Project: Pinch Limitation - Construction Comprehensive Handbook

Page 1


TABLE OF CONTENTS


6

10

SITE DESIGN

PROGRAM LAYOUT

SUN DIAGRAM / PROGRAM LAYOUT / SITE ANALYSIS

DESIGN CONCEPT / PROGRAM LAYOUT

14

22

STRUCTURE ANALYSIS

ACCESSIBILITY

AXONOMETRIC / STRUCTURE SPEC / PLAN / LATERAL DIAGRAM

FLOOR PLAN DIAGRAM / AXONOMETRIC DIAGRAM

28

36

CIRCULATION

HVAC SYSTEM

FLOOR PLAN DIAGRAM / AXONOMETRIC DIAGRAM

FLOOR PLAN ANALYSIS/AXONOMETRIC DIAGRAM

40

44

FACADE DETAILS

FINAL DRAWINGS

WALL SECTION / ASSEMBLE ANALYSIS

FLOOR PLANS / SECTIONS /DIAGRAMS / FIFTH FACADE

52

FINAL MODELS DP 1-5 / STUDY MODEL


SITE DESIGN SUN DIAGRAM / PROGRAM LAYOUT / SITE ANALYSIS



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R

Page 6


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R

Page 7

PROGRAM ANALYSIS

SITE ALLEY ANALYSIS


PROGRAM LAYOUT DESIGN CONCEPT / PROGRAM



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: PROGRAM LAYOUT Grade: HP P LP R

Page 10


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: PROGRAM LAYOUT Page 11

Grade: HP P LP R

Program Plan

Progam Diagram


STRUCTURE ANALYSIS AXONOMETRIC / STRUCTURE SPEC / PLAN / LATERAL DIAGRAM



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STRUCTURE ANALYSIS Grade: HP P LP R

Page 14

Plan


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STRUCTURE SPEC Grade: HP P LP R

Page 15

BUTLER STRUCTURE SPEC:

STRUCTURE DETAIL :

Joint Detail

Connection Detail

Long Span Elevation

Long Span Section


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STRUCTURE ANALYSIS

Plan

Page 16

Plan


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STRUCTURE SPEC

BUTLER STRUCTURE SPEC :

Page 17


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: TRANSFORMED STRUCTURE LATERAL DIAGRAM Page 18

Grade: HP P LP R

TRANSFORMED LATERAL LOAD

Transformed Lateral Butler

Precedent Tension Bar

PRECEDENT LATERAL LOAD


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: MAIN STRUCTURE DIAGRAM Grade: HP P LP R

Page 19

Main Structure Diagram


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: MAJOR STRUCTURE DIAGRAM Grade: HP P LP R

Page 20

Primarily Structure Diagram


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SECONDARY STRUCTURE DIAGRAM Grade: HP P LP R

Page 21

Secondary Structure Diagram


ACCESSIBILITY FLOOR PLAN DIAGRAM / AXONOMETRIC DIAGRAM



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: EGRESS DISTANCE Grade: HP P LP R

Page 24

PUBLIC EGRESS ACESS

PRIVATE EGRESS ACESS


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: EGRESS CIRCULATION Grade: HP P LP R

Page 25


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: EGRESS CIRCULATION Grade: HP P LP R

Ground Floor FIre Access

Second Floor FIre Access

Page 26


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: ACCESSIBLE BATHROOM Grade: HP P LP R

Page 27

ACCESS RESTROOM


CIRCULATION FLOOR PLAN DIAGRAM / AXONOMETRIC DIAGRAM



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: PARKING LOT CIRCULATION Grade: HP P LP R

Page 30

PARKING LOT CIRCULATION


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: GROUND FLOOR CIRCULATION Grade: HP P LP R

Page 31

GROUND FLOOR CIRCULATION


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SECOND FLOOR CIRCULATION Grade: HP P LP R

Page 32

SECOND FLOOR CIRCULATION


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: AXONMETRIC FLOOR CIRCULATION Grade: HP P LP R

Page 33


HVAC SYSTEM FLOOR PLAN ANALYSIS/AXONOMETRIC DIAGRAM



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R

Page 36

PARKING FLOOR MECH

GROUND FLOOR MECH


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: AXONMETRIC HVAC DIAGRAM Grade: HP P LP R

Page 37


FACADE DETAIL WALL SECTION / ASSEMBLE ANALYSIS



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Page 40

Grade: HP P LP R

CONCRETE SLAB

WINDOWS ASSEMBLY

WATER DRAINAGE

FOUNDATION DETAIL


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R

Page 41

AXONMETRIC CHUCK


FINAL DRAWING FLOOR PLANS / SECTIONS /DIAGRAMS / FIFTH FACADE



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: GROUND FLOOR PLAN Grade: HP P LP R

Page 44


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: FIFTH FACADE DRAWING Grade: HP P LP R

Page 45


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: PARKING PLAN Grade: HP P LP R

Page 46


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SECOND FLOOR PLAN Grade: HP P LP R

Page 47


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R

Page 48

SECTION A


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R

Page 49

SECTION B


FINAL MODELS DP 1-5 / STUDY MODEL



arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: DP1 MODEL DISPLAY Grade: HP P LP R

Page 52

PERSPECTIVE RENDER

ELEVATION RENDER


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STUDY MODEL DISPLAY Grade: HP P LP R

Page 53

STUDY MODEL


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: TRANSFORMED STRUCTURE MODEL Grade: HP P LP R

Page 54

ELEVATION RENDER


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: TRANSFORMED STRUCTURE MODEL Grade: HP P LP R

Page 55

INTERIOR RENDER


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STRUCTURE DISPLAY Grade: HP P LP R

Page 56

PERSPECTIVE RENDER

ELEVATION RENDER


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: STRUCTURE DISPLAY Grade: HP P LP R

Page 57

INTERIOR RENDER

PERSPECTIVE RENDER


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: CHUCK MODEL DISPLAY Grade: HP P LP R

Page 58

EXTERIOR RENDER

INTERIOR RENDER


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: CHUCK MODEL DISPLAY Grade: HP P LP R

Page 59


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: FINAL FINAL MODEL DISPLAY Grade: HP P LP R

Page 60

Exterior render showing the court yard / alley condition and program use.

Exterior render A

Exterior render B

TITLE


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: FINAL MODEL DISPLAY Grade: HP P LP R

Page 61

FULL COMBINED MODEL TITLE


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: FINAL MODEL DISPLAY Grade: HP P LP R

Page 62

Interior render showing the transformed structure and spacial quality.

Interior render A

Interior render B


arch 302b Student: Timlok Li

Instructor: Maria Ensanola Date Due:

Coordinator: Esnaola

INTEGRATED STUDIO DOCUMENTATION: FINAL MODEL DISPLAY Grade: HP P LP R

Page 63

SPLIT SECTION MODEL



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.