Company Brochure

Page 1

LW Panels www.celergroup.com

celer group



CELER GROUP

Celer Group specializes in cutting edge technology, providing turnkey solutions for the construction industry. With our innovative molding system and local manufacturing we are able to deliver high quality products that bring advanced technology to the construction industry; reducing the carbon footprint of construction at every phase.


LW Panel Lightweight Panels for interior and exterior walls and partitions The LW-Panel is composed of a 6mm fibre cement board facing with a core of concrete and EPS (expanded polystyrene) Each panel is 1.8 m2 (3m x 0.6m) with thickness options of 75mm, 100mm, 150mm and 200mm Tongue and groove profiles to interlock each panel

History The idea of the light weight panel originated from Australia in the 1970’s and since then it has spread across Asia, being used in all areas of construction. With over two years of R&D and four years of production, Celer Group is proud to be the first and only GCC manufacturer to be approved by Dubai Municipality, UAE Civil Defense and Qatar Civil Defense.


Advantages

Time Saving Up to 5x faster installation than competition

Cost Saving Significantly reduced foundation depth Fewer labor hours Transport efficiency

Quality Local manufacturing High quality components from reputable brands No ripples Flat and straight

Safety Upto 4 Hours fire rating (Civil Defense Approved) Non-toxic

Sustainability U-Value < 0.5 Minimal wastage

Handling No wet work/plastering required Ready to paint Lightweight Simple installation


Installation

1

2

Fix Channel/Angle to floor and ceiling

Place the panel in the channel and slide into position

3

4

Apply adhesive to the mating surfaces and slide the next panel into position

Tape LW-Panel joints and fill

5 The LW-Panels are ready to be painted


Detailed View 10

Celer cavity wall system

10 05 06

08

11 04 09

1

12

03

10

13

07

07

08

08

14

01

15

08

Celer single wall system

08

11 13

02

14

01 08

01 02

15

DESCRIPTION 1. Galvanized U Channel fixed by fischer fixing stud fn. (shall be covered by screed) 2. Fischer fixing stud fn 27mm long, spaced at every 500 mm. 3. 6mm thick fibre cement board. 4. EPS with regular portland cement. 5. Celer Group multibond PVA. 6. Celer Group repair mortar. 7. Boral jointing tape & boral premium premix finish.

8. Ă˜-12mm Dowel rebar with chemically bonded on Celer Group anchor grout with 50 mm minimum penetration from each side @ every 1.00 MTR 9. 10. 11. 12. 13. 14. 15.

Hilti CP 606 fire sealant. R.C.C column / wall Celer light weight panel. Knauf dritherm cavity insulation. Wall finish as per schedule. Floor finish as per floor schedule. R.C.C slab


Product Specification Comparison LW Panels

Hollow Block Plaster Finished

AAC Block

5.5

1.3 - 3.5

3.0 - 4.0

Direct Pullout (N)

1800 - 2000

Up to 710

Up to 320

Density (Kg/m3)

520 - 810

1400 - 1900

400 - 1000

0.4

2.3 - 2.8

0.3 - 0.4

Fire Rating

1.5 - 4 Hours

Varies

0-4 hours

STC Rating

43 - 60

up to 46

up to 39

Joint Capacity (kN-m)

2.53 - 4.66

2 – 2.5

2 – 2.5

Panel Moment Capacity (face) (kN-m)

1.99 - 2.96

N/A

N/A

Panel Moment Capacity (side) (kN-m)

5.58 - 7.15

N/A

N/A

Axial Load Capacity (kN/m)

173.8 - 283

N/A

N/A

Not Required

Required

Required

Acceptable

Acceptable

Acceptable

Compressive Strength Wall Section (N/mm²)

U Value

Plaster Requirment Wet Areas

LW Panel offers speed of construction, cost savings in both material and manpower requirements, functionality and adaptability in design, along with outstanding engineering characteristics.


Time Comparison A comparison of the time taken to build a wall finished (2 sides of plaster) and ready to paint on both sides.

Wall area = 16sqm (as per BS 5628-1:2005) Length = 4.5m Height = 3.5m 2-point lateral support; 1 existing and 1 to be installed by contractor No fire proofing

Light Weight Panels

Blocks

3000 x 600 x 150 (h x l x w) Team of 6 skilled labourers

200 x 400 x 150 (h x l x w) Team of 5 bricklayers and 2 plasterers

Step

Time

Step

Time

Location marking

0.5 hr

Location marking

0.5 hrs

Bottom and top track cutting and setting

1.0 hr

Mortar mixing and setting out

1.0 hr

Install first panel with dowel bars

0.5 hr

Block laying

48 hrs

Installation of vertical panels

1.0 hr

Steel fixing for column support

2 hrs

Measuring and cutting of horizontal panels

1.0 hr

Mixing and casting of column

1.5 hrs

Installation of horizontal panels

1.0 hr

Curing time

24 hrs

Closing of head track

0.25 hr

Manual plastering

5 hrs

Wind post measurement and fixing

0.5 hr

Curing time

24 hrs

Closing of joints

1.0 hr

Curing time

24 hrs

Finishing of joints

1.0 hr

Note: Panels only require mobile scaffolding and not restricted by height

Total Time

31.75 hrs

Note: Block work walls cannot be built higher the 6 courses without the mortar setting i.e. 24hours Rigid scaffolding is required to be fixed for blockwork at 1.5m height. Celer assumes the scaffolding and the first 6 courses can be done in 24 hours..

Total Time

106 hrs


Clients The Dubai Mall Zabeel Expansion

Client: Brookfield Multiplex Location: Dubai

Square Meters: 42,000

Expected Completion: 2017

Al Habtoor Polo Resort & Club

Client: Parkway International Contracting Location: Dubai

Square Meters: 20,000

Expected Completion: 2016

One The Palm

Client: Brookfield Multiplex Location: Dubai

Square Meters: 60,000

Expected Completion: 2017

PARKWAY INTERNATIONAL CONTRACTING L.L.C.


Clients Abraj Quartier

Client: Shapoorji Pallonji Location: Doha, Qatar

Square Meters: 301,000

Expected Completion: 2017

Labour Accomodation for Al-Itihad Duct Pipe Factory

Client: Eagle Electromechanical & Al-Hijaz Mechanical Location: Dubai

Square Meters: 16,000

Expected Completion: 2017

SAMSUNG DSD

Saudi Arabian National Guard

Alandalus Property

Saudi Binladin Group

Petro Rabigh

Makkah Water


Project Photos - Cutting & Chasing for Services


Project Photos


Project Photos


Up to 5x faster installation per m2 compared to competition


1102 | Grosvenor Business Tower | Tecom PO Box 118550 | Dubai | UAE T. +971 4 558 6950 www.celergroup.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.