Portfolio Atelier Bow-Wow + Brunnquell & André architectes

Page 1



portfolio / atelier bow-wow /

Atelier Bow-Wow 8-79 Suga-cho Shinjuku-ku Tokyo 160-0018 Japan T +81-3-3226-5336 F +81-3-3226-5366 www.bow-wow.jp

1



CONTENTS /

OFFICE ORGANISATION p.5 - Practice Profile and CV - Material and Technical Resources

SELECTED WORKS p.9 - BMW Guggenheim Lab NY - BMW Guggenheim Lab Mumbai - Four Boxes Gallery - Global Center - Showa Kinen Park Hanamidori Cultural Center - Koisuru - Buta Laboratory - Kitamoto Station West Square - Miyashita Park - Disaster Recovery Public Housing Kamaishi - Student Housing Munich - House & Atelier Bow-Wow - Pony Garden - Mountain House - Osthang Project Main Hall - Kaka'ako Agora - White Limousine Yatai

MAIN WORKS p.66 PUBLICATIONS & AWARDS p.80

35



PRACTICE PROFILE AND CVs

PRACTICE PROFILE / Atelier Bow-Wow is a Tokyo-based firm founded by Yoshiharu Tsukamoto and Momoyo Kaijima in 1992. The pair’s interest lies in diverse fields ranging from architectural design to urban research and the creation of public artworks, which are produced, based on the theory called “behaviorology”. The practice has designed and built houses, public and commercial buildings mainly in Tokyo, as well as Europe and the USA. Their urban research studies lead to experimental project ‘micro-public-space’, a new concept of the public space, which has been exhibited across the world.

ARCHITECTURAL BEHAVIOROLOGY / Atelier Bow-Wow’s works are produced from the concept “architectural behaviorology”. The word “behavior” includes human behavior inside and outside of the building, physical phenomenon produced by different environmental elements such as light, air, heat, wind, and water in architecture, and building’s behavior in its surroundings. “Architectural behaviorology” aims to understand the behaviors of those different elements, and to synthesize them to optimize their performance in its specific context. It could be a new definition of “what organic” in Architecture. YOSHIHARU TSUKAMOTO CV / Associate professor of Tokyo Institute of Technology, Dr.Eng. 1987 1987~88 1994 2000~ 2003, 07 2007, 08

Graduate from Tokyo Institute of Technology Guest Student of L'ecole d'architecture, Paris, Bellville (U.P.8) Graduate from Post-graduate school of Tokyo Institute of Technology Associate professor of Tokyo Institute of Technology Visiting faculty of Harvard GSD Visiting associate professor of UCLA

MOMOYO KAIJIMA CV / Associate professor of University of Tsukuba, M.Eng. 1991 1994 1996~97 1999 2000~09 2003

Graduate from Japan Women's University Graduate from Graduate school of Tokyo Institute of Technology Guest student of ETH Graduate from Post-graduate school of Tokyo Institute of Technology Assistant professor of University of Tsukuba Visiting faculty of Harvard GSD

57



MATERIAL AND TECHNICAL RESOURCES

EQUIPMENT / 1 Mac mini 1 iMac G5 2 Power Book G4 1 Macbook Pro 5 iMac 20” 1 iMac 24” 3 iMac 21.5” 3 iMac 27” 20 External HDD 1 Projector 1 Plotter A1 1 Laser printer A3 1 Laser meter 1 Digital camera 2 Tripod 2 Styro cutter SOFTWARE / Graphic/Design software: Vectorworks 2014/2013/2012/2010, Adobe Creative Suite 3.3 (InDesign, Illustrator), Photoshop CS3/CS4/CC 2014, Adobe Acrobat XI pro, Sketchup Pro 2014

BUSINESS AND SERVICES / Design and supervision of architecture Urban design and research Landscape design Book publication, print design, planning and sales Furniture design, production and sales Dress and accessories design, production and sales Computer software development sales and maintenance Electronic dictionary development, editing, production and sales Imaging software production and sales Lecture and education on architectural design

79



BMW GUGGENHEIM LAB / NEW YORK BUILT / 2011 BMW Guggenheim Lab (New York) is an experimental public space with free programs well considered by Guggenheim’s curators in a temporary structure, which is designed by Atelier Bow-Wow. The building is considered to be a pop-up fly loft theatre in the city that allows various modes of activities such as workshops, lectures, exhibitions, film screenings, receptions etc. to happen. Furniture, screens, lighting and stages are suspended in the loft space and provided according to the activities on the ground level. It is less the very light and minimum structure made of carbon fiber* which is defining lab space, but rather the rhythm of the ongoing programs and the human behavior which is why the public spaces might appear quite different in different places. The Lab travels through three different cities from New York to Berlin and afterwards to India. Principal use: Movable Laboratory Design Period: 2010.8 - 2011.4 Construction Period: 2011.5 - 2011.7 Total floor area: 216.00 m2 (268.90 m2 incl. cafe, wc) Structural engineers: Arup Construction: Nussli Group + Sciame Construction Architects: Atelier Bow-Wow + Fiedler Marciano Architecture

191



13 11



BMW GUGGENHEIM LAB / MUMBAI BUILT / 2012 The BMW Guggenheim Lab, which serves as a think tank and community gathering space, is a mobile laboratory devoted to discussing various issues related to city life. We designed the first lab building using CFRP (carbon-reinforced-plastic). Originally, this building was scheduled to travel from New York to Berlin, and then on to Mumbai. Later, however, it was decided that a second lab building would be constructed in Mumbai using local materials and technologies. Mumbai has a long tradition of erecting mandapa, simple bamboo structures, for weddings and festivals, so we decided to create a lab building belonging to the mandapa structural genealogy. Mandapa are often partially supported by nearby trees and buildings. The event organizers, however, requested that the second lab building be a freestanding structure: they wanted an itinerant space that could be moved to a new ward every week. This would make the Lab accessible to people whose castes ordinarily prohibit them from visiting museums. To achieve these objectives, we designed a structure composed of 2.5-meter-span longitudinal units and 4.5-meter-span truss beam units, all of which fit onto the back of a flatbed truck. We devised joints in which wood connectors were fastened together using rope ties. Some joints also incorporated bolts. To prevent bamboo members from splitting along the grain, we filled them with synthetic resin cement where they were bolted. We wrapped the structure in a rope noren (curtain), to provide transparency and minimize resistance to lateral wind forces, and covered it with a tent roof, to shield visitors from sunlight and bird droppings. Principal use: Movable laboratory Design Period: 2012.8 - 2012.10 Construction Period: 2012.10 - 2012.12 Total floor area: 182.25 m2 Structural engineers: Arup Mumbai Construction: Wonder Grass Initiative Pvt. Architects: Atelier Bow-Wow + SDM Architects

0

3

6

9

12

S:1/500 15(m)

SITE PLAN 1/500

13 15



17 15



FOUR BOXES GALLERY / SKIVE BUILT / 2009 The gallery is located in northern Denmark, on a former farmhouse property that was converted to an art school. It’s directly adjacent to a port district, characterized by its silo and warehouse buildings. On campus, there’s a diverse collection of buildings both traditional and modernist, as well as some art pavilions. In complete contrast with existing structures, Four Boxes Gallery is built solely of precast concrete panels and looks almost primitive. The panels vary in height, enclosing two exterior lawn courtyards and one three-floor volume. The front courtyard leads to the large ground-floor exhibition space, and diffused light spills in from clerestory windows tucked along lateral walls. All interior surfaces are kept clear, without openings or interruptions, allowing for easy display, light control and spatial flexibility. Above this, two more individually contained spaces - another gallery and a workshop - are stacked, nested, and connected by a side staircase. Courtyards, too, become optional exhibition areas. As its users are mainly students engaging in all forms of experimentation and artistic creation, the building’s tough, unadorned volumes appear up to the task. Water utilities are kept detached, accessible from the rear courtyard, resulting in a pure, autonomous art space. Principal use: Gallery Design Period: 2008.1 - 2008.12 Construction Period: 2009.2 - 2009.9 Total floor area: 236.41 m2 Structural engineers: Fritz Nielsen & J. Juul Christensen A/S Construction: Dan-element Architects: Atelier Bow-Wow + University of Tsukuba, Kaijima Lab.

17 19



21 19



GLOBAL CENTER / AICHI BUILT / 2010 This is a building to commemorate the Aichi Expo 2005 and offers a new gathering space for NPO and NGO groups who were established for the event. It consists of a large concrete shell and repetitive wall columns that create an arcade around the edges of the building. The form of the building is shaped by the main circulation into the entry of the park. The building covers 10,000sqm and houses a gymnasium, meeting rooms, a lecture hall, and a large covered plaza space under the rooftop garden.

Principal use: Community center + Gymnasium Design period: 2007.5 - 2008.3 Construction period: 2008.11 - 2010.9 Total floor area: 8,824.62 m2 Structural Engineers: Construction: JV of Tsuchiya, Nakamura and Fujimoto Architects: Design: Yamashita Sekkei Inc. | Design Advisor: Y. Tsukamoto, M.Kaijima and T. Kuwahara | Design collaborator: Atelier Bow-Wow, Kuwahara Office

21 23



SHOWA KINEN PARK HANAMIDORI CULTURAL CENTER / TOKYO BUILT / 2005 With the mountains in the background and huge round field in front, a long, undulating landscape dominates the view at the entrance to the Showa Memorial Park. Lush with greenery, even fully grown trees sprouting up from the top, it looks much more like a long, city-scale planter box than a building. Its structure is composed of sixteen cylinders, supporting the steel-truss roof; inside it feels like a miniature city constructed solely from circular buildings. Their distribution and size restrict views through the entire complex; instead, one curls around them gradually. The continuous space is flexible enough to facilitate activities and temporary events akin to those appropriate for an external plaza. Softening the interior atmosphere and providing acoustical assistance in the eight-meter-high space, a series of textiles hang from the spider-web-like structure of the roof trusses. Within each cylinder, more specific facilities (workshop, library, café) can be found. Each have different sizes and structure—some are opaque with small openings, some are fully transparent and admit sunlight—and feature natural materials employed to mediate exterior and interior. At their connection to the roof structure, truss depths increase and produce a topography of craters above. These are then filled with soil, trees are planted, and voila—a floating garden. The Hanamidori Cultural Centre works to disseminate knowledge about "green culture," in the form of workshops, exhibitions, and archives. Principal use: Park facility Design period: 2002.10 - 2003.3 Construction period: 2003.8 - 2005.5 Total floor area: 6,031.64 m2 Structural engineers: Kanebako Structural Engineers Construction: Takenaka Corporation Architects: Hanamidori cultural Center Architectural Design Team + Atelier Bow-Wow (collaborator)

25 23



25 27



KOISURU - BUTA LABORATORY / KATORI BUILT / 2012 People with disabilities are hired and guaranteed minimum wage. To do so, sales network was built by establishing branding strategy for pork and processed products. The purpose of this building is to provide a place for a factory for pork processing and packing and a restaurant, as well as an office for the social welfare agency who operates several elderly homes and this facility. The beautiful rural landscape near Narita Airport was chosen as the site aspiring for cooperation between agriculture and social welfare. This space serves not only functional purposes but also to draw out vitality from the community by connecting existing surrounding scenery and resources to this new facility. The genealogy of Italian Villa was introduced for welcoming people while becoming familiar with farming village. Attaching arms of loggias to the main building confidently places building of limited size on a large site, while addressing practical concerns including leading people from parking lot at the back of the site and lending eaves to outdoor activities like vegetable market and wood-chopping, etc. Roof of the two-storey building considering the visibility from cars on the road, consists of gambrel roofs assigned to restaurant, office, and covered plaza. Continuous ribbon of windows on the second level provides views of the surrounding cedar forest from anywhere inside. Catwalk situated all around allows for constant maintenance keeping windows beautiful, which is important for a restaurant. Principal use: Employment support center (factory + restaurant + office) Design Period: 2009.7 - 2011.11 Construction Period: 2011.10 - 2012.9 Total floor area: 1,015.45 m2 Structural engineers: Structural Design Office OAK Construction: Ishii Corporation Architects: Atelier Bow-Wow

(

27 29



31 29



KITAMOTO STATION WEST SQUARE / KITAMOTO BUILT / 2012 This project involves not only the design of a new station plaza, but also the provocation of the civic attention on town management and the revitalization of existing commercial streets in order to prepare for a new mode of citizen life in the super-aged society of typical Tokyo suburbia. Atelier BowWow has been working for 5 years on this project during which they firstly reduced the traffic area covered by asphalt and produced green gathering areas for the public. The operation was the key catalyst of the project: A new committee to discuss the use of this public space was formed, the human resources who actually use it and thus activate it were identified and various activities including a vegetable market and a crafts market were proposed and are presently prepared for the grand opening. The project exemplifies a new type of public sphere by connecting the producer of the urban environment (municipality, engineer, architect) with the citizen. Principal use: Station Square Design Period: 2008.10 - 2010.9 Construction Period: 2011.10 - 2012.9 Total floor area: 1,465.68 m2 Structural engineers: Kanebako Structural Engineers Construction: Kamio Kogyo, Ogawa Kogyo Architects: Atelier Bow-Wow

31 33



35 33



MIYASHITA PARK / TOKYO BUILT / 2011 We renovated a 50 years old park situated on the roof of a parking structure in Shibuya, one of the busiest commercial areas in Tokyo. We collaborated with Nike Japan and the local municipality with the aim to invite potential users into the park by improving the existing structure through the introduction of new sports facilities such as skateboard park and a climbing wall. This opened a new framework of public space, which was donated equally by private enterprises, initiated by the municipality and private companies. The project provoked various discussions on public space, including the one related to the treatment of homeless people, who are gathering in and around the park.

Principal use: Park + Sports facility Design period: 2007.8 - 2010.9 Construction period: 2010.10 - 2011.4 Site area: 10,808.00 m2 Structural engineers: Kanebako Structural Engineers Construction: Tokyu Construction Architects: Atelier Bow-Wow + Tokyo Institute of Technology, Tsukamoto Lab.

37 35



39 37



DISASTER RECOVERY PUBLIC HOUSING / KAMAISHI CITY BUILT / 2014 9 public housings for disaster recovery were planned at the former site of Shirahama Elementary School. Since the site is located relatively high above the sea level in Hakozaki Shirahama district, it is planned to become an evacuation area for residents by building an assembly hall, etc. As temporary housings will still remain at the site, the housing development, road planning and square planning has been done accordingly. There is a plan to build the disaster relief community space and the assembly hall after the temporary housings are demolished. The square, which is surrounded by the houses, will be the community space for residents. Each house has certain distance between each other considering the daylight in winter. Roofed outside space and sliding doors are designed to face the streets and it will stimulate the communication between the residents. The houses have large living space without having hallways. The dining kitchen, which is also a common area, is directly connected to each living space. The living spaces can be used as individual rooms as well as one common space. The counter kitchen has daylight with top light and natural ventilation. Porch and roofed outside space are designed in front of the entrance, which enables the residents to work outside and communicate with each other. Principal use: Public housing Design Period: Construction Period: Total floor area: lot 1~4: 57.97sqm/ 1LDKm2 ; lot 5~9: 69.56sqm/ 2LDK Structural Engineers / Architects: The Kamihei-ArchiAid Special Joint Venture MEP engineers: Shinko Setsubi Sekkei 2-5

NO.4 +10 .00

NO.4

4-2

市道

既存樹木(桜)

48-2

水勾 道路 配 0. 55 中心 % 線

(既存仮設住宅)

公共施設配置予定 4-4

EC1

D-⑩

(既存仮設住宅)

NO.2 SP1

Y

5

(既存仮設住宅)

広場

1820

D-⑨

NO.3

900

D-⑧

1-5

Y

4

60

1820

道路中心線

S.23

Y

S.26

C-⑥

.00 17 R=

A-②

B-③

3

35-3

B-④

60

C-⑦

Y

2

55

60

7280

水勾配0.51% 道路中心線

1820

B-⑤

水勾配0.51% 道路中心線

A-①

NO.1

水勾配0.50% 道路中心線

既存樹木(桜)

BC1

.0

NO

1820

水勾配0.51% 道路中心線 S.24 S.25

市道

Y

35-4 39-2

35-2 40

35-7

site plan S=1:1000

39 41

1

900

市道

a



43 41



STUDENT HOUSING / MUNICH TO BE BUILT / since 2011 The planned student housing located in the south of Munich has a dense mix of residential and commercial space. The diverse range of single, double and shared apartments, partly equipped with bay windows, sleeping lofts or roof terraces, will call for a colorful mix of residents, while spacious stairways and connected encounter spaces will vivify the housing. On the ground floor, the reinforced concrete structure is supported on pilasters with arched openings, which form arcades for an organic market, a bistro and a passage to the courtyard. The passage leads through the commercial space towards the entrance hall of the student halls of residence and aims to make the mixed use a conscious experience. The project is planned in cooperation with the Munich architect Hannes Rรถssler and is currently in the detailed design.

Principal use: Student housing Design Period: since 2011 Total floor area: 9,685 m2

43 45



HOUSE AND ATELIER BOW-WOW / TOKYO BUILT / 2005 Hard to both plan and construct, House & Atelier Bow-Wow is perhaps even harder to find, as it’s hidden almost completely from the access street. Establishing good manners in such a crowded area becomes crucial. With a sensitivity to provide suitable gap space, large openings are placed towards adjacent houses, even at one or two meters’ distance. This positions the interior space as a part of its surroundings: a room coexisting with its next-door neighbor’s exterior wall. As a semi-public building it is already transposing activities, inviting them inside, so if it were just a private opening perhaps it is too large, too aggressive. But this size of window can be quite reasonable and inviting, since these are spaces used by both staff and family. This is an extraordinary opportunity to situate our way of living as part of the broader order of the urban environment. The avoidance of heavy partition walls softens even further the distinction between surroundings and interior; and within this, between house and office. Instead, a long, radiant heater/cooler is installed, running vertically through the entire building; this also addresses the practical problem of climate control in a large space that is in use twentyfour hours per day. Devices like these are for forgetting about boundaries between territories, and establishing in its stead more nuanced relationships. Overlapping and permeable boundaries assign different levels of privacy within this atelier inside a family house. The home area on the upper levels can only be accessed by moving through the office area by way of a prominent staircase. Principal use: Residence + Office Design Period: 2004.2 - 2005.4 Construction Period: 2005.5 - 2005.12 Total floor area: 218.67 m2 Structural engineers: Structural Design Office OAK Construction: Nichinan Tekkou Architects: Atelier Bow-Wow

47 45



49 47



PONY GARDEN / SAGAMIHARA-CITY BUILT / 2008 Surrounded by small houses and farming plots, Pony Garden is a ten-minute drive from Lake Miyagase. The house looks more like a small barn with its mansard roof, and features a single, broad opening with wooden shutters. The site is transformed into a standard-sized paddock, with the triangularshaped house occupying a small corner; entering the house means entering the pony's paddock. By opening the shutters, the entire ground-floor space becomes a loggia, and from anywhere the entire paddock––and the grazing pony––is visible. The triangle's long edge is oriented towards mountain scenery beyond. Upstairs, in the bedroom attic, semi-translucent roof insulation brings in diffused light. The client, a woman in her mid-fifties and a horse enthusiast, saw this as her last chance to build a new house. Her decision to spend her remaining years with her future pony meant that a home would first need to be built. Once she embarks on this new life, she will lose, in a sense, her individual freedom. Rather than seeing this is a limitation, it becomes a unique opportunity to create time together, which synchronizes the rhythms of pony and owner. Such uncommon spatial practice required a shift in approach. Instead of imagining a tiny, low-budget house for a retired woman, why not a luxurious garden for a pony, inhabitable for a human? It's as if the pony, de facto master of the space, allows the woman to build a house in its territory. How generous! In exchange, she allots a portion of the house for the pony's room-stable. Principal use: Residence Design period: 2006.12 - 2008.4 Construction period: 2008.5 - 2008.9 Total floor area: 71.72 m2 Structural engineers: Kanebako Structural Engineers Construction: Harashima and Associates Architects: Atelier Bow-Wow

49 51



53 51



MOUNTAIN HOUSE / NEVADA BUILT / 2008 Typically, a loggia is in the size that could be the semi-attached space in front of a building. In the case of the Mountain House, however, the roof of the loggia on the ground floor that greets visitors at the end of the approach continues rising upward to envelop the whole house and transform the entire interior behind it into a semi-outdoor space. In other words, it is like a house built inside a loggia. The house is built in an area that, into the 1980s, had been a site for mining gold until 1980. Drainage from water cannons eroded and denuded the surrounding mountains. A decade after the mine was closed, new sprout of trees began so that today the destruction wrought by human beings and reviving nature stand in stark contrast to one another. From the loggia, one can enjoy the scenery, feel the subtle change of wind and light. It is a meditative place where one is brought close to nature’s rhythm and self-healing energy. An interior with more beds than rooms and a large north-south oriented room in the center of the home open to the outside on both sides make Mountain House a place where friends are always welcome. Principal use: Residence Design period: 2002.10 - 2003.3 Construction period: 2003.8 - 2005.5 Total floor area: 6,031.64 m2 Structural engineers: Kanebako Structural Engineers Architects: Atelier Bow-Wow

53 55



57 55



OSTHANG PROJECT MAIN HALL / DARMSTADT BUILT / 2014 A small events hall and public square were planned as a central communications area. During the entire duration of the 'Osthang Project' festival and the subsequent summer school workshop, and through the International Summer Course for New Music, daily discussions, presentations, dinners, concerts and film screenings on the theme of »communal living« will take place here. During the Summer School, the hall will be host to communal dining, as well as speeches and workshops. The hall designed together with ConstructLab is about 150 m2 in size and 7.50 m high, and structured like a house of cards. Large doors link the inside with the surrounding park. To protect it against rain, the wooden structure is covered in polycarbonate panels. The façade is semi-transparent and gleams at night. Principal use: Main hall for gathering/performance Design period: 2014.1 - 2014.4 Construction period: 2014.5 - 2014.7 Total floor area: 156 m2 Structural engineers: Bollinger + Grohmann Construction: Constructlab Architects: Atelier Bow-Wow + Constructlab

57 59



61 59



KAKA'AKO AGORA / HAWAII BUILT / 2014 Designed as an indoor public space for the local community in Honolulu, Kaka'ako Agora project transforms a 3,225 square-foot warehouse into a publicly accessible, free, shaded community gathering place. The build out includes a mezzanine-level that adds 687 square-feet to the formerly vacant space. Kaka'ako Agora is devoted to arts and culture events that continue to push creativity and innovation within the community. The vision for the space will be executed through local partnerships and is the first multi-purpose, free public space in urban Honolulu.

Principal use: Indoor public space for local community Design period: 2013.4 - 2014.3 Construction period: 2014.4 - 2014.7 Total floor area: 124.5 m2 Architects: Atelier Bow-Wow

63 61



65 63



WHITE LIMOUSINE YATAI / NIIGATA BUILT / 2003 Followed by a crowd and creating a small traffic jam in the Tokamachi downtown, a strange, oblong cart on wheels appears, pushed by several people dressed in white. They're trying, in vain, to smoothly turn the corner—a humorous occasion en route to its next destination. White Limousine Yatai, painted in pure white, recalls the heavy snowfall and long winters for which this area is so well-known (fig. 1). A yatai (street-side food cart) is a common sight in Japanese cities (fig. 2). It has a wonderful small-scale charm, encouraging interaction due to proximity between friends and strangers alike. But whereas the standard yatai is less than two meters long and run by a single person, this one stretches out to ten meters, like a limousine, requiring several people to propel and operate it. Its extreme length allows a large group to gather at one sitting, creating a banquet-like urban experience. In keeping with the color palette, the food and drink selections are also white or translucent, featuring local specialties such as rice, tofu, pickled white radish, and Japanese sake. After its debut at the 2002 Echigo-Tsumari Triennale, it has since been glimpsed at various events around Tokyo.

Principal use: Installation Structural engineers: Kanebako Structural Engineers Construction: Kanetake Kensetsu + University of Tsukuba, Kaijima Lab Architects: Atelier Bow-Wow + University of Tsukuba, Kaijima Lab

8.6m

0.5m

MPS-05 ホワイトリムジン屋台 White Limousine YATAI

マイクロ・パブリック・スペース MICRO PUBLIC SPACE

MPS-37

ホワイトリムジン屋台

マイクロ・パブリック・スペース

MICRO PUBLIC SPACE

65 67



69 67


REFERENCES / PRIVATE RESIDENCE

ANI HOUSE Location: Chigasaki City, Kanagawa Prefecture Principal Use: Residence Structural Engineers: Umezawa Structural Engineers Construction: Tokyo Tekkin Concrete Architects: Atelier Bow-Wow Total Floor Area: 121.85m2 Design period: 1996.3-1996.10 Construction period: 1996.10-1997.4

MINI HOUSE Location: Nerima, Tokyo Principal use: Residence Structural engineers: Construction: Architects: Total floor area: Design period: 2000.1-2000.6 Construction period: 1998.4 - 1998.10

HOUSE ASAMA Location: Karuizawa, Nagano Prefecture Principal use: Villa Structural Engineers: Kanebako Structural Engineers Construction: Homeing Architects: Atelier Bow-Wow Total floor area: 87.00m2 Design period: 2000.1-2000.12 Construction Period: 2000.7-2000.12

HOUSE SAIKO Location: Ashiwada, Yamanashi Prefecture Principal Use: Villa Structural Engineers: Kanebako Structural Engineers Construction: Nanaho Architects: Atelier Bow-Wow + T.I.T. Tsukamoto Lab Total floor area: 157.96m2 Design period: 2000.1-2000.6 Construction period: 2000.10-2001.1

GAE HOUSE Location: Setagaya, Tokyo Principal Use: Residence Structural Engineers: Structural Design Office OAK Construction: Tokyo Tekkin Concrete Architects: Atelier Bow-Wow + T.I.T. Tsukamoto Lab Total floor area: 88.42m2 Design period: 2000.1-2000.6 Construction period: 2000.10-2001.1


REFERENCES / PRIVATE RESIDENCE

IZU HOUSE Location: Nishiizu, Shizuoka Prefecture Principal Use: Residence Structural Engineers: Structural Design Office OAK Construction: Nanaho Architects: Atelier Bow-Wow Total floor area: 133.08m2 Design period: 2002.6-2003.8 Construction period: 2003.9-2004.3

BLACK DOG HOUSE Location: Karuizawa, Nagano Prefecture Principal Use: Weekend House Structural Engineers: Kanebako Structural Engineers Construction: Maruyama Construction Architects: Atelier Bow-Wow Total floor area: 145.80m2 Design period: 2002.12-2003.8 Construction period: 2003.9-2004.4

JUICY HOUSE Location: Setagaya, Tokyo Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Hanami Corporation Architects: Atelier Bow-Wow Total floor area: 130.37m2 Design period: 2002.11-2004.6 Construction period: 2004.7-2005.2

ACO HOUSE Location: Setagaya, Tokyo Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Iizuka Construction Architects: Atelier Bow-Wow Total floor area: 84.86m2 Design period: 2004.5-2004.12 Construction period: 2005.1-2005.6

HOUSE&ATELIER BOW-WOW Location: Shinjuku, Tokyo Principal Use: Residence + office Structural Engineers: Structural Design Office OAK Construction: Nichinan Tekkou Architects: Atelier Bow-Wow Total floor area: 211.27m2 Design period: 2004.5-2004.12 Construction period: 2005.1-2005.6

69

71


REFERENCES / PRIVATE RESIDENCE

HOUSE TOWER Location: Shinagawa, Tokyo Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: TTC Corporation Architects: Atelier Bow-Wow Total floor area: 65.28m2 Design period: 2005.3-2005.10 Construction period: 2005.11-2006.4

NORA HOUSE Location: Sendai, Miyagi Prefecture Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Hashimoto Corporation Architects: Atelier Bow-Wow + T.I.T. Tsukamoto Lab Total floor area: 137.88m2 Design period: 2005.6-2006.7 Construction period: 2006.8-2006.12

HOUSE CRANE Location: Karuizawa, Nagano Prefecture Principal Use: Villa Structural Engineers: Structural Design Office OAK Construction: Sasazawa Construction Architects: Atelier Bow-Wow Total floor area: 197.20m2 Design period: 2005.8-2006.8 Construction period: 2006.9-2007.4

SWAY HOUSE Location: Setagaya, Tokyo Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Fukasawa Komuten Architects: Atelier Bow-Wow Total floor area: 107.01m2 Design period: 2006.9-2007.5 Construction period: 2007.6-2008.1

DOUBLE CHIMNEY Location: Karuizawa, Nagano Prefecture Principal Use: Weekend house Structural Engineers: Structural Design Office OAK Construction: Sasazawa Construction Architects: Atelier Bow-Wow Total floor area: 176.01m2 Design period: 2007.6-2007.11 Construction period: 2007.12-2008.6


REFERENCES / PRIVATE RESIDENCE

IKUSHIMA LIBRARY Location: Kokubunji, Tokyo Principal Use: Mixed-use house (residence + office) Structural Engineers: Kanebako Structural Engineers Construction: Iizuka construction Architects: Atelier Bow-Wow Total floor area: 96.56m2 Design period: 2006.11-2007.11 Construction period: 2007.12-2008.7

PONY GARDEN Location: Sagamihara, Kanagawa Prefecture Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Harashima and Associates Architects: Atelier Bow-Wow Total floor area: 71.72m2 Design period: 2006.12-2008.4 Construction period: 2008.5-2008.9

MACHIYA GUEST HOUSE Location: Kanazawa, Ishikawa Prefecture Principal Use: Guest house Structural Engineers: Kanebako Structural Engineers Construction: Seikou Kenchiku Architects: Atelier Bow-Wow + Naoki Noda Total floor area: 144.10m2 Design period: 2008.8-2008.9 Construction period: 2008.9-2008.10

MOUNTAIN HOUSE Location: Nevada, U.S.A Principal Use: Villa Structural Engineers: Kanebako Structural Engineers Architects: Atelier Bow-Wow Total floor area: 115.18m2 Design period: 2005.3-2005.10 Construction period: 2005.11-2006.4

TREAD MACHIYA Location: Meguro, Tokyo Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Iizuka Construction Architects: Atelier Bow-Wow + T.I.T. Tsukamoto Lab. Total floor area: 79.41m2 Design period: 2007.6-2008.5 Construction period: 2008.5-2008.12

71

73


REFERENCES / PRIVATE RESIDENCE

BOKUTEI Location: Sumida, Tokyo Principal Use: Residence Structural Engineers: Structured Environment Construction: Hirohashi Koumuten Architects: Atelier Bow-Wow + T.I.T. Tsukamoto Lab. Total floor area: 64.60m2 Design period: 2007.9-2008.6 Construction period: 2008.7-2008.12

TOWER MACHIYA Location: Shinjuku, Tokyo Principal Use: Residence Structural Engineers: Structural Design Office OAK Construction: Kudo Koumuten Architects: Atelier Bow-Wow Total floor area: 58.17m2 Design period: 2007.7-2009.7 Construction period: 2009.11-2010.3

SPLIT MACHIYA Location: Shinjuku, Tokyo Principal Use: Residence Structural Engineers: Mato Structural Engineers Construction: Iizuka Construction Architects: Atelier Bow-Wow Total floor area: 54.62m2 Design period: 2009.5-2009.12 Construction period: 2010.2-2010.7

BEACH HOUSE Location: Chousei, Chiba Prefecture Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Kashinoki Corporation Architects: Atelier Bow-Wow Total floor area: 98.52m2 Design period: 2009.7-2010.3 Construction period: 2010.4-2010.11

TERRACE HOUSE Location: Yokohama, Kanagawa Prefecture Principal Use: Residence Structural Engineers: Mato Engineers Construction: Heisei Construction Architects: Atelier Bow-Wow Total floor area: 113.87m2 Design period: 2010.2-2010.9 Construction period: 2010.10-2011.4


REFERENCES / PRIVATE RESIDENCE

IZU BOOK CAFE Location: Ito, Shizuoka Principal Use: Mixed-use house (residence+cafe) Structural Engineers: Kanebako Structural Engineers Construction: Tabata Kensetsu Architects: Atelier Bow-Wow Total floor area: 131.82m2 Design period: 2010.5-2011.3 Construction period: 2011.4-2012.2

ANTIPAROS RING Location: Antiparos, Greece Principal Use: Residence Structural Engineers: Manos Kyriazis Construction: Doriki Techniki e.e. Architects: Atelier Bow-Wow + Dionysis Zacharias Architects Total floor area: 474.25m2 Design period: 2009.10-2011.4 Construction period: 2011.4-2012.7

DOUBLE GABLE HOUSE Location: Kamakura, Kanagawa Prefecture Principal Use: Residence Structural Engineers: Yosuke Kinoshita Construction: Tosho Architects: Atelier Bow-Wow Total floor area: 91.38m2 Design period: 2011.1-2011.10 Construction period: 2011.11-2012.5

TAMA MACHIYA Location: Koto, Tokyo Principal Use: Model home Structural Engineers: Tamahome Construction: Tamahome Architects: Atelier Bow-Wow + Tamahome Total floor area: 106.00m2 Design period: 2012.8-2013.1 Construction period: 2013.2-2013.4

73

75


REFERENCES / PRIVATE RESIDENCE

TAMA LOGGIA Location: Koto, Tokyo Principal Use: Model home Structural Engineers: Tamahome Construction: Tamahome Architects: Atelier Bow-Wow + Tamahome Total floor area: 124.95m2 Design period: 2012.8-2013.1 Construction period: 2013.2-2013.4

KURA HOUSE Location: Funabashi, Chiba Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Hirohashi Architects: Atelier Bow-Wow Total floor area: 130.6m2 Design period: 2012.5-2013.10 Construction period: 2013.11-

HOUSE PLATEAU Location: Kitasaku, Nagano Prefecture Principal Use: Residence Structural Engineers: Structural Design Office OAK Construction: Sasazawa Construction Architects: Atelier Bow-Wow Total floor area: 497.87m2 Design period: 2011.3-2013.10 Construction period: 2013.11-

LUNAR MACHIYA Location: Tsuruga, Fukui Prefecture Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Shimbo Kougyo Architects: Atelier Bow-Wow Total floor area: 125.36m2 Design period: 2012.10Construction period: 2013.10-

MAGARIYA Location: Honjo, Saitama Prefecture Principal Use: Residence Structural Engineers: Kanebako Structural Engineers Construction: Yasumatsu Takken Architects: Atelier Bow-Wow Total floor area: 158.17m2 Design period: 2012.10Construction period: 2013.10-


REFERENCES / HOUSING

LOGEMENTS SOCIAUX RUE REBIERE Location: Paris, France Principal Use: Apartment Structural Engineers: SIBAT Construction: Entreprise Generale Leon Grosse Architects: Atelier Bow-Wow + T.I.T Tsukamoto Lab + Brunquell&AndrĂŠ Total floor area: 1934m2 Design period: 2006.11-2009.9 Construction period: 2009.9-2012.6

DISASTER RECOVERY PUBLIC HOUSING / KAMAISHI CITY Location: Principal use: Public housing Total floor area: lot 1~4: 57.97sqm/ 1LDKm2 ; lot 5~9: 69.56sqm/ 2LDK Structural Engineers / Architects: The Kamihei-ArchiAid Special Joint Venture MEP engineers: Shinko Setsubi Sekkei Design Period: Construction Period:

STUDENT HOUSING / MUNICH Location: Munich, Germany Principal Use: Student housing Total floor area: 9,685 m2 Design Period: since 2011

REFERENCES / OFFICE

MADO BUILDING Location: Setagaya, Tokyo Principal Use: Rental building Structural Engineers: Kanebako Structural Engineers Construction: Katayama Corporation Architects: Atelier Bow-Wow Total floor area: 574.67m2 Design period: 2005.4-2005.8 Construction period: 2005.8-2006.3

MICRO OFFICE Location: Koriyama, Fukushima Prefecture Principal Use: Office Structural Engineers: Jun Sato Construction: Ojikensetsu Architects: Atelier Bow-Wow Total floor area: 64.59m2 Design period: 2011.1-2011.12 Construction period: 2011.12-2012.7

75

77


REFERENCES / PUBLIC SPACE

MIYASHITA PARK Location: Koto, Tokyo Principal Use: Park + Sports facility Structural Engineers: Kanebako Structural Engineers Construction: Tokyu Construction Architects: Atelier Bow-Wow + Tokyo Institute of Technology, Tsukamoto Lab. Site area: 10,808.00 m2 Design period: 2007.8 - 2010.9 Construction period: 2010.10 - 2011.4

BMW GUGGENHEIM LAB NY Location: New York, U.S.A. Principal Use: Movable Laboratory Structural Engineers: Arup Construction: Nussli Group + Sciame Construction Architects: Atelier Bow-Wow + Fiedler Marciano Architecture Total floor area: 216m2 (268.90m2 incl. cafe, wc) Design period: 2010.8-2011.4 Construction period: 2011.5-2011.7

BMW GUGGENHEIM LAB MUMBAI Location: Mumbai, India Principal Use: Movable Laboratory Structural Engineers: ARUP Mumbai Construction: Wondergrass Initiative Pvt. Architects: Atelier Bow-Wow + SDM Architects Total floor area: 182.25m2 Design period: 2012.8-2012.10 Construction period: 2012.10-2012.12

KITAMOTO STATION PLAZA Location: Kitamoto, Saitama Prefecture Principal Use: Station square Structural Engineers: Kanebako Structural Engineers Construction: Kamio Kogyo, Ogawa Kogyo Architects: Atelier Bow-Wow Total floor area: 1465.68m2 Design period: 2008.10-2010.9 Construction period: 2011.10-2012.9

KAKA'AKO AGORA Location: Honolulu, Hawaii Principal Use: Structural Engineers: Baldridge & Associates Construction: Sunwork Construction Architects: Atelier Bow-Wow + Collaborative Studio LLC Total floor area: 124.5m2 Design period: 2013.4-2014.3 Construction period: 2014.4-2014.7


REFERENCES / PUBLIC SPACE

OSTHANG PROJECT MAIN HALL Location: Darmstadt, Germany Principal Use: Multi-purpose event hall Structural Engineers: Bollinger+Grohmann Construction: Constructlab Architects: Atelier Bow-Wow + Constructlab Total floor area: 156m2 Design period: 2014.1-2014.4 Construction period: 2014.5-2014.7

SHOWA KINEN PARK HANAMIDORI CULTURAL CENTER Location: Tachikawa, Tokyo Principal Use: Park facility Structural Engineers: Kanebako Structural Engineers Construction: Takenaka Corportation Architects: Hanamidori cultural Center Architectural Design Team + Atelier Bow-Wow (collaborator) Total floor area: 6031.64m2 Design period: 2002.10-2003.3 Construction period: 2003.8-2005.5

GLOBAL CENTER Location: Aichi, Aichi Prefecture Principal Use: Community center + Gymnasium Construction: JV of Tsuchiya, Nakamura and Fujimoto Architects: Design: Yamashita Sekkei Inc. | Design Advisor: Y. Tsukamoto, M.Kaijima and T. Kuwahara | Design collaborator: Atelier Bow-Wow, Kuwahara Office Total floor area: 8,824.62 m2 Design period: 2007.5 - 2008.3 Construction period: 2008.11 - 2010.9

KOISURU - BUTA LABORATORY Location: Katori, Chiba Prefecture Principal Use: Employment support center (factory+restaurant+office) Structural Engineers: Structural Design Office OAK Construction: Ishii Corporation Architects: Atelier Bow-Wow Total floor area: 1015.45m2 Design period: 2009.7-2011.11 Construction period: 2011.12-2012.7

FOUR BOXES GALLERY Location: Skive, Denmark Principal Use: Gallery Structural Engineers: Fritz Nielsen&J.Juul Christensen A/S Construction: Dan-element Architects: Atelier Bow-Wow + University of Tsukuba Kaijima Lab. Total floor area: 236.41m2 Design period: 2008.1-2008.4 Construction period: 2009.2-2009.9

77

79


REFERENCES / EXHIBITION

MANGAPOD (THE 4TH GWANGJU BIENNALE) Location: Gwangju, South Korea Principal Use: Installation Architects: Atelier Bow-Wow Built 2002

FURNICYCLE (SHANGHAI BIENNALE 2002) Location: Shanghai, China Principal Use: Installation Structural Engineers: Kanebako Structural Engineers Construction: Hirohashi Architects: Atelier Bow-Wow Built 2002

WHITE LIMOUSINE YATAI (ECHIGO TSUMAARI ART TRIENNALE) Location: Tokamachi, Niigata Prefecture Principal Use: Installation Structural Engineers: Kanebako Structural Engineers Construction: Kanetake Kensetsu + University of Tsukuba Kaijima Lab. Architects: Atelier Bow-Wow + University of Tsukuba Lab. Built 2003

HOUSE OF WEEDS Location: Mito, Ibaraki Principal Use: Installation Construction: University of Tsukuba Kaijima Lab. Architects: Atelier Bow-Wow + University of Tsukuba Kaijima Lab. Built 2004

JUMBO ORIGAMI ARCH Location: Jakarta, Indonesia / Pescara, Italy Principal Use: Installation Architects: Atelier Bow-Wow Built 2005


REFERENCES / EXHIBITION

SCHOOL WHEEL (BUSAN BIENNALE 2006) Location: Busan, South Korea Principal Use: Installation Architects: Atelier Bow-Wow Built 2006

MONKEY WAY (THE 27TH SAO PAULO BIENNALE) Location: San Paolo, Brazil Principal Use: Installation Structural Engineers: Kanebako Structural Engineers Construction: Minoru Shibata Architects: Atelier Bow-Wow Built 2006

PUPPET THEATER HOUSE Location: Minato, Tokyo Principal Use: Installation Structural Engineers: Inoue Industries Construction: Inoue Industries Architects: Atelier Bow-Wow + T.I.T. Tsukamoto Lab.

LIFE TUNNEL (PSYCHO BUILDINGS) Location: The Heyward, London, U.K. Principal Use: Installation Architects: Atelier Bow-Wow Built 2008

FURNIVEHICLE (VENICE BIENNALE 2008) Location: Venice, Italy Principal Use: Installation Architects: Atelier Bow-Wow Built 2008

79

81


REFERENCES / EXHIBITION

ALPINISM Location: Geneva, Switzerland Principal Use: Installation Architects: Atelier Bow-Wow Built 2008

ROCKSCAPE (LIVERPOOL BIENNALE) Location: Liverpool, U.K. Principal Use: Installation Architects: Atelier Bow-Wow Built 2008

SMALL CASE STUDY HOUSE (THE GALLERY AT REDCAT) Location: California, U.S.A. Principal Use: Installation Structural Engineers: MATO Structural Engineers Construction: Roy and Edna Disney / Calarts Theater Architects: Atelier Bow-Wow Built 2009

RENDEZVOUS (THE NATIONAL MUSEUM OF MODERN ART) Location: Tokyo, Japan Principal Use: Installation Architects: Atelier Bow-Wow Built 2014

LINZ SUPER BRANCH (OK OFFENES KULTURHAUS) Location: Linz, Austria Principal Use: Installation Structural Engineers: Kanebako Structural Engineers (Schematic Design) + DI Harald Weiss (Execution Design) Construction: Bruder Resch Hoch-u. Tiefbau GesmbH & Co KG Architects: Atelier Bow-Wow Built 2009


REFERENCES / MICRO PUBLIC SPACE

MODEL HOME (ROCKBUND ART MUSEUM) Location: Shanghai, China Principal Use: Installation Construction: Shanghai Xinli Decoration and Construction Co. Ltd Architects: Atelier Bow-Wow Total floor area: 20.2m2 Built 2012

LEARNING FROM UTZON (UTZON CENTER) Location: Aalborg, Denmark Principal Use: Installation Architects: Atelier Bow-Wow Built 2013

MICRO PUBLIC SPACE (HIROSHIMA MOCA) Location: Hiroshima, Japan Principal Use: Installation Architects: Atelier Bow-Wow Built 2014

POETRY WILL BE MADE BY ALL! 89PLUS Location: Zurich, Switzerland Principal Use: Installation Architects: Atelier Bow-Wow Built 2014

WINDOWSCAPE (MILANO SALONE 2014) Location: Milano, Italy Principal Use: Installation Architects: Atelier Bow-Wow Built 2014

81

83



SELECTED PUBLICATIONS / 2014 - Atelier Bow-Wow, COMMONALITIES Production of Behaviors (LIXIL Publishing) - GRAPHIC ANATOMY 2 ATELIER BOW-WOW (TOTO Publishing) - WindowScape 2 (edited by Tokyo Institute of Technology Tsukamoto Lab) (Filmart) 2013 - Atelier Bow-Wow: A Primer (Verlag der Buchhandlung Walther Konig) 2012 - Public Space by Atelier Bow-Wow, Tokyo: In the State of Spatial Practice (Aedes) - In Praise of Mud: A guide to the Earth Walls of Kyoto (Gakugei Publishing) - JA 85 SPRING 2012 / House Genealogy Atelier Bow-Wow: All 42 Houses (Shinkenchiku-sha) 2010 - WindowScape: Window Behaviorology (edited by Tokyo Institute of Technology Tsukamoto Lab) (Filmart) - TOKYO METABOLIZING (co-authored by Yoshiharu Tsukamoto, Koh Kitayama, Ryue Nishizawa) (TOTO Publishing) - Kenchiku kara mita machi ie tatemono no shinario (by Momoyo Kaijima) (INAX Publishing) - Behaviorology (Rizzoli New York) 2009 - Atelier Bow-Wow: Echo of Space / Space of Echo (INAX Publishing) 2007 - GRAPHIC ANATOMY ATELIER BOW-WOW (TOTO Publishing) 2006 - Atelier Bow-Wow from Post Bubble City (INAX Publishing) 2004 - Contemporary House Studies (co-authored by Yoshiharu Tsukamoto & Taira Nishizawa) (INAX Publishing) - Small but Pleasant House (co-authored by Akira Nagae) (Hara Shobou) 2003 - Chiisana ie no kizuki (by Yoshiharu Tsukamoto) (Ohkokusha) 2001 - Made in Tokyo (Kaijima Institute Publishing) - Pet Architecture Guide Book (World Photo Press)

SELECTED AWARDS / 2013 - Good Design Award (Kitamoto Station West Square, Tama Machiya, Tama Loggia) - Good Design Award (Core House) 2012 - Good Design Award (Miyashita Park) 2007 - Good Design Award (House&Atelier Bow-Wow) 2002 - American Wood Design Awards 2002 2000 - The 16th Yoshioka Prize 1999 - Tokyo Society of Architects & Building Engineers, Residential Architecture Award, Gold Prize 85 83



portfolio / brunnquell & andré architectes /

Axel André & Xavier Brunnquell architectes dplg 13 rue Durantin 75018 Paris Métro Abbesses T +33 (0)1 42 23 21 24 axxa.studio@orange.fr www.brunnquell-andre-archi.fr



sommaire /

structure de l’agence - Moyens humains - Moyens techniques

principales réalisations - Logements collectifs des Abondances, Boulogne-Billancourt - Hôtel-spa de la Corniche, Rolleboise - Logements collectifs rue Rebière, Paris 17° - Logements collectifs rue Taitbout, Paris 9° - Espace d’accueil du Petit Trianon, Versailles - Musée René Sordes, Suresnes - Bureau Roche Pharma, Neuilly sur Seine - Ateliers EDP, Montreuil - Agence Success, Paris 3° - Maison Soubret, Pressigny L’Orgueilleux - Maisons corses, Baie de Saint-Cyprien - Maison Chatin, Benerville-sur-mer

références publications & expositions

87



moyens humains

Architectes associés / Axel André est né le 13 décembre 1964 à Boston, aux États-Unis. Diplômé DPLG en 1991 de l’école d’architecture Paris la Seine, il a collaboré avec Francis Soler (1991-1995), avec Gilles Margot-Duclot (1993), avec Reichen & Robert (1995) et avec Jean-Philippe Pargade (1999). Xavier Brunnquell est né le 13 juin 1966 à Neuilly en région parisienne. Diplomé DPLG en 1993 de l’école d’architecture Paris la Seine, il a collaboré avec Radu Vincenz (1990), Louis Sirvin & Michel Guerrier (1990-2001), au sein de Studio Milou (1993-1998). Il a enseigné à l’école nationale supérieure d’architecture de Paris Malaquais (ENSAPM) de 2006 à 2010 dans les ateliers d’études P1 ‘‘Récit Urbain’’ et OA3 ‘‘Représentation de l’Architecture’’. Il enseigne le projet urbain à l’école d’architecture de Versailles depuis 2013.

Architectes assistants / Bénédicte Gourdon, architecte DE, formation renouvellement urbain des quartiers et développement durable. Lauren Mathoré, architecte DE, Master «Habitats et énergies», formations RT 2012 et accessibilité PMR.

Collaborateurs depuis la création de l’atelier / Kaddour Asmahan, étudiante en architecture Marie Béniguel, architecte dplg, Chaillot Julie Bretonné, étudiante en architecture Jennifer Durand, étudiante en architecture Mikako Hayashida, architecte d’intérieur Kien Hoang, étudiant en architecture Claire Hoppenreys, étudiante en architecture Ronan Legrand, étudiant en architecture Egle Mariani, architecte de, Polytech Milan Simon Morville, architecte dplg Valentina Pacetti, étudiante en architecture Thomas Perez, étudiant en architecture Sarah Rahoult, architecte dplg Ferdinand Simon, étudiant en architecture Yuji Tsukamoto, designer Dorothée Zawisha, architecte dplg

89



moyens techniques

matériel / 4 postes informatiques Imac 24’ 2 postes de travail informatique PC 1 imprimante A4 laser couleur en réseau 1 imprimante A3+ jet d’encre couleur en réseau 1 traceur A0 1 photocopieuse - 1 télécopieur 1 mètre laser 3 postes téléphoniques 1 Scanner A4 4 Appareils photos numériques 1 poste maquette

logiciels / Logiciels graphiques : Autocad 2013, Vectorworks 12.5, Rhinoceros (3D), SketchUp, VRay, Artlantis, Photoshop, Illustrator Logiciels de bureautique : Open Office, Word, Excel, In Design, Power point, Quark X Press

activités de l’atelier / Logements collectifs Maisons individuelles Hôtellerie Bureaux Equipements publics Etablissement de soins Commerces : identité visuelle, aménagement, charte Patrimoine : rénovation lourde et amélioration de l’habitat Scénographies Etudes de faisabilité

91



48°50’48.0’’ N 2°13’49.9’’ E

logements des abondances / boulogne-billancourt mission conception réalisation / livraison prévue juin 2015 Le projet consiste à créer 15 logements de fonction dans l’aile d’un hôpital du XIXème, inscrit au patrimoine de la ville de Boulogne-Billancourt. Du fait de la faible épaisseur du bâtiment, les circulations horizontales sont sorties de l’emprise bâtie : 2 niveaux de coursives alimentent les logements en façade nord. Afin d’optimiser l’habitabilité, la surface actuelle est augmentée par la surélévation de l’actuel plancher du 1er étage qui vient se positionner par rapport aux hauteurs d’allèges et permet ainsi la création d’un nouveau niveau de plancher. La distribution des logements intègre la trame horizontale donnée par les travées. Le projet s’organisant en fonction des ouvertures et de la trame existante, les interventions sur les façades sont minimisées. Début d’étude : 2013 Chantier : début du chantier juin 2014 Montant des travaux : 1 950 000 euros H.T Surface: 998 m2 Entreprise générale : Genere BET thermique : Alterea

11



49°01’21.9’’ N 1°36’29.5’’ E

hôtel-spa de la corniche / rolleboise mission complète / 2013 Le Domaine de la Corniche, récemment rénové, agrandit sa capacité d’accueil avec la construction d’un nouveau bâtiment. Celui-ci accueille 10 chambres supplémentaires, dont 5 PMR, et un Spa, comprenant salons de massage, vestiaires, tisanerie, piscine, hammam, fitness. La sobriété de la construction, par son traitement et son implantation, révèle le relief et s’intègre dans le paysage à la manière des bâtiments agricoles, ne créant ainsi pas de rivalité avec le château. Le bardage noir associé à l’ardoise des toits en pentes, la rigueur des formes, la tenue des lignes en fait un monolithe intrigant depuis l’extérieur, tandis que l’intérieur contraste par sa chaleur. La structure primaire en béton permet de répondre aux contraintes d’isolation acoustique et de protection au feu ainsi qu’aux limites budgétaires du projet. Pour l’ensemble du clos couvert en revanche, l’ossature bois a été retenue pour ses performances thermiques et sa mise en oeuvre rapide grâce à la préfabrication. Le chantier a été organisé en corps d’état séparés coordonnés par l’agence. Début d’étude : 2011 Chantier : novembre 2012 - décembre 2013 Montant des travaux : 1 875 000 euros H.T Surface: 876 m2 Maîtrise d’ouvrage : SCI du manoir de la corniche Entreprise de gros-oeuvre : Donato Entreprise de charpente ossature bois : Vaninetti

95







48°53’48 N 2°18’57 E

22 logements rue rebière / Paris 17° mission complète en co-traitance avec l’agence japonaise bow-wow / 2012 A Paris, nous avons réalisé avec l’agence japonaise Bow-Wow, un immeuble de logements sociaux dans le cadre de la ZAC Pouchet, sur l’une des divisions créées le long du cimetière des Batignolles. La stratégie mise en oeuvre a permis d’éviter le simplisme des plots par un travail sur les seuils, les vues, les entre-deux, les pratiques domestiques tant individuelles que collectives, tout en tirant parti des dimensions réduites de la parcelle. Le programme de 22 logements et un local associatif, se répartit sur trois bâtiments. Deux maisons encadrent un grand volume, ménageant des interstices aux proportions mesurées. Un jeu d’arcade, soutenant la barre, crée une galerie, qui concentre les accès des logements et équipements. Orientée vers la rue et ouverte sur un parvis minéral, ses proportions confortables et son banc lui confèrent les qualités d’un espace public. Chaque appartement se voit attribuer un grand balcon connecté au séjour et chaque pièce un petit balcon individuel. Cette règle respectée, les balcons se composent aléatoirement sur la façade, venant perturber le rythme linéaire des fenêtres. Certification : Label Haute Qualité Environnementale, option Très Haute Performance Energétique Début d’étude : 2006 Chantier : septembre 2009 - juin 2012 Montant des travaux : 2 593 000 euros H.T Surface: 1934 m2 Maîtrise d’ouvrage : Paris Habitat OPH BET : Sibat Entreprise générale : Léon Grosse

101





48°53’48 N 2°18’57 E

22 logements rue rebière / paris 17° construction en co-traitance avec l’agence suisse em2n / 2012 Les deux bâtiments s’implantent au croisement de la rue Rebière et de la nouvelle voie en direction du boulevard Bois le Prêtre. La cohérence du projet tient à la volumétrie très caractéristique des deux bâtiments et de la cour qui les relie. Cette disposition, par un système de retraits et de vues «croisées», garantit ensoleillement et vue dégagée à chacun des logements: façade au Sud et vue directe sur le cimetière au Nord pour ceux situés le long de la rue Rebière, loggias ouvertes au Sud à distance de la rue et vue biaises sur le cimetière pour ceux situés en fond de parcelle. Située à l’une des extrémités du logement et profitant de dimensions généreuses (18m2), la loggia est conçue en prolongement direct du séjour, dilatant considérablement l’espace intérieur. Les espaces «nuits» sont quant à eux regroupés à l’autre extrémité du logement. A l’extérieur, l’enveloppe formée par l’isolation apporte à l’ensemble un aspect monolithique, une géométrie simple. Les deux volumes bâtis sont enveloppés par une façade continue d’un seul matériau, tôle déployée qui ménage des percements et des transparences. Début d’étude : 2006 Chantier : janvier 2010 - décembre 2012 Montant des travaux : 2 740 000 euros H.T Surface: 1768 m2 Maîtrise d’ouvrage : Paris Habitat OPH BET : Sibat Entreprise générale : Léon Grosse

105



48°52’27.5’’N 2°20’06.7’’E

37 logements rue taitbout / paris 9° mission complète / 2012 La réhabilitation de l’immeuble, en situation de péril après plusieurs années d’abandon, a nécessité un travail quasi archéologique pour l’analyse de son système constructif, permettant ainsi de déterminer des solutions inédites de reprises des planchers. Datant de 1840, la construction utilise une technique de solivage en fer plat précontraint, technique antérieure aux profils laminés. La façade en pierre a fait l’objet d’un travail de ravalement avec une reprise complète des corbeaux de la terrasse de l’attique. Les planchers R+4 et R+5 ont fait l’objet d’une reprise en coffradal 200. Le catalogue des pathologies est ici très large et varié, avec une amélioration de l’accessibilité PMR, une isolation thermique intérieure, la mise en place d’une VMC hygro B., et la création de 37 logements. Début d’étude : 2010 Chantier : juin 2011 - juillet 2012 Montant des travaux : 2 400 000 euros H.T Surface : 2000 m2 Maîtrise d’ouvrage : AGCOP BET : FXH Entreprise générale : Genere

107



48°48’56 N 2°06’34 E

espace d’accueil du petit trianon / versailles aménagements intérieurs / 2008 L’aménagement des espaces d’accueil s’inscrit dans le cadre de la réhabilitation du Domaine MarieAntoinette. Intégrant les espaces rénovés de la maison du Suisse, les espaces d’accueil du Domaine de MarieAntoinette introduisent la thématique générale du lieu: le mariage de l’architecture et du végétal, par la réunion du Petit Trianon, des jardins et des pavillons dans une même visite. Détachés des murs existants, du sol et des plafonds, nos interventions sont clairement identifiables, volontairement en rupture avec les éléments existants. Le motif sérigraphié sur des plaques d’aluminium accompagne le visiteur dès l’approche extérieure, et le guide, liant les espaces traversés, à la manière de la haie de charmille encadrant la cour d’honneur. Début d’étude : 2006 Chantier : mai 2007 - avril 2008 Montant des travaux : 380 000 euros H.T Surface : 245 m2 Maîtrise d’ouvrage : Etablissement Public du Domaine de Versailles Architecte des Monuments Historique : Pierre André Lablaude

109



48°52’05 N 2°13’17 E

musée rené sordes / suresnes concours / 2008 Le nouveau musée René Sordes impose une réhabilitation et une extension de l’ancienne gare de Suresnes Longchamp, point de repère remarquable dans la ville. Le projet a pour ambition majeure de fournir les clés pour une lecture synoptique du territoire, de son identité et de ses diversités. Le parti est de révéler, de donner à comprendre le lieu, de « faire en sorte que l’édifice de la gare devenu muet raconte à nouveau une histoire sans cesse renouvelée ». Associée autant à la topographie et à l’échelle du lieu qu’à l’architecture de la gare, l’extension vient se caler contre la cassure du quai, reprenant dans sa forme la pente du site. Avec sa couverture inclinée, elle se dérobe au regard pour mieux révéler l’existant, permettant ainsi à la gare de conserver son rôle dans la place. Traitée en corian, la peau de l’édifice vient contraster avec les matériaux et les modénatures de la gare. Les ouvertures latérales du musée accompagnent les usagers sur leur parcours quotidien. La démarche HQE se retrouve ici dans la compacité du bâtiment, dans le choix des orientations et la gestion de la lumière, dans la démarche constructive, autant que dans le traitement des espaces publics.

Montant des travaux : 3 358 000 euros H.T Surface: 1373 m2 Maître d’Ouvrage : Mairie de Suresnes BET : Sibat Scénographe : Pixel Muséographes

29



48°48’56N 2°06’34 E

auditorium roche pharma / neuilly sur seine mission complète/ 2003 Situé au coeur d’un bâtiment remarquable de la fin des années soixante, à l’extrémité de l’île de la Jatte, le nouvel audirorium de 235m2 intègre la trame constructive de l’édifice, travail de géométrie épurée. L’acoustique et l’ensemble de la technologie sonore sont situés derrière le jeu d’écailles textiles constituant les flancs de la salle. La technique est totalement invisible, intégrée dans le plafond bois et les habillages latéraux. Le dispositif de double projecteur a permis de configurer l’écran selon des proportions cinématographiques. La gestion de la lumière est assurée par une centrale permettant de moduler la température de la salle. Récemment, le bâtiment a fait l’objet d’une réhabilitation lourde par des promoteurs suisses, avec une mise à nu complète de la structure poteau poutre en béton armé, mais l’auditorium situé au rez-de-chasussée a été intégralement conservé. Début d’étude : 2002 Chantier : de février 2003 à juin 2003 Montant des travaux : 799 348 euros H.T Maîtrise d’ouvrage : Laboratoire Roche Pharma

113



45°..’... N .°..’..E

Nom du projet / Programme / Localisation Type de mission et équipes associées si besoin / date de livraison Description du projet blabla blablabla Début d’étude : avril 2008 Chantier : de septembre 2008 à ... Montant des travaux : ... euros h.t Surface: .... m2

115



48°48’56N 2°06’34 E

2 auvents roche pharma / neuilly sur seine mission complète/ 2004 Le bâtiment des laboratoires Roche est habillé de plus de 3000 plaques d’émalit, qui présentent un risque de chute. Nous avons conçu des auvents suspendus sécurisant les entrées de l’édifice, solution alternative au remplacement des plaques. D’une surface de 80m2 chacun, réalisés en Reynobond, leur ligne est très épurée, intervention minimale s’attachant à intégrer l’architecture rigoureuse du lieu. Début d’étude : 2003 Chantier : août 2004 - octobre 2004 Montant des travaux : 173 420 euros H.T Maîtrise d’ouvrage : Laboratoire Roche Pharma

117



48°48’56 N 2°06’34 E

club direction roche pharma/ neuilly sur seine mission complète/ 2006 Le club direction est un espace modulable, permettant de gérer, par des cloisons mobiles et des dispositifs automatiques, toute une série de configurations différentes, allant de la salle de projection commune au salon de repas privé. La cuisine autonome qui lui est associée permet d’optimiser l’usage de cet espace qualitatif. Début d’étude : 2005 Montant des travaux : 418 600 euros H.T Maîtrise d’ouvrage : Laboratoire Roche Pharma

37



48°48’56 N 2°06’34 E

ateliers edp / montreuil mission complète en co-traitance avec thierry krengel / 2004 La réhabilitation de l’usine Letraset permet l’installation de 8 ateliers autour d’une cour commune. Celleci apporte la lumière nécessaire aux différentes activités, tandis que les verrières existantes assurent la ventilation au faitage et bénéficient d’apports solaires directs. Des techniques constructives économiques et respectueuses de l’environnement, à base de récupération et de recyclage, ont été mises en oeuvre: planchers de wagon, isolant en copeaux de liège, briques artisanales, doublage en monobrique, pavés de récupération. Les matériaux utilisés sont tous pérennes et recyclables tandis que la structure, elle-même, est optimisée afin d’en réduire les besoins. Début d’étude : 2003 Chantier : septembre 2003 - novembre 2004 Montant des travaux : 538 200 euros H.T Surface: 1216 m2 Maîtrise d’ouvrage : un Eléphant Dans le Potager

119





48°51’34 N 9°21’39 E

agence success / paris 3° mission complète / 1999 La reconversion de l’ancienne imprimerie en espace tertiaire s’est opérée dans un espace hétérogène et hybride, tant par sa volumétrie que ses matériaux. Les bureaux parisiens de l’agence Success offrent une réponse à la problématique du travail en openspace. Regroupés autour de vastes tables monobloc, les postes bénéficient de nappes acoustiques suspendues dont l’efficacité permet de s’approcher du confort phonique d’une cellule privative. Début d’étude :1999 Chantier : avril 1999 - juillet 1999 Montant des travaux : 521 319 euros H.T Surface: 670 m2 Maîtrise d’ouvrage : Success, agence de mannequins

123





49°07’75 N 1°25’57 E

maison soubret / pressigny l’orgueilleux mission complète / 2003 Située aux confins de la Normandie dans un jardin où coule la Seine, cette construction est double. En termes iconographiques, elle est la juxtaposition d’une boîte en ardoise dédiée à la vie nocturne sur une autre en bois consacrée aux pièces à vivre. Ces 2 blocs monolithiques débarrassés de toutes fioritures dessinent une image type de la maison individuelle. Cette structure d’une grande sobriété est le résultat d’une double réflexion, à la fois sur les manières d’habiter et sur la nécessité d’une architecture pragmatique, intelligente et économique. Début d’étude : 2000 Chantier : janvier 2002 - janvier 2003 Montant des travaux 108 240 euros H.T Surface: 149 m2

127





41°39’03 N 9°21’39 E

maison ory / baie de saint cyprien, corse mission complète / 2007 Volume simple qui épouse la topographie singulière du site, la maison est presque entièrement contenue sous un large toit de tuiles canales. Pointant vers la mer, le couloir de nage, belvédère situé en prolongement du volume de l’entrée, révèle le relief et ancre l’édifice au terrain. La simplicité des volumes et des matériaux participent à l’intégration de l’ensemble dans un paysage naturel conservé. Début d’étude : 2004 Chantier : janvier 2006 - mars 2007 Montant des travaux : 350 000 euros H.T Surface: 230 m2

131



41°39’02 N 9°21’38 E

maison vigand / baie de saint-cyprien, corse mission complète /2003 L’accessibilité autant que la contemplation sont les notions à la base de ce projet, conçu pour une personne handicapée, sa famille et leurs amis. Le choix de la tuile canale pour la toiture, les murs massifs, la sobriété des volumes, l’implantation de la construction sur le terrain, permettent l’intégration du projet dans un paysage littoral remarquable. Début d’étude : 2002 Chantier : septembre 2002 - octobre 2003 Montant des travaux : 690 000 euros H.T Surface: 340 m2

133



49°20’46.9’’N 0°02’38.4’’E

maison chatin / benerville-sur-mer mission complète / livré en 2010 Ce projet concerne la réhabilitation complète d’une maison en bord de mer pour une famille nombreuse (7 personnes). Le projet est guidé par la recherche d’un juste équilibre entre la modernisation de la maison et la conservation de son esprit originel. Les transformations ont pour but de rendre la construction performante : aussi bien en termes de thermique que d’acoustique ; mais également de l’adapter au mode de vie de cette grande famille : aménagement de vastes espaces communs, chambres et salles de bain démultipliées, système de collecte du linge et douches collectives pour le retour de plage. Afin d’augmenter l’espace offert par la structure existante, une extension est réalisée en sous-sol, elle permet d’apporter des pièces fraîches, participant au confort d’été et mettant en relation directe la maison avec son environnement. La réflexion sur le neuf et l’ancien s’est poursuivi par la décoration intérieure : tous les parquets et boiseries ont été conservés, certains éléments, comme le carrelage de la cuisine, ont été reproduits, d’autres réemployés, réinterprétés, conférant ainsi à la maison une atmosphère singulière, hybridation de diverses époques. Début d’étude : 2009 Chantier : de février 2009 à juillet 2010 Montant des travaux : 598 000 euros H.T Surface: 458 m2 Maçonnerie carrelage plâtrerie : Entreprise Loizon Plomberie chauffage : Entreprise Truchet Electricité ventilation : Entreprise Hebert

135


bibliothèque eymoutiers Lieu : Eymoutiers, Limousin Maître d’Ouvrage : Henri Vignes Programme : réhabilitation d’un chateau et aménagement d’une bibliothèque de 70 000 ouvrages dans les communs. En cours - APD budget estimatif : 700 000 €

maison du projet v1 et v3 Lieu : ZAC Batignolles, Paris 17ème Maître d’Ouvrage : Paris Batignolles Aménagement Programme : maison du projet Batignolles, espace d’accueil et d’informations Livré en 2014 Montant des travaux HT : 115 000 € Surface : 180 m2 Mission complète en association avec Polymago

Centre d’interprétation de la bourgogne ducale Lieu : Châteauneuf en Auxois Maître d’Ouvrage : Conseil Régional de la Bourgogne Programme : Centre d’interprétation de la Bourgogne ducale Concours réalisé en 2009 Budget estimatif : 990 000 € Surface : 237 m2 BET : Sibat Scénographe : Pixel muséographe

musée rené sordes Lieu : Suresnes Maître d’Ouvrage : Mairie de Suresnes Programme : Musée de l’histoire urbaine et sociale Concours réalisé en 2008 Budget estimatif : 2 908 000 € Surface : 1 373 m2 BET : Sibat Scénographe : Pixel muséographe


espace d’accueil du domaine marie-antoinette Lieu : Petit Trianon, Versailles Maître d’Ouvrage : Etablissement public du domaine de Versailles Programme : aménagement intérieur et mobilier des espaces d’accueil Livré en 2008 Montant des travaux HT : 380 000 € Surface : 245 m2 Mission complète en collaboration avec Pierre André Lablaude, AMH

les Abondances Lieu : Boulogne-Billancourt Maître d’Ouvrage : Centre de gérontologie Les Abondances Programme : reconversion d’un ancien hôpital en 15 logements Chantier en cours Montant des travaux HT : 1 950 000€ SHON : 998 m2 Mission complète en conception réalisation avec l’entreprise Genere

LACORDAIRE Lieu : rue Lacordaire, Paris 15ème Maître d’Ouvrage : Paris Habitat Programme : réhabilitation lourde d’un immeuble de 15 logements, démarche HQE, certification « Habitat et environnement profil A» En cours - PC SHON : 810 m2 Mission complète

Pré de l’enclos Lieu : Villiers Le Bel, Val d’Oise Maître d’Ouvrage : SDC du Pré de l’enclos II Programme : rénovation d’un ensemble de 110 logements En cours - APD budget : 1 300 000 €

137


Rebière lot 03-04 Lieu : rue Rebière, Paris 17ème Maître d’Ouvrage : Paris Habitat Programme : construction de 22 logements HQE et de 1 local associatif Livré en 2012 Montant des travaux HT : 2 593 000 € SHON : 1 390 m2 Mission complète en co-traitance avec l’Atelier Bow-Wow (Japon) BET : Sibat

Rebière lot 17 - 18 Lieu : rue Rebière, Paris 17ème Maître d’Ouvrage : Paris Habitat Programme : construction de 22 logements HQE et de 1 local associatif Livré en 2012 Montant des travaux HT : 2 740 000 € SHON : 1 400 m2 Mission complète en co-traitance avec EM2N (Suisse)

taitbout Lieu : rue Taitbout, Paris 9ème Maître d’Ouvrage : AGCOP Programme : réhabilitation d’un immeuble et conception de 37 logements Livré en 2012 Montant des travaux HT : 2 400 000 € SHON : 1 883 m2 Mission complète

polonceau Lieu : la Goutte d’or, Paris 18ème Maître d’Ouvrage : AGCOP/SEMAVIP Programme : plan de sauvegarde et réhabilitation lourde en site occupé Livré en 2010 Montant des travaux HT : 425 000 € Surface : 450 m2 Mission complète


hôtel-spa de la corniche Lieu : Rolleboise Maître d’Ouvrage : SCI du manoir de la corniche Programme : Nouveau pavillon Spa, 10 chambres d’hôtel, salon de massage, hammam, piscine, tisanerie Livré en 2013 Montant des travaux HT : 1 875 000 € SHON : 876 m2 Mission complète et économie

hôtel bailli de suffren Lieu : Paris 7ème Maître d’Ouvrage : Algonquin Programme : réhabilitation d’un hôtel de 25 chambres Concours 2010 Budget estimatif HT : 663 000 € Surface : 256 m2

le manoir Lieu : Rolleboise Maître d’Ouvrage : SCI La grange du moulin Programme : rénovation d’un hôtel de 7 chambres Livré en 2008 Montant des travaux HT : 380 600 € Surface : 346 m2 Mission complète

le château Lieu : Rolleboise Maître d’Ouvrage : SCI La grange du moulin Programme : rénovation d’un hôtel de 38 chambres et salles de séminaire Livré en 2008 Montant des travaux HT : 1 619 000 € Surface : 1450 m2 Mission complète


edp Lieu : 13, rue Marceau, Montreuil sous Bois Maître d’Ouvrage : un Eléphant Dans le Potager Programme : réhabilitation d’une usine pour la création de 8 ateliers Livré en 2004 Montant des travaux HT : 538 200 € SHON : 1216 m2 Mission complète en association avec Thierry Krengel

Club et ce roche Lieu : 52, bd du Parc, Neuilly sur Seine Maître d’Ouvrage : Laboratoire Roche Pharma Programme : club direction et comité d’entreprise Livré en 2006 Montant des travaux HT : 418 600 € et 391 368 € Surface : 138 et 70 m2 Mission complète

Auvent roche Lieu : 52, bd du Parc, Neuilly sur Seine Maître d’Ouvrage : Laboratoire Roche Programme : 2 auvents Livré en 2004 Montant des travaux HT : 173 420 € Surface :160 m2 Mission complète

Auditorium roche Lieu : 52, bd du Parc, Neuilly sur Seine Maître d’Ouvrage : Laboratoire Roche Programme : auditorium de 150 places Livré en 2003 Montant des travaux HT : 799 348 € Surface : 235 m2 Mission complète


agence success Lieu : 11, rue des Arquebusiers, Paris 3° Maître d’Ouvrage : Success, agence de mannequin Programme : bureaux, studio photos et casting Livré en 1999 Montant des travaux HT : 521 319 € Surface : 670 m2 Mission complète

le carré simple Lieu : 17 rue Tronchet, Paris 8°w Maître d’Ouvrage : M. Charley Programme : boutique d’herboristerie, identité visuelle, packaging Livré en 2003 Montant des travaux HT : 45 832 € Surface : 17 m2

Au nom de la rose Lieu : diverses localisation Maître d’Ouvrage : Le Nom de la Rose France Programme : nouvelle charte architecturale pour la chaîne de boutiques «Au nom de la Rose» Livré en 2002 En association avec Cécile Halley des Fontaines, architecte

formes Lieu : Europe, Japon, Canada, Liban Maître d’Ouvrage : Formes S.A. Programme : charte architecturale et chantier pour 40 boutiques de prêt à porter Livré en 1998 En association avec Olivier Thin, architecte Surface : de 45 à 80 m2


Maison PROGLIO Lieu : Feucherolles, Yvelines Maître d’Ouvrage : M. et Mme Proglio Programme : réhabilitation d’une maison secondaire Chantier en cours Montant des travaux HT : 723 000 € SHON : 430 m2 Mission complète

Maison CHARLOTTE Lieu : Longeville-sur-mer, Vendée Maître d’Ouvrage : M. et Mme Lefort Programme : construction d’une maison de vacances structure bois en forêt littorale Chantier en cours Montant des travaux HT : 125 000 € SHON : 86 m2 Mission complète

Maison Halle Lieu : Meaulne, Allier Maître d’Ouvrage : M. et Mme Halle Programme : réhabilitation de 2 corps de ferme en une maison Livré en 2011 Montant des travaux HT : 466 176 € SHON : 365 m2 Mission complète

Maison Fay Lieu : Vitré, Allier Maître d’Ouvrage : M. et Mme Vigand Programme : réhabilitation d’une maison de campagne Livré en 2010 Montant des travaux HT : 141 500 € SHON : 160 m2 Mission complète


Maison chatin Lieu : Bénerville-sur-Mer, Haute Normandie Maître d’Ouvrage : M. et Mme Chatin Programme : réhabilitation d’une maison en bord de mer Livré en 2010 Montant des travaux HT : 598 000 € SHON : 458 m2 Mission complète

Maison curcio chavanne Lieu : Coulimer, Basse Normandie Maître d’Ouvrage : M. et Mme Curcio Chavanne Programme : réhabilitation de deux corps de ferme Livré en 2006 Montant des travaux HT : 290 000 € SHON : 360 m2 Mission complète

Maison soubret Lieu : Pressigny L’Orgueilleux, Normandie Maître d’Ouvrage : M. Soubret Programme : construction d’une maison de week-end Livré en 2003 Montant des travaux HT : 108 240 € SHON : 149 m2 Mission complète

Maison landon Lieu : St Pierre de Quiberon, Morbihan Maître d’Ouvrage : M. et Mme Landon Programme : réhabilitation et extension d’une maison Livré en 2011 Montant des travaux HT : 252 000 € SHON : 160 m2 Mission complète


Maison dedeyan Lieu : St Pierre Quiberon, Morbihan Maître d’Ouvrage : M. et Mme Dedeyan Programme : construction d’une résidence secondaire Livré en 2008 Montant des travaux HT : 310 697 € SHON : 208 m2 Mission complète

Maison masseran Lieu : La Trinité sur Mer, Morbihan Maître d’Ouvrage : M. et Mme Masseran Programme : construction d’une résidence secondaire Livré en 2011 Montant des travaux HT : 325 600 € SHON : 228 m2 Mission complète

Maison de l’instituteur Lieu : île de Houat, Morbihan Maître d’Ouvrage : M. et Mme Le Gurun Programme : construction d’une maison Livré en 1999 Montant des travaux HT : 99 090 € SHON : 131 m2 Mission complète

Maison ory Lieu : Baie de Saint-Cyprien, Corse Maître d’Ouvrage : SCI MLS Rossi Programme : construction d’une maison individuelle Livré en 2007 Montant des travaux HT : 425 000 € SHON : 250 m2 Mission complète


Maison vigand Lieu : Baie de Saint-Cyprien, Corse Maître d’Ouvrage : Mr et Mme Vigand Programme : construction d’une résidence secondaire Livré en 2003 Montant des travaux HT : 690 000 € SHON : 340 m2 Mission complète

Maison Ristorcelli Lieu : Baie de Saint-Cyprien, Corse Maître d’Ouvrage : Mr et Mme Ristorcelli Programme : construction d’une maison individuelle Livré en 2004 Montant des travaux HT : 552 000 € SHON : 303 m2 Mission complète

maison uld Lieu : rue Ramus, Paris 20ème Maître d’Ouvrage : SCI Un Léger Décalage Programme : surélévation d’une maison de ville Livré en 2009 Montant des travaux HT : 165 000 € SHON : 106 + 42 m2 Mission complète

maison guillaume Lieu : 3 allée des Hautes Sorrières, Meudon Maître d’Ouvrage : M. et Mme Guillaume Programme : Réhabilitation et extension d’une maison Livré en 2002 Montant des travaux HT : 137 200 € SHON :171 m2 Mission complète


références / appartements Rue de Verneuil, Paris 7° / 90m2 / 190 000 euros TTC Rue Germain Pilon, Paris 18° / 52m2 / 81 695 euros ttc Rue St Ferdinand, Paris 17° / 152m2 / 208 000 euros ttc Rue Kléber, Levallois Perret / 220m2 / 180 000 euros ttc Passage du Désir, Paris 10° / 92m2 / 115 000 euros ttc Rue d’Assas, Paris 6° / 75m2 / 92 500 euros ttc Rue Saulnier, Paris 9° / 40m2 / 27 400 euros ttc Rue Truffaut, Paris 17° / 135m2 / 92 000 euros ttc Rue Pigalle, Paris 18° / 270m2 / 109 760 euros ttc Porte Maillot, Paris 8° / 190m2 / 84 900 euros ttc Rue de la Planche, Paris 7° / 130m2 / 158 165 euros ttc Rue Saint Antoine, 17° / 105m2 / 105 000 euros ttc Rue Nollet, Paris 17° / 115m2 / 76 000 euros ttc Rue Treilhard, Paris 8° / 150m2 / 60 980 euros ttc Place du Tertre, Paris 18° / 65m2 / 22 800 euros ttc Rue des Vignes, Paris 18° / 110m2 / 42 000 euros ttc Rue Emile Dubois, Paris 14° / 47m2 / 25 900 euros ttc Passage Dauphine, Paris 6° / 50m2 / 12 000 euros ttc Rue de Marignan, Paris 8° / 200m2 / 168 000 euros ttc Rue Saint Dominique, Paris 6° / 102m2 / 78 633 euros ttc


147


1. 6. 2.

5.

3.

4.

8. 7.


PUBLICATIONS / 2014 2013 2012

2008

2007

2001

2000 1997

- Graphic Anatomy 2 Atelier Bow-Wow, TOTO publishing, février (1) - The Japan Architect 92, winter 2014 (2) - Shikenchiku, février 2013 (3) - D’architectures n°213, novembre (4) - Le moniteur n° 5662, juin (5) - AMC n° 215, mai (6) - AMC Spécial intérieurs, janvier (7) - Carnets DVD n°2 des salons de l’Institut français d’architecture, Périphériques Architectes Éditions A.p.r.e.s et la Cité de l’Architecture et du Patrimoine (8) - Autrement Rebière Workshop organisé par l’OPAC de Paris pour la création de 180 logements rue Rebière dans le cadre du Grand Projet de Renouvellement Urbain de la Porte Pouchet (Paris 17ème) Éditions du Pavillon de l’Arsenal, Barcelone (9) - Les minis Pavillon de l’Arsenal, Jeunes Architectures, n°28, Juillet (10) - Architecture A Vivre, Journées de la maison contemporaine, n°4, Juillet - Les minis Pavillon de l’Arsenal, Constructions de petites échelles, décembre (11) - AMC Spécial tertiaire, n°106, avril(12) - AIT büro heute, «très à la mode», octobre (13) - Europan 4, Construire la ville sur la ville, Les éditions de l’imprimeur, mars (14)

RADIO / 2011

- Euradionantes, Rumeurs d’archi - La rue Rebière, émission diffusée le 29 09 2011 animée par Hubert Dubois et réalisée par Adrien Maillard

EXPOSITIONS / 2006 2001

- (36) histoires de maisons, Arc en Rêve, Bordeaux (FR) (15) - Jeunes architectures, Pavillon de l’Arsenal, Paris (FR) - Constructions de petites échelles, Pavillon de l’Arsenal, Paris (FR)

149


10.

9.

12.

Hugues Martin, député-maire de Bordeaux Serge Goldberg, président Francine Fort, directrice d’arc en rêve centre d’architecture sont heureux de vous inviter à l’ouverture de l’exposition

[suites]

1997 > 2006

36 modèles pour une maison

conférence

jeudi 26 janvier 2006 à 19h galerie blanche cocktail jeudi 26 janvier 2006 à 18h salle de conférences

ouverture tous les jours sauf le lundi de 11h à 18h nocturne le mercredi jusqu’à 20h du jeudi 26 janvier 2006 au dimanche 5 mars 2006 visites commentées sur rendez-vous exposition réalisée avec le concours de Tollens Materis Peintures pour les vins Château Chasse-Spleen

architecture ville design

Entrepôt 7 rue Ferrère F-33000 Bordeaux www.arcenreve.com

tél. 33 (0)5 56 52 78 36 fax 33 (0)5 56 48 45 20

info@arcenreve.com direction de l'architecture et du patrimoine direction régionale des affaires culturelles Aquitaine

11. 15.

13.

14. 16.

17.

graphisme : arc en rêve centre d’architecture - photographie : © Raphaël Picaper

exposition en collaboration avec Périphériques et Architecture Dijon Bourgogne


1994

- Balise de survie, Beaubourg, Paris (FR)

ENSEIGNEMENT / 2004 -2010 - Ecole d’architecture de Paris-Malaquais, P1 avec Mme Clotilde Barto, « Le Récit Urbain », initiation à l’architecture : un regard sur la ville, avec les élèves de 1ère année. (16) 2004 -2006 - Ecole d’architecture de Paris-Malaquais, AO3, TD : « représentation de l’architecture, analyse de situations urbaines et croquis » 2011

2008

- « Ateliers Villes », workshop « Une autre rue Rebière » avec les enfants de CM2 de l’école Bessière, Paris 17ème (17) - Ecole élémentaire Houdon, Paris 18ème, Séances d’initiation à l’architecture avec les élèves de CP

151


Xavier Brunnquell & Axel AndrĂŠ architectes dplg

13 rue Durantin 75018 Paris / T +33 (0)1 42 23 21 24 / axxa.studio@orange.fr


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.