Hilton Solvent Waste System

Page 1

DOCUMENT PACKAGE

HILTON SOLVENT WASTE SYSTEM HILTON BUILDING - FIRST LEVEL ROCHESTER, MN MAYO PROJECT NUMBER #8R111060

ISSUED:

AUGUST 09, 2013

PACKAGE:

CONSTRUCTION DOCUMENTS RSP Architects 1220South 320 Marshall Broadway Street NE Ste. B 612.677.7100 507.285.6569 MinneapolisMinnesota 55904612.677.7499 Rochester, 612.677.7499 faxfax Minnesota 55413-1036 www.rsparch.com www.rsparch.com Consultants

Certification

DRAWING ABBREVIATIONS

ABV. A.F.F. ACC. ACC. PML. ACFLR. ACOUS. A.C.T. A.C.P. ADD. ADD'N(L) ADH. ADJ. A/C ALT. ALUM. A.D.A. ANCH. A.B. ANOD. & "L" ANTQ. APT. APPVD. ARCH.

ABOVE ABOVE FINISH FLOOR ACCESS or ACCESSARY (IES) ACCESS PANEL ACCESSIBLE FLOORING ACOUSTICAL ACOUSTICAL CEILING TILE ACOUSTICAL WALL PANEL ADDENDUM ADDITION(AL) ADHESIVE ADJACENT AIR CONDITIONING ALTERNATE ALUMINUM AMERICAN'S WITH DISABILITY ACT

ART. ATT. AUTO. AVG.

ANCHOR(AGE) ANCHOR BOLT ANODIZED AND ANGLE ANTIQUE APARTMENT APPROVED ARCHITECT OR ARCHITECTURAL ARCHITECTURAL WOODWORK ARTWORK ATTACH(ED) (MENT) AUTOMATIC AVERAGE

BQ. B. BSMT. BM. BRG. B.MK. BTWN. BEV. BLK. BLKG. BD. BT. B.S. BOT. BRKT. BRK. BRNZ. BLDG. B.U.R. B.S. B.BD.

BANQUETTE BASE MATERIAL BASEMENT BEAM BEARING BENCH MARK BETWEEN BEVELED BLOCK BLOCKING BOARD BOLT OR BOLTS BOTH SIDES BOTTOM BRACKET BRICK BRONZE BUILDING BUILT UP ROOFING BUILDING STANDARD BULLETIN BOARD

CAB. CPT. CSWRK. C.I. C.I.P. C.B. CALK. CLG. CEM. CTR. C.L. C.T. C.BD. CH. CR. CIRC.

CABINET CARPET CASEWORK CAST IRON CAST IN PLACE CATCH BASIN CAULKING CEILING CEMENT CENTER CENTER LINE CERAMIC TILE CHALK BOARD CHAIR CHROMIUM, CHROME CIRCLE, CIRCULAR CIRCUMFERENCE CLEANOUT CLEAR CLEAR OPENING CLOSET CLOSURE COLD WATER COLUMN COMPOSITE COMPRESSIBLE CONCRETE CONCRETE MASONRY UNIT CONFERENCE CONNECT OR CONNECTION CONSTRUCTION CONTINUED CONTINUOUS CONTRACTOR CONTRACT CONTROL JOINT JOINT CORNER CORNER GUARD CORRIDOR CORRUGATED COUNTER COUNTERSUNK CREDENZA

AWDWK.

C.O. CLR. CLR.OPG. CLO. CLS. C.W. COL. COMP. COMPR. CONC. CMU. CONF. CONNX. CONST. CONT'D. CONT. CONTR. C.J. COR. C.G. CORR. CORRUG. CTR. CSK. CRED.

SHEET INDEX DRAWINGS

DK. DEC. DEM. DMT. DEPT. DET. DIAG. DIA. DIM. DISP. DISPOS. DIST. DO. DIV. DR. D.O. DBL. D.A. DN. D.S. DRAP. DWR. DW. DWG. D.F. D.S.P. D.W. D.X.

EA. E.F. E.W. E. ELAST. ELEC. E.O. E.P. E.W.C. ELEV. ELEVR. EMER. ENCL. E. to E. ENGR. ENTR. ENVL. EQ. EQUIP. EQUIV. EXCAV. EXH. EXIST. EXPAN. EXP. BT. E.J. EXPOS. EXT. EX.

F. FABR. F.O.C. F.O.F. F.O.M. F.O.S. F.O.W. F-F F.M. FAS. FIN. F.F. F.A. F.E. F.E.C. F.H.C. F.H.R. F.P. FRT. FIX. FIXT. FLASH. F.H. F.H.S. FLEX. FLR. F.D. F. MTD. FLUOR. FL. FT. FTG. FDN. FRM. FRMG. F.S. FURN. F.B.O. FUR. FURR. FUT.

DARK DECORATIVE DEMOLITION DEMOUNTABLE DEPARTMENT DETAIL DIAGONAL DIAMETER DIMENSION DISPENSER DISPOSAL or DISPOSER DISTANCE DITTO DIVISION DOOR DOOR OPENING DOUBLE DOUBLE-ACTING DOWN DOWNSPOUT DRAPERY DRAWER DRYWALL DRAIN DRINKING FOUNTAIN DRY STANDPIPE DRYWALL DUPLEX

GA. GALV. G.I. GASK. GA. GEN. GL. G.B. GRD. GRN. GRT. GRV. GRND. GFCI. GT. GYP. GYP. BD.

HVY. HDF. HT. H.P. H.C. H. GRN. HORIZ. H.B. H.W. HR.

HANDRAIL HARDBOARD HARDWARE HARDWOOD HEAD HEATING HEATING, VENTILATING AND AIR CONDITIONING HEAVY HIGH DENSITY FIBERBOARD HEIGHT HIGH POINT HOLLOW CORE HONED GRANITE HORIZONTAL HOSE BIBB HOT WATER HOUR

I.C. INCAN. INCL. INFO. I.D. INSUL. INT. INTM. INV. I.O.C.

IN CONTRACT INCANDESCENT INCLUDE(D)(ING) INFORMATION INSIDE DIAMETER INSULATION INTERIOR INTERMEDIATE INVERT ITEM OF CHARGE

JAN. JAN. CLO. JNT. JTFILL JST. J.B.

JANITOR JANITOR CLOSET JOINT JOINT FILLER JOIST JUNCTION BOX BOX

K.P. KIT. K.O.

KICK PLATE KITCHEN KNOCKOUT

HNDRL. HDBD. HDWR. HDWD. HD. HTG. HVAC

EACH EACH FACE EACH WAY EAST ELASTIC ELECTRIC ELECTRIC OUTLET ELECTRIC PANEL ELECTRIC WATER COOLER ELEVATION ELEVATOR EMERGENCY ENCLOSURE END TO END ENGINEER ENTRANCE ENVELOPE EQUAL EQUIPMENT EQUIVALENT EXCAVATED or EXCAVATION EXHAUST EXISTING EXPANSION EXPANSION BOLT EXPANSION JOINT EXPOSED EXTERIOR EXISTING

FABRIC FABRICATE FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FACE OF WALL FACE TO FACE FACTORY MUTUAL FASTEN, FASTENER FINISH(ED) FINISH FLOOR FIRE ALARM FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FIRE HOSE CABINET FIRE HOSE RACK FIREPROOFING FORE FIRE RETARDANT FIXED FIXTURE FLASHING FLAT HEAD FLAT HEAD SCREW FLEXIBLE FLOOR FLOOR DRAIN FLOOR MOUNTED FLUORESCENT FLUSH FOOT OR FEET FOOTING FOUNDATION FRAME FRAMING FULL SIZE(SCALE) FURNITURE FURNISHED BY OTHERS FURRED FURRING FUTURE

GAGE, GAUGE GALVANIZED GALVANIZED IRON (STEEL) GASKET GAUGE GENERAL GLASS OR GLAZED GRAB BAR GRADE GRANITE GRATE, GRATING GRAVEL GROUND GROUND FAULT CIRCUIT INTERPRETER GROUT GYPSUM GYPSUM BOARD

LAB. LAM. LG. LAT. LAV. L.H. L.H.R. L. LT. LTWT. LIN. LTL. L.L. LKR. LONG'L. LOUV. L.P. LB. MACH. MAINT. MGR. MFGR. MRB. MAS. M.O. MATL. MAX. MECH. M.C. MED. MEMB. MET. M.L. MEZZ. MLWK. MIN. MIR. MISC. MTD. MUL.

LABORATORY LAMINATE LARGE LATERAL LAVATORY LEFT HAND LEFT HAND REVERS LENGTH LIGHT LIGHT WEIGHT LINEAR or LINOLEUM LINTEL LIVE LOAD LOCKER LONGITUDINAL LOUVER(S) LOW POINT POUND MACHINE MAINTENANCE MANAGER MANUFACTURE(ER) MARBLE MASONRY MASONRY OPENING MATERIAL MAXIMUM MECHANICAL MEDICINE CABINET MEDIUM MEMBRANE METAL METAL METAL LATH MEZZANINE MILLWORK MINIMUM MIRROR MISCELLANEOUS MOUNTED MULLION

NAT. NEG. NOM. N. N.I.C. N.T.S. NO.

NATURAL NEGATIVE NORMAL NORTH NOT IN CONTRACT NOT TO SCALE NUMBER

OBSC. OFF. OPNG. OPP. O.H. ORIG. ORN. OZ. O.D. OTOO OVHD. O.HD. O.C.

OBSCURE OFFICE OPENING OPPOSITE OPPOSITE HAND ORIGINAL ORNAMENTAL OUNCE OUTSIDE DIAMETER OUT TO OUT OVERHEAD OVERHEAD DOOR ON CENTER

SAN. S.N.D. SC. SCHED. SCHEM. SEAL. SECT. SEL. SEP. SERV. SVSNK SHT. SH. SHWR. SIM. SNK. SKYLT. SLDR. SM. S.D. S.C.

P. PTD. PR. PNL. P.T.D. P.T.R. PART. BD. PTN. PATT. PAV. P.H. PERM. PC. PERP. PLAS. P.LAM. PL. PL.GL. PLBG.

PAINT PAINTED PAIR PANEL PAPER TOWEL DISPENSER PAPER TOWEL RECEPTACLE PARTICLE BOARD PARTITION PATTERN(ED) PAVING OR PAVEMENT PENTHOUSE PERMANENT PIECE PERPENDICULAR PLASTER PLASTIC LAMINATE PLATE PLATE GLASS PLUMBING

PLYWD. PT. POL. PVC. PORT. PSF. PREFAB. PROD. PROJ. PROP. P.L. PLAM

PLYWOOD POINT POLISH POLYVINYL CHLORIDE PORTABLE POUNDS PER SQUARE FOOT PREFABRICATED PRODUCTION, PRODUCT PROJECT PROPERTY PROPERTY LINE PLASTIC LAMINATE

QUAL. QUAN. Q.T.

QUALITY QUANTITY QUARRY TILE

RAD. RECEP. REF. RE: REFL. REFR. REINF. REBAR. REM. REMV. REQD. RESIL. R.B. R/A REV. R.H. R.H.R. R. R.D. RFG. RM. R.O. RND.

RADIUS RECEPTACLE REFERENCE REFER TO REFLECTED REFRIGERATOR REINFORCED REINFORCED BAR REMAINDER REMOVE REQUIRED RESILENT RESILENT BASE RETURN AIR REVISION RIGHT HAND RIGHT HAND REVERSE RISER ROOF DRAIN ROOFING ROOM ROUGH OPENING ROUND

S. SPKR. SPEC'L. SPECS. SPL. SQ. SF. SQ. IN. STAG. S.S. STD. STA. STL. ST. STOR. STFNT. STRUCT. SUP. SUSP. SYMM. SYST.

SANITARY SANITARY NAPKIN DISPENSER SCALE SCHEDULE SCHEMATIC SEALANT SECTION SELECT SEPARATE SERVICE SERVICE SINK SHEET SHELF or SHELVING SHOWER SIMILAR SINK SKYLIGHT SLIDING DOOR SMALL SOAP DISPENSER SOLID CORE or SEALED CONCRETE SOUTH SPEAKER SPECIAL SPECIFICATIONS SPLASH SQUARE SQUARE FEET SQUARE INCHES STAGGERED STAINLESS STEEL STANDARD STATION STEEL STONE STORAGE STOREFRONT STRUCTURAL SUPPLY SUPPORT SUSPEND(ED) SYMMETRICAL SYSTEM

T.BD. TAN. TECH. TEL. T.V. TEMPD. TEMP. TRZ. THK. THRESH. T.PAV. T.P.H. TOL. T&G T&B T.O.C. T.C. T.O.P. T.O.S. T.O.W. T.B. T.D. TR. T. TYP.

TACKBOARD TANGENT TECHNICAL TELEPHONE TELEVISION TEMPERED TEMPORARY TERRAZZO THICK(NESS) THRESHOLD TILEPAVERS TOILET PAPER HOLDER TOLERANCE TONGUE AND GROOVE TOP AND BOTTOM TOP OF CONCRETE TOP OF CURB TOP OF PAVEMENT TOP OF STEEL TOP OF WALL TOWEL BAR TOWEL DISPENSER TRANSFORM TREAD TYPICAL

U.L. U.C. UNFIN. U.N.O. UR. UTIL.

UNDERWRITERS LABORATORY UNDERCUT UNFINISHED UNLESS NOTED OTHERWISE URINAL UTILITY

VAR. VNR. V.I.F. VERT. VEST. VIN. V.B. V.C.T. V. VOL.

WSCT. W.H. WC. W.H. W.R. W.P. W.S. WT. WLD. W.W.M. W. W.S.P. W.F. WDW. WDWALL W.GL. W/ W/IN W/O WD. W.B. W.PT. W.W.F.

WAINSCOT WALL HUNG WATER CLOSET WATER HEATER WATER RESISTANT WATERPROOF WEATHERSTRIPPING WEIGHT WELDED WELDED WIRE MESH WEST WET STANDPIPE WIDE FLANGE (STEEL) WINDOW WINDOW WALL WIRE GLASS WITH WITHIN WITHOUT WOOD WOOD BASE WORKING POINT WOVEN WIRE FABRIC

X

TIMES OR BY (AS IN 2X4)

YD.

OWNER REPRESENTATIVE

MECH/ELEC ENGINEERS

MAYO FOUNDATION FACILITIES PROJECT SERVICES 200 FIRST STREET SW ROCHESTER, MN 55905

MEP ASSOCIATES, LLC 2900 43RD ST NW STE 100 ROCHESTER, MN 55901 PHONE: 507/281-1632 FAX: 507/281-6328

CONSTRUCTION MANAGER:

PROJECT MANAGER:

TIM SMITH PHONE: 507/293-4864 EMAIL: SMITH.TIMOTHY1@MAYO.EDU

MECHANICAL CONTACT:

PHIL PLONKA PHONE: 507/284-8444 EMAIL: PLONKA.PHIL@MAYO.EDU

ELECTRICAL CONTACT:

ISSUE KEY: 1 ISSUED (WITH SIGNATURE) 2 REVISED AND RE-ISSUED (WITH SIGNATURE) 3 NOT FOR CONSTRUCTION - REFERENCE ONLY 4 RE-ISSUED FROM A PRIOR BID PACK - NO REVISIONS

LUKE JOHNSON PHONE: 507/281-1632 EMAIL: LUKEJ@MEPASSOCIATES.COM KERRY HAYDEN PHONE: 507/281-1632 EMAIL: KERRYH@MEPASSOCIATES.COM

ARCHITECT RSP ARCHITECTS, LTD. 320 SOUTH BROADWAY STE. B ROCHESTER, MN 55904 PHONE: 507/285-6569 FAX: 612/677-7499 PROJECT CAPTAIN:

JASEN ANDRING PHONE:507/292-8664 EMAIL: JASEN.ANDRING@RSPARCH.COM

@ c L o ' " #5 _ 5#

1 1

A101 A201 A301 A801

PARTIAL FIRST LEVEL DEMOLITION AND NEW FLOOR PLANS PARTIAL FIRST LEVEL DEMOLITION AND NEW CEILING PLANS SCHEDULES AND DETAILS ENLARGED PLANS AND DETAILS

1 1 1 1

I101 I201

FIRST LEVEL FINISH PLAN FIRST LEVEL FURNITURE PLAN

1 1

M001

1

M101 M201 M401

MECHANICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES, DETAILS, DIAGRAMS AND SCHEDULES PARTIAL FIRST FLOOR MECHANICAL HVAC PLAN PARTIAL FIRST FLOOR MECHANICAL PIPING PLAN MECHANICAL PIPING FLOW DIAGRAM

1 1 1

E001 E101 E201 E301

ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES PARTIAL FIRST FLOOR ELECTRICAL LIGHTING PLAN PARTIAL FIRST FLOOR ELECTRICAL POWER PLAN PARITAL FIRST FLOOR ELECTRICAL SIGNAL PLAN

1 1 1 1

Signature

DAVE NORBACK

Registration Number Date

11902 08.09.13

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.

Signature

DAVE NORBACK

Registration Number Date

11902 08.09.13

Project For

YARD

AND AT CENTERLINE DIAMETER FEET INCHES (OR DITTO) NUMBER ("NUMBER 5") PER ("POUNDS/FOOT") PERPENDICULAR POUNDS ("5 POUNDS")

&

SHEET NO. NAME G000 COVER SHEET G101 FIRST FLOOR FIRE AND LIFE SAFETY PLAN

ISSUES CONSTRUCTION DOCUMENTS

Note: Not all abbreviations listed below are necessarily used in the drawings; refer elsewhere for abbreviations related to product or material codes.

PROJECT TEAM

I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Ronald B. Carlson, License Number 10850, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.

HILTON SOLVENT WASTE SYSTEM GENERAL NOTES

HILTON BUILDING FIRST LEVEL

1. ALL CONTRACTORS ARE RESPONSIBLE TO REVIEW ALL CONSTRUCTION DOCUMENTS AND ARE RESPONSIBLE FOR INFORMATION ON ALL CONSTRUCTION DOCUMENTS. 2. ALL CONTRACTORS AND SUBCONTRACTORS TO COMPLY WITH MAYO CAMPUS STANDARD SPECIFICATIONS AND STANDARD PROCEDURES. 3. THE AVAILABILITY OF ALL MATERIALS DESIGNATED ON PLANS TO MATCH EXISTING SHALL BE VERIFIED BY CONTRACTORS AND SUBCONTRACTORS PRIOR TO ESTIMATE SUBMITTALS. CONTRACTOR TO NOTIFY OWNER IF MATCHING MATERIALS ARE NOT AVAILABLE. ANY SUBSTITUTIONS TO BE REVIEWED AND APPROVED.

PROJECT #8R111060

4. ALL CUTTING AND PATCHING SHALL BE PERFORMED BY THE GENERAL CONTRACTOR. GENERAL CONTRACTOR SHALL INCLUDE COST OF ALL REQUIRED CUTTING AND PATCHING FOR ALL TRADES IN THEIR ESTIMATE. 5. CONTRACTORS TO PROVIDE TEMPORARY PARTITIONS AND DUST CONTROL AT ALL LOCATIONS WHERE WORK OCCURS IN CORRIDORS AND/OR CANNOT BE CONTAINED WITHIN ROOMS. 6. REMOVAL OF WALLS AND PARTITIONS TO INCLUDE ALL MECHANICAL AND ELECTRICAL ITEMS. DEMOLITION OF THESE ITEMS SHALL EXTEND BACK TO MAIN DISTRIBUTION POINTS UNLESS NOTED OTHERWISE. 7. THE GENERAL CONTRACTOR SHALL PROVIDE MAJOR DAILY CLEAN UP OF THE CONSTRUCTION SITE. ALL OTHER CONTRACTORS OR SUBCONTRACTORS SHALL CLEAN UP THEIR INDIVIDUAL TRASH AND DISPOSE OF IT. MAJOR SHIPPING CONTAINERS AND DEMOLITION ITEMS SHALL BE THE RESPONSIBILITY OF INDIVIDUAL CONTRACTORS OR SUBCONTRACTORS TO REMOVE DAILY. 8. AT CONCLUSION OF PROJECT, ALL CONTRACTORS SHALL REDLINE THE CONSTRUCTION MANAGEMENT OFFICE SET FOR OWNER'S RECORDS SHOWING ALL DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS. 9. FLAME SPREAD CLASSIFICATION OF INSTALLED FINISH MATERIALS SHALL CONFORM TO 2007 MINNESOTA BUILDING CODE (2006 INTERNATIONAL BUILDING CODE) CHAPTER 8.

VARIABLE VENEER VERIFY IN FIELD VERTICAL VESTIBULE VINYL SHEET GOODS VINYL BASE VINYL COMPOSITION TILE VINYL WALL COVERING VOLUME

10. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF THE U.S. GYPSUM PRODUCTS AND SYSTEMS SPECIFICATION BULLETIN OR NATIONAL GYPSUM COMPANY'S LATEST SPECIFICATIONS EXCEPT AS NOTED. ALL GYPSUM BOARD TO BE FIRE RESISTIVE UNLESS NOTED OTHERWISE. 11. ALL WOOD BLOCKING AND CONCEALED LUMBER TO BE FIRE RETARDANT TREATED.

Project No.

6287.029.25

Drawn By

BCS

Checked By

12. ALL HOLES IN FLOORS OR WALLS AS A RESULT OF DEMOLITION SHOULD BE FILLED AND SEALED TO MAINTAIN EXISTING FIRE AND SMOKE RATING OF FLOOR OR WALL SYSTEM ACCORDING TO MAYO STANDARD SPECIFICATION SECTION 07840. 13. IF ASBESTOS OR QUESTIONABLE MATERIAL IS ENCOUNTERED, CONTACT THE MAYO FOUNDATION CONSTRUCTION MANAGER. MAYO'S ASBESTOS EVALUATION AND ABATEMENT TEAM WILL ADDRESS ANY IDENTIFIED ASBESTOS EXPOSURE. 14. CONTRACTOR, CONSTRUCTION MANAGER AND TONY BUCHOLZ FROM FACILITIES WAREHOUSE TO VERIFY ALL ITEMS TO BE SALVAGED AND RETURNED TO OWNER'S STOCK BEFORE DEMOLITION OCCURS. 15. ALL FURNISHINGS SHALL CONFORM TO 2007 INTERNATIONAL FIRE CODE CHAPTER 8.

JHA, MLK

Date

08/09/13

NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice.

16. NEW UPHOLSTERY MATERIALS MUST BE CALL TB117 COMPLIANT.

© Copyright RSP Architects 2007. All rights reserved.

17. PREPARE PARTITION SURFACES (PATCH, SKIM COAT, ETC.) AS REQUIRED IN PREPARATION FOR SCHEDULED FINISHES - TYPICAL.

Revisions

18. ALL CONTRACTORS INCLUSIVE OF SUBCONTRACTORS ARE TO COMPLY WITH THE GUIDELINES OF THE INFECTION CONTROL UNIT IN RELATION TO ALL CONSTRUCTION IN HOSPITAL. CONTRACTORS TO REVIEW GUIDELINES PRIOR TO SUBMITTING ESTIMATES.

No.

Date

Description

DRAWING SYMBOLS KEY PLAN 1

0

1

0

ROOM NAME REVISION REFERENCE

0

ELEVATION TAG SINGLE VIEW

101

A101 1i

COLUMN OR GRID LINE - EXISTING

PROJECT AREA

ROOM TAG

(ROOM AREA)

XX

KEYNOTE

DN

UP FE

2

ELEVATION TAG MULTIPLE VIEW

23 1t

PARTITION TAG

1

(ROOM NUMBER)

150 SF

1

COLUMN OR GRID LINE - NEW

0

A101

(ROOM NAME)

1 A101

DETAIL TAG

WINDOW TAG

234

SIM

EQUIPMENT TAG FE

FE

MATCH LINE

MATCH LINE

12

SEE X/XXX

T.O. FOOTING Name Elevation EL. = 96'-0" EL. = 100'-0"

VIEW NAME 1/8" = 1'-0"

DRAWING TITLE

1 A101

ELEVATION / LEVEL TAG NORTH ARROW

SPOT ELEVATION

NORTH NORTH

\\minfs02.rsparch.internal\RSPUsers$\jandring\Documents\Hilton Solvent Waste Upgrades Central_jandring.rvt 8/9/2013 8:46:27 AM

1 A101

SIM

101

UP

EXIST EXIST EXIST

SIM

(WALL FINISH) (BASE FINISH) (FLOOR FINISH)

DN

FINISH TAG ALL SURFACES

DN UP

BUILDING SECTION TAG

EXIST EXIST

1 A101 SIM

DOOR TAG

WALL SECTION TAG

ENLARGED PLAN OR DETAIL REFERENCE

CPT-01

CPT-02

FINISH TAG WITH EXTENT OF FINISH

FINISH TRANSITION

0

5

10

30

COVER SHEET

DN UP

NORTH

G000



7

8

2 A801

7

1 A801

8

A 1.8

A 2.2

1.9 2.1

1.6

1.1

MEN 1-51

MEN 1-51

1.7 1.17

CONFERENCE 1-60A

1.11 1.9

1.13

RSP Architects 1220South 320 Marshall Broadway Street NE Ste. B 612.677.7100 507.285.6569 MinneapolisMinnesota 55904612.677.7499 Rochester, 612.677.7499 faxfax Minnesota 55413-1036 www.rsparch.com www.rsparch.com

MELISSA WALKER

OFFICE 1-60A

JODY WAYNE

1.14

1.16

CARRIE BOWLER

JENNIFER TALMO

7' - 8"

STORAGE 1.12 1-71A

CONFERENCE 1-60B

2.7

2.2

2.2

B

3

2.2 1.1 2.2 2.2

1.7

Consultants

STORAGE 1-71A

1.6 2.1

DEB KARGER

CONFERENCE 1-60B

MARGE MAYFIELD

Certification

2.3

1.2

B

B

1.3

L 1.10

CORRIDOR 1-40Z

1.10

1.10

1.5

1.4

CORRIDOR 1-40Z

6' - 6"

L

5' - 4 1/2"

B

3 B

1-71B

5' - 3"

1.2

1-60B

1' - 6"

1-60A

I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Ronald B. Carlson, License Number 10850, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.

Signature

3

DAVE NORBACK

Registration Number Date

OFFICE 1-68

1.3

STORAGE 1-50

L

STORAGE 1-50

1.15

08.09.13

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.

STORAGE 1-71B

2.4

STORAGE 1-71B

11902

Signature

2.5

DAVE NORBACK

Registration Number

1.1

Date

CONFERENCE 1-68

11902 08.09.13

Project For

1.10

1.10

1.10

2.6

CORRIDOR 1-62Z

CORRIDOR 1-62Z

C

1.1

LAB 1-52

C

LAB 1-52

LAB

1

HILTON SOLVENT WASTE SYSTEM

LAB

1-65A

1-65A

PARTIAL FIRST LEVEL DEMOLITION PLAN

2

1/4" = 1'-0"

HILTON BUILDING FIRST LEVEL

PARTIAL FIRST LEVEL PLAN 1/4" = 1'-0"

NORTH

NORTH

DEMOLITION PLAN GENERAL NOTES:

FLOOR PLAN GENERAL NOTES

1. SEE MECHANICAL DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, LIGHTING, ELECTRICAL CONDUIT, ETC. DEMOLITION AND/OR PROTECTION.

1. LOCATION OF EQUIPMENT , OR ANY OTHER ITEMS THAT MAY INTERFERE WITH THE LIGHTING, STRUCTURAL, OR MECHANICAL SYSTEMS, SHALL BE CAREFULLY COORDINATED AND DISCREPANCIES BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY.

2. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS.

2. WALL SHELVING OR REAGENT SHELVING SUPPORTS SHALL BE SPACED AND POSITIONED TO CLEAR FITTINGS, ELECTRICAL PEDESTALS, SINKS AND CUP SINKS.

KEYNOTES - DEMOLITION PLAN

3. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE STAIRS, ALARMS,SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES. IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY.

1.1 1.2 1.3

4. ALL FIRE SAFETY EQUIPMENT AND THE ASSOCIATED CONDUIT AND WIRING SYSTEM SHALL NOT BE HARMED DURING DEMOLITION AND/OR CONSTRUCTION AND SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. NOTIFY BUILDING SECURITY AND MAYO CONSTRUCTION MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY.

1.4 1.5 1.6 1.7

5. LOUD DEMOLITION WORK (i.e. CONCRETE REMOVAL) SHALL BE COORDINATED WITH THE BUILDING MANAGER TO MINIMIZE DISRUPTION TO BUILDING OCCUPANTS.

1.8

6. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING CONSTRUCTION IN ELEVATOR LOBBIES, PUBLIC CORRIDORS OR RESTROOMS. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.

1.9 1.10

7. ALL DIMENSIONS TO EXISTING ELEMENTS ARE FOR REFERENCE ONLY AND SHOULD BE FIELD VERIFIED.

1.11 1.12

8. THE INTENT OF THIS DEMOLITION IS TO PROVIDE A CLEAN AND CLEAR AREA FOR NEW CONSTRUCTION AND FINISHES AS INDICATED ON THESE ARCHITECTURAL DRAWINGS. A. DEMOLISH DASHED WALLS, MILLWORK, OR MISCELLANEOUS ITEMS. RELATED FRAMING, BRACING, AND ANCHORS MUST BE REMOVED. PROVIDE RELATED MECHANICAL/ELECTRICAL FOR THIS WORK. B. DEMOLISH FINISHES ON EXISTING WALLS OR SURFACES TO REMAIN WHERE NEW FINISHES ARE SCHEDULED. C. DEMOLISH FLOOR FINISHES AND BASE AS NOTED OR WHERE NEW FLOOR FINISHES AND BASE ARE SCHEDULED, INCLUDING ADHESIVES. D. DEMOLISH CEILINGS AND SOFFITS AS REQUIRED TO PROVIDE THE NEW CEILING LAYOUT (SEE CEILING PLAN). COORDINATE WORK INCLUDING THAT REQUIRED FOR MECHANICAL/ELECTRICAL. E. EXISTING WALLS AND SURFACES NOTED TO REMAIN, BUT DAMAGED PRIOR TO OR DURING DEMOLITION, MUST BE REPAIRED TO ACCEPT NEW FINISHES.

1.13 1.14 1.15 1.16 1.17

NO WORK IN THIS AREA. NEW DOOR OPENING - SEE FLOOR PLAN FOR LOCATION. REMOVE AND SALVAGE EXISTING DOOR, FRAME, AND HARDWARE FOR REUSE. REMOVE EXISTING METAL STUD AND GYPSUM WALL TO DECK. REMOVE EXISTING CMU WALL AND FURRING FULL HEIGHT. REMOVE EXISTING METAL STUD AND GYPSUM WALL FULL HEIGHT. REMOVE EXISTING LAYER OF 5/8" GYPSUM BOARD FULL HEIGHT (AND LENGTH) OF WALL. SALVAGE EXISTING ACCESS PANEL FOR REINSTALLATION. REMOVE AND SALVAGE EXISTING AUDIO/VISUAL CABINET FOR REUSE. REMOVE EXISTING PROJECTOR AND SCREEN. REMOVE AND SALVAGE EXISTING PLASTIC LAMINATE SHELF AND BRACKETS FOR REINSTALLATION. REMOVE EXISTING SOLVENT TANK - SEE MECHANICAL DRAWINGS REMOVE EXISTING CONCRETE HOUSE KEEPING PADS INSIDE PIT. PATCH CONCRETE AS REQUIRED AND PREPARE FOR NEW SURFACE. REMOVE EXISTING BAR GRATING IN IT'S ENTIRETY. EXISTING STEEL ANGLE SUPPORTS TO REMAIN - SANDBLAST ANGLES AND REPAINT REMOVE EXISTING WATER PROOFING AND SEALANTS FROM WITHIN EXISTING PIT. PREPARE FOR NEW CONTAINMENT LINER. REMOVE AND SALVAGE EXISTING PLASTIC LAMINATE BOOKCASE FOR REINSTALLATION. REMOVE EXISTING MAP RAIL FROM ENTIRE ROOM. PATCH WALL TO ACCEPT NEW FINISHES. REMOVE AND SALVAGE EXISTING ELECTRONIC WHITE BOARD FOR REUSE.

3. OVERALL LENGTH OF TOPS SHALL BE DETERMINED BY CASEWORK AND DIMENSIONS AS INDICATED ON PLANS. TOPS SHALL OVERHANG ½” AT EACH END AND 1” FROM FRONT OF BASE CABINET. WHEN OVERALL DIMENSIONS ARE GIVEN, ½” OVERHANG IS NOT INCLUDED.

EXISTING DOOR AND FRAME TO REMAIN

5. ALL PLAN DIMENSIONS LOCATING INTERIOR WALLS ARE TO: a: FACE OF EXISTING WALL SYSTEM UNLESS NOTED OTHERWISE. b: FACE OF GYPSUM BOARD UNLESS NOTED OTHERWISE. c: CENTERLINE OF BUILDING GRID. 6. ALL ELEVATION MEASUREMENTS ARE IN REFERENCE TO THE FINISHED FLOOR. 7. SEE LIFE SAFETY PLANS, SHEETS "G101" FOR ALL RATED PARTITION LOCATIONS. 8. EXISTING PENETRATIONS IN RATED PARTITIONS TO BE FIRESTOPPED & SEALED. NEW MECHANICAL / ELECTRICAL PENETRATIONS TO BE FIRESTOPPED & SEALED. ALL SUBCONTRACTORS TO USE THE SAME FIRESTOPPING SYSTEM.

FLOOR PLAN LEGEND: EXISTING PARTITION TO REMAIN

EXISTING DOOR AND FRAME TO REMAIN

NEW PARTITON

2.3 2.4 2.5 2.6 2.7

Project No.

6287.029.25 BCS

Checked By

JHA, MLK

Date

08/09/13

NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2007. All rights reserved.

2.1 1i

NEW DOOR, REFER TO DOOR SCHEDULE

1i

No.

Date

Description

KEYNOTE

ROOM NAME

EQUIPMENT TO BE RELOCATED, REFER TO EQUIPMENT SCHEDULE

EXISTING FURNITURE TO BE RELOCATED, REFER TO FURNITURE SCHEDULE

C31-PL

EXISTING FURNITURE AND EQUIPMENT TO BE REMOVED AND RETURNED TO OWNER'S STOCK. NO WORK IN THIS AREA

ROOM NAME

2.2

INSTALL 3" ACOUSTIC SOUND BATTS IN EXISTING STUD CAVITY. INSTALL 1/2" RESILIENT CHANNELS OVER STUDS AT 16" O.C. MAX. INSTALL (2) LAYERS OF 5/8" GYPSUM BOARD OVER STUDS AND PREPARE FOR FINISHES. REINSTALL EXISTING ACCESS PANEL IN SAME LOCATION. REINSTALL SALVAGED PLASTIC LAMINATE SHELVING AND BRACKETS AT NEW CUBICAL LOCATION - BOTTOM OF STANDARD AT 4'-6" A.F.F. REINSTALLED LOCATION OF PLASTIC LAMINATE BOOKCASE. REINSTALL SALVAGED A.V. CABINET. NEW FLAT PANEL SCREEN - BY A.V. PROVIDE BLOCKING IN WALL. REINSTALL ELECTRONIC WHITEBOARD. REMOVE EXISTING DOOR HARDWARE AND CLIP DOOR SHUT.

Revisions

"OUT" EXISTING DOOR AND FRAME TO BE REMOVED

2.1

Drawn By

2.1 EXISTING PARTITION, CASEWORK, SHELVING, EQUIPMENT TO BE REMOVED

KEYNOTES - FLOOR PLAN

4. ALL CASEWORK, FUME HOODS AND ANY OTHER FURNISHINGS WITH EXPOSED TO VIEW AND SIDES SHALL BE FINISHED.

DEMOLITION PLAN LEGEND: EXISTING PARTITION TO REMAIN

PROJECT #8R111060

ROOM TAG

1i

1

ROOM TAG

KEYNOTE COUNTERTOP TAG

1i

EQUIPMENT TAG

A

SPECIALITY EQUIPMENT TAG

101

DOOR TAG

NEW PARTITION AS SCHEDULED, SEE MAYO SPECIFICATIONS SECTION 09200 FOR PARTITION CONSTRUCTION

NO WORK IN THIS AREA

PARTIAL FIRST LEVEL DEMOLITION AND NEW FLOOR PLANS

A101 \\minfs02.rsparch.internal\RSPUsers$\jandring\Documents\Hilton Solvent Waste Upgrades Central_jandring.rvt 8/9/2013 8:46:25 AM


7

8

7

8

A

A

CONFERENCE 1-60A

CONFERENCE 1-60A

MEN 1-51

MEN 1-51

S

OS

STORAGE 1-71A

1.2

1.1

1.1

2.4

2.1

RSP Architects 1220South 320 Marshall Broadway Street NE Ste. B 612.677.7100 507.285.6569 MinneapolisMinnesota 55904612.677.7499 Rochester, 612.677.7499 faxfax Minnesota 55413-1036 www.rsparch.com www.rsparch.com

S

2.5

Consultants

STORAGE 1-71A J

S

CONFERENCE 1-60B CONFERENCE 1-60B

Certification

B

B

I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Ronald B. Carlson, License Number 10850, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.

2.3

1.1

CORRIDOR 1-40Z

S

2.2

SD

CORRIDOR 1-40Z

Signature

DAVE NORBACK

OS Registration Number Date

2.5

OFFICE 1-68

OFFICE 1-68

STORAGE 1-71B

STORAGE 1-50

11902 08.09.13

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.

STORAGE 1-71B

OS

SD

SD

STORAGE 1-50

Signature

DAVE NORBACK

Registration Number Date

11902 08.09.13

Project For S

CORRIDOR 1-62Z

CORRIDOR 1-62Z

SD

C

LAB 1-52

S

LAB 1-65A

LAB 1-52

1

2

1/4" = 1'-0"

HILTON SOLVENT WASTE SYSTEM

LAB 1-65A S

PARTIAL FIRST LEVEL CEILING DEMOLITION PLAN

C

SD

HILTON BUILDING FIRST LEVEL

PARTIAL FIRST LEVEL CEILING PLAN 1/4" = 1'-0"

NORTH

NORTH

PROJECT #8R111060 KEYNOTES - REFLECTED CEILING PLAN - DEMOLITION 1.1 1.2

REMOVE EXISTING SUSPENDED ACOUSTICAL CEILING TILE AND GRID - COORDINATE WITH NEW PLAN. REMOVE EXISTING SUSPENDED ACOUSTICAL CEILING TILES AND GRID AND SALVAGE TO INSTALL NEW GYPSUM BOARD.

REFLECTED CEILING PLAN GENERAL NOTES:

KEYNOTES - REFLECTED CEILING PLAN

1. GENERAL CONTRACTOR TO COORDINATE ALL WORK OF ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC. NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON ARCHITECTS DRAWINGS.

2.1 2.2

2. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING, MECHANICAL DUCTS, STRUCTURAL ELEMENTS AND ANY OTHER APPLICABLE ITEMS. INSTALL NEW PLUMBING, MECHANICAL FANS, DUCTS, CONDUITS, AND OTHER RELATED ITEMS SO AS NOT TO CONFLICT WITH LUMINARIES. 3. VERIFY ALL RECESS DEPTHS OF FIXTURES AGAINST A.C. DUCTS, PIPES, BEAMS, ETC. BEFORE ORDERING FIXTURES. SUBMIT SHOP DRAWINGS OF ALL FIXTURES TO ARCHITECT AND ENGINEER FOR APPROVAL. 4. REMOVE ALL OBSTRUCTIONS FROM CEILING, INCLUDING ABANDONED CONDUITS, WIRES, DUCT WORK, ETC. NOT SCHEDULED FOR REUSE.

2.3 2.4 2.5

NEW SUSPENDED ACOUSTICAL CEILING TILE PATCHED INTO EXISTING CEILING AT 8'-0" A.F.F. (V.I.F.). MATCH EXISTING GRID AND TILE. NEW 12" x 12" GLUE UP ACOUSTICAL CEILING TILE AND GYPSUM BOARD BACKER PATCHED INTO EXISTING CEILING SYSTEM AT 8'-0" A.F.F. (V.I.F.) NO CEILING IN THIS AREA. INSTALL REMOVED CEILING TILE AND GRID. TRIM AS REQUIRED TO ACCEPT NEW THICKNESS OF WALL. INSTALL NEW ACOUSTICAL CEILING TILE WALL ANGLE AND MODIFY ACOUSTICAL CEILING TILE AND GRID AS REQUIRED.

5. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION OF VARIOUS ABOVE-CEILING ELEMENTS ARE TO BE FOUND IN HVAC, PLUMBING, FIRE PROTECTION, ELECTRICAL AND LIGHTING DRAWINGS. REFER TO ENGINEERING DRAWINGS FOR FULL WORK SCOPE ON DIFFUSERS, RETURNS, SPRINKLERS, LIGHT SWITCHES, THERMOSTATS, FIRE ALARMS, STROBES, ETC. 6. REFER TO ENGINEERING DRAWINGS FOR ALL LIFE SAFETY DEVICES REQUIRED BY CODE AND ALL EMERGENCY LIGHT FIXTURES. ARCHITECTURAL DRAWINGS SHALL GOVERN LOCATION OF THESE DEVICES. 7. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS WITH MAIN CEILING GRID RUNNERS, DUCTS, STRUCTURES, HVAC AND/OR ELECTRICAL CONDUIT, PRIOR TO FRAMING FOR LIGHTS. ANY DISCREPANCIES BETWEEN ARCHITECT'S CEILING GRID LOCATION AND ACTUAL FIELD CONDITIONS ARE TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING.

Project No.

8. INSTALL LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER OVER LOUVER, LENS, BAFFLE, AND THE LIKE, TO AVOID FIXTURE SOILING OR DAMAGE. FIXTURES SHALL BE KEPT CLEAN AND AS NEW. LAMPS SHALL BE NEW AT PROJECT COMPLETION.

Drawn By

9. SWITCHES, THERMOSTATS, STROBES AND OTHER ELECTRICAL DEVICES ARE TO ALIGN ALONG THEIR CENTERLINE, WHEN DEVICES OCCUR IN THE PROXIMITY OF WALL OUTLETS. ALIGN OUTLETS WITH DEVICES ABOVE.

Checked By

10. LIGHT FIXTURES, EXIT SIGNS, SPRINKLERS AND OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.N.O.

Date

11. ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF GYB. BD. OR CEILING TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES. 12. FIRE SAFETY MUST BE MAINTAIN FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE STARS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES. NOTIFY BUILDING FACILITIES MANAGER OF DAMAGED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. 13. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS.

6287.029.25 BCS JHA, MLK 08/09/13

NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2007. All rights reserved.

Revisions No.

Date

Description

REFLECTED CEILING PLAN LEGEND SPRINKLER HEAD S SD

SPEAKER

LIGHT FIXTURE - SEE ELECTRICAL LIGHT FIXTURE - SEE ELECTRICAL

SMOKE DETECTOR EMERGENCY LIGHT FIXTURE - SEE ELECTRICAL EXIT SIGN DIFFUSER - SEE MECHANICAL FIRE ALARM

OS

OCCUPANCY SENSOR NEW SUSP. CEILING TILE IN EXISTING GRID SYSTEM EXISTING SUSP. CEILING TILE AND GRID SYSTEM TO REMAIN

RETURN AIR GRILLE - SEE MECHANICAL LINEAR DIFFUSER - SEE MECHANICAL DUPLEX RECEPTACLE ON CEILING - SEE ELECTRICAL DUAL INFORMATION OUTLET ON CEILING - SEE ELECTRICAL

NO WORK IN THIS AREA J

JUNCTION BOX

PARTIAL FIRST LEVEL DEMOLITION AND NEW CEILING PLANS

A201 \\minfs02.rsparch.internal\RSPUsers$\jandring\Documents\Hilton Solvent Waste Upgrades Central_jandring.rvt 8/9/2013 8:46:26 AM


H 7' - 0" 7' - 0" 7' - 0"

PAIR

DOOR TYPE F F F

FRAME TYPE F1 F1 F1

HEAD 1/A301 1/A301 1/A301

JAMB 2/A301 2/A301 2/A301

FIRE LABEL

HDWR. PA2 SG, KP NOTE 1 45 MIN. EDCL-1 SG, KP

SEE SCHED

COMMENTS

SEE SCHED

2"

3' - 0"

DOOR SCHEDULE NOTES: 1.

2"

3' - 0"

2"

SIZE W 3' - 0" 3' - 0" 3' - 0"

SCALE: 1/4" = 1'-0"

INSTALL SALVAGED DOOR, FRAME, AND HARDWARE FROM DOOR REMOVED IN ROOM 1-60B.

RSP Architects 1220South 320 Marshall Broadway Street NE Ste. B 612.677.7100 507.285.6569 MinneapolisMinnesota 55904612.677.7499 Rochester, 612.677.7499 faxfax Minnesota 55413-1036 www.rsparch.com www.rsparch.com

7'-0"

ROOM NO. ROOM NAME 1-60A OPEN OFFICE 1-60B CONFERENCE ROOM 1-71B STORAGE

SPECS.

SEE SCHEDULE

DOOR NO. 1-60A 1-60B 1-71B

FRAME

FRAME TYPES

SCALE: 1/4" = 1'-0"

7'-0"

DOOR

DOOR TYPES

SEE SCHEDULE

DOOR SCHEDULE DOOR

Consultants

F - FLUSH STAIN TO MATCH EXISTING

F1 - HOLLOW METAL - PAINT

Certification

4 7/8" 4 7/8"

5/8" GYP. BD.

5/8" GYP. BD.

3/8"

3/8" 7/16"

JAMB ANCHORS 3 PER JAMB

2"

HEADER BY STEEL STUD SUPPLIER

3 5/8" METAL STUDS - SEE PARTITION TYPES.

7/16"

5 3/4"

HOLLOW METAL FRAME

5 3/4"

2

TYPICAL DOOR JAMB DETAIL 3" = 1'-0"

JAMB ANCHORS 3 PER JAMB

MIN.

11902 08.09.13

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.

Signature

5/8"

2" 5/8"

HOLLOW METAL FRAME

WOOD DR. - SEE DOOR SCHEDULE

HOLLOW METAL FRAME

DOOR - SEE DR. SCHEDULE

DOUBLE STUDS AT JAMBS (TYPICAL)

Date

7/16"

2"

7/16"

SEE PLANS FOR PARTITION TYPE

DAVE NORBACK

Registration Number

2"

3 5/8" METAL STUDS -SEE PARTITION TYPES.

SEE DOOR SCHEDULE

3 5/8" STEEL STUD FRAMING

3" = 1'-0"

Signature

4 7/8"

5/8" TYPE 'X' GYP. BD.

TYPICAL DOOR HEAD DETAIL

CORNER TRIM ( TYP. )

DOUBLE STUDS AT JAMB ( TYP. )

4 7/8"

1

I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Ronald B. Carlson, License Number 10850, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.

4 7/8"

4 7/8"

DAVE NORBACK

Registration Number Date

11902 08.09.13

Project For

5 3/4"

3

JAMB DETAIL AT TYPICAL CORNER 3" = 1'-0"

HILTON SOLVENT WASTE SYSTEM HILTON BUILDING FIRST LEVEL PROJECT #8R111060

Project No.

6287.029.25

Drawn By

BCS

Checked By

JHA, MLK

Date

08/09/13

NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2007. All rights reserved.

Revisions No.

Date

Description

SCHEDULES AND DETAILS

A301 \\minfs02.rsparch.internal\RSPUsers$\jandring\Documents\Hilton Solvent Waste Upgrades Central_jandring.rvt 8/9/2013 8:46:26 AM


3' - 3"

1' - 10 1/4"

1' - 8 1/4"

2"

KEYNOTES - ENLARGED TANK ROOM PLAN 1 2 3 4

2' - 4 1/2"

STORAGE 1-71A

5

5 6

6

7

2' - 0 3/4"

1

4' - 1 1/2"

4

EXISTING STEEL STAIR TO REMAIN - PAINT STAIR AND HANDRAILS. NEW SOLVENT TANK - SEE MECHANICAL DRAWINGS. EXISTING STEEL BAR GRATING SUPPORT ANGLES TO REMAIN - PAINT. DASHED LINE REPRESENTS SEPARATE SECTIONS OF NEW BAR GRATING (15W4 - 1X3/16) PAINT NEW REMOVABLE GUARDRAIL - PAINT - SEE DETAILS: 3/A801, 4/A801, AND 5/A801. FIRE CAULK ALL PENETRATIONS THROUGH WALLS OF THIS ROOM - SEE LIFE SAFETY PLAN FOR WALL RATING REQUIREMENTS. NEW 18 GAUGE STAINLESS STEEL LINER WITH ALL WELDED SEAMS. EXTEND STAINLESS UPSIDES OF WALLS TO 24" A.F.F.. SLOPE AS SHOWN - SEE DETAIL 6/A801

STORAGE 1-71A

2' - 0"

3

10' - 1"

2' - 0 3/4"

SLOPE 1/8"/12"

5

RSP Architects 1220South 320 Marshall Broadway Street NE Ste. B 612.677.7100 507.285.6569 MinneapolisMinnesota 55904612.677.7499 Rochester, 612.677.7499 faxfax Minnesota 55413-1036 www.rsparch.com www.rsparch.com Consultants

7 6 A801

1' - 11 1/2"

2

SLOPE 1/8"/12"

2

SLOPE 1/8"/12"

2' - 0"

3

4

6 A801

Certification

I hereby certify that I have reviewed the Mayo Clinic Standard General Specifications prepared by Ronald B. Carlson, License Number 10850, that they are appropriate for the work except as amended in this plan, specification or report, and that I am a duly licensed Architect under the laws of the State of Minnesota.

Signature

DAVE NORBACK

Registration Number Date

11902 08.09.13

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of Minnesota.

4' - 0 1/2"

2' - 9"

2" Signature

DAVE NORBACK

Registration Number Date

11902 08.09.13

Project For

1

1

ENLARGED TANK ROOM FLOOR PLAN ABOVE PIT

2

1/2" = 1'-0"

ENLARGED TANK ROOM FLOOR PLAN AT PIT 1/2" = 1'-0"

NORTH

HILTON SOLVENT WASTE SYSTEM

NORTH

HILTON BUILDING FIRST LEVEL

SEE PLAN 1 1/2" X 1 1/2" X 1/4" VERTICAL STEEL GUARDRAIL POST.

10 1/2"

5 A801 1/2" DIA. THROUGH BOLT TO ATTACH GUARDRAIL POST TO BASE.

10 1/2"

6"

PROJECT #8R111060

2" X 2" X 1/4" X 6" STEEL TUBE BASE WELDED TO BASE PLATE.

6"

EQ

STEEL BASE PLATE.

EQ

3"

EQ

4 A801

10 1/2"

1/2" THICK STEEL BASE PLATE WITH (4) 1/2" DIA. EXPANSION ANCHORS WITH 4" EMBEDMENT. 1/2" DIA. THROUGH BOLT TO ATTACH GUARDRAIL POST TO BASE.

6"

3"

10 1/2"

EQ

1/2" THICK STEEL BASE PLATE WITH (4) 1/2" DIA. EXPANSION ANCHORS WITH 4" EMBEDMENT.

1/2"

3' - 6"

1 1/2" X 1 1/2" X 1/4" STEEL POST OR HORIZONTAL RAIL.

6"

1 1/2" X 1 1/2" X 1/4" VERTICAL STEEL GUARDRAIL POST. 2" X 2" X 1/4" X 6" STEEL TUBE BASE WELDED TO BASE PLATE.

Project No.

3

GUARDRAIL DETAIL

4

1" = 1'-0"

GUARDRAIL/BASE PLATE ELEVATION 3" = 1'-0"

5

GUARDRAIL/BASE PLATE SECTION 3" = 1'-0"

6287.029.25

Drawn By

BCS

Checked By

JHA, MLK

Date

EXISTING POURDED CONCRETE WALL TO REMAIN.

08/09/13

NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of RSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright RSP Architects 2007. All rights reserved.

EXISTING CMU WALL TO REMAIN. NEW BAR GRATING - SEE FLOOR PLAN.

Revisions No.

Date

Description

EXISTING STEEL ANGLE FOR BAR GRATING SUPPORT.

NOTE: PROVIDE LIQUID TIGHT SEALANT SYSTEM AT DISCHARGE PIPE PENETRATION THROUGH STAINLESS STEEL.

2' - 0"

2' - 4"

FASTEN TOP OF STAINLESS STEEL LINER WITH STAINLESS STEEL TEMINATION STRIP AND CONTINUOUS SEALANT (COMPATIBLE WITH STAINLESS STEEL) TO TOP EDGE. EXISTING CMU PIT WALL TO REMAIN. NEW 18 GUAGE STAINLESS STEEL LINER WITH WELDED SEAMS. EXISTING FLOOR CONSTRUCTION TO REMAIN. PROVIDE NON-SHRINK GROUT TO SLOPE FLOOR SEE FLOOR PLAN.

6

ENLARGED TANK ROOM SECTION

ENLARGED PLANS AND DETAILS

3/4" = 1'-0"

A801 \\minfs02.rsparch.internal\RSPUsers$\jandring\Documents\Hilton Solvent Waste Upgrades Central_jandring.rvt 8/9/2013 8:46:26 AM