SAG Team I Pratical all

Page 1

12/8/20104:47 PM

Evaluator Employee ID

Problem statement

工作人员在电子舱的坠落防护 Fall protection for working in E/E bay open

526

Discription Process A/C Daily Maintenance Employees Exposed 1 to 2 Sub-process open the E/E Bay hatch Frequency of Exposure Once a year 1 Treament the injury Containme site specific pro Plane Job Title 2 Report the safety nt Location Cabin Property A/C Mechanic 3 Briefing on site Nature Dept. lectronics/Electrical Tec 4 People Production Publish a instruction of pre work

ChenSheng

aluator Na

who

Discript who ion

where

HuangMingLCabin Eric HM Eric HM Eric HM

Other index Related MET item

where

5 6 7 8

100736 Hazard Id 10

Poll Results Identified Risks

KNOT Date Quantitative

Further control acton

Existing controls described & evaluated

4

3

4

3

4

3

12

Procedure or Process re- 发布新的有关机上工作注意事项的指引 assessment

M

N

N

N/A

Y

3

2

3

2

3

2

7.2

M

N

N

N/A

Y

4

4

4

3

4

3

4

4

4

4

4

4

14.4

M

N

N

N/A

Y

4

3

3

3

3

3

4

3

4

3

4

3

10.8

3

3

3

3

3

3

3

3

3

3

3

3

9

3

4

4

4

4

4

3

4

3

4

3

4

13.6

Procedure or Process re- 发布新的有关机下(电子舱)工作注意 assessment 事项的指引 Training 安全教育-公司级及部门安全教育 Safety Awareness 定期宣扬-daily meeting,现场开工前会议 training / consciously Training 安全教育-公司级及部门安全教育 Audit 质量系统自我评估,查找漏洞,编制质 量系统日常检查单的具体项目。

7

0

0

0

0

0

8

0

0

0

0

0

9

0

0

0

0

0

10

0

0

0

0

0

11

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

3

3

4

2

4

2

3

3

3

3

3

3

8.84

2

2

2

2

2

2

2

2

2

2

2

2

4

0

2

3

3

3

3

2

3

2

3

2

3

5.6

0

0

0

0

0

0

0

0

0

0

0

0

0

0

2

community with the onsite mechanic community with the onsite mechanic community with the onsite mechanic

安全意识不够高 3 Attitude Quality/Workmanship/Safety 4 Communication Breakdown 现场协调不好 5 Schedule/Time/Deadline 现场协调不好(控制人员协调) Detection System Fault 质量系统没有发现这个风险源

6

Or add a new current h d

Sele Select Potential Hazard: 1t Attitude Quality/Workmanship/Safety 2 Procedure/Policy Human Performance

Detail discript about the Harzard

Detail discript about the Harzard

Before inprovement-Risk After inprovement-Risk

VH

18.44

H

L

2

飞机没有推梯 子,直接从客 舱进入飞机

电子舱口 盖未关闭

3 E/E bay fall down injury

电子舱,打开 后没有人负责 关闭

3W 飞机准备推出机 库,没有打开照明 飞机准备推出机 库,工作人员不选 择从机身下部进入 电子舱 工作者以为后面没 有人跟进,应客户 要求保留电子舱口 盖打开

没有设置 4 警告装置 现场操作 人员没有 通知后续 5 人员电子 舱口盖已 打开

现场操作人不 知道后面有人 进入客舱

现场协调不好

6 当事人没 想到

没有人提醒

这是班组人员的一 贯做法

N

N/A

Y

N

N/A

Y

M

N

N

N/A

N

Dec. Dec. 10 30 2010 Dec. 30 Dec. 30 Dec. 30 Dec. 30 Dec. 30

Dec. 10 Xian QS Dec. ghua 10 JR HM Dec. 10 Dani Oper Dec. el ation 10 Xian QS Dec. ghua 10

0

67

M

2W 飞机没通电, 无客舱照明

N N

HM HM

Potential control if appropriate

一线人员宣扬的效果,安全意识的有效 提高 质量系统的检查单是否能涵盖所有日常 的风险源 执行效果

1W 当事人没 1 有看到

M M

JR JR

4W

5W 没有明确规定客舱工作需 要打开客舱照明

没有明确的程序要求需要 从飞机下部进入电子舱

安全意识不够高

质量系统没有发现这个风 险源

Page 1 of 13

Evaluation Date: Future Review date:

程序及工作指引发布 程序及工作指引发布 培训宣讲纪录 定期抽查 定期抽查 质量系统的自我审核

chen shen g chen shen chen shen chen shen chen shen Xue Che

Date

3 3

Measurement of Effectiveness (MOE)

Due Date

4 3

Validation and Audit

Assigned To

3 3

Date

4 3

Due Date

3 2

Procedure/Policy

Dept。

4

1

没有明确规定客舱工作需要打开客舱照 明 没有明确的程序要求需要从飞机下部进 入电子舱

W h at w e wi ll d o to

Assigned To

Cost to implement?

Accept Risk (Yes or No)

Difficulty to implement?

Detail discription about the control action

Solution creates new problems?

Risk level

Solution to problem accuracy?

What we do now to manage this risk.

3

Procedure/Policy

3

Action Taken to validation

Likelihood

know

(L, M, H or VH - see Sheet 1)

on

Consequence

w

(1, 2, 3, 4 or 5 - see Sheet 1)

w

Likelihood

Kno

Lack of q uality attitude

(1, 2, 3, 4, or 5 - see Sheet 1)

Hang er constructio n limitation

Lack of quality attitud e

(1, 2, 3, 4 or 5 - see Sheet 1)

Lack of saf ety training

we

Likelihood

Lack of safety training

Consequence

Lack of safety sense Walkie-talkie is in - op eration Not follow the procedure (Industry standard)

Kno

5 th Why

Short of skill traini ng

(1, 2, 3, 4 or 5 - see Sheet 1)

Lack of saf ety sense

Entry HIDRA Average Risk Lever

shane (1, 2, 3, 4, or 5 - see Sheet 1)

4th Why

Likelihood

Not fol low th e procedu re manual

Lack of insp ection skill

Consequence

Not use the communica tio n tool No communicati on between team

D o not tag o n warning tag

Staff not be assig n

(1, 2, 3, 4 or 5 - see Sheet 1)

Lack of communicati on

3rd Why

shane (1, 2, 3, 4, or 5 - see Sheet 1)

O ver sign th e mistake

Likelihood

Lack of onsite monito r

Consequence

No 6 slat PNL D amag ed

2nd Why

Likelihood

Lack of Observation

Consequence

1st Why

Problem Stat ement

Consequence

5-Why Analysis

(1, 2, 3, 4 or 5 - see Sheet 1)

Think

d to Opini

(1, 2, 3, 4 or 5 - see Sheet 1)

Nee KInde Risk Description x method selection

(1, 2, 3, 4, or 5 - see Sheet 1)

T-

XiaoFen g Dawei (1, 2, 3, 4, or 5 - see Sheet 1)

O-

(1, 2, 3, 4, or 5 - see Sheet 1)

N-

shane

Jan. Jan. 5 5 Jan. 5 Jan. 5 Jan. 5 Jan. 5 Jan. 5

Jan. 5 Jan. 5 Jan. 5 Jan. 5 Jan. 5


12/8/20104:47 PM

Evaluator Employee ID

B747/767尾架移动撞击东航设备

luator N HeGe

396

who

Discription Process A/C Daily Maintenance Employees Exposed 25 to 35 employees Sub-process The 747 tail docking impacting Frequency of Exposure Once a year 1 Containm site specific pro Plane Job Title 2 ent Location Apron Property Facilities Maintenance 3 Nature People Dept. A/C Mechanic 4 Production

Problem statement

Discri who ption

where

Other index Related MET item

where

100722

5 6 7 8

Evident

10

Pic Pic 2 invest Modi

Poll Results Identified Risks

KNOT Date Quantitative

4

3

4

3

10.4

Engineering Controls

在此工作梯上明显位置注明移动梯架 M 时风速不超过30公里/小时。

N

N

4

4

4

4

4

3

11.4

Planning, Phasing

现场指挥者要及时注意当时天气变化 M (通过网络,机场塔台等)。

N

N

4

3

4

3

4

3

4

3

4

3

4

3

12

Procedure

3

3

3

3

3

3

3

3

3

3

3

9.6

Engineering Controls

按照pro-04-m08r3规定梯架停滞进行 M 现场开工程序培训(口述,文本签字. 与供应商协调,在安全的范围里重新 H 设计梯架,减轻重量,或改为自动式

N

4

N

0

0

0

0

0

Engineering Controls

在使用上,梯架固定在机库内某一区 M 域减少移动距离

0

0

0

0

0

Engineering Controls

梯架支撑脚脱卸式摇把改成固定式

M

0

0

0

0

0

Procedure

在支撑脚锁 定前用轮挡刹住轮子防止移动

M

8

0

0

0

0

0

9

0

0

0

0

0

10

0

0

0

0

0

11

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

修理坞改装效果,成本

3

2

3

2

3

2

3

3

3

3

3

2

7.2

effective of procedudre implementation

2

2

2

1

2

2

2

2

2

2

2

2

3.6

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

梯架设计不合理-支撑脚锁定过程繁 琐 Attitude 现场人员决断力及判断力不够(应急 4 Quality/Workmanship/Safety 处置,安全意识) Tools

3

interview with the onsite mechanic

5 6 7

Or add a new current hazard:

Detail discript about the Harzard

Sele Select Potential Hazard: 1t Equipment Human Performance

Detail discript about the Harzard

storm stronger on apran

2W

43.4

VH

After inprovement-Risk

10.8

H

3W

4W

5W 工作者在移动梯架时没有 及时预判风速变大

2 Storm impact docking moving

现场人员 3 无法控制 修理坞

梯架设计不合理-梯架庞 大重量重

4

梯架设计不合理-支撑脚 锁定过程繁琐

现场保护 措施不足梯架停放 时锁定支 5 撑脚未全 部锁定, 未设置轮 档

N

N/A

Y

Y

much Y

N

Y

N/A

N

N

10000 Y

N

N

N/A

Y

Y

供应 Bac Dec 商 ksh 0 op 201 PPC Eng Dec 0 、 201 MO Zon HM Dec e 0 Mik Faci Dec lity 0 e Zh 201 JR HM Dec 0 201 Mik Faci Dec e lity 0 JR HM Dec 0

Dec , 30 Dec , 30 Dec , Dec , 30 Dec

现场人员决断力及判断力 不够(应急处置,安全意 识) Page 3 of 13

铭牌在位 相应程序建立,并发布 相应程序建立,并发布 修理坞改装完成

相应程序建立,并发布 , 30 修理坞改装完成 Dec Dec 相应程序建立,并发布 ,

0

Before inprovement-Risk

L

1W

Y

Potential control if appropriate

M

1

500 Y N/A

Evaluation Date: Future Review date:

Date

3

3

Measurement of Effectiveness (MOE)

Due Date

4

4

Validation and Audit

Assigned To

2

2

Date

4

3

Due Date

2

2

Dept。

4

4

W h a t w e w i l l

Assigned To

3

梯架设计不合理-梯架庞大重量重

Cost to implement?

4

Design/Architecture

Accept Risk (Yes or No)

Difficulty to implement?

Solution creates new problems?

Detail discription about the control action

工作者在移动梯架时没有及时预判风 速变大

2

2

Solution to problem accuracy?

What we do now to manage this risk.

Environmental Conditions 1

Further control acton

Existing controls described & evaluated

Risk level

Likelihood

Action Taken to validation

(L, M, H or VH - see Sheet 1)

know

Consequence

ion

(1, 2, 3, 4 or 5 - see Sheet 1)

w

Likelihood

w

(1, 2, 3, 4, or 5 - see Sheet 1)

Kno

Lack of q uality attitude

(1, 2, 3, 4 or 5 - see Sheet 1)

Hang er constructio n limitation

Lack of quality attitud e

Likelihood

Lack of saf ety training

k we

Consequence

Kno

(1, 2, 3, 4 or 5 - see Sheet 1)

Lack of safety training

Entry HIDRA Average Risk Lever

HeGe (1, 2, 3, 4, or 5 - see Sheet 1)

Lack of safety sense Walkie-talkie is in - op eration Not follow the procedure (Industry standard)

5 th Why

Short of skill traini ng

Likelihood

Lack of saf ety sense

Consequence

Not fol low th e procedu re manual

4th Why

Lack of insp ection skill

(1, 2, 3, 4 or 5 - see Sheet 1)

Not use the communica tio n tool No communicati on between team

D o not tag o n warning tag

Staff not be assig n

HeGe (1, 2, 3, 4, or 5 - see Sheet 1)

Lack of communicati on

3rd Why

Likelihood

O ver sign th e mistake

Consequence

Lack of onsite monito r

(1, 2, 3, 4 or 5 - see Sheet 1)

No 6 slat PNL D amag ed

2nd Why

Likelihood

Lack of Observation

Consequence

1st Why

Problem Stat ement

Consequence

5-Why Analysis

(1, 2, 3, 4, or 5 - see Sheet 1)

Thin

d to Opin

(1, 2, 3, 4 or 5 - see Sheet 1)

Nee KInd Risk Description ex method selection

T-

XiaoFe ng DaWei (1, 2, 3, 4, or 5 - see Sheet 1)

O-

(1, 2, 3, 4, or 5 - see Sheet 1)

N-

Shane

HG Jan 5 201 HG Jan 5 201 HG Jan 5 HG Jan 5 201 HG Jan

Jan 5 201 Jan 5 201 Jan 5 Jan 5 201 Jan

5 201 HG Jan 5 HG Jan 5

5 201 Jan 5 Jan 5


12/8/20104:47 PM

Evaluator Employee ID

Process plane Maintenance - A Ch Employees Exposed Sub-process Close the side cowl Frequency of Exposure site specific pro 发动机勤务的恢复工作 Plane Location Hangar Bay 4 Property Nature Dept. People Heavy Maintenance

Problem statement

side cowl突然滑落导致人员受伤

who

Discription

3 to 6 Once a year Job Title

Containme 1 2 nt

A/C Mechanic Inspector

Other index

Disc who ripti

where

Treament the injury inspect the side cowl

where

Discription

who

where

Identified Risks

KNOT Date Quantitative

Existing controls described & evaluated

N

3 Knowledge 4 Design/Architecture

工作经验不足

3

3

3

3

4

3

4

3

4

3

11 Training

N

N

No

Y

configuration defferent

3

2

3

2

3

3

3

3

H 培训 OJT requires the sells to communication L ith t

Y

Y

n/A

Y

w

Action Taken to validation

9 Engineering Controls

Cost to implement?

on

Solution creates new problems?

w

2000 Y

司介 HM 忠

Dec.1 Dec. 梯子到位 0 30 read and sign training emaildrecord

Daw Jan Jan i 5 5

Risk level (L, M, H or VH - see Sheet 1)

N/A

w

Measurement of Effectiveness (MOE)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

N

Lack of quality attitude

Lack of quality attitude

Detail discription about the control action

Future Risk Level Target (L, M, H or VH - see Sheet 1)

N

Hanger con stru ction limitation

Not follow the procedure (Indu stry stand ard )

kno

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

N

H

Walkie-talkie is in -operatio n

Kno

Date

N

重新review生产部门授权体制

Lack of saf ety training

Due Date

使用与机型匹配的现有梯架 采购 M /配置与不同机型相匹配的梯架

11 Procedure or Process re-

Short of skill trainin g

Lack of saf ety sense

What we do now to manage this risk.

10

Expected Risk After Improvements

Validation and Audit

Assigned To

17 Engineering Controls

3

Not follow th e procedure manual

Kno

Date

5

4

Not use th e co mmunica ti on tool No commun icati on between team

D o not tag on warn ing tag

Lack of safety trai ning

Due Date

4

3

Lack of insp ectio n skill

5 th Why

Dept。

5

3

O ver sig n the mistake

Lack of saf ety sen se

Accept Risk (Yes or No)

5

3

Lack of co mmu nicati on

4th Why

Staff not be assign

Difficulty to implement?

4

4

No 6 slat PNL D amaged

3rd Why

Lack of onsite mo nitor

Solution to problem accuracy?

4

3

Problem Statement

2nd Why

Risk level (L, M, H or VH - see Sheet 1)

4

3

Lack of O bservation

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

3

3

1 st Why

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

5

4

5-Why Analysis

Assigned To

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

3

授权限制比较多

Thin

d to Opini k we

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

没有合适的梯架-梯架与飞机型号不匹配

Nee

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

1 Equipment 2 Fatigue

KInde Risk Description x method selection

0 0 0 0

4

4

5

0

0

6

0

0

0

0

0

0

9

0

0

0

0

0

0

10

0

0

0

0

0

0

11 Or add a new current h d

Sele Select Potential H d Knowledge

1t 2

Other

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

T-

Further control acton

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

O-

Entry HIDRA Average Risk Lever

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

N-

DaWei Song

100863 Evident

Report MEDA

3 4

Poll Results XiaoFe Shane ng He Ge He

Related MET item

Fatigue

Detail discript about the H d

Detail discript about the H all the d employee can got not th t it f t i i 授权实施效果待确定

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

2

3

2

1

2

2

2

1

2

2

3

2

2

2

3

2

4

0

3

2

3

2

6

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

9

VH

M L

1W

2W

3W

4W

5W

梯子不合 适

没有合适 的梯子 没有足够 的休息时 间

没买合适 的梯子

Equipment

站不稳

2 疲劳 3 经验不足 设计缺陷4 安全余度 不够

疲劳

人手不够

没有合适的 经授权的工 作人员 Knowledge Design/Arc hitecture

0 After inprovement-Risk

47

H

然滑落导 致人员受 伤

0 0

Potential control if appropriate

After inprovement-Risk

1

0 0

Before inprovement-Risk

side cowl 突

shan

授权限制 比较多

Page 4 of 13

Future Review date:


12/8/20104:47 PM

Evaluator Name

Evaluator Employee ID

Process A/C Daily Maintenance Employees Exposed Sub-process Frequency of Exposure Plane site specific pro Location Hangar Bay 3 Property Nature Dept. People Heavy Maintenance

Problem statement

飞机进场维修未接地

A Team Once a season Job Title A/C Mechanic Facilities Maintenance

Discription Containme 1 2 nt

reconnect the static ground

who

where

Discription who

Mechanic

Cabin HM HM HM

5 6 7 8

3 4

XiaoFeng where

Other who

Discription

where

Identified Risks

KNOT Date Quantitative

Existing controls described & evaluated

Buy new static wires

H

N

N

2

6 Training

associate with ground training

H

N

N

N/A

Y

3 Instruments, Controls, No checklist regarding A/C static lib ti 4

2

2

3

2

3

2

3

2

3

2

3

2

6 Procedure

update the checklist

H

N

N

N/A

Y

0

0

0

0

0

5

0

0

0

0

0

6

0

0

0

0

0

7

0

0

0

0

0

8

0

0

0

0

0

9

0

0

0

0

0

10

0

0

0

0

0

kno

Lack of q uality attitud e

L ack of q uality attitude

w

w

on

w

Action Taken to validation

12 Material handling device

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

B

0

0

0

0

0

C

0

0

0

0

0

D

0

0

0

0

0

E

0

0

0

0

0

1t

2

2

2

2

4

2

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

11 A

Or add a new current Detail discript about the Harzard h d

Sele Select Potential H d Performance Human

Detail discript about the Harzard

After inprovement-Risk

2

1

2

2

2

2

24 4

M L

3W

4W

接地线不 够长 工作人员 2 不知道怎 么接 3 没有 checklist

5W Equipment The length of current cable does not satisfy to connect A/C and ground point

1

飞机进场 维修未接 地

没有受过 相应机型 接地培训

没有人提 出需要相 应培训

Facil facili Dec. it t 10 Eric HM Dec. QA QA 10 Dec. 10

After inprovement-Risk VH H

2W

1000 Y

No aircraft static ground training for junior mechanics Instruments No checklist , Controls, regarding calibration A/C static

Page 5 of 13

Measurement of Effectiveness (MOE)

Dec. static wire available 30 Dec. Training record 30 Dec. Checklist update 30

Potential control if appropriate

Before inprovement-Risk

1W

Detail discription about the control action

Cost to implement?

Hang er construction limita tion

Kno

0 Future Review date:

XF XF XF

Jan. Jan. 5 5 Jan. Jan. 5 5 Jan. Jan. 5

5

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

3

3

Lack of safety training

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

4

2

Walkie- talkie is in -op erati on Not follow the proced ure (Ind ustry standard )

Kno

5th Why

Short of skill training Lack of safety trai ning

Future Risk Level Target (L, M, H or VH - see Sheet 1)

4

3

Lack of safety sense

Date

3

2

No t follo w the proced ure manual

4th Why

Lack of safety sense

Due Date

3

3

No t use the communica tio n tool No communicati o n between team

Do not tag o n warning tag

Staff no t be assi gn Lack of i nspectio n skill

Expected R After Improvemen

Validation and Audit

Assigned To

3

2

Lack of communicati on

3rd Why

Date

3

4

Lack of onsite monitor Over si gn the mistake

Due Date

4

2

2nd Why

Dept。

Solution creates new problems?

3

3

Lack of Observation

What we will do to reduc e this risk

Assigned To

Solution to problem accuracy?

3

2

1st Why

No 6 sl at PNL Damaged

What we do now to manage this risk.

Accept Risk (Yes or No)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

3

3

d to Opini k we 5-Why Analysis Problem Statement

1 Equipment 2 Knowledge

Thin

Difficulty to implement?

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

5

No aircraft static ground training for junior mechanics

Inde Risk Description x method selection

Nee

Risk level (L, M, H or VH - see Sheet 1)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

The length of current cable does not satisfy to connect A/C and ground point

K-

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

Likelihood (1, 2, 3, 4 or 5 - see Sheet 1)

T-

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

O-

Further control acton

Consequence (1, 2, 3, 4, or 5 - see Sheet 1)

N-

Entry HIDRA Average Risk Lever

10071 Evident N/A N/A N/A N/A

Poll Results XiaoFe DaWei Shane ng He Ge He Song Other

Related MET


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.