ARCHITECTURE PORTFOLIO
REPRESENTATIVE WORKS
GHEORGHIU BOGDAN
C O N T E N T S
ACADEMIC 1. 2012 2. 2011
RESEARCH AND TECHNOLOGY PARK WORKSHOP STAGE 1 AND 2
WORK 3. 4. 5. 6. 7. 8.
2013
COLLIERS OFFICES HBO OFFICES BREWERY TEAMNET OFFICES COFFEE SHOP VARIOUS PROJECTS AND RENDERS
1-2
A C A D E M I C
GRADUATION PROGRAM
LOCATION DESCRIPTION
PROIECTUL DE
PROJECT Cement and concrete research institute Forest Biometrics and Geomatics laboratories exhibition space and quarry museum Bicaz city , neamt County, Romania The site in an abandoned cement factory plot near a significant industrial node.through the conversion of this space into a reserarch and technology park for the industries in the area,the economy will be strengthened, new public space introduced and 2 tourism encouraged
DIPLOMA
PROGRAM
Centru de cercetare al materialelor de constructie laboratoare de biometrie forestiera Spatii publice si expozitionale
LOCATIE
Orasul Bicaz , jud, neamt
DESCRIEREA TEMEI
Situl se afla intr-o importanta zona industriala din jud neamt, pe locul unei fabrici de ciment abandonate. Regenerarea acestui tesut post industrial (prin implementarea unui program de cercetare necesar industriei din zona ) ar contribui la stabilitatea economica a zonei , la creearea de noi spati publice pentru orasul Bicaz si la incurajarea turismului A 3-4
A 5-6
CUMULATIVE THERMAL EXPOSURE EXPUNERE SOLARA CUMULATIVA
FACADE DETAIL DETALIU DE FATADA
THERMAL BATTERY BATERIE TERMICA
1
EAST VIEW FATADA EST
2
DETAIL DETALIU
3
MASTERPLAN
4
A 7-8
A 15-16
A C A D E M I C
WORKSHOP TEAM DESCRIPTION
Stage 1 Bridge Mikov Yuliyan,Gheorghiu Bogdan, Valcu horatiu A 7 day grasshopper worskshop in which we had to design a special structure of our chosing. It had 2 stages, one in which we had a tutorial for the software, and one to desing a model
2
WORKSHOP ECHIPA DESCRIERE
Etapa 1 Pod Mikov Yuliyan,Gheorghiu Bogdan, Valcu horatiu Un workshop de grasshopper ce a durat 7 zile, si in care scopul final era proiectarea unei structuri speciale. S-a desfasurat in 2 etape, prima fiind una de acomodare cu Sofware-ul,iar a doua de utilizare a lui in proiectarea unei srtucturi.
A 17-18
2
1
2
3 2 A 19-20
A 21-22
A C A D E M I C
WORKSHOP
Stage 2 pavilion
LOCATION
The university of architecture and urbanism ion mincu
TEAM
DESCRIPTION
Ran Berman, Han feng, Gheorghiu Bogdan, Valcu horatiu Alexandra Varlan, Bogdan Chipara, Andrei raducanu,irina Bogdan, Dragos Solot, Sandu milea lucian The second stage of the workshop dealth with desinging and building a structure around an existing concrete shell, which is situated in the university’s inner courtyard 2
WORKSHOP AMPLASAMENT
Etapa 2 Pavilion Universitatea de arhitectura si urbanism “ion Mincu”
ECHIPA
Ran Berman, Han feng, Gheorghiu Bogdan, Valcu horatiu Alexandra Varlan, Bogdan Chipara, Andrei raducanu,irina Bogdan, Dragos Solot, Sandu milea lucian
DESCRIERE
A doua etapa a workshop-ului a cuprins elaborarea si constructia unei structuri in jurul zidului circular de pe terasafacultatii
A 23-24
STAGE 1
ETAPA 1
Consisted in measuring and evaluating the existing structure from the terrace, then modeling it in 3d . this gave us a starting point in the evaluation of the growth pattern for the original structure.
A constat in relevarea zidului existent pe terasa, apoi modelarea lui in mediul 3d. Acest lucru permitand obtinerea unei curburi exacte si generarea unei cresteri a acesteia
1
STAGE 2
ETAPA 2
After the curvature was established , a surface was added along the growth pattern, itself expanding at the same rate
Dupa stabilirea directiei de crestere a pavilionului a fost generata o suprafata ce o urmareste si o potenteaza prin implementarea algoritmului de crestere si pe inaltime.
2
2 A 25-26
STAGE 3
ETAPA 3
`
This focused around slicing the shell previously created with 14 vertical planes, starting from the center point outwards. the curves created served as axes for the beams.
Aceasta a debutat prin intersectarea suprafetei obtinute anterior cu paisprezece planuri verticale, ce au ca punct de plecare axa din centrul structurii existente.Curbele rezultate au fost folosite ca si axe pentru grinzile pavilionului.
3
STAGE 4
ETAPA 4
2
Having the beams in place, a series of panels were added between them, at an equal pace. The orientation and size of each pannel varried along an attractor curve. This gave the skin a certain variabile transparancy and a possibilty to control the angle of view from the inside out.
Intre grinzile astfel otinute s-au plasat o serie de “solzi� la un pas constant. Orientarea si marimea lor fiind data de o curba atractor ce influenteaza ughiul in care sunt dispusi. Aceasta schimbare progresiva de unghi directioneaza campul vizual din interior si ofera o transparenta variabila.
4 A 27-28
STAGE 5
ETAPA 5
The digital model was completed after the insertion of the floor design. this followed the projection of the beams onto the horizotal plane of the terrace and varied in hight according to the path and transparency of the model. Modelul virtual a fost completat prin implementarea unei pardoseli. aceasta urmareste proiectia grinzilor pe terasa si variaza pe inaltime in functie de parcursul si transparentapavilionului
5
FABRICATION
For the main load bearing beams we used cnc cut 1.8 cm MDF sheets , each beam comprised out of three overlaped layers secured by screws. The “fins” were laser cut out of 6 mm MDF panels and the floor structure was made out of wood.
PROCESUL DE In cazul grinzilor am folosit MDF de 1.8 cm taiate la cnc. FABRICARE Pentru “solzi” s-au folosit placi (MDF) de 6 mm taiate la laser iar pentru pardoseala s-a folosit lemn
2 A 29-30
2
F A 31-32
W O R K
PROGRAM LOCATION TEAM
DESCRIPTION
Colliers Offices Calea Floreasca 169A , Bucharest Prographic Architecture Studio : Gheorghiu Bogdan, Gabriela Barbulescu, Lavinia Moraru, Stefan Bianco Design and execution of Colliers headquarters in Bucharest
2
PROGRAM
Birouri Colliers
LOCATIE
Calea Floreasca 169A, Bucuresti
ECHIPA
DESCRIERE
Prographic Architecture Studio: Gheorghiu Bogdan , Gabriela Barbulescu, Lavinia Moraru Stefan Bianco Amenajarea si executia noului sediu Colliers in Bucuresti
A 33-34
RECEPTION
1
STAGE
2
HOT DESKING
3
7
6
8 SOLO BOOTH
4 5
OPEN SPACE
5
CEO OFFICE
6
INT. CONFERENCE
7
OFFICE DEPT. 8
EXT. CONFERENCE
9
9 4
1 3 2
RECEPTION
A 35-36
OPEN SPACE AND HOT DESKING
INFORMAL LIBRARY AND BOOTH
2 A 37-38
EXT. CONFERENCE
INITIAL PICTURE
+
TEXTURE PAINTING (MATTE PAINTING)
FINAL IMAGE FOR WALL MOUNTING 9m x 3m
2 A 39-40
W O R K
PROGRAM LOCATION TEAM
DESCRIPTION
HBO Offices Str. Buzesti 76 , Bucharest Prographic Architecture Studio : Gheorghiu Bogdan, Lavinia Moraru, Mihai Caranica Stefan Bianco Pitch for HBO headquarters in Bucharest
2
PROGRAM
Birouri HBO
LOCATIE
Str. Buzesti 76, Bucuresti
ECHIPA
DESCRIERE
Prographic Architecture Studio: Gheorghiu Bogdan , Lavinia Moraru, Mihai Caranica Stefan Bianco Propunere pentru birourile HBO in Bucuresti
A 41-42
FLOOR PLAN
2 A 43-44
FLOOR PLAN
2 A 45-46
A 95-96
CURRICULUM VITAE
PERSONAL INFORMATION NAME ADRESS
Gheorgiu Bogdan Alexandru Str. Copaceni, nr. 3, ap 20, Bucuresti, Sector 3 , Jud. Neamt
TELEPHONE
+40722 258 564 (RO)
Bogdanveb@gmail.com
NATIONALITY DATE OF BIRTH PLACE OF BIRTH
OCCUPATIONAL FIELD
Roumanian rd
January 23 1986 Piatra neamt, jud. Neamt Architecture
WORK EXPERIENCE DATE OCUPATION (POSITION HELD) MAIN ACTIVITIES AND RESPONSABILITIES
September 2012 - January 2014 Architect Prepare information regarding design, specifications, materials. Producing cad drawings and specification for construction Involved in the design and concept stage 3d Moldeing and render Identifying customer requirements and attending meetings on site Involved in all aspects of design and procurement process Review of architectural documents for potential conflict with other disciplines