Portfolio

Page 1

PORTFOLIO LANDSCAPE ARCHITECT

CAMILLE

BOUCHARD


LANDSCAPE ARCHITECT BOUCHARD CAMILLE PROFILE 11-12-1988

˝

I acquired during my course curriculum some interdisciplinary skills between technical and artistic training. It’s also through the experience of a community garden that I enriched my eyes, my vision of space, and my botanical knowledge daily. I like to mix design works and building work. Today, I am working to associated my skills of landscape architecture with permaculture and selfsufficient life, by working for private project and festivals. I have a lot to give and I whish this energy can go towards helping people to understand the importance of a change and taking care of our nature.

C O N TA C T La Ribière 26220 Comps France

EDUCATION 2019

PERMACULTURE TEACHER TRAINING

2009

ENGINEERING LANDSCAPE ARCHITECTURE

Octobre

-master degree- École nationale supérieure de la nature et du paysage, from 2009 to 20014

2007

A LEVELS IN ENVIRONNEMENTAL SCIENCES option landscape architecture, from 2007 to 2009

2005

BTEC FIRST DIPLOMA ( equivalent NVQ Level 1 ) in landscaping, from 2005 to 2007

camillebouchard@sfr.fr +33 (0) 6 86 11 73 17 Camille Bouchard Driving licence

INTERETS Travelling

Gardening

Musics

Botanic

Artistic creations

Meeting

SKILLS CONSTRUCTION Garden Land work Irrigation Carpentry

+++++ +++++ +++++ +++++

ARTS EXPRESSION Land art Draw / sketches / paint Recycling natural materials Music Pinao & Hang Pan

SOFTWARE Photoshop Indesign Illustrator Autocad

+++++ +++++ +++++ +++++

Sketchup Vectorworks Qgis

LANGUAGES

PERSONALITY

+ French native language + English IELTS level 6 + Portuguese beginner level + Spanish beginner level

Creative Social Dynamic

+++++ +++++ +++++

Independant Adventurous Teamworker


WORK EXPERIENCE

2019

Festival artist builder, stage, bar, toilets, huts (land art, carpentry) for the festival Tribal Gathering - 2 months - Panama Land art artist - Hostel « Casa del agua » - Columbia Festival artist builder, garden, fontains, showers, willow art (land art, gardener, construction) for Own Spirit Festival - 2 months - Spain Grapes harverst - France

2018

Yoga Teacher Trainning cours - 200 hours - Kerala - India Festival artist builder, gardener, land artist for the Boom festival - 5 months - Portugal Garden project- Dieulefit - France Garden retreat center project - Sesimbra - Portugal

2017

Private gardens projects: maintenance, design and construction - Comporta- Portugal Volonteering in a permaculture project - 1 month - Desert - Marocco Gardener for the Being Gathering -2 months - Boomland - Portugal Art & design work : Poster, flyer, logo, stickers

2016

Permaculture and landscaping volonteering: 6 months in Portugal Volonteering in festival : Boom Festival -PortugalInternational festival of art and construction - Spain

2015

Formation tourism - 3 weeks - Les Menuires - France Barmaid in a vin bar ‘Le Verlaine’ - 4 months - Blois- France

2014

Intership in COACHE LACAILLE AGENCY, design concepts and realisations of privates garden - 3 months - France

2013

Internship in SATIVA PAYSAGE AGENCY, design concepts of publics places and site supervision work - 2 months - France

2012

Internship in PTA DESIGN AGENCY, design concepts for private contractors: outside mixed development as condominiums, hotels, shopping centers, parks and gardens - 3 months - Malaysia

2011

Internship in THE ROYAL BOTANICAL GARDEN of Melbourne as a gardener - 2 months - Australia

2010

Internship in the private garden of MR CHARLES JENCKS «THE GARDEN COSMIC OF SPECULATION» as a gardener - 2 months - Scotland

2008

Internship in EPODE OFFICE, conception project management and design concepts, site supervision work - 1 month - France

2003

Intership and participation to the design conception and realisation of natural swimming pools and private gardens in MR RICHARD CHRISTIAN PAYSAGISTE agency - 10 months accumulated - France

TO

2008

2003 TO

2015

VARIED EXPERIENCES, A plot in a community garden since 2012, childcare, gardening for private clients, occasional sales assistant on the Blois’s market, housekeeper, street marketing, take stocks.


BOOM Festival Portugal 2018

SACRED FIRE Boom festival is located in the north east of Portugal, closed to the Spanish border. The sacred fire team worked on site for 5 months before the festival started. My team principale mission was to maintain and create gardens combined with artistic shapes and constructions. On the thematic of the sacred geometry. All around the space people can found sitting places, green gardens, hidden spots, platforms, benches, lights, water points, shades all in contact with nature. This is a giant playground for grown up and little ones. In the next few pages I compiled pictures of differents stages of the built up and place we created. Tipis gardens for the children, green hole, twisting willow bench... This project had been done with mostly recycled materials from pasted years of nature. The recycling playground make in challenge your neourones to bring to life crazy ideas.





On the work on top, it’s a garden mixed with string art to remind the geometry. In the center a stone totem.

Here on the right, exemple of lights that are only made with natural element. A team collected leafs, powder, cutting wood slices, flowers, lichen...


The star is a giant hanging wood star, this structure is hold by three poles. Inside we planted succulents and growing seed on top.


OWN SPIRIT FESTIVAL Spain 2019

HOLISTIC ZONE Own Spirit Festival is a project located at the reservoir of Santa Ana, close to Baldellou village, near the city of Lerida in spain. It was 2 months build up before the festival started. I worked for the Holistic zone with a mixed team of long term workers and volunteers. My main mission was to create green pathes, gardens feeling in the middle of the desert, build fountains, shower, gestion of the dirty water, stairs, benches... all combined with artistic vision. All of this has been done without any budget, only recycled materials and using the maximun of what nature give to us around.

BEFORE

AFTER


On the pictures we can see the result, with a very little amount on time, seeds, stones, branches

AFTER

BEFORE

and lot’s of humans energy the transformation of the whole area to welcome a week event in deep dry nature.


OWN SPIRIT FESTIVAL Spain 2019 YOGA STAGE This stage is part of the Holitic zone, my work was to create a peaceful background, make a separation with outside environment combine with a land art. On this stage was mostly happening talks, yoga classes, dances, instrumental concert.. I collected drift wood from the lack and assembled it as it’s look like a lotus flower with leafs on the side. With recycled fabrics the petals of the flower was completed. For this pieces we used only rope, fabric and screws.



TRIBAL GATHERING Panama 2019 Tribal Gathering is project located on the carabean cost on a beach in Panama. This is a gathering of 65 tribes from all around the world mixed with trance music party. One of the mission that had been given to me was the construction of the Tribes stage. On this stage they dance, sang, shared their culture and knowledge. The stage had been built under the giant «Malloca», it’s an open space, with a round roof built in wood and palm leafs. The background had been closed with bamboo slice.

This stage is a little reproduction of the jungle, we included plants in the background. Creating, boxes, earth and collecting plants,sprounding seeds was first mission. Then the idea was to bring out the bamboo from the bamboo wall from both side of the platform. Then the orgue of the univers is born ( hidding the technical boxes on the right side of the stage ). By creating levels mixing pieces of wood, plants and sand to integreate the whole scene. Then we create mendalas with tresors from the beach to cover up the sand and hang epiphytes plants all over. It’s became a living stage.


For this work we only used bamboos, roots, plants, earth, wood boxes, sand lots of screws and tresors from the nature.


TRIBAL GATHERING Panama 2019

LOTUS BAR

This bar had been built only with drift wood from the beach located 20 meters from it. The art work that I have done is an assemblissement of wood creating a giant face. In the end of the construction the local creat a roof with thier unique technics with bamboos and palm leafs.



CASA EN EL AGUA Hostel, Columbia 2019

Located in the archipelago of San Bernardo in the Columbian carabean sea, this hostel is very special because it’s only one building on water. The owner asked me to refresh the front of the kitchen. After collecting drift wood all around the islands I created a structure to hold the wood puzzling. To refresh the vegetable storage a new structure as been done with boxes. Easier to clean and organiz the vegtable. I recovered the structure with wood.


SOMMARY LANDSCAPE ARCHIECTURE PROJECTS

1

PRIVATE G arde n s

pro j ect

Portugal : Beco da Sardinha - 1 Beco da Sardinha - 2 Lagoa Farmosa Good Muda -

3

PROJECT A G E N C Y

Neighbourhood of «Val de l’aurance» in Limoges Urban reform projet, the draft-design phase by Sativa agency.

City center of Blois

City center reform by Sativa agency.

Garden of the bishop’s palace in Blois Historical garden project. Design concept and realisation by Caoche Lacaille agency.

2

MASTER THESIS

Presentation of the master’s thesis and the problematic studied.

Presentation of the master’s thesis, complet work accessible on:

http://issuu.com/camillebouchard/docs/ me__moire_camille_bouchard_2015/0

Project’s presentation

the restoration of an old uranium mine located in the « massif central» in France. This presentation is composed by 13 boards entitled «Memory of the invisible,rediscovering the Besbre’s valley»

4

PROJECT E.N.S.N.P

Guerlédan’s lake

large territory’s analysis and project

The terrace of the Blois’s chateau historical garden project.

The place of Rochambeau in Vendome Project of a parking and urban redeveloppement.


Retreat center - S

esimbra - PERMACULTURE PROJECT - MASTER PLAN

master plan

REFERENCES


The theater

Accessibility


The terrain in a forest stade - before intervention winter pictures 2018


The terrain earth / soil work Spring pictures 2020


Private Garden - B

eco da Sardinha 1

GARDEN PROJECT - MASTER PLAN 1. Natural Hedge

6. Shadow path

2. Dune garden

4. Aromatics

3. Climbing garden

PLANTS SELECTION

CONSTRUCTION SITE

Surface : 450 M2 5. Intimity hedge


2017 PORTUGAL

Olive trees

Ombrellas

Acacia

Grass

Garrage Outside deck Sand path Garden projection - views FIVE MONTH AFTER CONSTRUCTION


MARCH 2018 - ONE YEAR AFTER -

MARCH 2020



Private Garden - B

eco da Sardinha 2

CONSTRUCTION SITE

GARDEN PROJECT - MASTER PLAN Surface : 350 M2

FLOOR MATERIAL OPTION


2017 PORTUGAL

FRONT HOUSE OPTION

PLANTS SELECTION

VIEW - AMBIANCES OF THE GARDEN


Private Garden - L

agoa Farmosa

CONSTRUCTION SITE

GARDEN PROJECT - MASTER PLAN Surface :2000 M2

PLANTS SELECTION VIEW - AMBIANCES OF THE GARDEN


2017 PORTUGAL

PERGOLA STRUCTURE & BUILDING OPTION


FIRST BUILDING PART - SEPTEMBER 2017



Private Garden - GOOD MUDA Estoril

Lisbon

The land has a longitudinal shape, featuring a 2 hectares area and one main access. The land can be divided into two main spaces:

The property is surroundedby Eucalyptus and Cork plantations.

Setùbal Alcacer do sal Comporta

Setùbal bay Atlantic Ocean

Grandola

Sines

It is a small and calm neighborhood mostly occupied by farmers who are cultivating Cork, Eucalyptus, Olive trees and grapes vine. The vegetation is influenced by the dry climate, with temperatures reaching 40°Cin summer.

Backyard land

Front Garden

N

Sintra

The landscape is composed by soft rolling hills, plains and coastline (Comporta peninsula).

Google map satelite view

This property is situated in the Alentejo’s countryside, 15 Km from The property’s ground is essentially the coast between Comporta and composed by sand due to the Grandola. coastline’s proximity.

1

5

2. vegetable forest Mandala flower garden

Wild vegetable forest

3

2

Front house orchard

1.

Vegetable garden wealth Main house

Organic vegeta

SECTION 1/500

pATH

1 Green house oRCHARD

WOODLAND AMBIANCY

Katy’s GARDEN

STORAGE

ROAD

View 1

0

5

15

25

N

MASTER PLAN 1/500E

ENTRANCE cARPARK


2016 PORTUGAL Given the location, geography and climate, some problematics need to be addressed prior to the elaboration of a green garden. This allows to give a robust and balanced basis to the garden by first analyzing the original landscape ( soil, climate, topography, water, vegetation, access, surroundings, space issues, wishes.. ) then by providing sustainable environmental design answers to the specific requirements.

Problematics

Garden design and philosophy based on permaculture principles

- Soil composition ( sandy ground ) - Dry climate - Water irrigation - Sustainable vegetable garden - Space for events and workshop - Eco-building programs

- Enrich soil ecosystem, recreate forest and dune ecosystems by introducing plants, natives trees, this will improve organic life in the garden. - Use recycling organics materials. - Food autonomy by the organic vegetable garden. - Eco-building for rent, inform and educated with workshops around healthy life ( yoga, food, garden, music ).

We can project ourselves in a new green environment offering many opportunities to enjoy the beauty of nature, to relax, practice sports and to meditate. Landscape architecture is an art which combines design, space projection and nature integration. This outside lifestyle brings us closer to nature by allowing us to enjoy the healthy food from our own gardens or to enjoy peaceful and relaxing moments. In my view, those are the first steps toward a new way of life more connected with our planet.

3. Natural dry garden Natural Pool

able garden

Sandy garden: vegetation based on wild dune flora.

Dry garden: wild grass, agave, cactus. small bush

nATURAL POOL Chill out

2

dune ambiancy PATH

PATH

yoga deck pOOL HOUSE dune ambiancy

Eco-houses mixed tree plantation ( oak, pin, cork, small bush ) creating intimicy and natural freshness.

View 2



MASTER THESIS 2013-2014

DESCRIPTION

The last year of the school program is dedicated to a territory study and to design the project related to the study territory and to the developed problematic.

Thesis First, it’s the work of the dissertation which developpe the topic and the selected project site through out an territory analysis. this is a multidisciplinary study by looking the site history, sociology and economic uses. The thesis is concluded on the main issues and intended project. This can introduce the second step, the landscape project.

Project The landscape project is the spatial answer of the problematic exposed in the thesis. The project is presented in the form of panel ( next pages ). it’s supported publicly in front of a jury composed by teachers and professionals. It is just after the validation of these two steps and after the presentation of the end-of-course internship.that we are graduated landscape architect.

MASTER’S THESIS SUBJECT Theme The invisible contamination of the Besbre valley by radioactif waste which come from the old uranium mine which has exploited the territory between 1950 and 1980.

Place + Saint-Priest-la-Prugne, départment of the Loire + Old uranium mine « Bois Noirs Limouza.» + Area: 88 acre + Owner: Areva

Subject Saint-Priest-la-prugne has his history is closely linked with 210 others sites in France. What they all have in common ? The presence of uranium deposit in his subsoil. This simple ore has played a significant role in energy strategy taken in the middle of the twenty century. It’s in mountainous context that this small village developed quickly during the 50’s due to the exploitation of the uranium deposit. The presence of the uranium mine has boosted the growth population by the creation of hundred jobs. During twenty years new public infrastructures have been built. Today the activity has disappeared, it’s still exist these community amenagements which attest of a past time. The mine also modified the landscape. The mining has modified the Besbre’s riverbed by creating a dam which closed the valley. In the 1980, the mine had been filled by the proccessing residues which comes from the mining process. Unfortunately, the influence of the owner is not stopping to the right of way of the mining. It’s a contamination of the whole territory due to the donation of polluted backfill to the local population. Consequently an invisible pollution infested the territory. The COGEMA’s fence are powerless to stop the outside environment contamination. This invisible risk infiltrate the landscape.

The beginning and the end of the uranium mining generate many changes on the whole territory. How we can perpetuate the mine memory, reveal the invisible pollution, while fit into a global reflexion at the territory scale of st priest la prugne?


MASTER THESIS Short presentation of the master thesis analysis ( global work 145 ). This work represent a large vision of the site story, landscapes, populations, territory usages to find the best answer to the problematic. I used many tools of representation which can procure a clear vision for the reader. ( actor schemes, maps, diagram blocks, photography, model )

L O C A T I O N O F T H E V I L L A G E O F S A I N T- P R I E S T- L A - P R U G N E AND THE OLD MINE OF ÂŤBOIS NOIRS LIMOUZAÂť

1 2

3 N

Located at the border of The Livradoi forez Natural parcral Parc

geomorphological analysis

T H E E N T I T I E S T H AT M A K E U P T H E T E R R I T O R Y mosaic of a rural landscape

Corridors bocage

Hamlets

Old uranium mine

Forest massif

Villages


O B S E R VAT I O N O F T H E E V O L U T I O N O F T H E M I N E geoportail archive

aerial view

O R G A N I Z AT I O N O F T H E M I N E D U R I N G I T S O P E R AT I N G T I M E

Underground mining work Open mine

Dam

Mill pond

HOW THE DIFFERENT TECHNICALS STRUCTURES WORKS

Dyke cross-section

the management of stormwater on site

Piezometric network of the dam Besbre’s spring

Channel Viaduct diversion

Mill pond 18 Ha

Wetland

saturated zone

Mill pond residue treatment

Overflow pipe

Open mine section Schematic section of the open mine

Water ski-jumping

Settling tank

Dam


MEMORY OF THE INVISIBLE, RED The time of an industrial bracket

a natural heritage territory

THE CLUES DISCOVERY TO THE GROUND EXPLOITATION

THE QUARRY T

Contamination registered into the landscape LOCALISATION AND TYPOLOGY OF THE WASTE residue treatment

Sludge decantation Mining barren

Radioactivity chemistry

Areva zone

EVOLUTION BETWEEN 2001 AND 2005 OF THE ANNUAL REJECTION OF RADIUM 226 INTO THE BESBRE

IMPACT OF URANIUM 238 AND RADIUM 226 ON THE ENVIRONMENT Study realised by the CRRIRAD

Besbre

nstream

dow n

rejectio

Paraou

area

nt dam

St-Cléme

right of way of the mine

Years


DISCOVER THE BESBRE VALLEY ERASING THE INDUSTRY, THE END OF THE URANIUM VEIN

TO THE GALLERIES, OPERATION OF THE URANIUM VEIN

CONSEQUENCE OF AN INVISIBLE CONTAMINATION

The choice of a scenario AREVA PROJECT

DECONTAMINATION OF THE SITE

KEEP THE WASTE

Elaboration of an concept, between the memory and the invisible 1/ THE BESBRE’S VALLEY, ELEMENT OF THE REVALORISATION OF A CONTAMINATED TERRITORY

2/ THE: SUPPORT OF A TERRITORY MUTATION PROCESS

3/ RECONSIDERATION OF THE ARTICULATIONS BETWEEN THE MINE, VILLAGE AND TERRITORY


TIME OF DECO decontamination site at the scale of the former mine DRAINING THE MILL POND

EVACUATION OF TREATMENTS RESIDUES TECHNICAL INFORMATION

TECHNICAL INFORMATION

DRAINING THE MILL POND

VOLUME : 700 000m2

of radioactives sludge

VOLUME : 600 000m2

TIME: 4 years

of contaminated water

TIME: 2 years

DAY

Following the site mutation by the large scale landscape project

1/ MEDIATION STRATEGY, TO

BEGINNING OF THE DECONTAMINATION SITE Year zero

MA AN

2/ SIGNAGE STRATEGY

3/ DISCOVERY STRATEGY


ONTAMINATION DAM DECONTAMINATION

STERILES DECONTAMINATION TECHNICAL INFORMATION

TECHNICAL INFORMATION

VOLUME : 642 000m2

VOLUME : 642 000m2

compacted ground

compacted ground

TIME: 2 years

10T/H

DAY

O DEVELOPP A NEW COLLECTIVE MEMORY

AINTENANCE OF SITE MONITORING COMMITTEE NNUALS ACTIONS

CREATION OF A MEMORY MOVIE

SITE SUPERVISION MEETING WITH THE LOCAL PEOPLE MONTHLY ACTIONS

COMMUNICATIONS SIGNS IN RELATION WITH THE EVOLUTION OF THE SITE

CREATION OF THREE DISCOVERING PATHWAYS

CREATION OF A NEW COLLECTIVE MEMORY

LANDSCAPE MUTATION MILL POND AND DAM EVACUATION

HAPPY MEMORIAL DAY OF THE FORMER MINE

RECEPTION OF THE SITE 10 years


ACCROSS THE TRACE

5 ALONG THE BESBR

4 MEMORY PATH

3 THE VEIN DEPTH


ES OF THE INVISIBLE

RE

HS

1 REDISCOVERY OF

THE BESBRE VALLEY

2 ACROSS THE BACKFILL MEMORY


Project principles MEMORY OF FORMER INDUSTRIAL MARK

DISTRIBUTION OF STERILES FROM THE DA Print of the mill pond

642000m3 to reuse

Dam outline Print of the preparation workshop Print of the SIMO field Former access Perimeter property

REDISCOVERY OF THE BESBRE’S VALLEY

MEMORY DOOR

Belvedere path

M

RECOVERED A ECOLOGICAL CONTIN

EVOLUTION OF GRANITIC GROUND OF THE VALLEY BOTTOM


AM

TYPOLOGY OF PATHWAYS AND PANORAMAS Main public entrance

Large panorama Small window Departemental road Forest road Pedestrian path Bridge and viaduct Stairs

h int byr Overlook the rocky valley

Th

e la

Memory house

PRINT OF THE DAM A LUNAR ATMOSPHERE THE NAKED VALLEY

Pa the nora ca ma no i py nsid e

PRINT OF THE WASTE, BASE OF NEW LANDSCAPE MEMORY

Print of the Dam and his mill pond

NUITY

Access


ACROSS THE BACKFILL MEMORY

PRINCIPLE OF C

GREEN PALETTE

BELVEDERE

NORTH-EAST ENTRANCE


TECHNICAL SECTION OF A GABION WALL

Lun

ar

lan

dscape

climb

the

valle

y

CONSTRUCTING A GABION WALL

ARCHITECTURAL REFERENCES


THE VEIN DEPTHS TRANSCRIPT OF A MINING CHAOTIC ATMOSPHERE

DETAIL OF AN ARTIFICIAL WALL SUPPORTING STRUCTURE

WELDED MESH

Green palette

MEMORY PATH, CULTURAL AND SCIENCE CENTER

SPRAYED CONCRETE


SYMBOLIC OF THE MINING WELL

ARCHITECTURALS REFERENCES


U

r b a n

r e n o v a t i o n

o f

L

i m o g e s

VAL DE L’AURENCE NEIGHBOR H O O D PHASE DRAFT PRODUCED BY THE AGENCY SATIVA PARTICIPATION AS AN INTERN Complete project management, of the diagnostic study to the direction of the execution of work contracts. Performing a central square, residentialisation and creation of a road. In the continuity of the urban renewal program of the district of Val Aurence, Limoges Métropole continues its policy in favor of the social diversity of the neighborhood and its connection to the urban fabric of the city with a program of public facilities including a sport association.

situation of val de l’Aurance neighborhood in

Limoges

Plans uses and land use Parking and roads

Shadow building

PLANTS AREA

scenario

Pedestrian circulations

1

Résidentialisation

The preliminary study was built around two scenarios. The site has been divided according to residential spaces, public spaces and large central square. This division of space allows to identify different uses, but still connected to each other. Each place has parking and a private entrance.


scénario

2


u r b a n

r e q u a l i f i c a t i o n

B L O I S

C I T Y

C E N T E R

WORKING PAPERS MADE BY THE AGENCY SATIVA PARTICIPATION AS A TRAINEE

Master plan of city Blois

1

2

The study is organized around two main axes, the axis of the station at the roundabout Wilson, and the axis of the quays of the right bank. However the analysis covers a wider area to emit different scenarios on traffic in the city center and adjacent neighborhoods. The purpose of the study is to propose new public spaces that allow more fluid traffic in the city center while revealing the heritage of the urban landscape and create a new report to the Loire.

3 4 5

The documents presented are discussion documents between the mastery of work and mastery of work, several proposals are made for each part with variants of usage and traffic.

1 Victor Hugo place. 2 Denis Papin / Porte Côté axe. 3 Résistance place. 4 libération crossroad 5 Avenue du Président Wilson.

Area of study and area of work

1 Victor Hugo Place

Before-project Road Parking Pedestrian space Planting area

project

2 Denis Papin / Porte Côté Axe principle section one road up, one bus road down

Before-project

keep the double sens

Road Pedestrian space Parking

project


3 Résistance Place The reductions of the road made possible a important gains of space

Road

Pedestrian space

Parking

Planting area

Before-project

Parking deleted to widen the pavement opposite the Loire. Carrefour priority to pedestrians. Square that values facades and public spaces. Sidewalk wide front of the Loire Side-path removed to allow space for pedestrians projetc

4 libération crossroad Road

Modifying the Chaine street

Parking Pedestrian space

suppression of the road

Planting area

Open place

Before-project

Place unified pacifying traffic and enhancing the facades

Urbain objectifs : Reduce the use of cars in the heart of town Promote the use southern bypass for users Preserving the local accessibility

enlargement of the sidewalk

project

5 Président Wilson Avenue

Before-project

project

Pedestrian crossroad car retarder

Road shared with bus and cycles

Planting area

Technical section Urban objectif : Staging the entrance of town Reduce speed Facilitating pedestrian crossings Improve cycle and pedestrian paths


H I S T O R I C A L

G A R D E N

L E J A R D I N D E L’ É V Ê C H É COACHE-LACAILLE AGENCY PARTICIPATION AS AN INTERN

Before-project

Master plan and inventory of fixtures.

The garden was left on its own, the few shrubs and tall subjects stifled the space. The garden was not invested and has become a wilderness. The atmosphere was not friendly, it was a wasteland with its center a remarkable fountain. There is a big historical potential to change this place into a beautiful garden. 750 m2 garden area projet

Statue of Virgin Mary Pergola Terrace

Small hedge Fountain

Prunus

If fastigié Fruits trees Retaining wall


The garden proposed has been designed with some religious symbolic . The different symbols are found in the design of this garden ( plants, religious axes..).

Production

coating master plan

Photos réalisées durant la réalisation du projet.


L

a

r

g

e

s

c

a

l

e

GUERLÉDAN LAKE 2013

Integration of a touristic train along a national road between Gouarec and Bon repos abbey. Renovation of the village entrance, redimensionnement of the road, give back a new value to the granitic landscape.

DISCLOSE THE ASSETS OF THE TERRITORY AS A SCENIC ROUTE

1

2 Master plan 1/25000e Former RN 164

Planted area water

Train

Stabilized places

Towpath

Bridge Highway reduction

Canal

N

3

1 Valuing the entrance of Gouarec Touristic train Road Lawn Pedestrian path Wood bridge Railroad Crossing Pedestrian path along the Blavet river

B’

ornemental tree

Parking 20 places Playground

A’

creation of a bridge

events place

Fruit garden sights

B

New train station, cafe, museum

Viewpoint

A

2

MASTER PLAN 1/1000E

N

1


AA’ SECTION 1/200e, A new train station

10m Train station,

10m Terrace cafe

Place

2m Path

Lawn

2m Path

museum

5m 3m Road Parking

Park

2m Path

2m Path

6m Road

garden

BB’ SECTION 1/200e, Discovery of the banks: the town hall at the station

Path

Fruit

15m Playground

2m Path

6m Road

2 threshold to mark

5m Parking

3m 2m Touristic Path

6m Road

6m Road

Belvedere on roc landscape and

train

the canal

3 requalification of the road to make way for the train Principle section 1

2

3

Principle revegetation bitumen

A.

r Cu

r

t en

e at st

B.

en

um

Inc

is

ion

bit

C.

n

tio iza

c

on ol

D.

i

of

es

tic

rs

e nt

s

nd

r sh

u

a bl

en

ad Ro

1.

ion

at et

eg

2.v

b

m itu

Tou

3.

ic

t ris

ain

tr

Towpath Canal

Organization of different uses after reducing of the road


H I S T O R I C

G A R E N

T H E C H AT E A U T E R R A C E 2012

Coupe BB’

The project presented here is oriented around several issues. First, highlight the courtyard of Foix while improving accessibility of the site to the public. Give new functions to this space as art exhibition, relaxation areas, playground, but also the possibility a parking for staff without visual annoyance.

Coupe AA’


u r b a n

p r o j e c t

ROCHAMBEAU SQUARE Path Pavement Desactived concrete Bitumen Lawn

A

Group of tree Tree

Housing

Tree Housing

Events place retirement home

galery

workshop

Workshop

A’ Master plan

The objective of district Rochambeau was to rearrange the space so to enhance the landscape and architectural heritage. The project proposal intervenes in the general reorganization of the central parking, the reopening of the riverbanks to the public with the proposal for an open walk on the environment surrounding the site.

Section AA’

View on the Loir river

Parking

3 Housing

7 housing with parking and garden Events

Tree-filled way Walk along the Loir river

Art Galery

8 workshops


LANDSCAPE ARCHITECT

CAMILLE

BOUCHARD C AMILLEBO U C HARD @ S F R . F R 06.86.11.73.17




S O M M A R Y

1

PRIVATE G arde n s

pro j ect

Portugal : Equestrian center Beco da Sardinha - 1 Beco da Sardinha - 2 Lagoa Farmosa Good Muda -

2

MASTER THESIS

Presentation of the master’s thesis and the problematic studied.

Presentation of the master’s thesis, complet work accessible on:

http://issuu.com/camillebouchard/docs/ me__moire_camille_bouchard_2015/0

Project’s presentation

the restoration of an old uranium mine located in the « massif central» in France. This presentation is composed by 13 boards entitled «Memory of the invisible,rediscovering the Besbre’s valley»


SOMMARY LANDSCAPE ARCHIECTURE PROJECTS

1

PRIVATE G arde n s

pro j ect

Portugal : Beco da Sardinha - 1 Beco da Sardinha - 2 Lagoa Farmosa Good Muda -

2

MASTER THESIS

Presentation of the master’s thesis and the problematic studied.

Presentation of the master’s thesis, complet work accessible on:

http://issuu.com/camillebouchard/docs/ me__moire_camille_bouchard_2015/0

Project’s presentation

the restoration of an old uranium mine located in the « massif central» in France. This presentation is composed by 13 boards entitled «Memory of the invisible,rediscovering the Besbre’s valley»


3

PROJECT A G E N C Y

Neighbourhood of «Val de l’aurance» in Limoges Urban reform projet, the draft-design phase by Sativa agency.

City center of Blois

City center reform by Sativa agency.

Garden of the bishop’s palace in Blois Historical garden project. Design concept and realisation by Caoche Lacaille agency.

4

PROJECT E.N.S.N.P

Guerlédan’s lake

large territory’s analysis and project

The terrace of the Blois’s chateau historical garden project.

The place of Rochambeau in Vendome Project of a parking and urban redeveloppement.


Equestrian center - COMPORTA RECEPTION AREA PROJECT - Design a garden bed of the front reception LOCATION Main entrance

Main road

Parking Space to design Stable training field

Yoga center Pin forest and coast landscape Rice field

PROJECT PROPOSAL OPTION A - Central stairs

OPTION B - Discret path

TRANSVERSAL SECTION

Path Planted area

Waving willow structure

Path

Wild meadow dune vegetation


2017 PORTUGAL

MASTER PLAN Stable biilding

Wild dune vegetation Option « discret path »

Waving willow structure

Circulation preserved

PALETTE VEGETAL

REFERENCES


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.