PROJECT: ESSENDON CONSTRUCTION OF THREE NEW TOWNHOMES ON LOT 1
DRAWING SCHEDULE TP01 SITE CONTEXT PLAN TP02 PROJECT VIEWS & DETAILS TP03 SITE FLOOR PLANS TP04 ELEVATIONS PAGE 1 TP05 ELEVATIONS PAGE 2
ISSUED FOR PLANNING APPROVALS The Builder should check and verify all the dimensions and verify all errors and omissions to the design. Donot scale the drawings Drawings shall not be used for the construc on purposes un l issued by the designer for construc on
CLIENT NAME
TP06 SHADOW DRAWINGS PAGE 1 TP07 SHADOW DRAWINGS PAGE 2
PROJECT NAME
CONSTRUCTION OF 3 NEW DWELLINGS PROJECT ADDRESS
DRAWING TITLE
LIST OF DRAWINGS SCALE
DATE
STATUS T/PLANNING
CHECKED BY
PROJECT NO
DRAWING NO
C:\ArchiCAD Projects\Robert\
St. Townhouse\11‐02‐2010\11‐02‐2010
st‐v2.pln