BE T TISABEL LAMELO
PORTFOLIO
SELECTED WORKS _ ARCHITECTURE + URBANISM 2009 - 2015
1
CV
+INFO
B E T T I S A B E L L A M E LO V I Ñ A bettilamelo@gmail.com | 03.03.89 +34 617691135 | Barcelona, España
E D U C AT I O N 2013-2015 Jan 2015 Jun-Jul 2014 Jul 2011 2006-2011
Universitat Politècnica de Catalunya / TU Delft | EMU European Postgraduate Master in Urbanism National University of Singapore | IFoU International Forum of Urbanism - Winter School 2015 Università IUAV di Venezia | Recycling City 3 Workshop Universitat Politècnica de Catalunya | Summer International Workshop TE’ETSAB.11 BeSIDES TOURISM Universidad Simón Bolívar | Architect - CumLaude Mention
PROFESSIONAL EXPERIENCE 2012-2013 Dec 2011-Jul 2013 Mar-May 2011 Dec 2015-present
Urbanism & Public Space Project - Oncological and Cardiological Hospital | Architect & Urban Planner LAB.PRO.FAB | Architect | http://www.labprofab.com/ Puchetti Arquitectos | Architecture Intern | http://www.puchettiarquitectos.com/ Good Urban Practices (GUP) | Founder & Editor in Chief
TEACHING EXPERIENCE Apr-Jul 2013 Chair of Design - Level II - Universidad Simón Bolívar | Visiting Professor
LANGUAGES Spanish | Native English | Advanced, TOEFL 111/120 Catalán | Basic
R E C O G N I T I O N S & AW A R D S Best Student 2011 | Universidad Simón Bolívar Honorable Mention | Final Bachelor Project: Inhabitating the limit Best Projects USB 2012 | Final Bachelor Project: Inhabitating the limit Best Projects USB 2011 | Projects: Abonador Mirador & Cosiendo el Territorio Best Projects USB 2010 | Project: Office Tower Best Projects USB 2009 | Project: Cultural House in Choroní 2
P U B L I C AT I O N S 2015 2013 2012 2012 2010
Projecting the Territory publication | European Postgraduate Master in Urbanism Idea Proyecto Obra (Idea Project Work), Recent architecture in Venezuela, Project: Tiuna el Fuerte EntreRayas Magazine | Final Bachelor Project with honorable mention: Inhabitating the limit SAI Salón de Arquitectura Interior | Final Bachelor Project Exhibition - USB Stand EntreRayas Magazine | Best Projects USB 2009 | Project: Cultural House in Choroní
SEMINARS AND EVENTS Jun 2015 Nov 2011 Feb 2011 Oct 2010
VII International Seminar on Urban Research Speaker Forum “Footprint in architectural competitions,” 40th Anniversary of Architecture Department Speaker IAC Iberoamerica: Architecture and City, Maracaibo VII Iberoamerican Biennial of Architecture, Medellín
COMPETITIONS 2015 2014 2014 2012 2011 2010
Participation in Kymfield Schools Competition Participation in ArchMedium Medellín Experimental Social Housing competition Participation in YAC Space to Culture competition 4th Place | Caracas a Pedal competition - Bike-path design category Participation in International Competition of Ideas Brasilia +50 2nd Place | National Competition of Design in Steel ILAFA 2010
SKILLS AND COMPETENCES Social and Organizational Skills | Excellent Communication skills - Multitasking - Teamwork - Ability to lead groups - Solid time management skills Computer Skills | Advanced: Autocad 2015 - Photoshop, Illustrator and Indesign CS7 - Sketchup Pro - Space Syntax - Movie Maker - Office | Good: ArcGIS - Revit 2015 Artistic | Freehand drawing, painting, sculpture, dancing and singing Studies: Singing (2004-2012) - Electric guitar (2004-2007) - Drums (2006-2007) 3
CV
GRAPH
B E T T I S A B E L L A M E LO V I Ñ A bettilamelo@gmail.com | 03.03.89 +34 617691135 | Barcelona, Spain
‘06 ‘07 B AC H E LO R
‘07 ‘08 ARCHITECT_CUMLAUDE
‘08 ‘09
‘09 ‘10
‘10 ‘11
UNIVERSIDAD SIMÓN BOLÍVAR | VENEZUELA
I N T E R N AT I O N A L W O R K S H O P S P R O F E S S I O N A L E X P E R I E N C E PA R E C O G N I T I O N S & AWA R D S
BEST PROJECTS: CASA CULTURAL
BEST PROJECTS: OFFICE TOWER
C O M P E T I T I O N S ILAFA 2010
2ND PLACE
P U B L I C AT I O N S ENTRERAYAS S E M I N A R S & E V E N T S VII BIAU
IAC
PERSONAL INTERESTS F O U N D E R A N D E D I TO R I N C H I E F O F G O O D U R B A N P R AC T I C E S ( G U P ) , A P L AT F O R M F O R T H E D I S C U S S I O N O F CO N T E M P O R A RY TO P I C S R E G A R D I N G C I T I E S , F E AT U R I N G A S E L E C T I O N O F U R B A N P R O J E C TS , P L A N S A N D P O L I C I E S F R O M A L L A R O U N D T H E G LO B E I N T E R E S T E D I N D E V E LO P I N G B OT H U R B A N A N D A R C H I T E C T U R A L P R O J E C TS O F S M A L L A N D L A R G E S C A L E , PA R T I C I PAT I N G I N A L L P R O J E C T S TAG E S , T E AC H I N G A N D R E S E A R C H I N G , A S W E L L A S PA R T I C I PAT I N G I N A R C H I T E C T U R E A N D U R B A N I S M CO M P E T I T I O N S
4
L A N G U AG E S
SKILLS
S PA
A U TO C A D *
S PAC E S Y N TA X
ENG
PSD | AI | INDD
ARCGIS
C AT
S K E TC H U P P R O
REVIT *
‘11 ‘12
* A U TO D E S K O F F I C I A L C E R T I F I C AT E
‘12 ‘13
‘13 ‘14 MASTER
BESIDES TOURISM LAB.PRO.FAB
UPC
IUAV
‘14 ‘15
‘15 ‘16
EUROPEAN MASTER IN URBANISM RECYCLING CITY 3
UPC & TUDELFT
IFOU NUS
SELF-EMPLOYED
GUP
T E A C H I N G E X P E R I E N C E CHAIR OF DESIGN USB BEST PROJECTS X 2 FINAL PROJECT HONORABLE MENTION BEST STUDENT USB
BRASILIA +50
BEST PROJECTS: FINAL PROJECT
CARACAS A PEDAL SAI
USB 40 AÑOS SPEAKER
4TH PLACE
ENTRERAYAS
YAC
MESH
IDEA PROYECTO OBRA
EMU VIISIIU SPEAKER
PROFESSIONAL INTERESTS #S T R E E T A S P U B L I C S PAC E #R E C YC L I N G I N D U S T R I A L S PAC E S #R E T H I N K I N G I N F R A S T R U C T U R E # I N H A B I TAT I N G URBAN LIMITS #WORKING WITH INFORMAL SETTLEMENTS AND PRACTICES #URBAN MORPHOLOGIES #SUSTAINABLE DEVELOPMENT # U R B A N R E G E N E R AT I O N # PA R T I C I PATO RY P R O J E C TS # S O C I A L A N D S PAT I A L J U S T I C E #SOCIAL, ECONOMIC AND ENVIRONMENTAL SUSTAINABILIT Y # M U LT I - P U R P O S E S PA C E S #ARCHITECTURAL COMPONENTS #MODULAR ARCHITECTURE #MOBILIT Y AND FLOWS #ARCHITECTURE AND ECONOMY
5
PROJECTS 2007-2015
DELTA CULTURAL TERRITORIAL PROJECT FOR THE CARDENER RIVER THE CITY AFTER THE GAMES
1
A RESCUE FOR LA PERLA
40+ INHABITATING THE LIMIT
CROSSED LINES + 1 LIVING URBS 1
3 CONTINENTS
9 COUNTRIES
50+ PROJEC TS
The fact of having studied my bachelor in Latin America, master degree studies in Europe, having worked in an office with projects in different countries, as well as the workshops and international competitions, has helped me to familiarize with different contexts, practices and techniques, in terms of construction, urbanism and society.
6
SEWING THE TERRITORY
3
1
THE KNOWLEDGE ECOSYSTEM 2
URBS IN HORTO THE OPEN BUILDING 1
1
CONTAINER CREATIVE CARNIVAL
KYMFIELD SCHOOLS 1
PRODUCTIVE SINGAPORE 2050
7
SELECTED WORK _ ARCHITECTURE 2009-2015 LIVING URBS
10
Experimental Social Housing in Medellin International Competition | ArchMedium | Medellin, Colombia | 2014
THE OPEN BUILDING
12
A space to culture International Competition | Young Architects Competition | Bologna, Italy | 2014
THE HELIX
14
Prototype school for the tropical savanna climate in Africa Competition Kymfield Schools | Africa | 2015
S I M Ó N R O D R Í G U E Z C U LT U R A L H O U S E
16
Cultural facility, social architecture Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014
SANTA ROSA SPORTS CENTER
20
Sports Facility, social architecture Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014
URBAN ENTERTAINMENT CENTER OF CARABALLEDA
22
Metropolitan Facility and Public Space 2nd Place | Steel Design National Competition ILAFA 2010 | Caraballeda, Venezuela | 2010
THE VIEWPOINT FERTILIZER
26
The study of the unknown territory Academic Project | Best Projects 2011 USB receiver | Caracas, Venezuela | 2011
INHABITATING THE LIMIT Inhabitable Bridge over the Albarregas River Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011 8
30
SELECTED WORK _ URBANISM 2011-2015 CROSSED LINES
36
Re-thinking infrastructure in the search for urbanity Master’s Degree Final Project | European Postgraduate Master in Urbanism EMU | Merida, Venezuela | 2015
THE KNOWLEDGE ECOSYSTEM
40
“A Knowledge-based spatial development” Academic Project | European Postgraduate Master in Urbanism EMU | Westland Greenport, NL | 2015
PROJECTING THE TERRITORY
44
Hand by hand: From recognizing the differences to the construction of linking spaces Academic Project | European Postgraduate Master in Urbanism EMU | Bages, Spain | 2013
THE CITY AFTER THE MEDITERRANEAN GAMES
48
Plan for Tarragona 2017 Academic Project | European Postgraduate Master in Urbanism EMU | Tarragona, Spain | 2014
HPA
52
Urban design of the Public Space of the Oncology and Cardiology Hospital of Caracas Professional Project | Caracas, Venezuela | 2012
T H E C U LT U R A L D E LTA
54
A review over Les Rambles International Workshop | Besides Tourism ETSAB UPC | Barcelona, Spain | 2011
PRODUCTIVE SINGAPORE 2050
58
Re-inventing the industrial urban model International Workshop | IFoU Winter School Jurong Vision 2050 | Jurong, Singapur | 2015
PEDALING CARACAS
62
Metropolitan Bike Path Network 4th Place | Caracas a Pedal Competition | Caracas, Venezuela | 2012
REVIT
Artisan’s Market and Residential Block
66
9
LIVING URBS Experimental Social Housing in Medellin International Competition | ArchMedium | Medellin, Colombia | 2014 | B. Lamelo, N. Covarrubia
The way the informal city builds itself over time has determined how its elements and individuals relate to each other. These elements make possible the building particular experiences; where the streets and pedestrian pathways function as spaces for social exchange, the flexible housing units can grow according to the needs and possibilities of the family, and the mixing of program and activities keep the neighborhood active at different times. This project combines these elements in a residential building for the city center, capturing the spatial, social and economic benefits of the model of informality.
Sketchup + Photoshop
Sketchup + Photoshop
10
4th floor
Elements of the proposal Preserved buildings
Structure
Commerce and Facilities
Internal mobility
Dwelling Units
Public and Shared Space
3rd floor
2nd floor
Flexibility in dwelling units
1st floor
C
ol
om bi
a
Av
.
Ground floor
11
THE OPEN BUILDING A space to culture International Competition | Young Architects Competition | Bologna, Italy | 2014 | B. Lamelo, N. Covarrubia
Faced with the possibility of transforming an industrial building into a cultural center, we thought about how an old factory could mutate into a work space for creativity. In that sense and considering the current dynamics of society (start-ups, cooperatives, collectives) a concept of an “Open Building” is proposed; an option where the skeleton and main construction elements of the building are preserved, as they are understood as Italian industrial heritage. To this it is added the use of modular structures that will enable the building for the new cultural activities. The flexibility in the use of these structures will allow the transformation of the space into different setups, allowing the users to change the space according to their needs, adapting to different situations (art galleries, theater performances and films, workshops and offices, hotel and apartments for artists, etc). It is a proposal that promotes individual freedom within the collective space that is the “Open Building”.
Base Structure Steel frame structure 2.40m x 2.40m
12
Multimedia Module Projection, exhibition and classroom boards
Work space Module with integrated furniture
Storage and Bedroom Module Integrated bed and storage space
Sketchup + Photoshop
Recommended Layout
Possible Setups
Dwellings and Workshops for artists
3rd level Art Hotel Dwellings for artists 2nd level Services and Maintenance
Workshops / Offices
1st level Theatre / Cinema Multipurpose Rooms Games & Media Room Offices / Workshops Services and Maintenance
Food Court
Ground Floor Services Food Court Daycare Exhibition Gallery Offices Offices / Workshops
Exhibition Gallery
13
THE HELIX Prototype school for the tropical savanna climate in Africa Competition Kymfield Schools | Africa | 2015
Helix is an economically and environmentally sustainable prototype that follows 5 main pillars: self-sufficiency in terms of water management, supplies, ventilation and lighting; efficiency in the distribution of space; the proposal of an ecological and participatory architecture and the possibility of adapting furniture.
ROOF
FURNITURE
WALLS, DOOR & WINDOWS
Sketchup + VRay + Photoshop
ESTRUCTURE
BASE CONSTRUCTION METHODS & MATERIALS
14
BB
FLOOR PLAN - AREAS & DISTRIBUTION
PROPOSAL PERIMETER
LAYOUT PLAN
AA SECTION
EAST FAÇADE
FLOOR PLAN - DETAILED
BB SECTION
NORTH FAÇADE
SOUTH FAÇADE
WEST FAÇADE
15
S I M Ă“ N R O D R Ă? G U E Z C U LT U R A L H O U S E Cultural facility, social architecture Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014
This cultural hub and multipurpose room was constructed after the recovery and rehabilitation of an unused unfinished structure. The reuse of existing elements and a focus for efficiency in the design increased the feasibility of the building, and as a proof of this, it was constructed in few weeks. Local community and participation played a relevant role in the project, as the project represents one of the few cultural spaces available for this area. * All images and plans are property of Lab.Pro.Fab. Working as an architect in Lab.Pro.Fab, I participated in all phases of this project, having done a large part of its documentation and graphic material.
16
Photo of the building
3D model
Sketchup + VRay + Photoshop
Elements of the proposal
Photo of the building
Ground Floor
First Level
17
S I M Ă“ N R O D R Ă? G U E Z C U LT U R A L H O U S E Cultural facility, social architecture Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014
Facade construction details
Facade construction diagrams
18
Facade construction diagrams
Cross Section
Example of furniture construction details
19
SANTA ROSA SPORTS CENTER Sports Facility, social architecture Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014
Located in an area of scarcity of public and recreational spaces, this sports center aims to give the community a space for the enjoyment of sport and leisure activities. By layering the sport courts from the ground floor to the roof top, the building enables maximum soil occupancy, and at the same time, it allows to have a major square in front of the building that will serve as an iconic public space for the surroundings. The proposal of this project is to foment social cohesion in this low income area and to provide the community with spaces for the enjoyment of urban life. * All images and plans are property of Lab.Pro.Fab. Working as an architect in Lab.Pro.Fab, I participated in all phases of this project, having done a large part of its documentation and graphic material.
View from the exterior
20
Ground floor
2nd level
View from the interior
21
URBAN ENTERTAINMENT CENTER OF CARABALLEDA Metropolitan Facility and Public Space 2nd Place | Steel Design National Competition ILAFA 2010 | Caraballeda, Venezuela | 2010 B. Lamelo, M. Ramos, J. García
Problem Statement: Caraballeda is part of the Venezuelan Port System. It is an area with high touristic potential and a source for entertainment and recreation for the capital city. Unfortunately, it is also a highly seismic and landslide-prone area, which has been affected in recent years by natural disasters and that after over 10 years hasn’t been recovered. Objective: The aim of this proposal is the urban renewal of the area, while putting into value the touristic assets of Caraballeda and providing the incorporation of new services and equipment to assist the community. Master Plan: For the Caraballeda Port Master Plan, six points for intervention were defined. Together they will constitute an architectural and urban complex intended for public use. These six intervention points are: Fishermen’s Port (1), Access to the bathing area (2), the rehabilitation of the urban front (3) the Bus Terminal (4) the Sports Complex (5) and the access to the Main Port (6).
22
Master Plan
23
URBAN ENTRETAINMENT CENTER OF CARABALLEDA Metropolitan Facility and Public Space 2nd Place | Steel Design National Competition ILAFA 2010 | Caraballeda, Venezuela | 2010 B. Lamelo, M. Ramos, J. GarcĂa
As a proposal for the rehabilitation of the access to the Main Port (6) and the formalization of it as a new center that promotes tourism in the area, it is proposed to link the area with cultural activities (cinemas, art galleries , outdoor amphitheaters) which is practically absent in the area. Thus, the Urban Entertainment Center of Caraballeda is born.
Urban scale model
Architectural proposal model
Cross section
24
Structural model
Longitudinal Facade - North
Longitudinal Section - South
Longitudinal Facade - South
Basement Level
25
The study of the unknown territory Academic Project | Best Projects 2011 USB receiver | Caracas, Venezuela | 2011 Collaboration in the analysis stage: M. Ramos, L. Ruiz
Projecting the unknown territory has its advantages. When analyzing a case, it can be seen with a first time critical eye. There are no preconceptions and this helps getting to more accurate conclusions and possibilities of intervention that are specific for the case study. In order to understand the unknown territory, we proceeded to study its elements, to understand how they have determined the qualities of the site; in particular, attention is paid to the fine and fuzzy lines between different areas: the limits, which allow us to understand the dynamics and vocation of the territory. In this case study, the existence of a risk zone, located in one of the topographical limits, separates the natural landscape from the urban area, and shows continuous attempts of invasion by the latter, which worsens existing problems of landslides and soil erosion.
Functional diagram of the sample
26
Tridimensional study of the sample
View of the risk area
Invasion
To consolidate limits through a constructed element
Risk zone
To recognize the event by intervening on the area
erosion
To reforest the area by nourishing the land
non gradual intensity
Landslide as a natural event
To reorganize activities by densifying
Natural and Constructed limits
Flows intensity
jan-mar
apr-jun
jul-sep
oct-dec
Action of the water in the terrain
27
THE VIEWPOINT FERTILIZER The study of the unknown territory Academic Project | Best Projects 2011 USB receiver | Caracas, Venezuela | 2011
Strategy: It is decided to consolidate the risk zone limit through a constructed element that would change the character of the area but that would also respect and recognize the landslide as a natural event. At the same time, it is intended to reorganize the activities of the area through densification, in order to stop further invasions and to try to reforest the area by taking advantage of the landslides for spreading nutrients. Thus arises the idea of ​​a fertilizer building. However, in order to consolidate the intervention, it is necessary to foment new spatial situations that would change the spatial dynamics of the place. For this matter it is proposed that the element operates also as a viewpoint, taking advantage of the natural balcony condition it has, facing the landscape. Both ideas are embodied in a spatial proposal, where the existing natural event that defines the place is complemented and reinforced by interesting spatial situations that reconstruct the landscape and therefore construct the city.
Cardboard Model Photos + Photoshop
View of the proposal Fertilizer cycle organic waste
28
decomposition
rain - moisture
landslide
nutrients go into the soil
reconstruction
Fertilizer floor plan
Viewpoint floor plan
Cross section
29
INHABITATING THE LIMIT Inhabitable Bridge over the Albarregas River Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011
Objective: The city of Merida is divided by the Albarregas River, a topographic inaccessible limit, ignored by the inhabitants as it is occupied by trash and informal settlements. The proposal aims to connect both sides of the river through a inhabitable bridge that will transform the river into an integrating element for the city and will act as an exchange area between both sides of the city.The proposal seeks to integrate the historical grid, the river and the modern city, so that the activities of the city can expand into the park, the park as a public space is recognized, admired and enjoyed and new ways of living the city for the community are generated.
Proposed situation
Historical Grid |
River | Modern City
Existing situation
30
View from the Park
Aerial view Sketchup + Photoshop
31
INHABITATING THE LIMIT Inhabitable Bridge over the Albarregas River Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011
In order to avoid a zoning configuration in the use of space and to ensure maximum occupancy of the bridge, a normative on gradual occupation is set, which determines a gradual mix of uses, in the horizontal and vertical sense. In existing, proposed and recovered typologies, the spirit of the proposal can be appreciated: the inhabitable bridge must provide the connection between both sides of the river, and also it should enable activities to happens in its own structure. It is a square and a gallery, it is a viewpoint and a residence, and it is the platform where all the local elements meet and mingle to produce rich experiences.
32
Park Level
Street Level - South
Street Level - North
Residential Level 1
Residential Level 2
Roof Plan
Existing Program in the Cross Section
Functional Scheme for the proposal
Proposed Program in the Cross Section
33
INHABITATING THE LIMIT Inhabitable Bridge over the Albarregas River Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011
The key elements of the project (the program, the bridge and the landscape) are present in the architectural proposal. Each level of the building presents a program that is related to the immediate context, and also, the proposal introduces urban operations that benefit the existing spatial relationships and enable functional and spatial development. As for the landscape, the three main courtyards of the building allow the interaction between the users and the park. In addition, the inhabitable bridge introduces new dwelling typologies and new ways of inhabiting the city: the Urban Block, which proposes the reconstruction of a continuous urban front in the old town; the Suspended Building, which enjoys the spatial qualities of living suspended over the river; and the Terraced Building, which reinterprets the informal settlements that adapt to the topography and that has strong connections with the park.
View from the corridors
View from the main square
view from the central courtyard
Longitudinal Section
34
Autocad + Photoshop
Urban Block Typology
Standard Layout - Urban Block
Standard Layout - Suspended Building
Suspended Building Typology
Terraced Building Typology
Standard Layout - Terraced Building Sketchup + Photoshop
35
CROSSED LINES
Re-thinking infrastructure in the search for urbanity Master’s Degree Final Project | European Postgraduate Master in Urbanism EMU | Merida, Venezuela | 2015
Objective: The aim of this thesis is to create a strategy for the urban regeneration and development of Merida, on the premise of rethinking the infrastructure space in the search of urbanity. It is an opportunity to structure the transformation of the city into a consolidated touristic and student town, as well it is an opportunity to propose a new paradigm for the contemporary city where the relationship between nature, city and infrastructure is rebuilt. Strategy: A strategy of crossing the lines between infrastructure and nature is set, in order to tackle the problems of the city and at the same time, to create the conditions that promote urbanity. The strategy consists of three main actions: to increase the transversal connections; to redefine the longitudinal axes and to cross these lines, in order to generate new points of maximum interaction in the city. Testing ground: To test the strategy, 3 interventions are proposed in an area chosen as case study, each responding to an action of the strategy. Besides being examples, these are strategic interventions and intend to be triggers of the transformation of the city.
Case Study
Hand drawing + Photoshop Transversal axes Potential for urbanity found in the historical analysis
36
3 Actions that conform the strategy 3 Key Interventions (T1, T2, T3)
INTENSIFY THE TRANSVERSAL
T1 3 WAYS OF CROSSING
REDEFINE THE LONGITUDINAL
T2 THE RIVER PARK
Strategy: Crossed Lines Maximum interaction between city and nature
CROSS THE LINES
T3 THE CROSSING
Vision: A new reality A regenerated urban space Analysis of the case study
The most severe case of urban discontinuity
Hand drawing + Photoshop
This discontinuity affects the integration of the street network
Space Syntax
Major clusters of services and University facilities
Autocad + Photoshop
Dense Mix between residential and nonresidential areas
Autocad + Photoshop
37
CROSSED LINES
Re-thinking infrastructure in the search for urbanity Master’s Degree Final Project | European Postgraduate Master in Urbanism EMU | Merida, Venezuela | 2015
T1 “Three ways of crossing”: For this intervention, it is proposed to create more transversal axes to give priority to slow mobility and public transportation systems, with the intention of generating different spatial situations that enrich urban experience and give the inhabitant different options for moving around the city. The proposal also promotes the cross between different uses, especially between urban programs and the ones associated to nature. Finally, the intervention aims to improve the urban space, looking to improve the overall quality of the city and to bring benefits to all residents. For the complete information on this project, please visit issuu.com/bettilamelo
3 ways of crossing Isometric view
Recovery of a historical path Longitudinal Section
38
Scheme of the Intervention
Autocad + Photoshop
Intensified use of urban space Longitudinal Section
Crossed Programs Between natural and built environment Sketch Up + VRay
New slow mobility axis Longitudinal Section
Autocad + Photoshop
39
THE KNOWLEDGE ECOSYSTEM “A Knowledge-based spatial development� Academic Project | European Postgraduate Master in Urbanism EMU | Westland Greenport, NL | 2015 B. Lamelo, N. Covarrubia, G. de Neuville, A. Ergamina, W. Park
Objective: The aim of this project is to develop a strategic plan for the spatial development of the South Wing of the Randstad Region in the Netherlands, based on the theories of knowledge economy. It is chosen to work with the economic area of the Greenports, specifically in the Westland Greenport, as this case study gathers the best knowledge qualities to be strengthened and consolidated, therefore it is a suitable area for Knowledge Development.
South Wing Economic Areas full of knowledge and Innovation
Vision: the Westland Greenport will become a Knowledge Ecosystem, where the dimensions of knowledge will coexist and make synergy consolidating itself as the Top City of the Greenports. Strategy: To achieve the vision, a strategy of three actions is set: clustering, in order to strengthen the current facilities and infrastructure of knowledge; connecting, by creating better physical connections between the clusters and with the surrounding environment; and intertwining, to articulate these social and economic activity along a Knowledge Corridor. Photoshop
CLUSTERING
40
+
CONNECTING
+
INTERTWINING
=
THE KNOWLEDGE ECOSYSTEM
T H E K N OW LE D G E ECO SYSTEM TO P C IT Y O F T H E G R E E N P O R TS
Illustrator
41
THE KNOWLEDGE ECOSYSTEM “A Knowledge-based spatial development� Academic Project | European Postgraduate Master in Urbanism EMU | Westland Greenport, NL | 2015 B. Lamelo, N. Covarrubia, G. de Neuville, A. Ergamina, W. Park
The strategy is implemented through five strategic projects, which face the main problems of Westland and work in complementarity to achieve the transformation of the area into a Knowledge Ecosystem. These projects are: The Horti-Showcase, the cluster to attract business and tourism, the Bio-based tech Park, which encourages production in a sustainable environment, the Westland Horticampus, the cluster of knowledge and innovation, Inter-modal Logistics, a multi-modal cargo transport system, and finally, the Westland Light-rail, the new public transportation system.
42
Westland Horticampus
Horti-Showcase
Intermodal Logistics
Bio-based Tech Park
Photoshop
Phase 3 Connection & Intergration
I R/N
E G
I R
L R/N
E G
R Turnnel to existing cargo line
L
Intermodal station and acilities
Greenport university
R Alternative pathway
Welcome point & Knowledge Hub
Showcase’s pavillions & Business cluster
I
Integration with urban area
G
Recycling powerplants with Green park
E Tramline from Den Haag to Naalwijk
R/N
Pipe line
L
interchange tram station
an d
ht R
ai
Bi
lw ay S ho oba w ca se se d W T ec es tla h Pa nd rk Ho In rti te c am rm od pu al s Lo gi sti cs e
L ig le dg
Kn ow
W es tl
At each stage the level of participation of specific actors is highlighted in order to emphasize collaborations that should be encouraged and to divide the responsibilities of the project.
Stakeholders & Governance L: Local Government R/N: Regional/National Government G: Growers R: Residents I: Investors E: Entrepreneurs
Tramline from Naaldwijk to other towns
Phase 1 Laying Foundations
timeline in terms of development and governance is proposed, in order to set priorities and to give a logical order for the implementation of the proposal.
Link with existing park
Phase 2 Main Construction
A
43
PROJECTING THE TERRITORY An strategic territorial project for the valley of Cardener River Academic Project | European Postgraduate Master in Urbanism EMU | Bages, Spain | 2013 B. Lamelo, M. Carrillo, N. Covarrubia, L. Ciccu, D. Zelayarรกn, G. Millรกn, F. Michailidou, B. Guedes, G. de Neuville
Context: The project is located in a unique territory with great morphological and landscape diversity, the Bages Area; specifically in the valley of the Cardener, one of its main river structures. As a physical unit, the valley of the Cardener River evidences the historical occupation of the territory, especially in the activities of mining and industry that in some cases are still functioning. It is also a corridor where urban settlements have evolved throughout history and today set different dynamics together.
The Baix Cardener, a unique and diverse territory
44
Activities and dynamics of the Baix Cardener
Task: The current process of socioeconomic re-activation of the Baix Cardener Area demands for a territorial project for this section of the valley, as this will serve as an instrument to ensure a sustainable development where its main resources are put in value. Methodology: The area was analyzed according to a 3 layers system (natural support, infrastructure and settlements). The interplay between these layers revealed the existence of different logics that affect the territory. These logics correspond to the way the Cardener Valley has been occupied and used considering its morphology.
Analysis Conclusions: The area is seen as the encounter between two logics that coexist: the natural and the human logic. In this reading, attention is paid to the interstices between these two logical sets, as they are meeting spots between different entities. In addition, the territory is seen as a set of compression and decompression, as the river has shaped the landscape of the valley and this has conditioned human activity and landscape value. With these readings, fragments with individual identities were defined, in relation to both logics.
Layered Analysis Natural Support
Layered Analysis Infrastructures
Logic of compression and decompression - In the territorial map of the Baix Cardener
Logic of human / natural - In the cross sections of the Baix Cardener
45
PROJECTING THE TERRITORY Hand by hand: From recognizing the differences to the construction of linking spaces Academic Project | European Postgraduate Master in Urbanism EMU | Bages, Spain | 2013 B. Lamelo, M. Carrillo, N. Covarrubia, L. Ciccu, D. Zelayarรกn, G. Millรกn, F. Michailidou, B. Guedes, G. de Neuville
1 1 2
3
2
3 4
4
5
Hand drawing Logic of human / natural Differentiated Fragments
46
Hand drawing Interaction between natural and human Baix Cardener Valley Views
5
Objective: After the recognition of five units that operate by contiguity and complementarity, it is established as main objective to connect these units, in order to achieve territorial cohesion, acknowledging the differences and working with the identity and diversity of each unit. These units have two elements in common: the lines (roads and systems of mobility that intertwine and reinforce the large unit idea) and the points (flexible spaces for the development of multiple activities). One of the points was developed as a personal project.
The points Spaces of encounter
The lines The braid that intertwines
Differentiated Units that connect to enhance territorial identity Hand drawing
Views: Sequence of the entrance to the city
Arrival to diversity Point of Intervention
View of the encounter space
47
THE CITY AFTER THE MEDITERRANEAN GAMES Plan for Tarragona 2017 Academic Project | European Postgraduate Master in Urbanism EMU | Tarragona, Spain | 2014
Objective: Considering that the Mediterranean Games will take place in the city of Tarragona in 2017 and that the city is preparing for the event, this was an opportunity to rethink the city and develop an urban plan for “after the games�, against the bad practice of planning for the immediacy, the intention was to create the conditions for the city to develop successfully even after the event has passed. Methodology: Among the aspects analyzed of the area, particular attention was given to the system of open and public spaces & facilities, as it was key to secure the habitability of the future development. Parting from this map, a plan for Tarragona 2017 was designed.
Hand drawing Open Spaces & Public Facilities System Proposed guidelines
48
Hand drawing Urban Axis & associated activities Definition of units
49
THE CITY AFTER THE MEDITERRANEAN GAMES Plan for Tarragona 2017 Academic Project | European Postgraduate Master in Urbanism EMU | Tarragona, Spain | 2014
View of the new urban axis
Public transportation & commercial areas La Floresta, chosen case study
Autocad + Photoshop Master Plan
50
The master plan for Tarragona 2017 proposed a master proposal for the open spaces system and facilities, and 7 strategic areas for development. The guidelines for each area were the integration of the proposal with the open space system, a mix of uses and activities, and the strengthening of the main urban axes. As a personal project, the area of “La Floresta� was developed.
New residential development
Clean industry
New residential development
Local Park
Autocad + Photoshop
Residential Block Prototype
Commercial Boulevard
Park Tipology
Secondary street
Community Patio
Proposed Section
51
HPA Urban design of the Public Space of the Oncology and Cardiology Hospital of Caracas Professional Project | Caracas, Venezuela | 2012 | B. Lamelo, R. Guerra, N. Covarrubia para AGUA & AREPA
Objective: The aim of the project is to strengthen the spatial and functional organization of the open spaces of the hospital, through the formalization of a system of parallel bands representing the main public and collective spaces, which are perpendicular to the main circulation systems and mobility; as well as to characterize the public and semi-puiblic spaces, by using 3 groups of elements: Barriers, Articulators and Scenarios.
E A B C D C B A
Degrees of privacy
-
+
Landscape Pattern Types of open spaces A North & South Public Promenades C North & South Elevated Terraces
B North & South Patios D Central Patio E Lineal Park
Cross Section
52
Technical Sheet of articulator
Source: AREPA Barriers, articulators and Scenarios
A view from the exterior
Cross Section - Proposal
53
T H E C U LT U R A L D E LTA A review over Les Rambles International Workshop | Besides Tourism ETSAB UPC | Barcelona, Spain | 2011 B. Lamelo, K. Sabirli, M. Jordan, Y. Wang, D. Carballo, Y. Sik Moon, A. Sanz
Problem Statement: The proposal envisions Les Rambles, an area of great urban and touristic importance in Barcelona, as a river that is born in Catalunya Square, flows through the historical center and finally ends in a large delta, the port area. Unfortunately, the ending of this river is a dispersed urban space. The commercial and cultural activities in the area award it with great potential as a cultural and touristic node, however the existing roads interrupt the flow of public space and become a problem for pedestrian flows that arrive to this space and scatter because of the lack of clear urban space. Objective: The aim of the proposal is the creation of a defined space for the arrival of Les Rambles and the other paths that arrive to the Cultural Delta. A traffic redefinition is proposed, to prioritize pedestrians over the vehicle. The unification of the pavement in the area of intervention will facilitate pedestrian traffic and at the same time, will reduce car speed.
Analysis of the intervention area
54
Proposed public space
Views and Sections of the intervention
General and Specific site of intervention
55
T H E C U LT U R A L D E LTA A review over Les Rambles International Workshop | Besides Tourism ETSAB UPC | Barcelona, Spain | 2011 B. Lamelo, K. Sabirli, M. Jordan, Y. Wang, D. Carballo, Y. Sik Moon, A. Sanz
Strategy: To consolidate the area it is proposed to rethink public space and integrate the ground floors of existing buildings with the urban space, thus enriching the pedestrian experience and providing continuity of pedestrian flows. With the opening of the ground floors, the relationship between the city and the sea that is now discontinued but that is the natural condition of the site is recovered.
56
57
PRODUCTIVE SINGAPORE 2050 Re-inventing the industrial urban model International Workshop | IFoU Winter School Jurong Vision 2050 | Jurong, Singapur | 2015 B. Lamelo, A. Astrup, D. Ferrer, L. Lin Qing, N. Agarwal, O. Serra, Riberd, S. Sudhindra, Z. Nan Xin
Task: The theme of the workshop addresses the area of Jurong West, a monofunctional, segregated and fragmented industrial area, which has been designed after a zoning strategy and represents the heart of the industrial economy of the past. The aim of the workshop was to structure and envision Jurong’s transformation into an area for possible urban development and clean industry that could integrate with the existing green and residential areas.
FROM
INDUSTRIAL JURONG
2015 The heart of the industrial economy of the past 58
MONOFUNCTIONAL AREA
“ZONING” PLAN
COMMERCIAL RESIDENTIAL
PRODUCTION
Some current trends driving the proposal ... Smart Clusters
Digital communication
Smart mobility
Miniaturization
Decentralization
Automation
Strategy: To achieve this “Habitable Jurong” it is proposed to decentralize productivity, thereby achieving Productive Singapore 2050, and thus freeing space for inputting habitability in Jurong. Decentralization is recognized as an emerging process in industry today, which will be emphasized by current trends, including miniaturization of production.
C LU S T E R S , I N D U S T R I E S A N D CO M PA N I E S E M E R G I N G S E C TO R S LO G I S T I C S ELECTRONIC CHEMICAL BIOMEDICAL SCIENCES PRECISION ENGINEERING A E R O S PA C E
TO
PRODUCTIVE SINGAPORE
HORIZONTAL I N T E G R AT E D
RADICAL MIX USE
2050 A resilient structure for a postindustrialized society
RESIDENTIAL PRODUCTION COMMERCIAL
59
PRODUCTIVE SINGAPORE 2050 Re-inventing the industrial urban model International Workshop | IFoU Winter School Jurong Vision 2050 | Jurong, Singapur | 2015 B. Lamelo, A. Astrup, D. Ferrer, L. Lin Qing, N. Agarwal, O. Serra, Riberd, S. Sudhindra, Z. Nan Xin
Thus, it is proposed that by 2050, Jurong represents the reinvention of the urban industrial model: a model where it will be possible to achieve high levels of productivity and livability at the same time.
Prototypes for urban regeneration
It is therefore proposed to re-think the water and green systems, the infrastructure and the old industrial buildings, in order to transform these into the base structure for implementing livability in Jurong. water + green
Master Plan
60
industrial monuments
Autocad + Illustrator + Photoshop
WATER TRANSFORMATION
GREEN TRANSFORMATION
INFRASTRUCTURE TRANSFORMATION
RECYCLING OF LARGE INDUSTRIES
Current waterfront situation
Existing Parks
Existing Infrastructure
Existing large scale industry
Water enters into port industries
Green lung infiltrates
Green Areas interact with infrastructure
Large structures connect to infrastructure
Port industry miniaturizes
Urban Industrial tissue is soften with green
Infrastructure becomes a green artery
Large structures become useful and flexible
61
PEDALING CARACAS Metropolitan Bike Path Network 4th Place | Caracas a Pedal Competition | Caracas, Venezuela 2012 | B. Lamelo, N. Covarrubia, C. Levy
62
Autocad + Photoshop
63
PEDALING CARACAS Metropolitan Bike Path Network 4th Place | Caracas a Pedal Competition | Caracas, Venezuela 2012 | B. Lamelo, N. Covarrubia, C. Levy
Objective: The aim of the proposal is to promote urban cycling as a possible solution for the problems of mobility of Caracas through the implementation of a bikepath network and its associated services. It is a proposal that focuses on the progressive change of infrastructure and civic culture. In each phase of the project it is intended to have enough strength to change mindsets and make urban cycling a new reality for citizens. Methodology: To establish the main routes, the main points that generate urban dynamics were studied, and in that way, the bike path network is based on real flows and is adjusted to the current needs of the population. Nodes were also established, and were categorized in major and minor nodes, in order to determine the function of each. The nodes were also used to provide the city of urban infrastructure. Phases: In terms of short- and medium-term feasibility of the project, it is intended that the first stage of formalizing the network involves minimal impact on existing roads. This involves initiatives such as the redeployment of wide roads, the use of separation elements, the improvement or creation of pavements, the treatment of intersections, among others.
Integrated Street bike path Wide roads are restructured to include the minimum bike path space (1.5m), It is marked on the pavement and in some cases shared with the bus lane
Sidewalk integrated bike path with protection The road infrastructure supports the incorporation of the bike path without changing lanes or sidewalks dimensions. It is marked on the pavement and protection elements and demarcation of the channel are placed
Sketchup + Photoshop
64
Prototype No. 01-02 Seating Module
Prototype No. 03 Bike parking Module
Prototype No. 04 Bike rack devices in public transportation
Trash can and drinking fountain Module
Independent bike path The bike path is included in residual spaces of existing roads. Dimensions of lanes or sidewalks are not altered.
Sidewalk integrated bike path - unprotected The bike path is incorporated into the sidewalk and is normally related to an urban park or linear public space
65
REVIT
ARTISAN’S GALLERY AND MARKET Cultural & Commercial Facility Revit Project | Choroní, Venezuela
External view
3D section
66
1
2
4.50
3
4.50
4
4.50
A
5
4.50
6
4.50
Level 1 4.00
Ground Floor
Ground Floor
0.00
0.00
1
12
E
D
23
C
34
B
45
A
56
67
7
7
4.50
Level 1
0.10
UP 4.50
Level 1 4.00
UP
Level 1
Level 1
4.00
4.00
4.00
Ground Floor
4.50
B
Ground Floor
Ground Floor 0.00
0.00
0.00
West Elevation 1
2
C
3
A B
4.50
A
4
B C
E
D
5
6
C D
D
7
D E
C
E
B
A
Level 1
4.50
4.00
Level 1 Level 1 Ground Floor 4.00 4.00 0.00 Level 1
E
4.00
Ground Floor 1
2
3
4
5
6
7
Ground Floor
Ground Floor
0.00
0.00 Ground Floor
East 0.00 A
E
D
C
B
A
Elevation
1
A
2
3
Code
Status
D
4
PROJECT
Status
4.00
SHEET
SUITABILITY DESCRIPTION SUITABILITYPURPOSE DESCRIPTION OF ISSUE PURPOSE OF ISSUE
Level 1
C
www.autodesk.com/revit www.autodesk.com/revit Level 1
Code
C
Level 1
SHEET
4.00
Ground Floor
Ground Floor
Date
Date Project Number
Drawn by
Drawn by DRAWING NUMBER
UnnamedUnnamed
Author
Scale (@Number A4) Project
1Project : 200 Number
Author
A102
Scale (@ A4) REV
REV
1 : 200
DRAWING NUMBER
A102
Checked by
Checker
Ground Floor
Checker
25/3/2016 12:32:31 a. 25/3/2016 m. 12:32:31 12:30:36
South Elevation
Casa Cultural B ChoroníC
PROJECT
A www.autodesk.com/revit Code
Status
SUITABILITY DESCRIPTION
PURPOSE OF ISSUE
E
SHEET
1
2
3
4
Casa Cultural Choroní
PROJECT
www.autodesk.com/revit Status SHEET
Level 1
Owner Owner
Project Number Issue Date
Issue Date
0.00
0.00
SUITABILITY DESCRIPTION
7
CLIENT
0.00
DCross Section
Code
6
CLIENT
Checked by
4.00
E
5
Casa Cultural Casa Cultural Choroní Choroní
PROJECT
B
B
PURPOSE OF ISSUE
4.00
Internal view
5
6 CLIENT
Date
Project Number
DRAWING NUMBER
Author
Checked by
Checker
Project Number
A101
D
Owner
Project Number
Drawn by
DRAWING NUMBER
Issue Date
Unnamed
E
Date
Author
Checked by
Checker
Project Number
Scale (@ A4)
1 : 200
REV
A102
25/3/2016 12:30:36 a. m
Owner
Drawn by
Issue Date
Unnamed
7
CLIENT
Level 1 4.00 Scale (@ A4)
1 : 200
REV
Ground Floor 0.00
24/3/2016 11:48:04 p. m.
Internal view
Ground Floor 0.00
Casa Cultural
PROJECT
CLIENT
67
Owner
REVIT
BRISAS DE CÚA RESIDENTIAL BLOCK Multifamily Housing Project Revit Project | Cúa, Venezuela
A'
A
B'
C'
B
D'
E'
C
D
C'
B
D'
E'
C
D
F'
E
F
G'
G
H'
H
I'
I
J
E
F
G'
G
H'
H
I'
I
J
J'
K
K'
L
K
K'
L
1
2
3
4
UP
5 1' 6 2' 7 8 3'
Level 1 A'
1
A B'
F'
J'
Level 1 1
1 : 500
2
3
4
External view
5 1' 6 2' 7 8 3'
Ground Floor A'
1
A
B'
D'
E'
C
F'
SHEET
Ground Floor
Unnamed
2
3
E
F G'
G
Project Number
Drawn by
DRAWING NUMBER
Author
Checked by
Checker
H'
H
Owner
Date
Issue Date
PURPOSE OF ISSUE
1 : 500
D
CLIENT
Status
SUITABILITY DESCRIPTION
1
B
Brisas de Cúa
www.autodesk.com/revit Code
C'
PROJECT
Project Number
Scale (@ A4)
1 : 500
REV
A102
27/3/2016 5:18:08 p 4
5
CLIENT
PROJECT
Brisas de Cúa
1'
www.autodesk.com/revit
6
Code
Status
SUITABILITY DESCRIPTION
7 PURPOSE OF ISSUE
2'
SHEET
Sectioned Isometric View
68
Unnamed
Standard Layout
y1
Project Number
Drawn by
DRAWING NUMBER
Issue Date
8 3'
Owner
Date
Author
Checked by
Checker
Project Number
Scale (@ A4)
1 : 500
REV
A101
27/3/2016 5:17:46 p
North Elevation
South Elevation
Isometric view 3'
8
7
2'
6
1'
5
4
3
2
1
Roof Top 15.90 Roof Base 15.00 Level 4 12.00 Level 3 9.00 Level 2 6.00 Level 1 3.00 Ground Floor 0.00
View from the gallery
A'
A
Cross Section
B'
C'
B
D'
E'
C
D
F'
E
F
G'
G
H'
H
I' I
J
J'
K
K'
L
Roof Top 15.90 Roof Base 15.00 Level 4 12.00 Level 3 9.00 Level 2 6.00 Level 1 3.00 Ground Floor 0.00
Brisas de CĂşa
www.autodesk.com/revit
1
Section 4 1 : 200
CLIENT
PROJECT
Longitudinal Section Code
Status SHEET
SUITABILITY DESCRIPTION
PURPOSE OF ISSUE
Project Number
Drawn by
DRAWING NUMBER
Issue Date
Unnamed
Owner
Date
Author
Project Number
Scale (@ A4)
1 : 200
REV
69
A R C H _ U R B
BE T TISABEL LAMELO 2016
Cover Photo: Mayor Square, Ourense - 2012
70
+34 617 69 11 35 bettilamelo@gmail.com