Los Angeles International Airport (LAX)
Terminal Renovation
The LAX Terminal Renovation is a project to modernize and upgrade the airport's terminals. 4D BIM was used to simulate the construction process, optimize the construction sequence, and identify potential conflicts.The 4D model helped the project team to deliver the project on time and within budget.
Advertisement
https://tinyurl.com/3acbe2p9
Outline the process of creating a 4D BIM plan
Creating a 4D BIM plan involves several steps, which can be broadly categorized into four phases: planning, modeling, scheduling, and visualization.
Here's an outline of the process:
Planning Phase
Modeling Phase
Scheduling Phase
Visualization Phase https://tinyurl.com/3acbe2p9