Presentation POS Environment

Page 1

MA SOP Environment

SECTORAL OPERATIONAL PROGRAMME ENVIRONMENT IN ROMANIA Water & Waste water – Waste & Contaminated Sites

Valentin SIMION Public Manager


Content •SOP Environment Overview •Implementation Stage SOP Environment (water/ waste water; waste & contaminated sites) •Perspectives & Conclusions


GENERAL OBJECTIVE General Objective – protection and improvement of living standards of the population and of environmental standards aiming, first of all, the compliance with the environmental community acquis. General Strategy - to answer to the following 3 main strategic directions: • Improving access to public utilities in Romania and supporting the economic development conditions in regions • Improving environmental protection as a mandatory condition for sustainable development • Strengthening institutional and governmental capacity as a key-priority, aiming the development of an efficient management structure for environmental services


SOP ENVIRONMENT- PRIORITY AXES General Objective of SOP ENV– improvement of living standards of the population and of environmental standards, aiming, mainly, the compliance with the environmental communaitaire aquis

Specific Objective 1 Improvement of quality and access to the water/wastewater infrastructure

Priority Axis 1 Extension and modernization of water and wastewater infrastructure cca 2776.5 million Euro (CF)

Specific Objective 2 Development of sustainable waste management systems

Specific Objective 3 Reduction of the Specific Objective 4 Specific Objective 5 negative environmental Protection and improvement Reduction of the incidence impact caused by of biodiversity and of natural disasters urban heating natural heritage affecting the population plants

Priority Axis 2 Development of Priority Axis 3 Integrated waste Rehabilitation of management systems municipal district and rehabilitation of heating systems historically contaminated sites cca 934 million Euro (ERDF)

Priority Axis 5 Priority Axis 4 Development of Implementation of adequate management adequate infrastructure for natural risks systems for prevention nature protection

cca 229 million Euro (CF)

cca 172 million Euro (ERDF)

Priority Axis 6 Technical Assistance cca 130 million Euro (ERDF)

cca 270 million Euro (CF)


Breakdown of total financial contribution by priority axis (EUR million)

214

317

173

458

3,266 1,167


SOP - key aspects SOP Financial Allocation: TOTAL: 5,6 billion Euro - EU Contribution (CF): 4,5 billion Euro - National Contribution: 1,1 billion Euro

Decentralized management: MA/ IB/ Beneficiaries Major Beneficiaries:regional operators / local authorities / intercommunity development associations

Funding for regional projects: water/ waste water; waste Principles: solidarity, polluter pays, affordability Contribution to meeting the commitments of the Accession Treaty


ACHIEVEMENTS TO DATE – relevant figures

267 Projects approved, in total value of 6.434.688.684 Euro, out of which 4.833.024.743 Euro eligible value

 Commitment rate of SOP funds – 86,14 %  Total payments made up to date: 547.964.958 Euro, out of which:  Pre-financing – 381.236.368 Euro  Reimbursements – 166.728.590 Euro  Rate of absorbtion – 19,59%, out of which 5,16% reimbursements and 14,43% pre-financing.


Funds commitment – SOP Level


Funds commitment – Priority Axis Level


Projects still to be approved … PA 1 – Water & wastewater – 8 projects PA 2 – Waste & Contaminated sites – 19 projects PA 3 – District Heating - 7 projects PA 4 – Nature Protection – 70 projects PA 5 – Floods and coastal erosion – 17 projects


Implementation Stage of SOP Environment Priority Axis 1 - Extension and modernization of water and wastewater infrastructure

ďƒ˜ Projects under implementation: 35 major projects - total value of about 3.87 bilion Euro of which EU contribution (CF) represents 100% versus EU contribution allocated through SOP Env. 2007-2013 ďƒ˜ Nr of contracts for the 35 major projects aproved: 493 - of which 188 signed contracts in total value of about 891,824,25 Euro Reimbursements to the beneficiaries: about 403,270,752 Euro of which 382,670,390 Euro represents 13,78% vs. EU contribution allocated through SOP Env 2007-2013 for this priority axis


Project Status - Axis SOP 1 - Water sector - 36 Approved Projects (1 non-major project) B O T O ŞA N I SAT U M A R E

- 4 Proiects Approval in 2011

M A R A M U R E Ş - 4 Proiects Approval in 2012

SU C E AVA SĂ L A J

B IS T R IŢ A N Ă SĂ U D

IA ŞI

B IH O R

N E A M Ţ C L U J M U R E Ş

VA SL U I H A R G H ITA

A R A D

B A C Ă U

A L B A C O VA SN A T IM IŞ

H U N E D O A R A

C A R A Ş S E V E R IN

S IB IU

V R A N C E A

B R A ŞO V

B U Z Ă U

V Â L C E A G O R J

G A L A Ţ I

A R G E Ş

PR A H O VA D Â M B O V IŢ A

B R Ă IL A

T U L C E A

IA L O M IŢ Ă M E H E D IN Ţ I

IL F O V

O LT

C Ă L Ă R A ŞI

D O L J

G IU R G IU T E L E O R M A N

C O N STA N Ţ A


Implementation Stage of SOP Environment Priority Axis 2 - Development of Integrated waste management systems and rehabilitation of historically contaminated sites

 Major projects under implementation: 21 – total value: about 657,100,000 Euro  Number of contracts related to the 21 major projects: 192 - of which 64 signed in a total value of about 86,125,528 Euro


Project Status - Axis SOP 2 - Waste sector - 18 Approved Projects B O T O ŞA N I SAT U M A R E

- 7

M A R A M U R E Ş SU C E AVA SĂ L A J

Proiects to be approved in 2011

- 12 Proiects to be approved in 2012

B IS T R IŢ A N Ă SĂ U D

IA ŞI

B IH O R

N E A M Ţ C L U J M U R E Ş

VA SL U I H A R G H ITA

A R A D

B A C Ă U

A L B A C O VA SN A T IM IŞ

H U N E D O A R A

C A R A Ş S E V E R IN

S IB IU

V R A N C E A

B R A ŞO V

B U Z Ă U

V Â L C E A G O R J

G A L A Ţ I

A R G E Ş

PR A H O VA D Â M B O V IŢ A

B R Ă IL A

T U L C E A

IA L O M IŢ Ă M E H E D IN Ţ I

IL F O V

O LT

C Ă L Ă R A ŞI

D O L J

G IU R G IU T E L E O R M A N

C O N STA N Ţ A


Implementation Stage of SOP Environment Priority Axis 2 KAI 2.1 Development of Integrated waste management systems  Major projects under implementation: 18 – total value: about 625 million Euro, of which the EU contribution (ERDF) represents 54% versus SOP allocation  Contracts related to the 18 major projects: 177 - of which signed contracts: 59 – total value: approx. 85,932,034 Euro Reimbursements to the beneficiaries: about 73,473,370 Euro of which about 70,325,836 Euro EU contribution represents 8,87% of EU contribution allocated through SOP Env.


Implementation Stage of SOP Environment Priority Axis 2 KAI 2.2. Rehabilitation of historically contaminated sites  Major projects under implementation: 3 – total value of about 32,100,000 Euro of which 24,650,008 Euro represents 17% of EU contribution (ERDF) versus SOP Env. allocation  Number of contracts related to the 3 projects: 15 of which 5 signed contracts – total value: about 193,494 Euro No payments reimbursed to the beneficiaries.


Perspectives for 2012 and onwards...  Commitment of all the funds still available and approval of the projects in the portfolio;  SOP Environment evaluation;  Launch the preparation of the project pipeline for 20142020 in the water, waste and contaminated sites sectors;  Start the preparatory activities to elaborate the strategic documents for the 2014-2020 programming period.


Conclusions  SOP Environment - operational program with experienced users who have implemented similar projects in the past: MUDP, SAMTID, ISPA, PHARE;  Last year was an unprecedented leap in terms of employment of funds in the water, waste, heating - over 4 bilion Euro funds committed  It is expected a market response in the awarding process for contracts of works, equipment and services;  Period 2011-2013 is decisive for contracting components included in projects funded by SOP Environment  Efforts to achieve full compliance with European Directives should continue in the programming period 2014 - 2020!


MINISTRY OF ENVIRONMENT AND FORESTS MANAGING AUTHORITY FOR SOP ENVIRONMENT 2007 - 2013 30-32 Calea Serban Voda, sector 4, Bucharest, Romania Tel: +4021/335 35 65; Fax: +4021/316 07 78 www.posmediu.ro www.mmediu.ro