CCR May 19

Page 150

SOUND MATRIX By Robert Marshall

148

E

xplosive population growth has a direct effect on building design, especially when it comes to creating enough flexibility to adapt to ongoing change and delivering the hospitality-like experience that patients want. Harris County, Texas, home to Houston, is one of the fastest growing counties in the nation. From 2000 to 2016, the metro area’s population exploded from 3.4 million to 4.6 million. This swelling of new residents, combined with an aging population, has placed considerable demand on the city’s hospitals to rise up and meet the needs of a changing populace. Houston Methodist West Hospital in the suburb of Katy was completed in 2010 at a finished size of 447,000 square feet, and uses CertainTeed Ceilings products throughout the building structure. The hospital is now constructing a 228,000-square-foot expansion to support the needs of its patient com-

COMMERCIAL CONSTRUCTION & RENOVATION — MARCH : APRIL 2019

Photography courtesy of Geoffrey Lyon

Designing spaces for patient comfort with targeted acoustics


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.