Speed of Construction – Zego Australia
A Case Study
The Challenge This project involved working with a large Commercial Building
company who were using the ZEGO Building System for the first time. Our client’s challenge was to design and construct a new 3 storey, 16
dwelling apartment complex with ground floor car parking incorporating passive construction solutions to be built quickly and efficiently to meet their tight construction program.
The Solution ZEGO supplied the Commercial FireFORM System for external and
internal fire rated acoustic party walls with a 150mm and 200mm concrete core. The ZEGO FireFORM Building system is installed and poured in situ
reducing the material handling and labour required on site. With a reinforced concrete core, the FireFORM achieved the structural
requirements whilst also providing the fire rating solution for the party and boundary walls.
The Solution ď‚— ZEGO also supplied the ReFORM strippable and reusable plastic
formwork solution for the carpark where insulation was not required. ď‚— ZEGO was able to offer a one stop wall solution for all applications
streamlining the installation process.
The Result Significant cost saving and construction time saving completing the project 4
weeks ahead of schedule. Due to the incorporation of the ZEGO Insulated Concrete Formwork wall
system, this project achieved a 6.4-7.5 star Nathers Energy rating and a 5 Star Green Star Design rating certified project. 56 Seventh Street was awarded the 2015 MBA (SA)Excellence Award Winner
for Excellence in Environmental & Sustainable Constructions- Residential. The success of this project has propelled the benefits of using ZEGO Insulated
Concrete Building Systems as an alternative wall system for commercial and residential projects achieving faster construction, reduced labour costs, sustainability and energy efficiency in one process.