Operational programme for large infrastructure (poim) 1

Page 1

Operational Programme for Large Infrastructure (POIM) 2014-2020

Source: Romanian Ministry of European Funds, August 2014


Introduction n

Total POIM Financial allocation (including the performance reserve): 9.4 billion Euros

n

Thematic objectives( TO): q

TO 4: Supporting the transition towards economic sectors with low carbon emissions

q

TO 5: Promoting the adaption to climate change, preventing and managing risks

q

TO 6: Environmental protection and promotion of efficient use of resources

q

TO 7: Promoting sustainable transport systems and eliminating blockages in the infrastructure of major networks


Priority Axes (PA) Transport PA 1 ‐ Developing the TEN‐T network in Romania PA 2 ‐ Increasing the regional accessibility by connecting to the TEN‐T PA 3 ‐ Developing a transport system that is safe and friendly towards the environment q

n n n

n

Environment and climate change PA 4 ‐ Environmental protection and promotion of the efficient use of resources PA 5 ‐ Biodiversity protection and conservation, polluted site decontamination, air quality

n

monitoring PA 6 ‐ Promoting the adaption to climate change, preveting and managing risks

q

n

n

Clean energy and energy efficiency PA 7 ‐ Safe and clean energy for a low carbon emission economy

n

PA 8 - Intelligent and suistainable transport systems for electricity and natural gases

q

q

n

Infrastructure in Bucharest-Ilfov region

PA 9 - Developing urban infrastructure in Bucharest-Ilfov


Environment & climate change n

PA 4 ‐ Environmental protection and promotion of the efficient use of resources q

q

n

n

Investments in the water and waste water sector in order to meet the EU environmental acquis requirements through the further development of integrated projects on water and waste water Investments in the waste sector in order to meet the EU environmental acquis requirements through the further project development on the integrated waste management at County level

PA 5 ‐ Biodiversity protection and conservation, polluted site decontamination, air quality monitoring PA 6 ‐ Promoting the adaption to climate change, preventing and managing risks q

q q

Non-structural measures, orientated towards mitigating risks generated by climate change, especially floods and droughts complemented through infrastructure projects (river course planning, enbankments etc.) Investments for the reduction in coastal erosion on the Black Sea shore Developing the capacity for emergency response of the professional and voluntary services


Environment & climate change Eligible beneficiaries: n

Local public authorities q q

q

n

Other beneficiaries at the local level / NGOs q q

n

Developing the waste integrated management systems ‐ PA 4 Decontaminating polluted sites, where the polluter cannot be identified and there is a negative impact on human health ‐ PA 5 Biodiversity protection measures where the LPAs or the subordinate structures have in custody or are administrating protected areas / Natura 2000 sites ‐ PA 5

Regional water operators - PA 4 Biodiversity protection measures where the NGOs or the subordinate structures have in custody or are administrating protected areas / Natura 2000 sites ‐ PA 5

Central public administration q

Romanian Waters National Administration, authorities responsible for the monitoring and warning systems of meteorological events and for the management of emergency situations


For further questions please don’t hesitate to contact us: Business Development Group Tel:+40-21-3179870 Fax:+40-21-3179871 office@bdgind.ro

Ciprian Nanu Partner +40-744 298 803 ciprian.nanu@bdgind.ro

Bianca Pricope Consultant +40-744 272 914 bianca.pricope@bdgind.ro


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.