3 minute read
Solar panel field near Hardisty opens
- Important Update BUSINESS LICENSES DUE
The original Business License renewal deadline was extended from January 30th to April 30th. Late penalties will not accrue until May 1st.
To sign up for paperless billing, go to www.camrose.ca/BL-SignUp/
For more information:
P. 780.672.4428 | E. planning@camrose.ca www.camrose.ca
RESIDENTIAL CURBSIDE ORGANICS PICKUP
Accepted Items in the Organics Cart (green)
• Leaves, shrubbery, and twigs • Cold Ashes (from untreated wood) • Food soiled paper towel, napkins, paper egg carton, pizza box, etc. • Fruits, vegetables and their peelings • Coffee grounds, filters and tea bags • Weeds and grass clippings • Cardboard, paper products without staples or spines
NO PLASTIC BAGS
Compostable materials that are placed in regular plastic bags will not be picked up Organic Collection Day
For more information on waste management in Camrose or assistance with any lost or broken carts: www.camrose.ca or call 780-672-4428 REMEMBER TO GUARANTEE COLLECTION HAVE YOUR WASTE AND COMPOST OUT BY 7:45 AM
Solar panel field near Hardisty opens
By Murray Green
With Earth Day just passed (on April 22), Enbridge just opened its first solar self-power project on the Prairies, and it’s now providing power to its Mainline pipeline system, which runs through Alberta, Saskatchewan and Manitoba, and includes the recently completed Line 3 replacement pipeline.
Enbridge previously announced a push to achieve net-zero emissions from operations by 2050.
The southern prairies see greater than 2,400 hours of sunshine annually, compared to between 1,200 and 2,000 hours in the rest of Canada. It may not seem like it at times, but the Prairies typically see some sunshine about 320 days every year.
The vast, open spaces of the northern plains continue to support a rich agricultural economy, but increasingly, that abundant sunshine is being harnessed to backstop a burgeoning solar power industry.
In late March, Enbridge opened its first solar selfpower project in Canada between Lethbridge and Medicine Hat. Alberta Solar One, as it’s known, now supplies a portion of power to the Enbridge Mainline pipeline network, which includes the recently completed Line 3 replacement pipeline.
The $20-million facility features 36,000 solar panels and has a capacity of 10.5 megawatts, equivalent to meeting the energy needs of about 3,000 homes and offsetting some 12,000 tonnes of carbon annually. By supplying Enbridge’s Mainline power requirements with renewable electricity, the solar farm displaces power generated from carbon emitters like coal-fired power plants.
“These types of projects fit into our larger growth plans to reduce emission intensity by 35 per cent and be net zero by 2050,” said Vern Yu, executive vice president and president, liquids pipelines. “To help get there, we’re using solar self-power to generate electricity for our operations, modernizing our systems to improve efficiency and advancing other technologies. While the new facility is the first of its kind for Enbridge in Canada, it’s part of a broader program the company is initiating to self-supply a growing portion of its energy needs from renewable resources.”
The project comes together near Hardisty.
“This project is a winwin for Enbridge’s power team as we continue to grow our renewable energy portfolio and support Enbridge’s sustainability goals,” added Matthew Akman, Enbridge’s senior vice president of strategy and power. “We’re excited to see our first Canadian self-power project come on line, and we will continue to invest in opportunities across North America that generate energy to power our operations.”
Including Alberta Solar One, Enbridge is looking at approximately 15 to 20 self-power projects for its liquids pipelines pump stations and gas pipelines compressor stations in the future.