architect’s field report
ideas taking shape
Issue Date: August 14, 2015
Project Name:
Site Visit Date: August 13, 2015
Brevard College - Residential Hall – Phase I One Brevard College Drive Brevard, NC
McMillan Pazdan Smith Project Number: 013427.01
Time: 10:30 a.m. Site Conditions: Clear
Attendees: Brevard College Henry Haywood McMillan Pazdan Smith Architecture Ed Reeves Distribution: (if different from above) Deborah Hall Pam Hysong Carleton Collins Tara Hile Matt Brantley Writer: Ed Reeves
The following notes represent our understanding of matters discussed and actions agreed upon. Please report corrections and/or omissions to the writer within five (5) working days.
SITE OBSERVATIONS 1. The site needs an overall clean up. There is still construction debris that needs to be removed and material stored on site needs to be maintained in an organized manner. 2.
There is a significant amount of mud along the toe of the slope of the south side of the building (cast-in-place wall). This must be removed and provisions made to prevent this from reoccurring.
3.
The temporary sewer line is still leaking and has not been relocated. po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com P:\013426.00 - Brevard College - Residence Hall Assess\File Cabinet\5.0_Const Admin\5-9 Field Reports\Brevard College_Field Report_081315.dot