architect’s field report
ideas taking shape
Issue Date: August 14, 2015
Project Name:
Site Visit Date: August 13, 2015
Brevard College - Residential Hall – Phase I One Brevard College Drive Brevard, NC
McMillan Pazdan Smith Project Number: 013427.01
Time: 10:30 a.m. Site Conditions: Clear
Attendees: Brevard College Henry Haywood McMillan Pazdan Smith Architecture Ed Reeves Distribution: (if different from above) Deborah Hall Pam Hysong Carleton Collins Tara Hile Matt Brantley Writer: Ed Reeves
The following notes represent our understanding of matters discussed and actions agreed upon. Please report corrections and/or omissions to the writer within five (5) working days.
SITE OBSERVATIONS 1. The site needs an overall clean up. There is still construction debris that needs to be removed and material stored on site needs to be maintained in an organized manner. 2.
There is a significant amount of mud along the toe of the slope of the south side of the building (cast-in-place wall). This must be removed and provisions made to prevent this from reoccurring.
3.
The temporary sewer line is still leaking and has not been relocated. po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com P:\013426.00 - Brevard College - Residence Hall Assess\File Cabinet\5.0_Const Admin\5-9 Field Reports\Brevard College_Field Report_081315.dot
architect’s field report
ideas taking shape
4.
Safety policies and the monitoring of safety is the responsibility of the general contractor. The following safety observations were noted during this site visit: • Rebar caps are missing from some of the rebar. • A barrier needs to be placed along the elevator first level opening. • It did not appear masonry workers working from the scaffolding in Stair No. 1 were tired off.
5. The first floor electrical and plumbing underslab rough in appeared to be 98% complete. 6. Masonry is underway in Stair No. 1. The masonry is completed in the elevator shaft. 7. A significant amount of waterproofing is in place along the south cast-in-place wall.
Work In Progress 1.
Steel erection is underway.
po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com P:\013426.00 - Brevard College - Residence Hall Assess\File Cabinet\5.0_Const Admin\5-9 Field Reports\Brevard College_Field Report_081315.dot
architect’s field report
ideas taking shape
2.
The majority of waterproofing is complete along the cast-in-place wall.
po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com P:\013426.00 - Brevard College - Residence Hall Assess\File Cabinet\5.0_Const Admin\5-9 Field Reports\Brevard College_Field Report_081315.dot
architect’s field report
ideas taking shape
3.
The majority of electrical and plumbing underslab rough in is complete.
4.
The masonry is progressing in Stair No. 1.
po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com P:\013426.00 - Brevard College - Residence Hall Assess\File Cabinet\5.0_Const Admin\5-9 Field Reports\Brevard College_Field Report_081315.dot
architect’s field report
ideas taking shape
5.
Safety policies and the monitoring of safety is the responsibility of the general contractor. The following safety observations were noted during this site visit:
Standing on top of ladder and not tied-off
Masons do not appear to be tied off and operating masonry saw without appropriate safety equipment.
No barrier at ground level elevator shaft
po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com P:\013426.00 - Brevard College - Residence Hall Assess\File Cabinet\5.0_Const Admin\5-9 Field Reports\Brevard College_Field Report_081315.dot
architect’s field report
ideas taking shape
6.
All construction material debris must be removed from site before backfilling.
7.
Conduit stored between the silt fence and temporary chain link fence must be removed and relocated.
END OF FIELD REPORT