incorporating Changing Times
news for thames water people
February/March 2012
inside this issue 3 Supporters assemble for Thames Tunnel 4 New approach to event response 6 Improvements take hold at Long Reach 10 What a Beauty: stage success in Swindon 30 Dave’s 42-year career at Riverside
Measuring the benefits: How we’re leading the way with metering p16-17