ARCHITECTURE
PORTFOLIO brandon boon kwan tung 1
TABLE OF CONTENTS UNDERGRADUATE PROJECTS
Landscape Design Studio 3: Urban Open Space Architecture Design Studio 3: Air Site Tectonics Architecture Design Studio 4: Fire
8
Construction Design
16
2
10 12 14
2
POSTGRADUATE PROJECTS
Studio D: City as World Studio E: Another Way of Living Design Thesis: Forms and Materiality
3
PART
PART
1
4
PART
Curriculum Vitae
22 26 30
PROFESSIONAL PROJECTS
Thomas + Williams Architects Davies Street Residence Maxine Court Residence Airlie Avenue Residence
38 40 44
Battersby Chow Studio 881 High Street Blode Residence
46 48
TILBUILT Rachelle Road Residences Burchett Street Residences Cochrane Street Residence
50 52 54
Sketches
5
PART
PART
4
SKETCHES
60
Photography
PHOTOGRAPHY
64
3
CURRICULUM VITAE BRANDON BOON KWAN TUNG
4
PROFILE
EXPERIENCE
I am a Masters of Architecture graduate at the University of Melbourne.
Dec 2012 - Feb 2013
Student Architect Habitat Design Architect Penang, Malaysia
May - Jul 2016
Graduate Architect DETAIL 3 Melbourne, Australia
Oct 2016 - Mar 2017
Graduate Architect Thomas + Williams Architects Melbourne, Australia
May - Oct 2017
Graduate Architect Battersby Chow Studio Melbourne, Australia.
Jan - Sept 2018
Graduate Architect TILBUILT Melbourne, Australia
As an architecture graduate, I am interested in modern tropical architecture that blends in with the local and cultural context, and how these built environments shape the urban fabric and improve the lifestyle of the community. I am also passionate about how these rapid urban, infrastructure and property developments could affect the overall social, economical and political landscape, both positively and negatively. I am passionate about collaborating with peers and learning from different design approaches and expertise. Besides that, I am keen in contributing my ideas to the team based on my design background and skills.
BRANDON BOON KWAN TUNG
EDUCATION 2010 - 2013
University of Melbourne, Australia Bachelor of Environments (Architecture)
2013 - 2015
University of Melbourne, Australia Master of Architecture
GRADUATE ARCHITECT
CONTACTS
SKILLS
ACHIEVEMENTS
Phone 61459930925
Microsoft Word
• Masters of Architecture Studio D work shortlisted for exhibition at Melbourne School of Design Studio CDE Exhibition and St Kilda Town Hall hosted by the City of Port Phillip. (2014)
E-mail boonkwantung@gmail.com
Microsoft Excel Microsoft Powerpoint Sketchup
Portfolio http://issuu.com/boonkwan/docs/portfolio2
Rhino Grasshopper
LANGUAGES
AutoCAD
English
Professional working proficiency
Revit
Malay
Professional working proficiency
Chinese
Native speaker
• Design Thesis exhibition at the Melbourne School of Design Graduate Exhibition. (2015) • Photography entry shortlisted as finalist for ‘What I Love About Kew’ photography competition organised by Kew Junction Business Association. (2018)
Adobe Photoshop Adobe InDesign Adobe Illustrator Adobe Lightroom
5
6
PART
1
UNDERGRADUATE PROJECTS
7
UNION LAWN
Landscape Design Studio 3: Urban Open Space University of Melbourne Brandon Tung
REDEVELOPMENT THE UNIVERSITY OF MELBOURNE PARTI DIAGRAMS
PERSPECTIVE RENDERS
8
SITE PLAN
SECTIONS
This is an open space redevelopment project located in Union Lawn, University of Melbourne. A whirlpool spiral design is adopted. The whirlpool represents the historical past of a ornamental lake which is being drained and filled to built the Union Lawn. The centre has a depression to reflect the previous lake that has become the campus identity. The whirlpool sprawls in all four directions which attracts the people to the centre. There is also equal distribution of space between private and public space. The public square is also human-centric.
9
WYNDHAM CITY
Architecture Design Studio 3: Air University of Melbourne Brandon Tung
GATEWAY DESIGN WERRIBEE, VICTORIA, AUSTRALIA
This project features the design of a sculptural gateway that is located along the central reservation of Princes Freeway between Geelong and Melbourne to welcome motorists to Wyndham City, Werribee and Melbourne City. This was designed using Grasshopper, a plug-in for Rhino 3D capable of creating parametric design , which involves a system that allows desginers to perform taks such as algorithm, scripting and programming. Melbourne CBD
Site Location Port Phillip Bay
From Wyndham City to Melbourne CBD
N START
Werribee RTH
CES
N
PRI
O Y (N A EEW
)
ND
U BO
FR
TH OU
ES INC
TRANSITION
Y (S A EEW
D)
B
N OU
Melbourne CBD
FR
PR
Geelong
10
N
From Melbourne CBD to Wyndham City
END
Galvanised steel beam Galvanised steel beam Bolts
L-bracket joint Bolts
Concrete footing Steel sheeting
11
MARIBYRNONG
Site Tectonics University of Melbourne Brandon Tung
RIVERBANK PAVILION
MARIBYRNONG, VICTORIA, AUSTRALIA This project focuses on intervention of the natural landscape and hilly terrain of the Maribyrnong riverbank which is sloping down towards the south east for the placement of the riverside pavilion. The topography is manipulated via filling, cutting, adding circulation pathways and mounding. There is also treatment of surfaces by adding wetlands, green roof, rainwater garden, retention pond, timber deck patio to enhance the aesthetic purpose surrounding the pavilion. Besides that, the landscape garden features a reflection pool surrounding the pavilion to exude the floating effect. GRAPHICAL SITE PLAN
12
The pavilion sits on a platform which is 9.5m above the river, in which the platform is constructed using cut and fill. The upper path features a vehicular driveway connecting the pavilion to the main road with a cul-de-sac for parking on the platform. The upper ramp has a slope gradient of 1:14. The lower path consists of a series of staircase ascending from the riverbank to the pavilion. This lower path is design in a hierarchial and perpendicular way to create a pure and formal system of International Style, similar to the Mies van der Rohe’s design of the Farnsworth House and the Barcelona Pavilion. TECHNICAL SITE PLAN
GRAPHICAL SECTIONS
PERSPECTIVE RENDERS
SECTIONAL DETAILING
13
CAR SHOWROOM BUILDING
Architecture Design Studio 4: Fire University of Melbourne Brandon Tung
FOR BARLOW MOTORS MELBOURNE, VICTORIA, AUSTRALIA
The building design of a car showroom for an the automobile company Barlow Motors Pty Ltd, has drawn inspiration from aerodynamics which reflects the high speed of a sports car. Examples of contemporary sports cars are Ferrari, Lamborghini and Aston Martin which is to be displayed and showcased in the car showroom, which occupies the “Podium”. The “Tower” consists of a multi-storey car park, while the “Skydeck” consists of a rooftop miniature golf course, swimming pool, cafe and an observation deck.
14
La Trobe Street facade
Victoria Street facade
Rooftop Cafe
Car Showroom at first atrium
Car Showroom at second atrium
PODIUM TOWER SKYDECK
Open plaza at Grant Lane
SECTION B-B
The ground floor has an open plaza at the Grant Lane and McKenzie entrances. As there are no public open spaces nearby, this open plaza allows the public to converge in a common location and relax. Public space helps to boost human activity and revitalize urban space. It would also allow people to rest while looking at the cars displayed in the car showroom. Aside from that, there are two main multi-storey atriums within “The Podium�. Both are at the car showroom at either end.
15
CONSTRUCTION
Construction Design University of Melbourne Brandon Tung
DRAWINGS CARLTON, VICTORIA, AUSTRALIA
LEGEND
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
FFL
FINISHED FLOOR LEVEL
AHD
AUSTRALIAN HEIGHT DATUM PROJECT DATUM
39.09
ADJACENT SINGLE STOREY BUILDING
39
A3 1
0.13m 180°0’ 2
A2 1
5 4
7
3
6
16
S
100M O PVC DOWNPIPES CONCRETE PAVING 100MM X 300MM 'C' SHAPED ALUMINIUM BOX GUTTER
S
SEWAGE PIT
G
GAS PIT
39
5043
4593
OPE
3° SL
3000
ROOF TERRACE
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
FIRST FLOOR ROOF
A
DP
FFL 42.30
B
17.75m 180°13’
A2 2
C
CP
CAR PARK
1000
6829 4585
EXISTING CONCRETE CROSSOVER
CP
A3 4
CAR PARK
BG
38.54
1100
D A2 2
A2 1
CP CAR PARK
DP
CP ELEC POLE 38.76
TITLE BOUNDARY 22.30m 270°0'
38.31
GRATTAN PLACE
FALL 3° SLOPE
4905
A3 2
EXISTING CONCRETE CROSSOVER
CAR PARK
DP BG
0°0’
17.92m
BG
A2 2
LOT NUMBER
DP CP BG
TELSTRA PIT
4000
3814
CONTOUR LINES
16
39.09
1504
1
10.25m 89°34’
FALL
CARDIGAN STREET
TITLE BOUNDARY 12.08m 90°20’
38.79
FALL 3° SLOPE
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
AHD 38.71
PEDESTRIAN SIDEWALK
164
SPOT LEVEL
138
NOTES
10
1. LYSAGHT BONDEK FLOOR SLAB BETWEEN GROUND FLOOR AND FIRST FLOOR 2. TRIMDEK CORRUGATED STEEL SHEET FOR ROOFING 3. CENTOR FOLDING DOORS AT EXHIBITION SPACE 4. EDGE BEAMS 1000MM X 1000MM MASS CONCRETE PADS FOR FOOTING 5. PILING 500MM DIAMETER BORED PILES 6. 300MM X 100MM 'C' SHAPED BOX GUTTER 7. FIRST FLOOR SUSPENDED CEILING 200 UB SPANNING AT 2.7M SUPPORTING BONDEK 8. ROOF BEAMS AND PURLINS 150 PFC SPANNING AT 1.2M 9. PRECAST CONCRETE PANELS 230M THICK THERMOMASS WITH 150MM THICK INTERNAL PANEL, 25MM THICK STYROFOAM AND 55MM THICK EXTERNAL PANEL
ADJACENT 3 STOREY BUILDING
1 A0
SITE PLAN SCALE 1:100
Student Name
BOON KWAN TUNG
Subject Name
ABPL30041
CONSTRUCTION DESIGN Student Number
384398
Tutor name
GIORGIO MARFELLA
SITE PLAN Project Title PROPOSED COMMERCIAL OFFICE BUILDING AT 148-156 CARDIGAN STREET CARLTON
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
16
Scale
Drawing Title
N
Drawing No.
Revision No.
1:100 Date
22 MAY 2013 Drawn By
BOON KWAN TUNG
A01
A
17
CONSTRUCTION
DRAWINGS CARLTON, VICTORIA, AUSTRALIA
18
Construction Design University of Melbourne Brandon Tung
19
20 20
PART
2
POSTGRADUATE PROJECTS
21
CITY OF PORT PHILLIP
Masters of Architecture Studio D: City as World University of Melbourne Brandon Tung
FISHERMANS BEND URBAN RENEWAL PROJECT
PORT MELBOURNE, VICTORIA, AUSTRALIA
The proposed redevelopment of Sandridge Precinct features recreational parks and open plazas which are incorporated as civic centres of the precinct. Public open space runs through the centre, forming a corridor. It has easy access to the residents living within the precinct. The recreational park features a lake, which could accommodate storm water, creating a floodplain and manmade wetland. The lake also can act as a venue for water sports activities.
There is a mixed-use of space within a single building block: commercial, retail shops and offices in high-rise blocks. Open space are located in every apartment courtyard which functions as recreation, events, sports and activity venue. The buildings are designed to be oriented towards the open space and surrounding a public courtyard, encouraging social interaction, rather than parallel arrangement. To increase permeability, pedestrian pathways, new streets and smaller city blocks are incorporated into the proposed urban fabric. A community centre, library, public open space, plaza is incorporated in the proposed redevelopment of Sandridge Precinct to enhance social interaction. A shopping centre is proposed to be built above West Gate Freeway and business centre with retail shops along Plummer Street to revitalize the precinct. Landmarks and nodes, such as tram stop, railway station, open plaza and lake are clearly defined to make the precinct more legible.
MASTER PLAN
An integrated transit hub forming a linear axis connects key nodes and important landmarks such as shopping mall, community centre, library, recreational park, sports oval and open plaza.
S
TRAM
INS
SITE CONNECTIVITY
TRA
TE OU R G LIN C Y C MS TRA
SANDRIDGE PRECINCT
S TRAM S TRAIN
FIGURE GROUND MAP
STREET HIERARCHY
Local Transport Area Perimeter Road Public Transport Road Primary/Secondary Green Road Minor Road
S AM
22
BUILDING TYPOLOGY
TR
OPEN SPACE
MS TRA NG CLI CY
E
ROUT G N I L CYC ROAD
PROGRAMME DISTRIBUTION
Commercial and retail
Offices
Parkland
Residential
PERSPECTIVES
SECTION
PARKLAND VIEW
23
CITY OF PORT PHILLIP
Masters of Architecture Studio D: City as World University of Melbourne Brandon Tung
SANDRIDGE PRECINCT COMMUNITY CENTRE
PORT MELBOURNE, VICTORIA, AUSTRALIA
The spatial functions of the community centre is divided into three categories: public spaces, semi-public spaces and private spaces. Active and passive spaces. The spatial functions also divided into different zones for different age groups: working adults, children, teenagers, and senior citizens. The community centre caters residents of the precincts of all ages: children, teenagers, youths, working adults, seniors and disabled individuals. Each level is divided according to specific functions. The basement caters for learning, the ground floor focuses on family while the first floor focuses on career.
Entry access from shopping centre
AM TR
SITE PLAN
MASTER PLAN
S
TR AM
S
IN
A TR
S
The community centre is the key civic centre of the precinct and is located within the recreational park. It sits at the central axis with direct connections to the transportation hub such as tram stop and railway station and easy access to major pedestrian crossing. This building also incorporates a landscaped park into the building. The roof of the building becomes a public space. The rooftop garden also serves as a new public pedestrian infrastructure in the city. The design maximises connection within the urban fabric by having entrances at key locations of the building with direct connections to public transportation, major pedestrian crossings and recreational park, which highlight the issue of connections.
New pedestrian infrastructure
Main entry access from major street crossing
N SITE PLAN SCALE 1:1000
BASEMENT FLOOR PLAN SCALE 1:1000
24
GROUND FLOOR PLAN SCALE 1:1000
FIRST FLOOR PLAN SCALE 1:1000
SECOND FLOOR PLAN SCALE 1:1000
Entry access from public transportation hub
PERSPECTIVES
PERSPECTIVES
SECTION A-A
Pavilion
SKETCHES
SECOND FLOOR ROOFTOP GARDEN
Community garden
FIRST FLOOR CAREER SECTION
Meeting room Function room Seminar room
GROUND FLOOR
SCALE 1:1000
Outdoor deck Cafe Games room Children’s play area Nursery Multipurpose hall
Reception Senior’s lounge Auditorium
SECTION B-B SCALE 1:1000
BASEMENT EDUCATION SECTION Lecture theatre Reading room Quiet oasis room
SITE CONTEXT
Cyber cafe Audio and visual room Collaborative learning and work space Library
25
KINLOCH GARDENS
Masters of Architecture Studio E: Another Way of Living University of Melbourne Brandon Tung
RESIDENTIAL PRECINCT ELTHAM, VICTORIA, AUSTRALIA
The project focuses on redeveloping the Kinloch House in Kinloch Gardens, 93 Arthur Street, Eltham into a residential precinct to cater a group of compatible cohabitants. The purpose is to intensify the density of housing by introducing the site with modern housing added to the existing French style chateau. The site will be redeveloped into a bed and breakfast homestay accommodation with four bedroom suties and in-house facilities such as swimming pool, jacuzzi, massage room, outdoor deck and landscaped gardens to enable guests to have leisure activities such as barbequing, ball games and camp fires set in a romantic ambience, which provides a unique gateway from the city.
The main design concept is to introduce farmland and wilderness living into an urban setting. The building typology accommodates activity for both outdoor and indoor activities, such as cooking, games, outdoor dining, music playing and socialising to reflect the holiday camping concept. The design of a separate pavilion for separate functions make the building footprint smaller and thus retains the existing vegetation on site. There is also a clear separation between living and sleeping spaces by a central hallway.
SITE CONTEXT
Diamond Creek oad
R Western Ring
Melbourne Airport Montmorency Coburg
Preston
ELTHAM Warrandyte
Heidelberg Templestowe Doncaster Eastern Free
Footscray
way
MELBOURNE CBD Box Hill Port Melbourne
St Kilda Williamstown
PORT PHILLIP BAY
SECTION A-A
26
Glen Waverley
SECTION B-B
SITE PLAN
FLOOR PLAN
SECTION C-C
27
KINLOCH GARDENS
Masters of Architecture Studio E: Another Way of Living University of Melbourne Brandon Tung
RESIDENTIAL PRECINCT ELTHAM, VICTORIA, AUSTRALIA PERSPECTIVE SECTION A-A
DETAILED SECTION A-A
PERSPECTIVE SECTION B-B
DETAILED SECTION B-B
PERSPECTIVES
28
EXPLODED AXONOMETRIC FLOOR PLAN
PERSPECTIVE
29
LORNE CLUSTER HOUSING
Masters of Architecture Design Thesis: Forms and Materiality University of Melbourne Brandon Tung
GREAT OCEAN ROAD LORNE, VICTORIA, AUSTRALIA
The proposed cluster housing is located in the hidden valley not far from Lorne along the Great Ocean Road which induces a feeling of being enclosed within the bushland, secluded and isolated from the town of Lorne.
The objective is to maximise the view of the natural landscape and maintain a minimum distance between buildings and the forested areas to create private open space and reduce impact of bushfires.
The dwellings are positioned to maintain defendable space between buildings. The dwellings are aligned along the contours, orientated towards the communal open space and at the same time orientated towards the north.
The clustering of dwellings also create a communal open space equipped with amenities that will support the rural and coastal lifestyle of the residents. The access road has a width of 5m to enable fire trucks to access each of the dwellings.
SITE PLAN
12 11
4
12 11 10 6 5 4 3
2 7 1
7 9 8 7
FORESTED AREA OUTER ZONE INNER ZONE SCALE 1:5000 @ A3
30
ABORIGINAL HERITAGE OVERLAY
VEGETATION RETAINED VEGETATION CLEARED
1. HORSE STABLE 2. HORSE PADDOCK 3. PLAYING FIELD AND CHILDREN’S PLAYGROUND 4. BOATHOUSE AND BICYCLE SHED 5. DAM 6. JOGGING TRACK 7. WALKING TRACK 8. ACCESS ROAD 9. COMMON OPEN SPACE AND BARBEQUE AREA 10. CREEK 11. HOLIDAY CABINS 12. CAMPING GROUND
The clustering of houses consists of a mixture of housing types along with different design variations in each cluster. Each zoning has housing with design variations to suit each site.
Each of the dwelling has a mudroom, outdoor shower, outdoor deck equipped with outdoor living area, outdoor fireplace, outdoor dining area and barbeque area to support outdoor and rural living.
The dwellings are designed with a gabled roof form with fibre cement cladding to express the notion of the beach cottage and rural vernacular architecture. The dwellings are single storey high and screened by vegetation to minimise the visual impact on the existing coastal and bushland setting. The incorporation of large open glazing, outdoor deck and folding doors blurs the boundary between indoor and outdoor space, the openness of the internal planning creates a sense of being in the bush and retreat from the city with modern living. Its residential form expresses the notion of being at home and create a sense of relaxation, personal belonging and identity.
The living spaces are equipped with folding doors with direct access to the outdoors to embrace the natural landscape into the internal spaces.
The spatial organisation of each of the dwelling which consists of outdoor deck, living pavilion and the sleeping pavilion arranged along the site slopes.
SITE PLAN
Aside from that, the dwelling is equipped with water tank, on-site sewage treatment and in the basement and solar panels on the garage roof to support off-grid living. The dwelling are designed equipped with bushfire shutters at every openings and a bushfire bunker to provide shelter and protection for residents in times of bushfire.
SITE PLAN
10 6
3 2
4
5
1 7
9
7
SCALE 1:4000 @ A3
SITE SECTION A-A
8
1. HORSE STABLE 2. HORSE PADDOCK 3. PLAYING FIELD AND CHILDREN’S PLAYGROUND 4. BOATHOUSE AND BICYCLE SHED 5. DAM 6. JOGGING TRACK 7. WALKING TRACK 8. ACCESS ROAD 9. COMMON OPEN SPACE AND BARBEQUE AREA 10. CREEK
SCALE 1:1000 @ A3
SITE SECTION B-B
SITE BOUNDARY ACCESS ROAD
WALKING TRACK
WALKING TRACK
ACCESS ROAD
ACCESS ROAD WALKING TRACK
A
B
SCALE 1:500 @ A3
A
SCALE 1:500 @ A3
B
31
LORNE CLUSTER HOUSING
Masters of Architecture Design Thesis: Forms and Materiality University of Melbourne Brandon Tung
GREAT OCEAN ROAD LORNE, VICTORIA, AUSTRALIA ROOF PLAN
BASEMENT FLOOR PLAN A
A
B
B
3 1
C
C
A
SCALE 1:400 @ A3
SOUTH ELEVATION
SCALE 1:200 @ A3
32
2
C
C
A
B
SCALE 1:400 @ A3
WEST ELEVATION
SCALE 1:200 @ A3
B
1. BUSHFIRE BUNKER 2. MECHANICAL ROOM 3. ON-SITE SEWAGE TREATMENT
GROUND FLOOR PLAN
FIRST FLOOR PLAN A
A
B
B
5
C
C 4
6
7
8
9
10
11
13
A
SCALE 1:400 @ A3
NORTH ELEVATION
SCALE 1:400 @ A3
19
C
25
15
14
17
18
C
16
12
24
22 23
20
8
B
21
21
4. GARAGE AND STORAGE 5. DECK 6. VEGETABLE GARDEN 7. STUDY 8. BATH 9. PANTRY 10. KITCHEN 11. DINING ROOM 12. LIVING ROOM 13. ENTRY PORCH
14. FOYER 15. PATIO 16. LAWN 17. VERANDAH 18. OUTDOOR SHOWER 19. MUDROOM 20. LAUNDRY ROOM 21. BEDROOM 22. MASTER BEDROOM 23. EN-SUITE 24. WATER TANK
A
SCALE 1:400 @ A3
B
25. ATTIC
EAST ELEVATION
SCALE 1:200 @ A3
33
LORNE CLUSTER HOUSING
Masters of Architecture Design Thesis: Forms and Materiality University of Melbourne Brandon Tung
GREAT OCEAN ROAD LORNE, VICTORIA, AUSTRALIA 1 2 3 4 5 6
1
7
2
8
3
9
4
10 11 12 13
1. ZINC ROOF 2. INSULATION 3. SARKING 4. 200PFC 5. GLASSWOOL BATTENS 6. LEAF GUARD 7. BOX GUTTER 8. STEEL PORTAL FRAME 150UC37 9. FIBRE CEMENT CLADDING 10. TIMBER BATTENS 11. SUN SHADING SYSTEM 12. ALUMINIUM BI-FOLDING DOOR 13. MAXIBLOCK BUSHFIRE SHUTTER 14. FLASHING 15. SILL SUPPORT 16. EDGE BEAM 17. WATERPROOF MEMBRANE
5 6 7 8
14
9
15 16 17
10
SCALE 1:40 @ A3
1. FIBRE CEMENT CLADDING 2. INSULATION 3. TIMBER BATTENS 4. PRECAST CONCRETE PANEL 5. PLASTERBOARD 6. TIMBER FLOOR TRUSS 7. MAXIBLOCK BUSHFIRE SHUTTER 8. 6MM TOUGHENED GLASS FIXED GLAZING 9. FLASHING 10. EDGE BEAM 11. WATERPROOF MEMBRANE
11
SCALE 1:40 @ A3
SECTION B-B
SECTION C-C
SCALE 1:200 @ A3
SCALE 1:200 @ A3
34
PERSPECTIVE SECTION B-B
PERSPECTIVE SECTION C-C
35
36
PART
3
PROFESSIONAL PROJECTS
37
DAVIES STREET RESIDENCE
Thomas + Williams Architects Brandon Tung
MALVERN EAST, VICTORIA, AUSTRALIA NORTH ELEVATION
SCALE 1:200 @ A3
SOUTH ELEVATION
SCALE 1:200 @ A3
EAST ELEVATION
SCALE 1:200 @ A3
WEST ELEVATION
38
SCALE 1:200 @ A3
GROUND FLOOR PLAN
SECTION A-A
SCALE 1:200 @ A3
SECTION B-B
SCALE 1:200 @ A3
SCALE 1:200 @ A3
FIRST FLOOR PLAN
SECTION E-E
SCALE 1:200 @ A3
SECTION F-F
SCALE 1:200 @ A3
SCALE 1:200 @ A3
39
MAXINE COURT RESIDENCE
MALVERN, VICTORIA, AUSTRALIA
40
Thomas + Williams Architects Brandon Tung
EAST ELEVATION
SCALE 1:100 @ A3
NORTH STREET ELEVATION
SOUTH ELEVATION
SCALE 1:200 @ A3
SCALE 1:200 @ A3
NORTH ELEVATION
WEST ELEVATION
SCALE 1:200 @ A3
SCALE 1:200 @ A3
41
MAXINE COURT RESIDENCE
MALVERN, VICTORIA, AUSTRALIA GROUND FLOOR PLAN
SCALE 1:100 @ A3
42
Thomas + Williams Architects Brandon Tung
FIRST FLOOR PLAN
SECTION A-A
SCALE 1:200 @ A3
SECTION B-B
SCALE 1:200 @ A3
SECTION C-C
SCALE 1:200 @ A3
SCALE 1:200 @ A3
ROOF PLAN
SECTION E-E
SCALE 1:200 @ A3
SECTION F-F
SCALE 1:200 @ A3
SCALE 1:200 @ A3
43
Thomas + Williams Architects Brandon Tung
AIRLIE AVENUE RESIDENCE
PRAHRAN, VICTORIA, AUSTRALIA GROUND FLOOR PLAN
SCALE 1:200 @ A3
FIRST FLOOR PLAN
44
SCALE 1:200 @ A3
SOUTH ELEVATION
SECTION A-A
SCALE 1:200 @ A3
SCALE 1:200 @ A3
WEST ELEVATION
SECTION A-A
SCALE 1:200 @ A3
NORTH ELEVATION
SCALE 1:200 @ A3
SECTION E-E
SCALE 1:200 @ A3
SCALE 1:200 @ A3
EAST ELEVATION
SECTION F-F
SCALE 1:200 @ A3
SCALE 1:200 @ A3
45
881 HIGH STREET
Battersby Chow Studio Brandon Tung
ARMADALE, VICTORIA, AUSTRALIA EAST ELEVATION
SCALE 1:300 @ A3
NORTH ELEVATION
SOUTH ELEVATION
SCALE 1:300 @ A3
SCALE 1:300 @ A3
46
GROUND LEVEL FLOOR PLAN
SCALE 1:300 @ A3
LEVEL 5 FLOOR PLAN
SCALE 1:300 @ A3
47
BLODE RESIDENCE
Battersby Chow Studio Brandon Tung
TOORAK, VICTORIA, AUSTRALIA
NORTH ELEVATION
WEST ELEVATION
SCALE 1:200 @ A3
SCALE 1:200 @ A3
SOUTH ELEVATION
EAST ELEVATION
FR
SCALE 1:200 @ A3
48
FR
FR
SCALE 1:200 @ A3
LOWER GROUND LEVEL FLOOR PLAN
SCALE 1:200 @ A3
GROUND LEVEL FLOOR PLAN
SCALE 1:200 @ A3
49
RACHELLE ROAD RESIDENCE
TILBUILT Brandon Tung
KEILOR EAST, VICTORIA, AUSTRALIA
1 : 100
5
49 .9
1
49 .9
9 50 .0
3 50 .0 6
50 .2
1
50 .2
6 49 .9
50 .1
0
NEW 1.8M HIGH TIMBER FENCE
3
2 50 .3
KLIP-LOK
ROBE
9 5
8 50 .3 50 .3
6
3300
TIMBER
PALING
Dway
FENCE
Dway
6
M HIGH
2
RIDGE 55.62
6 49 .9
Back of Kerb
Invert of Kerb
53.68 GUTTER
Verandah
6
1
49 .9
8
(7.5)
0
RIDGE 55.06
51 .6
55.61 RIDGE
53.70 GUTTER
50 .3
No.77 SINGLE STOREY BRICK DWELLING TILE ROOF
53.70 GUTTER
HRW TOP 53.50
HRW
HRW
DOOR
HRW
50 .3
3
P.O.S
Concrete Footpath
53.72 GUTTER
HRW TOP 53.60
BRICK - Ht.1.0m
53.72 GUTTER
53.82 GUTTER 53.70 GUTTER
50 .0
5
53.40 RIDGE
53.51 GUTTER
50 .3
(4.1)
BRICK GARAGE
NEW 1.8
35.48 260°09'
50 .3
35.48 260°09’
HRW TOP 53.50
3670
RWH
KLIP-LOK
SHED
RWH
SERVICE YARD
KLIP-LOK
50 .3
RWH
50 STORMWATER PIT .04
50 .1
50 .45
9000
NATURE STRIP
CONCRETE FOOTPATH
FFL. 53.750 CH. 2700 CARPET
KLIP-LOK
Y WA IVE DR NEW 0.9M HIGH TIMBER FENCE
BOX GUTTER
MASTER
ROOF
W NE
3340
ROOF
ROOF
TOP OF WALL
50 .0
20 00
50 NEW CROSSOVER .02
1 50 .4 ROOF
13 14 15 16 17
1890
BOX GUTTER
RWH
BOX GUTTER
KLIP-LOK
4
50 .1 9
12.19 180°06'
BOX GUTTER
50 .2 NEW 0.9M HIGH TIMBER FENCE
ENS
BOX GUTTER
SKYLIGHT
12.19 180°06’
2
3
3
FFL. 53.750 CH. 2700 TILES
12
7990
ROAD
STORMWATER PIT
RWH
4
50 .0
4
4595
50 .3
3000
7 50 .2
2 50 .3
3 50 .3 NC E T IM BE HIG H M 1.8 W NE
NEW 1.8M HIGH TIMBER FENCE
R FE
NEW 0.9 M HIGH TIMBER FENCE
5300
8
5
EXISTING FOOTPATH
50 .1 7 50 .2
4 50 .3 5
7 50 .4
3800
50 .0
50 .1
5
50 .0
3 50 .3 5 50 .4
9 BOX GUTTER
3°55' 21.421.41 1
3°55’ TIMBER PALING FENCE NEW 1.8M HIGH
9
HRW TOP 56.36
900
50 .04 2 1000 HRW TOP 56.25 STORMWATER PIT
50 .1
5 6
ROOF
HRW
PROPOSED FIRST FLOOR PLAN
50 .3
50 .3
50 .4 RWH
1200 900 3000
2
50 .0
NATURE STRIP
RIDGE
55.11 RIDGE
GUTTER 54.05 GUTTER
1
4
DP
RIDGE 55.39
0
55.11
5
DN
MIN. SETBACK OF SOUTH-FACING FIRST FLOOR WALL FOR P.O.S. = 2+0.9h = 2m+0.9 x 6.5m = 7.85m
DP
8
FRONT SETBACK 6870
RIDGE 55.06
6
P.O.S.
DP
RIDGE 55.24 1
(7.5)
GUTTER
11
FFL. 53.750 CH. 2700 TILES
ROBE
SCALE 1:200 @ A3
51 .6
53.70
7500 55.61 RIDGE
6 50 .5
50 .1 20 00
NEW CROSSOVER
3
50 .3
3
BRICK GARAGE
6
No.77 SINGLE STOREY BRICK DWELLING TILE ROOF
DOOR
HRW
BOX GUTTER
Verandah
P.O.S
53.70 GUTTER
10
GUTTER 53.98
GUTTER
50
6
6 50 .4 50 STORMWATER PIT49 .92 .04
4 50 .0 4
Verandah
HRW
RIDGE 55.39
50 .5 4 50 .5
3
.29
50 CONCRETE FOOTPATH
12.19 180°06'
12.19 180°06’
GUTTER 56.87
Verandah
BRICK - Ht.1.0m
HRW TOP 53.50
RIDGE 55.62
HRW TOP 53.50
HRW
HRW
3
4 50 .5 49 .9
0 50 .1
(5.6)
50 .3 NEW 0.9M HIGH TIMBER BATTEN FENCE
11355 FRONT SETBACK
Verandah
4
8
50 .4 9
1 50 .6
7
53.68 GUTTER
KLIP-LOK
P.O.S.
6345
53 .7
HRW TOP 53.60
GUTTER 53.98
54.05 GUTTER
8
1 7
6
53.72 GUTTER
10740
P.O.S SCALE 1:200 @ A3
(2.8)
7
9
ROOF
FFL. 53.750 CH. 2700 CARPET
ENSUITE BEDROOM 2 FFL. 53.750 CH. 2700 CARPET
RACHELLE
53.70 GUTTER
3500
6
53.72 GUTTER
RETREAT FFL. 53.750 CH. 2700 CARPET
8
RWH
6095
DP
53.82 GUTTER
ROBE
MASTER BEDROOM
3240
49 .9
53.51 GUTTER
35.48 260°09'
FFL. 53.750 CH. 2700 TILES
FFL. 53.750 CH. 2700 TILES
14 15
ROBE
DECK BELOW
Back of Kerb
RIDGE
Dway
COLORBOND
BATH
13
ROOF
BATH
FFL. 53.750 CH. 2700 TILES
49 .9
SHED
53.40
GUTTER 54.05
7560
FFL. 53.750 CH. 2700 CARPET
11 12
BATH
50 .0
BRICK GARAGE
57.44 RIDGE
50 .1
TOP523OF 0 WALL WALL
ARY ON BOUND
SINGLE CROSSOVER
Dway
FENCE
TOP 53.37
K
PAVING 13.0M2
50 .3
WATER TAN
3455
2000L RAIN
SERVICE YARD
11
ROBE
[ DWELLING 1 ]
DN [ DWELLING 2 ]
ROBE
Invert of Kerb
(4.1)
FP DP
STORAGE 6m3 (1580L x 1580W x 2300H)
DP
HRW TOP 53.35
2
35.48 260°09’
PAVING 7.1M2
TIM M HIGH NEW 1.8
ING BER PAL
No.31 DOUBLE STOREY BRICK DWELLING FLAT ROOF
Concrete Footpath HRW
TV BENCH
SERVICE YARD
HWS
50 .3
2000L RAIN WATER TANK
1065
DP
FFL. 50.650 CH. 3000 TIMBER
8000 FRONT SETBACK
HRW TOP 53.35
4190
LIVING ROOM
1875
TIMBER 11.0M2
3950
PATIO
17.8M2
PEDESTRIAN VISIBILITY SPLAY LANDSCAPING & STRUCTURES NO HIGHER THAN 900MM WITH MINIMUM 50% VISIBILITY THROUGH BATTEN FENCE
HRW2 TOP 56.30
STORAGE 6m3 (1580L x 1580W x 2300H)
HWS
HRW2 TOP 56.25
50 .3
FP
A/C
DP
A/C
WIR
FFL. 53.750 CH. 2700 CARPET
FFL. 53.750 CH. 2700 CARPET
ROBE
16 17
FFL. 53.750 CH. 2700 CARPET
6
FFL. 50.650 CH. 2700 TIMBER
NC
FRONT YARD
BUILDING ABOVE
2000L RAIN WATER TANK
ALL CROSSOVERS ARE TO BE CONSTRUCTED IN ACCORDANCE TO COUNCIL'S VEHICLE CROSSING POLICY
YARD BELOW
10
FRONT YARD
BEDROOM 2
BEDROOM 1
BEDROOM 1
7 8
DESK
50 .3
LIVING ROOM
CO
DN17 16 15 14 13 12
ROOF
COLORBOND
ROBE
FFL. 53.750 CH. 2700 CARPET
9 10 8
FFL. 53.750 CH. 2700 TIMBER
FFL. 53.750 CH. 2700 TIMBER
BEDROOM 2
5 6
7
9
Y
50 .3
BUILDING ABOVE
10
)
6425
[ DWELLING 3 ]
HRW2 EW N TOP 56.27
WA IVE DR RETE
GRASS
NEW 1.8M HIGH TIMBER PALING FENCE
GRASS 25M2
2500 VISIBILITY SPLAY
57.45 RIDGE
DP
WALL-MOUNTED BIKE RACK
2455
BUILDING ABOVE
UPPER VERANDAH 50 .3
150
FFL. 50.500 CH. 2665 CONCRETE
P.O.S.
TV BENCH
SEWER EASEMENT 1.8M WIDE
49 .9
1 50 .2 FFL. 50.650 CH. 2700 TILES
6650
MIN. SETBACK OF SOUTH-FACING GROUND FLOOR WALL FOR P.O.S. = 2+0.9h = 2+0.9x3.2m = 4.88m
TOP OF WALL
1 2 3 4 5 6
[ DWELLING 3 ] ROBE
5
13 14 15 16 17
12
L'DRY
FFL. 50.650 CH. 2700 TILES
KLIP-LOK
50 .3
130
[ DWELLING 2 ]
10
6095
FIRST FLOOR
COL
WC
11
DINING ROOM
DP
(7.9)
UP
10
150
LETTER BOX
PERGOLA
BALCONY BALCONY
3 4
FFL. 53.750 CH. 2700 TILES
FFL. 53.750 CH. 2700 CARPET
ROOF
57.43
DP
BUILDING ABOVE
CONCRETE
1
GARAGE
GRASS 44.8M2
PORCH
ENSUITE
CARPORT
1
2
20
P.O.S.
50 .0
3 3
450
P.O.S.
3440
CANOPY
DP
RELOCATED EXISTING AUSTRALIA POST STREET POSTING BOX
FENCE HRW TOP 53.35
HRW TOP 53.35
4
ROOF
COLORBOND
FFL. 53.750 CH. 2700 TIMBER
1825
PEDESTRIAN VISIBILITY SPLAY LANDSCAPING & STRUCTURES NO HIGHER THAN 900MM WITH MINIMUM 50% VISIBILITY THROUGH BATTEN
TOP OF WALL
ROOF
COLORBOND
BALCONY
MASTER BEDROOM
8
5
3240
FFL. 50.650 CH. 2700 TIMBER
50 .3
2 6
FFL. 50.650 CH. 2700 TIMBER
50 .4
7
9
WALL-MOUNTED BIKE RACK
FFL. 50.650 CH. 2700 TILES
FFL. 50.650 CH. 2700 TIMBER
FFL. 50.650 CH. 2700 TILES
6000
BUILDING ABOVE
PANTRY
KITCHEN LAUNDRY
8
HRW TOP 53.34
STUDY
50 .45
16 17
11
100 PANTRY
FFL. 50.650 CH. 2700 TIMBER
FRIDGE
WC & LAUNDRY
100
TIMBER PALING FENCE
14 15
FRIDGE
A/C
30
12 13
KITCHEN
1210
PANTRY
3500
6125
NEW 0.9M HIGH TIMBER BATTEN FENCE
17 16 15 14 13 12
WALL-MOUNTED BIKE RACK
3°55’
3°55' 21.421.41 1
HWS
FFL. 50.500 CH. 2850 CONCRETE
FFL. 50.650 CH. 2700 TIMBER
BUILDING ABOVE
YARD
10
GARAGE
KITCHEN
FRIDGE
8 9
COL
CANOPY
2595
54.37 RIDGE
55.40
8 9 10 11
7
GRASS 69.0M2
100
6 7
PANTRY
UP
1 2 3 4 5 6
NEW 1.8M HIGH TIMBER PALING FENCE
[ DWELLING 1 ]
4 5
SKYLIGHT ABOVE
FFL. 50.550 CH. 2850 CONCRETE
6000
BUILDING ABOVE
GARAGE
FFL. 50.650 CH. 2700 TIMBER
FRONT YARD
FP
3
BATH
FFL. 50.650 CH. 2700 TILES
DINING ROOM
3500
1 2
ROBE
BUILDING ABOVE
FFL. 50.650 CH. 2700 TIMBER
100
BUILDING ABOVE
UP
7500 FRONT SETBACK
CANOPY ABOVE
FFL. 50.650 CH. 2700 TIMBER
50
NEW 1.8M HIGH
50 .2
2 50 .3
3 50 .3
3000 FRONT SETBACK
HIG H M 1.8 NE W
TV BENCH
LIVING ROOM
DINING ROOM
1825
50 .55 0 .0
6 50 .2
NC E FE NG RP A LI T IM BE
2500 VISIBILITY SPLAY
3000 FRONT SETBACK
5
7
NEW 1.8 M HIGH TIMBER PALING FENCE
NEW 1.0 M HIGH TIMBER BATTEN FENCE
2500 VISIBILITY SPLAY
50 .4
6 50 .5
50 .3
4 50 .5 5000
5000 BUILDING ABOVE
SEWER EASEMENT 1.8M WIDE
NEW DRIVEWAY
FRONT YARD
NEW 0.9M HIGH TIMBER FENCE
E
FFL. 50.650 CH. 2700 CARPET
NEW
- NATIVE OR DROUGHT DRIVEWAY TOLERANT SPECIES AND DRIP IRRIGATION SYSTEM TO BE INSTALLED FRONT YARD
NEW 1.8M HIGH TIMBER FENCE
NOT FENCED
HIG
CONCRETE
BEDROOM
NEW 0.9M HIGH TIMBER FENCE
CONCRETE FOOTPATH
Concrete Footpath
M 0.9
COL
PORCH
CONCRETE
Dway
E NC
100
PORCH BUILDING ABOVE
GAS
NEW 0.9M HIGH TIMBER FENCE
30.48 90°06’
LAMP POST
' 06 5° 13 4.31
PERGOLA ABOVE
90°06' 30.48
PIT
NC 1 ’ FE 4.3 ° 06 BE R 5 13 H TIM
GRASS 25M2
CONCRETE FOOTPATH
W NE
P.O.S.
BE TIM
CONCRETE
H
DRIVEWAY
GRASS 15.4M2
BRICK - Ht.1.6m
WATER
STORAGE 6m3 (1580L x 1580W x 2300H)
HIG
FRONT YARD
GRASS 10.7M2
SEWER EASEMENT 1.8M WIDE
GUTTER 54.05
NEW 0.9M HIGH TIMBER BATTEN FENCE
NEW 1.8M HIGH TIMBER PALING FENCE
' 06 5° 13 4.31
GAS
- BICYCLE SPACE FOR EACH DWELLING NEW 0.9M HIGH TIMBER FENCE BICYCLE RACKS NOT TOFENCED BE WALL MOUNTED IF REQUIRED/APPROPRIATE WITHIN EACH GARAGE.
NATURE STRIP
ER
2000 VISIBILITY SPLAY
NOT FENCED
M
FRONT YARD
GRASS 15.3M2
GAS
30.48 90°06’
FE 1 ’ N 4.3 ° 06 ATTE 5 RB 13
CONCRETE
FRONT YARD
2000 VISIBILITY SPLAY
LETTER BOX
WATER
0.9
DRIVEWAY
NEW 0.9M HIGH TIMBER BATTEN FENCE WATER
W NE
ay
NEW 0.9M HIGH TIMBER BATTEN FENCE
LETTER BOX
- DOUBLE GLAZING FOR HABITABLE SPACES IN DWELLINGS
STORM WATER
Back of Kerb
V SO OS CR
2000 VISIBILITY SPLAY
NOT FENCED
Concrete Footpath
NEW CROSSOVER
- ALL STORMWATER FROM BALCONIES TO BE CONNECTED TO LPOD
LAMP POST
Invert of Kerb
G
2000 VISIBILTY SPLAY
NEW 0.9M HIGH TIMBER BATTEN FENCE
PEDESTRIAN VISIBILITY SPLAY - LANDSCAPING & STRUCTURES NO HIGHER THAN 900MM WITH MINIMUM 50% VISIBILITY THROUGH BATTEN FENCE
Dway
EXISTING CROSSOVER
TBM RIVET IN FOOTPATH RL.50.00
IN IST EX
90°06' 30.48
PEDESTRIAN VISIBILITY SPLAY - LANDSCAPING & STRUCTURES NO HIGHER THAN 900MM WITH MINIMUM 50% VISIBILITY THROUGH BATTEN FENCE
- RAINWATER TANKS TO BE CONNECTED TO TOILETS FOR FLUSHING.
Dway
G TIN ER IS OV EX SS O CR
PEDESTRIAN VISIBILITY SPLAY - LANDSCAPING & STRUCTURES NO HIGHER THAN 900MM WITH MINIMUM 50% VISIBILITY THROUGH BATTEN FENCE
STORM WATER PIT
8
NATURE STRIP
CONCRETE FOOTPATH PEDESTRIAN VISIBILITY SPLAY - LANDSCAPING & STRUCTURES NO HIGHER THAN 900MM WITH MINIMUM 50% VISIBILITY THROUGH BATTEN FENCE
50 .4
49 .9 50 5 .55
5 50 .1
5 50 .1
50 .3
50 .2
4
7
450
5
50 .4
50 .4
9
3 50 .5
Back of Kerb
EXISTING PATHWAY
50 .3 465
NATURE STRIP
50 .3
50 .4
6
6
SSOVER
Invert of Kerb
8
900
58 .8
3000
NEW CROSSOVER
50 .0
900
900
50 .0
3000
NEW CROSSOVER Dway
- REFER TO BESS & STORM REPORTS FOR EXTENT OF ROOF CATCHMENT AREAS (CHARGED SYSTEMS TO BE USED IF REQUIRED/APPROPRIATE)
TBM RIVET IN FOOTPATH RL.50.00
ALL CROSSOVERS ARE TO BE CONSTRUCTED IN ACCORDANCE TO COUNCIL'S VEHICLE CROSSING POLICY
3
900
way
AVENUE
- REFER TO BESS & STORM REPORTS FOR DETAILED ESD & WSUD REQUIREMENTS & COMITMENTS INCLUDING MINIMUM INSULATION AND GLAZING, LIGHTING SPECIFICATIONS AND SELECTION OF BUILDING MATERIALS, FITTINGS & FIXTURES.
4
ALL CROSSOVERS ARE TO BE CONSTRUCTED IN ACCORDANCE TO COUNCIL'S VEHICLE CROSSING POLICY
DAVID
BESS NOTES:
AVENUE
RWH
DAVID
49 .9
FIRST FLOOR PLAN
50 .1
GROUND FLOOR PLAN
NORTH ELEVATION
5
1
600 1200
400
6635
6670
6690
6735
7830
1200
2700
3610
TITLE BOUNDARY
BOUNDARY
135
110
2575
3090
DWELLING 3 5 4
1200
7750
400
6670
3610
2575
2700
7830
1200
2700
600
SCALE 1:200 @ A3
PROPOSED FIRST FLOOR PLAN AHD. 53.75
PROPOSED GROUND FLOOR CEILING AHD. 53.35
150
900
PROPOSED GROUND FLOOR PLAN AHD. 50.65 PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
DWELLING 1
BOUNDARY
BOUNDARY
NEW 0.9M HIGH TIMBER BATTEN FENCE
2
1 : 100
3
4435
TITLE BOUNDARY
TITLE BOUNDARY
PROPOSED EAST ELEVATION WITH FENCES
3090
NEW 1800 TIMBER PALING FENCE
PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
NEW 1800 TIMBER PALING FENCE
2700
NEW 0.9M HIGH TIMBER BATTEN FENCE
150
6790
8
PROPOSED GROUND FLOOR CEILING AHD. 53.35
900
7815
7
6840
7920
2700 400
6745
PROPOSED FIRST FLOOR PLAN AHD. 53.75
DWELLING 2
DWELLING 3
BOUNDARY (IN DISTANCE)
600
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
4 2 7
4715 3500
900
DWELLING 2 1
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
7740
7635 6640
6790
400 41 4
DWELLING 1
PROPOSED GROUND FLOOR PLAN AHD. 50.65
TITLE BOUNDARY
7815
1 : 100
PROPOSED GROUND FLOOR PLAN AHD. 50.65 PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
?
NEW 1.8M HIGH TIMBER BATTEN
BOUNDARY (IN DISTANCE)
6840
PROPOSED NORTH ELEVATION
NORTH ELEVATION WITH FENCES
4
6
7920
BOUNDARY
1
SCALE 1:200 @ A3
1
NEW 0.9M HIGH TIMBER BATTEN FENCE
2700
2700 PROPOSED GROUND FLOOR PLAN AHD. 50.65 PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
RE G
EAST ELEVATION WITH FENCES
PROPOSED FIRST FLOOR PLAN AHD. 53.75
PROPOSED GROUND FLOOR CEILING AHD. 53.35
3
TITLE BOUNDARY
150
2700
4715
PROPOSED FIRST FLOOR PLAN AHD. 53.75 PROPOSED GROUND FLOOR CEILING AHD. 53.35
NEW 1.8M HIGH TIMBER BATTEN/METAL FENCE
TITLE BOUNDARY
7 7
PROPOSED EAST ELEVATION 1 : 100
3
2
TITLE BOUNDARY
7795
7725
6640
BOUNDARY (IN DISTANCE)
5
4
4
7
SCALE 1:200 @ A3
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
150
4
5
5
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
BOUNDARY (IN DISTANCE)
600
1
TITLE BOUNDARY
EAST ELEVATION
PROPOSED NORTH ELEVATION WITH FENCES 1 : 100
SCALE 1:200 @ A3
WEST ELEVATION
SOUTH ELEVATION 4
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
9
1
6
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
5
600
4
2
2700
600
1
7520
400
6530
PROPOSED GROUND FLOOR CEILING AHD. 53.35
2700
3145
3255
6485
6475
7510 6455
6420
2700
1 : 100
SCALE 1:200 @ A3 4 1
DWELLING 3
DWELLING 2
TITLE BOUNDARY
PROPOSED WEST ELEVATION
BOUNDARY
150
PROPOSED GROUND FLOOR PLAN AHD. 50.65 PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
BOUNDARY
150
TITLE BOUNDARY
PROPOSED FIRST FLOOR PLAN AHD. 53.75
PROPOSED GROUND FLOOR PLAN AHD. 50.65
SCALE 1:200 @ A3
WEST ELEVATION WITH FENCES
7
PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
TITLE BOUNDARY
8
3400
PROPOSED GROUND FLOOR CEILING AHD. 53.35
3400
3445
2
TITLE BOUNDARY
NEW 1.8M HIGH TIMBER BATTEN/METAL FENCE
PROPOSED FIRST FLOOR PLAN AHD. 53.75
3200
400
2
BOUNDARY (IN DISTANCE)
7560
2700
7
DWELLING 1
PROPOSED SOUTH ELEVATION 1 : 100
SOUTH ELEVATION WITH FENCES
1 6
ITEM
1 2
@ A3
CODE
ITEM
MATERIAL
FINISH
ROOF
COLORBOND
COLORBOND - LIGHT GREY
6
WINDOW FRAME
ALUMINIUM
BLACK
EXTERNAL WALL
BRICK
MID GREY
7
PERGOLA
METAL
DARK GREY
3
EXTERNAL WALL
TIMBER
NATURAL FINISH
8
FENCE
TIMBER
NATURAL FINISH
4
EXTERNAL WALL
CEMENT RENDER
WHITE
9
GLAZING
GLASS
CLEAR
MID GREY
600 2700
7545
400
6530
6485
6475
7510
6455
6420
PROPOSED GROUND FLOOR CEILING AHD. 53.35 1800 TIMBER PALING FENCE
DWELLING 2
PROPOSED GROUND FLOOR PLAN AHD. 50.65 PROPOSED GARAGE FLOOR LEVEL AHD. 50.50 TITLE BOUNDARY
DWELLING 3
BOUNDARY
BOUNDARY
BOUNDARY (IN DISTANCE)
TITLE BOUNDARY
150
TITLE BOUNDARY FINISH
CEMENT RENDER
3255
3400
2700
3445
3
MATERIAL
EXTERNAL WALL
PROPOSED FIRST FLOOR PLAN AHD. 53.75
8
2
3200
400
7560 1800 TIMBER PALING FENCE 1 : 100
CODE
RY UNDA ON BO HEIGHT WALL G NEW 3.2M AV MAX
PROPOSED GROUND FLOOR PLAN AHD. 50.65 PROPOSED GARAGE FLOOR LEVEL AHD. 50.50
PROPOSED WEST ELEVATION WITH FENCES
MATERIALS SCHEDULE SCALE 1:200
5
PROPOSED FIRST FLOOR PLAN AHD. 53.75 PROPOSED GROUND FLOOR CEILING AHD. 53.35
TITLE BOUNDARY
7
7
2
2
2700
600
9
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
4
2700
6
9
4
PROPOSED ROOF PLAN AHD. 57.05 PROPOSED FIRST FLOOR CEILING AHD. 56.45
150
4 4
DWELLING 1
PROPOSED SOUTH ELEVATION WITH FENCES 1 : 100
SCALE 1:200 @ A3
N
REV
DATE
PROJECT :
AMENDMENT
TILBUILT
PTY LTD
DP-AD 41043
LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102 0433 841 331 tass@tilbuilt.com.au CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO THE COMMENCMENT OF ANY WORKS AND OR SHOP DRAWINGS. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. THIS DRAWING & DESIGN IS SUBJECT TO COPYRIGHT & REMAINS THE INTELLECTUAL PROPERTY OF PAUL TASS SACHINIDIS AND MAY NOT BE ALTERED OR ADJUSTED IN ANY WAY WITHOUT PRIOR WRITTEN CONSENT.
79 RACHELLE ROAD, KEILOR EAST ISSUE :
PLANNING
DRAWING TITLE :
JOB NUMBER :
PROPOSED ELEVATIONS
17075 DRAWING NUMBER :
TP12
SCALE :
1 : 100 @ A1 DRAWN :
BT
51
DATE :
3/07/2018 3:24:44 PM REVISION :
BURCHETT STREET RESIDENCE
TILBUILT Brandon Tung
BRUNSWICK, VICTORIA, AUSTRALIA
BENCH
8
7
6
5
4
DRIVEWAY
1 3 2
EXPOSED AGGREGATE
17 16 15 14 13 12 11 10 9
BUILDING ABOVE
7
6
5
4
3
2
1
FFL. 10.600 CH. 2500 TILES
FFL. 10.600 CH. 2500 TILES
G.I. FENCE - Ht.2.1m
G.I. FENCE - Ht.2.1m
10 .3 PROJECT : DP-AD 41043
DRAWING TITLE :
Author
7800 PROPOSED WALL ON BOUNDARY
13.10 GUTTER
4/09/2018 10:25:05 AM REVISION :
DRAWN :
TP07
PLANNING
DATE :
1 : 100 @ A3
DRAWING NUMBER :
14.01 GUTTER
9100 SETBACK
89°40' 40.31
7
BOX GUTTER
10 .7
BOX GUTTER
RWH
G.I. FENCE - Ht.1.6m RWH
13.72 GUTTER
SCALE :
17069
ISSUE :
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO THE COMMENCMENT OF ANY WORKS AND OR SHOP DRAWINGS. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. THIS DRAWING & DESIGN IS SUBJECT TO COPYRIGHT & REMAINS THE INTELLECTUAL PROPERTY OF PAUL TASS SACHINIDIS AND MAY NOT BE ALTERED OR ADJUSTED IN ANY WAY WITHOUT PRIOR WRITTEN CONSENT.
14.48 GUTTER
JOB NUMBER :
PROPOSED GROUND FLOOR PLAN
2 BURCHETT STREET, BRUNSWICK
P.O.S.
10 .6
P.O.S.
RWH
BOX GUTTER
P.O.S. DECK BELOW
DP
KLIP-LOK
DECK BELOW
SHOWER/BATH
BED 1
FFL. 13.700 CH. 2700 CARPET
BED 2
FFL. 13.700 CH. 2700 CARPET
FFL. 13.700 CH. 2700 CARPET
LINEN
FFL. 13.700 CH. 2700 CARPET
DN 18 DP
ROBE
ROBE
DN18
17 1615 14 13 12 11 10 9 8 7 6 5 4
SHOWER
1 3 2
2
7
8 4
1 10 .2
9 10 .0
10 .1
10 .1
RWH
BRICK - Ht.2.9m
G.I. FENCE - Ht.2.2m
G.I. FENCE - Ht.2.2m
G.I. FENCE - Ht.2.1m
G.I. FENCE - Ht.2.1m
BRICK - Ht.2.6m
12.94 TOP OF WALL
10 .3
6
SINGLE STOREY BRICK GARAGE
10 .3
4
10 .3
6
10 .1
0
6
10 .0
9
BLUESTONE LANEWAY 10 .1
8
4
BOX GUTTER
10 .2
4
KLIP-LOK
10 .2
RWH
3 10 .1 9.9 7
CANOPY
KLIP-LOK
LANEWAY
10 .0
FFL. 13.700 CH. 2700 CARPET
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3
CANOPY
PALINGS - Ht.1.8m
RUMPUS
LINEN
RUMPUS
BOX GUTTER
KLIP-LOK
DWELLING 3
DWELLING 2
KLIP-LOK
ROBE
10 .4
ROOF
FFL. 13.700 CH. 2700 CARPET
DP
ROOF DESK
DESK
BED 3
FFL. 13.700 CH. 2700 TILES
FFL. 13.700 CH. 2700 TILES
BED 2
7
KLIP-LOK
KLIP-LOK
FFL. 13.700 CH. 2700 CARPET
BATH
ROBE
DP
BED 1
10 .3
8
ROOF
ROOF
FFL. 13.700 CH. 2700 CARPET
DWELLING 1 ENSUITE
10 .3
BED 2
ROBE
BOX GUTTER
DN
BOX GUTTER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
SHOWER/BATH
DP
BATH
FFL. 13.700 CH. 2700 TILES
ROBE
KLIP-LOK
RWH
DP
8
FFL. 13.700 CH. 2700 CARPET
ROBE
RWH
DP
10 .3
ROBE
RWH
DP
9.14
9.14
RUMPUS CANOPY
13.33 RWH GUTTER
SHOWER/BATH
BATH
FFL. 13.700 CH. 2700 TILES
KLIP-LOK
RWH
BED 1
FFL. 13.700 CH. 2700 CARPET
ROOF
KLIP-LOK
RWH
13.72 GUTTER
ROOF
DECK BELOW
10 .2
ROOF
9
PTY LTD
5
TILBUILT
LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102 0433 841 331 tass@tilbuilt.com.au
9
9 10 .5
10 .5
7 10 .4
AMENDMENT
14.86 TOP OF WALL
Win
P.O.S
G.I. GATE - Ht.2.0m
13.77 GUTTER
DATE
Hab Win Top.13.68
(0.9)
PALINGS - Ht.1.9m
14.52 GUTTER
REV
N
P.O.S
(4.2)
Hab Win Top.13.18
VERANDAH 13.52 GUTTER
13.59 GUTTER
18.02 RIDGE
PALINGS
Door
BRICK DWELLING G.I. ROOF
PROPOSED GROUND FLOOR LEVEL 1 : 100
8
12.94 TOP OF WALL
BRICK - Ht.2.6m
6
WINDOWS NOT ACCESSIBLE
FIRST FLOOR PLAN 14.53 GUTTER
10 .5
10 .2
10 .0 6 10 .1
6 10 .1
G.I. FENCE - Ht.2.2m
SCALE 1:200 @ A3
1
9
1
10 .1
10 .0
9
BLUESTONE LANEWAY
SINGLE STOREY BRICK GARAGE
14.52 GUTTER
10 .4
UP
4
4
7
LAUNDRY BUILDING ABOVEWC
CONCRETE
10 .1
8
10 .2
4
8
10 .4
10 .2
3 10 .1 9.9 7 10 .0
PORCH
CONCRETE
G.I. FENCE - Ht.2.2m
BRICK - Ht.2.9m
5 2 10 .4
18
DRIVEWAY
PLANTER BOX
LANEWAY
FRIDGE
EXPOSED AGGREGATE
PORCH BUILDING ABOVE
FFL. 10.600 CH. 2700 TIMBER
7
UP
18 17 1615 14 13 12 11 10 9
KITCHEN
CH. 2700 TIMBER
10 .3
FFL. 10.600 CH. 2700 TILES
FFL. 10.600 CH. 2700 TILES
DINING
FFL. 10.600 CH. 2700 TIMBER
FFL. 10.600 CH. 2700 TIMBER
GARAGE FFL. 10.450 CH. 2600 CONCRETE
10 .6 3500 SETBACK PANTRY
LIVING CLOAK
WC & LAUNDRY
WC
FFL. 10.600 CH. 2700 TILES
FFL. 10.600 CH. 2700 TIMBER
10 .3 10 4 .38
LAUNDRY
DWELLING 3
0
10 .3
8
BUILDING ABOVE
STORE
PALINGS - Ht.1.8m
7
LIVING DINING
PANTRY
DRIVEWAY
TV BENCH
8
FRIDGE
2ND CAR SPACE 4.9M X 2.9M
EXPOSED AGGREGATE
TV BENCH
DWELLING 2
FFL. 10.600 CH. 2700 TIMBER
10 .3
KITCHEN
9 10 11 12 13 14 15 16 17 18
8
8
10 .2
7
10 .3
6
BUILDING ABOVE
5
BENCH
9
4
FIREPLACE
3500 SETBACK
3
FIREPLACE
BUILDING ABOVE
2
BUILDING ABOVE
TIMBER
PANTRY
BUILDING ABOVE
UP
1
DECK
HWS
TIMBER
180°24' 9.14
9.14
FFL. 10.600 CH. 2700 TIMBER
FFL. 10.600 CH. 2700 TIMBER
BENCH
CONCRETE
DECK
BUILDING ABOVE
KITCHEN
DINING
DWELLING 1
FFL. 10.450 CH. 2600 CONCRETE
8
FRIDGE
P.O.S.
GARAGE
FFL. 10.450 CH. 2600 CONCRETE
10 .5
BUILDING ABOVE
13.33
GARAGE
P.O.S.
RAIN GARDEN
BUILDING ABOVE
TIMBER
3500 WALL ON BOUNDARY
2000L RAIN WATER TANK
DECK
A/C
RAIN GARDEN
FFL. 10.600 CH. 2700 TIMBER
CLOTHES LINE
A/C
STORAGE 6M3
HWS
LIVING
PORCH
G.I. FENCE - Ht.1.6m 2000L RAIN WATER TANK STORAGE 6M3
P.O.S.
RAIN GARDEN
10 .5
9
900 SETBACK
9 10 .5
7 10 .4
FIREPLACE
9100 PROPOSED TIMBER PALING FENCE ON BOUNDARY
2000L RAIN WATER TANK
CLOTHES LINE A/C
HWS
BUILDING ABOVE
13.72 GUTTER
7800 PROPOSED WALL ON BOUNDARY
89°40' 40.31
WALL
G.I. GATE - Ht.2.0m
TV BENCH
13.10 GUTTER
Win
P.O.S
14.01 GUTTER 14.48 GUTTER
13.72 GUTTER
CLOTHES LINE
P.O.S
(4.2)
14.52 GUTTER
13.77 GUTTER
Hab Win Top.13.68
(0.9)
PALINGS - Ht.1.9m
18.02 RIDGE
Hab Win Top.13.18
VERANDAH 13.52 GUTTER
13.59 GUTTER
G.I. ROOF
10 .7
Door
GUTTER
PALINGS
WINDOWS NOT ACCESSIBLE
GROUND FLOOR PLAN
SCALE 1:200 @ A3
52
1
PROPOSED FIRST FLOOR LEVEL 1 : 100
N
REV
DATE
PROJECT :
AMENDMENT
TILBUILT
PTY LTD
DP-AD 41043
LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102 0433 841 331
2 BURCHETT STREET, BRUNSWICK
DRAWING TITLE :
JOB NUMBER :
PROPOSED FIRST FLOOR PLAN
17069
SCALE :
1 : 100 @ A3
DATE :
4/09/2018 10:25:06 AM
AHD. 13.10
PROPOSED NORTH ELEVATION 1 : 100
3
2 7
1
3
3
4
2
41
RE G
G RE
41 4
6
3
2
4
7
7
7
PROPOSED FIRST FLOOR CEILING AHD. 16.40
PROPOSED ROOF LEVEL AHD. 17.00 6
600
6 4
2700
400
PROPOSED FIRST FLOOR 4 CEILING AHD. 16.40
2700
2650
400
PROPOSED FIRST FLOOR LEVEL AHD. 13.70
MATERIAL
FINISH
5
WINDOW/DOOR FRAME
ALUMINIUM
MONUMENT
6
GLAZING
GLASS
CLEAR
MONUMENT
7
METAL BOX WINDOW FRAME METAL
BLACK
BRICK
RED
8
DOWNPIPE & CAPPINGS
4
2
RE G
N
REV
DATE
COLORBOND
MONUMENT
PROPOSED ROOF LEVEL AHD. 17.00
PROPOSED FIRST FLOOR CEILING AHD. 16.40 2 BURCHETT STREET, BRUNSWICK PROJECT :
AMENDMENT
TILBUILT
PTY LTD
DP-AD 41043
LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102 0433 841 331 tass@tilbuilt.com.au
DRAWING TITLE :
JOB NUMBER :
PROPOSED NORTH & SOUTH ELEVATIONS
17069
ISSUE :
SCALE :
1 : 100 @ A3
DRAWING NUMBER :
TP13
PLANNING
DRAWN :
DATE :
4/09/2018 10:25:20 AM REVISION :
Author
PROPOSED FIRST FLOOR LEVEL AHD. 13.70
400
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO THE COMMENCMENT OF ANY WORKS AND OR SHOP DRAWINGS. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. THIS DRAWING & DESIGN IS SUBJECT TO COPYRIGHT & REMAINS THE INTELLECTUAL PROPERTY OF PAUL TASS SACHINIDIS AND MAY NOT BE ALTERED OR ADJUSTED IN ANY WAY WITHOUT PRIOR WRITTEN CONSENT.
600
EXTERNAL WALL
1
3
2700
4
7 2
6
400
METAL
41 4
EXTERNAL WALL
?
7
4
3
LIGHT GREY
7
41
SCYON MATRIX CLADDING
3 4 41
EXTERNAL WALL
2 G RE
2
7
G RE
4
7
6
COLORBOND - MONUMENT
TITLE BOUNDARY
BOUNDARY
ITEM
41 4
1
COLORBOND
ROOF
EAST ELEVATION
CODE
RE G
PROPOSED EAST ELEVATION
FINISH
600
MATERIAL
PROPOSED GARAGE FLOOR LEVEL AHD. 10.45
2700
ITEM
1 : 1001
2700
2650
CODE
TITLE BOUNDARY
MATERIALS SCHEDULE WEST ELEVATION
PROPOSED GARAGE CEILING LEVEL AHD. 13.10 PROPOSED GROUND FLOOR LEVEL AHD. 10.60 PROPOSED GARAGE FLOOR LEVEL AHD. 10.45
PROPOSED GROUND FLOOR LEVEL AHD. 10.60
TITLE BOUNDARY
1 : 100
PROPOSED GARAGE CEILING LEVEL AHD. 13.10
BOUNDARY
PROPOSED SOUTH ELEVATION TITLE BOUNDARY
2
SCALE 1:100 @ A3
PROPOSED FIRST FLOOR LEVEL AHD. 13.70 PROPOSED GROUND FLOOR CEILING AHD. 13.30
PROPOSED GROUND FLOOR CEILING AHD. 13.30
LANEWAY
PROPOSED ROOF LEVEL AHD. 17.00
600
?
7
4 41
3
G RE
SOUTH ELEVATION
2700
1
PROPOSED GARAGE FLOOR LEVEL AHD. 10.45
BOUNDARY
BOUNDARY
TITLE BOUNDARY
PROPOSED GROUND FLOOR LEVEL AHD. 10.60
LANEWAY
SCALE 1:100 @ A3
PROPOSED GROUND FLOOR LEVEL AHD. 10.60 PROPOSED GARAGE FLOOR LEVEL AHD. 10.45
SCALE 1:100 @ A3
PROPOSED WEST ELEVATION
1
1 : 100
PROPOSED EAST ELEVATION
1
1 : 100
WINDOW/DOOR FRAME
ALUMINIUM
MONUMENT
41 4
5
7
RE G
FINISH
7 2
3 4 41
MATERIAL
2 G RE
- MONUMENT
ITEM
7
6
4 CODE
TITLE BOUNDARY
TITLE BOUNDARY
TITLE BOUNDARY
TITLE BOUNDARY
TITLE BOUNDARY
LANEWAY
TITLE BOUNDARY
7
53
2700
PROPOSED GARAGE CEILING LEVEL AHD. 13.10
2650
2700
2650
PROPOSED GROUND FLOOR CEILING AHD. 13.30
3 3210
2600
3050
COCHRANE STREET RESIDENCE
DB
TILBUILT Brandon Tung
EXISTING GROUND FLOOR LEVEL AHD. 10.72
EAST ELEVATION
BOUNDARY
BRIGHTON, VICTORIA, AUSTRALIA
BOUNDARY
PROPOSED GROUND FLOOR LEVEL AHD. 10.37
PROPOSED WEST ELEVATION
1
1 : 100
PROPOSED SKYLIGHT
EXTERNAL TIMBER CLADDING TO FIRST FLOOR
COLORBOND ROOF AT 2째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
KLIP-LOK ROOF AT 2째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
TIMBER FLOOR TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
KLIP-LOK ROOF INSULATION AS
ROOF TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
TC
D 10
FFL. 13.820 CH. 2700 CARPET
BR
110MM SINGLE BRICK
WHITE/IVORY - PAINT
TS
90MM TIMBER STUD
PLASTERBOARD
TC
145MM TIMBER CLADDING WALL INNOWOOD - LILY WHITE
PROPOSED EAST ELEVATION 1 : 100
9
PROPOSED GROUND FLOOR LEVEL PROPOSED GROUND FLOOR LEVEL AHD. 10.37 AHD. 10.37 BOUNDARY
BOUNDARY
EXISTING FOOTING
SKYLIGHT VELUX FS 2005
2
TIMBER FLOOR TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
KLIP-LOK ROOF AT 22.4째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
ROOF TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
COLORBOND
COLORBOND- SURFMIST
ROOF
COLORBOND
COLORBOND - SHALE GREY
METAL BOX WINDOW FRAME
METAL
BLACK
F
BATH
SKYLIGHT VELUX FS 2005
TC 300MM WIDE ZINCALUME BOX GUTTER
N
REV
DATE
W 14
AMENDMENT COWL DOUBLE FACE BRICK WALL TO BOUNDARY FRL 60/60/60
TILBUILT
PTY LTD
D 07
FFL. 13.820 CH. 2700 TILES
O
W 03
PROPOSED EXISTINGFIRST FIRSTFLOOR FLOOR LEVEL PLAN DRAWING TITLE : JOB NUMBER : AHD. 13.82 PROPOSED EAST & WEST ELEVATIONS 17076 PROPOSED GROUND FLOOR CEILING DRAWING PROPOSED KITCHEN AHD. CEILING 13.42NUMBER : AHD.A201 13.07
148 COCHRANE STREET, BRIGHTON
LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102 0433 841 331 ISSUE : tass@tilbuilt.com.au DB PLANNING CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO THE COMMENCMENT OF ANY WORKS AND OR SHOP DRAWINGS. FIGURED W DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. THIS DRAWING & DESIGN IS SUBJECT TO COPYRIGHT & REMAINS THE INTELLECTUAL PROPERTY OF PAUL TASS SACHINIDIS AND MAY NOT BE WITHOUT PRIOR WRITTEN CONSENT. 04ALTERED OR ADJUSTED IN ANY WAYKITCHEN FFL. 10.370 CH. 2700 CONCRETE
PR
30 BO
PROJECT :
DP-AD 41043
SK
MEALS
W 01
FFL. 10.370 CH. 3050 CONCRETE
SCALE :
CO
1 : 100 @ A
350
GUTTER/DOWNPIPES
RAINWATER HEAD
DRAWN :
BT
2700
CLEAR
PROPOSED FIRST FLOOR CEILING LEVEL AHD. 16.799
W 14
2980
GLASS
EXTERNAL TIMBER CLADDING TO FIRST FLOOR
400
GLAZING
1 : 100
PROPOSED ROOF LEVEL AHD. 17.32
520 FINISH/COLOUR NATURAL FINISH
3050
MATERIAL TIMBER
SECTION
KLIP-LOK ROOF AT 2째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
W 16
OTHER:
WINDOW/DOOR FRAMES
DOUBLE FACE BOUNDARY FR
3050
41
FLASHING OVE
EXISTINGFIRST FIRSTFLOOR FLOORLEVEL PLAN PROPOSED PROPOSED FIRST FLOOR LEVEL AHD. 13.82 AHD. 13.82 PROPOSED GROUND FLOOR CEILING PROPOSED GROUND FLOOR CEILING AHD. 13.42 AHD. 13.42
EXISTING TIMBER FLOOR STRUCTURE
300MM WIDE ZINCALUME BOX GUTTER
ITEM
400
400 ER EG
3050
HT L IN
F
SECTION C-C
1 1E-E : 100 SECTION
SIG
BOUNDARY
SCALE 1:100 @ A3
2
7060
EXISTING GROUND FLOOR LEVEL AHD. 10.72
FINISH/COLOUR WHITE/IVORY - PAINT
D 01
SD
O
BOUNDARY
MATERIAL
FFL. 10.720 CH. 2700 TIMBER
BR
3560
G4
3200
E ER LIN
19
LOUNGE
MATERIAL SCHEDULE:
250MM DOUBLE BRICK
TC
DIRECT LINE OF SIGHT OBSCURED BY ADJOINING GARAGE
3380
3380
W 04
WALL TYPES: CODE
EXTERNAL TIM
F
480
500
EXISTING GROUND FLOOR CEILING AHD. 14.10
HT SIG
DB
EXISTING CORRUGATED METAL ROOF
F
300MM WIDE Z
1700
F
NO DIRECT LINE OF SIGHT WITHIN ADJOINING POS OBSCURED BY BOUNDARY FENCE
EXISTING GROUND FLOOR LEVEL AHD. 10.72
300MM WIDE Z
PROPOSED CHIMNEY DOUBLE FACE BRICK WALL TO GROUND FLOOR
EXISTING GROUND FLOOR CEILING AHD. 14.10
1
EXISTING BRICK
2980
TC
1975
PROPOSED SKYLIGHT
1935
2090
2090
METAL BOX WINDOW FRAME
W BEDROOM 08
2980
D TC06
PROPOSED ROOF LEVEL PROPOSED ROOF LEVEL AHD. 17.32 AHD. 17.32
PROPOSED FIRST FLOOR CEILING LEVEL PROPOSED FIRST FLOOR CEILING LEVEL AHD. 16.799 AHD. 16.799
3215
EXISTING ROOF LEVEL AHD. 16.19 RAINWATER HEAD
520
EXTERNAL TIMBER CLADDING TO FIRST FLOOR
EXISTING BRICK CHIMNEY
EXISTING ROOF LEVEL AHD. 16.19
520
300MM WIDE ZINCALUME BOX GUTTER
BOUNDARY
BOUNDARY
PROPOSED GROUND FLOOR LEVEL AHD. 10.37
CONCRETE FLOOR SLAB TO ENGINEERING DETAIL
3
54
SECTION E-E
REFER TO ENGINEERING FOR FOOTING DETAIL
4
1 : 100
SCALE 1:100 @ A3
MATERIAL SCHEDULE:
WALL TYPES: CODE
OTHER: MATERIAL
FINISH/COLOUR
ITEM
MATERIAL
FINISH/COLOUR
SECTION 1 : 100
25
3225
3
305
DB F
EXISTING GROUND FLOOR LEVEL AHD. 10.72
F
BOUNDARY
BOUNDARY
PROPOSED GROUND FLOOR LEVEL AHD. 10.37
PROPOSED NORTH ELEVATION SOUTH ELEVATION 1 1 : 100
PROPOSED SKYLIGHTS
RAINWATER HEAD EXTERNAL TIMBER CLADDING TO FIRST FLOOR COLORBOND ROOF AT 22.4째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
W 16
RAINWATER HEAD
NEW ROOF TO MATCH EXISTING
PROPOSED CHIMNEY
520
EXISTING BRICK CHIMNEY TO BE RETAINED
PROPOSED ROOF LEVEL AHD. 17.32
COWL
COWL PROPOSED SKYLIGHTS
515
EXISTING ROOF LEVEL AHD. 16.19
SW
W 14
ED
L WA
PROPOSED GROUND FLOOR CEILING AHD. 13.42
DB D 03
4190 PROPOSED WALL ON BOUNDARY
3200
3200
OS OP PR
Y AR ND OU NB LO
PROPOSED FIRST FLOOR LEVEL AHD. 13.82
400
6395
5825
F
2980
1975 COWL
PROPOSED CHIMNEY
TC
F
920
O
SH
PROPOSED GROUND FLOOR LEVEL AHD. 10.37
BOUNDARY
EXISTING GROUND FLOOR LEVEL AHD. 10.72
BOUNDARY
COWL
TC
3050
1445
TC
7075 6175
5955
5435
W 06
W 07
2520
EXISTING MEZZANINE FLOOR LEVEL AHD. 13.24
F
F
1700
2090 860
EXISTING GROUND FLOOR CEILING AHD. 14.10
SW
F
D 11
TC
1700
W 15
PROPOSED FIRST FLOOR CEILING LEVEL AHD. 16.799
METAL BOX WINDOW FRAME
PROPOSED SCALE 1:100 @SOUTH A3 ELEVATION 2
1 : 100
SECTION A-A
KLIP-LOK ROOF AT 2째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING TIMBER FLOOR TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
MATERIAL SCHEDULE:
ROOF TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
OTHER:
BR
FINISH/COLOUR
EXISTING ROOF LEVEL250MM DOUBLE BRICK AHD. 16.19
WHITE/IVORY - PAINT WHITE/IVORY - PAINT
TS
90MM TIMBER STUD
PLASTERBOARD
TC
145MM TIMBER CLADDING WALL INNOWOOD - LILY WHITE
2090
110MM SINGLE BRICK
EXISTING GROUND FLOOR CEILING AHD. 14.10
MATERIAL
WINDOW/DOOR FRAMES
TIMBER
COLORBOND
COLORBOND- SURFMIST
ROOF
COLORBOND
COLORBOND - SHALE GREY
METAL BOX WINDOW FRAME
METAL
BLACK
DATE
520 TC
WALL INFILL TO EXISTING OPENING CLEAR
GLASS
REV
TC
NATURAL FINISH EXISTING TIMBER ROOF TRUSSES
GUTTER/DOWNPIPES
TS
D 12
TS
F
O
F
BEDROOM 2
FFL. 13.820 CH. 2700 CARPET
FFL. 13.820 CH. 2700 CARPET
BATH
D 08
BEDROOM 3
FFL. 13.820 CH. 2700 TILES
EN-SUITE
PTY LTD
DP-AD 41043
LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102 0433 841 331 tass@tilbuilt.com.au
LOUNGE
148 COCHRANE STREET, BRIGHTON D 02
CONTRACTORS TO THE COMMENCMENT OF ANY WORKS AND OR SHOP DRAWINGS. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. FFL. 10.720 MUST VERIFY ALL DIMENSIONS ON SITE PRIOR FFL. 10.670 FFL. 10.720 THIS DRAWING & DESIGN IS SUBJECT TO COPYRIGHT & REMAINS THE INTELLECTUAL PROPERTY OF PAUL TASS SACHINIDIS AND MAY NOT BE ALTERED OR ADJUSTED IN ANY WAY WITHOUT PRIOR WRITTEN CONSENT. CH. 3340 CH. 3390 CH. 2700 SD TIMBER TILES TIMBER
ISSUE :
PLANNING SD
2
FFL. 13.820 CH. 2700 CARPET
D 07
PROJECT :
WIR
W 06
DRAWING TITLE :
JOB NUMBER :
PROPOSED NORTH & SOUTH ELEVATIONS
17076
D 01 SD
KLIP-LOK ROOF AT 2째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
SD
MEALS
A501
FFL. 10.370 CH. 3050 CONCRETE
EXISTING GROUND FLOOR LEVEL AHD. 10.72
1 : 100 @ A3 DRAWN :
BT D 01
PROPOSED EXISTING FIRST FIRSTFLOOR FLOORLEVEL PLAN DATE : 3/09/2018 9:47:15AHD. AM 13.82 PROPOSED GROUND FLOOR CEILING REVISION : AHD. 13.42
F
PROPOSED GROUND FLOOR LEVEL AHD. 10.37
PROPOSED TIMBER TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
SECTION A-A
EXISTING FOOTING
1 : 100
REFER TO ENGINEERING FOR FOOTING DETAIL
REFER TO ENGINEERING FOR FOOTING DETAILS
PROPOSED TIMBER TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
ASSUMED EXISTING TIMBER SUBFLOOR DIRECTION
TIMBER FLOOR TRUSSES TO MANUFACTURER'S CENTRES & SPECIFICATIONS
PROPOSED ROOF LEVEL AHD. 17.32
PROPOSED FIRST FLOOR CEILING LEVEL
KLIP-LOK ROOF AT 22.4째 FALL WITH CEILING INSULATION AS PER 6 STAR ENERGY RATING
FLASHING FOR PARAPET WALL
PROPOSED TIMBER OUTDOOR DECKING
SKYLIGHT VELUX FS 2005 PROPOSED TIMBER STUD WALL
520
SCALE 1:100 @ A3
BR
A203
LIVING
FFL. 10.370 CH. 3050 CONCRETE
SCALE :
DRAWING NUMBER :
W 02
F
1
PROPOSED FIRST FLOOR CEILING LEVEL AHD. 16.799
TS
O
BEDROOM 1
TILBUILT
FFL. 10.720 CH. 3370 TIMBER
TS
METAL BOX WINDOW FRAME
AMENDMENT
MASTER BEDROOM 2520
FINISH/COLOUR
PROPOSED TIMBER STUD WALL
GLAZING
N
860
EXISTING MEZZANINE FLOOR LEVEL AHD. 13.24
ITEM
PROPOSED ROOF LEVEL AHD. 17.32
2980
BR
MATERIAL
EXISTING CORRUGATED METAL ROOF
400
CODE
TIMBER EXTERNAL CLADDING TO FIRST FLOOR
3050
WALL TYPES:
W 11
EXISTING BRICK CHIMNEY EXISTING CORRUGATED METAL ROOF EXISTING TIMBER ROOF TRUSSES
55
COCHRANE STREET RESIDENCE
TILBUILT Brandon Tung
BRIGHTON, VICTORIA, AUSTRALIA PARAPET CAPPING & WINDOW HEADER DETAIL
EXPOSED BEAM DETAIL
INNOWOOD EXTERNAL TIM 35MM VENTILATION CAVIT
230 PFC TO ENGINEERING DETAILS 14MM SELECTED CARPET
INSULATION AS SPECIFIED
20MM COMPRESSED FC SHEET
35 x 70MM TIMBER STUD
TIMBER PURLINS KLIP-LOK METAL ROOF TRAY AT 2째 FALL
BOTTOM PLATE TIMBER C INNOWOOD EXTERNAL 35MMTIMBER VENTILATION BATTENCAVITY
230 PFC TO ENGINEERING DETAILS
PARAPET CAPPING
14MM SELECTED CARPET
SELECTED BRICK TO DOUBLE FACE BRICK WALL
20MM COMPRESSED FC SHEET
INSULATION AS SPECIFIED 140 TIMBER 35 x 70MM TIMBERJOIST STUD BOTTOM PLATE TIMBER BATTEN
EXPOSED 226 TIMBER BEA 140 TIMBER JOIST
BACKER ROD & SEALANT EXPOSED 226 TIMBER BEAM
TIMBER SLIDING DOOR FRAME 90MM TIMBER RAFTERS TO ENGINEERING DETAILS
BACKER ROD & SEALANT
BACKER ROD & SEALANT
GLAZED SLIDING DOOR PANEL TIMBER SLIDING DOOR FRAME
FLASHING TIMBER WINDOW HEADER
FIRE RATED CANOPY CEILING FRL 60/60/60 2x13MM FIRECHECK PALSTERBOARD DIRECT FIX + 4MM CEMENT SHEET SOFFIT
GLAZED SLIDING DOOR PANEL
FIXED WINDOW GLAZING
SCALE 1:10 @ A3
1
DETAILSCALE - EXPOSED 1:10 BEAMS @ A3 1 : 10
ROOF TRAY & BOX GUTTER DETAIL 1
DETAIL - EXPOSED BEAMS 1 : 10
SELECTED BRICK TO SINGLE BRICK WALL SELECTED 300MM WIDE ZINCALUME BOX GUTTER SARKING INSULATION BLANKET AS PER 6 STAR ENERGY RATING PARAPET CAPPING KLIP-LOK METAL ROOF TRAY AT 2째 FALL SELECTED BRICK TO SINGLE BRICK WALL FLASHING SELECTED 300MM WIDE ZINCALUME BOX GUTTER SARKING INSULATION BLANKET AS PER 6 STAR ENERGY RATING KLIP-LOK METAL ROOF TRAY AT 2째 FALL FLASHING
SELECTED BRICK TO DOUBLE FACE BRICK WALL
2
DETAIL - WINDOW HEADER 1 : 10
INNOWOOD EXTERNAL TIMBER CLADDING 35MM VENTILATION CAVITY 35 X 70MM TIMBER STUD INSULATION AS SPECIFIED INTERNAL PLASTERBOARD LINING 14MM SELECTED CARPET INNOWOOD EXTERNAL TIMBER CLADDING 20MM COMPRESSED FC SHEET 35MM VENTILATION CAVITY TIMBER BATTEN 35 X 70MM TIMBER STUD INSULATION AS SPECIFIED 35 x 70MM BOTTOM PLATE INTERNAL PLASTERBOARD LINING FLASHING 14MM SELECTED CARPET
TIMBER PURLINS KLIP-LOK METAL ROOF TRAY AT 2째 FALL PARAPET CAPPING SELECTED BRICK TO DOUBLE FACE BRICK WALL
20MM COMPRESSED FC SHEET TIMBER BATTEN 35 x 70MM BOTTOM PLATE
FLASHING
FLASHING
TIMBER WINDOW JAMB FIXED WINDOW GLAZING
90MM TIMBER RAFTERS TO ENGINEERING DETAILS
BACKER ROD & SEALANT FLASHING FIRE RATED CANOPY CEILING FRL 60/60/60 TIMBER WINDOW HEADER 2x13MM FIRECHECK PALSTERBOARD DIRECT FIX + 4MM CEMENT SHEET SOFFIT TIMBER PURLINS
PROJECT :
148 COCHRANE STREET, BRIGHTON ISSUE :
ALED DIMENSIONS. PRIOR WRITTEN CONSENT.
PLANNING
DRAWING TITLE :
JOB NUMBER :
DETAILS
17076 DRAWING NUMBER :
A503
SCALE :
1 : 10 @ A3 DRAWN :
FIRE RATED CANOPY CEILING FRL 60/60/60 2x13MM FIRECHECK PALSTERBOARD DIRECT 90MM TIMBER RAFTERS TO FIX + 4MM CEMENT SHEET SOFFIT ENGINEERING DETAILS FIRE RATED CANOPY CEILING FRL 60/60/60 FIXED WINDOW GLAZING FLASHING 280MM SMART JOIST 2x13MM FIRECHECK PALSTERBOARD DIRECT FIX + 4MM CEMENT SHEET SOFFIT
DATE :
3/09/2018 9:47:25 AM
TIMBER PURLINS
REVISION :
DOOR 90MMTIMBER TIMBERSLIDING RAFTERS TO HEADER ENGINEERING DETAILS
Author
FLASHING GLAZED SLIDING DOOR PANEL
SCALE 1:10 @ A3
56
SCALE 1:10 @ A3
2
280MM SMART JOIST
DETAIL - PARAPET
TIMBER SLIDING DOOR HEADER
1 : 10 GLAZED SLIDING DOOR PANEL
1
PARAPET CAPPING
10 .2
WINDOW JAMB DETAIL
PICKETS - Ht.1.1m
WIN
Bitumen
(12.1)
GROUND FLOOR PLAN
1
2
3
4
A302
A302
A302
A302
NH WIN
NH WIN
(1.0)
GUTTER
NH WIN
90°00' 40.23
1
TOP OF WALL 12.96
GUTTER 14.07
W/Board & Brick Garage ADJOINING PROPERTY WALL ON BOUNDARY
A503
BLACK
4 10 .1
1265
1265
2 2
3 10 .2
BESSER BRICK Ht.2.3m
8 10 .2
BUILDING ABOVE
7.93
4
10 .2
3
10 .2
1
10 .2
6 10 .1
1000
4 10 .2
7 10 .2
5
41 9
RE G
41 9 EG ER IN HT L SIG
00 90
4 10 .1 10 .2
3
BESSER BRICK Ht.2.3m
METAL BOX WINDOW FRAME
ROOF RIDGE
Grassed
DECK BELOW
Area
SKYLIGHT
FALL 2°
EXHAUST FAN DUCTED TO OUTSIDE AIR BOX GUTTER
RWH
PROPOSED CHIMNEY
FALL 2°
KLIP-LOK BOX GUTTER BOX GUTTERS: MINIMUM DIMENSION 300MM x 100MM MINIMUM FALL 1:200
S.D : SMOKE DETECTOR THAT IS HARD WIRED, INTERCONNECTED & BATTERY BACKED UP
ALL GLASS IN DOORS TO BE GRADE A SAFETY GLASS. WINDOWS ADJACENT TO POOL TO HAVE GRADE A SAFETY GLASS AND TO BE CHILD RESISTANT
GUTTER 14.06
SPREADERS TO ALL FIRST FLOOR DOWNPIPES DISCHARGING ONTO LOWER STOREY ROOFS
RWH TO BE IN ACCORDANCE WITH AS 1926.1 & AS 1923.2 POOL SAFETY BARRIERS
Garden Bed
POOL RECIRCULATION SYSTEM TO BE COMPLIANT WITH AS 1926.3
NUMBER : PALINGS - JOBHt.2.6m
8840GROUND FLOOR PLAN PROPOSED
17076
SCALE :
DATE :
9 41
DRAWING TITLE :
STREET, BRIGHTON
DP
ROOF
G RE
1 : 100 @ A3
7650
3/09/2018 9:47:06 AM
SIG L HT
40.23 270°00'
TC
00
3685 PROJECT : EXISTING LOCATION OF WALL ON BOUNDARY TILBUILT PTY LTD DP-AD 41043 4190 148 COCHRANE PROPOSED WALL ON BOUNDARY LEVEL 1, 599 HIGH STREET KEW EAST, VIC 3102
Storage
W 09
DRAWING NUMBER :
DRAWN :
BT
9 41
A101
G
DOOR
GUTTER 14.50
RE
PLANNING
E IN
ISSUE :
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO THE COMMENCMENT OF ANY WORKS AND OR SHOP DRAWINGS. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. THIS DRAWING & DESIGN IS SUBJECT TO COPYRIGHT & REMAINS THE INTELLECTUAL PROPERTY OF PAUL TASS SACHINIDIS AND MAY NOT BE ALTERED OR ADJUSTED IN ANY WAY WITHOUT PRIOR WRITTEN CONSENT.
7.93
BOX GUTTER
7650 REAR SETBACK
KLIP-LOK
CP01
WEEPHOLES TO BE AT 1.2M CENTRES
1095
W 11
ROOF
8745
ROBE
EX
PALINGS
WIN/DOOR 2
FALL 2°
W 08
SKYLIGHT ABOVE
FFL. 13.820 CH. 2700 CARPET
DP TC 10 10 MECHANICAL VENTILATION TO BE CONSTRUCTED IN ACCORDANCE TO 1668.2 DP
RWH
1930
METAL
(2.2)
10 .2
(2.2) WIN
ALL FLAT METAL ROOFS TO HAVE SARKING INSTALLED UNDER
685
ALL WET AREAS TO BE ACCORDANCE WITH AS3740
(1.1)
WINDOWS TO BE IN ACCORDANCE WITH AS 2047 & AS 1288
4
14.01 COLORBOND - SHALE GREY
9
COLORBOND
10 .1
515
CP01
90
ROOF
KETS
9260 REAR SETBACK
FFL. 13.820 CH. 2700 CARPET
FFL. 13.820 CH. 2700 TILES
W
RWH: RAIN WATER HEAD & DOWNPIPE WITH PROVISION FOR OVERFLOW
0
BEDROOM 3
BATH
D 08
W 14
TIMBER FRAMING TO BE IN ACCORDANCE WITH AS 1684.2
WIN
Garden Bed
6
11
ADJOINING PROPERTY WALL ON BOUNDARY
10 .1
12
6
FOOTINGS & SLABS TO BE IN ACCORDANCE WITH AS 2870
WIN
D 06
D 07
Swimming Pool
P.O.S
1
13
5
COLORBOND-GUTTER SURFMIST
0433 841 331 tass@tilbuilt.com.au
Decking
10 .2
14
4
DP
TC
W/Board & Brick Garage Timber
8
3
COLORBOND
10 .2
GUTTER
7650
10 .2
15
GUTTER/DOWNPIPES
WIN
Garden Bed
3
2
INTERNAL SUMP WITH PROVISION FOR OVERFLOW IN ACCORDANCE WITH AS3500.3. 8 9
GUTTER 14.52
GRASS
10 .2
16
MASONRY CONSTRUCTION TO BE IN ACCORDANCE WITH AS 3700
SCALE 1:100 @ A3
TC
7
GALVANISED IRON
TOP OF WALL 12.96
SINGLE STOREY
BEDROOM 2
17
1
ALL STORMWATER DRAINAGE TO BE IN ACCORDANCE WITH AS 3500.3
19550
SERVICE YARD
4
ROBE
TOP OF WALL 13.72
TL01
DN
EXISTING ROOF
AMENDMENT
GRASS
A302
PLANTER BOX
FFL. 13.820 CH. 2700 CP01 CARPET ROOF RIDGE
SKYLIGHT
DATE
Area
4
A302
LINEN
TC
REV
DP
1265
2005
BEDROOM 1
WATER METER
PALINGS - Ht.2.6m
REAR YARD
WIN
GUTTER 14.07
ROBE
CLEAR
N
GUTTER 14.06
HABITABLE
1SETBACK 0 .2 2
3 10 .3
840
UPPER WIN
1
(1.0)
CP01
D 09
GALVANISED IRON
FLASHING BACK TO RIDGE
WIN
W 13
TC
GLASS
METAL BOX WINDOW FRAME
HWS
PALINGS - Ht.2.6m
3 HABITABLE
NH WIN
VERANDAH BELOW
TELSTRA PIT
NOTES:
A/C
DB
8840
NH WIN
EXISTING ROOF
W 15
W 03
DB
GUTTER 17.17
2 A302
W 12
GAS METER
Storage
10 .2
NATURAL FINISH
19655 FRONT SETBACK
16335 SEWER PIT FRONT SETBACK
BR
7
Area
DOOR
WIN
NON-HABITABLE 1 NON-HABITABLE
10 .2
TIMBER Grassed
FINISH/COLOUR
G S
TV UNIT
10 .2
WINDOW/DOOR FRAMES
MATERIAL
RIDGE 15.62
TM01
1000 SETBACK
3
C'PICKETS
ITEM
GLAZING
(7.0)
10 .2
10 .1
8
2 A301 OTHER:
10 .2
145MM TIMBER CLADDING WALL INNOWOOD - LILY WHITE
TC
Grassed
TIMBER
2500 SETBACK
4
W
100
FFL. 10.320
GUTTER 14.50
90°00' 40.23
GRATED PIT
FP
5
6 10 .2
PLASTERBOARD
DB
W 04
D 04
40.23 270°00'
STOP VALVE
WHITE/IVORY - PAINT
FFL. 10.720 CH. 2350 TILES
UPPER WIN NH HABITABLE WIN
(1.4)
WIN WIN T
RIDGE
SHELF
BENCH
0 .2
DP
BUILDING ABOVE
(1.0) 1
WC
EX
FFL. 10.370 CH. 3050 CONCRETE
DECK
50
SKYLIGHT ABOVE
FFL. 10.720 CH. 2350 TILES
3685 EXISTING LOCATION OF WALL ON BOUNDARY 4190 PROPOSED WALL ON BOUNDARY
WIN
WIN
NON-HABITABLE
PALINGS - Ht.1.5m
ELEC/LIGHT POLE
3
FRONT SETBACK
Brick Path
9
A302
GUTTER RIDGE 14.07 18.11
10 .3
10 .2 6 10 .2 10 .2
EXISTING SERVICES: CANOPY BELOW
WHITE/IVORY - PAINT
10 .2
9 10 .1
0°00' 7.93
GUTTER 14.07 FINISH/COLOUR 4
10 .2
2
4
10 .1
10 .1
2
6
.16
Ht.1.45m 10
Brick D'way
90MM TIMBER STUD
TS
NON-HABITABLE
FFL. 10.370 CH. 2700 CONCRETE
FRIDGE
LAUNDRY
10
LIVING BULKHEAD ABOVE
KITCHEN
TL01 BULKHEAD ABOVE WM BUILDING ABOVE
W 05
BRICK DWELLING TILE ROOF
WIN
DOOR
PICKETS - Ht.1.1m R'BRICK & IRON PICKETS Ht.1.6m
10 .1
7
7375 FRONT SETBACK
6715 110MM SINGLE BRICK
11
BENCH
0 .2
4 10 .2
ROOF OVERHANG
HABITABLE
250MM DOUBLE BRICK
12
6
8
CUP'D
W 06
W 07
600LT (1250L x 580W x 1250H) S-LINE ASC RAINWATER TANK
GUTTER 17.18
(8.8)
A301 BR
13
5
PANTRY
EX
SHOWER
D 01
TM01
UP
D 03
(1.
7950 REAR SETBACK
(1.0) 1
ROBE
FFL. 10.370 CH. 3050 CONCRETE
1000 SETBACK
ROBE
UPPER WIN
PROPOSED GROUND FLOOR LEVEL
DB 1
14
4
2 10 .2
9 10 .1 0
10 Footpath .2
Footpath Bitumen
Bitumen
(12.1)
MATERIAL
3
7650 REAR SETBACK
MEALS
4
FP
SCALE 1:100 @ A3
CODE
15
BUILDING ABOVE
GUTTER 14.52
WALL TYPES:
2
7
EX
19550 EXISTING SETBACK
MATERIAL SCHEDULE:
EXPOSED RAFTERS ABOVE
EXPOSED RAFTERS ABOVE
SKYLIGHT ABOVE
16
Garden Bed
DB
BR
17
1
W 02
10 .2
2925
TL01
GRASS
10 .2
2 10 .3
UP
WIR
GUTTER 14.01
1 : 100
D 02
DB
BOOTH
TM01
PALINGS - Ht.2.6m
1
CUP'D
STUD WALL PACKED TO SUIT
FRONT YARD
FIRST FLOOR PLAN
TM01
UP
W 01
10 .2
10 .2
FFL. 10.720 CH. 2700 TIMBER
FFL. 10.720 CH. 3340 TIMBER
Area
DB
ROOF ABOVE
1930 SETBACK
3 10 .3
(1.4)
D 05
LOUNGE
1110
C'PICKETS
Grassed
50
FFL. 10.720 CH. 3370 TIMBER
(1.1)
10 .1
8
10 .2
(7.0)
A301
RIDGE 15.62
TIMBER
UPPER WIN
3
10 .2
4
7015 FRONT SETBACK
FFL. 10.670 CH. 3390 TILES
ROBE
MASTER BEDROOM
ROOF OVERHANG
Brick Path
ROOF OVERHANG
BUILDING ABOVE
EN-SUITE
7
6
7500 FRONT SETBACK
10 .2
A301
2,000LT (2050L x 620H x 2020W) UNDER DECK RAINWATER TANK
VERANDAH FFL. 10.720
BUILDING ABOVE
3
10 .1
10 .2
9
1
2
tpath
1265
FFL. 10.720 CH. 3380 TIMBER
TIMBER
3
OUTDOOR SHOWER AREA
SHELF
HALLWAY
FFL. 10.720
10 .2
2
UP
ARCH ABOVE
1
4
10 .2
10 .1
DN
PORCH
10 .3
0
10 .3
GUTTER 14.07
2
4
9415 FRONT SETBACK
2915
10 .2
6
Brick D'way
2 10 .1
0°00' 7.93
PALINGS - Ht.1.5m
1
6 10 .2
Ht.1.45m 10
.16
10 .1
7
14.07
TOP OF WALL 13.72
REVISION :
57
GUTTER
58
PART
4
SKETCHES
59
SKETCHES
60
Brandon Tung
61
62
PART
5
PHOTOGRAPHY
63
PHOTOGRAPHY
64
Brandon Tung
65