RAYMOND J BYUN ARCHITECTURE PORTFOLIO SELECTED WORKS 2010-2016
CONTACT
Raymond J Byun 201.669.8239 raymondbyun@gmail.com
EDUCATION
Andrews University Bachelors of Science in Architecture 2013 Andrews University Master of Architecture 2014
5
EXIST. WAITING AREA 324
03
DR. SHEU 343B
A5-1
EXIST. ELECTRICAL PANEL
1
EXIST RECEPTION 322
5"
343B -
3
A5-1 2
4' - 0"
DOCTOR'S WORK AREA 323
2' - 0 3/4"
A5-1
ALIGN
03
EXISTING PROCEDURE 312
RELOCATED DOORS + HARDWARE
NEW FULL LITE DOOR w/ FROSTED GLASS
ALIGN
G
15 3' - 0"
EXISTING EXAM ROOM 313
5' - 5"
INFILL WALL OPENING
02
H
ALIGN - TYP
318
EXISTING EXAM ROOM 320
EXISTING EXAM ROOM 319
EXISTING STAFF LOUNGE 301
-
REF/F RZ
R
10
01
INFILL WALL WHERE DOOR REMOVED
03
SOILED HOLD 303 12
303
A5-1
-
-
11
15 01
15
03
A5-1
EXISTING EXAM ROOM 321
EXAM CHAIR [O.F.O.I]
02 311
A5-1
M-139 Corridor Improvement Plan 2013
301
5"
5"
A5-1
3' - 9 1/2"
6' - 0" +/-
8
EXIST PASSAGE 305 03
9
EXAM 311
02
4
-
A5-1
EXISTING NURSE STATION 316
-
EXIST. COUNTER TO REMAIN
03
A5-1
PASSAGE 314
5
6
332
310
TOILET 310 03
EXISTING MILLWORK TO REMAIN
EXIST. COPIER
02
03
EXISTING PROCEDURE 315
5"
F
135. 00째
MOC 323A
2' - 4 1/2"
8' - 11 3/4"
03
Professional Work 2015-2016
EXISTING CLEAN SUPPLY 302
03 03
6
7' - 1 1/2"
5"
CONTENTS 01
4
8"
3
2' - 0"
1
7
EXAM 318
-
EXISTING EXAM ROOM 309
EXISTING EXAM ROOM 308
EXISTING EXAM ROOM 307
EXISTING OFFICE 306
EXAM CHAIR [O.F.O.I]
I
1
03
A1-1
The St. Joseph Center 2012
03 Floor - Plans SCALE: 1/4" = 1'-0"
G
1
2.
3
4
5
6
04
Niles Chapel / Plaza 2011
7
8
9
10
11
12
05
Sketches & Watercolors 2011 - 2013
C:\revit\2015\941455 - GSS - Dermatology - Central_rjb.rvt
13
14
15
16
17
18
01
Professional Work Wilmot Sanz Inc.
JOHNS HOPKINS MEDICAL CENTER Green Spring Station Pavilion III The Green Spring Station Pavilion III is an ongoing project for the Johns Hopkins Medical Group involving a new building to join Pavilions 1 & 2. The design includes suites for Orthopedics, Rehab, Imaging, Otolaryngology, Oncology, Lab/Testing, Surgery and Urology. The exterior was designed to reflect similar elements used in the existing buildings of Pavilions 1 & 2. My duties were to translate the Sketchup modeled exterior as well as sketches into Revit. I also took redline drawings and sketches of floor plans, area plans, and elevations and created Revit views and sheets.
Professional Work Wilmot Sanz Inc.
3
4
5
6
7
8
9
9.910
11
1
2
3
6
11
DME STORAGE TOILET
24
MRI CONTROL
STORAGE
19
16
17
VITALS SOILED HOLD
22
18
CONTROL
J.C.
23
NC
GOWN
NURSE STATION
NC
PATIENT TOILET
MRI/ CT PREP
PATIENT TOILET
PUBLIC TOILET
SUPERVISORADMINISTRATOR
BUSINESS OFFICE
SOILED HOLD
MANAGER
gov
STAIR C
RAD. ORTHO 1
LOBBY
WORK AREA
TOILET BIOSPY COORD.
RECEPTION
BODY U/S
LIASON
NC
TOILET
LOBBY
GOWN
GOWN
SUB WAITING
PASSAGE WAITING (40)
PREP 3
PREP 4
PREP 5
PREP 6
BODY U/S
TOILET
BODY U/S
BREAST U/S
TRASH
STAFF TOILET
STORAGE
DN UP
RECEIVING
DATA
OTO STORAGE
C
NC
TOILET GOWN
GOWN
SUB WAITING
MAMMO #1
PUBLIC TOILET
ELEC
WAITING REGISTRATION
STAIR B
STAFF LOCKERS
SHARED WAITING (63)
PASSAGE
STAIR A
CLEAN SUPPLY
DEXASCAN
PUBLIC TOILET
ELEVATOR CONTROL JAN CLOSET
TLC REHAB
SLP ROOM
STAFF LOUNGE
SCOPE CLEAN TECH WORK
gov
gov
WORK AREA
BREAST U/S
STEREO/SONO
ALLERGY TESTING #2
EXAM #1
D
CONSULT
WAITING
READING ROOM
D
ALLERGY WORK ROOM
EXAM #2
STAFF LOUNGE
MANAGER/DIRECTOR SHOWCASE
NC
CLEAN PROCESSING
DECONTAM
STAIR C
PHOTO
DICTATION
CMA
EXAM #3
CONF
CONCIERGE HEARING AID
NC
STAFF PATIENT PROCEDURE TOILET TOILET #2 PASSAGE
PASSAGE
VESTIBULE
DN
PASSAGE
WAITING
RECEPTION
CLEAN SUPPLY
PREP 7
BUILDING STORAGE
B
STAFF TOILET
TOILET
PROCESSING
STERICYCLE
GOWN
SUBWAITING (5)
LAB/ PROCESSING
? ENGINEER OFFICE
STORAGE CONTROL
NC
ELEVATOR EQUIPMENT
RAD. ORTHO 2
REHAB
REHAB
DATA
gov gov
PUBLIC TOILET
CAST ROOM VITALS
GOWN
TECH / WORK
NC
TOILET
9
8
MRI EQUIPMENT
CT CONTROL
ELECTRIC
MRI 3
MRI 2
CT READ
STORAGE
STORAGE
VITALS
CT EQUIP.
QUIET DRAW
PASSAGE
CMA / PHY / RES
15
DRAW DRAW STATION STATION
SWITCHGEAR
C.T.
NC
10
7
MRI 1
STAFF TOILET
STAFF TOILET 21
STAFF LOUNGE/ CONFERENCE
LAB/TESTING BREAK ROOM
IR
NC
2
20
OFFICE
A
MRI EQUIPMENT
MRI EQUIPMENT
NC
13
12
14
STAFF LOCKERS (54)
NC
5
CMA / PHY / RES
OFFICE
EQUIPMENT ALCOVE
EQUIPMENT ALCOVE
4
1
PROVIDER 8
NC
EQUIPMENT ALCOVE
STAIR A
PROVIDER 7
PROVIDER 6
5
gov
PROVIDER 5
OV
PROVIDER 1
PROVIDER 4
NC
PROVIDER 3
4
SUPPORT SERVICES
ORTHOPEDICS PROVIDER 2
3
NC
2
NC
1
MAMMO #2
MAMMO #3
STAFF WORK AREA
EQUIPMENT ALCOVE
PROCEDURE #1
TECH OFFICE
EXAM #4
EXAM #5
EXAM #6
E
IMAGING
OTOLARYNGOLOGY
EXAM #7
CLINIC SUPPORT
PROCEDURE PROCEDURE #1 #2
ESTH
PASSAGE EXAM #8
EXAM
EXAM
EXAM
PROCEDUR #3
9.910
1
11
2
3
4
5
6
NC
NURSE MANAGER
HAZ
C
PATIENT TOILET
PHYSICIAN OFFICE #1
PHYSICIAN OFFICE #2
PHYSICIAN OFFICE #3
PHYSICIAN OFFICE #4
EXAM #7
PHYSICIAN WORK
EXAM #8
EXAM #1
NC
18
NURSES STATION
17
NURSES STATION
16
PUBLIC TOILET
HOT WATER
ELEVATOR LOBBY
EXAM #5
PATIENT TOILET
D
NC
SOILED
15
EXAM #3
STAGE II 04
PATIENT TOILET
PREP 13
STAGE II 02
SERVICE ELEVATOR LOBBY
MALE
STAFF LOUNGE
SOILED HOLD
PREP 14
PACU 01
STAGE II 07
STAGE II 08
PACU 02
PACU 03 PACU 04 (ISOL)
NURSE STATION
MEDS
STAGE II STAGE II 09
PACU 05
PACU 11 CLEAN SUPPLY
STAGE II 03
STAGE STAGE II 05 II 06
A
NC
PATIENT TOILET
PREP 10
PREP 09
CORRIDOR PACU
CHARTING
STAGE II
CORRIDOR
CORRIDOR
STAGE CORRIDOR II
PACU 10
PACU 06
NURSE STATION
B
CORRIDOR PATIENT TOILET
SOILED
ALCOVE JAN
STAIR B PACU 09
PACU 08
PACU 07
C
gov
gov
CONTROL SHARED SHOWER
PATIENT TOILET
FEMALE EXAM #2
NC
PATIENT TOILET
PUBLIC TOILET
SEMI-RESTRICTED CORRIDOR
ANESTH. COORD. OFFICE
LAB
NURSE MANAGER
11
OR #2
OR #1
OR #3
SHELL (FUTURE OR)
ANESTHESIA WORKROOM
STAIR C
OR #4 (ORTHO)
OR #5 (ORTHO) STORAGE
JAN
EXAM #6
PASSAGE NC
MEDICAL ONCOLOGY
CMA WORKSTATION
? DECONTAM
DECONTAM 05 09
01
UROLOGY
03 03 02 02
18
COPPER/BRASS PLUMBING
17
STERILE SUPPLIES
STAINLESS STEEL PLUMBING
13
11 13
PREP/PACK
15
08
17 17
07
14
14
16
18
COPPER/BRASS PLUMBING
E
PHYSICIAN OFFICE
STAINLESS STEEL PLUMBING
NC
NC
NC
NC
NC
13 (PRIVATE)
12
10
MINIMUM
12
11
10
06
VENDOR DROPOFF
PREFERRED
11
PROCEDURE ROOM #1
STANDARD CONTROL
10
09
04
STANDARD CONTROL
9
PROCEDURE ROOM #2
ALTERNATE CONTROL
8
PROCEDURE ROOM #3
DECONTAM
7
PROCEDURE ROOM #4
DECONTAM
6
NC
5
NC
4
NC
3
NC
2
NC
NC
1
SHARED PHYSICIAN OFFICE
ALTERNATE CONTROL
STAFF TOILET
STAFF LOUNGE
14
PASSAGE
O2
CONSULT CONSULT
NC
NC PATIENT TOILET
19
NC
VITALS
NC
INFUSION SUPPLY
VITALS
TECH
CLEAN SUPPLY / EQUIP
SOILED HOLD
EXAM #4
W/C STORAGE
CORRIDOR ELEC
DATA
VITALS / BLOOD DRAW
VITALS
NC
WORK AREA
CONCIERGE
DIRTY LINEN
CLEAN SUPPLY / MEDICATIONS
NC
VITALS
RECEPTION
PREP-08
PREP 07
CORRIDOR
PREP 12
NURSE STATION STAGE II 01
NC
STAIR B
MED DIRECTOR
RECEPTION
PREP 11
CORRIDOR
PREP 06
CORRIDOR
WAITING (13)
UP
NC
EXAM #6
DN
9.910
gov
EXAM #5
HD STORAGE [NEG. PRESSURE]
NC
EXAM #2
NC
WORK AREA
PREP 02
PREP 05
STAIR A
PHARMACY STORAGE
PAT. TOILET
FAMILY WAIT (11)
PREP 04
PRE-OP
PHYSICIAN PATIENT PREP 01 CONSULT TOILET
RECEPTION
PASSAGE
B
NC
WAITING (31)
EXAM #3 EXAM (BARIATRIC) #4
STAFF NC TOILET PREP 03
EQUIP. ALCOVE
STOR.
NC
MELANOMA COORDINATOR
FIN. CONSULT
SHARED WAITING WORK ROOM
WAITING AREA (50)
UNNASSIGNED ADMIN. MANAGER
FINANCIAL CONSULT
9
STAGE II 02 (EXTENDED) TOILET
GOWN REGISTRATION
RESEARCH
8
AMBULATORY SURGERY CENTER STAGE II 01 TOILET (EXTENDED)
GOWN
CONSULT MANAGER
EXAM #1
7
UNASSIGNED A
STAFF LOUNGE
FERENCE
RE
9
SHARED SPECIALTY
VEST.
HETICS
8
NC
7
NC
6
17
E
Professional Work Wilmot Sanz Inc.
JOHNS HOPKINS MEDICAL CENTER Green Spring Station Pavilion I : Suite 350 Dermatology 4
5
6
EXISTING CLEAN SUPPLY 302
03
8' - 11 3/4"
F
MOC 323A 03
DR. SHEU 343B
A5-1
EXIST. ELECTRICAL PANEL
1
5"
343B -
3
A5-1 2
4' - 0"
2' - 0 3/4"
03
RELOCATED DOORS + HARDWARE
TOILET 310
NEW FULL LITE DOOR w/ FROSTED GLASS
15 3' - 0"
ALIGN
G
EXISTING EXAM ROOM 313
EXAM CHAIR [O.F.O.I]
INFILL WALL WHERE DOOR REMOVED
5' - 5"
INFILL WALL OPENING ALIGN - TYP
3
4
318 A5-1
EXISTING EXAM ROOM 321
H
EXISTING EXAM ROOM 320
EXISTING EXAM ROOM 319
5
03
RELOCATED
10
01
SOILED HOLD 303 12 A5-1
-
-
A5-1
1
03
303
02 311
REF/F RZ
11
15
5"
5"
EXISTING STAFF LOUNGE 301
-
01
3' - 9 1/2"
6' - 0" +/-
301
A5-1
EXIST PASSAGE 305 03
9
EXAM 311
02
4
8
A5-1
EXISTING NURSE STATION 316
-
EXIST. COUNTER TO REMAIN
03
-
A5-1
PASSAGE 314
6
332
310
03
5
A5-1
ALIGN
DOCTOR'S WORK AREA 323
EXISTING PROCEDURE 312
EXISTING MILLWORK TO REMAIN
EXIST. COPIER
02
03
EXISTING PROCEDURE 315
EXIST RECEPTION 322
5"
03
135. 00째
2' - 4 1/2"
03
7' - 1 1/2"
5"
EXIST. WAITING AREA 324
7
8"
3
2' - 0"
1
15 15
EXISTING NURSES'S OFFICE 304
6
-
EXISTING EXAM ROOM 309
7
EXAM 318
EXISTING EXAM ROOM 308
EXISTING EXAM ROOM 307
EXISTING OFFICE 306
7
S
EXAM CHAIR [O.F.O.I]
I MODIFY AS REQUIRED
1 A1-1
03 Floor - Plans SCALE: 1/4" = 1'-0" DR. SHEU 343B
MOC 323A
+8' - 0"
+9' - 0"
EXISTING PROCEDURE 315
TOILET 310 +9' - 0"
EXISTING PROCEDURE 312
ETR
GENERAL NOTES
EXISTING STAFF LOUNGE 1. 301
MODIFY AS REQ'D
ETR
EXIST RECEPTION 322
F
ETR
+6' - 4"
+9' - 0"
PASSAGE 314
DOCTOR'S WORK AREA 323
G
EXISTING CLEAN SUPPLY 302
EXISTING NURSE STATION 316
+9' - 0"
EXAM 311
EXISTING EXAM ROOM 313
ETR
EXIST PASSAGE 305 +9' - 0"
2.
PRIOR TO THE START OF WORK, CONTRACTOR SHALL COORDINATE AND ESTABLISH OWNER APPROVAL FOR THE PROCEDURES, USE OF BUILDING FACILITIES, INCLUDING ELEVATORS, STAIRS, TOILETS, FOOD SERVICE, HVAC, ELECTRICAL, WATER, ETC.
3.
DRAWINGS ARE NOT TO BE SCALED; DIMENSIONS GOVERN ON LARGE SCALE DRAWINGS AND LARGE DETAILS OVER SMALL SCALE DRAWINGS.
4.
CARE SHALL BE TAKEN NOT TO DISTURB THE INTEGRITY OF EXISTING FIRE ASSEMBLY RATINGS AND FIRE PROTECTION ELEMENTS WHERE NEW CONSTRUCTION IS SCHEDULED TO OCCUR.
+8' - 0"
ETR
EXISTING BULKHEAD
EXIST. PASSAGE 347
MODIFY CEILING AS REQUIRED FOR NEW CONSTRUCTION
SOILED HOLD 5. 303 +9' - 0"
MODIFY EXISTING FIRE PROTECTION SYSTEM AS REQUIRED TO ACCOMMODATE NEW WORK AND MEET FIRE MARSHAL AND BUILDING CODE REQUIREMENTS.
7.
GYPSUM WALLBOARD SHALL BE 5/8-INCH THICK UNLESS OTHERWISE MODIFY AS REQ'D INDICATED; APPLIED TO METAL STUDS AT 16-INCHES ON CENTER UNLESS OTHER WISE INDICATED. A THREE COAT TAPE AND FINISH SYSTEM SHALL BE PROVIDED TO ALL JOINTS UNLESS OTHER WISE INDICATED.
8. 9.
- GSS - Dermatology - Central_rjb.rvt
H I
1
3rd Floor RCP SCALE: 1/4" = 1'-0"
EXISTING EXAM ROOM 320
EXISTING EXAM ROOM 319
EXAM 318 ETR
ALL DIMENSIONS MEASURE TO FINISH FACE UNLESS OTHER WISE NOTED. PARTITIONS WITH DIMENSIONS NOT INDICATED IN PLAN SHALL ALIGN WITH EXISTING ADJACENT PARTITION.
6.
ETR
EXISTING EXAM ROOM 321
ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) AND IN ACCORDANCE WITH THE LATEST EDITION OF THE INTERNATIONAL BUILDING CODE (IBC), LIFE SAFETY CODE (LSC) AND APPLICABLE STATE AND LOCAL ORDINANCES AND CODES.
EXISTING PROVIDE TRANSITION STRIPS AT ALL CHANGES IN FLOOR FINISH. NURSES'S
THE CONTRACTOR SHALL COORDINATE VARIOUS ITEMS OF ALL TRADES AND OFFICE ASSURE PROPER INSTALLATION AND LOCATION. CONTRACTOR SHALL COORDINATE 304 SHOP DRAWINGS WITH ALL TRADES.
EXISTING EXAM ROOM 309
EXISTING EXAM ROOM 308
EXISTING EXAM ROOM 307
EXISTING OFFICE 306
10.
ETR DUST BARRIERS SHALL BE NON-COMBUSTIBLE, INCLUDING TEMPORARY DOOR OPENINGS.
ETR
ETR
ETR
+9' - 0"
11.
WHERE DEMOLITION AND ALTERATIONS OCCUR WITH NO SPECIFIC NEW SCHEDULED FINISHES, THE CONTRACTOR SHALL PATCH AND REPAIR AND/OR REPLACE EXISTING FINISH AS REQUIRED TO MATCH EXISTING ADJACENT FINISHES.
12.
REMOVAL OF EXISTING PLUMBING AND/OR ELECTRICAL FIXTURES SHALL INCLUDE DISCONNECTING AND CAPPING ASSOCIATED PIPING/CONDUIT BACK TO SOURCE.
13.
ANY FLOOR SLAB DEPRESSION THAT MAY OCCUR DUE TO REMOVAL OF WALLS, FLOOR FINISHES AND/OR PLUMBING FIXTURES SHALL REPAIRED AND FILLED WITH A SELF-LEVELING CONCRETE MIX (ARDEX OR DURA-CAP) TO OBTAIN A UNIFORM FLOOR FINISH AND LEVELED WITH ADJACENT FLOOR. DEPRESSIONS REQUIRING LIGHTWEIGHT CONCRETE FILL SHALL BE THOROUGHLY CLEANED AND TREATED WITH AN EPOXY BONDING AGENT (SONOBOND OR EQUAL) PRIOR TO PLACEMENT ON NEW TOPPING.
14.
REMOVAL OF DEMOLITION ITEMS INDICATED SHALL INCLUDE ALL ASSOCIATED ELEMENTS.
15.
WORK MAY REQUIRE ADDITIONAL DEMOLITION NOT INDICATED ON THE DOCUMENTS. A. CORE DRILLING AND REMOVAL OF WALLS AS NECESSARY TO INSTALL MECHANICAL, PLUMBING AND ELECTRICAL WORK. REMOVAL OF WALLS SHALL BE EVALUATED BY A REGISTERED STRUCTURAL ENGINEER PRIOR TO ANY REMOVAL. B. REMOVAL OF ALL NAILS, ANCHORS, CLAMPS, HOOKS, DEVICES, EMBEDDED ANCHORS, SIGNAGE AND SIMILAR ITEMS FROM WALL, FLOOR AND/OR CEILING SURFACES.
JH
10
G Sta
D
Revisions
CEILING AS SCHEDULED
CEILING AS SCHEDULED
EXIST. WINDOWS
EXIST. WINDOW - TYP.
FILLER PANEL S 30 30
CEILING AS SCHEDULED
S 30 30 P-LAM WALL CABINET - TYP.
7' - 2"
EXIST. P-LAM. COUNTERTOP MODIFY EXIST. COUNTER AND BACKSPLASHAS REQ'D. FOR NEW COUNTERTOP
P-LAM COUNTERTOP w/4" BACKSPLASH [PLAM-3]
P-LAM COUNTERTOP w/4" BACKSPLASH [PLAM-3]
M 18 30
2' - 6"
2' - 6"
P-LAM BASE CABINET KNEE SPACE
METAL WORKSTATION BRACKET - TYP.
1
BASE AS SCHEDULED
2' - 1"
EXIST. SUPPORT
A5-1
METAL WORKSTATION BRACKET - TYP.
KNEE SPACE
BASE AS SCHEDULED
BASE AS SCHEDULED
2
Office / MOC SCALE: 3/8" = 1'-0"
A5-1
3
Doctor's Work Area - South SCALE: 3/8" = 1'-0"
A5-1
CEILING AS SCHEDULED
Doctor's Work Area - West SCALE: 3/8" = 1'-0"
CEILING AS SCHEDULED
CEILING AS SCHEDULED
JHMMC at ST 10755 Falls Luthervi
CEILING AS SCHEDULED GWB BULKHEAD
EXIST. GWB BULKHEAD
Green Station Sui Derm
EXIST. MILLWORK TO REMAIN S 48 30
R 24 30
REMOVE EXIST COUNTERTOP TO EXTENT SHOWN - PATCH / REPAIR WALL
KNEE SPACE
4
5
MA WorkStation / Check-Out SCALE: 3/8" = 1'-0"
METAL WORKSTATION BRACKET - TYP.
KNEE SPACE
BASE AS SCHEDULED
BASE AS SCHEDULED
A5-1
P-LAM COUNTERTOP
2' - 6"
2' - 6"
METAL WORKSTATION BRACKET - TYP.
A5-1
A5-1
A5-1
RELOCATED MILLWORK TYP.
6' - 4"
Existing Passage - West SCALE: 3/8" = 1'-0"
CEILING AS SCHEDULED
CEILING AS SCHEDULED
GWB BULKHEAD
GWB BULKHEAD
P-LAM WALL CABINET - TYP.
SUITE 350
P-LAM WALL CABINET - TYP. S 24 30
R 18 30
S 24 30
S 30 30
OPEN BASE AS SCHEDULED
BASE AS SCHEDULED
9 A5-1
Exam SCALE: 3/8" = 1'-0"
AUTOCLAVE
AUTOCLAVE
SOLID SURFACE COUNTERTOP w/ 4" BACKSPLASH
SOLID SURFACE COUNTERTOP w/ 4" BACKSPLASH P-LAM APRON
P-LAM APRON
2' - 10"
BASE AS SCHEDULED
entral_rjb.rvt
S 33 30
WALL HUNG LAV
PROVIDE 4" BASE
8
Exam - East SCALE: 3/8" = 1'-0"
1' - 6"
RELOCATED PURSE LOCKERS
A5-1
KNEE SPACE
4' - 4"
CEILING AS SCHEDULED
GWB BULKHEAD
F 24 34
BASE AS SCHEDULED
7
Reception - South SCALE: 3/8" = 1'-0"
CEILING AS SCHEDULED
CEILING AS SCHEDULED
D 24 34
BASE AS SCHEDULED
6
Reception - East SCALE: 3/8" = 1'-0"
P-LAM COUNTERTOP w/4" BACKSPLASH
2' - 6"
FINISH COUNTERTOP EDGE P-LAM COUNTERTOP w/4" BACKSPLASH
7' - 2"
P-LAM. WALL CABINET
2' - 10"
S 30 30
10 A5-1
Exist. Staff Lounge SCALE: 3/8" = 1'-0"
B 18 34
P-LAM BASE CABINET
C 30 34
P-LAM BASE CABINET
OPEN
BASE AS SCHEDULED
11 A5-1
Soiled Hold - East SCALE: 3/8" = 1'-0"
BASE AS SCHEDULED
12 A5-1
Soiled Hold - North SCALE: 3/8" = 1'-0"
KEY PLAN
02
M-139 Corridor Improvement Plan Berrien Springs, MI
The M-139 Corridor Improvement Plan was a plan to revist the Berrien Springs Zoning Ordinance and compare it to the town’s Master Plan to see if there were changes that needed to be considered. This project showed what a certain property would like if it had adhered to the way the Master Plan had intended. The goal was to show how to maximize land use, and display how the M-139 Corridor would look following the principles of New Urbanism. The design shows not only how the property itself would change, but also how the street, sidewalks, and overall environment would benefit from this Improvement Plan.
Existing Perspective of Baguette De France
Proposed Perspective of Baguette De France
M-139 Corridor Improvement Plan The Process
The first steps involved creating a design for the Baguette de France restaurant that would be placed on the site. Rather than design a cool, modern and flashy building, we wanted to create something that would be appealing yet reasonable to build from an economic standpoint. With the aid of Prof. Von Maur, we designed a more streamlined and retro style restaurant with an extension that was already planned to be built. In order to make the site relate more to the street and not isolate the building with parking lots or cars, we turned the area in front of the building into a seating area with sitewalks so people can walk by and see customers enjoying the food of the restaurant.
M-139 Corridor Improvement Plan
The Street
The current street of Berrien Springs is a 3 laned road with a left turn “suicide” lane in the middle. With the aid of Civil & Traffic engineering expert Peter Swift, we created a plan to make the roads more safe by turning the “suicide” lane into a median, and creating left land turn queue where needed. Also, bike lanes on either side were put in to create a safe right of way for bikers.
03
The St. Joseph Center St. Joseph, MI
The St. Joseph Center is a theoretical Hotel / Convention Center project located at the edge of the St. Joseph river on the border between St. Joseph, and Benton Harbor, Michigan. The site was adjacent to a bridge and sharing a parking lot with the Berrien County Jury Offices, on the corner of Port St. and M-63. Historically, the two cities have had tensious realtions, and so the intent of this project was to create a building that could be a connection between the two cities through appealing asthetics, and program. The Center has an exhibit hall, pool, restaurant, hotel rooms, and a 2 story parking garage underneath the building.
The St. Joseph Center Hotel Lobby
The St. Joseph Center Structure and Plans
In order for the “bridge” exhibit hall to span across the two ends of the building, a large steel truss had to be designed on both sides.The entire structural frame is held up by using vaying sizes of steel members, while the parking garage underneath the building is made of precast concrete. On the exterior, the white and gray colors are from the use of Corian® Cladding.
The St. Joseph Center Hotel Room
The St. Joseph Center Exhibit Hall
03 04
Niles Plaza & Chapel Niles, MI
The Niles Plaza & Chapel was a theoretical project to enhance the current plaza located on E. Main St by redesigning the site and adding a chapel as well. Instead of tearing the site down and starting from blank, I chose to keep some of the existing buildings and enhance the site by adding more open spaces, and replace the overly large parking lot with walkable paths, along with a park with fountain to promote more usability by the public.
Niles Plaza & Chapel The Chapel
Front Elevation
Rear Sitting Area Draft
Section
Floor Plan
Interior Perspective
Niles Plaza & Chapel Rear Seating Area
05
Sketches & Watercolors Personal Work
RAYMOND J BYUN 201.669.8239 raymondbyun@gmail.com