DENVER INTERNATIONAL AIRPORT | Stantec & RNN Architects

Construction Administration - Construction documentation

Project Lead: Carl Hole

CA Lead: Nathan Martin, Rusty Lamb

Softwares: Revit, Trimble ProjectSight, Bluebeam Program: Aviation Terminal interior renovation

PROJECT OVERVIEW

Work includes moving all TSA Security Lines from Level 5 to Level 6 while reconfiguring ticketing and baggage check-in at Level 6. Vertical circulation to / from the Level 4 train departure platform is being expanded and MEP / COM / Security systems are being reconfigured from Level 3 through Level 7 roof to accommodate alternations to the terminal. Baggage Handling Systems from Level 6 to Level 4 are undergoing major renovations / changes. Retail spaces are also undergoing relocation and reallocation where possible. The Terminal is identified by three modules: MOD 1, 2 and 3 and the project consists of three phases. The first two Design/Construction Phases are scheduled to be completed within the original $770 million budget and involve the middle third (Mod 2) in its entirety and the west half of the north third (Mod 1) of the existing terminal building. The initial 2 phases focus strictly on installing new ticketing / check-in space on Level 6 for selected airlines in Mod 2, reconditioning all of Level 5 in Mod 2 as well as a new TSA security checkpoint in the west half of Mod 1, level 6 of the north area of the main terminal. Modifications to Level 4 AGTS (train) platform and new MEP systems are included in this initial work.

Personal Duties:

• Aided Stantec with the Construction Administration process.

• Managed ‘As-Built’ Drawing set in BIM.

• Formulated sketches in response to RFI’s

• Conducted frequent observation walks with contractors.

• Aided with Punch walks for approval of construction.

• Submittal reviews.

• Attended coordination meetings between MEP and structural.

• Reviewed Shop Drawings

• Construction Document production for Phase 2

01.\
01.\ E.J. S S S S S S S S S S S S S S SS S S S S S S S SS SS SS S S SS S SS S SS A A A A A A A A A S S S S S S SS S S N16 N22 EW E2 E3 E4 E5 E6 E7 E8 E9 E10 E1 N17 N18 N19 N21 1 A5.1561 1 A5.1561 1 A5.1564 1 A5.1563 TML_05_11E_011 ELEVATOR LOBBY (E) STAIR 19 (E)TE-06N (E)TE-06S TML_05_11E_048 (E) BAGGAGE BOH TML_05_11E_CR03 VESTIBULE TML_05_11E_097 LIFT SYSTEM TML_05_11E_040 TML_05_11E_044 CONVEYOR TML_05_11E_MS36 (E) BAGGAGE SHAFT (E)TE-92 (E)TE-91 (E)TE-90 A5.1893TML_05_11E_186 ENTRANCE A5.1821 MS37 (E) MECH. SHAFT TML_05_11E_122 ENTRANCE 1 OPH A5.1881 2 1 A5.5301 E-GYP 8' -0"1 7 N20 10 WP GYP-1 8' -8" GYP-1 9' -0" GYP-1 10' -0" GYP-1 9' -0" GYP-1 9' -0" Z1 8' -6" Z1 8' -6" Z1 10' -0" GYP-1 13' -11" ACT-2 14' -0" ACL 14' -0" Z1 8' -6" Z1 8' -6" GYP-1 9' -0" REMAIN. CLEAN, REPAIR AND REFRESH MATERIALS TO MAKE READY FOR PUBLIC USE. OTSOTSA5.5306SC-3 GYP-1 8' -6" ACM-8 8' -7" ACM-8 8' -7" GYP-1 8' -6" GYP-1 8' -6" ACT-1 12' -6" ACL 14' -0" 2 OPP 3 OPP A5.1764 4 TR-12.1 A5.4101 1 TML_05_11E_096 CIRCULATION TML_05_11E_110 AIRSIDE CIRCULATION TML_05_11W_080 AIRSIDE CIRCULATION TML_05_11E_060 RESTROOM TML_05_11E_121 CHASE TML_05_11E_086 RESTROOM TML_05_11E_126 JANITOR TML_05_11E_004 RESTROOM TML_05_11E_095 TML_05_11E_093 MECH SHAFT OTSOTSTML_05_11E_005 WHITE BOX TML_05_11E_115 WHITE BOX TML_05_11E_080 ELECTRICAL TML_05_11E_MS38 MECH. SHAFT 4 A5.1821 A5.1821 20 22-E Q E QTYP E Q EQ 83 83 37 7 6"6"6" OPP SIM OPP 6 5 SC-T 35 41 41 41 Z1 11' -6" 42 OTSE-ACT 9' -0" E-ACT 9' -0" E-GYP 9' -0" E-GYP 11' -6" E-GYP 11' -6" E-ACT 9' -0" RFI 2441 TML_05_11E_007 WHITE BOX TML_05_11E_009 TML_05_11E_010 WHITE BOX 2'-8 1/2"2'-10 3/4" 20'-11 1/4" 7'-8"1'-4 1/2" 11'-4" 10'-6 3/4" 6'-8 1/4" RFI 2673 RFI 2689 RFI 2689 35 35 GYP-1 8' -0" RFI 2772 RFI 2276 RFI 2276 1'-4" 1'-4" 4'-0" 1'-4" 1'-4" GYP-1 12' -3" RFI 2952 GYP-1 11' -6" 39 ACT-2 11' -6" GYP-1 8' -0" GYP-1 8' -0" RFI 2998 TML_05_11E_174 SHELL SPACE RFI 3015 OTSGYP-1 11' -6" RFI 2998R1 2 2 2 ACOUSTIC CEILING TILE 4'X4' TEGULAR CEILING MATERIAL LEGEND ACT-3 PERFORATED METAL LAY-IN TEGULAR PERFORATED LINEAR METAL PANEL INSULATED METAL PANEL. GYPSUM BOARD CEILING Z1, Y1, X1, W1 A5.7020 SCHEDULE SC-1 SC-2 SC-3 SMOKE CURTAIN OPEN TO STRUCTURE GYP-S RE. TO A5.5701. CAC=35 TEMPORARY SMOKE CURTAIN CONFORMANCE WITH NFPA 204. DETAIL. FINISH TO MATCH OTE OPEN TO EXTERIOR 2HR FIRE RATED ACT-2 ACOUSTIC CEILING TILE 2'X4' TEGULAR ALUM. METAL LINEAR PANELS GYPSUM BOARD CEILING HATCH LEGEND ACOUSTICAL BATT INSULATION ABOVE OPEN GAPS FOR AIR RETURN BATT INSULATION ABOVE CEILING, 3" MIN. REFER TO A5.5312 FOR ACCESS PANEL DETAILS. CEILING FIXTURE LEGEND FIXTURE 4" WIDE MAX. LINEAR DIFFUSER 4" WIDE MAX. SQUARE 2' LAY-IN AIR DIFFUSER SUSPENDED LINEAR LIGHTING FIXTURE SQUARE 2' LAY-IN LIGHTING FIXTURE SQUARE 2' LAY-IN AIR CAMERAS RADIO ANTENNA SPEAKER RETURN AIR GRILLE DAYLIGHT SENSOR WIFI AP OMNI SPEAKER COLUMN ALL DEVICES LOCATED IN ACL CEILING TO HAVE BLACK FINISH. ALL DEVICES LOCATED IN CEILING OTHER THAN ACL TO HAVE A WHITE FINISH. RE: CEILING MATERIAL LEGEND. SPRINKLER (FIRE EXTINGUISING) FIRE ALARM ARROW INDICATES STARTING LAYOUT WORKPOINT LEGEND WP LINEAR RECESSED EMERGENCY LIGHTING FIXTURE ALSE EVN E D OF R AND Y T C TY COUN CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT SHEET NO. BIM FILE NO. VOLUME NAME: CHECKED BY: DRAWN BY: ISSUE RECORD SCALE: SHEET TITLE BIM 360://03-SP-TML GHP Completion-201735867/TML_ST N-A_GHCP-5-6_Central-2021.rvt As indicated STANTEC 1050 17TH ST., #A200, DENVER, CO 80265 A5.1562 PHASE 1 03/04/2021 RNN Architects 201839412 8400 Peña Blvd., Denver CO 80249 GREAT HALL COMPLETION RCP - LEVEL 5PLAN 11B 24 0 16 8 N 1/8" = 1'-0" 1 11B 3 GENERAL NOTES: 1. REFER TO MECH., FIRE PROTECTION, PLUMBING, IT, ELECTRICAL AND TELECOM DRAWINGS FOR TYPES OF ASSOCIATED APPURTENANCES. 2. FOR CEILING TRIMS, TRANSITIONS AND EDGES, RE:A5.5301-A5.5314 CEILING DETAILS. 3. ALL RESTROOMS SHALL HAVE WATER RESISTANT CEILING FINISHES. 4. GRAY SHADED AREAS ARE OUT OF SCOPE. GRAY SHADED ELEMENTS ARE EXISTING. BLACK CROSSHATCH INDICATES OUT OF PHASE. 5. ALL "ACL" TYPE CURVED CEILINGS TO BE PROVIDED WITH FACTORY MITER CUTS AND FACTORY ASSEMBLED CURVED CARRIERS TO MATCH EXACT DIMENSIONS AND ANGLES 6. "ACL" TYPE CEILING LAYOUT WILL HAVE STAGGERED JOINTS WITH AT LEAST THREE 7. ALL CEILING TILES AND METAL PLANKS SHALL BE ACCESSIBLE IN ORDER TO PROVIDE 8. UNLESS OTHERWISE NOTED, ALL END DEVICES MUST BE CENTERED TO CEILING SPACE AND TO CLOSEST CEILING TILE, PANEL OR GYPSUM SOFFIT 9.CEILING SUSP. SYSTEM TO BE DESIGNED BY CONTRACTOR’S ENGINEER WHO IS DUCTWORK SUSP. SYSTEM SHALL NOT BE USED TO HANG CEILING BELOW UNLESS 10.AT LEVEL 4 RCP, V.I.F AND COORDINATE EXISTING MECHANICAL, FIRE PROTECTION, IT, ELECTRICAL, TELECOM DEVICES AND ACCESS PANELS. MEP LEVEL NOT INCLUDED IN PRESENT PERMIT PACKAGE U.N.O IN DRAWINGS. 12. ALL CEILING HEIGHTS REFER TO FINISHED FLOOR ELEVATION. WITH STRUCTURAL GRID AND WALL CONTROL JOINTS. RE: A5.5301. 15. ALL CEILING ELEMENTS WITHIN ACT CEILINGS TO BE CENTERED IN FULL TILE U.N.O SHEET KEYNOTES RCP 24EXISTING SLOPED EXTERIOR CEILING. OUT OF SCOPE. 26SECURITY GRILLE 31ACT CEILINGS IN AGTS ARRIVAL PLATFORM TO MATCH EXISTING HEIGHT AT ELEVATOR LOBBIES. HEIGHT TO BE FIELD VERIFIED. 33EXISTING CEILING TO REMAIN 35SUSPENDED SIGNAGE. REFER TO WAYFINDING DRAWINGS. 37WALL-MOUNTED SIGNAGE. REFER TO WAYFINDING DRAWINGS. 39REINSTATE EXISTING WALL FACE ABOVE AND TIE IN TO NEW GYPSUM SOFFIT BORDER. 41EXISTING LIGHTING AND DIFFUSERS TO BE RE-HOUSED N NEW CEILING. REFER TO ENGINEERING DRAWINGS FOR OTHER NEW DEVICES. LAYOUT TO BE COORDINATED ON SITE. 43EXISTING PROJECTOR TO BE RELOCATED SHEET KEYNOTES RCP 1SLOPED CEILING. REFER TO A5.3100 SERIES FOR POSITION, SLOPE AND DIMENSIONS. 3EXISTING BAGGAGE CONVEYOR. 5SMOKE CURTAIN. REFER TO A5.5305 FOR DETAILS. NEW SMOKE CURTAIN TO TIE INTO EXISTING AT PHASE DEMARCATION. 7SET OFF LINE FOR LOW END OF CURVED CEILING. 9EXISTING LOUVER TO REMAIN. 11FORMED METAL POCKET. 13SUSPENDED FIXTURE TRACK. REFER TO A5.5501 FOR DETAILS. 15CEILING HEIGHTS BASED ON CENTRAL CORRIDOR HEIGHT. 17V.I.F CEILING HEIGHT TO MATCH EXISTING CONDITION. 19MAINTAIN CONTINUITY OF FINISHES ONCE THE TEMPORAR SMOKE CURTAIN IS REMOVED. 21SLAB EDGE REFERENCE LINE. 23SUSPENDED ART INSTALLATION TO BE REINSTALLED. SUSPENSION SYSTEM TO BE DESIGNED BY A STRUCTURAL ENGINEER AND INSTALLATION COORDINATED WITH CEILING SYSTEM. ARTWORK INSTALLATION REQUIREMENTS TO BE COORDINATED AND APPROVED BY DEN AND THE ARTIST. 4 A PRC 4 PHASE LEGEND: OUT OF SCOPE EXISTING TO REMAIN 5 5 RFI 2509 RFI 2509 RFI 2509 RFI 2509 RFI 2509 NO.BYPURPOSEDATECKD RFI 2946 RFI 2998R1
02.\ (585)-905-5651| bminster333@gmail.com

BCHA- The Spoke on Coffman | RNN Architects

Design Development - Construction Documentation

Project Lead: Jerry Boland, Rea Jackson

Softwares: Revit

Program: Affordable Multi-Family housing

PROJECT OVERVIEW

Boulder County Housing Authority developed 518 Coffman Street which is approximately a 1.3-acre site into a mixed-use facility. The design is to become an integral part of the City of Longmont’s Coffman Street redevelopment-improvement project. The project site is located on the city block located along Coffman Street between 5th and 6th Street in Longmont’s Central Business District (CBD). The “mixed-use” facility has an approximate building area of 180,000 Sq. Ft, 240 parking garage spaces, approximately 10,000 Sq. Ft of commercial/office space, 75 affordable housing dwelling units (one, two and three bedrooms), leasing office, community room, various resident amenities and building services functions. The “Residence” portion of the building includes a centralized courtyard open to the weather, providing daylight to internally located dwelling units surrounding the courtyard perimeter and provide sat gathering space including amenities for residence and private groups to enjoy. This multi-family affordable housing portion of the project is to be constructed with conventional wood framing four stories in height as a modular of panelized system.

Personal Duties:

• BIM Production in DD and CD Phases

• Developed 3D views for client review.

• Produced axonometric drawings to convey design intent

• Attended coordination meetings between MEP and structural.

• Reviewed Shop Drawings

02.\
03.\ DN UP A4.21 4 A4.21 3 A4.23 1 A4.21 2 A2.24 1 14 6 1 2 4 5 6 7 8 A B D E F G D.1 3 8.9 A4.22 3 A4.20 4 A4.21 1 A4.23 3 E-202 EE-204 EE-205 EE-206 WW-203 TELECOM CL STORAGE PEDESTRIAN WALKWAY 2U-B E-204 3U-B E-206 1U-A E-208 1U-B E-210 1U-B E-212 1U-B E-201 1U-B E-203 1U-A E-205 1U-B E-207 1U-B W-213 1U-B W-211 1U-B W-209 1U-B W-207 1U-A W-205 1U-A W-203 1U-B W-202 2U-B W-204 1U-B W-201C EE-204 EE-205 EE-206 FD JAN CL WW-201 W-201A A9.80 4 A4.22 1 A4.23 4A9.80 3 A4.20 2 A4.33 2 A4.33 1 C A4.33 3 PEDESTRIAN WALKWAY MECH W-201D W-201D PA PA1 PA2 PB1 PB2 PC A8.12 2 A8.21 4 70238 46 70 70 34' - 3" 23' 1" 23' - 1" 23' 1" 23' 1" 23' 1" 23' - 1" 10' - 8 1/2" 66 66 10 13 66 65 66 66 1 A6.11 1 A6.14 1 A6.10 1 A6.13 1 A6.12 1 A6.15 1 A6.16 1 A6.17 1 A6.18 1 A6.19 OPEN TO BELOW OPEN TO BELOW A6.17 2 A6.10 2 A6.11 2 A6.12 3 A6.13 2 A6.14 2 A6.15 2 A6.16 2 A6.18 2 A6.19 2 E E E E F E E2 E2 E2 E2 E2 E2 G G I G I J J J J J J I E F E E I E E E I J J J J J 12-A 12-A 22-A 22-B 22-A 22-B 22-B 12-B 11-B2 12-B 12-A 12-B 12-B 22-B 22-B 53-A 53-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A 13-A BREAKROOM W-201B COMMUNITY ROOM WW-201A STAIRWAYS WW-201 GENDER NEUTRAL RESTROOM W-201C J J J J J J ST100 SF108 SF109 ? P1 ID.41 3 J SF117 SF122 A4.23 2 5 A4.10 A4.22 4 J 1 1 WEST EGRESS BALCONY WW-202 4 A9.10 RESIDENTIAL KEY LEGEND SHEET GENERAL SCALE: 1/8" = 1'-0" 1 ENLARGED 2ND LEVEL RESIDENTIAL FLOOR PLAN north 10RATED FIRE 13MOP SINK 65GLULAM MEMBERS 66OPEN WALKWAY TENANT LEVEL -2' - 0" P12 31 1 2 1 31 0 2 70 BEDROOM CLOSET BEDROOM F CENTERLINE BETWEEN DWELLING UNITS A9.90 1 1 2 22 1 18 1 NOTE: 1. RE: ENLARGED PLANS 2. RE: ELEVATIONS FOR WINDOW 1 28 27 4 1 5 6 31 32 3 17 30 18 20 2 7 23 31 4 1 3 2 26 LIVING ROOM BATHROOM 2 BATHROOM 1 ENTRY CLOSET LINEN CLOSET 27 LIVING ROOM BATHROOM 2 BATHROOM 1 BEDROOM 1 BEDROOM 2 KITCHEN 2' 6" 20 ALIGN ALIGN ALIGN ALIGN ALIGN ALIGN 2' 6" 24 2' - 6" 2' - 6" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" BEDROOM CLOSET 1 BEDROOM CLOSET 2 PANTRY ENTRY CLOSET LINEN CLOSET AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB 7' - 0" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" AFF GB - 1 8' - 2" 3' - 6" AFF GB 7' - 0" AFF GB 7' - 0" A4.31 4 NOTE: AT LEVEL 01 UNITS ONLY, SOFFIT LEVELS TO BE 8'-8 5/8" AFF WHERE TAGGED AS 7'-0" ABOVE AND 10'-2" AFF WHERE TAGGED AS 8-2" AFF ABOVE 1 SCALE: 1/4" = 1'-0" 4 2-BED DWELLING UNIT -FINISH PLAN SCALE: 1/4" = 1'-0" 3 2-BED DWELLING UNIT -REFLECTED CEILING PLAN 2ND FLOOR PLAN PARTIAL AXON
SCALE: 4 NORTH COURTYARD PERSPECTIVE PEDESTRIAN PATH PERSPECTIVE LOOKING EAST SCALE: 2 SOUTH COURTYARD PERSPECTIVE SCALE: VIEW FROM COFFMAN ST & 6TH VIEW FROM COFFMAN ST & 5TH SCALE: 4 NORTH COURTYARD PERSPECTIVE SCALE: 6 PEDESTRIAN PATH PERSPECTIVE LOOKING EAST SCALE: VIEW FROM 6TH AVE & ALLEY SCALE: 2 SOUTH COURTYARD PERSPECTIVE SCALE: VIEW FROM COFFMAN ST & 6TH SCALE: VIEW FROM COFFMAN ST & 5TH SCALE: 4 NORTH COURTYARD PERSPECTIVE SCALE: 6 PEDESTRIAN PATH PERSPECTIVE LOOKING EAST SCALE: VIEW FROM 6TH AVE & ALLEY LEVEL 1 0' - 0" LEVEL 2 12' - 0" LEVEL 3 22' - 0" LEVEL 4 32' - 0" T.O. WALL 40' - 2 5/8" 1 2 4 5 6 7 8 3 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 8.9 T.O. CONC T.O. GCU T.O. GCU 35-A 15-A 44-A 65-A P8.1 P9.1 T.O. GCU P1 5 A4.10 LEVEL 1 0' - 0" LEVEL 2 12' - 0" LEVEL 3 22' - 0" LEVEL 4 32' - 0" T.O. WALL 40' - 2 5/8" 1 2 4 5 6 7 8 3 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 8.9 T.O. CONC T.O. GCU T.O. GCU T.O. GCU 15-A 35-A 44-A 15-A 15-A 65-A P8.1 P9.1 P1 5 A4.10 SCALE: 1/16" = 1'-0" 1 WEST BUILDING SECTION SCALE: 1/16" = 1'-0" 2 EAST BUILDING SECTION LEVEL 1 0' - 0" LEVEL 2 12' - 0" LEVEL 3 22' - 0" LEVEL 4 32' - 0" T.O. WALL 40' - 2 5/8" 1 2 4 5 6 7 8 3 P2 P3 P4 8.9 T.O. CONC T.O. GCU T.O. GCU T.O. GCU 15-A 35-A 44-A 15-A 15-A 65-A P1 5 A4.10 LEVEL 1 0' - 0" LEVEL 2 12' - 0" LEVEL 3 22' - 0" LEVEL 4 32' - 0" T.O. WALL 40' - 2 5/8" A B D E F G D.1 C 44-A 15-A 65-A 55-A 35-A 65-A 15-A 15-A 65-A SCALE: 1/16" = 1'-0" EAST BUILDING SECTION SCALE: 1/16" = 1'-0" NORTH BUILDING SECTION 34' 3" 34' 3" VTAC 52-B 43-A 13-A 43-A 43-A 43-A 11' 6" 11' - 7" 11' 2" 1 39 1 37' 7" 18' 1" 8' - 7" 3' 3 1/2" LIVING ROOM BATHROOM 2 BATHROOM 1 BEDROOM 1 BEDROOM CLOSET 1 BEDROOM CLOSET 2 BEDROOM 2 KITCHEN PANTRY ENTRY CLOSET LINEN CLOSET 43-A MECH A9.40 1 6' - 10" A9.91 1 A9.90 1 19 V F 21 25 1 2 55 2 7' 3 1/2" I E UFAS UNITS ONLY CENTERLINE BETWEEN DWELLING UNITS 22 114 2 27 1 35 1 2 2' - 11" 5' - 3 1/2" 18 1 2 J 26 26 1 1 26 1 6" 1' 4 1/2" 7' 7" 1 FOR EXTERIOR WALL ASSEMBLY TAGS WINDOW TYPE VARIATIONS LIVING ROOM BATHROOM 2 BATHROOM 1 ENTRY CLOSET LINEN CLOSET D E M J UNIT 2U-B A WH-CL R GYPSUM BOARD GYPSUM BOARD SOFFIT INSTALLED BELOW CONTINUOUS FRR F/C ASSEMBLY Copyright © RNN Architects Inc. www.rnnarchitects.com ISSUE: DATE: SCALE: DRAWN BY: CHECKED BY: JOB NUMBER: As Indicated A2.21 2-BED DWELLING UNIT FLOOR PLANS - ICC/ANSI TYPES A & B BCHATHE SPOKE ON COFFMAN COFFMAN STREET, LO NGMONT, CO 80501 BM 0907-16 LEGEND SCALE: 1/4" = 1'-0" 1 2-BED DWELLING UNIT -FRAMING PLAN SCALE: 1/4" = 1'-0" 2 2-BED DWELLING UNIT -TYP DOOR TYPE LAYOUT 30(5) ADJUSTABLE SHELVES 31(5) FIXED SHELVES 32FIXED SHELF 332x6 PLUMBING WALL 34 SHOWER GRAB BARS 35FIXED WINDOW 36DECORATIVE 4" ROUND STEEL POST 37JULIET BALCONY AT TYP UPPER LEVEL UNITS 38SLIDING GLASS DOOR AT TYP UPPER LEVEL UNITS; FIXED PANEL WITHIN 4 FT OF VTAC VENT 39PRE-MANUFACTURED PRE-FINISHED METAL FENCE WITH POSTS @ 4" O.C. MKC WP-02 PERMIT SUBMITTAL 04-10-2020 WP-02 REVISION 1 08-14-2020 1 2 BEDROOM 2 BATH UNIT LONGITUDINAL SECTION TRANSVERSE SECTION AXON PARTIAL ELEVATION PARTIAL WALL SECTION
(585)-905-5651| bminster333@gmail.com

LA GORCE RESIDENCE | SAOTA, ARRCC, PorterFanna Architects

Interior Construction Documentation

Design Architect: SAOTA, ARRCC

Interior Architect: PorterFanna Architecture

Softwares: Revit, AutoCAD Program: Luxury High-End Single Family Residence

PROJECT OVERVIEW

LA Gorce is a luxurious 20,000 SF single family residence located on an 82,000sf corner waterfront lot, in Miami Florida. The house feature bespoke custom millwork thought the house. Soft cove lighiting illumates all rooms on the interior. High end finished from travertine stone to brass inlays line the house.

Personal Duties:

• Developed details in AutoCAD for cove lighting, millwork, shade pockets and material finishes.

• BIM Production for interior construction drawings

• Procurment of materials from suppliers

• Worked with Owner Rep to select plumbing fixtures

SUPAWOOD

HVAC LINEAR SIDEWALL DIFFUSER MAY OCCUR VERIFY

FIXED TO SUBSTRUCTURE WITH NON-CORROSIVE SCREWS TO MANUFACTURER'S SPECIFICATION AND ARCHITECTS APPROVAL.TO BE SKIMMED, PRIMED AND PAINTED. ALL JOINTS TO BE TAPED WITH SKIM WIRE AND SKIMMED OVER

1 8"RHINOLITE SKIM

CONCEALED LED STRIP LIGHTING CORNER BEADS TO REINFORCE OUTER EDGES OF CEILING

3 8" FIXED TO SUBSTRUCTURE WITH NON-CORROSIVE SCREWS TO MANUFACTURER'S SPECIFICATION AND

TIERED COVE LIGHTING DETAIL COVE LIGHTING DETAIL WITH EXTRUDED PROFILE
03.\
05.\ 8" 2 7/8" 3 7/8" 1" 1 1/2" 4" 2 7/8" 1 1/8" 5" HVAC DIFFUSER MAY OCCUR VERIFY CEILING PACKAGE CLEARANCES WITH G.C. SUPAWOOD FINISH AS PER RCP PLAN CONCEALED LED STRIP LIGHTING CORNER BEADS TO REINFORCE OUTER EDGES OF CEILING 4" 2" VARIES RHINOBOARD 3 8" FIXED TO SUBSTRUCTURE WITH NON-CORROSIVE SCREWS TO MANUFACTURER'S SPECIFICATION AND ARCHITECTS APPROVAL.TO BE SKIMMED, PRIMED AND PAINTED. ALL JOINTS TO BE TAPED WITH SKIM WIRE AND SKIMMED OVER CEILING STRUC. BY SPECIALIST WITH MANUFACTURERS SPECIFICATION 2" 4" 4" CEILING STRUC. BY SPECIALIST WITH MANUFACTURERS SPECIFICATION RHINOBOARD 3 8
CEILING PACKAGE CLEARANCES WITH G.C P37 HVAC DUCT 4 P37 RHINOBOARD
APPROVAL.TO BE SKIMMED, PRIMED AND PAINTED. ALL JOINTS TO BE TAPED WITH SKIM WIRE AND SKIMMED OVER SUPAWOOD 1 8"RHINOLITE SKIM WITH LEATHER/FABRIC CEILING FINISH AS PER DESIGN CONCEALED LED STRIP LIGHTING CORNER BEADS TO REINFORCE OUTER EDGES OF CEILING BRASS TRIM PROFILE PURPOSE MADE AS PER DESIGN 2" 5" 1/2" 1" 1/2" 4" 1" 2 1/2" BRASS PROFILE PURPOSE MADE AS PER DESIGN SUPAWOOD PROFILE PURPOSE MADE AS PER DESIGN CEILING STRUC. BY SPECIALIST WITH MANUFACTURERS SPECIFICATION 4" 5" P30 P33 CP30 CP30 LIGHT COVES SECTION DETAIL 01 A-353 SCALE: 3"=1'-0" 215 - BEDROOM 6 LIGHT COVES SECTION DETAIL 02 A-353 SCALE: 3"=1'-0" 225 - THEATER 224 - ENTERTAIMENT ℄ ℄ 03 A-353 106 - POWDER ROOM 111 - OFFICE 103 - LOUNGE 116 - CHANGE 120 - LOUNGE 112 - BEDROOM 1 222 - MASSAGE 223 -DEN 217 - BATHROOM 6 124 - GH BATH 1 8 8 DRAWER S14 S8 S9 S7 103 LOUNGE A-228 A-229 A-228 A-229 104 VODKA BAR 22 A-229 02 03 04 01 S21 MULTI TEMP DRAWER S5 S4 S4 S2 S2 S2 S4 R1 R1 R1 R1 R1 R1 R1 R1 S5 S33 103 LOUNGE A-228 A-229 CEILING HEIGHT 12'-0" CEILING HEIGHT 12''-7" CEILING HEIGHT 12'-0" CEILING HEIGHT 10'-0" A-228 A-229 104 VODKA BAR P21 P23 G28 P21 REVISIONS DATE NO. ISSUE INTERIOR ARCHITECTURE PACKAGE 30% 06-01-2022 60% 01-04-2022 109 HATFIELD STREET CAPE TOWN 8001 WWW.SAOTA.COM LEAD DESIGNERS 109 HATFIELD STREET CAPE TOWN 8001 WWW.ARRCC.COM LEAD DESIGNERS ARRCC 07-04-2022 90% 12-14-2022 100% ARCHITECTURE ENLARGED 24'-7" 4 1/2" 11" 1'-3 1/4" 2'-03/4" 2'-2 3/4" 5" 4'-0 1/4" 6'-9" 3'-6 3/4" 10'-2 1/4" 9 1/4" 16'-11 1/2" 1'-0 1/4" EQ EQ 1'-10" 2'-0 1/4" 103 LOUNGE / 104 VODKA BAR PLAN 01 A-228 SCALE: 3/8"=1'-0" 103 LOUNGE / 104 VODKA BAR RCP 02 A-228 SCALE: 3/8"=1'-0" 1'-7" 4'-9 1/4" 5'-5 1/4" 3" 4'-9 1/4" 5'-5 1/4" 3" 11" 8 1/2" 25'-3 3/4" 4" 4" 1'-2" 4" 1'-8 1/2" 01 A-351 A-302 03 A-302 03 04 A-350 01 A-320 01 A-370 02 A-320 A-302 04 A-302 05 A-302 03 A-302 05 A-302 03 A-302 05 A-302 05 01 A-301 02 A-350 02 A-350 02 A-350 02 A-350 02 A-353 03 A-310 01 A-310 01 A-310 02 A-312 01 A-313 03 A-310 02 A-313 01 A-313 02 A-313 01 A-821 01 A-319 SIM. LEGEND 00 X-000 DETAIL REFERENCE TAG 00 X-000 CALL OUT DETAIL TAG REVISION REFERENCE ALIGN ALIGN FINISH SURFACE TAG 000 DOOR TAG WALL TAG X0 X0 000 ROOM NAME X-000 ROOM TAG ℄ CENTER LINE CEILING HEIGHT 0'-0" CEILING HEIGHT TAG ELEVATION TAG FINISH TAG X-000 00 00 00 00 FLOOR FINISH TRANSITION A-000 00 CALL OUT BASE DETAIL TAG ELEVATION NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER FLOOR RECEPTACLE LINEAR DIFFUSER CEILING LIGHT NOTES: 1- REFER TO LIGHTING DESIGNER DRAWINGS FOR LIGHTING SPECIFICATIONS 2- REFER TO MECHANICAL ENGINEER DRAWINGS FOR HVAC SPECIFICATIONS 3- ALL CABINETRY TO BE COORDINATED WITH MW. MW TO PROVIDE SHOP DRAWINGS FOR REVIEW. 4- ALL MILLWORK AND SPECIALTY ITEMS TO BE COORDINATED WITH AS-BUILT CONDITIONS 5- PLUMBER TO VERIFY LOCATION WITH MANUFACTURER SPEC AND CONTRACTOR IN FIELD LINEAR SIDEWALL DIFFUSER LINEAR DIFFUSER IN COVE (SEE HVAC SPECS) CONTINUOS CEILING REVEAL ALL AROUND RECESSED LIGHT FIXTURE (SEE SPECIFICATIONS) RECESSED LIGHT FIXTURE (SEE SPECIFICATIONS) SHADE POCKET (SEE DETAIL) SIDEWALL DIFFUSER IN COVE (SEE HVAC SPECS) LINEAR DIFFUSER IN COVE (SEE HVAC SPEC) LIGHT COVES (SEE DETAIL) SIDEWALL DIFFUSER IN COVE (SEE HVAC SPEC) RETRACTABLE TV HATCH SIDEWALL DIFFUSER IN COVE (SEE HVAC SPEC) LIGHT FIXTURE BUILT INTO CABINET. TBC WITH MILLWORKER DWGS. LIGHT FIXTURE BUILT INTO CABINET. TBC WITH MILLWORKER DWGS. FLOOR RECEPTACLE 33'-3 1/4" TV INTEGRATED INTO FURNITURE UNIT SHADE POCKET (SEE DETAIL) 11'-7" 4'-8 1/4" ℄ 4" 10" CONTRACTOR TO COORDINATE PRECISE LAYOUT OF CEILING DESIGN WITH ARCHITECT AND DESIGNER L/5 L/5 L/5 L/5 L/5 EQ EQ 3'-6" 3'-6" EQ EQ 3'-5" 4'-10" EQ EQ 1'-0" 4" 4" 21'-4 1/4" R3'-71/4" 10'-03/4" 1'-3" 4'-11/2" 9 1/4" R6'-43/4" R5'-21/2" 1'-0" 4" 4" 17'-9 3/4" 3'-93/4"R3'-8" 9'-91/4" 4'-53/4" R4'-4" 5'-7" 01 A-828 02 A-828 02 A-828 DINING ROOM RCP BESPOKE CUSTOM VANITY SHADE POCKET DETAIL 121 - VANITY CABINET ELEVATION 02 A-803 SCALE: 1/2"=1'-0" 121 - VANITY CABINET SECTION 03 A-803 SCALE: 3"=1'-0" 1'-10 1/2" LED STRIP 6 1/2" 2" 1'-3" 1/2" 121 - VANITY CABINET 04 A-803 SCALE: 3"=1'-0" 9 1/4" 1'-10 1/2" 1'-10 1/2" 1'-10 1/2" 9" 1'-3" 7'-5 3/4" 2'-5 1/2" STRUCTURAL ENGINEER TO ADVISE ON FIXING DETAIL STRUCTURAL TO ADVISE 3 1/4" 8" COUNTERTOP S29 DRAWER FRONT T22 M22 3 1/4" STRUCTURAL STEEL TUBE WELDED TO STEEL TUBE FRAME FLOATING SHELF M22 8" SHADE POCKET SECTION 01 A-324 SCALE: 3"=1'-0" 224 - ENTERTAIMENT (W-39) SHADE POCKET SECTION 02 A-324 SCALE: 3"=1'-0" 112 - BEDROOM 01 (W-15)
ARCHITECTS

CABINETRY DETAILS

06.\ (585)-905-5651| bminster333@gmail.com 41 42 43 44 46 47 45 48 49 50 51 52 53 54 35 36 37 38 55 56 58 34 203 BEDROOM 2 A-266 206 BEDROOM 3 A-267 209 BEDROOM 4 A-268 212 BEDROOM 5 A-269 207 BATHROOM 3 A-207 210 BATHROOM 4 A-208 204 BATHROOM 2 A-206 213 BATHROOM 5 A-209 205 TOILET RM 2 A-206 201 GALLERY A-263 A 264 211 TOILET RM 4 A-208 214 TOILET RM 5 A-209 215 BEDROOM A-270 202 GYM A-265 221STEAMROOM A-211 219SALON A-272 218 200 PASSAGE A-260 A-261 A-262 A-270 216 CLOSET BD 6 A-210 221SPAPASSAGE A-273 A-224 101 ELEVATOR 217 BATHROOM 6 A-224 101A STAIRS 221ASHOWER A-211 78 3 18 77 24 1 1 6 64 62 57 60 63 4 20 23 1 53 53 53 53 1 32 23 23 32 28 28 28 13 13 13 13 65 19 69 19 69 19 65 19 53 66 59 59 27 85 30 30 33 33 67 38 55B 55A 55C 58 59 6 61 59 86 70 70 73 73 72 208 TOILET RM 3 A-207 71 8 6 76 61 40 68 75 56 27 27 87 REVISIONS DATE NO. 06-01-2022 01-04-2022 109 CAPE 109 CAPE ARRCC 07-04-2022 12-14-2022 PARTIAL FLOOR PARTIAL SECOND FLOOR PLAN 01 A-101 SCALE: 3/16"=1'-0" SEE 02 A-102 SEE 02 A-102 MATCH LINE SEE 01/A-104 MATCHLINE SEE 01/A-104MATCHLINE 01 SECOND 82LOOR KEYPLAN UP UP UP RHINOBOARD 3 8" FIXED TO SUBSTRUCTURE WITH NON-CORROSIVE SCREWS TO MANUFACTURER'S SPECIFICATION AND ARCHITECTS APPROVAL.TO BE SKIMMED, PRIMED AND PAINTED. ALL JOINTS TO BE TAPED WITH SKIM WIRE AND SKIMMED OVER SUPAWOOD 1 8" RHINOLITE SKIM Q-TRAN FLEXIBLE LINEAR LED CLADDED TO CEILING BY SPECIALIST CORNER BEADS TO REINFORCE OUTER EDGES OF CEILING CEILING STRUC. BY SPECIALIST WITH MANUFACTURERS SPECIFICATION 96 X 1 SLT. SUPPLY/RETURN NOTA: H/AC SPECIALIST/ MECHANICAL ENGINEER TO BE CONSULTED REGARDING RETURNAND SUPPLY AIR -GRILLES 1" 1 1/2" 4" 2 7/8" Q-TRAN FLEXIBLE LINEAR LED M33 G28 RHINOBOARD 3 8" FIXED TO SUBSTRUCTURE WITH NON-CORROSIVE SCREWS TO MANUFACTURER'S SPECIFICATION AND ARCHITECTS APPROVAL.TO BE SKIMMED, PRIMED AND PAINTED. ALL JOINTS TO BE TAPED WITH SKIM WIRE AND SKIMMED OVER SUPAWOOD 1 8"RHINOLITE SKIM CONCEALED LED STRIP LIGHTING CORNER BEADS TO REINFORCE OUTER EDGES OF CEILING BRASS PURPOSE MADE ANGLE TO HOUSE Q-TRAN FLEXIBLE LINEAR LED 4" 2" 1 1/2" 2" 3" 1" 1" CEILING STRUC. BY SPECIALIST WITH MANUFACTURERS SPECIFICATION Q-TRAN FLEXIBLE LINEAR LED 4" P37 P33 HVAC LINEAR SIDEWALL DIFFUSER MAY OCCUR VERIFY CEILING PACKAGE CLEARANCES WITH G.C HVAC DUCT REVISIONS DATE NO. ISSUE DATE: 12-14-2022 PLAN NORTH PORTERFANNA 45 MAIN STREET #212 BROOKLYN, NY 11201 P: 212-273-1100 INFO@PORTERFANNA.COM WWW.PORTERFANNA.COM ASSISTED BY: 100 LA GORCE CIRCLE INTERIOR ARCHITECTURE PACKAGE MIAMI BEACH, FLORIDA 30% CD 06-01-2022 60% CD 01-04-2022 109 HATFIELD STREET GARDENS CAPE TOWN 8001 SOUTH AFRICA WWW.SAOTA.COM LEAD DESIGNERS 109 HATFIELD STREET GARDENS CAPE TOWN 8001 SOUTH AFRICA WWW.ARRCC.COM LEAD DESIGNERS ARRCC 07-04-2022 90% CD 12-14-2022 100% CD ARCHITECTURE GENERAL DETAILS LIGHT COVES ℄ ℄ LIGHT COVES SECTION DETAIL 03 A-353 SCALE: 3"=1'-0" 202 - GYM VANITY DETAIL DETAIL PARTIAL 2ND FLOOR PLAN REVISIONS DATE NO. ISSUE DATE: PROJ. NO.: 12-14-2022 2012 PAGE: DWG NO.: PLAN NORTH 100 LA GORCE INTERIOR ARCHITECTURE MIAMI BEACH, FLORIDA 30% CD 06-01-2022 60% CD01-04-2022 A803.00 07-04-2022 90% CD 12-14-2022 100% CD 124 - VANITY CABINET ELEVATION 06 A-803 SCALE: 1 1/2"=1'-0" 124 - VANITY CABINET SECTION 07 A-803 SCALE: 3"=1'-0" CABINET SECTION 6 1/2" 2" 1/2" 9" 1'-0 1/4" 1'-4 1/4" ℄ 6 1/2" 6" 7 1/4" 1'-7 3/4" 6'-7 1/2" 2'-5 1/2" 11 1/2" 1" 1/2" 1'-1" 1'-3" 1'-4 1/4" 6" 1'-7 3/4" 1'-7 3/4" 1'-7 3/4" ENGINEER ON FIXING DETAIL STRUCTURAL ENGINEER TO ADVISE ON FIXING DETAIL STRUCTURAL STEEL TUBE WELDED TO STEEL TUBE FRAME STRUCTURAL STEEL TUBE WELDED TO STEEL TUBE FRAME 3 1/4" LED STRIP LED STRIP BOTTOM PANEL TO BE DETACHABLE TO ALLOW FOR BOTTLE TRAP MAINTENANCE BOTTOM PANEL TO BE DETACHABLE TO ALLOW FOR BOTTLE TRAP MAINTENANCE COUNTERTOP S25 DRAWER FRONT T22 DRAWER FRONT G30 M22 1'-0" 1'-0" 3 1/4" 3 1/4" STRUCTURAL STEEL TUBE WELDED TO STEEL TUBE FRAME FLOATING SHELF M22 STRUCTURAL STEEL TUBE WELDED TO STEEL TUBE FRAME FLOATING SHELF M22
ALIGN 1'-2" x 6" CURTAIN RECESS 2 1/4" 5 1/8" 10" RHINOBOARD 3/8" FIXED TO SUBSTRUCTURE WITH NON-CORROSIVE SCREWS TO MANUFACTURER'S SPECIFICATION AND ARCHITECTS APPROVAL.TO BE SKIMMED, PRIMED AND PAINTED. ALL JOINTS TO BE TAPED WITH SKIM WIRE AND SKIMMED OVER 2 5/8" ALIGN MOTORISED BLACKOUT ROLLER BLIND (SEE SPECIFICATIONS) 1'-2" MOTORISED SHEER CURTAIN (SEE SPECIFICATIONS) 4" SEE WINDOW & EXTERIOR ENVELOPE INSTALLATION & FLASHING OF ALL EXTERIOR WINDOWS. 4" 2" 6" EQ. EQ. HVAC LINEAR SIDEWALL DIFFUSER MAY OCCUR VERIFY CEILING PACKAGE CLEARANCES WITH G.C. INTERIOR 5 1/8" 10" 2 5/8" MOTORISED BLACKOUT ROLLER BLIND (SEE SPECIFICATIONS) 1'-0" MOTORISED SHEER CURTAIN (SEE SPECIFICATIONS) 2" 3" SEE WINDOW & EXTERIOR ENVELOPE INSTALLATION & FLASHING OF ALL EXTERIOR WINDOWS. 2 1/4" M33 INTERIOR SECTION DETAIL SECTION DETAIL ℄ ℄ ℄ ℄ ℄ TYP. LINEAR DRAIN DETAIL 03 A-324 SCALE: 6"=1'-0" LINEAR DRAIN; REFER TO PLUMBING SCHEDULE FOR SPECIFICATION SUBFLOOR TILE FINISH LATICRETE WATERPROOF MEMBRANELIQUID APPLIED - DOUBLE PLY REINFORCING FABRIC @ COVES & CORNERS EXISTING WALL MORTAR BED- 1" MIN. THICKNESS LATICRETE CEMENT BACKER BOARD SEALANT NEW TILE LATICRETE WATERPROOF MEMBRANE - LIQUID APPLIEDDOUBLE PLY REINFORCING FABRIC @ COVES & CORNERS SLOPE

MATERIALS & TECTONICS

SCI-Arc Fall 2019

Professors: Maxi Spina, Randy Jefferson

Softwares: Rhino, Grasshopper, Keyshot, Illustrator

Collaboration: Saleh Jamsheer, Sixtina Maculan, Ozan Cicek

FACADE TRANSFORMATION

The Dalian International Conference center now features aluminum panels with a rigid, angular, and daunting aesthetic. Our transformation premise alters the aesthetic to a fluid, inflated membrane. The Building has been designed and constructed with an absurd amount of metal. The structure is comprised of w-section box trusses with concrete floor slabs. The skin of the building is supported by the primary steel structure that utilizes a three-meter-thick braced column framing.

The intentions of our transformation are to lighten the overall structure of the skin of the façade, while reducing the weight of the material used to enclose the building. The implementation of ETFE (Ethylene tetrafluoroethylene) pillows allow for various benefits to the building performance. ETFE is a fluorine-based plastic which possesses high corrosive resistance and strength of a large variance of temperatures. The cushions allow the flexibility to contain several different gasses to improve environmental performance of the skin. ETFE allows for longer spans of materials versus the aluminum panels.

TRANSFORMED FACADE CHUNK

DALIAN INTERNATIAL CONFERENCE CENTER

Precedent Study: Dalian Conference Center Envelope System: Perforated Aluminum Facade 1 2 3 4 5M 1 2 3 4 5M 5M 4 3 2 1 WORMS EYE CHUNK A6 - FACADE DETAIL ETFE SUBSTRUCTURE CONNECTION A7- FACADE DETAIL ETFE CONNECTION A6 Floor
Secondary Bracing Structure ETFE Cushions 40cm Poured In Place Concrete Slad With #9 Reinforcing Bar
Structural Truss System Composed of W-Sections With Welded Connections-Field Fabrication
04.\ 07.\
GRASSHOPPER SCRIPT

PHYSICAL MODEL

Advanced Materials and Tectonics. AS3200 Sixtina Maculan Saleh Jamsheer Blake Minster Ozan Cicek
- FACADE DETAIL UPPER CORNER CONDITION ASSEMBLIES
- FACADE DETAIL LOWER CORNER CONDITION ASSEMBLIES 5M 5M 4 3 9 Gauge (3.5 mm) QUADROCLAD Perforated Aluminum Panel 12 Gauge Auxiliary Structural Square Steel Tubing Primary Steel Framing 0.75M x 0.5M Exterior Facade Skin System Primary Structural Steel Laterally Braced Columns 2.75M x 1.0M A2 Floor Structural Truss System Composed of W-Sections With Welded Connections-Field Fabrication Floor Structural Truss System Composed of W-Sections With Welded Connections-Field Fabrication QUADROCLAD QC200 Aluminum Panels With Honeycomb Stiffening QUADROCLAD QC200 Aluminum Panels With Honeycomb Stiffening 20cm Rigid Foam Insulation With Vapor Barrier 20cm Rigid Foam Insulation With Vapor Barrier Steel Angle Joinery for Cladding of Aluminum Paneling System Steel Angle Joinery for Cladding of Aluminum Paneling System Horizontal Joinery for Aluminum Paneling System Double Glazing Rainscreen System 20mm Thickness Vision Glass Double Glazing Rainscreen System 20mm Thickness Vision Glass Metal Flashing Corner VFP LUXALON Lay On Tiles 15mm Grid Drop Ceiling Hangers T-Bar Frame for Drop Ceiling 40cm Poured In Place Concrete Slad With #9 Reinforcing Bar Extruded Aluminum Mullions Extruded Aluminum Mullions A3 A4 Advanced Materials and Tectonics. AS3200 Sixtina Maculan Saleh Jamsheer Blake Minster Ozan Cicek A7 Thermal Insulation, Steel Section; Composite sheet-metal and plastic-sheet gutter Triple Layer ETFE Cushions Sheet Steel bent to Shape Vision Glass Mullions Steel Tube Bird Deterrent Wires on Stainless Steel Carrier Concrete Floor Slabs Extruded Alloy Cap with Foamed Steel Carrier Floor Structural Truss System Composed of W-Sections With Welded Connections-Field Fabrication Extruded Aluminum Frame to Opening Flap Aluminum Cladding Keder Cushion Restraint Extruded Steel Sections For Mounting of ETFE Cushions Three Layer ETFE Cushion Substructure For ETFE Cushions 08.\ (585)-905-5651| bminster333@gmail.com
A1
A2
OF ETFE PANELIZATION

DESIGN DEVELOPMENT & DOCUMENTATION

SCI-Arc 2020 Spring Deisgn Develoment & Documentation

Softwares: Rhino, Cinema 4D, AutoCAD

Proffesors: Herwig Baumgartner, Brian Zamora

Collaboration: Kristoffer Lund, Nero He, Deepak Agrawal, Gia Zhao, Kshitij Bhende

05.\ 09.\

DESIGN DEVELOPMENT

This course focused on construction systems and systems integrations. This course aimed to achieve an extremely detailed full design of structural members of a rather unusual building. The course focused on a new media to display the structural development of the project. A 7 minute animation was created showing the main overall concepts in the structural detailing of the project. We had weekly consultations with structural engineers as well as MEP engineers. This allowed us to collaborate while sharing our ideas with real engineers.

10.\
(585)-905-5651| bminster333@gmail.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.