Design Studio Gamma portfolio(H1)

Page 1


Description: About Myself...... Gamma is divided into three stages, but the three stages are equally important. The analysis of the first project lays the foundation for the following assignments. And after continuous improvement, we have the last two assignments. Gamma is not only talking about architectural systems in cities, but also talking about how people live with the factors such as density, climate, biodiversity of ecological system and civic system. Among them, diagram helps me to analyse each system and how they function together. And then, the ideas and design concept will come up with full thinkings of the site

Although I started with landscape architecture, I still have a strong love for architecture. I have integrated the knowledge I have learned, and I hope that I will go longer on the road of design. . .

Contact

Awards and Experience

Email: bettyqichuyin@gmail.com

2016- In my Chinese university, I participated in Tongji University design

Wix Page link: https://bettyqichuyin.wixsite. com/bettyqichuyin

competition and won an award for excellence. Besides, I also participated in physical building renovation activities.

2018- I had one- month internship experience in China Architecture and Research Institute-----Southwest Branch. During the internship, I worked with my team for designing the concept of high school, mainly design thegate and kindergarten. At the same time, I have 3 years experience of sketching, including sketches, watercolor, line drawing, Marker . Additionally, I have experienced model . MSDx-During my study in university, My subjects FODR: Mario World and Design Studio Alpha had score which is 95 and was shown on the TV of the MSDx and MSDx. And Digital Design(83/100) and Design Studio Beta (90/100)also have been shown in MSDx.

2018 - current Bachelor of Design 2016-2018 Bachor of Landscape Suzhou University of technology

Instgram: chuyin.qi

and science

Issuu: https://issuu.com/bettyqichuyin?issuu_product=header&issuu_subproduct=pay-

2013-2016

Skills:

Intership Experience:

Rhino Grasshopper

Architecture China Southwest Architectural Design And Research Institute

Liewu High School

Enscape Photoshop

Awards / Exhibition:

Illustrator

2020 Beta

MSDx Digital Design&Design Studio

2019

MSDx Design Studio Alpha

2018

FOD:R Exhibition, AFLK Gallery

Indesign Fabrication Sketchup


CONTENT

ASSIGNMENT 1

ASSIGNMENT 2

ASSIGNMENT 3


ASSIGNMENT 1 Mapping + Analysis: Urban Ecology, Landscape, Place, Dwelling Assignment 1 - Mapping + Analysis: Urban Ecology, Landscape, Place, Dwelling. This project is mainly to have a basic analysis of site, and to understand the function of systems. Mine analysis is built systems in Calton. First I analyse the site plan and spatial experiences in public places. Then the built forms also define the residential areas. The framework and SWOT have the idea of improvements from previous problems that site may have and create a basic ideas of how I define the residential house on the site



0

5

10

15 m


0

5

10

15 m


0

5

10

15 m



SWOT Diagram

Community: 1. Residential area and old houses Building Typology 1. Comebination with Terrace, Townhouse and Stand-alone house together History& Cultures 1. Historical response on houses - VIctorian Style 2. Cultures of Australia houses - unit blocks

Strong

Threats

Function Unity 1. Most houses are residential areas, which provide private zones, compared with city

Materiality: 1. Use long- live materials 2. Maintain the color of materials

Orientation 1.Facing the streets and easy to access 2. Back yard facing north gains more sunlight

Among buildings: 1. Less rest facilities in public rest area 2. Too clear boundary between each house 3. Narrow path and less private at the yard 4. Sunlight 5. The problem of car part area both in and outside of the buildins 6. Too many hard ground between each other 7. Too private at the front door between each building, for they have walls In the building: 1. Material aging 2. Landscaping, less diversity 3. Sunlight 4. Color

Space Arrangement: 1. Car park area(individual) 2. More multipul function in the house 3. Threshold 4. Interaction between houses and landscaping 5. Social public space 6. Weaken the space boundary

Weakness

Opportunities

Effciency 1. Saving Energy(use sunlight) Environment: 1. Green roof 2. Interaction between yard and house 3. Re- connect with square landscape and service place Style 1. Recall the Victorian Style 2. Import the modern urban life in the community

Future

Current

Circulation and Path 1. Well organized circulation inside and outside of the houses, from threshold to back yard 2. Have small path connected to back yard of each house and connect civic transportation

1. Impact on Climate Change 2. People density 3. The limitation of site area 4. Increasing the interaction 5. A combination of modern urban and residential styles 6.Balance between landscaping and buildings




Tracing Plan


Search Results Web results Urban Hybrid - MVRDV The main purpose of the building is to think about creating a new type of neighborhood relationship in the urban context. The establishment of standardized changes, as well as the landscape areas and courtyards used to connect between each building, are necessary conditions for neighbors to communicate. The purpose of the design is to let people out of the house to achieve the purpose of interaction between the houses


From House to Neighbor Yard The rectangular housing unit has more opportunities to touch the green space area, which maximizes the influence of neighborhood green space and public area on the housing.Under the influence of the unit, the green space takes on different shapes to realize the permeation and natural transition between neighbors. They can also divide the site into different zones like puzzle pieces

From Yard to Yard External and internal courtyard courtyard are also closely linked, the outdoor garden (unit) neighbors and itself has a certain visual contact, although each unit yard is own property, but they also strengthen the contact, the neighbor landscape make public and private, at the same time also emphasized the influence of ecological environment for human



The design framework shows basic ideas of desining new residential form in Carlton. For my concept through assignment 2 and 3, I always keep the entry clear and have strong visual permeability in the house


ASSIGNMENT 2 LIVING NEIGHBORHOOD Assignment 2 allows us to design the thinking of the intensify and densify. We should consider the incresing number of population on our site and add more units according to our original boundary between each unit. We have to think a new way of producing biodiversity and ladscaping around people. Moreover, after analysing the possibilities of improvement from orginal site, some problems such as hard boundary betwen each unit will be solved in the project



N

Site Responding 1:200

Massing Component Winter

12 pm

9 am

3pm

Circulation form

Summer

Boundary

Building area

Rise and fall

12 pm

9 am

Segmentation

Partition

Addition and Subdivision

3pm

Cantilever

Site boundary

Fall and hold

Subdivision


Entry

N


Roof Garden- In oder to reach Ecological system and Melbourne condition, it is good to plant some trees on the top of the house and achieve the biodiversity not just on the ground floor but in different levels


Underground public study studio


Steel Stairs

Outdoor Public Swimming Pool

Roof Garden


Steel Floor


Public Coffee Room

Study Room


Description: Linear-Ground floor and Roof garden: The linear landscaping is onr of the basic site form to be integrated with units. And linear landscaping form will be crossed with units and reach to different levels to enrich different biodiversities.

Circular-Public rest area facing north: Circulat landscaping is actally a garden drip area with steel

floor, so that the rain could fall down to the earth through these small gaps between each other. Also, circular form is one of the secondary elements in my design to response to my steel floor on level 2 and 3

Vetical-Some planting steel plate between each unit: This planting plates are solutions to hard

boundary between units. I changed the walls to these steel plate with some earth, it could plant some trees by people and communicate with each other through these plates


Birds: Parrot, Cracticus tibicen Reptile: Brushtail Possum Insects: Fly, Bee, Butterfly, etc

The garden drip is divided into different curcular shapes, which could plant trees by human and people could also rest in the area. The area could reach biological system with different species


N

Canning Street


Entry




ASSIGNMENT 3 LIVING HOUSE Assignment 3 is the improvement from assignment 2 and could redefine the idea of how people live in one unit. The project will be more detailed and comprehensive in thinking about the design and change some parts from assignment 2. Ecological system and building systemwill be detailed in one house and especially in how they function together after 3 decades when different generations live there





Ground Floor Plan 1:100

0

1

2

3m



0

1

2

3m

Not to scale


Decade 1

Decade 2

Decade 3


0

0

1

2

3m

1

2

3m

0

1

2

3m


Section model shows main garden and gallery through living room to kitchen room. You could see it has two levels and both of them will have visual permeability to main garden. And when biodiversities grow in the garden, people could enjoy with nature together in the house and reach the balance between each other

Sectional Model (4)1:50 0

1

2

3m


Entry

Living room

Gallery

Bedroom

Gallery

0

1

2

3m

Kitchen room


Main garden have emotional feeling of people. When people see through gallery or just sit in the main garden. They will have visual contact with each other and with landscaping. The landscaping also consider the decades when biodiversities grow up


The study area doesn't occupy full area above kitchen room, because the landscaping from two sides will allow people to feel ecological feeling. Also, people could contact with each other on different levels, which is very interesting to stand on different places and talk


N

Roof Garden- In oder to reach Ecological system and Melbourne condition, it is good to plant some trees on the top of the house and achieve the biodiversity not just on the ground floor but in different levels




Some little openings which are one brick-size, will make the brick house lighter. And lighting is also important in the house, not only for people inside of the site, but also we could see how builing function from outside









REFLECTION All projects are important in thinking more detailed about architecture in Gamma. And for the future study, we have to think more comprehensively about the design. I think it is a very interesting project and process of producing different design and diagrams to show our full ideas of architecture especially in house project, for the condition of residential areas and ecological system in Melbourne and convid-19


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.