F.1 ………………………………………………………………………………………. P-Wall Panels ………………………………………………………………………………….. P.1-P.2 W- Window ………………………………………………………………………………………. W.1 S- Skylight ……………………………………………………………………………………….. S.1 R- Roof ………………………………………………………………………………………... R.1-R.2 D- Door …………………………………………………………………………………….. D.1-D.2 C- Changing Room ……………………………………………………………………………. C.1-C.2 A– Mass Assemblies ……………………………………………………………………………. M.1-M.4 E– Master Planning ……………………………………………………………………………. E..1-E.3 M- Models …………………………………………………………………………………… M.1-M.5 N– Plans & Elevations ……………………………………………………………………………. N.1-N.5 B– Build Project ………………………………………………………………………………… B.1-B.3 F-Flooring
ARC 2526 Professor Herrmann Second Year Fall 2016
Quantity Take-Off
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Q.1
Tools
Cordless Drills/Drill Batteries
Speed Squares
Tape Measures
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year
Pencil
Circular Saws/Miter Saw
Hammers
Fall 2016
O.1
ABBY JACKSON
Assignment 7.0
Truss Assembly
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Truss Assembly
ABBY
Outer Triangle Materials:
JACKSON
Tools: Circular Saw Tape Measure Pencil
2x4 P. T. Pine– 12’ (1)
Steps: 1.
Take 12’ 2x4 and cut down to 11’ 3/4”. Waste
Assignment 7.0 2.
On one end of the 2x4, mark 7 1/2” and cut from corner to mark.
Assembly Sequencing Diagrams
65°
Waste
Professor Herrmann 3.
On the opposite side of the 2x4, cut 45° from bottom corner.
ARC 2526 45°
Waste
4.
Finished board should look as shown.
T.1
Truss Assembly Outer Triangle Materials:
2x6 P.T. Pine– 10’ (1)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
Steps: 1.
Take 10’ 2x6 and cut down to 8’ 4 9/16”.
Assignment 7.0 Assembly Sequencing Diagrams 2.
On both ends of the 2x6 mark 2 1/8” and cut from corner to mark creating a parallelogram shape.
Professor Herrmann ARC 2526
3.
Finished board should look as shown.
T.2
Truss Assembly Outer Triangle Materials:
2x4 P.T. Pine– 6’ (1)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
Steps: 1.
Take 6’ 2x4 and cut down to 5’ 8 1/8”.
Assignment 7.0
2.
On one end of the 2x4. mark 4 5/16” on the bottom side and cut to corner.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
On opposite end of 2x4, mark 3 3/4” on bottom side and cut to corner.
4.
Finished board should look as shown.
T.3
Truss Assembly Web Members Materials:
2x4 P.T. Pine– 8’ (1)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
Steps: 1.
Take 8’ 2x4 and cut in half to make two 4’ long pieces.
Assignment 7.0
2.
Take one 4’ board and rip down middle.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
Cut 4’ board down to 3’ 1 7/8”.
4.
Cut corners off of one end from mark.
T.4
Truss Assembly Web Members Materials:
2x2 P.T. Pine– 4’ (1) (from previous 8’ 2x4)
ABBY JACKSON
Tools: Circular Saw Tape Measure Pencil
Steps: 1.
Take 2x2 from previous cut down 2x4 and cut down to 2’ 1 3/16”.
Assignment 7.0
2.
Cut off both corners of one end at 45°.
45°
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
T.5
Truss Assembly Web Members Materials:
2x2 P.T. Pine– 4’ (from previous 8’ 2x4)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
Steps: 1.
Take 2x2 from previous cut down 2x4 and cut down to 3’ 7 9/16”.
Assignment 7.0
2.
Cut ends accordingly.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
T.6
Truss Assembly Web Members Materials:
2x2 P.T. Pine– 4’ (from previous 8’ 2x4)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
Steps: 1.
Take 2x2 from previous cut down 2x4 and cut down to 2’ 2 2/8”.
Assignment 7.0
2.
Cut ends accordingly.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
T.7
Truss Assembly Web Members Materials:
2x4 P.T. Pine– 8’ (1)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
Steps: 1.
Mark corners.
Assignment 7.0
2.
Cut ends as diagrammed.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
T.8
Truss Assembly Materials:
2x2 P. T. Pine– 12’ (10) 2x4 P. T. Pine– 12’ (10) 2x6 P. T. Pine– 16’ (15)
Tools: Circular Saw Tape Measure Pencil Screws Drill
ABBY JACKSON
Steps: 1.
The top of the truss is made of 2x4’s. The column is a 2x6 and the web members are 2x2’s.
Assignment 7.0
2.
You will need 2 of these flat trusses.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
To create the 4 3D trusses, construct two of these trusses.
4.
Then attach together with screws at 90° angle with 2x2.
T.9
ABBY JACKSON
Assignment 7.0
Flooring Install
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Flooring Install Materials:
Plastic vapor barrier (3’ wide roll)
Tools: Hammer 16D nails
ABBY JACKSON
3/4” 4’x8’ plywood sheets- (6) 2x2 stained P.T. Pine– 12’ (11) 2x12 stained P.T. Pine– 12’ (20)
Steps: 1.
Take the plastic vapor barrier and roll out the cover concrete slab.
Assignment 7.0
2.
Take sheets of plywood and layer on top.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
Place 2x2’s 2’ apart and nail down.
4.
Insert 2x12 boards in sets of twos in between the 2x2’s and nail down.
F.1
ABBY JACKSON
Assignment 7.0
Wall Panel Assembly
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Wall Assembly
Materials:
2x12 stained P. T. Pine– 10’ (6) 2x10 stained P. T. Pine –10’ (6) 2x8 stained P. T. Pine– 10’ (8) 2x6 stained P. T. Pine– 10’ (8) 2x4 stained P. T. Pine-10’ (10) 2x2 stained P. T. Pine– 10’ (10)
Tools: Circular Saw Tape Measure Pencil Hammer 16d nails
ABBY JACKSON
Rigid insulation 1’x12’ (16)
Steps: 1.
Construct stud wall.
Assignment 7.0 Assembly Sequencing Diagrams 2.
Insert Rigid insulation.
Professor Herrmann ARC 2526
3.
Stack and nail wood panels on both sides of stud wall.
4.
Repeat to create 9 total walls at this dimension.
P.1
Wall Assembly
Materials:
Rigid insulation—12’ (3) 2x12 stained P. T. Pine– 10’ (6) 2x10 stained P. T. Pine –10’ (6) 2x8 stained P. T. Pine– 10’ (8) 2x6 stained P. T. Pine– 10’ (8)
Tools: Circular Saw Tape Measure Pencil
ABBY JACKSON
2x4 stained P. T. Pine-10’ (10) 2x2 stained P. T. Pine– 10’ (10) Rigid insulation 1’x12’ (16)
Steps: 1.
Repeat previous page instructions for each wall dimension. *Create 2 of each of these walls for north and south sides of cabin.
Assignment 7.0 Assembly Sequencing Diagrams Professor Herrmann ARC 2526
P.2
ABBY JACKSON
Assignment 7.0
Window Install
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Window Install Materials:
2x12 Stained P. T. Pine– 12’ (1) 2x4 Stained P. T. Pine– 8’- (2)
Tools: Drill Bits Screws Circular Saw Tape Measure
ABBY JACKSON
Steps: 1.
Take 10’ 2x12 and cut (2) 3’ 6 15/16” boards for the window sill.
Assignment 7.0 Assembly Sequencing Diagrams 2.
3.
Stack wood board 2x4, 2x4, 2x2, 2x2, 2x2, and screw to trusses on either side.
Professor Herrmann ARC 2526
Cut custom glass panels.
W.1
ABBY JACKSON
Assignment 7.0
Skylight Install
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Skylight Install Materials:
2x6 P. T. Pine– 12’ (3) 4’ x 3’ glass panels (3)
Tools: Drill Bits Screws Circular Saw Tape Measure
ABBY JACKSON
Steps: 1.
Cut boards to length.
Assignment 7.0 Assembly Sequencing Diagrams 2.
Notch boards 1” from bottom and 1” inside for the glass panels to sit on. Screw together frame.
Professor Herrmann ARC 2526
3.
Install glass.
S.1
ABBY JACKSON
Assignment 7.0
Roof Assembly
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Roof Assembly Materials: 4’x8’ 3/4” plywood sheets- (20) 2x4 wood lathes– 10’ (18) Rigid foil-backed foam
Tools: Hammer 16D Nails
ABBY JACKSON
insulation– 20’-(9)
Steps: 1.
Lay out sheets of plywood for each side of roof.
Assignment 7.0
2.
Spread the wood lathes out along the bottom plywood layer and nail.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
Place the insulation in between the wood lathes.
4.
Place another 3/4” sheet layer on top just as step 1 and nail.
R.1
Roof Assembly Materials:
2x4 wood lathes– 10’ (18) 29 gauge R-panel metal roof–
ABBY JACKSON
Tools: Hammer 16D nails
20’x5’ 8 1/8”- (1)
29 gauge R-panel metal roof– 20’x8’- (1)
Roof felt (3’ wide roll) 20’ ridge cap
Steps: 1.
Start at bottom of each roof side and roll out 3’ wide roofing felt and overlap each layer 6” and nail.
Bottom
Assignment 7.0
Bottom
2.
Take the remaining wood lathes and lay out just as step 2 on the previous page and nail.
3.
Lastly, take the 29 gauge R-panel and place on top and nail to layers beneath.
4.
Attach ridge cap.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
R.2
ABBY JACKSON
Assignment 7.0
Door Assembly
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Door Assembly Materials:
12’ stained P. T. Pine (1) 10’ stained P. T. Pine (1) 8’ stained P. T. Pine (1) 6’ stained P. T. Pine (1) 4’ stained P. T. Pine (1)
Tools: Hammer 16D nails Circular Saw Tape Measure Speed Square Pencil
ABBY JACKSON
4’x8’ plywood sheet (1)
Steps: 1.
Start building the door jam by cutting pieces of plywood to the dimensions of the jam.
Assignment 7.0
2.
Cut wood block 4 1/2” x (each dimension) nail down to plywood and repeat for both sides of jam.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
Start constructing the door by cutting a piece of plywood 3’ x 6’8”.
4.
Cut wood boards 3’ long x (each dimension) and nail to plywood. Repeat for both sides of door.
D.1
Door Assembly Materials:
2x2 P. T. Pine– 10’
Tools: Hammer 16D nails Drill Drill Bit Screws
ABBY JACKSON
Steps: 1.
First cut the three 1 1/4”x1 1/4” x 2 1/2” pieces that attach to the door.
Assignment 7.0
2.
Cut the two long pieces at 3’ each; then cut off angles as shown.
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
3.
To attach door to jam, set door square inside jam and drill down hinges 2’ 5 15/16” with the middle hinge centered to door.
D.2
ABBY JACKSON
Assignment 7.0
Changing Room Assembly
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Changing Room Assembly Materials:
2x12 stained P. T. Pine– 3’ (6) 2x10 stained P. T. Pine –3’ (6) 2x8 stained P. T. Pine– 3’ (8) 2x6 stained P. T. Pine– 3’ (8)
Tools: Hammer 16D nails Drill Drill Bit Screws
ABBY JACKSON
2x4 stained P. T. Pine-3’ (10) 2x2 stained P. T. Pine– 3’ (10)
Steps: 1.
Construct stud wall.
Assignment 7.0 Assembly Sequencing Diagrams 2.
Stack and nail wood panels on both sides of stud wall.
Professor Herrmann ARC 2526
3.
Repeat to make 2 walls and then stack wood panels connecting the two.
C.1
Changing Room Assembly Materials:
2x2 P. T. Pine– 3’ (1)
Tools: Hammer 16D nails Drill Drill Bit Screws Speed Square
ABBY JACKSON
Steps: 1.
Use speed square to cut angles of door knob.
Assignment 7.0 Assembly Sequencing Diagrams
2.
Attach with screws.
Professor Herrmann ARC 2526
C.2
ABBY JACKSON
Assignment 7.0
Mass Assemblies
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Super-Structure
ABBY JACKSON
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann Top View
ARC 2526
Axonometric
Second Year November 28, 2016
Super-Structure Truss Types
3D Truss Front Elevation
3D Truss Side View
Middle Truss Front Elevation
A.1 Inner Truss Front Elevation
Roof Assembly
ABBY JACKSON
Corrugated Metal with Ridge Cap
Wood Lathes
Roofing Felt
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann ARC 2526 Second Year
Plywood
November 28, 2016
Rigid Insulation
Wood Lathes
Roof Layers Plywood
A.1
Special Assembly
ABBY JACKSON
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann ARC 2526 Second Year November 28, 2016 Axonometric View of 3D Truss Plan
3D Truss Construction
Custom 1/4� Steel Gusset Plates
A.2
Wall Panel Assembly
ABBY JACKSON
This zone is not studded and will be custom for door and window.
*2- 2x12’s 2– 2x10’s 5– 2x8’s 4– 2x6’s 4– 2x4’s 5– 2x2’s
l
l
2x4 stud walls in between each truss with studs 1’ apart
Interior sides are boarded with stained P. T. Pine starting with 2x12 up to 2x2.*
Steps of Wall
Panel Assembly
l
l
Rigid insulation is cut to fit between studs.
Exterior sides are boarded in the same fashion as the interior sides.*
A.3
Corner Assembly
ABBY JACKSON P. T. Pine column finishes off exterior
3D truss extending from corner
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann Corner Plan View Without Roof
ARC 2526 Second Year
Boarded stud walls meet with east/west walls over lap the end of the north/south walls
November 28, 2016 Corner Explanation in Plan and Elevation
Exterior Elevation of Corner Interior Corner Without Diagonal Beam
A.4
ABBY JACKSON
Master Planning
ARC 2526 Professor Herrmann
Second Year Fall 2016
Cluster Exploration Project
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Exploring the technique of cluster planning through photos and diagrams
E.1
Master Plan Proposals
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Proposals for master plan using cluters
E.2
Master Plan
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Master plan for Hood Scout Reservation
E.3
ABBY JACKSON
Models
ARC 2526 Professor Herrmann
Second Year Fall 2016
Process Models
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Initial structure models Experimenting with different truss types
M.1
Process Models
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Experimenting with skinning and bed layout
M.2
Final Model
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Final model elevations on site
M.3
Computer Model
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Interior and Exterior views using Sketchup computer drawing program
M.4
Rendering
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
M.5
ABBY JACKSON
Assignment 7.0
Plan & Elevation Drawings
Assembly Sequencing Diagrams Professor Herrmann ARC 2526
Plan
ABBY JACKSON
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann ARC 2526 Second Year November 28, 2016
Scale: 1/2” = 1’-0” Plan
N.1
Elevations
ABBY JACKSON
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann West
ARC 2526 Second Year November 28, 2016
c East
N.2
Elevations
ABBY JACKSON
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann ARC 2526 Second Year November 28, 2016
North
South
N.3
Sections
ABBY JACKSON
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann ARC 2526 Second Year November 28, 2016
Transverse
Longitudinal
Building Sections
N.4
Site
ABBY JACKSON
N
Assignment 7.0 Assembly Sequencing Diagrams
Professor Herrmann ARC 2526 Plan
Second Year November 21, 2016
Site Plan Site Section
Section
N.5
ABBY JACKSON
Build Project
ARC 2526 Professor Herrmann
Second Year Fall 2016
Build Project
ABBY JACKSON
Sleeping Shelter Cabin for Hood Scout Reservation in Hazlehurst, MS
ARC 2526 Professor Herrmann Second Year Fall 2016
Architecture & Building Construction Science
Bridge for access to sleeping shelter when it is placed on site
Collaborative Studio Fall 2016 Build Project Both sleeping shelter and bridge were constructed at Mississippi State University by students.
B.1
Build Project Initial Super-Structure Model
ABBY JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Architecture & Building Construction Science Collaborative Studio Fall 2016 Build Project
B.2
Build Project
ABBY
My Hands-On Projects
JACKSON
ARC 2526 Professor Herrmann Second Year Fall 2016
Cut out custom metal gusset plates with plasma cutter. Then, drilled holes for bolts with drill press. Team of 4 created custom wood and polygal door and window for entrance.
Cut and drilled together pieces for window frames for operable windows.
Architecture & Building Construction Science Collaborative Studio Fall 2016 Build Project
B.3