Appendix C Fehr&Peers Traffic Study April 2017

Page 1

MEMORANDUM Date:

April 30, 2017

To:

Jason Graf, Crandall Arambula

From:

Ariel Davis and Nathan Chan, Fehr & Peers

Subject:

Downtown Lake Stevens – Redevelopment Concept Refinement SE16-0480

Fehr & Peers reviewed the proposed Downtown Lake Stevens redevelopment concept to provide feedback on transportation circulation and operations. This memorandum describes our traffic operations findings and resulting recommendations.

TRAFFIC CIRCULATION The redevelopment concept would largely maintain the current traffic circulation patterns. Key differences include: •

Extending 18th Street NE west of Main Street to meet the existing north-south alley between 17th Place NE and 18th Street NE, in essence creating a loop road connecting Main Street to North Cove Park and the boat launch.

Vacating 21st Street NE between Grade Road and Hartford Drive and realigning Grade Road to straighten the curve at Hartford Road. This creates a more traditional “T” intersection at Hartford Road and eliminates the Grade Road/21st Street NE intersection. Left turn pockets would be provided on Grade Road at 22nd Street NE and Hartford Road.

The number of vehicle through lanes would remain the same as current conditions with one lane in each direction on roadways throughout the study area. The redevelopment concept includes more substantial changes for the pedestrian and bicycle environment, with proposed facilities including sidewalks, multi-use paths, bicycle lanes, and protected bike lanes.

1001 4th Avenue | Suite 4120 | Seattle, WA 98154 | (206) 576-4220 | Fax (206) 576-4225 www.fehrandpeers.com


Jason Graf, Crandall Arambula April 30, 2017 Page 2 of 6

TRAFFIC OPERATIONS This study includes analysis of two intersections within Downtown, Main Street/20th Street NE and Main Street/16th Street NE, as well as Grade Road/SR 92 to the north. Travel demand forecasts developed by City staff in 2016 were used for traffic operations analysis. The forecast assumes traffic volumes increase by roughly two percent annually out to the horizon year of 2035. The City’s Comprehensive Plan establishes level of service standards for intersections in the City. The City sets LOS E as the standard for acceptable operation along arterials and collectors, and LOS C as the standard for acceptable operations on local access roads. This study will apply the level of service standard E as the study intersections fall along arterials and collectors. For all-way stopcontrolled intersections and roundabouts, LOS is determined by the weighted average delay for all approaches of the intersection. For two-way stop controlled intersections, LOS is determined by the movement with the highest delay. Downtown Main Street/16th Street NE and Main Street/20th Street NE are currently all-way stop controlled intersections. Turning movement counts were collected at these locations in November 2016. Turning movement volumes for 2035 were calculated based on the City’s annual growth rate forecast and analyzed using HCM 2010 methodology for unsignalized intersections. Table 1 shows the existing and 2035 level of service for the two downtown study intersections and the movement with the highest delay during the PM peak hour. TABLE 1. EXISTING AND 2035 PM PEAK HOUR LEVEL OF SERVICE Existing Intersection

2035

Delay (seconds)

LOS

Delay (seconds)

LOS

Main Street / 16th Street NE

10

A

15

C

Main Street / 20th Street NE

12

B

36

E

By 2035, it is expected that the increased volumes would cause the Main Street/20th Street NE intersection to fall to LOS E. Although this meets the overall intersection level of service standard,


Jason Graf, Crandall Arambula April 30, 2017 Page 3 of 6

the westbound approach would operate at LOS F. To mitigate the delay on that approach, several potential improvements were examined and the results are shown in Table 2. These improvements are consistent with projects identified in the City’s 2017-2022 TIP. TABLE 2. POTENTIAL IMPROVEMENTS AT MAIN STREET/20TH STREET NE (2035 PM PEAK HOUR)

Improvement

Delay (seconds)

LOS

50’ left-turn pockets on the EB & WB approaches

23

C

Roundabout

7

A

Providing left turn pockets on the eastbound and westbound approaches would bring the average intersection delay to LOS C with each approach operating at LOS D or better. Building a roundabout would also mitigate the delay at Main Street/20th Street NE with all approaches of the intersection operating at LOS A. As stated above, the overall intersection delay is expected to be within the City’s adopted standard; these are simply potential improvements if the City finds the westbound delay to be an issue. The primary challenge to adding turn pockets or a roundabout at this intersection relates to the adjacent buildings and the culvert on the east side of Main Street. Expansion of the roadway may require right of way acquisition and potentially a new or expanded culvert over the creek. Although Main Street/18th Street NE and Main Street/17th Street NE are not formal study intersections, we considered how the redevelopment concept may affect traffic operations at those locations. To determine what kind of intersection control may be necessary, we conducted a sensitivity test on potential turning volumes. This evaluation suggested that an all-way stop controlled intersection may be required at the four-way Main Street/18th Street NE intersection. Left-turn pockets on the northbound and southbound approaches are another potential option depending on the level of turning volumes. Side-street stop control at the Main Street/17th Street NE “T” intersection would likely meet City level of service standards in 2035. However, this analysis will need to be refined during the EIS phase once the land use alternatives are finalized.


Jason Graf, Crandall Arambula April 30, 2017 Page 4 of 6

State Route (SR) 92 & Grade Rd The SR 92 / Grade Road intersection is a side-street stop controlled intersection along a WSDOT facility with one travel lane in each direction. Turning movement counts were collected in November 2016 and forecasted using the two percent annual growth rate. Table 3 shows the existing and 2035 intersection operations.

TABLE 3. EXISTING AND 2035 PM PEAK HOUR LEVEL OF SERVICE - SR 92/GRADE ROAD Existing Intersection

SR 92 / Grade Road

Movement with Highest Delay

Delay (seconds)

NB

81

2035

LOS

Movement with Highest Delay

Delay (seconds)

LOS

F

NB

>150

F

SR 92/Grade Road currently operates at an LOS F on the northbound approach; this condition would be exacerbated as volumes grow into the future. The City’s 2017-2022 TIP includes a project to replace the intersection with a roundabout. Table 4 presents the results of a roundabout analysis using Sidra software and WSDOT’s guidelines for Sidra analysis settings. TABLE 4. ALTERNATIVES AT SR 92/GRADE ROAD (2035 PM PEAK HOUR)

1.

Alternative

Delay (seconds)

LOS

Roundabout

10

B

Analyzed using Sidra 6.1 based on WSDOT’s Sidra Policy Settings for roundabouts

The analysis indicates that a roundabout would improve operations at the intersection and meet the City’s LOS standard as well as WSDOT’s LOS standard (LOS D on SR 92). We recommend the redevelopment concept include replacing the side-street stop controlled intersection at SR 92/Grade Road with a roundabout consistent with the project identified in the City’s 2017-2022 TIP.


Jason Graf, Crandall Arambula April 30, 2017 Page 5 of 6

PEDESTRIAN AND BICYCLE FACILITIES We have reviewed the proposed pedestrian and bicycle network and have the following recommendations: 20th Street Bike Lanes We recommend the bike lanes on 20th Street be 6.5 feet wide to allow cyclists to pass each other without leaving the bike lane. Prioritization The recommended plan includes new pedestrian and bicycle facilities on all major roadways within the study area. As these will likely require phased implementation due to funding constraints, we recommend the following projects be prioritized in the near term: •

• •

20th Street multi-use path – Multi-use paths on both 20th and 16th Streets would connect Downtown to the Centennial Trail. We recommend 20th Street be prioritized first because it connects to Mt. Pilchuck Elementary and the Lake Stevens Disc Golf Course in addition to residential uses and requires a shorter distance to the Centennial Trail than 16th Street. Grade Road multi-use path – this path would connect downtown to a large concentration of residential uses to the north. 20th Street bike lanes west of Main Street – this facility would connect downtown to a large concentration of residential uses to the west.

North Lakeshore Swimming Beach Crossing The proposed transportation network includes two options for a connection to the North Lakeshore Swimming Beach west of Downtown: a boardwalk on the south side of N Lakeshore Drive or a multi-use path on the north side of N Lakeshore Drive. If feasible, the boardwalk on the south side would be preferable because it provides a more direct connection to Downtown and keeps pedestrians and cyclists on the shore side of the roadway. A multi-use path on the north side of the road would require pedestrians and bicyclists to cross N Lakeshore Drive to reach the swimming beach. If the multi-use path is ultimately selected, we recommend a high visibility marked crossing from the path to the swimming beach. Sight distance along this stretch of the roadway is limited due to the curvature of the road and vegetation. We recommend further study to identify the best location for the crossing as well as potential complementary measures including trimming


Jason Graf, Crandall Arambula April 30, 2017 Page 6 of 6

vegetation, lowering the speed limit in the vicinity of the beach, and advanced yield lines, traffic calming measures, and signage to alert motorists to the crossing.


ATTACHMENT A



ATTACHMENT B


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.:

DTSAP

Location: Date: Recorder: Interval (dd) : (In Minutes)

Main St/16th St NE 11/10/2016 Thursday AAE 15 PEAK HOURS

Street Name--> HOUR ENDING

Main Street From North L 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30

TOTAL AM Peak Vol PM Peak Vol

T

15 14 16 11 10 12 11 17

106 0 56

AM PERIOD 6:00AM12:00PM

R

10 7 12 18 14 8 9 14

92 0 47

County: Town: Weather:

45 40 34 33 38 25 31 29

275 0 152

Start 00:00

Main Street From South TOT L 0 0 0 70 3 61 2 62 4 62 4 62 3 45 7 51 3 60 5 0 0

473 0 255

31 0 13

End 01:00

T

Volume 0

R

12 10 7 16 7 6 12 13

83 0 45

TOT

16th Street NE From East L T

0 0 0 16 13 14 24 10 14 17 21 0 0

1 1 3 4 0 1 2 3

15 0 9

Start 16:00

PM PERIOD 12:00PM-7:00PM

129 0 67

0 3 1 1 2 1 2 4

14 0 5

End 17:00

R

7 10 5 3 16 11 6 7

65 0 25

Snohomish Lake Stevens Overcast

Volume 632

TOT 0 0 0 29 24 17 11 29 28 16 26 0 0

22 11 11 7 11 16 8 15

101 0 51

16th Street NE From West L T

180 0 81

41 44 41 41 48 28 27 40

310 0 167

R

7 11 9 16 12 13 7 8

83 0 43

TOT 0 0 0 52 59 55 63 64 50 41 55 0 0

4 4 5 6 4 9 7 7

46 0 19

439 0 229

GRAND TOTAL 0 0 0 167 157 148 160 165 137 125 162 0 0

1221 0 632


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.: Location: Date: Recorder: Interval (dd) : (In Minutes)

DTSAP Main St/16th St NE 11/10/2016 Thursday AAE 15 PEAK HOURS

Hour Ending

Bicycles

AM PERIOD 6:00AM12:00PM Main Street PED.

15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30

TOTAL AM Peak Vol PM Peak Vol

County: Town: Weather:

U.T.

Start 00:00

End Volume Start End Volume PM PERIOD 01:00 0 16:00 17:00 632 12:00PM-7:00PM BICYCLES PEDESTRIAN & U-TURN BREAKDOWN Main Street 16th Street NE Bicycles PED. U.T. Bicycles PED. U.T.

1 3 1 1 0 0 0 1

0 0 0

7 0 6

0 1 4 1 0 0 2 0

0 0 0

Snohomish Lake Stevens Overcast

0 0 0

8 0 6

Bicycles

16th Street NE PED. U.T.

2 7 0 0 0 1 1 1

0 0 0

0 0 0

12 0 9

0 1 0 0 0 0 0 1

0 0 0

0 0 0

2 0 1

0 0 0


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.:

DTSAP

Location: Date: Recorder: Interval (dd) : (In Minutes)

Main St/16th St NE 11/10/2016 Thursday AAE 15 PEAK HOURS

County: Town: Weather:

Start 00:00

AM PERIOD 6:00AM12:00PM

End 01:00

Volume 0

Start 16:00

PM PERIOD 12:00PM-7:00PM

End 17:00

Snohomish Lake Stevens Overcast

Volume 632

967

Turning Movement Summary: 473

494 LEG 1 Main Street

Quadrant Total

585

R

T 275

106

Quadrant Total

207 0

U

0

101

R

L

310

65

T

T

83

14

L

R

46

0

U

0 Quadrant Total

77

U

31

83

L

T

180 LEG 3

439

92

U

16th Street NE

LEG 4

810

16th Street NE

371

L

384 204

15 R

29

Quadrant Total

0

Quadrant Total

Main Street LEG 2 152

129 281

Comments:

LOS AM:C(0.80) PM:C(0.77)

0

AM Peak Hour : 0

0 LEG 1 Main Street

Quadrant Total

0

R

T 0

0

0

U

0

0

R

L

0

0

T

T

0

0

L

R

0

0

U

0 Quadrant Total

0

U

0

0

L

T

0 LEG 3

0

0

U

16th Street NE

LEG 4

0

16th Street NE

0

L

0

0 0

0 R

0

Quadrant Total

107

Quadrant Total

Main Street LEG 2 0

0 0

518

PM Peak Hour : 255

263 LEG 1 Main Street

Quadrant Total

319

R

T 152

0

U

0

51

R

L

167

25

T

T

43

5

L

R

19

0

U

0 Quadrant Total

56

32

U

13 L

45 T

9 R

14

Main Street LEG 2 71

67 138

81 LEG 3

229

47

U

16th Street NE

LEG 4

419

16th Street NE

190

L

Quadrant Total

189 108


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.:

DTSAP

Location: Date: Recorder: Interval (dd) : (In Minutes)

Main St/20th St NE 11/9/2016 Wednesday AAE 15 PEAK HOURS

Street Name--> HOUR ENDING

Main Street From North L 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30

TOTAL AM Peak Vol PM Peak Vol

T

18 10 19 7 8 7 7 11

87 0 54

AM PERIOD 6:00AM12:00PM

R

23 17 24 13 15 11 17 18

138 0 77

County: Town: Weather:

5 7 4 1 2 7 0 3

29 0 17

Start 00:00

Main Street From South TOT L 0 0 0 46 23 34 15 47 15 21 15 25 19 25 14 24 21 32 30 0 0

254 0 148

152 0 68

End 01:00

T

Volume 0

R

31 30 22 23 16 14 26 18

180 0 106

PM PERIOD 12:00PM-7:00PM

TOT

85 0 52

20th Street NE From East L T

0 0 0 57 61 57 51 43 37 55 56 0 0

3 16 20 13 8 9 8 8

417 0 226

Start 16:00

10 11 20 17 14 5 17 7

101 0 58

End 17:00

R

39 46 41 35 32 37 28 36

294 0 161

Snohomish Lake Stevens Overcast

Volume 843

TOT 0 0 0 56 68 83 63 64 57 53 52 0 0

7 11 22 11 18 15 8 9

101 0 51

20th Street NE From West L T

496 0 270

14 11 13 7 11 12 17 10

95 0 45

R

29 26 26 25 26 37 29 28

226 0 106

TOT 0 0 0 52 58 51 38 50 59 57 54 0 0

9 21 12 6 13 10 11 16

98 0 48

419 0 199

GRAND TOTAL 0 0 0 211 221 238 173 182 178 189 194 0 0

1586 0 843


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.:

DTSAP

Location: Date: Recorder: Interval (dd) : (In Minutes)

Grade Road/SR-92 11/8/2016 Tuesday AAE 15 PEAK HOURS

Street Name--> HOUR ENDING

Grade Road From North L 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30

TOTAL AM Peak Vol PM Peak Vol

9 0 2

AM PERIOD 6:00AM12:00PM

T

0 0 1 1 3 1 3 0

0 0 0 1 0 0 1 0

2 0 1

Start 00:00

Grade Road From South TOT L 0 0 0 0 18 1 20 2 23 3 21 3 18 3 23 5 12 0 14 0 0

R

0 1 1 1 0 2 1 0

6 0 3

County: Town: Weather:

17 0 6

149 0 82

End 01:00

Volume 0

T

R

1 0 0 0 0 0 1 1

3 0 1

TOT

SR-92 From East L

0 0 0 22 24 35 26 28 27 19 24 0 0

3 4 12 5 10 4 6 9

53 0 24

Start 16:00

PM PERIOD 12:00PM-7:00PM

205 0 107

3 3 4 6 3 3 9 7

38 0 16

T

End 17:00

Volume 1347

R

98 101 109 98 69 96 102 75

748 0 406

TOT

3 2 4 0 1 3 3 0

16 0 9

Snohomish Lake Stevens Overcast

SR-92 From West L

0 0 0 104 106 117 104 73 102 114 82 0 0

802 0 431

0 0 0 0 0 0 1 0

1 0 0

T

R

195 184 176 164 189 163 160 145

1376 0 719

TOT

16 24 27 17 22 28 20 25

179 0 84

0 0 0 211 208 203 181 211 191 181 170 0 0

1556 0 803

GRAND TOTAL 0 0 0 337 339 357 314 315 323 319 276 0 0

2580 0 1347


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.: Location: Date: Recorder: Interval (dd) : (In Minutes)

DTSAP Grade Road/SR-92 11/8/2016 Tuesday AAE 15 PEAK HOURS

Hour Ending

Bicycles

AM PERIOD 6:00AM12:00PM Grade Road PED.

15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30

TOTAL AM Peak Vol PM Peak Vol

County: Town: Weather:

U.T.

Start 00:00

End Volume Start PM PERIOD 01:00 0 16:00 12:00PM-7:00PM BICYCLES PEDESTRIAN & U-TURN BREAKDOWN Grade Road Bicycles PED. U.T. Bicycles

1 0 0 0 0 0 0 0

0 0 0

1 0 1

End 17:00

0 0 0

0 0 0

0 0 0

Volume 1347

SR-92 PED.

0 0 0 0 0 0 0 0

Snohomish Lake Stevens Overcast

U.T.

Bicycles

SR-92 PED.

0 0 0 1 0 0 0 0

0 0 0

0 0 0

1 0 1

U.T.

0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.:

DTSAP

Location: Date: Recorder: Interval (dd) : (In Minutes)

Grade Road/SR-92 11/8/2016 Tuesday AAE 15 PEAK HOURS

County: Town: Weather:

Start 00:00

AM PERIOD 6:00AM12:00PM

End 01:00

Volume 0

Start 16:00

PM PERIOD 12:00PM-7:00PM

End 17:00

Snohomish Lake Stevens Overcast

Volume 1347

37

Turning Movement Summary: 17

20 LEG 1 Grade Road

Quadrant Total

3

R

T 2

899

9

Quadrant Total

25 0

U

0

16

R

L

1

748

T

T

1376

38

L

R

179

0

U

0 Quadrant Total

328

U

149

3

L

T

802 LEG 3

1556

6

U

SR-92

SR-92

LEG 4

2455

L

2240 1438

53 R

91

Quadrant Total

0

Quadrant Total

Grade Road LEG 2 223

205 428

Comments:

LOS AM:C(0.80) PM:C(0.77)

0

AM Peak Hour : 0

0 LEG 1 Grade Road

Quadrant Total

0

R

T 0

0

0

0

U

0

0

R

L

0

0

T

T

0

0

L

R

0

0

U

0 Quadrant Total

0

U

0

0

L

T

0 LEG 3

0

0

U

SR-92

SR-92

LEG 4

0

L

0

0 0

0 R

0

Quadrant Total

11

Quadrant Total

Grade Road LEG 2 0

0 0

16

PM Peak Hour : 6

10 LEG 1 Grade Road

Quadrant Total

1

R

T 1

489

0

U

0

9

R

L

0

406

T

T

719

16

L

R

84

0

U

0 Quadrant Total

2

166

U

82 L

1 T

R

40

LEG 2 107 210

1176 745

24

Grade Road

103

431 LEG 3

803

3

U

SR-92

SR-92

LEG 4

1292

L

Quadrant Total


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.: Location: Date: Recorder: Interval (dd) : (In Minutes)

DTSAP Main St/20th St NE 11/9/2016 Wednesday AAE 15 PEAK HOURS

Hour Ending

Bicycles

AM PERIOD 6:00AM12:00PM Main Street PED.

15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30

TOTAL AM Peak Vol PM Peak Vol

County: Town: Weather:

U.T.

Start 00:00

End Volume Start End Volume PM PERIOD 01:00 0 16:00 17:00 843 12:00PM-7:00PM BICYCLES PEDESTRIAN & U-TURN BREAKDOWN Main Street 20th Street NE Bicycles PED. U.T. Bicycles PED. U.T.

7 1 1 0 0 0 0 0

0 0 0

9 0 9

1 2 2 0 1 0 0 0

0 0 0

Snohomish Lake Stevens Overcast

0 0 0

6 0 5

Bicycles

20th Street NE PED. U.T.

0 0 0 0 0 1 0 0

0 0 0

0 0 0

1 0 0

1 45 7 2 0 1 0 2

0 0 0

0 0 0

58 0 55

0 0 0


City of Lake Stevens, Washington Public Works Department Turning Counts Study - Field Sheet Request No.: Job No.:

DTSAP

Location: Date: Recorder: Interval (dd) : (In Minutes)

Main St/20th St NE 11/9/2016 Wednesday AAE 15 PEAK HOURS

County: Town: Weather:

Start 00:00

AM PERIOD 6:00AM12:00PM

End 01:00

Volume 0

Start 16:00

PM PERIOD 12:00PM-7:00PM

End 17:00

Snohomish Lake Stevens Overcast

Volume 843

630

Turning Movement Summary: 254

376 LEG 1 Main Street

Quadrant Total

124

R

T 29

87

Quadrant Total

188 0

U

0

101

R

L

95

294

T

T

226

101

L

R

98

0

U

0 Quadrant Total

250

U

152

180

L

T

496 LEG 3

419

138

U

20th Street NE

LEG 4

894

20th Street NE

475

L

894 398

85 R

186

Quadrant Total

0

Quadrant Total

Main Street LEG 2 337

417 754

Comments:

LOS AM:C(0.80) PM:C(0.77)

0

AM Peak Hour : 0

0 LEG 1 Main Street

Quadrant Total

0

R

T 0

0

0

U

0

0

R

L

0

0

T

T

0

0

L

R

0

0

U

0 Quadrant Total

0

U

0

0

L

T

0 LEG 3

0

0

U

20th Street NE

LEG 4

0

20th Street NE

0

L

0

0 0

0 R

0

Quadrant Total

105

Quadrant Total

Main Street LEG 2 0

0 0

350

PM Peak Hour : 148

202 LEG 1 Main Street

Quadrant Total

62

R

T 17

0

U

0

51

R

L

45

161

T

T

106

58

L

R

48

0

U

0 Quadrant Total

54

116

U

68 L

106 T

52 R

110

Main Street LEG 2 183

226 409

270 LEG 3

199

77

U

20th Street NE

LEG 4

445

20th Street NE

246

L

Quadrant Total

482 212


ATTACHMENT C


CITY OF LAKE STEVENS Lake Steven Washington RESOLUTION NO. 2016-I3 A RT,SOLUTION OF THE CITY COUNCIL OF THE CITY oF LAKE STEVENS, WASHINGTON, ADOPTING A SIXYEAR TRANSPORTATION IMPROVEMENT PLAN FOR THE YEARS 2017-2022 AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE PUGET SOUND REGIONAL COUNCIL. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City Council of the City of Lake Stevens has previously adopted a comprehensive street plan, including an arterial street construction plan, and has thereafter periodically modified said as part of the City's Comprehensive Plan resolution, and \ryHEREAS, the City Council has reviewed the work accomplished under the Plan, determined current and future City street and arterial needs, and based upon these findings has prepared a Six-Year Transportation Improvement Plan (TIP) for the ensuing six (6) calendar years; and WHEREAS, on 28th June 2016, following pubtic notice as required by law, a public hearing has been held on the TIP as required by RCW 35.77.010; and WHEREAS, the TIP has been updated for 2017-2022 in accordance with the State Requirements,

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE STEVENS DOES RESOLVE AS FOLLOWS: Section 1. Plan Adopted. The Six-Year Transportation Improvement Plan for the City of Lake Stevens, as revised and extended for the ensuing six (6) calendar years (2017-2022), a copy of which is attached hereto as Attachment A and incorporated herein by this reference as if fully set forth herein, which Plan sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Plan. Pursuant to Chapter 35.77 RCW, within 30 days of the adoption of this resolution the City Clerk is hereby authorized and directed to file a copy of this Resolution, together with the Attachment A (Project Descriptions) and Attachment B (Expenditure year projections) also attached hereto and incorporated herein by this reference, with the Secretary of Transpoftation for the State of Washington.

Resolution 2016-13

Page

I of8


ADOPrEDthis

a#

day ofJune 2016.

Spencer,

ATTEST:

Pugh,

APPROVED AS TO FORM:

Au,¿l'LtÅJþ/

C1antKl Weed, City

Resolution 2016-13

attoiúy

Page 2 of 8


Attachment A TIP with prolect description and costs

City of Lake Trans

Stevens

portation

I

m

startyear:

zo17

prove me nt Progra m 12077 - 2022!-

Revision:28 June 2016

TOTAL Proiect

I'Ð

d[5È -oo=

è

JõEO

õc

ROAD NÊ

SR

- lntersect¡on - sub-project of 2(1)

FROM 4th St NE

TO

lmprove egress ï18 alignmenl

right turn inqressfor [B lhe c0nstrucÌi0n 0f a

5R g/SR

204 - System

91stAve

NE

4th St NE

S is

SR

92 & Grade Rd RAB

nil

lntersect¡on

3/3lst r

Ava

aliqnmenl N-SVilhgelyay ßoad

lü, improvemr¡ts

(93il).

3

5R

204

SR9/S 8{¿nd

g¿tilay trcalment

XXX

91st Ave NE

W2

SR

sR

204

Vernon

right out mwonantfor S[

21L Ro¡dwEw¡uld

lntersect¡on

X

x

X

X

X

strceisIape

Sat¡

drivsn s¡lety pmjort to

nduc¡

20th 5t 5E - Segment L

83rd Ave

91st Ave

l4iidening 0f exìstin! two lane to four lane. providing n0n-m0t0dzed

SE

4,980,567

travel area with pedestrian sidewalks and improved drainage

Zoth St

SE

- Segment 2

79th Ave

SE

83rd Ave

Vlidming of uieling two

3,970,366

X

XX

hnr tofour lana proriding nil.mslonized

x

XX

tr¡{sl amawith tsdaslri¡n sidarrolk

and imprwad dminago and

lightin¡.

7(5)

20th St

SE

- Segment 3

73rd Ave

SE

79th Ave

lïide¡ing 0l ex¡stinq two lane to four lane, providing non-m0lorized

SE

2,770,169

1rðvel aæa wilh pedesldan sidewalks and im¡roved drainage and

2,599,205

llldenii¡ ol ulstlng two lsm t0 folr la¡a pmlding non-mot¡¡ir¡d troval amawith pedestrian ridaralls and improvad draimge and

X

XX

x

xx

lishtins.

7(6)

20th St

SE

- Segment 4

us2

73rd Ave

l¡¡ht¡¡q.

6(1)

24th St SE/73rd 5E - lntersection

73rd Ave

SE

6(21

24rh St

73rd Ave

SE

[0nstrutti¡n 0f

a new inleNecti0n t0 provide internal vehicle and

79th Ave

n0n-m0l0ilzEd

3,653,000

Non¡tm¡tion of a nm r¡rdw¡y ¡sgnsd t0 Fst¡ds lntsm¡l vðhicle ond ¡ornotsr.lzsd r¡mrlation adjacant to ãIh Stmat SL

SE

3[0,0m

2,70[.000

fl.m0,000

7,800.0[0

45.500,000

t000.000

E4û00,000

3.Eg4,6SS

1,028,305

3,078.Sr8

il4t00

2û0.0t[

828,000

ü10,000

35,10[

20,000

255.Sû0

35t.[00

lï1,000

30.000

200,000

s73,000

s35.400

3.47L181

t.04t.651

397.838

sz,sn

¿650,80Ê

t

345.853

lt8,82t

2.3t5,435

s69,55S

r.80û.6rI

2S4.S30

34t.Er0

r,s02605

ms,Tn

t683.183

80.!û0

50.ûû0

Ê70,000

800,00!

385.300

210.[B!

3,087.m0

3.653,000

80.000

5t,ttB

E7[.[0[

800,0!0

5Zl.8[0

200.000

{550.n0

5.2?8,00û

243û,517

38S,828

2580.738

XX

circulati0n ddjacent lo 2Ûlh Slreet SE. IonstrucÌion

800,000

is developer driven.

SE

r.734,3r'l

_

and

lishtinq.

7(31

842,500

x

vehlclo conflirls

200,000

TlLl

(':,

X

b¿ davaloper dniven

llpg¡ade ruadway Ì0 crcaÌe a pEdeslrian friendly d0wntown style

351,000 92 and lake Dr Re-channel¡zation

¿.

Ê23,r83

4tû,522 C¡nstructi¡n ol a nsw roadway segmerrt that wauld allowfor right in-

1,140,000 7l\41

o

xxxx

Ihis

t0 tha SR 3/4th lnterssrtion.

Roundabout intersection improvement wrth

Vernon

E

ú 9

c

safe'ty, econonical local ciroclation, and capacity impmvsm8nts.

4,r05,22L g(hh Ave NE Connector

3

o Ê

XXXX

turn onto

onto 4th St Ì.lE. Addithn¿l inprovement is

Syrt¿m impr'0vamentthst includ¡s ¡ound¡bouts at

65,000,000

D(lc)

6ão

Deicrlotlon

COST 3,000,000

2(11

C ð ôo

I ì g;

xx

Constmction h devalopar driren.

6(3)

24th St 5E/79th

SE

- lntersect¡on

79th Ave 5E

[onstructisn 0f ð new intersection ta provide internal vehicle and

800,000

is developer driven.

6(4)

24th St 5E

83rd Ave

SE

87th Ave

Conslßdion 0f a nrw ros&vry segmrnt to prwide lnlsmal v¡hicl¡

SE

5,278,0m

snd non-motorizBd cimulation adjacentto Construction

Resolution 2016-13

XX

no¡-molorized circulation adjacent to 2Ûllr Slreet S[. [onstruction

2fth

$re*

SL

xx

is daveloper drivan.

Page 3 of 8


6(s)

24th St SE/83rd

SE

- lntersection

83rd Ave

[!nstr!cti0¡ !l

SE

800,000

XX

a new i¡ts¡secti0n t0 prlvid¿ internal vehiclE and

n0n-n0l0rized circulatiB0 ¡djacent to 20th Slreet SE. Ionstruction is developer driven.

6(61

24th 5t

5R9

SE

91st Ave SE 2,970,00A

¡nd non-mst¡¡iz¡d elrcul¡tion adjacent to ãlth Stmat Construction is

1(1)

91st Ave NË/SR 204 - RTP

sR

204

200' north

91st Ave N€/SR 204 - RTP

sR

2l2J

91st Ave

20th 5t 5E

204

300'south 454,100

SE

S[

4th st 5E 4,770,000

870,0t0

8[0,00û

2$/.080

m0.00û

¿4ß.0û0

29m,000

33.7û0

t0,000

233,30û

r348û[

2t2.2Bl

45.1t0

20,000

388,ËSB

t8t8{0

mÆl

477,000

300,0û0

3,SS3.[0[

715,500

4,05450t

r95,000

t00,000

t.855.t00

Iss[,m0

il200[

40,0û0

t,0t3,000

232.5û[

757,846

5t0û00

8.3ä.811

7.578.{60

476,38û

2û0,0[[

4087,42!

t.s05,520

550,780

4S57.!2[

5.507,800

Ill,2tt

t,00û,804

556.002

556,0û2

t&047,052

7.8[3.$r8

?,803.9r8

20.0[0

r8û.ûûû

2û0,mI

40.000

380.000

400,000

s3.5û!

84t,5t0

s35,û00

800.0t0

3[0.000

700,000

450,0û0

r80,û00

42t.û0û

540.000

188,600

435,400

t.E3û,0û0

68t.S0[

t,5sl,t0[

XX

lane

fore dadicãtrd r¡ghttum

XX

Ì{¡den t0 a th¡ee lane secli0n with n0n-n0t0rized impr¡vements ¡nd

XX

llids¡ ¡orlh

5û,û00

dniYen.

fliden southb0und 0utside lane lo provide for a dedicaled dght tum

337,000 1(2)

dnahper

80,0[û

xx

ton¡troction ol a n¡wr¡¡dway sogmantlo provide intsmalv¡hlcb

bound outsid¡ lanclo pmvide

lan¡

pedestria¡ imprÐvEnents that include sidwalk segments and ¡urb separaled walking paved shoulder areas along ihe east side cf the roadway

2(3)

91st Ave

SE

20th st sE

24rh St

llar conne*or

SE

madway to 24th St

XX

S[

1,950,0æ 8(4)

99th Ave NE

Market

4th st NE

14(Al

4th st

91st Ave NE

sR

XXXX

[nhance Streetscape with improveme¡t wtth n0n-m0t0ilzed

1,170,000

enhancements and circul¡ti0n imp¡Dyements w¡th

¡

p0ssible

ruundabout intemection at 4th l.l[

NE

204

ll¡w int¡rn¡l connsrtor

7,578,4æ

brast ln

acc¡s

on

and cirrulalion rordwoy.

to 8R

Zl{.

lntsrs¡¡tion would

llill mquira b¿ a

ri¡ht tum

0nh.

L417l

99th Ave

SE

20th st sE

4th st sE

VJiden

4,763,800

lo

a

three lane secti0n with n0n-motDilzed improvemBnts and

877

5[[

XX

o nrvr

XXXX

pEdÊsÌrian improvemEnls lhat include sidewalk segments and curb

2.858.28t

separated walkinq paved shoulder areas alonq the east side of the roadway

14(8)

99th Ave

SE

20th 5t 5E

Leke Steìrens Rd

xx

¡ thm¡ lsna ¡¿ctionwith nsrmsto¡izsd inprovrmrntr and prdss¡da[ ¡mprovÊm¡ntsthat inctrda sidnrall sogm¿nl¡ and curt

Widsn to

5,507,800

separrtdwalling

pavad shouldar

arao

along tha oast sido of the

¡o¡dvay

D(1A)

D(18)

20th 5t NE & Ma¡n lntersection

6rade Road

liVideninq

lntersect¡on 20th st NE

sR

XXXX

to provide turn pockels ar possible roundabout

1,,rlz,OO4

inprovements

15,607,836

llidsn lo a thm¡ l¡¡¡ ¡¡¡timwi¡h non-motori¿sd ¡mprovrmsnt¡ md psds¡ln¡sn ¡iltmyemartslhat includr sldnall segm¡¡t¡ ad cu¡b

92

srparatrdwalling

pevodshouldaramas alongthewrstsida

XXXX

r,560,784

BådrBy

12(s)

91st Ave NE - lntersect¡on

Vernon Rd

li|inorwideninq and possible minir0undab0ut t0 improvemeßt safely

1s(2)

LundeenTVemon - lntersectlon

Vernon Rd

ls(1)

Vernon Road

91st Ave NE

sR9

116th Avenue NE

zorh 5t NE

26th St NE

200,000

and circülalion

400,000

lhann¡lir¡llon ¡nh¡¡¡sm¡nt t0 impovsnrnt s¡fety rnd cimulation. llay rostrictthmugb mwamant f$ssst-8ast cmss¡ig (V0m0n) llinorwidening tc provide

935,000

22nd St NE

26rh St NE

4th Street

91st Ave 5E

sR9

Foresl Rd

29th St NE

XX

X

XX

X

XX

xxx xxx

schooh.

impr8ve safety.

000,000

75.000

t25,0t0

50,0t0

It0,0û0

XXX

improve safety.

[onstruct vehicular bicycle and pEdeshian impmvemBrts t0

2,273,OOO

Resolution 2016-13

and pedartrian impmaments to

80n8{ruct pedssld¡n ¡mpr0vsm8ntrt0 impr0vs raf8ty âmüod

622,000 Cedâr Road

biqcla

X

improve saloty.

[onstruct vehicular bicycle and pedeslrian impmvements i0

600,000 SE

movement and impmved

pedeslria¡ movEmPnt Constructvrhiculrr,

1,OOO,OOO

1l.7th Avenue NE

f0rtlrn

t

of the

82û00

XXX 254.0û0

388.tût

Page 4 of 8


City-wide Min¡-RAB lntersection lmprovements

lntersection 900,000

S. Lake Stevens Road

5. Davies

[snstruct mi¡¡-roundabouls and tßff¡c losrat¡ln

at vari0us l0catì0ns t0 ìmpmvs ßaf8ty

St¡tch Road

xxxx X

430,000

tonst¡uct pedBstilan improvemenls t0 improle safelv.

30n,000

608800

2?[,000

830,00[

30,00t

4[û.000

r2s,00û

3ûr,ûûû

fl? 79n t49

57331 5n4

99 tR7ff74

X

an4lz\

Resolution 2016-13

14

514253

Page 5 of 8


Attachment B TIP with estimated 6 year expenditure projections

City of Lake Stevens

Transportat¡on lmprovement Program (2OL7 -20221 20!7

Rev¡s¡on: 28 June 2016

â

o

o

À 2(21

2(11

cr

ROAD

; o É

2018 Ê

to

U

9/4th NE - lntersection - subproject of 2(1) SR 9/SR 204 - System

lp o

ô

3

o c,

20L9 g

t

o

U

Io

Ð o

æ

ô

202r

2020 Ê

o

u

cE o

3 o Ê

6c o

u

E

ü o

ê

B

o É

2022 g

o

3 o e

o

ô

!

c

o I

c

o@

SR

400,000

2340,00¡

3,5t8.0[0

r,t?0.000

t950.000

n3)83

642500

29ã,000

3,s00.00

l,ß4.3t7

1755,mn

780,!m

fl.3fr.008

tm,000

27,30tt00

ã36,000

41t.522

r,028.305

2888,394

0

D(1c)

SR

92 & Grade Rd RAB

3

90th Ave N€ Connector

7(41

9Lst Ave NE

W2

SR

TlLl

20th St

SE

- Segment 1

7{3}

20th St

SE

- Segment 2

7(5)

20th St

SE

- Segment 3

7(61

2oth St

SE

- Setment 4

6(1)

24th St SE/73rd

6(21

24th St SE

6{3)

24th St SE/79th

6(4)

24th St SE

6(s)

24th 5t SE/83rd

6{6}

24th St

1(1)

91st Ave NE/SR 204 - RTP

il4,08!

200.m0

828 000

35.t00

20.û00

235.Sû[

92 and Lake Dr Re-channelization 30.000

25û.0tû

SE

SE

SE

323,t00

374.t8û

r70.000

56r.24û

1.388.867

2,083,300

s3.4Ë0

2S&379

500,00f1

3.012528

88.483

25S.390

il8,82r

2,3[5,455

ä,000

L514.nâ

25.t01

775,000

385,300

3.281m0

80,00û

720,000

- lntersection

- lntersection

80,û00

200,0!t

297,000

50

2zT5.r[fl

¿nzs00

335,tût

il8,[00

- lntersect¡on

80[

SE

47.000 ä0,000

4s4880

t.878.400

33,7t0

Resolution 20I6-13

Im00

2S3.30û

Page 6 of 8


1(21

gtst Ave

2l2l

9lst

2(31

91st Ave

8(4)

99th Ave NE

14(A)

4th sr NE

74(71

99th Ave 5E

14{8)

fr{tth AveSÊ

D(1A)

20th st NE & Main lntersect¡on

D{rB)

Gradè Road

L2(s)

91.st

1s(2)

Lundeen/Vemon - lntersect¡on

ls(1)

Vernon Road

NEÆR

204 - RT?

4i4t0

n0!0

388,8S0

Ave 5E ss8.25t

s5,480

3.878,270

SE

r9[000

t0û.t}00

t85i0r0

fl20û0

40.000

l.Ü3,!00 tBg.{82

568.385 ãtt0ft0

[flûÊr3

478.380

4,281,42t

5flt,40

{351020

flt.2[0

333.60t

667.203

u,\n,u4

78ü8U Ave NE - lntersect¡on 20,[00

r80,û00

4ft000 s3.5tû

3dt,0s0

233,750

607750

1f6th Avenue ilE

lt7th

?5,üt0 tã0[0

800.[00

Avenue NE

50.000

t00,00t

45!,û0û

4th Street SE 82000

5,t0¡00

Cedar Road

254ût0

389,t0t

t,63t.[0û

C¡ty..ur¡de M¡nÞRAB lntersectlon

lmprovements

t00.80[

50;000

ffir[t

rE0.00tÌ

5fl1100

t

3.397283

r0tfl00

50.000

t,58t.sg!

2287.48t

r00.000

5[000

t0ft000

5f1000

r5.?zì.[84

2587807

352n9 Ên5

3 5t9 nns

tot B00

5. Lake Stevens Road

3 3ÍI3 nnn

Resolution 2016-13

7t33

fin

I

534 Fnn

ttllTfn

7Êttl7[n

?nR ¿nn

4i62500

1.045.000

I[RRZ

313g? n95

Page 7

of8


Exhibit B Project Map

L

l t _l

x Ë

I f

7(s)

__i

20 17-2022 LAKE STEVENS Resolution 2016-13

6 YEAR TIP Page 8 of 8


ATTACHMENT D


HCM 2010 AWSC 1: Boys & Girls Club Drwy/Main St & E Lakeshore Dr/16th St NE

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

11/14/2016

9.9 A EBU

EBL

EBT

EBR

WBU

WBL

WBT

WBR

NBU

NBL

NBT

NBR

0 0 0.92 2 0 0

167 167 0.92 2 182 0

43 43 0.92 2 47 1

19 19 0.92 2 21 0

0 0 0.92 2 0 0

5 5 0.92 2 5 0

25 25 0.92 2 27 1

51 51 0.92 2 55 0

0 0 0.92 2 0 0

13 13 0.92 2 14 0

45 45 0.92 2 49 1

9 9 0.92 2 10 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS Lane Vol Left, % Vol Thru, % Vol Right, % Sign Control Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS HCM 95th-tile Q

Existing PM 09/21/2016 Baseline

EB WB 1 SB 1 NB 1 10.6 B

WB EB 1 NB 1 SB 1 8.4 A

NB SB 1 EB 1 WB 1 8.7 A

NBLn1 EBLn1 WBLn1 SBLn1 19% 73% 6% 22% 67% 19% 31% 18% 13% 8% 63% 60% Stop Stop Stop Stop 67 229 81 255 13 167 5 56 45 43 25 47 9 19 51 152 73 249 88 277 1 1 1 1 0.102 0.342 0.115 0.35 5.061 4.951 4.713 4.541 Yes Yes Yes Yes 702 722 753 787 3.135 3.015 2.79 2.595 0.104 0.345 0.117 0.352 8.7 10.6 8.4 10 A B A A 0.3 1.5 0.4 1.6

Synchro 9 Report Page 1


HCM 2010 AWSC 1: Boys & Girls Club Drwy/Main St & E Lakeshore Dr/16th St NE

11/14/2016

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

SBU

SBL

SBT

SBR

0 0 0.92 2 0 0

56 56 0.92 2 61 0

47 47 0.92 2 51 1

152 152 0.92 2 165 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS

Existing PM 09/21/2016 Baseline

SB NB 1 WB 1 EB 1 10 A

Synchro 9 Report Page 2


HCM 2010 AWSC 2: Main St/Hartford Dr & 20th St NE

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

11/14/2016

11.8 B EBU

EBL

EBT

EBR

WBU

WBL

WBT

WBR

NBU

NBL

NBT

NBR

0 0 0.92 2 0 0

45 45 0.92 2 49 0

106 106 0.92 2 115 1

48 48 0.92 2 52 0

0 0 0.92 2 0 0

58 58 0.92 2 63 0

161 161 0.92 2 175 1

51 51 0.92 2 55 0

0 0 0.92 2 0 0

68 68 0.92 2 74 0

106 106 0.92 2 115 1

52 52 0.92 2 57 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS Lane Vol Left, % Vol Thru, % Vol Right, % Sign Control Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS HCM 95th-tile Q

Existing PM 09/21/2016 Baseline

EB WB 1 SB 1 NB 1 11.2 B

WB EB 1 NB 1 SB 1 12.6 B

NB SB 1 EB 1 WB 1 12 B

NBLn1 EBLn1 WBLn1 SBLn1 30% 23% 21% 36% 47% 53% 60% 52% 23% 24% 19% 11% Stop Stop Stop Stop 226 199 270 148 68 45 58 54 106 106 161 77 52 48 51 17 246 216 293 161 1 1 1 1 0.379 0.33 0.439 0.258 5.548 5.488 5.39 5.782 Yes Yes Yes Yes 646 653 666 619 3.6 3.543 3.442 3.841 0.381 0.331 0.44 0.26 12 11.2 12.6 10.9 B B B B 1.8 1.4 2.2 1

Synchro 9 Report Page 3


HCM 2010 AWSC 2: Main St/Hartford Dr & 20th St NE

11/14/2016

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

SBU

SBL

SBT

SBR

0 0 0.92 2 0 0

54 54 0.92 2 59 0

77 77 0.92 2 84 1

17 17 0.92 2 18 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS

Existing PM 09/21/2016 Baseline

SB NB 1 WB 1 EB 1 10.9 B

Synchro 9 Report Page 4


HCM 2010 AWSC 1: Boys & Girls Club Drwy/Main St & E Lakeshore Dr/16th St NE

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

03/28/2017

15.4 C EBU

EBL

EBT

EBR

WBU

WBL

WBT

WBR

NBU

NBL

NBT

NBR

0 0 0.92 2 0 0

253 253 0.92 2 275 0

65 65 0.92 2 71 1

29 29 0.92 2 32 0

0 0 0.92 2 0 0

8 8 0.92 2 9 0

38 38 0.92 2 41 1

77 77 0.92 2 84 0

0 0 0.92 2 0 0

20 20 0.92 2 22 0

68 68 0.92 2 74 1

14 14 0.92 2 15 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS Lane Vol Left, % Vol Thru, % Vol Right, % Sign Control Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS HCM 95th-tile Q

2035 PM 5:00 pm 09/21/2016 Baseline

EB WB 1 SB 1 NB 1 17.2 C

WB EB 1 NB 1 SB 1 10.4 B

NB SB 1 EB 1 WB 1 10.7 B

NBLn1 EBLn1 WBLn1 SBLn1 20% 73% 7% 22% 67% 19% 31% 18% 14% 8% 63% 60% Stop Stop Stop Stop 102 347 123 386 20 253 8 85 68 65 38 71 14 29 77 230 111 377 134 420 1 1 1 1 0.189 0.602 0.214 0.619 6.122 5.748 5.761 5.308 Yes Yes Yes Yes 581 626 618 675 4.213 3.812 3.848 3.374 0.191 0.602 0.217 0.622 10.7 17.2 10.4 16.7 B C B C 0.7 4 0.8 4.3

Synchro 9 Report Page 1


HCM 2010 AWSC 1: Boys & Girls Club Drwy/Main St & E Lakeshore Dr/16th St NE

03/28/2017

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

SBU

SBL

SBT

SBR

0 0 0.92 2 0 0

85 85 0.92 2 92 0

71 71 0.92 2 77 1

230 230 0.92 2 250 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS

2035 PM 5:00 pm 09/21/2016 Baseline

SB NB 1 WB 1 EB 1 16.7 C

Synchro 9 Report Page 2


HCM 2010 AWSC 2: Main St/Hartford Dr & 20th St NE

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

03/28/2017

36.3 E EBU

EBL

EBT

EBR

WBU

WBL

WBT

WBR

NBU

NBL

NBT

NBR

0 0 0.92 2 0 0

68 68 0.92 2 74 0

160 160 0.92 2 174 1

73 73 0.92 2 79 0

0 0 0.92 2 0 0

88 88 0.92 2 96 0

243 243 0.92 2 264 1

77 77 0.92 2 84 0

0 0 0.92 2 0 0

103 103 0.92 2 112 0

160 160 0.92 2 174 1

79 79 0.92 2 86 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS Lane Vol Left, % Vol Thru, % Vol Right, % Sign Control Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS HCM 95th-tile Q

2035 PM 5:00 pm 09/21/2016 Baseline

EB WB 1 SB 1 NB 1 28 D

WB EB 1 NB 1 SB 1 51.2 F

NB SB 1 EB 1 WB 1 35.3 E

NBLn1 EBLn1 WBLn1 SBLn1 30% 23% 22% 37% 47% 53% 60% 52% 23% 24% 19% 12% Stop Stop Stop Stop 342 301 408 224 103 68 88 82 160 160 243 116 79 73 77 26 372 327 443 243 1 1 1 1 0.799 0.71 0.92 0.563 7.737 7.813 7.465 8.32 Yes Yes Yes Yes 465 461 483 431 5.819 5.899 5.541 6.416 0.8 0.709 0.917 0.564 35.3 28 51.2 21.7 E D F C 7.3 5.5 10.7 3.4

Synchro 9 Report Page 3


HCM 2010 AWSC 2: Main St/Hartford Dr & 20th St NE

03/28/2017

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

SBU

SBL

SBT

SBR

0 0 0.92 2 0 0

82 82 0.92 2 89 0

116 116 0.92 2 126 1

26 26 0.92 2 28 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS

2035 PM 5:00 pm 09/21/2016 Baseline

SB NB 1 WB 1 EB 1 21.7 C

Synchro 9 Report Page 4


HCM 2010 AWSC 2: Main St/Hartford Dr & 20th St NE

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

03/28/2017

23.2 C EBU

EBL

EBT

EBR

WBU

WBL

WBT

WBR

NBU

NBL

NBT

NBR

0 0 0.92 2 0 0

68 68 0.92 2 74 1

160 160 0.92 2 174 1

73 73 0.92 2 79 0

0 0 0.92 2 0 0

88 88 0.92 2 96 1

243 243 0.92 2 264 1

77 77 0.92 2 84 0

0 0 0.92 2 0 0

103 103 0.92 2 112 0

160 160 0.92 2 174 1

79 79 0.92 2 86 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS Lane Vol Left, % Vol Thru, % Vol Right, % Sign Control Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS HCM 95th-tile Q

2035 PM 5:00 pm 09/21/2016 Baseline

EB WB 2 SB 1 NB 1 18 C

WB EB 2 NB 1 SB 1 24.8 C

NB SB 1 EB 2 WB 2 28.6 D

NBLn1 EBLn1 EBLn2 WBLn1 WBLn2 SBLn1 30% 100% 0% 100% 0% 37% 47% 0% 69% 0% 76% 52% 23% 0% 31% 0% 24% 12% Stop Stop Stop Stop Stop Stop 342 68 233 88 320 224 103 68 0 88 0 82 160 0 160 0 243 116 79 0 73 0 77 26 372 74 253 96 348 243 2 7 7 7 7 2 0.745 0.174 0.545 0.219 0.728 0.523 7.216 8.493 7.747 8.228 7.537 7.727 Yes Yes Yes Yes Yes Yes 502 422 466 436 480 465 5.272 6.254 5.508 5.984 5.293 5.789 0.741 0.175 0.543 0.22 0.725 0.523 28.6 13 19.5 13.3 28 19 D B C B D C 6.3 0.6 3.2 0.8 5.9 3

Synchro 9 Report Page 1


HCM 2010 AWSC 2: Main St/Hartford Dr & 20th St NE

03/28/2017

Intersection Intersection Delay, s/veh Intersection LOS Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes

SBU

SBL

SBT

SBR

0 0 0.92 2 0 0

82 82 0.92 2 89 0

116 116 0.92 2 126 1

26 26 0.92 2 28 0

Approach Opposing Approach Opposing Lanes Conflicting Approach Left Conflicting Lanes Left Conflicting Approach Right Conflicting Lanes Right HCM Control Delay HCM LOS

2035 PM 5:00 pm 09/21/2016 Baseline

SB NB 1 WB 2 EB 2 19 C

Synchro 9 Report Page 2


MOVEMENT SUMMARY Site: 2035 Main St/20th St 2035 PM PEAK Roundabout

Movement Performance - Vehicles Mov ID

OD Mov

Demand Flows Total HV veh/h %

Deg. Satn v/c

Average Delay sec

Level of Service

95% Back of Queue Vehicles Distance veh ft

Prop. Queued

Effective Stop Rate per veh

Average Speed mph

South: 20th 3

L2

112

3.0

0.494

9.6

LOS A

3.6

91.6

0.71

0.74

24.1

8

T1

174

3.0

0.494

5.5

LOS A

3.6

91.6

0.71

0.74

23.9

18

R2

86

3.0

0.494

5.8

LOS A

3.6

91.6

0.71

0.74

23.4

372

3.0

0.494

6.8

LOS A

3.6

91.6

0.71

0.74

23.8

23.6

Approach East: Main 1

L2

96

3.0

0.608

11.7

LOS B

5.6

143.0

0.81

0.88

6

T1

264

3.0

0.608

7.6

LOS A

5.6

143.0

0.81

0.88

23.5

16

R2

84

3.0

0.608

7.9

LOS A

5.6

143.0

0.81

0.88

23.0

443

3.0

0.608

8.5

LOS A

5.6

143.0

0.81

0.88

23.4

Approach North: Hartford 7

L2

89

3.0

0.379

10.1

LOS B

2.4

60.7

0.74

0.78

23.9

4

T1

126

3.0

0.379

6.0

LOS A

2.4

60.7

0.74

0.78

23.7

14

R2

28

3.0

0.379

6.3

LOS A

2.4

60.7

0.74

0.78

23.3

243

3.0

0.379

7.5

LOS A

2.4

60.7

0.74

0.78

23.7

L2

74

3.0

0.424

8.7

LOS A

2.8

71.3

0.66

0.66

24.3

2

T1

174

3.0

0.424

4.6

LOS A

2.8

71.3

0.66

0.66

24.1

12

R2

79

3.0

0.424

5.0

LOS A

2.8

71.3

0.66

0.66

23.6

327

3.0

0.424

5.6

LOS A

2.8

71.3

0.66

0.66

24.0

1386

3.0

0.608

7.2

LOS A

5.6

143.0

0.74

0.77

23.7

Approach West: Main 5

Approach All Vehicles

Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections. Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: FEHR AND PEERS | Processed: Wednesday, March 29, 2017 12:41:28 PM Project: \\fpse03\Data2\2016Projects\SE16-0480_LakeStevens_Subarea_Plan_EIS\Analysis\Sidra\SR92_Grade_Main_20th.sip6


ATTACHMENT E


HCM 2010 TWSC 3: Grade Rd/Callow Rd & SR 92

Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow

6.7 EBL

EBT EBR

WBL WBT WBR

NBL

0 719 84 0 719 84 1 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 0 782 91

16 406 9 16 406 9 0 0 1 Free Free Free - None 0 0 92 92 92 2 2 2 17 441 10

82 1 24 82 1 24 0 0 1 Stop Stop Stop - None 0 0 92 92 92 2 2 2 89 1 26

2 3 1 2 3 1 1 0 0 Stop Stop Stop - None 0 0 92 92 92 2 2 2 2 3 1

Minor1 1310 1314 828 827 827 483 487 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 136 158 371 366 386 565 550 -

Minor2 1324 1355 447 482 482 842 873 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 133 149 612 565 553 359 368 -

Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2

Major1 452 4.12 2.218 1109 -

Approach HCM Control Delay, s HCM LOS

EB 0

Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)

03/28/2017

1109 -

0 -

NBLn1 EBL 152 1109 0.765 80.5 0 F A 4.7 0

Existing PM 09/21/2016 Baseline

0 -

Major2 873 4.12 2.218 773 772 -

0 -

0 -

WB 0.4

130 130 366 544 NB 80.5 F

NBT NBR

153 153 386 534

371 -

SBL

120 120 564 333

SBT SBR

145 145 536 368

611 -

SB 29.4 D

EBT EBR WBL WBT WBR SBLn1 - 772 - 154 - 0.023 - 0.042 9.8 0 - 29.4 A A D 0.1 0.1

Synchro 9 Report Page 1


HCM 2010 TWSC 3: Grade Rd/Callow Rd & SR 92

Intersection Int Delay, s/veh

110

Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow

EBL

EBT EBR

WBL WBT WBR

NBL

1 1 1 Free 92 2 1

1087 127 1087 127 0 0 Free Free - None 0 0 92 92 2 2 1182 138

24 614 14 24 614 14 0 0 1 Free Free Free - None 0 0 92 92 92 2 2 2 26 667 15

124 2 36 124 2 36 0 0 1 Stop Stop Stop - None 0 0 92 92 92 2 2 2 135 2 39

3 5 2 3 5 2 1 0 0 Stop Stop Stop - None 0 0 92 92 92 2 2 2 3 5 2

Minor1 1984 1989 1252 1253 1253 731 736 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 ~ 46 61 210 211 244 413 425 -

Minor2 2002 2050 676 728 728 1274 1322 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 44 56 453 415 429 205 226 -

Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2

Major1 684 4.12 2.218 909 -

Approach HCM Control Delay, s HCM LOS

EB 0

Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)

03/28/2017

909 -

0 -

NBLn1 EBL 48 909 3.668 0.001 $ 1376.3 9 F A 19.4 0

Notes ~: Volume exceeds capacity

0 -

524 WB 0.5

0 -

0 -

~ 39 ~ 39 210 373 NB $ 1376.3 F

56 56 243 391

SBL

210 -

32 32 413 164

SBT SBR

51 51 394 225

453 -

SB 93.8 F

EBT EBR WBL WBT WBR SBLn1 - 524 51 - 0.05 - 0.213 0 - 12.2 0 - 93.8 A B A F 0.2 0.7

$: Delay exceeds 300s

2035 PM 5:00 pm 09/21/2016 Baseline

Major2 1320 4.12 2.218 524 -

NBT NBR

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report Page 1


MOVEMENT SUMMARY Site: 2035 SR 92 / Grade 2035 PM PEAK Roundabout

Movement Performance - Vehicles Mov ID

OD Mov

Demand Flows Total HV veh/h %

Deg. Satn v/c

Average Delay sec

Level of Service

95% Back of Queue Vehicles Distance veh ft

Prop. Queued

Effective Stop Rate per veh

Average Speed mph 22.9

South: Grade Rd 3

L2

135

3.0

0.596

31.0

LOS C

5.8

149.1

1.00

1.19

8

T1

2

3.0

0.596

26.1

LOS C

5.8

149.1

1.00

1.19

19.4

18

R2

39

3.0

0.596

26.9

LOS C

5.8

149.1

1.00

1.19

22.6

176

3.0

0.596

30.0

LOS C

5.8

149.1

1.00

1.19

22.8

Approach East: SR 92 1

L2

26

3.0

0.577

13.1

LOS B

5.4

137.2

0.55

0.57

32.4

6

T1

667

3.0

0.577

7.6

LOS A

5.4

137.2

0.55

0.57

42.6

16

R2

Approach

15

3.0

0.577

7.1

LOS A

5.4

137.2

0.55

0.57

30.7

709

3.0

0.577

7.8

LOS A

5.4

137.2

0.55

0.57

41.8

North: Callow 7

L2

3

3.0

0.016

9.7

LOS A

0.1

2.4

0.74

0.58

29.9

4

T1

5

3.0

0.016

4.8

LOS A

0.1

2.4

0.74

0.58

24.2

14

R2

2

3.0

0.016

5.6

LOS A

0.1

2.4

0.74

0.58

29.4

11

3.0

0.016

6.4

LOS A

0.1

2.4

0.74

0.58

26.7

L2

1

3.0

0.965

14.7

LOS B

53.0

1357.0

1.00

0.39

31.2

2

T1

1182

3.0

0.965

9.2

LOS A

53.0

1357.0

1.00

0.39

40.7

12

R2

138

3.0

0.965

8.8

LOS A

53.0

1357.0

1.00

0.39

29.7

Approach

1321

3.0

0.965

9.2

LOS A

53.0

1357.0

1.00

0.39

39.2

All Vehicles

2216

3.0

0.965

10.4

LOS B

53.0

1357.0

0.85

0.51

37.7

Approach West: SR 92 5

Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections. Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: FEHR AND PEERS | Processed: Wednesday, March 29, 2017 12:33:49 PM Project: Not Saved


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.