Bluon TdX 20 Compared to R-22 Testing Summary

Page 1

Bluon TdX 20 Compared to R-22 Testing Summary

Prepared by

PG&E Applied Technology Services

Prepared for

Bluon Energy

August 2015


Testing Summary Bluon TdX 20 has been formulated as a drop-in replacement for R-22 in existing equipment. Rather than a pure chemical like R-22, Bluon TdX is a proprietary blend of several constituents each of which have been approved under the Environmental Protection Agency’s SNAP (Significant New Alternatives Policy) program. Bluon TdX 20, has been evaluated by the EPA and is currently authorized, under rule Section 82.180, for sales in commercial and residential air conditioning and heat pump systems. The use of a drop-in replacement will allow customers to operate their existing air conditioning and refrigeration equipment farther into the future. Testing was performed under contract from Bluon Energy to provide them with a report comparing TdX 20 with R-22. The test was performed in a controlled environment in the HVAC testing apparatus at PG&E’s San Ramon (California) Technology Center. The HVAC apparatus consisted of two side-by-side environmental chambers designed according to ASHRAE Standard 37. The objective of the test was to compare the efficiency of an air conditioner unit with the only variable being the type of refrigerant in the circuit. Tests were conducted on the system across different outside air temperatures and using both one and two compressors to isolate just the effect of the refrigerants. The test results are summarized below in the following figures and tables.

Energy Efficiency Measures Summary

EER is depicted at the AHRI Standard Test A with conditions of 95⁰F outside air temperature; SEER as calculated by the weighted bin method; and IEER derived from the AHRI Standard Test A with single compressor operation at temperatures between 65⁰F and 72⁰F.

P a g e 2|8


Test Comparisons TdX 20 v R-22 Summary Bluon TdX 20 showed better efficiency and lower pressures and temperatures as compared to R-22 across different outside air temperatures, using both one and two compressors. The results are demonstrated in the tables below1.

1

The testing unit was a Carrier Single-Package Rooftop Unit – Model 48 DJDE009 – 8.5 Nominal Tons, 2 Circuits, and 2 Compressors

P a g e 3|8


REFERENCES 1. ANSI/AHRI Standard 210/240-2008, Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment, Air-Conditioning, Heating and Refrigeration Institute, 2111 Wilson Boulevard, Suite 500, Arlington, VA 22201, 2011. http://www.ahrinet.org/App_Content/ahri/files/standards pdfs/ANSI standards pdfs/ANSI.AHRI Standard 210.240 with Addenda 1 and 2.pdf 2. ANSI/AHRI Standard 340/360-2007, Performance Rating of Commercial and Industrial Unitary Air-Conditioning and Heat Pump Equipment, Air-Conditioning, Heating and Refrigeration Institute, 2111 Wilson Boulevard, Suite 500, Arlington, VA 22201, 2011. http://www.ahrinet.org/App_Content/ahri/files/standards pdfs/ANSI standards pdfs/ANSI AHRI Standard 340-360-2007 with Addenda 1 and 2.pdf 3. ANSI/ASHRAE Standard 37-2009, Methods of Testing for Rating Electrically Driven Unitary Air-Conditioning and Heat Pump Equipment, ASHRAE, 1791 Tullie Circle NE, Atlanta, GA 30329, 2009. http://www.techstreet.com/ashrae/products/1650947 4. Davis, Robert, Laboratory Testing of Performance Enhancements for Rooftop Packaged Air Conditioners, ET13PGE1241. http://www.etcc-ca.com/reports/laboratory-testing-performance-enhancements-rooftoppackaged-air-conditioners

LEGAL NOTICE This report was prepared by Pacific Gas and Electric Company. Neither Pacific Gas and Electric Company nor any of its employees and agents: 1) makes any written or oral warranty, expressed or implied, including, but not limited to those concerning merchantability or fitness for a particular purpose; 2) assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus process, method, or policy contained herein; or 3) represents that its use would not infringe any privately owned rights, including, but not limited to, patents, trademarks, or copyrights.

APPENDIX 1

Test Objectives

The objectives of this test was to compare various performance attributes of an air conditioner with only variable being the type of refrigerant in the circuit. Tests were conducted on the system at a fixed set of environmental conditions and operating modes to isolate just the effect of the different refrigerants. The key parameters of interest for Bluon were: 

Cooling Capacity

Power Consumption

Efficiency (EER, SEER, IEER, COP)

Suction Pressure

Discharge Pressure P a g e 4|8


2

Discharge Temperature

Compressor Head Temperature

Mass Flow Rate

Ramp-up Time

Laboratory Facility

All testing was performed in the HVAC testing apparatus in the Advanced Technology Performance Lab (ATPL) at PG&E’s San Ramon Technology Center. The apparatus consists of two side-by-side environmental chambers designed according to ASHRAE Standard 37 (reference 3). The two chambers have independent conditioning systems for maintaining temperature and humidity, and each has its own airflow measurement apparatus or “code tester”. The airflow measurement apparatus follow ASHRAE standard design, and consist of a sealed box with a partition having several flow nozzles that can be opened or sealed in combination to provide the required range of differential pressure for the current airflow. Variable-speed blowers on the outlets of each station can be set to maintain the desired outlet static pressures or airflow rates and compensate for the added resistance of the flow measurement system and ductwork. The smaller of the two chambers is conditioned to maintain the required return air conditions to the RTU and its code tester is used to measure the supply airflow from the RTU. Whereas the larger chamber is used to maintain the required outside air conditions to the RTU condenser and its code tester is used to measure the condenser exhaust airflow. The test air conditioner was located completely inside the large chamber. Figure 1: HVAC Test Lab (Indoor room on left, outdoor room on right)

3

Test Unit

The air conditioner used for this evaluation is a circa 1991 Carrier Model 48DJD009 rooftop unit (RTU) with a nominal capacity of 8½-tons (100,000 Btu/hr). The unit is equipped with two compressors operating with R-22 refrigerant, a fixed-speed (constant volume) 1½-hp indoor blower, and a single ¾-hp condenser fan interconnected with the first stage compressor. The reason this unit was chosen was because it was already set up and instrumented in the PG&E HVAC laboratory following testing work that lead to the report listed as Reference 4. It has the advantage of being a fairly good representative of the state of existing systems. One drawback to using this unit was that with two compressors there are two separate circuits that would need to have the refrigerant replaced, increasing the cost and time required. Another issue is that the system uses what Carrier calls an Acutrol™ metering device, which is basically a header with multiple fixed orifices feeding separate circuits in the evaporator. If some become fouled, then the P a g e 5|8


evaporator may end up out of balance. Also, like most fixed geometry expansion devices, the system is less forgiving of improper refrigerant charge than one with a modulating expansion device like a TXV. Only a few modifications were needed to the test unit following the previous work. The outside air economizer was removed and a panel was installed in its place to prevent any intake of outside air. Thermocouples were attached to the top center of the two compressors to measure their head temperature, and two pressure transmitters were attached at the compressor discharges in addition to the existing transmitters at the compressor suction and condenser outlet of both circuits. 4

Test Procedure

The test procedure was nearly identical for each refrigerant charge, with some excursions. The return air to the test unit was held consistently at 80°F dry-bulb, and usually at 67°F wet-bulb (or about 50% relative humidity) following the condition used for rating purposes in the AHRI Standards (References 1 and 2). Some tests required a dry coil, for which the humidifier was turned off and the return air humidity was allowed to drop to whatever the ambient dew point would allow. (Usually around 61°F wet bulb, but still above the 57°F recommended in the standards.) The indoor fan was active at its fixed speed throughout the tests, with a supplemental fan and variable damper on the return duct set to maintain zero static pressure relative to the outside room at the return air intake, and with the variable speed booster fan on the airflow measurement device set to maintain a static pressure rise across the test unit (supply – return) of 0.25 inches of water. When the condenser fan was active, the variable speed fan on the exhaust airflow measurement device was set to maintain zero static pressure in the duct attached to the top of the RTU to capture the exhaust flow. Most of the system charging was done with the outdoor room temperature set at 82°F, which is the AHRI 210/240 Standard condition for test “B”. This was mainly done for the comfort of the service technician, as opposed to the “A” test condition of 95°F. Charge was initially added by weight, and then adjusted as needed to obtain the desired superheat for each circuit. Between charge changes, the previous refrigerant was recovered and the filter/driers were replaced. The circuits were charged with nitrogen at moderate pressure and held there to confirm no leakage, and then the circuits were pulled down to a low vacuum and held there to evaporate any liquid in preparation for adding the new refrigerant. The service technician was contracted directly by Bluon, and was well acquainted with system charging with their refrigerant. The superheat for each circuit was watched both by the technician’s tools and through the test data acquisition system, which used calls to NIST’s REFPROP library to look up properties for the different refrigerant blends and plot a live P-H diagram on the screen, along with calculated values of suction superheat and condenser subcooling. A sample screenshot of the data acquisition program is shown in Figure 2.

P a g e 6|8


Figure 2: Example DAS System Screenshot

A script was formulated to run the lab through the same test sequence with each refrigerant, which allowed for tests to be run overnight and unattended. Once the charge quantity was settled and enough time had passed such that condensate was observed to be draining from the evaporator coil, the data collection system was set to begin logging the data readings, normally at a 10-second interval. There were several distinct phases in the script: 

Phase 1: AHRI Standard Test “B” The outdoor room was held at the starting 82°F for 45 minutes, from which the last 30 minutes would be used for data analysis.

Phase 2: Outside Temperature Ramping The intent of this phase was to map the system performance as a function of the outdoor temperature. The temperature in the outdoor room would be ramped up or down at a rate of 1°F every two minutes to the next set point, and then held there for 45 minutes at most points. The selected set points ranged from a low of 65°F to a high of 115°F in 10°F increments (65, 75, 85, 95, 105, and 115). The script ran through the set points in a sine-wave pattern, beginning at the first stop of 85°F, rising up to 115°F, then down to 65°F, and then back up to 80°F. This hit all of the intermediate temperatures twice (including AHRI Standard Test “A” at 95°F), but the extremes (including the AHRI Standard and the Maximum Operating Condition Test at 115°F) only once. For those two points, the steady-state period was extended to 1 hour to ensure stability.

Phase 3: Single Compressor Operation At the conclusion of the last phase, the second compressor in the RTU was shut off and the outside temperature was nudged up to 81.5°F and the system held there for 1 hour. The purpose of this test was P a g e 7|8


primarily to capture part-load performance for use in calculating an IEER per AHRI Standard 340/360 (Reference 2; see example 3). Subsequent tests were run at outside temperatures of 68°F and 65°F, and in some cases at 71°F, with just the one compressor. The operation with only one compressor also allows for a calculation of an approximate refrigerant mass flow rate through that one circuit since it was not being measured directly. The refrigerant mass flow is calculated by taking the measured air-side cooling capacity (which is only being provided by the one circuit), adding back in the indoor fan power (since the fan power reduces the cooling done by the coil alone), and then dividing by the enthalpy change of the refrigerant across the coil, as follows: đ?‘šĚ‡ (đ?‘™đ?‘?â „đ?‘šđ?‘–đ?‘›) = 

12,000 Ă—đ?‘‡đ?‘œđ?‘›đ?‘ +3,412 Ă—đ??ľđ?‘™đ?‘œđ?‘¤đ?‘’đ?‘&#x; đ?‘˜đ?‘Š â„Žđ?‘ đ?‘˘đ?‘?đ?‘Ąđ?‘–đ?‘œđ?‘› −ℎđ?‘™đ?‘–đ?‘žđ?‘˘đ?‘–đ?‘‘

á 60

đ?‘šđ?‘–đ?‘› â„Žđ?‘&#x;

Equation 1

Phase 4: Dry Coil Tests At this point, the humidifier in the indoor room controlling the return air wet-bulb temperature was turned off, the second compressor was turned back on, and the outdoor room temperature was ramped back up to 82°F at the same rate as before. The low-temperature operation with both compressors helped to wring out much of the remaining moisture in the air along with drawing in some outside air; and by the time the outdoor room reached the set point, the flow of condensate from the evaporator coil had ceased. The system was then held steady at 82°F for an hour to capture AHRI Standard Test “Câ€?. Following the steady-state period began a series of cyclic tests. The AHRI Standard cycle is 24 minutes off followed by 6 minutes on. For these tests, the AHRI Standard procedure was deviated from in that the indoor blower was kept on with only the compressors cycled, and the two compressors were cycled together as if they were one (although a 10-second delay between the starts of the first and second compressor was added so as not to overload the circuit with startup current.) For most of the tests, three sequential cycles were conducted, with the third used for data analysis. For some of the sequences, the cyclic tests were expanded to include more realistic cycling: first where the secondary compressor was cycled with the primary compressor always on, and second where the primary compressor was cycled with the secondary compressor off. Since this was not done consistently for each of the refrigerant charges, they have not been included in the analysis.

The test sequence ended at the end of the cyclic tests.

P a g e 8|8


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.