What is 4D BIM Planning?

4D BIM planning, also known as 4D modeling, is a process that involves using 3D building information modeling (BIM) technology to create a construction schedule that is linked to the 3D model of a building or infrastructure project.This 4D model integrates time as a fourth dimension, allowing construction teams to visualize the construction process and track progress over time. https://tinyurl.com/3acbe2p9

Advertisement

How 4D BIM differs from traditional 2D or 3D planning?

Here are some key differences between 4D BIM and traditional 2D or 3D planning: https://tinyurl.com/3acbe2p9

 Time-based visualization: With 4D BIM, construction activities are visualized over time, which helps to better plan the sequence of work, identify potential clashes or conflicts, and optimize construction schedules.This allows for better coordination between various trades, reducing the likelihood of delays or reworks common in 2D and 3D architecture approaches.

 Real time collaboration: 4D BIM enables project stakeholders to view, analyze and update project information in real time.This is exponentially advantageous over the singular nature of 2D and 3D planning.

 Enables data-driven approach: 4D BIM incorporates actual data such as the duration of activities, resource availability, and weather conditions.This helps in saving a lot from linear project planning, scheduling, and resource allocation.