Contents 1.
Approval Bodies
7
2.
The Regulations
11
3.
The Building Control Team
19
4.
What the rules cover
23
5.
The difference between Planning and Building Control
33
6.
Demolitions
41
7.
What you need to do to obtain approval
45
8.
What is the Building Control Division’s responsibility after approval
53
9.
What happens on completion of works
59
10. What happens if work is carried out without permission
63
11. Applications for Scaffoldings and Hoardings
67
3
Building Control Guide
Locally recognised leaders in construction
Making homes beautiful one floor at a time. We provide solid wood, tile and laminate flooring.
45 Governor's Street Tel: 20073222 / 56002900 E-mail: gibflooring@outlook.com
• Building & Civil Engineering • Road and Paving Services • Specialised Waterproofing Services • Infrastructure Works • External Works / Hard Landscaping • Comprehensive Plant Holding for Hire • Building Renovations • Demolition • Suppliers of Asphalt • Suppliers of Sand / Aggregates • Land Surveying Services • Underground Radar Survey
For the Best Expert Local Advice, Quality Service and for Competitively Priced Quotations. Amco (Gibraltar) Ltd Unit 60, Harbours Deck, New Harbours, PO Box 382
Tel: 200 40840 Fax: 200 40841 E: mail@amco.gi
www.amco.gi
www.gibflooring.com
JANIS EVANS
SOLICITOR S
Our conveyancing team are pleased to offer a special rate on these new developments: Bob Peliza Mews
Hassan House
Hassan Centenary Terraces
International Lawyers Advisors on the two largest construction projects International Lawyers currently in progress in Gibraltar. However big or small your project, let us help you through the stages; Conception, Inception, Approvals and Build. Hassans has the unrivalled experience and connections to simplify what can sometimes prove to be a complex process.
Dedicated legal experts Fixed legal fees with no hidden charges* Fast and professional service Regular updates - we keep you informed Right Conceptual image of Apartment Building
Let us help. Come and talk to us about your ideas. www.gibraltarlaw.com business@hassans.gi 57/63 Line Wall Road, PO Box 199, Gibraltar. +350 200 79000 • +350 200 71966 •
4
Hadfield House, Library Street, PO Box 1426, Gibraltar Tel: (+350) 200 503 26 Fax: (+350) 200 457 93 Email: Janis.evans@janisevans.com
Building Control Guide
Introduction by the Building Control Officer – Robert Santos This is the first booklet on Building Control ever to be introduced since I joined the Building Control Team way back in 1984. It is therefore overdue and I am very pleased to have been involved in its introduction and indeed in the write up. This booklet is intended to provide guidance on Building Control and help you through the different aspects of the rules and assist you in understanding the system. I should emphasize that Building Control does not exist as an obstacle to your building intentions. It is there to safeguard the community against bad practices. They are aimed at improving the environment in which we live and to create a decent and safe surrounding to where we live and work. Whilst we are working with an outdated set of rules we are trying to provide a high quality service to all our customers. We are very keen to enable a response to our customers’ needs and therefore we offer an advisory service to builders, architects, engineers and the general public whose intentions are to carry out work in Gibraltar. We are presently working on a new concept of rules more in line with those in the UK, which will eventually replace the current ones with a more modern and pragmatic directions which will undoubtedly bring improvements to all those professionals associated with the Building Industry. We have only just completed a document aimed at improving the access and use of buildings with the main focus on disability.
This is part of our commitment to improving facilities generally. It will be introduced as an additional part to the present Building Rules and will be known as Part R – Access to and use of buildings. Part E – Safety in Fire has also been reviewed and now brings this in line with Approved Document B of the UK. Similarly to the UK an Approved Document is provided with the review providing much needed guidance on Fire related issues. This will come into effect shortly. I hope that this booklet emphasizes our commitment to a customer focused, professional service and helps explain the Building Control System. We are rapidly changing to meet demands and we are moving away from fulfilling only a traditional policing role to one of positively contributing to the design and construction process within a framework of customer service.
Robert Santos
5
Building Control Guide
Architecture at i t ’s fine s t
AKS
AKS ARCHITECTS & ENGINEERS
6
t. +350 20073260 e. mail@aks.gi www.aks.gi
1.
Approval Bodies
7
Building Control Guide
1. Approval Bodies The Building Control Division is part of the Department of Town Planning and Building Control and is presently located on the third floor Suite 631 at Europort. The division consists of the: • Building Control Officer • The newly incorporated Deputy • The Structural Engineer • Assistant Building Control Officers more commonly known as the Building Inspectors and now the incorporation of the Building Control Technicians. The Development and Planning Commission though just the Planning Authority have certain responsibilities to decide on applications for relaxation.
8
Building Control Guide
Construction Services The Bovis Koala Joint Venture combines its international experience with local knowledge to provide quality construction services to its clients. Bovis have grown over the past 100 years to be one of the most important & respected construction services providers in the market. Koala Construction has a strong track record of over 10 years constructing within Gibraltar gaining a reputation for quality construction and management. Our philosophy is based on understanding the business objectives of our clients with the aim of ensuring that the services we provide consistently meet or exceed their expectations. We have the capability to deliver a local service for all projects, regardless of size, location and type with a strong commitment to Health Safety and the Environment.
Construction
• Building Contractor • Design & Build • Construction Management
Bovis – Koala JV 34 Devils Tower Road Gibraltar Tel: +350 200 44058 Fax: +350 200 46652 info@koala-construction.com
www.bovis.es www.koala-construction.com
9
Building Control Guide
• •
S U P E R YA C H T M A R I N A
L U X U RY
R E S I D E N T I A L
•
•
A F F O R D A B L E
H O U S I N G
•
•
P R O M E N A D E
G A R D E N S
•
•
&
R E TA I L & CO M M E R C I A L •
F I V E
www.bluewatergibraltar.com 10
•
S TA R
H O T E L
•
•
2.
The Regulations
11
Building Control Guide
2. The Regulations They are legal requirements aimed to achieve adequate standards of building work that provide health and safety of people in and around all types of buildings. These rules are enforced under the provisions of the Public Health Act and are supported by the Gibraltar Building Rules 2007. These are as follows:
The 14 Parts of the Building Regulations Part A
Interpretation and general This part introduces and defines the important references that will be covered under these rules. It further explains what situations would be considered exempted and defines alterations, extensions and change of uses. This part also covers procedural and miscellaneous provisions where it describes how to give notice and deposit plans to lodge an application. It states the procedure to follow for relaxation and dispensation and explains what are considered unsuitable materials.
Part B
Materials and workmanship This part basically covers the fitness of materials and workmanship and the special treatment of softwood timber. Materials are usually certified in compliance with British Standards or its European equivalent.
Part C
Preparation of site and resistance to moisture This very important part explains in detail how the ground is prepared and effectively cleared of turf and harmful matter. It goes on to describe how the ground is prepared to prevent the passage of moisture and how this is extended to protect walls and roofs.
Part D
Structural stability This part covers all aspects of structural stability of a building. It defines the different loads and covers foundations for buildings, makes provisions for the use of structural timber and generally provides guidance on deemed-to-satisfy provisions for the different aspects of a structure in a building.
12
Building Control Guide
Part E
Safety in fire moisture ** New version to be introduced shortly.
This part exclusively covers Safety in Fire in and around a building. Covering all aspects related to the different categories of buildings which are also there defined. It also describes compartment walls and floors and the different fire resistance of elements of structure. A guide on minimum periods of fire resistance is also provided. Going on to further describe how to achieve compliance with separating walls, floors, shafts and doors. It also gives guidance on cavity barriers and fire stops and how to restrict the spread of flame. It also covers comprehensively means of escape.
Part F
Energy performance of buildings This is the most recent reviewed part having been introduced as a result of an EU directive for reducing the energy consumption of buildings. It covers minimum energy performance requirements for buildings. The introduction of Energy Performance Certificates is now a must with the sale of buildings. The aim is to achieve as close as possible zero energy buildings by 2020.
Part G
Sound insulation This part evidently covers guidance on how to achieve sound insulated walls, floors and roofs.
Part H
Stairways, ramps, balustrades and vehicle barriers This part covers general guidance on all types of staircases for the different categories of buildings. General requirements on how to achieve compliance in the design of stairs is provided. This extends to ramps and vehicle barriers.
Part J
Refuse disposal General requirements and guidance on how to achieve compliance with the storage of refuse is given in this part. It also covers refuse chutes and ventilating shafts on chambers.
Part K
Open space, ventilation and height of rooms This is perhaps the most complex of guidance. It provides management of open spaces, general ventilation requirements and minimum height for habitable rooms. It creates imaginary shafts of open space outside windows of habitable rooms and dictates how this may be achieved. It also provides guidance on shared land on housing estates for ventilation purposes. 13
Building Control Guide
Part L
Chimneys, flue pipes, hearths and fireplace recesses This part controls how a chimney is to be built. This includes the installation of flue pipes, hearths and fireplace recesses. The guidance provided assists designers on how to achieve compliance with different types of appliances. The deemed-to-satisfy provisions are also very helpful in providing guidance.
Part M
Heat-producing appliances and incinerators This part is perhaps the least used in Gibraltar given that there are not many heat producing appliances in use. It nevertheless gives guidance on how to install these appliances and incinerators.
Part N
Drainage, private sewers and cesspools Drainage requirement are covered in this very important part. It covers requirements on soil, waste and ventilating pipes. It also provides guidance on rainwater pipes including materials etc. The tests carried out to drains are also covered in this part giving guidance on how to achieve compliance. Further requirements on cesspools, septic tanks and similar structures are also provided.
Part P
Sanitary conveniences This part covers all aspects of the provision of sanitary conveniences in buildings from water-closets to urinals and how to achieve compliance.
Part R
Access to and use of buildings ** To be introduced shortly.
This is the equivalent of the UK’s Part M which provides guidance on access to buildings for disabled people. It gives technical guidance on how to make ease of access to and circulation around and within buildings together with requirements for facilities for the disabled. As mentioned in the introduction by the Building Control Officer the new concept of rules is in the design stage so there is still much work to be done before this is introduced. However, we have seen the introduction of the Energy Performance of Buildings and as already mentioned we are in the process of bringing in the new Part R which improves access and use of buildings with the focus on the disabled. 14
Building Control Guide
15
Building Control Guide
325a Main Street and
…
4 King’s Yard Lane G I B R A LTA R
Decorative and Commercial Lighting
Sales
B e s p o k e
LED Lighting d
e
s
i
g
n
Electrical
W h o l e s a l e
Domestic & Commercial Installations E: sales@thelightandpowershop.com T: ( + 3 5 0 ) 2 0 0 6 2 6 0 2 o r 2 0 0 6 4 5 3 4
Inline Framing Construction We offer a wide range of construction solutions
• • • • • • •
All types of construction High standard internal / external finishes Drywall partitions and ceilings Structural steel Light gauge steel External render systems All types of re-fit / turn-key projects
Government Approved Contractor T: (+350) 200 63515 E: info@inlineframing.com P.O. Box 1344 | Gibraltar Visit our website for more information:
www.inlineframing.com 16
Established Contractors
in Gibraltar
Profield contractors Ltd was constituted in 1989 and has been carrying out business as general building contractors in Gibraltar since then for major private clients and developers, as well as the Government of Gibraltar, including Design & Build projects and major Civil Engineering contracts.
T: (+350) 20043621 | E: management@profield.gi 95B Harbours Walk, The New Harbours, Gibraltar.
www.profield.gi
Building Control Guide
www.amberlaw.gi At Amber Law we provide professional advice at a fair and competitive rate and we advise on all conveyancing matters. So, whether you are:• • • • •
• Specialist building & general refurbishment contractors. • Specialist in structural works and wet trades including blockwork, brickwork,rendering, plastering and tiling.
Buying Selling Developing Looking to lease a commercial unit Taking out a mortgage
• Professional building service and quality workmanship. • Family run business established in 2005.
Contact: Colleene Wink at property@amberlaw.gi Amber Law, Suite C, 1st Floor, 85 Main Street, Gibraltar
Government Approved Contractors MOD Approved Contractors
+350 200 67585 or 56000765
Office: +350 20044964 Mobile: +350 54919000 Email: otlltd@gibraltar.gi f On The Level Ltd
C O N S T R U C T I O N C O M PA N Y BF CONSTRUCTIONS LTD 2/3 B HORSE BARRACK LANE GIBRALTAR PHONE: 200 41690 17
Building Control Guide
Is your bu faster tha siness moving n your in ternet?
We offer
Ultra Fast Broadband at competitive rates
GibFibreSpeed offers a wide range of corporate services for Mini, Small, Medium and Corporate Businesses. Trading under A.J. Sheriff Electrical Ltd we have vast market experience having operated locally for many years. We have always been determined to offer a high quality service at competitive prices.
Our Extensive Corporate Services Include: Internet Access Services
WAN (Site-to-Site) Connectivity
We also offer:
• High speed Fibre Optic Internet Access • Transit Service for Autonomous Systems • Advanced SLA’s for critical services • Prioritised traffic (QoS Services)
• Flexible connectivity: Point-toPoint, Point-to-Multipoint or Mesh connectivity models • Increased security & enhanced connectivity • Transparent connectivity & ease of deployment for new services
• Experienced Engineering and Tech Support • Top Class Layer 2 GPON Technology • Powerful CISCO infrastructure • Dual Provider Connectivity Redundancy
Tel: +350 20065154 or 20065155 sales@gibfibrespeed.com
www.gibfibrespeed.com Residential Packages also available 18
Unit 5 Waterport Terraces, North Mole Road, Gibraltar
3.
The Building Control Team
19
Building Control Guide
3. The Building Control Team The team is composed of a number of technical people very ably supported by a number of administrative officers. These are the following: The Building Control Officer Mr Robert Santos The Structural Engineer Mr Hubert McKay Deputy Building Control Officer Mr Norman Neale The Building Inspectors Mr Michael Peliza Mr Ernest Borrell Building Control Technicians Mr Oliver Quick Mr Jovan Santos Administration Mrs Miriam Brittenden Mrs Lianne Gonzalez Mr David Francis Mrs Angelica Pipo Mrs Analise Agius Mrs Myra Romero Ms Tracy Parody The department is presently under review and already the Government have agreed to enhance the Division with three additional officers, a deputy to the Building Control Officer at HPTO grade and two Building Control Technicians to assist the Building Inspectors. The new additions to the department will help to develop the service that we provide with the main focus on progressing on legislation which will hopefully see the introduction of the Building Control Act and move towards the new concept of rules that has been the aim for many years. This will see a move away from the present stringent set of requirements into a more flexible concept as is the case in the UK.
20
Building Control Guide
SPECIALISTS IN THE DESIGN, SUPPLY AND INSTALLATION OF DOMESTIC AND COMMERCIAL AIR CONDITIONING SYSTEMS. We manufacture all our own ductwork in our own local sheet metal fabrication workshop and are subcontractors to the main Building Services Companies in Gibraltar. We can offer full packages to include:
• Design • Supply
• Installation • Commissioning
+350 20047540
info@airconditioninggibraltar.gi
www.airconditioninggibraltar.gi
IAC LTD INDEPENDENT AIR CONDITIONING LTD
www.tandemdevelopments.gi info@tandemdevelopments.gi
ALL ASPECTS OF BUILDING AND CIVIL ENGINEERING
____________________________________________________________________________
21
Building Control Guide
ATLAS
BUILDERS MERCHANTS GIBRALTAR’S MAIN PLUMBING SUPPLIER: ALL SYSTEMS TO BS & DIN STANDARD. SUPPLIERS FOR: CPVC. UPVC. ABS. HTA. POLYBUTELENE. PPR. COPPER. PUSH FIT. GALVANISED PIPES & FITTINGS. IRRIGATION. MDPE. PE. TOOLS. WATER HEATERS. Q & E. MARLETON CROSS. EDINCARE. BATHROOMS & ACCESSORIES. etc. POLYPIPE TERRAIN. JOHN GUEST. UPONOR. GIRPI. VITRA. HUNTER. VADO. METHVEN. PEGLER. NIBCO. STERLING. POLYPIPE. EFFAST. G.FISCHER. WIRQUIN. ROPER RHODES. MARLETON CROSS. EDINCARE. etc. MAIN SUPPLIERS TO: GOVERNMENT OF GIBRALTAR. OCEAN VILLAGE. MID HARBOURS. BISHOP FITZGERALD. AERIAL FARM. SWJG. St BERNARD SCHOOLS.
WE OFFER FREE ADVICE. CUSTOMER SATISFACTION GUARANTEED 19 Governors Street, 7 New Harbours, Gibraltar
Tel: +350 20078816 Fax: +350 200 71896 Email: atlasbmes@gibtelecom.net
Operating under British Standards and Regulations • Ready mixed concrete supplier • 1000m3 per day capacity • Slab pours in excess of 600m3 in a day • Small 2m concrete Trucks for supplies inside the city walls • Supplier of sands and aggregates • Builders merchants 65 Devils Tower Road Gibraltar 22
T: +350 20047556 info@basewell.net
4.
What the rules cover
23
Building Control Guide
4. What the rules cover The Building Rules cover building works as defined and includes • Rebuilding operations • Alterations or additions to buildings • Loft conversions • New windows in walls or roofs • Structural alterations • Demolitions • The installation or extension of any service controlled under the rules • Non-structural alterations that may change the layout of a dwelling, office etc. • Change of uses It is advisable to consult the Building Control Division of any proposed works that may not appear to be controlled but could lead to contraventions of the rules and those which may have implications on adjacent properties.
24
Building Control Guide
Removing internal walls
Some internal walls are fundamental to the structure of the house. Some offer fire protection and others simply divide up space within a house and are relatively straightforward to alter or remove. Load-bearing walls obviously require very careful consideration before they can be altered or removed and must have the input of a structural engineer to design a suitable beam or some other supporting structure so that loads are safely transmitted to the ground. Therefore before demolishing an internal wall there are two key questions to ask: Is it load-bearing? It’s not always obvious which walls are holding things up, and which are merely partition walls. But if you get this wrong, you are in serious trouble. In most properties, especially in older buildings, the internal walls will normally be supporting roof loadings, floor joists or other walls. Does it protect you from fire? Walls around staircases offer protection allowing you to escape in the event of a fire. In flats particularly there are other partition walls which also offer protection especially those walls used to create a compartment where there is no alternative means of escape from habitable rooms. These walls are particularly important in houses with three or more storeys. If they are removed it is essential that the situation complies fully with requirements. If you wish to remove these walls you need to contact us and we will be happy to advice further.
Structural alterations
Before making any sort of structural alteration to your home a Building Regulations application must be made. This will necessarily involve a structural design package submitted by a structural engineer with all the relevant drawings and calculations. It must be noted that if these types of works are carried out illegally, it can cause major problems when you come to selling the property as well as being potentially dangerous. It is therefore re-assuring that Building Control will be conducting site visits to check the work and offer professional advice.
25
Building Control Guide
Replacing windows
The replacement of windows requires both Planning and Building Control consent. Planning consent may not be required for straightforward like-for-like replacements except in conservation areas or in listed buildings. However in any other situation an application would have to be made. With respect to Building Control maximum permitted heat loss standards apply and new windows must meet the minimum U-value under Part F and Approved Document of the Building Regulations. Replacement windows also need to comply with the requirements for ventilation. For new window openings to habitable rooms there are minimum size requirements equivalent to at least 1/20th of the room’s floor area. Building regulations consent will also be needed for any structural alterations that include a widening of an existing opening and fitting new lintel. Glazing technology has made great advances in recent years, and even super slim units can achieve excellent performance. There are three key features that help thermal performance: • Gas filling reduces heat transfer across the glazing cavity. • Low-E (emissivity) coatings reduce heat loss across the glazing cavity. • Super-insulated frames incorporate ‘warm edge’ spacers to reduce heat loss via thermal bridging. Where historic windows in older properties need to be retained, a good alternative is to install internal secondary glazing. These can comprise double glazed units that open inwards to the room. Secondary glazing also has superior sound deadening qualities to double glazing. Alternatively, special super-slim double glazed units can sometimes be fitted to existing window frames in period houses, retaining much of their period charm.
26
Premier suppliers of Windows, Doors, Conservatories and all your Glazing needs Building Control Guide
Total Facade ad
Total Facade Industries (Gibraltar) Ltd Unit 1, Neptune House, Marina Bay, Gibraltar Office: 21666612 Mob: 58007602 Coming soon - our all new premises, including showroom, details to be announced
R
ocal
Doors
Total Facade Industries
(Gibraltar) Ltd 27
Building Control Guide
Re-roofing
Normally re-instating roof coverings on a like-for-like basis will not require planning consent. But if you want to change the type of materials, or raise the profile of the roof, a planning application may need to be made. When it comes to the Building Regulations, consent is not normally required as long as no changes are made to the structure of the roof and you replace the roof finish like for like (i.e. slate with slate, not concrete tiles). However, ‘Part F’ of the Building Regulations requires you to improve thermal efficiency where you’re renovating any part of the building’s ‘thermal envelope’ (i.e. the roof, main walls or floors). This is something that commonly affects flat roofs because they need re-covering more frequently than main roofs.
28
Building Control Guide
Mersey Castle Scaffolding undertake all sizes of scaffolding projects
• All types of scaffolding, winches, hoists and lifts for both domestic, commercial and specialised use. • Access ramps and cradles. • We also undertake Painting & Decorating, Plastering & Rendering.
CONTACT US:
T: 20062523 M: 54348000 E: info@merseycastlescaffolding.com
www.merseycastlescaffolding.com
Government Approved Contractors
We are TEAM ICOPAL and ECO-PROOF approved contractors that are able of giving up to 20 year insurance backed guarantees. • Flat roofs, (Felt and Liquid Rubber) • Pitched roofs, (Metro tile, Decra tile, Cement tile) • Tanking, (Felt, Liquid Rubber) • Asbestos encapsulation, (Liquid Rubber) Southern Point Roofing Ltd Unit 5 6 Garrod Road Devils Tower Road Gibraltar P.O Box 1111
Office: 200 68116 Mob: 54008008 Email: info@spr-gib.com
f
southern point roofing
Companies House Registration Number: 82659
www.spr-gib.com 29
Building Control Guide
Daniel Barton Surveyors Ltd is a local firm of Chartered Quantity Surveyors offering the following core services: 1. Quantity Surveying, including; a. Provision of cost estimates for projects at a very early stage to enable key decisions to be made b. Cost planning and cost monitoring throughout all the stages of the project c. Advice on the procurement routes available d. Management of the design process to minimise the potential for claims and additional costs during the construction period e. Collation of tender documents including drafting of construction contracts and preliminaries requirements documents f. Impartial, forensic examination of tenders and production of tender reports 2. Cost Consultancy 3. Contract Administration 4. Project Management
Daniel Barton Surveyors Ltd Unit R 28, Ragged Staff Wharf Queensway Quay Gibraltar Tel: +350 20050844 Mob: +350 56000071/ +350 58008785 Email: info@gibraltar-surveyors.com
Renovating to sell? Interested in how much you will get back?
Contact us for a free valuation and professional property advice.
chesterton.gi 20 Ocean Village Promenade 30
+350 200 40041 enquiries@chesterton.gi
Building Control Guide
Chartered Health, Safety & Environmental Advisors
For all your CDM Requirements. For a reliable professional service & hassle free projects. • Planning Supervision / CDM Coordinator • Construction Phase Plans • Risk Assessments • Method Statements • Dust Control Plans • Environmental Management Plans • Traffic Management Plans • Safety Training & Toolbox Talks
Safety Solutions Ltd PO Box 333, Gibraltar, GX11 1AA Tel/Fax: (+350) 200 50929 Mobile: (+350) 56707000 E-mail: safetysolutions@gibtelecom.net
www.safetysolutions.gi
GO GREEN Want to save money and reduce your carbon footprint? Recycle.gi takes the hassle out of recycling, helping you comply with environmental standards and enhancing your reputation.
EWMS GIBRALTAR’S LEADING HAZARDOUS WASTE DISPOSAL EXPERTS SINCE 1994 EWMS adequately and responsibly deal with hazardous waste produced by local Industries and Government departments in an environmentally friendly way.
YOU NAME IT, WE’RE HERE TO RECYCLE IT. PAPER | CARDBOARD | PRINTER TONERS ELECTRONIC EQUIPMENT | BATTERIES FLUORESCENT BULBS | OFFICE FURNITURE OLD UNIFORMS | COOKING OIL
RECYCLING - OFFICE WASTE - CLINICAL WASTE
Visit Recycle.gi
PHARMACEUTICALS AND MEDICINES SHIPPING WASTE - CONSTRUCTION WASTE COMMERCIAL WASTE - CONSULTATION
Recycle.gi Limited | PO Box 1218, Gibraltar T. +350 200 44240 | +350 5401 2638 | +350 5600 0645 E. info@recycle.gi | www.recycle.gi
Environment & Waste Management Services Limited
Proud winners of the GFSB Award for Innovation and Achievement 2010 Proud winners of the ESG Environmental Award 2008
T +200 44220 - E ewmsgib@gibtelecom.net - W www.ewms.gi
PO Box 4, Governor’s Cottage, Europa Advance Road
31
Building Control Guide
International Standards,
Local expertise
B F A Estate Agents Tel: +350 200 71131 / info@bfagib.com
B F A
Valuers
Tel: +350 200 60344 / valuers@bfagib.com
B F A
Management
Tel: +350 200 42326 / management@bfagib.com
B F A
Development Consultants
Tel: +350 200 60344 / valuers@bfagib.com
B F A 32
ww w . b f a gi b . c o m
5.
Differences between Planning and Building Control
33
Building Control Guide
5. Differences between Planning and Building Control The department is responsible for both Planning and Building Control hence the name and whilst these are indeed two separate issues, any application submitted will be processed taking into consideration both aspects. The applications run through a simultaneous process and a decision on both aspects will be obtained at the end of such process. The Planning process is required to ensure that the proposed building will not be misused, that the appearance of the building will not contrast with the surroundings and that there are no justifiable complaints against the development. Further advice on Planning may be obtained from the Town Planner who will also provide guidance on this process. The Building Control process is concerned with the actual structure of the building. This includes both external and internal works such as those aspects covered as parts A to P and are there to achieve adequate standards of building work that provide health and safety of people in and around all types of buildings. It is however the householder’s responsibility for obtaining Building Control Approval. It is very often in Gibraltar for builders and architects to handle this for you. Although this department will provide you with an independent advice having experience of local knowledge on sites and buildings to protect your interest should issues arise.
34
From building clean rooms with the VC-D vibration criteria, a staggering 16 times more sensitive than human perception, to launching 53m 565 tonne bridges over 10 operational tracks and building schools within 18 months using level 2 BIM, our multidisciplinary team deliver outstanding solutions.
Building Control Guide
INGENUITY AND AMBITION (ENABLING REVOLUTIONARY SOLUTIONS)
Image: Hufton + Crow
See more at www.ramboll.co.uk
WITH 12,800 ENGINEERS, DESIGNERS AND CONSULTANTS, WE CREATE SUSTAINABLE SOLUTIONS WITHIN BUILDINGS, TRANSPORT, ENVIRONMENT & HEALTH, WATER, ENERGY, OIL & GAS, MANAGEMENT CONSULTING AND PLANNING & URBAN DESIGN.
T: +350 200 51987 M: +350 58008085 E: ramboll@gibtelecom.net A: Unit 8-9 Ragged Staff Wharf, Queensway Quay, Gibraltar 35
&
Building Control Guide
CHARLES GOMEZ & COMPANY BARRISTERS
AT
LAYING THE FOUNDATIONS
FOR A BRIGHT FUTURE FOR 30 YEAR S AND COUN TI NG
LAW
charles@gomezco.gi 5 Secretary’s Lane, Gibraltar
• PVC Fabrication
• Awnings
• Aluminium Fabrication
• Garage Doors
• Iron Gates & Fences
• Shower Screens
• Metal Roofs
• Window Shutters
• Polycarbon Roof
• Glass Window
• Exterior Blinds
• Window Refurbishment & Repairs
• Interior Blinds
C O N T A C T
U S
17G, Unit 7A Tel: 200 63995 Chatham Counterguard Email: sunlight@gibtelecom.net PO BOX 69, Gibraltar
36
Let’s Talk: 200 74998
www.lawequitygibraltar.com
Building Control Guide
CRJN
GENERAL CONSTRUCTION & SCAFFOLDING 60 CITY MILL LANE Tel: +350 200 76999 Mob: +350 54029894
LARES CONSULTANCY LTD
• Full House Refurbs.
Lionel Victor
• Floor Polishing
MICE MIStructE MCIOB Ing. CICCP
• Interior & Exterior
Civil and Structural Engineer / Project Manager
• Refurbishments • Tiling, Bricklaying, Plastering, Scaffolding Jobs • Floor Tiling & Boarding • Patios, Balconies
Gib: 00350 540 20808 Spain: 0034 647 813 095 E: lionel@larespm.com www.larespm.com
Quotations within 48Hrs
VISIT OUR SHOWROOM AT 6A OCEAN HEIGHTS GALLERY
Suites 1 & 2, Newton House, 5 King’s Yard Lane, Gibraltar T: (+34) 956 535 808 M: (+34) 606 463 805 E: pss.gibraltar@gmail.com
Scaffolding Solutions
www.asl-aluminiumsolutions.info
Providing a first class service to our customers in all commercial & domestic projects involving decorating, plastering, painting, carpentry & joinery, plumbing, masonry, tiling, treatment for termites & woodworms and building works at very reasonable prices.
FREE ESTIMATES 269/3 Main St M: 54012019 T: 20045175 E: bellacasa@live.co.uk
• CCTV and Access Control
• Manned Guarding
• Fire & Intruder alarms
• 24 Hr Mobile Response Services and Key Holding
(+350) 200 63699 www.securitek.gi 37
GJBS Limited From humble beginnings in 1988 GJBS was located in the MOD Dockyard as a small joinery company manufacturing windows and doors but is now, and for the past 5 years, the largest Building and Civil Engineering Company in Gibraltar. GJBS is proud to be a Gibraltarian company building in Gibraltar for Gibraltar by a local workforce guided and supported by the Company’s owner, HM Government of Gibraltar. Under the direction of the Managing Director Michael Estella there has been continuity in leadership ensuring the continued success of the company with consistent and positive results. The growth over the 27 years of trading has been a planned and measured success. Wholly owned by the HM Government of Gibraltar but having to operate on a stand-alone basis GJBS has to be commercially viable and although this has proven a challenge over the years they have consistently managed to produce satisfactory financial results year in year out. This demonstrates that GJBS is not a financial burden to the HM Government of Gibraltar but in fact a valuable asset. GJBS’s success is reliant upon the professional team of project managers, quantity surveyors, administration and accounting staff through to the dedicated team of the directly employed construction workforce. There is also the joinery workforce which includes skilled craftsmen based in the largest timber workshop in Gibraltar with a vast array of modern equipment producing anything from doors, staircases through to bespoke furniture. A few of the key indicators of the continued success are: • GJBS employ locals who have pride on working on projects in where they reside without relying solely on subcontractors • A vast fleet of wholly owned machinery and plant which negates the need to rely on other companies • An in-house Joinery workshop with skilled operatives producing quality products • A professional team of staff with varied disciplines – Civil Engineering, Building, New build, Refurbishment, Marine and Tunnel work • Close relationships with local design consultants, subcontractors and suppliers • Having the ability to undertake traditional building contracts as well as specialist such as design and build. • Adopting a non-confrontational and non-claims conscious approach
GJBS takes Health and Safety very seriously and every project has a dedicated team undertaking weekly audits to ensure the operatives are working safely and the site is managed to mitigate any possible health and safety infringements. In addition for specific tasks detailed method statements and risk assessments are produced as well traffic management plans. This combined approach has contributed to GJBS’s exemplary Health and Safety record. GJBS can also provide car parking solutions having recently installed a car park stacker to the new offices at Number 6, Convent Place. This machine, manufactured in Korea can accommodate up to 18 cars stored vertically with the cars being easily rotated to release the cars. This is an excellent solution for the problems encountered in Gibraltar with the shortage of available parking. Some of the high profile and prestigious projects GJBS have completed are: • The new Magistrates and Supreme Law Courts • The External refurbishment of the entire Montagu Gardens/Crescent estate • Completion of the Waterport Terraces estate • Completion of the Mid Harbours residential estate • Gibraltar International Bank • The new Elderly Care Facility at the old St Bernard’s Hospital • The new Catering facility at the new St Bernard’s Hospital • The Park and Ride carpark, Devils Tower Road • The new carpark at Eastern Beach • The completion of Cumberland, Bayview and Nelsons estate • Cancer relief Facility • Gibraltar international Airport • The Prison • Small Boats Marina • Parliament • Dementia and Mental Health facility at the old RNH Hospital • Pistol Shooting Club • St Bernard’s school • New offices at Number 6, Convent Place • Aerial Farm development residential • The Airport Tunnel Gibraltar’s future is looking extremely promising and with forthcoming projects such as the new Mid Town development, the Football Stadium and the Eastside Development to name but a few it is felt that GJBS will play a major role in some form or another. Contact: Email: mail@jbs.gi Telephone: 200 79888 Facsimile: 200 74028
Building Control Guide
Buying or Selling...
No-One Offers You More™
Visit us at: 1 The Boardwalk, Tradewinds, Gibraltar
Tel: 200 47777
www.brayproperties.com 40
Estate Agents Property Consultants Property Management Mortgages Valuations Surveys Lettings
6.
Demolitions
41
Building Control Guide
6. Demolitions An application for demolition will somewhat differ from the other applications. If it is intended to demolish a building or part of a building, it is necessary to submit an application showing plans and photographs of the building and must be accompanied by a Method Statement of demolition that is to be prepared by a competent person. This will be the subject of planning consideration and will be tabled at the Development and Planning Commission for approval. The supervising engineer overseeing the demolition must be a corporate member of either the Institution of Structural Engineers or the Institution of Civil Engineers. Disconnection Certificates must be obtained for the relevant services from: • The Electricity Authority at Gibelec House, North Mole Road. Tel 20076282 • Aquagib Ltd at Suite 10b Leanse Place, 50 Town Range. Tel 20040880 • Telecommunication disconnection from either Gibtelecom on 15/21 John Mackintosh Square, Tel 20052200 or Sapphire Networks Suite 3.0.3 Eurotowers, Tel 20047200 A separate notice is to be served under the Factories Act giving details of risk assessments on asbestos etc., to the Health & Safety Officer at the Ministry of Employment situated at Unit 76/77 Harbours Walk, New Harbours. For further information on this please contact them on Tel 20047958. A Demolition Permit will then follow with a series of conditions, which must be adhered to when carrying out the demolition operations. Separate permission is to be sought from Building Control for the temporary installation of scaffoldings and hoardings. (See 11)
42
Building Control Guide
PROPERTY & CONSTRUCTION LAW At Attias & Levy we deliver readily understandable focused legal advice whilst having conduct of all variety of property transactions. We are valued for our technical expertise, fully understanding the objectives of a client and the quality of service that we deliver. Attias & Levy clients include: Developers, Contractors, Construction Professionals, Financial Institutions, Investors, Estate Agents, Landlords, Tenants, Management Companies and Individual Purchasers. We have extensive experience in advising on: Development & Construction Projects, Strategic Portfolio Advice, Estate Management & Planning, Landlord and Tenant Issues, Contract Negotiations and Conveyancing Contact: attlev@gibraltar.gi First Floor Suites, 39 Irish Town, PO Box 466, Gibraltar Tel: 20072150 Fax: 20074986 website: www.attiaslevy.gi Like us on Facebook: https://www.facebook.com/AttiasLevy Follow us on Twitter: https://twitter.com/AttiasLevy 43
Building Control Guide
www.richardsonsproperties.com
Richardsons Building Surveying captures a wide range service for the built environment. From undertaking the purchase survey and advising on how best to convert or refurbish your property, to drawing up plans and managing your building works on site, we turn your plans into reality.
Our professional services include: • Inspections and surveys • Feasibility studies including maintenance, refurbishments, conversions and adaptations • Budget estimates • Construction drawings, design and specification • Project management and quality control (New-build and refurbishments) • Contract administration and cost analysis
• Planning and building control advice • Fire precautions • Building pathology and defect diagnostic service • Alternative dispute resolutions • Conservation of historic buildings • Condition reports and homebuyer reports • Dilapidations • Sustainability and energy conservation
Richardsons 1/4 College Lane, Gibraltar Tel: +350 20079210 E: info@richardsons.gi
Say hello to your new bank. Welcome to Gibraltar’s new retail bank. Whether you wish to open an account for yourself, your children or your grandchildren, or wish to take advantage of our corporate know-how, you’ll find not just a great local service with global expertise but also a very warm ‘hello’.
Traditional banking with a modern feel. Visit us today at www.gibintbank.gi Gibraltar International Bank Limited is authorised and regulated by the Gibraltar Financial Services Commission. Company Registration Number 109679
44
7.
What you need to do to obtain approval
45
Building Control Guide
7. What you need to do to obtain approval You are required to visit the Building Control Division to obtain the necessary forms (may also be downloaded from the Government website www.egov.gi ) well in advance of your intention to commence works on site. An application is to be lodged with full plans consisting as follows: • Site plan – Block plan • Plans of every pertinent floor – as existing and as proposed • Sections • Elevations • Constructional details • Structural design calculations (where applicable and these are to be undertaken by a competent person) • Drainage details Further advice may be obtained from the Division with respect to the Fees applicable. A table of fees is available upon request. You may either work out the fees yourself and the authority will provide a check or you may lodge the application and the fees will be requested by return. The Building Control Authority will thoroughly check your application for compliance with the Building Regulations and an Approval Notice will issue if found to be in compliance and conditions may be added to this Notice. A Refusal Notice may also issue if application found to be in breach. On providing a structural design package with an application, it would be advisable to contact the Structural Engineer to verify what is expected. There is a Design Data Sheet to be filled in to assist the structural check and a Design Certificate may also be required on more onerous designs.
46
Building Control Guide
Project Management Services Limited
Suite 3.02.03, Eurotowers, Europort Road, Gibraltar
Tel: +350 20068426 Email: office@ansgib.com 47
Building Control Guide
SFA Total Refurbishments - 11 Cornwalls Parade, Gibraltar
Specialist Floor Fitters
Laminate, Engineered & Vinyl flooring, Ceramic tiles and Carpet tiles
Professional Painters & Decorators Home, Shop & Office interiors, Commercial & Exterior painting
General Refurbishments
Bathrooms & Home refurbishments, Faรงade renovations
General Construction & Roadworks
WWW.SFA.GI 48
Tel: 20067980 / 54011849 Email: sfainteriors@hotmail.com
f
Building Control Guide
Tips in choosing a builder
The success of any building project is to a large extent down to your choice of builder. It is therefore essential that you do your homework before choosing one. Local recommendations are usually best, so be sure to follow up recommendations from friends. Architects and surveyors can be a useful source of advice as they may have previously worked with contractors. You need to decide whether to appoint a main contractor or directly employ individual trades. Therefore here are some tips for employing builders: • Get at least three quotes. For larger jobs this should be priced against an itemised specification. Get the cost broken down into as much detail as possible.
£
• When comparing quotes, check for hidden extras and don’t be tempted to automatically choose the lowest price.
• Ask for references on other jobs and take the trouble to see them.
12
3
• Never pay up front. Agree payment stages in advance and only pay for completed work.
• Be very clear about precisely what work you want done. Don’t keep changing your mind later or you will be charged for lots of expensive extras.
• Use a written contract or detailed letter.
• Confirm the start and finish dates in writing, along with the agreed price and arrangement for payments.
• Confirm what exactly is included in the price.
• Check that the builder is insured for risks to persons and property.
49
Building Control Guide
> Security systems, intrusion detection > Fire alarms and smoke detectors > CCTV installation and monitoring > 24/7 Operations room
Jebel Tarik Security are dedicated to enhancing your way of life by increasing your sense of security. Our easy-to-use and innovative Home Security Systems and components are vital parts of everyday family life for people of every age.
By providing 24x7 real-time connectivity between families, homes, property, care givers and community support networks, we empower you to pursue your daily lives with full conďŹ dence that the people and things you care most about are safe and comfortable.
Jebel Tarik Security First Floor, 50 116 Main Street, Gibraltar
info@jebeltariksecurity.gi
Tel: +350 200 41041
jebeltariksecurity.gi
Building Control Guide
18/10 Hospital Ramp, Gibraltar, GX11 1AA Tel/Fax: (+350) 20040037 Mobile: (+350) 58479000 E-mail: avellano@gibtelecom.net Building Services Engineers, Quantity Surveyors & Project Managers Also Government Accredited Energy Assessors
Based in Gibraltar, AMA Services Ltd started operation in 2005 and we provide comprehensive building services consultancy service assisting you from the earliest stages of the project through to its completion and handover.
MONTEVERDE & SONS LTD Transport & Demolition Contractors
Williams Way, Catalan Bay PO Box 504, Gibraltar Tel: 200 70401 Fax: 200 73427 Email: info@monteverdegib.com
www.monteverdegib.com
www.ama-services-gibraltar.co.uk
PROVIDING THE MACHINERY FOR GIBRALTAR’S CONSTRUCTION INDUSTRY
Gibstainless
W EL DI NG & FA B R I C AT I O N
Looking for a welder you can trust?
Look no further!
We’re committed to the craft of welding and serving you with honesty, quality, and value. From industrial welding to the easiest fabrication, here at Gibstainless Welding & Fabrication, we've got you and your needs covered. You see, we've been in the business for over 50 years now and we've got the experience that it takes to be the best.
Gibstainless Coaling Island Gibraltar, Gibraltar Tel: +350 54000779 Email: matt@gibstainless.com
www.gibstainless.com
Building Contractors and Carpentry Main or Sub Contractors of construction projects • Iberian peninsula official installers of AcryliCon Industrial Flooring • General maintenance work • Structural Steel Framework supply and installations • Industrial staircases - internal & external • Balustrades and handrails
• Stainless steel supply and installations • Aluminium windows and doors • General steel fabrication, supply and installations • Specialist project work - metal based • Building glass fronts • Glass curtain systems with solar control
Po Box 379, Gibraltar Tel: 20070110 Mob: 57092000 Email: gib.triangle@gmail.com
www.tri-angle.co
51
Building Control Guide
McKillop Smith offer independent professional advice on all aspects of commercial & residential property including: • Property condition, acquisition or relocation • Benchmarking/optimising property running costs & service charges • Boundary, rights of light disputes and party wall procedures • Building defect analysis/solutions & maintenance advice • Building surveys & architectural services, with value-added design solutions • Heritage Consultancy – Heritage Desk-based assessments, Statements of Historic Significance, Heritage Impact Assessments and Conservation Management Plans
52
• Design, adaptation, alteration – commercial & residential properties • Expert witness; property related issues • Insurance assessment and claims assistance • Landlord & Tenant advice, including dilapidations & schedules of condition • Management of building repairs, external redecoration & refurbishments • Office fit-outs, including full turn-key services • Planned maintenance plans (PMPs) • Property management of residential & commercial blocks • Refurbishment & project management
8.
What is the Building Control Division’s responsibility after approval
53
Building Control Guide
8. What is the Building Control Division’s responsibility after approval After the approval has been obtained and you have served the appropriate notice of commencement of works, the Building Inspectors will make periodical visits on site to ensure that the works are carried out in compliance with the approved plans and in accordance with conditions which may have been imposed. It is very important however to give the authority the necessary notice of commencement of works and subsequently any stages such as concrete pours, commencement of bricklaying, laying of Damp Proof Membranes /Damp Proof Courses and any other relevant stage that requires inspections. When laying new drains the Environmental Agency is to be called for the appropriate test to be effected on the new drains. This is to be carried out well in advance and appropriate notice is to be served to enable a convenient time and date. The drains are not to be covered until such time as the test is carried out and the necessary clearance obtained. The Building Inspectors may provide you with guidance and advice on any Building Control query that may arise during the construction period. However the role of the Building Inspector is not to be confused with that of a Clerk of Works.
54
Building Control Guide
55
Building Control Guide
FDT Architects Architects, Interior designers, Project managers.
jor designs limited JOHN O’REILLY Director & RIBA Chartered Architect m: +350 54025843 e: admin@jor-designs.com 207 Barbary View, Royal Ocean Plaza Ocean Village, Gibraltar
www.jor-designs.com
Francis Trico BA(HONS) INT DIP ARCH C.O.A.C. 458 ARCHITECTURE • INTERIORS • LANDSCAPE URBAN PLANNING • PROJECT MANAGEMENT
Gib: +350 54009795 Spain: +34 606 536545 E-mail: fdt@gibtelecom.net f /FDTArchitects.eu
Planning Applications • Technical Drawings Tender Packages • 3-D Visualisations
E • info@gamma.gi
• Construction specialists • Building and Civil Engineering • Infrastructure work • Pipework • Roads and Paving
56
Suite 7, 4 Georges Lane, Gibraltar
Tel: +350 200 67708
Building Control Guide
Your local communications provider • Full range of fixed, mobile and internet services
• Resilient local and international connectivity
• Range of broadband packages
for home and business (including SuperSwift fibre broadband)
• Tailored enterprise solutions (office systems, cabling, technical set-up)
• Dedicated staff giving high levels of customer care
• 24/7 technical support, network
monitoring and call centre services
Talk to us today
Tel: +350 20052200 info@gibtele.com gibtele.com
57
Building Control Guide
You have just entered the world of Mulberry Real Estate where you will find a selection of services committed to helping you, our client.
Our dedicated professionals who have many years of valuable experience in the property industry are here to help you find your dream home. Be it a main residence, second home, investment property, help with relocation, concierge services, lettings, mortgage advice, tax information and conveyancing, we will endeavour to find you what you are looking for. If you can't see what you need within our website please contact us and we will carry out a search with your exact specifications.
CONTACT US: (+350) 20042737 info@mulberry-realestate.com
www.mulberry-realestate.com 58
9.
What happens on completion of works
59
Building Control Guide
9. What happens on completion of works On satisfactory completion of the works the Building Control Division will issue you with a Certificate of Fitness or a Completion Certificate after consultation with both the Environmental Agency and the Fire Safety Department. A Certificate of Fitness will certify that the building is fit for occupation and provides formal confirmation that the works have been carried out in accordance with the relevant rules. Alternatively the Completion Certificate is issued for works of a minor nature where occupation/habitation is not necessarily the case such as i.e. a garage, structural alterations not affecting occupation etc. It is important to note that failure to obtain this certification may result in serious practical consequences for householders seeking to sell their property. Certification is required when purchasing or selling property by Building Societies and Banks in connection with mortgages prior to releasing money. This certification is also very important in domestic home insurance policies. Your attention is therefore drawn to the requirements of these policies where claims may not be accepted if certification is not available for any internal alterations that may have been carried out without the relevant permission. These minor alterations may include the removal of fire doors, the replacing of openings with arches, removal of non-structural walls or partitions or other minor alterations that may require approval. Free advice on these issues may be obtained from the Building Control Division.
60
Building Control Guide
“We shape our buildings, thereafter they shape us” Sir Winston Churchill
Property Developers Est 1984
MONTAGU GROUP | 83 Irish Town | P.O. Box 696 | Gibraltar, GX11 1AA Tel: +350 200 72035 | Fax: +350 200 79180 | Email: info@montagugroup.com
61
Building Control Guide
SOLAR POWERED ELEVATOR Forget about the electricity bill!
The OTIS GeN2 Switch is an elevator that can operate with 100% clean, renewable energy. In addition to generating its own energy, if it is connected to suitable solar PV (photovoltaic) panels, they will provide all the energy the elevator needs for operation*, thus completely eliminating CO2 emissions. * Consult the technical requirements of the solar panels that are necessary for each installation to operate correctly according to the number of sunlight hours.
Tel: 200 75002 www.otis.com
Property Refurbishment - Office & Shop Fitting - Construction - Painting Plumbing - Electrical - Carpentry - Flooring - Roofing
Tel: 200 66671 - Mobile: 58674000 We are an approved Gibraltar Government Contractor and authorised to carry out works for businesses with EU funding.
62
www.platinumgibraltar.com
10.
What happens if work is carried out without permission
63
Building Control Guide
10. What happens if work is carried out without permission If you carry out works, which are defined under the meaning of building operations without the pertinent approval, you may be asked by the authority to stop the works and you are given the opportunity to regularise the position by submitting the relevant application. Works may continue after the relevant permission has been obtained. If however works continue without permission you may be issued with a Stoppage Order. A person who fails to comply with a Stoppage Order shall be guilty of an offence and shall be liable on summary conviction to a fine on the standard scale and to a continuing fine at one tenth of the level on the standard scale a day for every day that work continues in contravention of the order.
64
Building Control Guide
65
Building Control Guide
TRANSPORT & DEMOLITION CONTRACTORS
Resa Group, with a presence in over 20 countries, leads the scaffolding industry for its design, engineering, manufacture and assembly of metallic structures. RBS, our Gibraltar branch, is located in the heart of Gibdock Shipyards. The satisfaction of our customers is based on the resolution of major projects, as the recent work in one of the most luxurious yachts in the world: Lady Moura. Resa Group, has a R&D department in constant evolution, which allows the execution of all type of projects thanks to our wide range of products and access solutions as motorized scaffolding, elevators, suspended platforms and tubular scaffolding.
www.gruporesa.com
• Demolition Contractors • Transport Contractors • Demolition Waste Disposal • Plant Hire • Haulage • Skip Hire • House/Office Removals • Telescopic Forklifts
Tel: 200 42266 Mob: 54033775 Fax: 200 51032
Email: mark.pilcher@pascoe.gi
Pushing the boundaries between progression and innovation.
Office Phone: +350 20064323 Email: info@mjlancleyltd.com
www.mjlancleyltd.com 66
11.
Applications for Scaffoldings and Hoardings
67
Building Control Guide
11. Applications for Scaffoldings and Hoardings The Public Health Act also empowers this department to permit the use of scaffoldings and hoardings on the public Highway. When there is a need to erect scaffoldings and hoardings to separate building operation from the general public it is required to apply to this department by filling in the pertinent form. The inspector will then arrange to meet on site to discuss how the structure may affect pedestrians, traffic or indeed services. After the necessary clearances from the pertinent authorities and the payment of the corresponding fees a permit is issued. It must be noted however that when considering the erection of scaffolding on Public Highway that inevitably encroaches on a road and may require the temporary closure of this road, the process may be more elaborate. This will involve consultation with the Highways Authority and a separate application must be made to them before consideration is given. This may result on particular requirements to follow such as the changing of the day to erect the scaffolding to a less busy day of the week such as a week-end.
68
Building Control Guide
We can supply and erect scaffolding for any size job, from individual properties to large construction projects. Our team of scaffolders are CISRS accredited and as such are fully trained in the safe erection of scaffolding whether the scaffolding is to enable safe access, or for support/ shoring work. We can provide advanced scaffold structures, quotes free of charge and will assist and guide you through the permit requirements.
Please call us on 20062628 or email enquiries@xlscaffolding.com 69
Building Control Guide
INTERIOR AND EXTERIOR MEASURED SURVEYS, ELEVATIONS AND CROSS SECTIONS !
FULL TIME SITE ATTENDANCE & SETTING OUT
E&M are the longest established M&E Consultants in Gibraltar.
!
BOUNDARY SURVEYS !
LAND AND SEA CONTOURS
! !
MERIDIAN
!
TOPOGRAPHIC SURVEYS (GIBRALTAR) LTD
AREA AND VOLUME CALCULATIONS
Meridian Topographic Surveys is a Gibraltar based company offering high quality, precision topographic surveys.
!
UNIT 4, WATERGARDENS 1 TEL: +350 200 69910
LIMITED
EMAIL: meridian@gibraltar.gi
Our principle aim remains to provide our clients with successful buildings with the use of sustainable and cost effective solutions. • Building Services - Electrical & Information Technology - Fire Engineering - Mechanical Engineering - Public Health
E&M Consulting Engineers Limited
• Construction Management
Gibraltar
Suite 6, Watergardens 1,
• Feasibility Studies • Project Management
Tel: +350 20079144 / 20059911
• Sustainability & Energy
Fax: +350 20040917
• BIM Systems
Email: info@emcl.gi
• Site Supervision
www.emcl.gi
Express delivery comes as a standard
Our services include: • Custom Clearance • Transport Services • Heavy Lift Equipment
• Temporary importation of plant and equipment • Infrastructure in Spain for Collection / Receipt and onward forwarding to Gibraltar
Telephone: +350 200 45818 Telephone: +350 200 43705 Email: logistics@redwood.gi 70
• Overland / Sea Freight Services • Free Project Planning Logistics Consultancy
We can provide all the logistics solutions under the one roof.
www.redwood.gi
Building Control Guide
Follow us on
f
Sales: +350 200 73017 Hire: +350 200 47171
BUILDERS MERCHANTS GENERAL CONTRACTORS: Gibraltar’s premier supplier of tools and equipment for hire or sale
Hire | Sales | Chandlery Contact us on:
E: sales@hire-u-shop.com Hire-u-Shop Ltd, 4 Watergardens, Gibraltar
www.hire-u-shop.com
QUALITY • SERVICE • PRICE
• PLUMBING • CARPENTRY • GLASS CUTTING • MASONRY • WATER HEATERS • PAINTING 1-3 SHACKLETON ROAD GIBRALTAR OFFICE TEL: 200 75220 SHOP TEL: 200 40746 ciapconstruction@gmail.com
Construforma offers all aspects of construction services, from a minor refurbishment to the construction of housing. Carpentry services are also available. Due to our extensive experience in the construction industry, we offer the best quality service and good quality is the best guarantee of satisfaction for our clients!
Supplier, Manufacturer & Installer of Aluminium-PVC Windows, Doors, Patios, Shop Fronts, French Doors & Bi-Fold Doors...
Contact us today to discuss your requirements, we look forward to your call.
Call: 200 68816 / 58007302
+350 2007 0737
email: judith@1stchoice.gi Suite 7, 4 Georges Lane, Gibraltar
construforma@hotmail.es 71
Building Control Guide
Does the project add value to your property? Some improvements add more value than others. It depends on the extent to which it overcomes a major drawback, such as enlarging a small kitchen or provision of parking where none existed previously. High value improvements, where all or most of the cost is typically recovered, includes things like re-decorating in neutral tones, and anything that improves ‘liveability’ – i.e. space, layout and style. So adding an extra double bedroom, extra bathroom, converting the attic or building an extension is normally money well spent.
72
Building Control Guide
Medium value improvements, where about half of the cost is typically recovered, include projects like re-fitting kitchens and bathrooms. But when it comes to improvements like installing double glazing, building a swimming pool or converting an integral garage, you may only recover a quarter of the cost (or slightly less) in the value they add to the property. Some works can actually damage the value, such as removing or replacing period features such as fireplaces, historic tiling or antique cornicing. Restoring original features such as sash windows can add considerably more value than fitting cheap replacements and stripping/restoring floorboards and old original doors etc to make the most of a property’s history can boost its appeal. But perhaps the best use of money is to fix any obvious defects, such as ensuring the building is structurally sound and weathertight. Good waterproof work and insulation may not necessarily add to the value of a property but without it, it can damage the value. Although not the most glamorous end of the renovation world, it’s always a good idea to carry out basic repairs – such as touching up paintwork, filling any cracks and straightening/ re-aligning kitchen cupboard doors. Something as simple as re-sealing mouldy joints around baths and showers can work wonders too, as can getting dripping taps fixed and replacing any cracked panes of glass.
73
Building Control Guide
saville jones | architects
Tel: +350 20067188 General Building - Home & Office refurbishments - damp specialists
t +44 (0)1903 211 363
www.savillejones-architects.com
SELINA LTD. Est. 1991
STEEL, ALUMINIUM, STAINLESS STEEL, FABRICATION & WELDING, SCAFFOLDING & GENERAL PIP-FITTING
Tel: 20040196 Fax: 20044260 Unit G20-23, Europa Business Centre,Queensway, Gibraltar
plumbing specialists - Boiler/water heating roofing specialists electrical - carpentry/joinery flooring specialists - tiling decorations - masonry Approved Government Contractor
free quotes
Email: no1propmainltd@hotmail.co.uk
E: Selinaltd@gibtelecom.net
Hadfield House, Library Street, Gibraltar. Tel: 200 41994
web: www.itek.gi 74
email: sales@itek.gi
Building Control Guide
Considering
investing
in property?
Over the years we have successfully advised many applicants and clients. We have done so responsibly and in your best interests. We are not about the hard sell.
experience
knowledge
BMI Group Limited, Unit 7 Portland House, Glacis Road, P.O. Box 469, Gibraltar
Tel: (+350) 200 51010 Email: info@bmigroup.gi
w w w. b m i g r o u p . g i 75
Building Control Guide
GIBRALTAR Building Control Department of Town Planning & Building Control Suite 631, Europort Gibraltar Tel: +350 20075483 Fax: +350 20074086
Published on behalf of the Dept of Town Planning & Building Control by Buildgibraltar.com | editorial@buildgibraltar.com | Tel: +350 200 65225 Design and Print by Piranha Designs Gibraltar | www.piranhadesigns.com | info@piranhadesigns.com | Tel: +350 200 45599
76