土木工程概念設計上課報-台灣高鐵

Page 1

Taiwan High Speed Rail Project 主講人:

康仕仲 教授 與談人:

蘇丁福 副總工程師 (台北市捷運工程局)

National Taiwan University 1


Why does Taiwan need High Speed Rail?

2


Congestion of the Freeway

3


94% of the population live on the west corridor TAIPEI, Taoyuan Population / m2 >15000 5000-15000 3000-5000 1000-3000 500-1000 300-500 100-300 <100

Hsinchu Taichung

Tainan, Kaohsiung

4


Why does Taiwan need HSR? •High Capacity •Energy Conservation •Low Pollution •Land Use Efficiency

To enhance economic growth To open up more areas for development To relieve transport congestion along the western coastal plain

Capacity

TRA Rail

High

HSR Bus Low

Airplane

Car 100

300

600

Speed (Km/Hour)

5


Why BOT (Privatization)?

6


Why Privatization ? • Lessons learned in the Taipei Mass Rapid Transit projects- efficiency of public works • Competitions of public funds • Entrepreneurship of private institute • Efficiency of private management

7


A Bold Start

8


THSRC BOT Scheme Planning by Government 10 Years Planning

Concession Period 35 years

Build

Operate

THSR is the largest Build-Operate-Transfer infrastructure project in the World

Transfer assets to government

Transfer

9


Fierce Competition • China High Speed Rail Consortium

– KMT backed enterprise – Japanese suppliers

(中國評論新聞網)

• Taiwan High Speed Rail Consortium – 5 young entrepreneurs – 5 successful private companies – European Partners

(中央社) 10


An offer government can not resist • China High Speed Rail Consortium – Government financing - NT$ 149.5 billions

• Taiwan High Speed Rail Consortium – Government Financing - NY$ (-) 105.7 billions

11


The World’s First Privatized HSR Rolled Off • Main CharactersA government with limited privatization experience + An eager concessionaire

World’s largest BOT Project  A Rocky Road 12


Project Plan

13


14


15


16


17


18


Copyright Š 2006 Taiwan High Speed Rail Corporation. All Contents Confidential.

19


20


T 700 Trainset • 12 coaches • 1 business ,11 standard class • 989 passenger seats

Standard class

Business class

21


30 Trainsets Ready for Operation

Copyright Š 2006 Taiwan High Speed Rail Corporation. All Contents Confidential.

22


Top Operation Speed 300 km/hr Taipei- Taichung 45 min Taipei- Kaohsiung 90 min

23


Impact on Regional Development

24


West Corridor Regional City After the completion of High Speed Rail

Taipei

Taoyuan 19.75 min

CKSTaoyuanTaipei

Taipei - BAC - TAY -

1-Day Living Periphery- Round trip within one day

West Corridor Megapolis

Hsinchu

Hsinchu 32.75 min Taichung Taichung

Taipei- BAC – Taichung 45.75 min

Northern Taiwan Metropolitan Area After the completion of Highway Central Taiwan Metropolitan Area

Southern Taiwan Metropolitan Area

Taipei - BAC - TAC - Chiayi 83.75 min Taipei-BAC - TAC - CHA - Tainan 103 min

Chiayi

Tainan Kaohsiung Tainan

Taipei Taoyuan

Kaohsiung

Taipei – Zuoying 90 min

Hsinchu

TRA Expwy HSR

Before the completion of Highway

Taichung Chiayi Tainan Kaohsiung

25


Taoyuan Station – 2000 vs. 2007

26


Zuoying Station – 2000 vs. 2007

27


Integrated Railroad Network

28


Integrated Railroad Network Taipei

南 港

松 山

板 橋

萬 桃園 華

桃 園 新 竹

中壢

HSR 台鐵 TRA

內 灣

竹 東

HSR Station 台鐵車站TRA Station

新竹

竹南

苗 栗

苗栗 三義

通霄

彰 化

雲 林

嘉 義

台 南

沙鹿

楠 梓

彰 員 田 二 化 林 中 水

斗 六

斗 南

嘉 義

善 化

永 台 康 南

大 湖

路 竹

Kaohsiung

台中

新 台烏 中日 )

大甲

(

豐原

集 集

29


工程困難 •噪音 •震動 •地層下陷 •財務 •車站聯外問題 •增加車站

30


New Life Style

31


Milky Way High Speed Rail Restaurant

32


New Life Style –Affordable

Copyright © 2006 Taiwan High Speed Rail Corporation. All Contents Confidential.

33


New Life Style – Home Coming

34


Lessons learned The privatization of the THSR project presented a unique opportunity to explore the effect of privatization on HSR projects: • A privatized HSR project will have a better chance in achieving the traditional project management success of time, cost and quality. Much contribution from less public and political interference/ interruption. •

A privatized HSR requires longer time in build up its ridership.

• A privatized HSR project is a commercial investment for the concessionaire and a government sponsored HSR is a national campaign.

35


課堂活動 請發揮想像力,打造2060的大眾交通工具。 1、連絡亞洲及美洲。 2、連絡美東與美西。

36


End Any questions?

37


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.