1 minute read

TACOIIA I,UilIBTB $At$$

714 W. Olympic Blvd. LOS ANGEI.ES 15. CAIJF.

Telephone PRosped ll08

GAAGO and &EIL

Repnesenting

St. Paul & Tcrcomcr Lumber Co. Tccomcr, Wash.

Deficrnce Lumber Compcrny Tccomcr, Wcsh.

Diclonan Lumber Compcrny Tccomc, Wash.

Karlen-Davis Compcny Tccomc, Wash.

are Le-

PR-33 has been amended by several changes, chief among which are as follows: s. s. wHm{EY otsoN s. s. wEsr coAsr

The period during which builders rvere required to start actual work on a project has been extended from 60 to 90 days.

Builders who plan to construct one-family dwellings, for sale only, need only specify in their application the maximum price at which they will offer them for sale, and need not specify a maximum rental.

In the case of a two-family dwelling, for which a maximum sales price of not more than $17,000 and a maximum rental per apartment of not more than $80 per month is fixed, the builder must specify both sales price and rentals in his application for priorities assistance.

With respect to brokerage or commission, in specifying his maximum sales price, the builder must make provision for brokerage or commission in that price. In the case of resale by a veteran or other buyer, during the life of the regulation, the brokerage or commission may be added to the maximum price at which he is permitted to sell.

The amendment also states that PR-33 is applicable to future veterans-those awaiting discharge-when they are applying to build homes for themselves.

Vqncouver Plywood & Veneer Co. Vcncouver, Wqsh.

Tccoma Hcrbor Lumber & Timber Co. TccomcL Wcsh.

Clecrr Fir Scrles Co. Eugene, Ore.

C&DtumberCo.

Roseburg, Ore.

This article is from: