1 minute read
MDL delive r s PLSV re co ve r y a ssembly fo r Sub sea 7
M
Manufactured
Advertisement
an
Af t Recover y Sys t em Assembly for Subsea7.
The unit consists of a chute, a removal device for buoyancy modules and a horizontal hang-off system and be utilised on multiple Subsea7 vessels operating in deepwater
The complete system is mountable in different locations on the stern of the vessels for flexibility and ease of use with lazy wave flexibles fitted with buoyancy modules It is engineered to be fixed to the deck by way of sea-fastening brackets with a quick release bolted connection
The system can recover a range of product diameters without overbending the flexible or crushing the buoyancy modules
The inboard angle of the chute arc extends over 90 degrees to facilitate buoyancy modules manoeuvring without using a crane and it is designed with a dedicated guide rail to suppor t the modules through recover y.
To allow for the suspension of the catenar y weight during recover y of a damaged lazy wave, the hang-off clamp is designed to be orientated in a horizontal position
MDL has previously provided solutions to Subsea7, through design, manufacture, rental and operation of a range of back-deck equipment, including bespoke deliveries of reel drive systems, tensioners, deck radius controllers and turntables to global locations
In recent years, MDL AME technical team has travelled to Subsea7 vessels to per form 5-yearly maintenance works as well as winch load-cell upgrades in-situ
“I am pleased to see the relationship with Subsea7 continue, from bespoke design and manufacture, to rental of equipment for specific projects, to more recently asset maintenance and engineering ser vices for their global fleet This latest deliver y draws a full circle, reflecting the complete integrated ser vices we can provide as a single-source par tner to our clients ” commented James Farquhar, MDL AME Key Account Manager
“As an established Original Equipment Manufacturer, our 23-plus-year exper tise of the back-deck also makes us the ideal par tner to efficiently per form annual sur veys and 5-yearly maintenance programmes on lifting and pulling equipment, including cranes and third-par ty systems, a growing track record in our trusted ser vices por tfolio ” he added www maritimedevelopments com