Mistakes to Avoid During Custom Home Building

Page 1

MISTAKES TO AVOID DURING CUSTOM HOME BUILDING


Page 1

One of the biggest relieving factors for people is living in a home that has been built as per their specifications. This is also given the name of custom building and there are several benefits of going for this construction. Despite being an expensive thing to deal with, more and more people are going with this trend by hiring custom builders Sydney. However, there are several things that are to be taken care of and it has been experienced that novice construction contractors and property owners don’t pay the attention that they deserve. Similarly, there are a number of mistakes that people should avoid and in this post, we are discussing some of the top ones.

Soil Tests  It is every important that prior to starting any construction, the construction contractor carries out a soil test.  This test is carried out to determine the quality of the soil and whether it is suitable for the kind of construction planned or proposed by the builders Sydney.  This is very important thing that should not be missed as it will help you determine the quality of the soil as poor soil makes building a custom home more challenging.  Poor soil quality will not only make it harder to construct a building, but it’ll even make the entire process more time consuming and challenging.  The same applies if the builders need to level a slope or adjust the plans accordingly.

Site costs  According to the experts of building services, the site cost is another very important thing that you should not miss at all.  According to the experts, largely based on the soil and contour tests, site costs can vary dramatically.  Other than this, there could be several other additional expenses like cutting down trees, building retaining walls and connecting services such as water, electricity and gas.


Page 2

Flooring  Before getting into the process of constructing a new home, one thing that you should know is that flooring often isn’t included in the costs of building a custom home when you receive the quote.  Therefore, it is important that you take note of this and make sure before signing the contract that the flooring related expenses are included in the quote.  Moreover, make sure that this cost is added as per your choice, no matter whether you’re opting for carpet, tiles, cork or floorboards or anything else.

Driveways  It has been observed a number of times that custom builders Sydney only quote the costs of the dwelling.  This clearly means that if you want to have a driveway, you will have to bear this as an additional expense.  This is something to take note of as this could be a major expense depending upon the kind of driveway and the area covered by it.

Several other things that you should take note are pointed below.  To avoid surprises, know exactly what your contract says in references to the variations.  Make sure you chat to your custom home builder to see if the block of land you’re building on has been registered.  Remember that if you’re building your custom home in a bushy area or close to a national park, then your property may have a Bushfire Attack (BAL) rating.  If the builders need to close the road or interrupt traffic during the construction process, then you may incur fees for this.

This article post originally posted on: http://www.sooperarticles.com/realestate-articles/construction-articles/mistakes-avoid-during-custom-homebuilding-1650046.html


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.