SEALANT
PRECAST CONCRETE SILL STONE
7 5/8"
EXISTING 12" NONREINFORCED CMU WALL CONSTRUCTION 3/8" BACKER ROD AND SEALANT
STEEL CLIP ANGLE - PAINT - SEE STRUCTURAL
LIQUID APPLIED WATERPROOFING 2" RIGID INSULATION (POLYICOSYANURATE)
FOAM INSULATION
4" CMU VENEER WITH WALL TIES AT 16" O.C. EACH WAY
STEEL TUBE BEAM - PAINT SEE STRUCTURAL
3 5/8" X 16 GAUGE STEEL STUD AT 16" O.C.
EXISTING 5/8" GYPSUM BOARD
STEEL BENT PLATE - PAINT SEE STRUCTURAL
1 1/2"
3 5/8"
3/8" SEALANT
1" 2 1/2"
2 3/4"
2"
8 5/8" 7 5/8"
1' - 6 1/2"
WOOD SHIM
PROJECT # 7R121080
1
1" INSULATED, TEMPERED, CLEAR, LOW E GLAZING
PHASE IIFIT - UP PACKAGE
1' - 4" 6"
2"
ANODIZED ALUMINUM WINDOW SYSTEM
7/8" 7 3/8"
5/8"
3/8" BACKER ROD AND SEALANT
8" REINFORCED CMU - SEE STRUCTURAL
EXISTING 3 5/8" METAL STUDS AT 16" O/C
3 5/8"
1" INSULATED PANEL (MP-1)CLIP TO STEEL STUDS
2915 WAREHOUSE VALLEY HIGH DRIVE
EXISTING 2" RIGID INSULATION (POLYICOSCYANURATE)
2"
2' - 0"
5/8" GYPSUM BOARD - PAINT
12.13.13
2"
5/8"
Date
11902
Project For
5 5/8"
3 5/8"
SELF ADHERED MEBRANE WATERPROOFING
11 5/8"
1"
DAVID C. NORBACK
Registration Number
3/8" BACKER ROD AND SEALANT PREFINISHED METAL SILL FLASHING WITH KEEPER
1/2" SHIM 1/2" BACKER ROD AND SEALANT
Signature
4 1/2"
5
11 1/2"
PHASE II - VESTIBULE WINDOW HEAD
6
3" = 1'-0"
PHASE II - VESTIBULE WINDOW JAMB AT EXISTING EXTERIOR WALL
7
3" = 1'-0"
1
PHASE II - VESTIBULE WINDOW SILL AT LOW WALL 3" = 1'-0"
Project No.
6287.048.01
Drawn By
1' - 11 7/8" 2"
1/4" BENT STEEL PLATE - PAINT
JAS
Checked By
MLK/JHA
Date
11/27/13
2" RIGID INSULATION
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
11 5/8"
EXISTING 12" CMU
© Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
4 3/4"
1' - 5 7/8"
EXISTING 12" CMU
O.H. STEEL DOOR DOOR TRACK GUARD
1 1/2"
HOLLOW METAL DOOR FRAME - PAINT COILING DOOR
4 1/8"
O.H. SECTION STEEL DOOR AND DOOR HARDWARE BY DOOR SUPPLIER
6"
COILING DOOR TRACK BEYOND
1 1/2"
1' - 0 1/4"
1
11 5/8"
8
PHASE II - COILING DOOR HEAD DETAIL AT EXTERIOR WALL 3" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:50 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
9
PHASE II - COILING DOOR JAMB DETAIL AT EXTERIOR WALL 3" = 1'-0"
VESTIBULE DOOR AND WINDOW DETAILS
A320.2
K
J
I
H
G
1 A501.2 3
3
3
TOP OF CMU 128' - 0"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
11 MEZZANINE LEVEL 114' - 6"
Consultants
11
11
15
11
11
1
15
15 2 FIRST LEVEL 100' - 0"
Certification
VESTIBULE LEVEL 98' - 0"
1
13
13
16
16
13
3 A401.2
14
PHASE II WEST ELEVATION
12
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
1/8" = 1'-0" Registration Number Date
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
2 A501.2
4
MEZZANINE LEVEL 114' - 6"
MEZZANINE LEVEL 114' - 6"
4
MEZZANINE LEVEL 114' - 6"
7
4
6
TYP.
7 Signature
DAVID C. NORBACK
Registration Number Date
8
6 8
11902
TYP.
6
7
11902 12.13.13
Project For TYP.
1
1 1
TYP
1 5 TOP OF SILL 102' - 0"
10
FIRST LEVEL 100' - 0"
TOP OF SILL 102' - 0"
TOP OF SILL 102' - 0"
FIRST LEVEL 100' - 0"
FIRST LEVEL 100' - 0"
10 VESTIBULE LEVEL 98' - 0"
PHASE II NORTH ELEVATION VESTIBULE 1/4" = 1'-0"
9
VESTIBULE LEVEL 98' - 0"
9
9
3
PHASE II WEST ELEVATION - VESTIBULE 1/4" = 1'-0"
2915 WAREHOUSE VALLEY HIGH DRIVE
10
10
VESTIBULE LEVEL 98' - 0"
9
2
5
5
4
PHASE II SOUTH ELEVATION VESTIBULE
PHASE IIFIT - UP PACKAGE
9
PROJECT # 7R121080
1/4" = 1'-0"
KEYNOTES - PHASE II - EXTERIOR ELEVATIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NEW EXTRUDED ALUMINUM STOREFRONT WINDOW SYSTEM - SEE A301.2 FOR WINDOW TYPES NEW EXTRUDED ALUMINUM STOREFRONT DOOR SYSTEM - SEE A301.2 FOR DOOR SCHEDULE EXISTING CMU PILASTERS TO REMAIN. STANDING SEAM ROOF SYSTEM (RP-1). PRECAST STONE SILL (ST-2). EXPOSED STRUCTURAL STEEL FRAME - CAP ENDS - PAINT - SEE STRUCTURAL DRAWINGS. PREFINISHED METAL FASCIA - MATCH ROOF COLOR. 1" INSULATED METAL PANEL (MP-1). CAST-IN-PLACE CONCRETE FOUNDATION WALL AND FOOTINGS - SEE STRUCTURAL DRAWINGS 4" CMU STONE VENEER (ST-1). EXISTING CMU CONTROL JOINT TO REMAIN. NEW LIQUID NITROGEN TANK AND FOUNDATION - SEE STRUCTURAL DRAWINGS EXISTING DOCK LEVELER. NEW LAMINATED DOCK BUMPERS -SEE FLOOR PLAN. NEW DOCK SEAL AND HEAD CURTAIN - SEE FLOOR PLAN. EXISTING DOCK BUMPERS TO REMAIN.
Project No.
6287.048.01
Drawn By
BCS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
EXTERIOR ELEVATIONS
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:51 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A401.2
1 A501.2
1
NEW SINGLE-PLY MEMBRANE ROOF SYSTEM BY OTHERS NEW PARAPET CAP FLASHING AND WOOD BLOCKING BY OTHERS
TOP OF CMU 128' - 0"
TOP OF CMU 128' - 0"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
EXISTING 12" REINFORCED CMU
EXISTING PRECAST "T" ROOF
EXISTING STEEL LINTEL
EXISTING 5/8" GYPSUM BOARD EXISTING 3 5/8" METAL STUDS AT 16" O.C. EXISTING 2" RIGID INSULATION (POLYICOSCYANURATE)
13' - 6"
EXISTING LOUVER
13' - 6"
Certification
6 A601.1
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
EXISTING LOUVER
Signature
DAVID C. NORBACK
Registration Number Date 5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
3' - 4"
8' - 11"
2 A501.2
MEZZANINE LEVEL 114' - 6"
MEZZANINE LEVEL 114' - 6"
EXISTING 12" CMU
3' - 3 1/2"
3' - 7 3/4"
3' - 7 3/4"
3' - 5 1/2"
9 A502.2
10 A502.2
EXISTING STEEL LINTEL
STEEL PURLINS - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
8"
14' - 6" GYPSUM BOARD RETURNS AT HEAD AND JAMBS -TYPICAL
STEEL COLUMN BEYOND - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
7' - 4"
7' - 4"
14' - 6"
STEEL BEAM - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
ANODIZED ALUMINUM STOREFRONT DOORS
PHASE IIFIT - UP PACKAGE
PRECAST STONE SILL
2' - 0"
8" ALUMINUM HANDRAIL AND SUPPORT POST
FIRST LEVEL 100' - 0"
VESTIBULE LEVEL 98' - 0" EXISTING 12" FOUNDATION WALL
Project No.
CAST IN PLACE CONCRETE STAIR - SEE STRUCTURAL DRAWINGS 1/2" EXPANSION MATERIAL 2" RIGID INSULATION
STONE VENEER (ST-1)
1' - 0"
3' - 0"
1' - 0"
STAIR RISERS PFT-3
8 A502.2
GRANULAR FILL
6287.048.01
Drawn By
JHA
1/2" EXPANSION MATERIAL
5' - 0"
8" CAST IN PLACE REINFORCED FOUNDATION WALL -SEE STRUCTURAL DRAWINGS
PROJECT # 7R121080
TOP OF SILL 102' - 8" TOP OF CONCRETE WALL 102' - 0"
2' - 0"
2' - 0"
FIRST LEVEL 100' - 0"
NEW 5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL DRAWINGS
2' - 0"
3' - 0"
TOP OF CONCRETE WALL 104' - 0"
4 RISERS AT 6"
8" 4' - 0" 2' - 0"
STEEL BEAM - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
STEEL COLUMN BEYOND - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
PRECAST STONE SILL BEYOND (ST-2)
5' - 0"
2915 WAREHOUSE VALLEY HIGH DRIVE
ALUMINUM ANODIZED STOREFRONT SYSTEM
ALUMINUM ANODIZED STOREFRONT SYSTEM
CAST IN PLACE REINFORCED CONCRETE FOOTING - SEE STRUCTURAL DRAWINGS
BOTTOM OF BEAM - HIGH 111'-5 3/4"
STEEL DECK - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
STEEL PURLINS - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
GRANULAR FILL
12.13.13
Project For DASHED LINES REPRESENT WIND COLUMNS BEYOND SEE STRUCTURAL DRAWINGS
STEEL DECK - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
VESTIBULE LEVEL 98' - 0"
11902
BOTTOM OF BEAM - LOW 110'-0"
BOTTOM OF BEAM (LOW) 110' - 0"
CONCRETE STOOP -SEE STRUCTURAL DRAWINGS
DAVID C. NORBACK
Date
5 A502.2
3 1/2"
1' - 5 3/4"
11 A502.2
3' - 7"
Signature Registration Number
STANDING SEAM METAL ROOF (RP-1)
19' - 5" 1' - 6"
5' - 4" 6 A502.2
STANDING SEAM METAL ROOF (RP-1)
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
17' - 7"
EXISTING 12" UNREINFORCED C.M.U.
11902
Checked By
MLK/JHA
2" RIGID INSULATION
3 TREADS AT 11"
REINFORCED CONCRETE FOUNDATION WALL - SEE STRUCTURAL DRAWINGS
16" CAST IN PLACE REINFORCED FOUNDATION WALL -SEE STRUCTURAL DRAWINGS BOTTOM OF FOOTING 93'-0"
CONCRETE FOOTING - SEE STRUCTURAL DRAWINGS
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
1
PHASE II - EAST/WEST SECTION VESTIBULE 1/2" = 1'-0"
2
PHASE II - NORTH/SOUTH SECTION VESTIBULE
Revisions No.
Date
Description
1/2" = 1'-0"
BUILDING AND WALL SECTIONS
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:52 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A501.2
1
1
Center Line
NOTE: PAINT ALL EXPOSED STEEL
Center Line
EQ
4' - 6"
EQ
1 1/2" O.S. DIA. STEEL PIPE HORIZONTAL MEMBERS SPACED AS TO NOT ALLOW A 4" DIA. SPHERE TO PASS THRU
EQ
EQ
Certification
1
8" CONCRETE FOUNDATION WALL AND FOOTING -SEE STRUCTURAL DRAWINGS
2
C8 X 11.5 - ATTACH W/ (3) HILTI KWIK BOLT TZ (1/2" DIA) W/ 3 1/4" OF EMBEDMENT EQUALLY SPACED
3
1/2" = 1'-0"
5/8" 12
1 1/2" = 1'-0"
4
OVERHANG ROOF EDGE FLASHING
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
PHASE II - HANDRAIL SECTION AT STRINGER
Registration Number
1 1/2" = 1'-0"
Date
6" 1/2"
2X BLOCKING ATTACHED TO BENT PLATE
4 1/2"
8"
1"
STEEL CLIP ANGLE - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
BOTTOM OF STEEL BEAM 110' - 0"
3/8" SEALANT WOOD SHIM
1 1/2" STEEL DECK - PAINT (PT-7)SEE STRUCTURAL DRAWINGS STEEL PURLIN - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
STEEL BENT PLATE - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
1" INSULATED PANEL -CLIPPED TO STEEL STUD (MP-1)
1 1/2"
3 5/8" X 16 GAUGE STEEL STUD AT 16" O.C. 2' - 0"
ANODIZED ALUMINUM WINDOW SYSTEM
4 1/2"
1 1/2" STEEL DECK - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
FOAM INSULATION 1" INSULATED PANEL -CLIPPED TO STEEL STUD (MP-1)
5 A320.2 BOTTOM OF BEAM (HIGH) 111'-5 3/4" STEEL BENT PLATE - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
PROJECT # 7R121080
3/8" SEALANT
11 1/2" 5 A320.2
11 1/2"
PHASE II - VESTIBULE OVERHANG DETAIL - LOW
6
1 1/2" = 1'-0"
4 1/2"
4' - 0"
1 1/2"
PHASE II - VESTIBULE OVERHANG DETAIL - HIGH
7
1 1/2" = 1'-0"
PHASE II - PLAN DETAIL OF WALL JOIN AT VESTIBULE 1 1/2" = 1'-0"
1' - 7 1/2" 7"
4 1/2"
1
8" REGLET CUT INTO CMU JOINT WITH COUNTER FLASHING
1" INSULATED GLAZING 3/8" BACKER ROD AND SEALANT
ANODIZED ALUMINUM WINDOW SYSTEM
PREFINISHED SILL FLASHING
WOOD SHIM
TOP OF SILL 102' - 8"
8"
3/8" SEALANT GALVANIZED STONE RELIEF ANGLE - BY PRECAST SUPPLIER
PRECAST CONCRETE SILL STONE (ST-2) LIQUID APPLIED WATERPROOFING
TOP OF CONCRETE WALL 102' - 0"
2' - 8"
3 5/8"
2 3/8" 2"
8"
2"
1/2"
EXISTING 5/8" GYPSUM BOARD
STANDING SEAM ROOFING (RP-1)
STANDING SEAM ROOFING (RP-1)
EXISTING NONREINFORCED C.M.U.
SLIP SHEET - 4LB RED ROSIN OR EQUAL
SLIP SHEET - 4LB RED ROSIN OR EQUAL
ICE AND WATERSHIELD
ICE AND WATERSHIELD
5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
8" CAST-IN-PLACE CONCRETE WALL - SEE STRUCTURAL DRAWINGS
FIRE TREATED WOOD BLOCKING 4 1/4" X 2" X 1/4" BENT PLATE SEE STRUCTURAL DRAWINGS
3/8" SEALANT AND BACKER ROD CLEAR ANODIZED ALUMINUM WINDOW - SEE WINDOW TYPES
Project No. DASHED LINE REPRESENTS WIND COLUMN BEYOND
4 1/2"
1"
STEEL PURLIN - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
5"
EXISTING 2" RIGID INSULATION
5/8" GYPSUM BOARD ADHERED TO EXISTING CMU (PT-3)
3 5/8" X 22 GAUGE STUDS AT 16" OC STEEL STUD SUPPLIER TO VERIFY
STEEL PURLIN - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
5/8" GYPSUM BOARD WOOD BLOCKING
BREAK METAL FLASHING TO MATCH STOREFRONT FRAME TO COVER BLOCKING
STOREFRONT WINDOW FRAMING
5"
1"
4 1/2"
1' - 1 3/8"
9
10
1 1/2" = 1'-0"
VARIES
4"
5"
STANDING SEAM ROOFING (RP-1)
2X BLOCKING ATTACHED TO BENT PLATE
1/2"
5" REINFORCED CONCRETE SLAB - SEE STRUCTURAL DRAWINGS
VESTIBULE LEVEL 98' - 0" NEW ASPHALT PAVING - SEE CIVIL DRAWINGS
GRANULAR FILL - SEE CIVIL DRAWINGS
PHASE II - VESTIBULE LOW WALL DETAIL 1 1/2" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:55 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
COMPACT GRANULAR FILL
STEEL PURLIN - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
UNDISTURBED SOIL
1' - 2" 1' - 3 1/2"
11
PHASE II - VESTIBULE EAVE DETAIL 1 1/2" = 1'-0"
#4 REINFORCING BARS - 15" LONG AT 24" O/C - DRILL DOWELS INTO EACH SIDE OF EXISTING SLAB W/ A MIN. EMBEDMENT OF 4"
PLUMBING UNDERGROUND LINE REFER TO PLUMBING DRAWINGS FOR PIPE INVERTS
1 1/2"
REINFORCED CONCRETE FOUNDATION WALL
Description
5" CONCRETE SLAB INFILL - VERIFY THICKNESS OF EXISTING ADJACENT SLAB
5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
1 1/2" STEEL DECK - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
12" GRANULAR FILL
Date
6" COMPACTED GRANULAR FILL (TYP.)
6"
1/2" EXPANSION JOINT
2 PIECE FASCIA FLASHING
10 3/4"
THRU WALL FLASHING - EXTEND AND TERMINATE AT TERMINATION BAR
4 1/4"
2' - 0"
2' - 0" ROPE WEEPS AT 32" O.C.
© Copyright RSP Architects 2013. All rights reserved.
6 MIL. VAPOR BARRIER
ICE AND WATERSHIELD
TERMINATION BAR AND SEALANT 1/2" EXPANSION JOINT
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
No.
SEE PLAN
CAVITY FILTER DRAINAGE SYSTEM
11/27/13
1 1/2" = 1'-0"
4"
SLIP SHEET - 4LB RED ROSIN OR EQUAL
MLK/JHA
Date
PHASE II - VESTIBULE ROOF AT EXISTING DETAIL
FIRST LEVEL 100' - 0"
4" CMU VENEER WITH ADJUSTABEL WALL ANCHORS AT 16" O.C. EACH WAY (ST-1)
BCS
Revisions
6"
1' - 11 7/8"
PHASE II - VESTIBULE EAVE/WINDOW DETAIL
Drawn By Checked By
1/2" SEALANT JOINT - EACH SIDE
1" VENEER STONE (ST-1) ADHERED TO CAST IN PLACE CONCRETE
6287.048.01
EXISTING 3 5/8" METAL STUDS
1 1/2" STEEL DECK - PAINT SEE STRUCTURAL DRAWINGS
1" INSULATED PANEL (MP-1) - CUT TOP TO PROFILE OF STEEL DECK
2" RIGID INSULATION (POLYICOSYANURATE)
2' - 0"
STANDING SEAM RAKE FLASHING
1 1/2" STEEL DECK - PAINT(PT-7) SEE STRUCTURAL DRAWINGS
STAINLESS STEEL DOWEL - BY PRECAST SUPPLIER
7 A320.2
PHASE IIFIT - UP PACKAGE
STEEL PURLIN - PAINT (PT-7) SEE STRUCTURAL DRAWINGS
3 5/8" X 16 GAUGE STEEL STUD AT 16" O.C. 3/8" BACKER ROD AND SEALANT ANODIZED ALUMINUM WINDOW SYSTEM
SIM
2915 WAREHOUSE VALLEY HIGH DRIVE
4 1/2"
5/8" GYPSUM BOARD - PAINT (PT-3)
STEEL TUBE BEAM - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
STEEL TUBE BEAM - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
CAP END OF STEEL TUBE - PAINT (PT-7)
STEEL BENT PLATE - SEE STRUCTURAL DRAWINGS
1' - 2"
1/2" 4 1/4"
9"
FOAM INSULATION
STEEL CLIP ANGLE - PAINT (PT-7) - SEE STRUCTURAL DRAWINGS
5/8"
4 1/4"
5/8" GYPSUM BOARD - PAINT
STEEL BENT PLATE - SEE STRUCTURAL DRAWINGS
8
12.13.13
6 A320.2
CAP END OF STEEL TUBE - PAINT (PT-7)
2X BLOCKING ATTACHED TO BENT PLATE
5
11902
1' - 7 1/2" 7"
OVERHANG ROOF EDGE FLASHING
PREFINISHED 2 PIECE FASCIA FLASHING
DAVID C. NORBACK
PREFINISHED 2 PIECE FASCIA FLASHING
2
5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
STEEL ANGLES WELDED TO STRINGER & METAL TREAD PAN - SEE STRUCT.
12.13.13
4 1/4"
12
5" NAILBASE INSULATION WITH 1" AIR SPACE AND 1/2" PLYWOOD SHEATHING
10 3/4"
STEEL ANGLES WELDED TO STRINGER & METAL TREAD PAN
PHASE II - GUARDRAIL SECTION AT LANDING
2
ICE AND WATERSHIELD
SLIP SHEET - 4LB RED ROSIN OR EQUAL
CONC. FILLED METAL TREAD PAN
11902
Project For
SLIP SHEET - 4LB RED ROSIN OR EQUAL
ICE AND WATERSHIELD
Date
STEEL CHANNEL STRINGER
PHASE II - NORTHWEST STAIR SECTION
DAVID C. NORBACK
Registration Number
STEEL CHANNEL STRINGER SEE STRUCT.
STANDING SEAM ROOFING (RP-1) STANDING SEAM ROOFING (RP-1)
Signature
STEEL PLATE RISER
3"X3"X5/16" STEEL ANGLE WITH EXPANSION BOLTED TO SLAB WITH MINIMUM 3 1/2" EMBEDDED
1/2" = 1'-0"
EQ
CONC. FILLED METAL TREAD PAN
3"X3"X5/16" STEEL ANGLE WITH EXPANSION BOLTED TO SLAB WITH MINIMUM 3 1/2" EMBEDDED
PHASE II - SOUTHWEST STAIR SECTION
AT VERTICAL SUPPORTS WELD TO THE STRINGER, GRIND EDGES SMOOTH - TYP.
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
EQ
COMPACTED GRAVEL SEE CIVIL DRAWINGS
MC12 X 10.6 STEEL CHANNEL FRAME WITH OPEN GRATE TREADS AND CLOSED RISER
8" CONCRETE FOUNDATION WALL AND FOOTING -SEE STRUCTURAL DRAWINGS
MC12 X 10.6 STEEL CHANNEL FRAME WITH OPEN GRATE TREADS AND CLOSED RISER
10 3/4"
C8 X 11.5 - ATTACH W/ (3) HILTI KWIK BOLT TZ (1/2" DIA) W/ 3 1/4" OF EMBEDMENT EQUALLY SPACED
COMPACTED GRAVEL SEE CIVIL DRAWINGS
VERTICAL SUPPORTS WELD TO CHANNEL, GRIND EDGES SMOOTH - TYP.
EQ
STEEL PLATE RISER
1 1/2" O.S. DIA. STEEL PIPE HORIZONTAL MEMBERS SPACED AS TO NOT ALLOW A 4" DIA. SPHERE TO PASS THRU
EQ
HANDRAIL
FIRST LEVEL 100' - 0"
4" ASPHALT PAVING SEE CIVIL DRAWINGS
1 1/2" O.S. DIA. STEEL PIPE VERTICAL SUPPORT AT EA. RUN END AND MIDSPAN ( MAX. 5'-0" O.C. SPACING )
3' - 0"
FIRST LEVEL 100' - 0"
EXISTING CONCRETE SLAB
GUARDRAIL
4" ASPHALT PAVING SEE CIVIL DRAWINGS
1 1/2" O.S. DIA. STEEL PIPE VERTICAL SUPPORT AT EA. RUN END AND MIDSPAN ( MAX. 5'-0" O.C. SPACING )
EQ
RETURN HANDRAIL TO VERTICAL POST
3' - 0"
EXISTING CONCRETE SLAB
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
EQ
MC12 X 10.6 STEEL CHANNEL FRAME WITH OPEN GRATE STEEL LANDING
3' - 6"
1 1/2" DIA STEEL HANDRAIL
EQ
1 1/2" DIA STEEL HANDRAIL WELDED TO GUARD RAIL
EQ
1 TREAD MC12 X 10.6 STEEL CHANNEL FRAME WITH OPEN GRATE STEEL LANDING
CENTERLINE OF HANDRAIL
EQ
3/4"
EQ
3/4"
11"
1 1/2" O.S. DIA. STEEL PIPE HANDRAIL, GRIND ALL WELDS & SHARP EDGES SMOOTH - TYP.
Center Line of Guardrail
GUARDRAIL
1 1/2" O.D.STEEL PIPE STAIR GUARDRAIL WELDED TO STRINGER
1' - 0"
SIM
3' - 6"
4 A502.2 SIM
NOTE: PAINT ALL EXPOSED STEEL
1' - 2" 2 RISERS AT 7"
3 A502.2
EQ
3/4"
CENTER LINE OF GUARDRAIL
BUILDING AND WALL SECTIONS
5"
12
PHASE II - UNDERGROUND PLUMBING TRENCH INFILL DETAIL 1" = 1'-0"
A502.2
F
G
H
I
J
DN
AREA A
AREA B
AREA B
AREA E.1 DN
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
1
OFFICE 1-221A
OPERATIONS SHOP
FED EX
KIT PRODUCTION 1-221
CONFERENCE 1-211D
LOADING DOCK
PALLET STORAGE
COAT CLOSET
CUSTODIAL
1-210
1-124
VESTIBULE
1-213
1-123
1-222 FED EX
Consultants
PACKAGING DESK
STORAGE BREAK ROOM OFFICE
1-125
1-209
1-211C
LACTATION
PROCESSING LAB
2
1-126
OFFICE
1-212
OPEN OFFICE
1-211B
CUSTODIAL
1-211
1-214
MEN'S TOILET
WOMEN'S TOILET
WOMEN'S TOILET
1-203
1-201
CONFERENCE
1-127 MEN'S TOILET
1-211A
1-128
OFFICE 1-212A
COPY/PRINT
OFFICE
OFFICE
OFFICE
1-211F
1-211G
1-211H
1-211J
ADA RESTROOM AREA A
AREA C
3
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number
CORRIDOR
1-215
AREA A
Certification
AREA C
AREA A AREA D
AREA B
AREA B
1-200-1
AREA D
AREA D
AREA B
AREA E
AREA E
AREA E.1
Date
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
SERVER
I/O MODULE (FRONT)
1-208A
Signature
W a te r Ou t
W a te r In
L N2 In
DAVID C. NORBACK 11902
W a te r In
W a te r Ou t
O2 /N2 Exh au st
Registration Number
Po we r - P2
Po we r - P1
Po we r - P3
12.13.13
W a te r In
L N2 In
Co mmu n i a c tio n s
De fro st Ai r In
Date
W a te r Ou t
MICROBIOME
O2 /N2 Exh au st
LAB
W a te r Ou t W a te r In De fro st Ai r In Po we r - P2
Po we r - P3
Po we r - P1
1-208
O2 /N2 Exh au st
W a te r Ou t
W a te r In
L N2 In
Co mmu n i a c tio n s
PRC IMAGING
1-207
Project For
1-204
Po we r - P2
Po we r - P3 Po we r - P3
Po we r - P1
Co mmu n i a c tio n s Co mmu n i a c tio n s
De fro st Ai r In
W a te r In
W a te r Ou t
?
W a te r Ou t
W a te r In
L N2 In
?
2915 WAREHOUSE VALLEY HIGH DRIVE
L N2 In
Po we r - P2
Po we r - P1
De fro st Ai r In
W a te r In
W a te r Ou t
O2 /N2 Exh au st
4
W a te r Ou t
W a te r In
SPVR OFFICE 1-207A
W a te r In
W a te r Ou t
O2 /N2 Exh au st
SPVR OFFICE
Po we r - P2
Po we r - P1
Po we r - P3
Co mmu n i a c tio n s
De fro st Ai r In
1-207C
STAIR 1-230
STAIR COLD ROOM
PHASE IIFIT - UP PACKAGE
1-206
1-207D
FUTURE LAB 1-232
5
PROJECT # 7R121080
DATA 1-231 87 SF Key Plan
AREA C AREA F
AREA C
AREA D
AREA F
AREA D AREA F
AREA F.1
AREA D
AREA E
AREA E
AREA F.1
AREA A
AREA B
AREA E.1
AREA F.1 AREA C
AREA D
AREA F
AREA E
AREA F.1
Project No.
6
6287.048.01
Drawn By
BCS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions
7
No.
AREA F
1
Date
Description
AREA F.1
PARTIAL FIRST LEVEL EQUIPMENT PLAN 1/8" = 1'-0"
NORTH
PARTIAL FIRST LEVEL EQUIPMENT PLAN
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:57 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801.2
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants DN
2112
2135
Certification
2136
1504 T
2068
2071
U
2073
SHIPPING ASSY.
KIT PRODUCTION
1525
1-221
1519
LOADING DOCK
T
OPERATIONS SHOP
Signature
1-213
U
1524
PALLET STORAGE
1-222
2110
1035
2114 T
1042
1036
1505 1037
Registration Number
1039
1-221A
N
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
1510
2109
11902
1506
U
OFFICE
Registration Number
1516 E E
F T
Date
1515
1543
F U
T
1041
1038
1040
DAVID C. NORBACK
1526
R
U
DAVID C. NORBACK
Date
2131
2111
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
11902 12.13.13
Project For
1031
1517
1030
1527
1522
PROCESSING LAB
1523
1-212 1507
1521 S
CUSTODIAL 1032
1-214
RESEARCH STORAGE
F
1-240
2915 WAREHOUSE VALLEY HIGH DRIVE
E K
998
999
997
996
1018 127
126
1-215
1082 1294
1350
1049
1020
141
1024
PHASE IIFIT - UP PACKAGE
ADA RESTROOM F
1508
1509
1514
T
U
T
U
E
995 1081
139
PROJECT # 7R121080
138
Key Plan
AREA A
1
ENLARGED EQUIPMENT PLAN - AREA A 1/4" = 1'-0"
NORTH Project No.
6287.048.01
Drawn By
BCS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
ENLARGED EQUIPMENT PLAN - AREA A
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:58 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801A.2
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
VESTIBULE 1-211E
Certification
OFFICE 1-211-4
OFFICE 1-211-10
OFFICE 1-211-5
R
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
R
OFFICE 1-211-11
2006
CONFERENCE 1-211D
T
T
U
U
T
U
T
COAT CLOSET
U
Signature
2005
DAVID C. NORBACK
1-210 Registration Number
OFFICE 1-211-3
N1
T
OFFICE 1-211-9
U
T
Date
U
2004
T
OFFICE 1-211-6
U T
T
U
R
U
Signature
OFFICE
T
OFFICE 1-211-2
U
1-211C
T
OFFICE 1-211-8
U
1-209
U
2007 2007
2007 2007
F E
Date
OFFICE 1-211-13
OFFICE 1-211-7 T
11902 12.13.13
Project For
R
CLERICAL 1-211-1
OFFICE
T
DAVID C. NORBACK
Registration Number
BREAK ROOM R
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
R
OFFICE 1-211-12
11902
T
U
2000
2001
2002 2003
R
U
B-36
1-211B P
C R
OPEN OFFICE
B-18 B-42 F
1-211
T
U
COPY/PRINT 1-211F
1392
OFFICE
OFFICE
1-211G
1-211H
OFFICE
1-212A
T
CONFERENCE T
1-211A
R
U
T
R
T
U
R
L
MEN'S TOILET
E
1-203 D C
F
WOMEN'S TOILET
L
1-201
E
2915 WAREHOUSE VALLEY HIGH DRIVE
L
PHASE IIFIT - UP PACKAGE
F
U
U
G
R
D C
C
L
1-211J
OFFICE
F
ENVIRONMENTAL SERVICES
G
1-202 H
H
N1
PROJECT # 7R121080 M
M
CORRIDOR 1-200-1
Key Plan
AREA B
1
ENLARGED EQUIPMENT PLAN - AREA B 1/4" = 1'-0"
NORTH
Project No.
6287.048.01
Drawn By
BCS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
ENLARGED EQUIPMENT PLAN - AREA B
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:40:59 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801B.2
2047
2042
2055
2053
2048
2057
2058
2059
1083
2074
2045
2060
1086
1093
2078
2046
2062
2054 2086
I/O MODULE (FRONT)
2085
Consultants
2088
O2/N2 Exhaust
Water Out
Water In
LN2 In
2087
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
2040
2063
2051
2072
2064
2061
1026
1016
1025
1013
1000
1019
Water Out
2049
Power - P1
Power - P2
Power - P3
Communications
Defrost Air In
2050
Water In
2084
Certification
2069
2066
2070
2044
2043
2083
Water In
LN2 In
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
2065
Power - P1
Power - P2
Power - P3
Communications
Defrost Air In
Water In
Water Out
O2/N2 Exhaust
2067
1011
Water Out
1012
LN2 In
Signature
Water Out
Water In
Registration Number
2009
2019
2015
2041
2021
Date
Water In
2025
2023
2026
2028
2027
2029
Power - P1
Power - P2
Defrost Air In
2024
12.13.13
2031 Water In
LN2 In
2022
Power - P3
Communications
156
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Water Out
2014
O2/N2 Exhaust
2013
2012
2020
DAVID C. NORBACK
Water Out
Signature
O2/N2 Exhaust
1315
DAVID C. NORBACK
Registration Number
11902
Water Out
RESEARCH STORAGE
Date
12.13.13
Power - P1
Power - P2
Power - P3
Communications
Defrost Air In
Water In
1-240
Project For
2034
2035
2037
2038
2039
LN2 In
2033
2036
Water In
2032
O2/N2 Exhaust
Water Out
2030
Water In
Water Out
2008
2011
2010
Defrost Air In
2016
Communications
1288
Power - P1
2017
Power - P2
2018
Power - P3
148
1202
2915 WAREHOUSE VALLEY HIGH DRIVE
1226 1095
135
150
157
134
149
136
137
146
130
145
144
154
155
143
133
152
142
PHASE IIFIT - UP PACKAGE
147
1234
1230
RESEARCH STORAGE
PROJECT # 7R121080
1-240 1116
1105
1189
1340
1228
1215
1176
1110
1122
1150
1152
1216
1217
1164
1158
1170
1163
Key Plan
AREA C
1368
1007
1232
Project No.
6287.048.01
Drawn By
1
ENLARGED EQUIPMENT PLAN - AREA C
BCS
Checked By
MLK/JHA
1/4" = 1'-0"
NORTH
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
ENLARGED EQUIPMENT PLAN - AREA C
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:00 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801C.2
CORRIDOR 1-200-1
2186
1537 1422
T
1427
1426
1438
1449
1428
1431
1441
1499
U
1502
1460 1498
1458
1503
1460
1460
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
T
K 1395
U
E
SERVER 1393
1459
1459
1459
F
1-208A
Consultants
T
T
U
1398
1535 1438
1453
U
1418
1436
1440
1413
1446
1425
1423
1424
1501
1419
1500
K
1455
1455
1452 1443 993
K
1444
T
1437
1415
1434
1447
1417
991
Certification
1467
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
1430 729
730 1534
989
1432
T
990
U
994
Signature
DAVID C. NORBACK
U
1451
U
1457
846
T
Registration Number
1528
PRC IMAGING
845
1416 1420 1412
T
1542
1414
1466
1472
1442
1448
1470
1469
992
847 U
1471
LAB 1-207
Signature
1454 T
F
Date
U
1435
E
11902 12.13.13
1429
1421
K
DAVID C. NORBACK
Registration Number
1465
F
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
K
1473
1468
Date
1-208
11902
Project For E
T
K T
U
T
1482
U
U
E F
U
T
2188
131
132
1544
STAIR
151
158
1-230
COLD ROOM
1545
1546
854
856
858
SPVR OFFICE
T
1-207C
U
R
1-207D
SPVR OFFICE
STAIR
1-207A
1-206
PHASE IIFIT - UP PACKAGE
T T
140
2915 WAREHOUSE VALLEY HIGH DRIVE
133
U
R
U
153 U
T
FUTURE LAB
T
PROJECT # 7R121080
U
1-232
RESEARCH STORAGE
OPEN OFFICE
1-240
R
T
Key Plan
U
1-207B T
DATA 1-231
U
AREA D T
R
U
T U
Project No.
6287.048.01
Drawn By
BCS
Checked By
1
MLK/JHA
ENLARGED EQUIPMENT PLAN - AREA D Date
1/4" = 1'-0"
NORTH
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
ENLARGED EQUIPMENT PLAN - AREA D
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:01 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801D.2
1559
1548
1560 1562 1561
1549
1552
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
1554
1557 1550
1558
1553
1556
Consultants
1565
1551
MICROBIOME 1-204 1564
K
Certification
E F
1566
T
U
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
1555
1563
T
U
T
DN
U
Signature
DAVID C. NORBACK
Registration Number
S
Date
OFFICE
VESTIBULE
1-205B
1-123
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
CUSTODIAL 1-124
Signature
DAVID C. NORBACK
Registration Number
11902
SPVR 1-205A R
Date
T U
12.13.13
Project For
2052 T
OFFICE 1-205-1
2056
STORAGE 1-125
U
OFFICE 1-205-7
T
OPEN OFFICE T
OFFICE 1-205-2
ENVIRONMENTAL SERVICES
H
G
U
LACTATION J
1-126
1-205
1-122
2915 WAREHOUSE VALLEY HIGH DRIVE
A E
F
U
OFFICE 1-205-6
T
E L
U
T
OFFICE 1-205-3
G H
OFFICE 1-205-5
PROJECT # 7R121080
T
B-42 B-18 C
U T
1-127 F D C B-18 B-42
B-36
U
PHASE IIFIT - UP PACKAGE
WOMEN'S TOILET
OFFICE 1-205-4
B-36
U
L E
H G
F
Key Plan
MEN'S TOILET
AREA E.1
1-128 AREA E
Project No.
6287.048.01
Drawn By
1
ENLARGED EQUIPMENT PLAN - AREA E
2
1/4" = 1'-0"
NORTH
BCS
Checked By
ENLARGED EQUIPMENT PLAN - AREA E.1 1/4" = 1'-0"
MLK/JHA
Date
11/27/13
NORTH
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. Š Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
ENLARGED EQUIPMENT PLAN - AREA E & E.1
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:02 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801E.2
1211 1015
1017
1044
1128
1370
1335
1309
1162
1221
1212
1235
1046
1004
1005
1021
1045
1043
1014
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
1182
1246
1286
1243
1148 1283
1233
1131
1314 1003
1050
1047
1048
1023
1022
1001
1073
1052
128
1009
1301
1289
1076
1075
1006
1008
1002
1029
1010
1135
1028
1027
1177
1224
1363
1077
1192
1369
1266
1253
Certification
1250
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
1172
1275
1248
1134
1171
1138
1088
1327
1149
1229
1245
1157
1074
1139
1136
1236
1129
1191
1137
1199
1282
1200 1348 1198
1091
RESEARCH STORAGE
1090
1271
1-240
1304
1287 1346
1203
1251
1084
Signature
1231
DAVID C. NORBACK
Registration Number
1204 1267
1321
1249
1201
1207
1214
1296
1261
1123
1263
1140
1353
1264
1178
1330
1334
1079
1241
1290
1112
1126
1205
1107
1125
1151
1132
1144
1142
1143
1130
1185
1242
1127
1187
1268
1218
1111
1272
1255
1240
1262
1259
1183
1196
1184
1342
1098 1222
1108
1121
1089
1332
Date
1252
1085
1358
1285
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
1269 Signature
DAVID C. NORBACK
Registration Number
1238
Date
11902 12.13.13
Project For
1260 1078
1208
1194
1325
1254
1237
1357
1347
1331
1355
1101
1320
1303
1322
1338
1341
1225
1186
1316
1297
1295
1274
1323
1324
2915 WAREHOUSE VALLEY HIGH DRIVE 1
PHASE IIFIT - UP PACKAGE
ENLARGED EQUIPMENT PLAN - AREA F 1/4" = 1'-0"
NORTH
PROJECT # 7R121080 Key Plan
1319
1109
1311
1104
1359
1181
1258
1220
1169
1156
1339
1265
1293 1256 1375
1100
1106
1292
1103
1365
1141
1180
1336
1168
1155
AREA F
1244
1312
1302
1257 1160
1291
1102
1133
1097
1333
1179 1328
1124
1167
1337
1277
1-240 1113
1173
1087
1120
1281
Project No.
1209
1360
1278
1146
1118
1114
BCS
1307
1247
1145
1153
1366
1279
1147
1273
MLK/JHA 11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
1166
1310 1174
Drawn By
1195
1227
1298
1317
6287.048.01
Date
1210
1354
1096
Checked By
RESEARCH STORAGE
1305
1154 1313
1356
1318
1117
AREA F.1
1165
Š Copyright RSP Architects 2013. All rights reserved.
1280 1094
1349
1284
1119
1329
1115
1308
1175
1306
1219
Revisions
1299
1161
No.
1362
1197 1159
1300
Date
Description
1080
1099
1213
2
1344
1326
1364
1371
1372
1373
1374
1092
1188
1223
1352
1239
1351
1367
1193
1345
1343
ENLARGED EQUIPMENT PLAN - AREA F & F.1
ENLARGED EQUIPMENT PLAN - AREA F.1 1/4" = 1'-0"
NORTH
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:04 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A801F.2
PHASE II - EQUIPMENT SCHEDULE EXIST ROOM NEW
DESCRIPTION RECYCLING CART - 3/4 YD
QTY 1
ROOM NUMBER 1-122
2056
NEW
RECYCLING CART - 3/4 YD
1
1-122
ENVIRONMENTAL SERVICES
OWNER
MANUFACTURER
2186 1548 1549 1550 1551 1552 1553 1554 1555 1556 1557 1558 1559 1560 1561 1562 1563 1564 1565 1566 131 132 133 729 730 845 846 847 854 856 858 991 1393 1395 1398 1412 1413 1414 1415 1416 1417 1418 1419 1420 1421 1422 1423 1424 1425 1426 1427 1428 1429 1430 1431 1432 1434 1435 1436 1437 1438 1440 1441 1442 1443 1444 1446 1447 1448 1449 1451 1452 1453 1454 1455 1457 1458 1459 1460 1465
NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW ST-12-14 ST-12-14 ST-12-14 ST-13-21C ST-13-21C NEW NEW NEW NEW NEW NEW ST-13-23 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10
SOILED LINEN HAMPER 4' BIO HOOD FASTPREP-24 SCALE MINI CENTRIFUGE QUBIT 2.0 4' BIO HOOD UC REF Flammable Storage Cabinet BIO STORAGE BOX SHAKER GALAXY MINI SHAK-R-BATH VORTEX MIXER MINISPIN INSTRUMENT CHARGER REFRIGERATOR CENTRIFUGE AUTOCLAVE -80 FREEZER -80 FREEZER -20 FREEZER REFRIGERATOR +4 4' - A2 BIO SAFETY HOOD 4' - A2 BIO SAFETY HOOD 8' - FUME HOOD 4' FLAMMABLE CABINET 4' FLAMMABLE CABINET SUPPLY CART SUPPLY CART SUPPLY CART MICROCORE 8' - FUME HOOD 4' FLAMMABLE CABINET 4' ACID/BASE CABINET WARMER JANUS CENTRIFUGE CENTRIFUGE CENTRIFUGE CENTRIFUGE COULTER ACT 70 DRY ICE MOBILE CHEST DELI -20 FREEZER ISOLATION SYSTEM DROP SENSE 96 VOLUME CHECK CAPPER/DECAPPER AUTOGEN AUTOGEN AUTOGEN -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER DRY ICE MOBILE CHEST JANUS NANOPURE UC -20 FREEZER ISOTEMP PERIPUMP DRY ICE MOBILE CHEST DRYER BOX OVEN QIA CUBE CENTRIFUGE CENTRIFUGE CENTRIFUGE SHAKER WATERBATH CRYOSTAT HYDROMETER DELI LEICA CM1850 CENTRIFUGE CYROCONSOLE FLOATATION BATH LEICA RM2255 CROSSLINKER
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 3 3 1
1-200-1 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-204 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207
CORRIDOR MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME MICROBIOME LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB
OWNER PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT ----------OWNER OWNER OWNER PROPONENT PROPONENT PROPONENT ---------------------------------------------------------------------------------------------------
MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER ----------MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER ---------------------------------------------------------------------------------------------------
TAG 2052
TAG A
DESCRIPTION HAND SANITIZER
QTY
TO ROOM
1
1-126
B-18 B-36 B-42 C
GRAB BARS GRAB BARS GRAB BARS TOILET PAPER DISPENSER
4 4 4 7
SEE PLAN SEE PLAN SEE PLAN SEE PLAN
D
SANITARY PRODUCT DISPOSAL
4
SEE PLAN
E
SOAP DISPENSER
17
SEE PLAN
F
PAPER TOWEL DISPENSER
17
SEE PLAN
G
SHARPS CONTAINTER
5
SEE PLAN
H J
24" x 60" MIRROR ACRYLIC MAGAZINE RACK
5 1
SEE PLAN 1-126
K
30" X 36" DRYING RACK
8
SEE PLAN
L M N N1 P
18" X 5" S.S. SHELF METAL LOCKER 24" x 36" WHITEBOARD 72" x 36" WHITEBOARD SANITARY PRODUCT DISPENSER
6 37 1 2 1
SEE PLAN 1-200-1 1-222 SEE PLAN 4-03
R S T U
60" x 16" CORKBOARD MOP STRIP CABLE MANAGEMENT TRAY CPU CLIP AND BRACKET
18 2 59 59
SEE PLAN SEE PLAN SEE PLAN SEE PLAN
NEW ROOM ENVIRONMENTAL SERVICES
ORDERED BY OWNER
SUPPLIED BY MANUFACTURER
PHASE II - SPECIALTY EQUIPMENT SCHEDULE ORDERED BY SUPPLIED BY INSALLED BY CONSTRUCTION MANAGER FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR MANUFACTURER CONTRACTOR CONSTRUCTION MANAGER FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONSTRUCTION MANAGER MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR FACILITIES CONTRACTOR WAREHOUSE CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR CONTRACTOR MANUFACTURER CONTRACTOR
PHASE II - EQUIPMENT SCHEDULE INSTALLED BY ENVIRONMENTAL SERVICES ENVIRONMENTAL SERVICES LINEN SERVICES GENERAL CONTRACTOR EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES CONTRACTOR OPERATIONS CONTRACTOR CONTRACTOR EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES CONTRACTOR EQUIPMENT SERVICES GENERAL CONTRACTOR OPERATIONS OPERATIONS OPERATIONS OPERATIONS GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR EQUIPMENT SERVICES GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS OPERATIONS OPERATIONS OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES
REMARKS
#72
G,V,CW, AND CUP SINK G,V,CW, AND CUP SINK A,G,V, & SINK WITH CW
A,G,V, & SINK WITH CW
#69 #40 #24 #19 #15 #21
#49 #48 #47 #38 #37 #36 #46 #30 #21 #50 #75 #70
#18 #22 #16 #72
#17
REMARKS
TAG 1466 1467 1468 1469 1470 1471 1472 1473 1482 1498 1499 1500 1501 1502 1503 1528 1534 1535 1537 1542 1544 1545 1546 2188 140 151 153 158 989 990 992 993 994 2000 2001 2002 2003 2004 2005 2006 2007 1392 1032 1504 1505 1506 1507 1508 1509 1510 1514 1515 1516 1517 1519 1521 1522 1523 1524 1525 1526 1527 1030 1031 1035 1036 1037 1038 1039 1040 1041 1042 1543 2068 2071 2073 2109 2110 2111 2112 2113 2114 2129 2131 2133 2134 2135 2136
EXIST ROOM ST-13-21 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-13-10 ST-12-14 ST-13-21 ST-13-21 ST-13-21 ST-13-21 ST-13-21 ST-13-21 ST-13-21 ST-13-10 ST-13-10 ST-13-10 NEW NEW NEW NEW NEW NEW NEW NEW NEW ST-13-23 ST-13-23 ST-13-23 ST-13-23 ST-13-23 NEW NEW NEW NEW NEW NEW NEW NEW NEW ST-SL-29A HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 HI-CL-21 ST-SL-16A ST-SL-16A NEW ST-SL-16 ST-SL-16 ST-SL-16 ST-SL-16 ST-SL-16 ST-SL-16 NEW NEW SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1 SW-1
DESCRIPTION DAKOCYTOMATION LEICA IPS LEICA BOND III LEICA BOND III LEICA BOND III INCUBATOR DAKO AUTOSTAINER REF/FREEZER PURIFIER CENTRIFUGE QIA CUBE CYROSTATION FREEZER MILL QIA CUBE UC REF CENTRIFUGE LEICA CV5030 NANODROP Flammable Storage Cabinet CAPPER/DECAPPER SUPPLY CART SUPPLY CART SUPPLY CART ICE MACHINE SUPPLY CART SUPPLY CART SUPPLY CART SUPPLY CART NANO ZOOMER 20HT NANO ZOOMER CART HYDROIZATION OVEN SCOPE STATION SCOPE STATION REFRIGERATOR REFRIGERATOR REFRIGERATOR ICE MACHINE VENDING - SNACKS VENDING - SNACKS VENDING - SODA MICROWAVE COPIER HAMILTON MICROLAB STAR CENTRIFUGE CENTRIFUGE CENTRIFUGE CENTRIFUGE -70 FREEZER DELI DRY ICE MOBILE CHEST -20 FREEZER CENTRIFUGE CENTRIFUGE CENTRIFUGE CENTRIFUGE JANUS PLATESTAK CAPPER/DECAPPER 4' TEC TABLE 4' TEC TABLE 4' TEC TABLE 4' TEC TABLE DRY ICE MOBILE CHEST DRY ICE MOBILE CHEST CART DRY ICE MOBILE CHEST DRY SHIPPER REFRIGERATOR +4 -80 FREEZER -80 FREEZER -20 FREEZER CART SPECIMEN CART LIFT TABLE LIFT TABLE LIFT TABLE TANK CART TANK BOX TANK BOX LIFT COMPRESSOR FREEZER CONTROLLER FLAMMABLE CABINET WALL MOUNTED VACUUM TANK CART ELECTRICAL CORD REEL AIR HOSE REAL LIFT COMPRESSOR LIFT COMPRESSOR
QTY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ROOM NUMBER 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207 1-207D 1-207D 1-207D 1-207D 1-208 1-208 1-208 1-208 1-208 1-209 1-209 1-209 1-209 1-209 1-209 1-209 1-209 1-211F 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-212 1-213 1-213 1-221 1-221 1-221 1-221 1-221 1-221 1-221 1-221 1-221 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222 1-222
NEW ROOM LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB LAB COLD ROOM COLD ROOM COLD ROOM COLD ROOM PRC IMAGING PRC IMAGING PRC IMAGING PRC IMAGING PRC IMAGING BREAK ROOM BREAK ROOM BREAK ROOM BREAK ROOM BREAK ROOM BREAK ROOM BREAK ROOM BREAK ROOM COPY/PRINT PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB PROCESSING LAB LOADING DOCK LOADING DOCK KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION KIT PRODUCTION OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP OPERATIONS SHOP
ORDERED BY --------------------------------------PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT PROPONENT ----------PROPONENT PROPONENT PROPONENT PROPONENT OWNER OWNER OWNER PROPONENT PROPONENT --------------------------------------------PROPONENT ------------PROPONENT PROPONENT -------------------------------
SUPPLIED BY --------------------------------------MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER ----------MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER MANUFACTURER --------------------------------------------MANUFACTURER ------------MANUFACTURER MANUFACTURER -------------------------------
INSTALLED BY EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES GENERAL CONTRACTOR EQUIPMENT SERVICES GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR OPERATIONS GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS OPERATIONS OPERATIONS EQUIPMENT SERVICES OPERATIONS OPERATIONS OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES OPERATIONS OPERATIONS GENERAL CONTRACTOR OPERATIONS EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES EQUIPMENT SERVICES GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR OPERATIONS OPERATIONS OPERATIONS OPERATIONS GENERAL CONTRACTOR OPERATIONS GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR
REMARKS
#1 #2 #3
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com #3
Consultants
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number Date
#52 #53 #54 #55
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature #45 #11 #10 #7 #57 #41
11902
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
Project For
2915 WAREHOUSE VALLEY HIGH DRIVE
#17 #45 #31 #31 RELOCATED FROM HILTON CL-21
PHASE IIFIT - UP PACKAGE PROJECT # 7R121080
Project No.
6287.048.01
Drawn By
BCS
Checked By MOUNT AT 3'-6" A.F.F. TO BOTTOM
MOUNT AT 3'-0" A.F.F. TO BOTTOM MOUNT AT 3'-0" A.F.F. TO BOTTOM
MOUNT AT 2'-6" A.F.F. TO BOTTOM MOUNT AT 5'-0" A.F.F. TO BOTTOM
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
EQUIPMENT SCHEDULE AND SPECIALTY EQUIPMENTS SCHEDULE
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:05 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A802.2
PHASE II - FREEZER SCHEDULE
PHASE II - FREEZER SCHEDULE
TAG 126 127 128 130 133 134 135 136 137 138 139 141 142 143 144 145 146 147 148 149 150 152 154 155 156 157 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009
EXIST ROOM ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-12-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60
DESCRIPTION -170 CRYOGEN -170 CRYOGEN LIQUID NITROGEN TANK -80 FREEZER REFRIGERATOR +4 -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER REFRIGERATOR +4 REFRIGERATOR +4 -20 FREEZER REF/FREEZER -20 FREEZER -20 FREEZER REFRIGERATOR +4 -20 FREEZER REF/FREEZER -20 FREEZER REF/FREEZER -20 FREEZER REFRIGERATOR +4 -20 FREEZER -20 FREEZER REF/FREEZER -80 FREEZER LIQUID NITROGEN TANK CYRO STORAGE CYRO STORAGE CYRO STORAGE CYRO STORAGE LIQUID NITROGEN TANK -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER HETO VAC
QTY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ROOM NO. 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240
NEW ROOM RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
ORDERED BY -----------------------------------------------------------------------------------
SUPPLIED BY -----------------------------------------------------------------------------------
1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1043 1044 1045 1046 1047 1048 1049 1050 1052
ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-13-60 ST-SL-29A ST-SL-29A ST-SL-29A ST-SL-29A ST-SL-29A ST-SL-29A ST-SL-29A ST-SL-29A ST-SL-29A
-80 FREEZER LIQUID NITROGEN TANK LIQUID NITROGEN TANK LIQUID NITROGEN TANK CYRO SAFE CYRO SAFE LIQUID NITROGEN TANK -20 FREEZER CYRO STORAGE LIQUID NITROGEN TANK LIQUID NITROGEN TANK -80 FREEZER -80 FREEZER -80 FREEZER CYRO MED FREEZER LIQUID NITROGEN TANK LIQUID NITROGEN TANK -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER SPEED VAC
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240
RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
-----------------------------------------------------------
-----------------------------------------------------------
1073
SW-1-01
DRY ICE MOBILE CHEST
1
1-240
RESEARCH STORAGE
---
---
1074
SW-1-01
DRY ICE MOBILE CHEST
1
1-240
RESEARCH STORAGE
---
---
1075
SW-1-01
DRY ICE MOBILE CHEST
1
1-240
RESEARCH STORAGE
---
---
1076
SW-1-01
DRY ICE MOBILE CHEST
1
1-240
RESEARCH STORAGE
---
---
1077 1078 1079 1080 1081 1082 1083
SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01
-80 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER CYRO STORAGE CYRO STORAGE LN2
1 1 1 1 1 1 1
1-240 1-240 1-240 1-240 1-240 1-240 1-240
RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
---------------
---------------
1084 1085 1086
SW-1-01 SW-1-01 SW-1-01
-80 FREEZER -80 FREEZER LN2
1 1 1
1-240 1-240 1-240
RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
-------
-------
1087 1088 1089 1090 1091 1092 1093
SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01
-80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER STORAGE TANK
1 1 1 1 1 1 1
1-240 1-240 1-240 1-240 1-240 1-240 1-240
RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
---------------
---------------
1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148
SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-01 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10
-80 CHEST FREEZER -80 FREEZER -80 CHEST FREEZER -80 FREEZER -80 FREEZER -80 CHEST FREEZER -80 CHEST FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240
RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:07 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
INSTALLED BY OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS EQUIPMENT SERVICES OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS EQUIPMENT SERVICES GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS GENERAL CONTRACTOR OPERATIONS OPERATIONS GENERAL CONTRACTOR OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS GENERAL CONTRACTOR OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS
REMARKS
#76 EVE #77 ADAM #78 DAVID #79 GOLIATH #17 #12 #5 #1 #8 #9 #20
#3 #81 #80 #83 #82
SAMPSON
#32 #34 #38
G. PETERSON #16 #53 #52 #55 #31 #54 1607 GUGG w/ Plumbing Connection
#B-1 #B-2
#11 #1
#6 #43 #3 #5 #60 #55
#41 #52 #51 #1 #3 #4 #5 #6 #7 #8 #9 #10 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22 #23 #24 #25 #26 #27 #28 #29 #30 #31 #32 #33 #34 #35 #36 #37 #38 #39 #40 #41 #42 #43 #44 #45 #46 #47 #48 #49 #50 #50
TAG 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187 1188 1189 1191 1192 1193 1194 1195 1196 1197 1198 1199 1200 1201 1202 1203 1204 1205 1207 1208 1209 1210 1211 1212 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1244 1245 1246 1247 1248 1249 1250 1251 1252 1253 1254 1255 1256 1257 1258 1259 1260 1261 1262 1263 1264 1265 1266 1267 1268 1269 1271 1272 1273 1274 1275 1277 1278 1279 1280 1281 1282 1283 1284 1285 1286 1287 1288 1289 1290 1291 1292 1293 1294 1295 1296 1297 1298 1299 1300 1301 1302 1303 1304 1305 1306
EXIST ROOM SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-10 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80
DESCRIPTION -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -20 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER REFRIGERATOR +4 -70 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -20 FREEZER -20 FREEZER -70 FREEZER -80 FREEZER -20 FREEZER -70 FREEZER -80 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -70 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -70 FREEZER -70 FREEZER REFRIGERATOR +4 -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 REFRIGERATOR +4 -80 FREEZER -80 FREEZER -80 FREEZER REFRIGERATOR +4 -20 FREEZER -20 FREEZER REFRIGERATOR +4 -20 FREEZER REFRIGERATOR +4 REFRIGERATOR +4 -80 FREEZER -80 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -30 FREEZER -30 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -20 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER REFRIGERATOR +4 -20 FREEZER -20 FREEZER -20 FREEZER REFRIGERATOR +4 -70 FREEZER REFRIGERATOR +4 -70 FREEZER -70 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER REFRIGERATOR +4 -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER
QTY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ROOM NO. 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240
NEW ROOM RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
ORDERED BY ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PHASE II - FREEZER SCHEDULE SUPPLIED BY ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
INSTALLED BY OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS
REMARKS #52 #53 #54 #55 #56 #57 #58 #59 #60 #61 #62 #63 #64 #65 #66 #67 #68 #69 #70 #71 #72 #73 #74 #75 #76 #77 #78 #79 #80 #81 #82 #83 #84 #85 #86 #87 #88 #90 #91 #92 #93 #94 #96 #97 #98 #99 #100 #103 #105 #106 #107 #108 #109 #110 #111 #112 #113 #114 #116 #117 #118 #120 #121 #122 #123 #124 #125 #126 #127 #128 #129 #130 #131 #132 #133 #134 #135 #136 #137 #138 #139 #140 #141 #142 #143 #156 #155 #145 #146 #147 #148 #149 #150 #151 #152 #153 #154 #157 #158 #159 #160 #161 #162 #163 #165 #166 #167 #169 #170 #172 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22 #23 #24 #25 #26 #27 #28 #29 #30 #31 #33 #34 #35 #36 #37 #38 #40 #41 #42 #43 #44 #45
TAG 1307 1308 1309 1310 1311 1312 1313 1314 1315 1316 1317 1318 1319 1320 1321 1322 1323 1324 1325 1326 1327 1328 1329 1330 1331 1332 1333 1334 1335 1336 1337 1338 1339 1340 1341 1342 1343 1344 1345 1346 1347 1348 1349 1350 1351 1352 1353 1354 1355 1356 1357 1358 1359 1360 1362 1363 1364 1365 1366 1367 1368 1369 1370 1371 1372 1373 1374 1375 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050 2051 2053 2054 2055 2057 2058 2059 2060 2061 2062 2063 2064 2065 2066 2067 2069 2070 2072 2074 2078 2083 2084 2085
EXIST ROOM SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 SW-1-80 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-90 GU-12-90 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-12-91 GU-11-93 GU-12-90 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-90 GU-11-90 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93 GU-11-93
2086
GU-11-93
2087 GU-12-91 2088 GU-12-91 Grand total: 437
DESCRIPTION -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER REFRIGERATOR +4 -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -70 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -140 CHEST FREEZER -80 CHEST FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER -20 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -20 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER -80 FREEZER LN2 LN2 CYRO STORAGE CYRO STORAGE
QTY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ROOM NO. 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240 1-240
NEW ROOM RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE RESEARCH STORAGE
ORDERED BY -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
SUPPLIED BY -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1
1-240
RESEARCH STORAGE
---
---
1 1 437
1-240 1-240
RESEARCH STORAGE RESEARCH STORAGE
-----
-----
INSTALLED BY OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS GENERAL CONTRACTOR GENERAL CONTRACTOR OPERATIONS OPERATIONS
REMARKS #46 #47 #48 #49 #50 #51 #52 #53 #54 #55 #56 #57 #58 #59 #60 #61 #62 #63 #64 #65 #66 #67 #68 #69 #70 #72 #73 #74 #75 #76 #77 #78 #79 #80 #81 #82 #83 #84 #85 #86 #88 #90 #91 #93 #94 #95 #96 #97 #99 #100 #102 #103 #104 #105 #106 #107 #108 #109 #110 #115 #116 #117 #120 #121 #122 #123 #124
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature Registration Number Date
#31 #15 # #20 #21 #22 #22 #24 #25 #26 #27 #28 #29 #30 #20 #11 #39 #5 #4 #37 #38 #41 #42 #6 #8 #19 #43 #40 #25 #26 #27 #28
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
Signature
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
Project For
2915 WAREHOUSE VALLEY HIGH DRIVE
#8 #7 #6 #5 #4 #3 #16 #1 DARLA #43 #10 #14 #12
DAVID C. NORBACK
PHASE IIFIT - UP PACKAGE PROJECT # 7R121080
Project No.
6287.048.01
Drawn By
TCM
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
#36 #11 #14 #45 #12 #23 #22 #24 #48 #46 #3 #1
#76 EVE SAMPSON
FREEZER SCHEDULE
A803.2
1 A920.2
1 A920.2
15' - 0" 2 A920.2
EQ
2 A920.2
EQ
EQ
5' - 0"
5' - 10"
6
10' - 0"
6
6
6
13
13 13
OFFICE 1-221A - WEST WALL ELEVATION
2
1/4" = 1'-0"
SHIPPING / KIT PRODUCTION 1-221 - SOUTH WALL ELEVATION
3
1/4" = 1'-0"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
20' - 1"
6
OFFICE 1-221A - SOUTH WALL ELEVATION
4' - 0"
5' - 0"
3 3' - 0"
6
5' - 0"
10' - 0"
6
4' - 0"
4' - 6"
4' - 6"
3
3' - 0"
3' - 0"
3' - 0"
3
R
3' - 0"
6
8' - 0"
8' - 0"
3' - 0"
6' - 2"
1
5' - 4"
13
13
13
Consultants
SHIPPING / KIT PRODUCTION 1-221 - WEST WALL ELEVATION
4
1/4" = 1'-0"
13
1/4" = 1'-0"
1 A920.2 20' - 0" 12' - 0"
EQ
8' - 0"
3' - 0"
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
10' - 0"
Signature
1039
6
4' - 0"
Date
2' - 2"
1"
13
13 12' - 0"
13
5' - 0"
13
7
SHIPPING / KIT PRODUCTION 1-221 - CENTER ISLAND WEST
Signature
1/4" = 1'-0"
DAVID C. NORBACK
Registration Number
SHIPPING / KIT PRODUCTION 1-221 - EAST WALL ELEVATION
6
12.13.13
15' - 0" 7 A920.2
5
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
30SC
3"
DAVID C. NORBACK
Registration Number
1040
3' - 0"
4' - 0"
1041
2' - 10"
3' - 0"
Certification
3
3
1543
5' - 0"
4' - 0"
8' - 0"
3
1038
2 13
EQ
E F
10' - 0"
10' - 0"
1036
1037
3' - 0"
1042
EQ
11 3
1035
EQ
7
1/4" = 1'-0"
SHIPPING / KIT PRODUCTION 1-221 - NORTH WALL ELEVATION
Date
11902 12.13.13
1/4" = 1'-0" Project For
1 A920.2 6' - 0"
9' - 0"
6' - 0"
5' - 0" 15 A922.2
1' - 6" K
6' - 0 1/4"
1' - 11"
30SC
3"
TC3678
MC3660L
MC3672L
MC3672L
6
12 A922.2 4' - 0"
4' - 0"
2915 WAREHOUSE VALLEY HIGH DRIVE PHASE IIFIT - UP PACKAGE
TC3678
24BD4 MC3660L
MC3660R
4' - 9"
3' - 0"
6
5' - 6"
1515
2' - 6"
4' - 0"
5' - 0"
4' - 0"
3' - 0"
1"
1516
1517
1032 5' - 6"
3 1523
2
10' - 0"
11
10' - 0"
1522
10' - 0"
1521
15 A922.2
3' - 0"
3
F
10' - 0"
E
14
14
7 A920.2
PROCESSING LAB 1-212 - SOUTH WALL ELEVATION - 1
8
9
1/4" = 1'-0"
PROJECT # 7R121080
PROCESSING LAB 1-212 ISLAND 1 - NORTH VIEW
10
1/4" = 1'-0"
PROCESSING LAB 1-212 - WEST WALL ELEVATION
11
1/4" = 1'-0"
PROCESSING LAB 1-212 - ISLAND 1 - EAST VIEW
12
1/4" = 1'-0"
COAT CLOSET WEST WALL
COAT CLOSET NORTH WALL
13
1/4" = 1'-0"
1/4" = 1'-0"
2 A920.2 8' - 2"
4' - 0"
4' - 0"
16' - 3 1/4"
3
14
7
6
4' - 0"
2' - 6"
6
36BC1 MC3678RS
4' - 6"
1
6
30BD4
14
14
PROCESSING LAB 1-212 - ISLAND 1 - WEST VIEW
1510
14
PROCESSING LAB 1-212 - EAST WALL ELEVATION
PROCESSING LAB 1-212 - SOUTH WALL ELEVATION - 2
16
1/4" = 1'-0"
14
14
1/4" = 1'-0"
17
6287.048.01
Drawn By
JAS/BCS
Checked By
1514
MC3672L
15
1/4" = 1'-0"
36BC1
1516
1519
1508
2' - 6"
1509
10' - 0"
W5
10' - 0"
Project No.
4' - 0"
4' - 0"
4"
2' - 6"
3' - 0"
10' - 0"
10' - 0"
3
14
PROCESSING LAB 1-212 - ISLAND 2 - NORTH VIEW 1/4" = 1'-0"
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
KEYNOTES - PHASE II - INTERIOR ELEVATIONS 1 2
30BC1 MC3660L
18
PROCESSING LAB 1-212 ISLAND 2 - EAST 1/4" = 1'-0"
24BD4 MC3660L
19
PROCESSING LAB 1-212 - ISLANDS - SOUTH VIEW 1/4" = 1'-0"
1505
1506
1507
5
5
5
5
1525 14
1524
1526
10' - 0"
1527 14
14
20
2' - 10"
1504
3' - 0"
1519 4' - 0"
1515
2' - 6"
1519
E
3
10' - 0"
10' - 0"
F
PROCESSING LAB 1-212 - NORTH WALL ELEVATION 1/4" = 1'-0"
7
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
STANDARD LAB COAT HOOK STRIP MOUNTED AT 4'-6" A.F.F. UNLESS NOTED OTHERWISE - SEE DETAIL 18/A920.2 STANDARD STEEL COUNTERTOP SUPPORT WALL BRACKET (29X24) - SEE DETAIL 13/A920.2 ELECTRIC/ VOICE/ DATA RACEWAY - COORDINATE WITH ELECTRICAL PLASTIC LAMINATE PIPETE RACK - SEE DETAIL 12/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FURNITURE - SEE FURNITURE PLAN (I301.2) WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS PLASTIC LAMINATE FILLER. PLASTIC LAMINATE WALL CLEAT. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21. RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. SERVICE FAUCET AND HOSE BRACKET - SEE MECHANICAL PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 20/A921.2
INTERIOR ELEVATIONS
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:11 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A901.2
KEYNOTES - PHASE II - INTERIOR ELEVATIONS 1 A920.2
2 A920.2
1
2 A920.2
5' - 9"
4' - 9 1/2"
2 A920.2
8' - 0"
6
6
6
OFFICE 1-211C - SOUTH WALL ELEVATION 1/4" = 1'-0"
6
OFFICE 1-211C - WEST WALL ELEVATON
2
4' - 6"
4' - 6"
4' - 6"
R
4' - 6"
R
1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3' - 0"
3' - 0"
3' - 0"
8' - 0"
6
2
5' - 10"
9' - 0"
9' - 0"
3' - 0"
5' - 1 1/2"
3
1/4" = 1'-0"
6
OFFICE 1-212A - NORTH WALL ELEVATION 1/4" = 1'-0"
7 A210.2
OFFICE 1-212A - EAST WALL ELEVATION
4
ENTRY 1-243 FEATURE WALL - NORTH WALL ELEVATION
5
1/4" = 1'-0"
1' - 9 1/4"
5' - 10"
2"
5' - 10"
1' - 9 3/4"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
1/4" = 1'-0"
2 A920.2
5 A210.2
STANDARD LAB COAT HOOK STRIP MOUNTED AT 4'-6" A.F.F. UNLESS NOTED OTHERWISE - SEE DETAIL 18/A920.2 STANDARD STEEL COUNTERTOP SUPPORT WALL BRACKET (29X24) - SEE DETAIL 13/A920.2 ELECTRIC/ VOICE/ DATA RACEWAY - COORDINATE WITH ELECTRICAL PLASTIC LAMINATE PIPETE RACK - SEE DETAIL 12/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FURNITURE - SEE FURNITURE PLAN (I301.2) WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS PLASTIC LAMINATE FILLER. PLASTIC LAMINATE WALL CLEAT. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21. RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. SERVICE FAUCET AND HOSE BRACKET - SEE MECHANICAL PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 20/A921.2
2 A920.2
5' - 10"
3' - 9"
5' - 10"
2' - 4 3/4"
5' - 10"
5' - 10"
1' - 9 1/4"
Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
M
6
6' - 0"
9' - 2"
3' - 0" 9' - 0"
9' - 2"
10' - 0"
3' - 0"
M
6
6
R
R
6
R
6
R
R
4' - 6"
4' - 6"
R
6
6
6
6
6
Signature
DAVID C. NORBACK
6 Registration Number Date
CORRIDOR 1-200-1 - WEST WALL ELEVATION
6
OPEN OFFICE 1-211 - NORTH WALL ELEVATION
7
1/4" = 1'-0"
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
OPEN OFFICE 1-211 - SOUTH WALL ELEVATION
8
1/4" = 1'-0"
11902
1/4" = 1'-0" 2 A920.2
6
6
6
6
6
EQ
EQ
Signature
DAVID C. NORBACK
20
20
20
8
2' - 10"
1392 8 1" 5 A210.2
6
6
6
6
30BC1
6 A920.2
10
1/4" = 1'-0" 10 A920.2
2 A920.2
2 A920.2
8
12.13.13
Project For
1"
6
CORRIDOR 1-200-1 - EAST WALL ELEVATION
COPY / PRINT 1-211F - NORTH WALL ELEVATION
3 A920.2
1"
5 A920.2
COPY / PRINT 1-211F - EAST WALL ELEVATION
11
1/4" = 1'-0"
2915 WAREHOUSE VALLEY HIGH DRIVE
1/4" = 1'-0"
2 A210.2
VWC-5
PHASE IIFIT - UP PACKAGE
5' - 10" 3630W
3630W
CWT-2
MCB3018 MCB3018
30BC1
1"
30BC1
3' - 0"
18BD4 18BD4 16' - 2"
30BC1
L
L
2001
2000
30BC1
9' - 0"
G
F
7' - 10"
2007 2002
8
E
8' - 0"
F
E
E
C
C
PROJECT # 7R121080
2' - 10"
6
2007 2003
F
8' - 0"
2' - 0"
2007 4' - 6"
4' - 6"
4' - 6"
6
2007
2' - 10"
6
R
VWC-5
CWT-2
3
8' - 0"
9' - 0"
8' - 0"
8' - 0"
3' - 0"
3' - 0"
1' - 6"
MCB3018 3030W
4' - 0"
5' - 1 1/2"
8' - 0"
9
30BC1 18BD4
Date
8' - 0"
W5
3' - 0"
W5
11902
4' - 6"
W5
8' - 0"
8' - 1 1/4"
10' - 0"
Registration Number
1"
17
8' - 10"
4 A920.2
OFFICE 1-211G - NORTH WALL ELEVATION
12
13
1/4" = 1'-0" 2 A210.2
VWC-5
OFFICE 1-211G - EAST WALL ELEVATION
14
1/4" = 1'-0"
BREAKROOM 1-209 - EAST WALL ELEVATION 1/4" = 1'-0" 2 A210.2
VWC-5 VWC-5
MEN'S TOILET 1-203 - SOUTH WALL ELEVATION
15
16
1/4" = 1'-0"
VWC-5
MEN'S TOILET 1-203 - WEST WALL ELEVATION 1/4" = 1'-0"
VWC-5
CWT-2
MEN'S TOILET 1-203 - NORTH WALL ELEVATION
17
1/4" = 1'-0" Project No.
2 A210.2
VWC-5
3 A920.2
6287.048.01
Drawn By
JAS/BCS
1"
CWT-2
3636W
1836W
Checked By
MLK/JHA
G H
Date F
D
2' - 10"
5' - 0"
C
A
2' - 10"
L
3' - 0"
L
8
8' - 0"
F
9' - 0"
E
8' - 0"
E
8' - 0"
9' - 0"
P
8' - 0"
C
8' - 0"
C
F
7' - 10"
H
B-18 B-42 C B-36
8' - 0"
9' - 0"
P
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
E
9
© Copyright RSP Architects 2013. All rights reserved.
Revisions
3' - 0" 17
18BD4
No.
4' - 7"
Date
Description
4 A920.2
1/4" = 1'-0"
1/4" = 1'-0"
F
17
17
24
WOMEN'S TOILET 1-127 - SOUTH WALL ELEVATION 1/4" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:17 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
B-36 B-42
1/4" = 1'-0"
VWC-5
B-18 B-42 C
L
23
1/4" = 1'-0"
VWC-5
CWT-1
B-18 B-42 C D B-36
WOMEN'S TOILET 1-201 - EAST WALL ELEVATION
F
VWC-5
E
H
B-36
2' - 10"
8' - 0"
F
22
1/4" = 1'-0"
2' - 10"
H
8' - 0"
E
8' - 0"
8' - 0"
L B-36 B-42
WOMEN'S TOILET 1-201 - NORTH WALL ELEVATION
VWC-5
VWC-5
VWC-5
21
8' - 0"
CWT-1
WOMEN'S TOILET 1-201 - WEST WALL ELEVATION
20
8' - 0"
1/4" = 1'-0"
WOMEN'S TOILET 1-201 - SOUTH WALL ELEVATION
8' - 0"
19
8' - 0"
MEN'S TOILET 1-203 - EAST WALL ELEVATION
18
LACTATION ROOM 1-126 - EAST WALL ELEVATION
25
G
WOMEN'S TOILET 1-127 - WEST WALL ELEVATION 1/4" = 1'-0"
F
17
26
WOMEN'S TOILET 1-127 - NORTH WALL ELEVATION 1/4" = 1'-0"
27
WOMEN'S TOILET 1-127 - EAST WALL ELEVATION 1/4" = 1'-0"
28
MEN'S TOILET 1-128 - SOUTH WALL ELEVATION 1/4" = 1'-0"
29
MEN'S TOILET 1-128 - WEST WALL ELEVATION 1/4" = 1'-0"
G
30
MEN'S TOILET 1-128 - NORTH WALL ELEVAITON 1/4" = 1'-0"
31
17
MEN'S TOILET 1-128 - EAST WALL ELEVATION 1/4" = 1'-0"
INTERIOR ELEVATIONS
A902.2
1 A920.2 33' - 9 1/4" 15' - 3"
5' - 0"
5' - 0"
6' - 0"
2"
KEYNOTES - PHASE II - INTERIOR ELEVATIONS
11' - 6"
6' - 0"
6' - 0"
6' - 4 1/4"
2' - 10"
1
EQ
2
1449
1426
1428
1499 1431 1441
MC3660L
1537
3' - 0"
W5 3
6' - 0"
4' - 0"
1427
5' - 0"
1438 1422
W5
3
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1502
1498
1458
MC3660L 14' - 11 3/4"
1503
MC3660R
7
MC3672R
6
MC3672R
1459
1460
1460
6
1459
1460
6
MC3672L
1459 5' - 0"
3' - 0"
W5
E F
2' - 10"
10' - 0"
2' - 0"
1 1/4"
3
6
6
MAIN LAB 1-207 - WEST WALL ELEVATION
1
STANDARD LAB COAT HOOK STRIP MOUNTED AT 4'-6" A.F.F. UNLESS NOTED OTHERWISE - SEE DETAIL 18/A920.2 STANDARD STEEL COUNTERTOP SUPPORT WALL BRACKET (29X24) - SEE DETAIL 13/A920.2 ELECTRIC/ VOICE/ DATA RACEWAY - COORDINATE WITH ELECTRICAL PLASTIC LAMINATE PIPETE RACK - SEE DETAIL 12/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FURNITURE - SEE FURNITURE PLAN (I301.2) WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS PLASTIC LAMINATE FILLER. PLASTIC LAMINATE WALL CLEAT. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21. RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. SERVICE FAUCET AND HOSE BRACKET - SEE MECHANICAL PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 20/A921.2
EQ
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
1/4" = 1'-0"
5' - 0" 1' - 0"
5' - 0"
5' - 0" 12
991
24RO MC3660LS
1440
1446
1535
11
Signature
DAVID C. NORBACK
Registration Number
24RO MC3660LS
MC3660LS
24BD4WB MC3660LS
6
24BD4WB MC3660RS
MC3672RS
MC3672RS
55SC1
1"
TC3678
MC3672RS
3' - 0"
6
1419
3' - 0"
3' - 0"
1452
1424
5' - 0"
Date
1455
3' - 0"
1455
1500
1425
7' - 0"
1413 1423
10' - 0"
K
1501
K
10' - 0"
3' - 6"
10' - 0"
1467
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
12
K
1436
1453
1' - 0"
3' - 6"
5' - 0"
Certification
3' - 0"
MC3660LS
12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
1"
4' - 9"
MC3660LS
Signature
7 A920.2
DAVID C. NORBACK
Registration Number
2
MAIN LAB 1-207 - WEST ISLAND - EAST VIEW
MAIN LAB 1-207 - WEST ISLAND END CAP - SOUTH VIEW
3
1/4" = 1'-0"
4
1/4" = 1'-0"
11902
Date
MAIN LAB 1-207 - CENTER BENCHES NORTH VIEW
11902 12.13.13
Project For
1/4" = 1'-0"
1 A920.2 5"
10' - 3"
25' - 0"
5' - 0"
5' - 0"
6' - 0"
2915 WAREHOUSE VALLEY HIGH DRIVE
5
6
1/4" = 1'-0"
MAIN LAB 1-207 - BENCH 2 SOUTH VIEW
6
6
1/4" = 1'-0"
3' - 0"
5' - 0"
PHASE IIFIT - UP PACKAGE
1438 1537
21' - 10 1/2"
RESEARCH STORAGE 1-240 - NORTH WALL ELEVATION
8
1418
MC3660L
MC3660L
7
7
MAIN LAB 1-207 - BENCH 3 SOUTH VIEW
7
1/4" = 1'-0"
5' - 0" 1' - 0"
6
MC3660LS
MC3660LS
MAIN LAB 1-207 - BENCH 1 SOUTH VIEW
6
1430
3' - 0"
6
1432
5' - 0"
1420
6 2' - 10"
6
2' - 10"
6
4' - 0"
6
10' - 0"
10' - 0"
10' - 0"
10' - 0"
E
6
MC3660LS
F E
F
3
3' - 0"
3
MAIN LAB 1-207 - SOUTH WALL ELEVATION
9
1/4" = 1'-0"
PROJECT # 7R121080
1/4" = 1'-0"
5' - 0"
3' - 0"
1' - 0"
1' - 0"
3' - 0"
1' - 0"
K
10' - 0"
10' - 0"
Project No.
7' - 0"
11
K
1"
55SC1
Drawn By
K
11
1444
1415
1417
729
1447
730
JAS/BCS
Checked By
MLK/JHA
Date
3' - 0"
7' - 0"
K
6287.048.01
1437
1"
1"
4' - 9"
55SC1
6
1" MC3660LS
4' - 9"
MC3660LS
MC3660LS
24BD4WB MC3660LS
MC3660LS
11/27/13
1434
6
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
24BD4WB MC3660LS
7 A920.2
© Copyright RSP Architects 2013. All rights reserved.
Revisions
10
MAIN LAB 1-207 - WEST, CENTER, & EAST ISLAND END CAPS NORTH VIEW
11
1/4" = 1'-0"
No.
MAIN LAB 1-207 - WEST ISLAND - WEST VIEW
Date
Description
1/4" = 1'-0"
5' - 0" 1' - 0"
5' - 0"
5' - 0"
5' - 0"
12
3' - 0"
1' - 0"
10
5' - 0" 12
24BD3WB MC3060LS
24BD3WB MC3060LS
6
6
24BD3WB MC3060LS
MC3060LS
K
7' - 0"
11
6
24RO MC3060LS
6
6
24RO MC3060LS
24RO MC3060LS
24BD4WB MC3660RS
3' - 0"
6
2' - 6"
6
10' - 0"
12
4' - 0"
10' - 0"
1482
6
MC3660RS
24BD4WB MC3660RS
24BD4WB MC3660LS
MC3660LS
1"
24BD4WB MC3660LS
1"
55SC1
4' - 9" 7 A920.2
12
MAIN LAB 1-207 - CENTER ISLAND - EAST ELEVATION 1/4" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:21 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
13
MAIN LAB 1-207 - CENTER & EAST ISLAND END CAPS - SOUTH VIEW
INTERIOR ELEVATIONS
1/4" = 1'-0"
A903.2
5' - 0" 3' - 0"
1' - 0"
1' - 0"
3' - 0"
1' - 0"
8' - 2"
3' - 2"
11' - 11 1/2" EQ
5' - 0"
3' - 10"
3' - 10"
4' - 0"
3' - 9"
6
6
1"
55SC1
1"
MC3660LS
3' - 0"
6
1"
55SC1
1395
1"
1398
30BC1
8' - 2"
4' - 9"
3' - 0"
1"
30BC1
846
847
992
994
3
993 4' - 6"
3
3 4' - 0"
4' - 0"
3
5' - 0"
845
1534
6' - 0"
5' - 0"
1429
8
4' - 9"
6
6
6
6
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
7
8' - 2" 5 A920.2
7 A920.2
MAIN LAB 1-207 - WEST, CENTER & EAST ISLAND END CAPS SOUTH VIEW
1
3' - 10"
10' - 0"
3' - 0"
1454
1443 1393
7' - 0"
1453
3' - 0"
7' - 0"
10' - 0"
10' - 0"
11
11
1"
EQ
K
K
MC3660LS
1 A920.2
11' - 6"
3' - 0"
1' - 0"
1 A920.2
5' - 0"
MAIN LAB 1-207 - NORTH WALL ELEVATION
2
1/4" = 1'-0"
Consultants
PRC IMAGING 1-208 - SOUTH WALL ELEVATION
3
1/4" = 1'-0"
1/4" = 1'-0"
1 A920.2 5' - 0"
5' - 0"
5' - 0"
Certification
2 A920.2
2 A920.2 4' - 10"
3' - 0"
4' - 0"
12
Signature
1
17' - 11 3/4"
2' - 11"
6
2' - 11"
4' - 6"
4' - 6"
4' - 6"
4' - 6"
4' - 0"
6
Date
PRC IMAGING 1-208 - NORTH WALL ELEVATION
5
1/4" = 1'-0"
OFFICE 1-207C - EAST WALL ELEVATION
6
1/4" = 1'-0"
MAIN LAB 1-207 - CENTER & EAST ISLAND END CAP - SOUTH VIEW
7
1/4" = 1'-0"
12.13.13
MAIN LAB 1-207 - EAST ISLAND END CAP - NORTH VIEW
8
1/4" = 1'-0"
Signature
1/4" = 1'-0"
DAVID C. NORBACK
Registration Number Date
11902 12.13.13
Project For
6' - 0"
10
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
MC3660L
OFFICE 1-207C - NORTH WALL ELEVATION
DAVID C. NORBACK
Registration Number
R
6
4
10' - 0"
4' - 0"
10' - 0"
8' - 0"
989
5' - 0"
12
8' - 0"
3' - 0"
10' - 0"
3' - 0"
5' - 0"
3
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
8' - 0"
1412
1542
1442
12
1448
1414
K
4' - 0"
10' - 0"
12
1471
1472
1466 1470
1468
1473
6
24BD4WB MC3660RS
MC3660RS
6
24BD4WB MC3660RS
6
24BD4WB MC3660LS
6
24BD4WB MC3660LS
MC3660LS
2' - 6"
1469
30BC1 24BD4 MC3660LS
24BD4WB MC3660LS
30RO MC3072RS
30BC1 24BD4 MC3660LS
2915 WAREHOUSE VALLEY HIGH DRIVE
30RO MC3072LS
MAIN LAB 1-207 - CENTER ISLAND - WEST VIEW
9
PHASE IIFIT - UP PACKAGE
1/4" = 1'-0"
KEYNOTES - PHASE II - INTERIOR ELEVATIONS 5' - 0"
1
6' - 0"
2
12
K
3' - 6"
10' - 0"
12
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1435
6
6
1421
24RO MC3660LS
3' - 0"
1465
6 30RO MC3072RS
MC3672RS
24RO MC3060LS
30BC1 24BD4 MC3660LS
24BD4WB MC3660LS
6
30BC1 24BD4 MC3660LS
6
24BD4WB MC3660RS
TC3678
24BD4WB MC3660RS
MC3672RS
MC3660RS
MAIN LAB 1-207 - EAST ISLAND - EAST VIEW
10
1/4" = 1'-0"
STANDARD LAB COAT HOOK STRIP MOUNTED AT 4'-6" A.F.F. UNLESS NOTED OTHERWISE - SEE DETAIL 18/A920.2 STANDARD STEEL COUNTERTOP SUPPORT WALL BRACKET (29X24) - SEE DETAIL 13/A920.2 ELECTRIC/ VOICE/ DATA RACEWAY - COORDINATE WITH ELECTRICAL PLASTIC LAMINATE PIPETE RACK - SEE DETAIL 12/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FURNITURE - SEE FURNITURE PLAN (I301.2) WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS PLASTIC LAMINATE FILLER. PLASTIC LAMINATE WALL CLEAT. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21. RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. SERVICE FAUCET AND HOSE BRACKET - SEE MECHANICAL PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 20/A921.2
PROJECT # 7R121080
Project No.
6287.048.01
Drawn By
JAS/BCS
Checked By
MLK/JHA
Date
10' - 0"
12 6
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
E F
1482
9 A922.2
6
11/27/13
© Copyright RSP Architects 2013. All rights reserved.
6
MC3660LS
11
24BD4WB MC3660LS
6
MC3660LS
2' - 10"
Revisions
6
6
6
30BC1 24BD4 MC3660LS
24BD4WB MC3660LS
24BD4WB MC3660LS
30BC1 24BD4 MC3660LS
6
36BD3 MC3072LS
6
36BD3 MC3072LS
36BD3 MC3072LS
No.
36BD3 MC3072LS
Date
Description
7
MAIN LAB 1-207 - EAST ISLAND - WEST VIEW 1/4" = 1'-0" 1 A920.2 30' - 2 1/4"
10' - 0" EQ
11 A920.2
EQ
5' - 1"
16 A922.2
4' - 11"
3
1544
3
17 A922.2
856
854
1546
1545
133
132
131
6
2188
1
4' - 6"
858
7' - 0"
6
4' - 0"
1
5' - 0"
4' - 6"
9' - 10"
10' - 0"
5' - 8"
3' - 0"
16 A922.2
6
INTERIOR ELEVATIONS 30BC1 24BD4 MC3660L
24BD4WB MC3660L
48U3
48U3
48U3
52' - 4 3/4"
12
MAIN LAB 1-207 - EAST WALL ELEVATION 1/4" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:24 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A904.2
2 A920.2 4' - 0"
4' - 8"
6
6
6
6
R
R
6
6
6
4' - 6"
6
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
4' - 6"
6
4' - 6"
4' - 6"
1
10' - 0"
10' - 0"
3' - 0"
10' - 0"
8 1/2"
4 1/4"
3' - 0"
2"
4' - 8"
6
5' - 10"
EQ
3' - 0"
2"
EQ
4' - 6"
2"
5' - 10"
4' - 0 3/4"
10' - 0"
2"
4' - 0"
2 A920.2
10' - 0 1/2"
10' - 0"
5' - 0"
2 A920.2
3' - 0"
5' - 0"
2 A920.2
6
6
6
6
6
Consultants
OPEN OFFICE 1-207B - SOUTH WALL ELEVATION
1
OPEN OFFICE 1-207B - NORTH WALL ELEVATION - 1
2
1/4" = 1'-0"
OPEN OFFICE 1-207B - WEST WALL ELEVATION
3
1/4" = 1'-0"
4
1/4" = 1'-0"
1 A920.2
5
1/4" = 1'-0"
OPEN OFFICE 1-207B - EAST WALL ELEVATION 1/4" = 1'-0"
1 A920.2
12' - 0" 6' - 6"
EQ
3' - 6"
Certification
6' - 6"
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
36BC1WB MC3672L
24BD4WB MC3660RS
36BC1WB MC3672L
7' - 0"
Registration Number
1562
1563
1555 9 3' - 2 1/4"
3' - 3"
1554
1"
42SC
24BD4WB MC3660RS
7
10' - 0"
1560
MICROBIOME 1-204 - SOUTH WALL ELEVATION
6
7
1/4" = 1'-0"
MICROBIOME 1-204 - ISLAND END CAP WEST VIEW
8
1/4" = 1'-0"
9
1/4" = 1'-0"
12.13.13
24BD4WB MC3660RS
Signature
MICROBIOME 1-204 - EAST WALL ELEVATION
10
1/4" = 1'-0"
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
7 A920.2
MICROBIOME 1-204 - ISLAND - NORTH VIEW
DAVID C. NORBACK
Date
2
24BD4 30BC1 MC3660R
24BD4WB MC3660RS
1561
1556
2' - 10"
4' - 0"
6
Signature
10' - 0"
3' - 0"
1558
E
1566
11 3' - 0"
6
F
3
5' - 0"
4' - 0"
7
5' - 0"
1565
1557
1549
1559
1552
K
3
10' - 0"
3
10' - 0"
10' - 0"
10' - 0"
3' - 0"
1' - 0"
EQ
OPEN OFFICE 1-207B - NORTH WALL ELEVATION - 2
MICROBIOME 1-204 - ISLAND - SOUTH VIEW
DAVID C. NORBACK
Registration Number Date
1/4" = 1'-0"
11902 12.13.13
Project For
1 A920.2
5' - 1 1/2"
4
3' - 0"
5' - 0"
2915 WAREHOUSE VALLEY HIGH DRIVE
6
6 30BO
18BD4
30BO
2"
4' - 0"
4' - 6"
E
2006
5' - 0"
9' - 0"
8' - 0"
4' - 6"
6
2005
7
PHASE IIFIT - UP PACKAGE
8
9' - 3"
MICROBIOME 1-204 - NORTH WALL ELEVATION
11
2004
24BD4WB MC3660R
4
5' - 0"
F
R
5' - 0"
3' - 0"
1551
3' - 2 1/2"
3' - 0"
3' - 0"
3' - 0"
6
1564
1550
4
8' - 0"
1553
4' - 0"
1548
14' - 3"
5' - 10"
10' - 0"
3
1 A920.2
2 A920.2
12' - 0"
2 A920.2
3' - 0"
6' - 5"
OFFICE 1-205A - NORTH WALL ELEVATION
12
1/4" = 1'-0"
13
1/4" = 1'-0"
6 A920.2
OFFICE 1-205A - EAST WALL ELEVATION
BREAKROOM 1-209 - SOUTH WALL ELEVATION
14
1/4" = 1'-0"
15
1/4" = 1'-0"
9 A920.2
OPERATIONS SHOP 1-222 - WEST WALL ELEVATION
PROJECT # 7R121080
1/4" = 1'-0"
1
8' - 0" 1"
24BD4 MC3660L
5" 8
30BO
30SC
15
16
8' - 0"
18
3
12' - 0"
2129
16 4' - 0"
2068
2073
2071
6287.048.01 JAS/BCS
Checked By
MLK/JHA
Date
1' - 4"
5' - 0"
Project No. Drawn By
6' - 4"
6' - 8" 9 A920.2
1' - 6"
3' - 0"
4' - 0"
4' - 6"
2' - 10"
3' - 0"
4' - 0"
5' - 0"
2114
2113
N
19
3
2133
4' - 6"
3
2111 30BO MC3660L
2134
3' - 0"
4' - 0"
18
17
2109
8
3036W
3' - 0"
2131
3' - 0"
12' - 0"
12' - 0"
3036W
4' - 0"
4' - 0"
12' - 0"
4' - 0"
3 A920.2
4' - 6"
1 A920.2
10"
2' - 10"
2112
2135
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
2136
7 A920.2
© Copyright RSP Architects 2013. All rights reserved.
Revisions
OPERATION SHOP 1-222 - ISLAND - WEST VIEW
16
OPERATIONS SHOP 1-222 - SOUTH WALL ELEVATION
17
1/4" = 1'-0"
1/4" = 1'-0"
2 A920.2 4' - 10"
4' - 10"
4' - 10"
18
OPERATIONS SHOP 1-222 - NORTH WALL ELEVATION 1/4" = 1'-0"
2 A920.2 EQ
4' - 10"
19
OPERATIONS SHOP 1-222 - EAST WALL ELEVATION
2 A920.2 6' - 5"
EQ
2"
6' - 5"
2"
6' - 5"
2"
No.
Date
Description
1/4" = 1'-0"
2 A920.2
6' - 5"
9 3/4"
6' - 2"
6' - 2"
1' - 0"
6' - 2"
KEYNOTES - PHASE II - INTERIOR ELEVATIONS
6
20
6
OFFICE 1-205B - WEST WALL ELEVATION 1/4" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:29 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
10' - 0"
6
6
21
OFFICE 1-205A - NORTH WALL ELEVATION 1/4" = 1'-0"
5' - 0"
6
6
22
2
3' - 0"
3' - 0" 5' - 0"
5' - 0"
6
10' - 0"
3' - 0" 10' - 0"
5' - 0"
10' - 0"
3' - 0"
1
6
OFFICE 1-205 - SOUTH WALL ELEVATION 1/4" = 1'-0"
6
6
6
23
6
OFFICE 1-205 - NORTH WALL ELEVATION 1/4" = 1'-0"
6
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
STANDARD LAB COAT HOOK STRIP MOUNTED AT 4'-6" A.F.F. UNLESS NOTED OTHERWISE - SEE DETAIL 18/A920.2 STANDARD STEEL COUNTERTOP SUPPORT WALL BRACKET (29X24) - SEE DETAIL 13/A920.2 ELECTRIC/ VOICE/ DATA RACEWAY - COORDINATE WITH ELECTRICAL PLASTIC LAMINATE PIPETE RACK - SEE DETAIL 12/A920.2 RELOCATED CENTRIFUGE CART FROM HILTON CL-21. FURNITURE - SEE FURNITURE PLAN (I301.2) WALL MOUNTED SINK - SEE MECHANICAL DRAWINGS PLASTIC LAMINATE FILLER. PLASTIC LAMINATE WALL CLEAT. CEILING MOUNTED SAFETY SHOWER - SEE MECHANICAL DRAWINGS DECK MOUNTED EYE WASH - SEE MECHANICAL DRAWINGS 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO MOBILE CASEWORK. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM STABILE SL-16. EXISTING MOBILE CASEWORK UNIT RELOCATED FROM HILTON CL-21. RELOCATED WOOD TANK STORAGE RACK FROM SOUTH WAREHOUSE 1-10H. GAS CYLINDER RACK AND HOOK - SEE DETAIL 20/A920.2 HOLLOW METAL PROTECTION RAIL - PAINT - SEE DETAIL 10/A922.2 SURFACE APPLY 1/2" FIRE TREATED PLYWOOD AT 4'-6" A.F.F. TO FACE OF GYP. BD. SERVICE FAUCET AND HOSE BRACKET - SEE MECHANICAL PLASTIC LAMINATE SLOPED LOCKER TOP - SEE DETAIL 20/A921.2
INTERIOR ELEVATIONS
A905.2
ACCESSORY MOUNTING DIAGRAM FOR MINIMUM ADA GUIDELINES
INFORMATION HERE IS FOR REFERENCE ONLY. ANY DIMENSIONS, NOTES, TEXT OR FINISHES ON ARCHITECTURAL PLANS OVERRIDES THE INFORMATION FOUND ON THIS SHEET.
SCALE: 1/2" = 1'-0"
2' - 0"
NOTE: REFER TO TOILET PLAN LAYOUT FOR GRAB BAR DIMENSIONS AND LAYOUT
3' - 0" MIN. 1' - 0"
2' - 0"
42" 3' -MIN. 6"
1' - 0" MAX.
40" MAX. 5' - 0"
MIN.
1' - 6"
TOILET SEAT HEIGHT
A2
48" MAX.
(3'-6" AT COUNTER)
WALL MOUNTED SINK HEIGHT
B1
GRAB BAR HEIGHT
B2
GRAB BAR HEIGHT
C
TOILET TISSUE DISPENSER
D
SANITARY PRODUCT DISPOSAL
E
SOAP DISPENSER
F
PAPER TOWEL DISPENSER
G
SHARPS CONTAINER
H
3' - 0" MIN. CLEAR
3' - 0" MIN. CLEAR
EQ
EQ
3' - 0" MIN.
Date
4' - 6" MIN.
7" - 9"
5' - 0" CLEAR
3"
D
2' - 8" CLEAR TYP.
3' - 6" MIN.
(SEE PLAN)
1' - 0" 3'-3" - 3'-5"
Signature
DAVID C. NORBACK
Date
E1 1' - 6"
30"x48" CLEAR FLOOR SPACE
11902
PARTITION
18" GRAB BAR
Project For
OPTIONAL SANITARY NAPKIN DISPOSAL UNIT AREA
17"-19" 1' - 6"
5 17/64"
7" - 9"
TS2 36" WIDE STALL
TS3 URINAL STALL
T1
TOILET STALL ELEVATION
3' - 0" MAX.
2' - 3" MIN
9" MIN.
15" MIN.
(WOMEN'S ONLY)
TO SPUOT AT H.C.
D
1' - 6"
2'-9" - 3'-0"
3'-3" - 3'-5"
42" GRAB BAR
C
6" MIN.
TS1 60" WIDE ADA STALL - FRONT
12.13.13
3' - 6" 1' - 0"
TO RIM @ H.C.
1' - 5" MAX
3' - 8" MAX
TO CONTROLS @ H.C.
M
3' - 6" CLEAR TO WALL
2' - 8" MIN.
3' - 6"
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
C
T1 A910.2
B
LATCH APPROACH
11902 12.13.13
Registration Number
2' - 8" MIN.
OTHER APPROACH
30"x48" CLEAR FLOOR SPACE
D
4' - 0"
3" 3' - 6" MIN.
4' - 6" (MN CODE)
(MN CODE) 4' - 0"
DAVID C. NORBACK
Registration Number
3"
4' - 0"
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
CEILING LINE
B
C
EQ
7" - 9"
MIN.
1' - 0" MIN.
MIN.
EQ
Certification
Signature
1 ' -6 "
1' - 6"
6' - 6" MIN.
FRAMED MIRROR
INFORMATION HERE IS FOR REFERENCE ONLY. ANY DIMENSIONS, NOTES, TEXT OR FINISHES ON ARCHITECTURAL PLANS OVERRIDES THE INFORMATION FOUND ON THIS SHEET.
SCALE: 1/2" = 1'-0"
2' - 0"
MAX.
MEASURED TO BOTTOM OF VIEWING SURFACE
1' - 6"
4'-0" MAX. TO DISP. SLOT
TO SPOUT
36" - 48"
Consultants
1' - 6"
STANDARD ADA TOILET STALL DIMENSIONS (BASED ON MINNESOTA GUIDELINES)
1' - 0"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
7" - 9"
15" MIN.
30" - 33"
39" - 41"
1' - 0"
17"-19"
A1
33" - 36"
33" - 36"
39" - 41"
MAX.
3' - 8"
33" - 36"
17" - 19"
2' - 10"
7" - 9"
30" - 33"
1' - 6"
39" - 41"
1' - 6"
18"X5" S.S. SHELF TYPICAL @ STAFF TOILETS
2915 WAREHOUSE VALLEY HIGH DRIVE
8" MIN.
PHASE IIFIT - UP PACKAGE
WC1 WATER CLOSET
PROJECT # 7R121080
Project No.
6287.048.01
Drawn By
JAS
Checked By
MLK/JHA
Date
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
Revisions No.
Date
Description
TOILET ELEVATIONS AND MOUNTING HEIGHTS
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:30 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
A910.2
ADA COMPLIANT SINK AND FAUCET, REFER TO PLUMBING DRAWINGS
1' - 0"
VARIES
2' - 1" 3/4"
1"
VARIES
EQ
1' - 0" U.N.O.
6"
6"
EQ
6"
3 1/2"
6"
1" PLASTIC LAMINATE BOOKEND (PLAM-1) AS INDICATED IN ELEVATIONS P4100 UNISTRUT CHANNEL HORIZONTAL
STANDARD KV VERTICAL CHANNELS
BACK PANEL WITH PLASTIC LAMINATE (PLAM-1) FACE
11" TYP.
11" TYP.
P4100 UNISTRUT CHANNELS VERTICAL
ALL EXTERIOR EXPOSED SURFACES AND EDGES ARE PLASTIC LAMINATE (PLAM-2) OVER 3/4" MDF INCLUDING FLUSH OVERLAY DOOR(S) ON CONCEALED HINGES TYPICAL
SEE ELEVATIONS
3 ' -0 "
VARIES
3/4" PLASTIC LAMINATE SHELVING ON STANDARD KV ADJUSTABLE BRACKETS - SEE ELVATION FOR QUANTITY
SEE ELEVATION
3 ' -0 "
SEE ELEVATION
6"
1" PLASTIC LAMINATE SHELVING (PLAM-1) 1" PLASTIC LAMINATE SHELVING ON UNISTRUT ADJUSTABLE BRACKETS - SEE ELEVATIONS FOR QUANTITY
3/4" PLASTIC LAMINATE BOOKEND - AS INDICATED IN ELEVATIONS (PLAM-1)
DOOR/DRAWER PULL - SEE SPEC.
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
SCHEDULED BASE
SEE ELEVATION
SEE ELEVATION
1
EQ
3/4" PLASTIC LAMINATE SHELVING (PLAM-1)
4"
EQ
2' - 10"
6"
P4100 UNISTRUT CHANNEL HORIZONTAL
PLASTIC LAMINATE (PLAM-2) COUNTER TOP ON 3/4" MDF WITH BACK SPLASH
WHITE PLASTIC LAMINATE OVER 3/4" MDF INTERIORS W/ ADJUSTABLE SHELF AND 1/4" BACK TYPICAL
2' - 5"
1' - 0" U.N.O.
SEE ELEVATIONS
1 1/2"
5' - 1 1/4"
SEE ELEVATIONS
NOTE: SEE ELEVATIONS FOR THE QUANTITY OF SHELVES, USE HEAVY DUTY UNISTRUT STANDARDS AND BRACKETS. SPACED AT 2'-6" OC MAX
PHASE II - TYPICAL HEAVY DUTY UNISTRUT ADJUSTABLE SHELVING
NOTE: G.C. TO PROVIDE BLOCKING IN STUD WALL AS REQUIRED
PHASE II - TYPICAL STANDARD KV ADJUSTABLE SHELVING
2
3/4" = 1'-0"
Consultants
NOTE: SEE ELEVATIONS FOR THE QUANTITY OF SHELVES, USE STANDARD KV STANDARDS AND BRACKETS. SPACED AT 2'-6" OC MAX
PHASE II - UPPER CABINET - ONE ADJ. SHELF
3
3/4" = 1'-0"
PHASE II - ADA COMPLIANT SINK SECTION
4
1" = 1'-0"
1" = 1'-0" Certification COUNTERTOP TYPE: A
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
COUNTERTOP TYPE: B
DIM.
DIM.
2' - 0"
2' - 0 1/2"
SEE PLAN
SEE PLAN
SEE PLAN
VARIES
VARIES
VARIES
VARIES
SEE PLANS FOR COUNTERTOP SIZE AND TYPE
SEE PLANS FOR COUNTERTOP SIZE AND TYPE
1/8" DRIP GROOVE
SEE PLANS FOR COUNTERTOP SIZE AND TYPE
SEE PLANS FOR COUNTERTOP SIZE AND TYPE
SEE PLANS FOR COUNTERTOP SIZE AND TYPE
1/8" DRIP GROOVE
COUNTERTOP TYPE: C
1"
SEE PLAN
1"
2' - 7"
COUNTERTOP TYPE: D
Signature
DAVID C. NORBACK
DIM.
(2) SLIDE OUT PLASTIC LAMINATE SHELVES WITH HEAVY DUTY SHELF GUIDES
OPEN
1" 11"
1"
OPEN PLASTIC LAMINATE BASE CABINET
OPEN
Registration Number
2' - 1"
1"
Date
1"
SEE ELEVATIONS
PLASTIC LAMINATE BASE CABINET
DIM.
5"
ADJUSTABLE PLASTIC LAMINATE SHELVING SEE ELEVATIONS FOR QUANTITY
OPEN
VARIES
VARIES
PLASTIC LAMINATE SINK CABINET
OPEN
SEE ELEVATIONS EQ EQ
SEE ELEVATIONS
PLASTIC LAMINATE BASE CABINET W/ DRAWERS
VARIES
VARIES
PLASTIC LAMINATE BASE CABINET
SEE ELEVATIONS
SEE ELEVATIONS
VARIES
2' - 1"
1/8" DRIP GROOVE
1/8" DRIP GROOVE
COUNTERTOP TYPE: E
COUNTERTOP TYPE: F
11902 12.13.13
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
DIM. 2' - 4 1/2"
4 1/2"
DIM.
Signature
2' - 4 1/2"
DAVID C. NORBACK
4 1/2"
7"
3"
1' - 7"
7"
3"
1' - 7"
7"
3"
1' - 7"
7"
3"
1' - 7"
7"
1"
1' - 7"
5"
3"
1"
11"
Registration Number
1/8" DRIP GROOVE
5
PHASE II - TYPICAL BASE CABINET SECTION
6
3/4" = 1'-0"
PHASE II - TYPICAL BASE CABINET SECTION W/ DRAWERS
7
3/4" = 1'-0"
PHASE II - TYPICAL SINK CABINET SECTION
8
3/4" = 1'-0"
PHASE II - TYPICAL BASE CABINET SECTION W/ 2 ROLL OUT SHELVES
PHASE II - TYPICAL BASE CABINET SECTION W/ OPEN SHELVING
9
3/4" = 1'-0"
Project For COUNTERTOP DESIGNATION
3/4" = 1'-0"
C31-PL
INDICATES: FINISH ( SEE BELOW )
DIM TYPICAL FINISHES PL = PLASTIC LAMINATE SS = STAINLESS STEEL AR = ACID RESISTANT
1' - 1"
1' - 6"
ALL EXTERIOR EXPOSED SURFACES AND EDGES ARE PLASTIC LAMINATE OVER 3/4" MDF INCLUDING FLUSH OVERLAY DOOR(S) ON CONCEALED HINGES TYPICAL
EQ
WALL LINE
9"
TYPICAL COUNTERTOPS
EQ
NOT TO SCALE
2915 WAREHOUSE VALLEY HIGH DRIVE
4" WIRE PULL
WHITE THERMOFUSED MELAMINE OVER 3/4" MDF INTERIORS W/ ADJUSTABLE SHELVES AND 1/4" THERMOFUSED MELAMINE BACK TYPICAL
SEE SCHED. BELOW 1' - 7 1/4"
3/4" ADJUSTABLE PLASTIC LAMINATE SHELVING - SEE ELEVATIONS FOR QUANTITY (TYP.)
1' - 6" SHELF BRACKET HOLES @ 32 MM O.C. (TYP.)
4"
4"
1' - 11 1/2"
11
17 A920.2
PHASE II - P-LAM STORAGE CABINET SECTION 1" = 1'-0"
4' - 0"
2' - 3"
3' - 0"
1" = 1'-0"
36" X 36" MOP SERVICE BASIN
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
11/27/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
14
PHASE II - MOP BASIN ELEVATION
No.
3/4" = 1'-0"
Date
Description
6"
VARIES - SEE FLOOR PLAN
19 A920.2 WOOD EDGE (WD-1) ALL EXPOSED SIDES
WOOD EDGE (WD-1) ALL EXPOSED SIDES
MDF VENEER (PLAM-5) SHELF
MDF VENEER (PLAM-5) SHELF
3/4" 4"
MDF VENEER (PLAM-5) PANEL BEYOND
MDF VENEER (PLAM-5) PANEL BEYOND
MDF VENEERED BACK PANEL COORDINATE OPENINGS WITH A.V.
MDF VENEERED BACK PANEL COORDINATE OPENINGS WITH A.V.
MDF VENEER (PLAM-5) BASE
MDF VENEER (PLAM-5) BASE
18
6" TYP. PLAM MOUNTING BOARD (PLAM-1)
CYLINDERS - BY OWNER 1 1/4" UNISTRUT ATTACHED TO 2"X8" FIRE TREATED WOOD BLOCKING IN WALL WITH 3/8" X 3 1/2" THRU BOLTS AT 10" OC MAX
PHASE II - TYPICAL LAB COAT HOOK STRIP 1" = 1'-0"
WALL LINE
WOOD EDGE (WD-1) ALL EXPOSED SIDES
3/4" P-LAM SLOPED CAP
1" 1" PLASTIC LAMINATE COUNTERTOP (PLAM-5)
3/4" PLASTIC LAMINATE INSIDE CABINET FACING
LIGHT WEIGHT CHAIN ATTACHED TO UNISTRUT WITH ATTACHMENT BOLTS. CHAIN SHALL BE CUT AT MID POINT AND CONNECTED TO EACH OTHER WITH SPRING CLIP.
30.00 °
19 A920.2
2' - 10"
3/4"
3/4" PLYWOOD
6 1/2"
1" C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:32 PM
MLK/JHA
HOOKS (TYP.)
3/4" PLYWOOD
6"
3/4"
WIRELESS KEYBOARD & MOUSE SHELF
3/4"
1" = 1'-0"
Checked By Date
TOP OF FILE CABINET
1' - 6"
PHASE II - AV CABINET FRONT ELEVATION
JAS/BCS
PLASTIC LAMINATE (PLAM-5) COUNTERTOP
PLASTIC LAMINATE (PLAM-5) COUNTERTOP
MDF VENEER (PLAM-1) BASE
4"
13
1" = 1'-0"
PHASE II - DETAIL OF COUNTER SUPPORT BRACKET
SEE ELEVATIONS
1' - 8 1/2"
2' - 3"
3' - 5"
HATCHED AREA INDICATES MIN. A.D.A. TOE SPACE CLEARANCE
6287.048.01
Drawn By SILICONE SEALANT @ TOP EDGES OF BASIN AND ABUTTING F.R.P.
BASE
Project No.
5' - 0"
DVD/VCR
3/4"
12
PHASE II - PLASTIC LAMINATE PIPETTE RACK
CABLE NOOK
"LIFT-OFF" LOCKABLE RACK MDF VENEER (PLAM-1) DOOR
2' - 0 1/2"
SERVICE FAUCET, RE: PLUMBING
COUNTERTOP INSTALLATION CLEARANCES
4' - 3 1/2"
3/4"
MOP RACK
HOSE BRACKET
1' - 5"
FRONT VIEW
4'-6" A.F.F.
PLAM COUNTERTOP (PLAM-1)
SILICONE SEALANT @ ALL EDGES OF FRP BOARD
8"
1' - 0"
SECTION VIEW
48" H. FRP PANELS ON BOTH WALLS ABOVE MOP BASIN
3' - 0"
DEEP TOP DEEP TOP DEEP TOP DEEP TOP
Revisions
1" = 1'-0"
16 A920.2
13" - 20" 20" - 25" 25" - 30" 30" - 36"
6"
NOTE: SUPPORTS TO BE SHOP PRIMED: PAINT TO MATCH WALLS AT TIME OF INSTALLATION
2' - 0"
PHASE II - SECTION AT MICROWAVE CABINET WITH BASE CABINET DRAWER AND DOOR
FOR FOR FOR FOR
B
PROVIDE FIRE TREATED 2" x 8" WOOD BLOCKING AS REQ'D. TO SUPPORT BRACKET
SLIDE OUT PLASTIC LAMINATE SHELVES WITH HEAVY DUTY SHELF GUIDES (TYP.)
2' - 6" 3"
PLAM BASE
2"
9"
SHELF BRACKET HOLES @ 32 MM O.C.
3' - 0"
3/4" PLASTIC LAMINATE SHELVING
2' - 2 3/4"
WHITE THERMOFUSED MELAMINE OVER 3/4" MDF INTERIORS W/ ADJUSTABLE SHELF AND 1/4" THERMOFUSED MELAMINE BACK TYPICAL
2 1/4"
STEEL SUPPORT BRACKET - PROVIDE BRACKETS AS SHOWN ON DRAWINGS AT 3'-0" O.C. MAX.
"B" 18" 12" 18" 24"
A
2' - 8 5/8"
2' - 4 1/2"
EQ
4" WIRE PULL
2' - 10"
7' - 0"
1" P-LAM PULL OUT WRITING BOARD
ADJUSTABLE PLASTIC LAMINATE SHELVING SEE ELEVATIONS FOR QUANTITY
PROJECT # 7R121080
10"
ALL EXTERIOR EXPOSED VERTICAL SURFACES AND EDGES ARE PLASTIC LAMINATE OVER 3/4" MDF INCLUDING FLUSH OVERLAY DOOR(S) ON CONCEALED HINGES TYPICAL
"A" 12" 18" 24" 29"
EQ
1 1/2"
4"
3/4"
EQ
1"
1/4" DIA. MOUNTING HOLES FOR WALL FASTENER (TYPICAL)
TYPICAL SUPPORT BRACKET
4"
2' - 1"
SEE ELEVATIONS
VARIES
PLASTIC LAMINATE COUNTER TOP AND BACK SPLASH
FIXED PLASTIC LAMINATE SHELF
1/8" STEEL
1' - 6"
1" 1' - 8"
PLASTIC LAMINATE OVER 1" MDF SHELF
1/4" DIA. MOUNTING HOLES FOR CSK. FHWS. (TYPICAL)
1 ' - 4 3 8/ "
ELECTRICAL OUTLET, SEE ELECTRICAL
PLASTIC LAMINATE CABINET DOOR
3"
2 43/64"
SEE SCHED. BELOW
ADJUSTABLE PLASTIC LAMINATE SHELVING SEE ELEVATIONS FOR QUANTITY
PHASE IIFIT - UP PACKAGE
3"
4' - 0"
EQ
2' - 0"
FIRE TREATED WOOD BLOCKING ANCHORED BETWEEN STEEL STUD
15
12.13.13
1/8" DRIP GROOVE
COUNTERTOP TYPE - SEE ABOVE
10
Date
11902
16
PHASE II - AV CABINET SECTION A 1" = 1'-0"
17
PHASE II - AV CABINET SECTION B 1" = 1'-0"
19
PHASE II - AV CABINET COUNTER DETAIL 3" = 1'-0"
20
PHASE II - CYLINDER SUPPORT DETAIL 3/4" = 1'-0"
21
PHASE II - SLOPED TOP DETAIL 1 1/2" = 1'-0"
MILLWORK DETAILS
A920.2
5' - 0" 1' - 4"
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
1" PLAM COUNTERTOP SEE DETAIL 7/A301
5' - 0"
1 A921.2
6' - 0"
2" GROMMET OPENING, TYP.
1' - 3"
2' - 4"
2' - 4"
EQ
EQ
2" 1 1/4" x 2" REEVE #80 TUBE W/ SLOTS, TYP. 2" GROMMET, TYP.
2' - 6"
3/4" PLAM PANELS, TYP.
2' - 6"
5 A921.2
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
2' - 6"
2' - 6"
2' - 0"
2' - 9"
2' - 2"
2' - 6"
3' - 0"
1" PLASTIC LAMINATE (PLAM-2) BACK PANEL
6 A921.2
3"
2"
1" PLASTIC LAMINATE (PLAM2) SHELF, WHERE REQUIRED SEE ELEVATIONS
3"
5' - 0"
1" PLAM SHELF VARIES - SEE ELEVATIONS
GROMMET OPENING, TYP.
1' - 6"
2' - 2"
1" PLASTIC LAMINATE (PLAM-2) SHELF, WHERE REQUIRED - SEE ELEVATIONS
3' - 0"
3/4" = 1'-0"
2' - 9"
3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
2' - 2"
1
2' - 2"
1' - 3"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
5' - 0"
3' - 0"
1' - 0"
PHASE II - TYPICAL 60" MOBILE CASEWORK PLAN VIEW
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
3 A921.2
2" GROMMET OPENING, TYP.
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
SHELF BRACKET HOLES AT 32 MM O.C.
2' - 9"
2' - 6"
2" GROMMET, TYP.
9 A921.2
9 A921.2
3"
2' - 0"
2
6' - 0"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
2' - 6"
Certification
7
PHASE II - TYPICAL "MC3660R" MOBILE CASEWORK (MIRROR AT MC3660L)
PHASE II - TYPICAL "MC3672R" MOBILE CASEWORK (MIRROR AT MC3672L)
8
1" = 1'-0"
9
1" = 1'-0"
3/4" = 1'-0"
6' - 0"
1 1/4" X 2" REEVE #80 TUBE W/O SLOTS
3' - 4"
6' - 0"
4' - 9"
5' - 9" 1 1/4" X 2" REEVE #80 TUBE W/O SLOTS
12 A921.2
1' - 4" 1" PLASTIC LAMINATE (PLAM-1) SHELF W/ BOOKENDS, TYP WHERE SHOWN ON ELEVATIONS
2" GROMMET, TYP.
2' - 6"
5' - 0"
1" = 1'-0"
Signature
12 A921.2
Date 1 1/4" X 2" REEVE #80 TUBE W/O SLOTS
1/8" X 2" PLEXIGLAS BACK PLATE, TYP.
1' - 0"
REEVE #81-12 SHELF BRACKET, TYP.
1" PLASTIC LAMINATE (PLAM-1) SHELF, TYP WHERE SHOWN ON ELEVATIONS
6' - 0"
1" PLASTIC LAMINATE (PLAM-2) SHELF WHERE REQUIRED - SEE ELEVATIONS 3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
2' - 6"
5 A921.2
PHASE II - TYPICAL 72" MOBILE CASEWORK W/ REAGENT SHELF PLAN VIEW
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
3/4" = 1'-0"
1' - 6"
12.13.13
Project For
2' - 6"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
5' - 0"
1" PLASTIC LAMINATE (PLAM-2) BACK PANEL
PHASE IIFIT - UP PACKAGE
1" PLASTIC LAMINATE (PLAM2) SHELF, WHERE REQUIRED SEE ELEVATIONS 2"X4" WOOD BLOCKING, TYP.
3' - 0"
6 A921.2
2915 WAREHOUSE VALLEY HIGH DRIVE
GROMMET OPENING, TYP.
2' - 3"
1" PLASTIC LAMINATE (PLAM-2) SHELF WHERE REQUIRED - SEE ELEVATIONS
1' - 3"
3"
2' - 0"
3" 3"
2" GROMMET OPENING, TYP.
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
4
1' - 3"
2" GROMMET OPENING, TYP.
3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
Date
11902
DASHED LINES INDICATE 24" x 18" COUNTER SUPPORT BRACKET MOUNTED TO BACK OF MOBILE CASEWORK AS REQUIRED - SEE SHEET I301D.2
4"
2' - 6"
1" PLASTIC LAMINATE (PLAM-1) SHELF
SHELF BRACKET HOLES AT 32 MM O.C.
2' - 3"
2" GROMMET, TYP.
3' - 0"
2' - 6"
3' - 0"
1' - 0"
Registration Number
4 A921.2
2' - 6"
1 1/4" x 2" REEVE #80 TUBE W/ SLOTS, TYP.
DAVID C. NORBACK
3"
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP 2 A921.2
2' - 3"
EQ
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
DASHED LINE INDICATES 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO BACK OF MOBILE CASEWORK AS REQUIRED - SEE ELEVATIONS
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP.
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
3"
EQ
2"
1' - 8"
2' - 10"
1' - 8"
2' - 10"
1" PLASTIC LAMINATE (PLAM-1) SHELF W/BOOKENDS, TYP REEVE #81-12 SHELF BRACKET, TYP.
1" PLASTIC LAMINATE (PLAM-1) SHELF, TYP WHERE SHOWN ON ELEVATIONS
1' - 8"
3/4" = 1'-0"
1' - 8"
PHASE II - TYPICAL 72" MOBILE CASEWORK PLAN VIEW
3' - 11"
3' - 11"
REEVE #81-12 SHELF BRACKET, TYP.
3' - 11"
4"
1/8" X 2" PLEXIGLAS BACK PLATE, TYP.
11902 12.13.13
Signature
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
2"
DAVID C. NORBACK
Registration Number
1" PLASTIC LAMINATE (PLAM-1) SHELF W/ BOOKENDS, TYP WHERE SHOWN ON ELEVATIONS
1/8" X 2" PLEXIGLAS BACK PLATE, TYP.
3
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
PHASE II - TYPICAL SECTION 36" HIGH MOBILE CASEWORK
PHASE II - TYPICAL 60" MOBILE CASEWORK W/ REAGENT SHELF PLAN VIEW
1' - 4"
Consultants
3"
1" PLASTIC LAMINATE (PLAM-1) SHELF
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com
3"
2' - 4"
3' - 0"
1' - 4"
2' - 6"
6' - 0"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
PROJECT # 7R121080
5' - 0"
11
1" = 1'-0"
PHASE II - TYPICAL "MC3072RS" MOBILE CASEWORK (MIRROR AT MC3072LS)
12
1" = 1'-0"
PHASE II - TYPICAL SECTION 30" HIGH MOBILE CASEWORK WITH REAGENT SHELF 1" = 1'-0"
1" PLASTIC LAMINATE (PLAM-1) BASE W/ EDGING (EDGE-1)
2' - 6"
6"
10
PHASE II - TYPICAL "MC3060RS" MOBILE CASEWORK (MIRROR AT MC3060LS)
OPEN
2' - 1 1/2"
5
2"
2"
15 A921.2
5" 5' - 0"
6' - 0"
4' - 9"
5' - 9"
1 1/4" X 2" REEVE #80 TUBE W/O SLOTS
R
R
15 A921.2
Project No.
1 1/4" X 2" REEVE #80 TUBE W/O SLOTS
Drawn By
PHASE II - TYPICAL 60" MOBILE CASEWORK BASE 3/4" = 1'-0"
6' - 0"
1" PLASTIC LAMINATE (PLAM-1) SHELF W/ BOOKENDS, TYP WHERE SHOWN ON ELEVATIONS
1" PLASTIC LAMINATE (PLAM-1) SHELF W/ BOOKENDS, TYP WHERE SHOWN ON ELEVATIONS
1/8" X 2" PLEXIGLAS BACK PLATE, TYP.
1/8" X 2" PLEXIGLAS BACK PLATE, TYP.
1 1/4" X 2" REEVE #80 TUBE W/O SLOTS
1/8" X 2" PLEXIGLAS BACK PLATE, TYP.
1" PLASTIC LAMINATE (PLAM-1) SHELF, TYP - WHERE SHOWN ON ELEVATIONS
5"
1 1/2"
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
MOBILE CASEWORK HEIGHT WIDTH MC3060 + SIDE OPTION + OPTIONS
2' - 0"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
13
PHASE II - TYPICAL "MC3660RS" MOBILE CASEWORK (MIRROR AT MC3660LS) 1" = 1'-0"
2' - 6"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
14
PHASE II - TYPICAL "MC3672RS" MOBILE CASEWORK (MIRROR AT MC3672LS) 1" = 1'-0"
3' - 5"
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.
Revisions No.
Date
Description
1" PLASTIC LAMINATE (PLAM-2) BACK PANEL
2' - 9"
3' - 0"
2' - 9"
GROMMET OPENING, TYP.
1" PLASTIC LAMINATE (PLAM2) SHELF, WHERE REQUIRED SEE ELEVATIONS 2"X4" WOOD BLOCKING, TYP.
3' - 0"
6 A921.2
3"
5' - 0"
1' - 6"
2' - 2"
3' - 0"
2' - 6"
5 A921.2
SIDE OPTION: L = 30" OPENING ON LEFT SIDE R = 30" OPENING ON RIGHT SIDE OPTIONS: S = REAGENT SHELF C = CASTERS R = REEVE TUBES ONLY
2' - 9"
3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
11/27/13
3"
3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
1' - 3"
2" GROMMET OPENING, TYP. 1" PLASTIC LAMINATE (PLAM-2) SHELF WHERE REQUIRED - SEE ELEVATIONS
MLK/JHA
Date
3"
2 UNITS TO BE 36" DEEP - SEE SHEET A101A.2 AND DETAIL 7/A922.2
NOTES: 1. COUNTERTOP AND SHELVES TO RECEIVE PLAM-1 2. MOBILE CASEWORK BASE AND CABINETS TO RECEIVE PLAM-2
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:34 PM
1" PLASTIC LAMINATE (PLAM-2) SHELF WHERE REQUIRED - SEE ELEVATIONS
1' - 3"
2' - 2"
8 5 2 14 38 4 14 6 2 5 1 4
1' - 0"
Checked By
4"
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
2" GROMMET OPENING, TYP.
PHASE II - MOBILE CASEWORK SCHEDULE QTY REMARKS
MC3060LS MC3072LS MC3072RS MC3660L MC3660LS MC3660R MC3660RS MC3672L MC3672R MC3672RS MC3678RS TC3678
4"
4 A921.2
2' - 2"
3/4" = 1'-0"
DASHED LINE INDICATES 1" PLASTIC LAMINATE BACKER BOARD MOUNTED TO BACK OF MOBILE CASEWORK AS REQUIRED - SEE ELEVATIONS 1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP.
SHELF BRACKET HOLES AT 32 MM O.C.
1 1/2"
R
1 1/2"
2 A921.2
PHASE II - TYPICAL 72" MOBILE CASEWORK BASE
MODEL
1 1/2"
JAS
© Copyright RSP Architects 2013. All rights reserved.
1" PLASTIC LAMINATE (PLAM-1) SHELF, TYP - WHERE SHOWN ON ELEVATIONS
2' - 2"
6
1" PLASTIC LAMINATE (PLAM-1) SHELF W/ BOOKENDS, TYP
REEVE #81-12 SHELF BRACKET, TYP.
2"
2' - 7 1/2"
2"
REEVE #81-12 SHELF BRACKET, TYP.
2' - 6"
OPEN
R
3' - 5"
REEVE #81-12 SHELF BRACKET, TYP.
3' - 5"
6"
1' - 0"
1" PLASTIC LAMINATE (PLAM-1) BASE W/ EDGING (EDGE-1)
6287.048.01
3"
2' - 0" 2' - 6"
6' - 0"
15
3"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
PHASE II - TYPICAL SECTION 36" HIGH MOBILE CASEWORK WITH REAGENT SHELF 1" = 1'-0"
MOBILE CASEWORK DETAILS
A921.2
4 A922.2
3 A922.2
SHELF BRACKET HOLES AT 32 MM O.C.
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
1 A922.2
1" PLASTIC LAMINATE PULL OUT WRITING BOARD
1" PLASTIC LAMINATE PULL OUT WRITING BOARD 1" PLASTIC LAMINATE (PLAM2) SHELF, WHERE REQUIRED SEE ELEVATIONS
3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
3"
1"
1' - 11"
1' - 11"
1"
3"
3 1/2"
2' - 3"
6' - 6"
2
3/4" = 1'-0"
3' - 0"
SLIDE OUT PLASTIC LAMINATE SHELVES WITH HEAVY DUTY SHELF GUIDES
3 1/2"
3 1/2"
3
1" = 1'-0"
3 1/2"
2' - 10"
2' - 10"
PHASE II - TYPICAL "TC3678" MOBILE CASEWORK (TECAN CART)
2' - 3"
RSP Architects 320 South Broadway Ste. B 507.285.6569 Rochester, Minnesota 55904 612.677.7499 fax www.rsparch.com Consultants
3"
SLIDE OUT PLASTIC LAMINATE SHELVES
PHASE II - TYPICAL 78" MOBILE CASEWORK (TECAN CART) PLAN VIEW
2' - 9"
3" 1" PLASTIC LAMINATE (PLAM-2) BACK PANEL
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
1
3' - 0"
1" PLASTIC LAMINATE (PLAM-2) BACK PANEL
3"
2' - 6"
2" GROMMET, TYP.
3' - 0"
1' - 4"
2" GROMMET OPENING, TYP.
1' - 8"
3' - 10"
11 1/2"
1' - 8"
1' - 4"
11 1/2"
2' - 9"
2" GROMMET OPENING, TYP.
2' - 9"
6' - 6"
PHASE II - TYPICAL SECTION AT BASE CABINET - 36" HIGH MOBILE TECAN CART
4
1" = 1'-0"
PHASE II - TYPICAL SECTION AT SLIDE OUT SHELVING - 36" HIGH MOBILE TECAN CART 1" = 1'-0" Certification
I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Russell J. Schultz, License Number 21581, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.
8 A922.2
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
5' - 0"
Signature
SHELF BRACKET HOLES AT 32 MM O.C.
5 A922.2
1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
Registration Number 1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
WOOD BLOCKING AS REQUIRED
5 1/2"
2' - 0"
7
3/4" = 1'-0"
2' - 3"
1" PLASTIC LAMINATE (PLAM-2) BACK PANEL
Date
3"
2' - 6"
3"
3"
3"
8
2' - 0"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
3' - 0"
1" = 1'-0"
PHASE II - 36" DEEP - SECTION 36" HIGH MOBILE CASEWORK
3"
2' - 6"
9
1" = 1'-0"
PHASE II - BASE CABINET SECTION - 3 DRAWERS 1" = 1'-0"
2915 WAREHOUSE VALLEY HIGH DRIVE 4' - 0" MAX.
1' - 3"
4' - 0"
PROVIDE 1 5/8" X 1 5/8" UNISTRUT LEG MAXIMUM 4'-0" O.C.
WIRE SHELVING
THREADED ROD THRU CEILING AND SUPPORTED BY STEEL STUD HEADER
3/4" x 3/4" x 12" P-LAM CLEAT
ACOUSTICAL CEILING SYSTEM
PROJECT # 7R121080
6"
1/4" X 4" STEEL PLATE WELDED TO FACE (WEST SIDE) OF POST
1' - 4 1/2"
3' - 0"
1 1/2" X 1 1/2" X 1/4" STEEL POST OR HORIZONTAL RAIL
PHASE IIFIT - UP PACKAGE
STEEL STUD HEADER - SEE STRUCTURAL
1 5/8" X 1 5/8" UNISTRUT
7 1/2"
G4000 WIREMOLD
12.13.13
Project For
SEE PLAN 4' - 0" MAX.
11902
3"
5' - 0"
PHASE II - 36" DEEP - "MC3660R" MOBILE CASEWORK (MIRROR AT MC3660L)
7' - 0"
2' - 6"
5 1/2" 1' - 1"
Registration Number
4"
PHASE II - 36" DEEP - 60" MOBILE CASEWORK BASE
DAVID C. NORBACK
7"
2"
2"
KAPPERS FABRICATING INC. PART #500240 LEVELING MOUNT, TYP.
5"
Signature
3"
3' - 0"
6 A922.2
R
R
6
3/4" = 1'-0"
1" PLASTIC LAMINATE (PLAM-2) PANELS
12.13.13
PLASTIC LAMINATE BASE CABINET W/ DRAWERS
3"
5
PHASE II - 36" DEEP - 60" MOBILE CASEWORK PLAN VIEW
2' - 6"
OPEN
2' - 1 1/2" 1" PLASTIC LAMINATE (PLAM-1) COUNTERTOP
2' - 0"
1" PLASTIC LAMINATE (PLAM2) SHELF, WHERE REQUIRED SEE ELEVATIONS
Date
11902
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.
AIR SPACE
3' - 0"
1" PLASTIC LAMINATE (PLAM-2) SHELF, WHERE REQUIRED - SEE ELEVATIONS
1' - 0" 3' - 0"
1" PLASTIC LAMINATE (PLAM-1) BASE W/ EDGING (EDGE-1)
2' - 9"
3/4" PLASTIC LAMINATE (PLAM-2) PANELS, TYP.
3' - 0"
5' - 0" 5' - 0"
DAVID C. NORBACK
VINYL BASE (VB-1)
8"X8"X1/2" STEEL BASE PLATE WITH 4 1/2" DIA EXPANSION ANCHORS WITH 4" EMBEDMENT
UNISTRUT POST BASE ANCHOR TO FLOOR
10
PHASE II - PROTECTION RAIL DETAIL
11
1" = 1'-0"
PHASE II - UTILITY FENCING
CEILING HUNG TOILET PARTITION MOUNTING BRACKET
12
1/2" = 1'-0"
PHASE II - SHOE RACK DETAIL
13
1 1/2" = 1'-0"
CEILING HUNG TOILET PARTITION DETAIL 3" = 1'-0"
Project No.
6287.048.01
Drawn By
BCS
5/8" GYP. BOARD.
1' - 6"
1 5/8"
TOP OF SHELF
8"
EL. = 5'-6" A.F.F.
DOOR AND FRAME - SEE DOOR SCHEDULE
4"
Checker 11/25/13
NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2013. All rights reserved.
SECURE WOOD BLOCKING
G4000 WIREMOLD
NOTES: 1. G.C. TO PROVIDE BLOCKING IN STUD WALL AS REQUIRED.
3 1/4" X 1 5/8" UNISTRUT
No.
Date
Description
ALUMINUM CLOSURE (6' WIDE) ATTACH TO WALL AND FREEZER PANEL INSULATED ALUMINUM FREEZER WALL PANELS
4' - 0"
METAL STUDS AT 16" OC - SEE FLOOR PLAN FOR WALL TYPE
EXISTING GYPSUM WALL
5/8" GYPSUM BOARD
UNISTRUT POST BASE ANCHOR TO FLOOR
Revisions
4"
3 1/4" X 1 5/8" BRACING BETWEEN ROWS OF UTILITY FENCING
INSULATED ALUMINUM FREEZER WALL PANELS
2"
3/4" MDF CORE MATERIAL W/ PLASTIC LAMINATE ON ALL FACES (PLAM-4), ANCHOR TO METAL STUDS W/CHROME SCREWS WITH GROMMETS
ALUMINUM CLOSURE ANGLE (8"X2") ATTACH TO WALL AND FREEZER PANEL
2"
1-1/4" CHROME COAT ROD W/ FLANGES
48" MAX @ ACCESSIBLE COAT STORAGE
10"
12" SECTION OF 1 5/8"X1 5/8" UNISTRUT FASTENED TO CMU W/ (2) 3/8" DIA. EXPANSION ANCHORS
10' - 0" MAX.
Date
4"
3 1/4"
3 1/4" X 1 5/8" UNISTRUT
3/4" MDF CORE MATERIAL W/ PLASTIC LAMINATE ON ALL FACES (PLAM-2)
4' - 0" MAX.
3"
8'-0" MAX.
Checked By
6"
SEE PLAN
SEALANT TOP & BOTTOM
4"
VINYL BASE (VB-1)
VARIES SEE PLAN
14
PHASE II - UTILITY FENCE BRIDGE 1/2" = 1'-0"
C:\Revit Projects\Biorepository_tcmiller.rvt 11/27/2013 2:41:36 PM
Please purchase PDF Split-Merge on www.verypdf.com to remove this watermark.
15
PHASE II - COAT ROD AND SHELF DETAIL 1" = 1'-0"
16
PHASE II - FREEZER CLOSURE JAMB DETAIL (HEAD SIM.) AT INTERIOR WALL 3" = 1'-0"
17
PHASE II - FREEZER CLOSURE AT DOOR 3" = 1'-0"
MOBILE CASEWORK DETAILS AND INTERIOR DETAILS
A922.2