Taiwan High Speed Rail Project 主講人:
康仕仲 教授 與談人:
李政安 副處長
( 捷運工程局 中區工程處 ) 課堂討論: 打造 2060 年的節能/綠色交通系統
National Taiwan University 1
Why does Taiwan need High Speed Rail?
2
Congestion of the Freeway
3
94% of the population live on the west corridor TAIPEI, Taoyuan Population / m2 >15000 5000-15000 3000-5000 1000-3000 500-1000 300-500 100-300 <100
Hsinchu Taichung
Tainan, Kaohsiung
4
Why does Taiwan need HSR? ••High HighCapacity Capacity ••Energy EnergyConservation Conservation ••Low LowPollution Pollution ••Land LandUse UseEfficiency Efficiency
To Toenhance enhanceeconomic economicgrowth growth To Toopen openup upmore moreareas areas for development for development To Torelieve relievetransport transportcongestion congestion along the western coastal along the western coastalplain plain
Capacity
TRA Rail
High
HSR Bus Low
Airplane
Car 100
300
600
Speed (Km/Hour)
5
Why BOT (Privatization)?
6
Why Privatization ? • Lessons learned in the Taipei Mass Rapid Transit projects- efficiency of public works • Competitions of public funds • Entrepreneurship of private institute • Efficiency of private management
7
A Bold Start
8
THSRC BOT Scheme Planning by Government 10 Years Planning
Concession Period 35 years
Build
Operate
THSR is the largest Build-Operate-Transfer infrastructure project in the World
Transfer assets to
government
Transfer
9
Fierce Competition • China High Speed Rail Consortium
– KMT backed enterprise – Japanese suppliers
( 中國評論新聞網 )
• Taiwan High Speed Rail Consortium – 5 young entrepreneurs – 5 successful private companies – European Partners
( 中央社 ) 10
An offer government can not resist • China High Speed Rail Consortium – Government financing - NT$ 149.5 billions
• Taiwan High Speed Rail Consortium – Government Financing - NY$ (-) 105.7 billions
11
The World’s First Privatized HSR Rolled Off • Main CharactersA government with limited privatization experience + An eager concessionaire ⇒World’s largest BOT Project ⇒ A Rocky Road 12
Project Plan
13
14
15
16
17
18
Copyright Š 2006 Taiwan High Speed Rail Corporation. All Contents
19
20
T 700 Trainset • 12 coaches • 1 business , 11 standard class • 989 passenger seats
Standard class
Business class
21
30 Trainsets Ready for Operation
Copyright Š 2006 Taiwan High Speed Rail Corporation. All Contents
22
Top Operation Speed 300 km/hr Taipei- Taichung 45 min Taipei- Kaohsiung 90 min
23
Impact on Regional Development
24
West Corridor Regional City After the completion of High Speed Rail
Taipei
Taoyuan 19.75 min
CKSTaoyuan Taipei
Taipei - BAC - TAY -
1-Day Living Periphery- Round trip within one day
West Corridor Megapolis
Hsinchu
Hsinchu 32.75 min Taichung Taichung
Taipei- BAC – Taichung 45.75 min
Northern Taiwan Metropolitan Area After the completion of Highway Central Taiwan Metropolitan Area
Southern Taiwan Metropolitan Area
Taipei - BAC - TAC - Chiayi 83.75 min
Chiayi
Tainan
Tainan
Taipei-BAC - TAC - CHA Kaohsiung - Tainan 103 min
Taipei Taoyuan
Kaohsiung
Taipei – Zuoying 90 min
Hsinchu
TRA Expwy HSR
Before the completion of Highway
Taichung Chiayi Tainan Kaohsiung
25
Taoyuan Station – 2000 vs. 2007
26
Zuoying Station – 2000 vs. 2007
27
Integrated Railroad Network
28
Integrated Railroad Network Taipei
港南
橋板
松 山
萬 桃園 華
桃 園
中壢
竹 東
竹新
HSR 台鐵 TRA
內 灣
HSR Station 台鐵車站 TRA Station
新竹
竹南
苗栗 三義
栗苗
豐原
林雲
義嘉
南台
沙鹿
彰 員 田 二 化 林 中 水
集 集
斗 六
斗 南
嘉 義
善 化
永 台 康 南
大 湖
路 竹
楠 梓
Kaohsiung
)
大甲
台 新化彰 日 中 烏 台中 (
通霄
29
工程困難 •噪音 •震動 •地層下陷 •財務 •車站聯外問題 •增加車站
30
New Life Style
31
Milky Way High Speed Rail Restaurant
32
New Life Style –Affordable
Copyright © 2006 Taiwan High Speed Rail Corporation. All Contents
33
New Life Style â&#x20AC;&#x201C; Home Coming
34
Lessons learned The privatization of the THSR project presented a unique opportunity to explore the effect of privatization on HSR projects: • A privatized HSR project will have a better chance in achieving the traditional project management success of time, cost and quality. Much contribution from less public and political interference/ interruption. •
A privatized HSR requires longer time in build up its ridership.
• A privatized HSR project is a commercial investment for the concessionaire and a government sponsored HSR is a national campaign.
35
End Any questions?
36