NGUYEN THI BICH HUE - PORTFOLIO
bichhue275@gmail.com 098 847 8274
INTERIOR DESIGN & ARCHITECTURAL DESIGN
Yu m i & M a r c a p a r t m e n t
location: The Manor, HCMC site area: 168 sqm responsiblity: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
Concep t s k etch
BALCONY
BALCONY
TWIN'S BEDROOM LIVING ROOM BEDROOM
PLAYROOM
MASTER BEDROOM
BEDROOM
exi s t i ng p l a n a nd r e nov a t e d p l a n
ENTRANCE HALL
CHILDREN'S BATHROOM
DINING ROOM
UTILITY KITCHEN
WC
British Council HCM r e v o v a t i o n
location: Le Duan, D1, HCMC site area: 480 sqm responsibility: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors along with PMs (CBRE) - created and managed all architectural drawings
ru bber-c lad d ed s teel s tair
TV
T08 CH 2600 CF : CB2 FF : CPT1
CV
T02 CH 2500 CF : CB2 FF : CPT1
P
T03 CH 2600 CF : CB2 FF : CPT1
CV
T04 CH 2600 CF : CB2 FF : CPT1
P
S
HDMI VGA
3700
3580
TV
3580
TV
3580
CV P
S
HDMI VGA
TV
3580
CV P
S
HDMI VGA
TV
3580
T05 CH 2600 CF : CB2 FF : CPT1
S
HDMI VGA
3840
CV P
3580
3580
2030
50 mm 80 kg/m3 rockwool insulation 12.5 mm Gyproc perforated ceiling
S
T06 CH 2600 CF : CB2 FF : CPT1
S
3580
3840
40020
CORRIDOR
CLASSROOM
13 18
70
18 65
WT 1
WT 1 - FB
FORBO bulletin board 6 mm MDF 18 mm WBP plywood board each side 50 mm 80kg/m3 rockwool sound insulation 12.5 mm Gyproc wall board 10
T01 CH 2600 CF : CB2 FF : CPT1
S
100 x 12 mm moisture resistant MDF skirting 70 mm Gypframe C studs @ 600cc Interface carpet 70 mm existing screed
100
HDMI HDMI VGA
FB1
S
8
FB1 FB2 FB3
S
T17 CH 2500 CF : CB1 FF : CPT1
C
70
S
WAP
10690
T16 CH 2500 CF : CB2 FF : CPT1
C
50 mm extruded polystyrene rigid form. closed cells insulation
S
HDMI VGA
WAP
CV T07 CH 2600 CF : CB2 FF : CPT1
S
T15 CH 2500 CF : CB1 FF : CPT1
4330
P
CV
4330
P
T11 CH 2520 CF : CB1 FF : CT1
TV
T12 CH 2520 CF : CB1 FF : CT1
S
T14 CH 2600 CF : CB2 FF : CPT1
HDMI VGA
TV HDMI VGA
T09 CH 2600 CF : CB1 FF : ESV
T10 CH 2520 CF : CB1 FF : CT1
CV
S
T13 CH 2800 CF : CB2 FF : RB1
P
1 400
Wall type 1 - WT1
1/5
Parkland
r e s i d e n c e location: Ha Noi highway, HCMC site area: 7804 sqm GFA: 9308 sqm responsibility: - designed concept - created and managed all architectural drawings
McDonald’s
K i n h D u o n g Vu o n g Dien Bien Phu location: Kinh Duong Vuong, D6, HCMC site area: 2216 sqm GFA: 800 sqm responsibility: - designed concept based on McDonald’s standard - dealed with suppliers on material and equipment specifications - created and managed all architectural drawings
Yu m i & M a r c T h a o
location: Thao Dien, D2, HCMC site area: 406 sqm GFA: 500 sqm responsibility: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
D i e n
V i l l a
1. l i v i ng r oom 2. kitchen
1 . m a i n entra nce deta il 2. m a st er bedroom entra nc e
1 . st u d y ar ea 2 . playr oom
1 . mast er bat h r oom t o mast er war d r obe 2 . mast er bed r oom wi n d ow seat
1. s t u dy r oom 2 . m a s t e r w a r dr ob e
Te r e n c e T h o a a p a r t m e n t
location: Riviera Point, D7, HCMC site area: 520 sqm responsibility: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
Quyen & Stephane p e n t h o u s e
location: City Garden, HCMC site area: 400 sqm responsibility: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
Thuy Design House location: Thi Sach, HCMC site area: 350 sqm responsibility: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
Marou
C a l m e t t e location: site area: responsibility:
Calmette, HCMC 300 sqm visualised concept design
The Factory Contemporary Arts Center location: Nguyen U Di, HCMC site area: 1000 sqm responsibility: - designed concept alongside with chief architect - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
X2
r e s o r t location: Hoi An site area: 2000 sqm responsiblity: - visualised concept design - dealed with suppliers on material and equipment specifications - created and managed architectural drawings
Le Cong Kieu h o t e l
location: Le Cong Kieu, HCMC site area: 260 sqm responsiblity: - designed concept alongside with chief architect - created and managed all architectural drawings
IMC Sky Bar location: Tran Quang Khai, HCMC site area: 500 sqm responsiblity: checked and managed all architectural drawings
O T H E R P E R S O N A L P R O J E C T S 1. MK Studio 2. FWA Studio 3. Phu My Hung Sanatorium
MK
s t u d i o
location: Suong Nguyet Anh, HCMC site area: 30 sqm responsiblity: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
F WA
s t u d i o location: Sky Center Apartment, HCMC site area: 40 sqm responsiblity: - designed concept - dealed with suppliers on material and equipment specifications - supervised contractors - created and managed all architectural drawings
Phu My Hung
S a n a t o r i u m
1. 2. 3. 4. 5. 6.
master plan b u nga l ow 1 p l a n bu nga l ow 1 s e c t i on v i e w f r om b e dr oom v i e w f r om l i v i ng r oom v i e w f r om be dr oom
Nguyễn Thị Bích Huệ bichhue275@gmail.com 098 847 8274 Bachelor of Architecture at Ho Chi Minh City University of Architecture Architect at BHA studio HTAP architects
10.2018