CANNER SLIPWAY AREA DEVELOPMENT
DOTTED RED LINE INDICATES PROPOSED DEVELOPMENT AREA
N
N
NEWLYN HARBOUR AUTHORITY
Tarmac car park area
CLIENT:
RNLI Workshop Building
Concrete slab around RNLI Workshop
Raised concrete quayside
Above: Plan on CANNER SLIPWAY AREA Scale 1:500
A 1
CANNER SLIPWAY BUSINESS PARK - 1. NEWLYN TOWN & EXISTING SITE PLAN Scale: As shown @ A3 Paper size
Mean High Water Spring Level (MHWS)
GENERAL ARRANGEMENT PLANS
Scale 1:5000
DRAWING TITLE:
Mean Low Water Spring Level (MLWS)
Above: Plan on Newlyn Town
DRAWING NAME:
Main road (pavements not shown)
GD7-NEWLYN-CSW-DRA-001-Rev02
PROJECT:
RNLI Current workshop building and area for potenJal development
CANNER SLIPWAY AREA DEVELOPMENT
DATE: 23:08:17
Cobbled slipway
DRAWN BY: G Duff
CONSULTANT:
Hardcore compacted rough ground
Sheet 1 of 6 REV: 02
14564 mm
m
Scale 1:1000
Building footprint: 8 x 120m2 = 960m2
Building footprint: 1,713m2 40488 mm
17500 mm
4000 mm
6000 mm 6000 mm
15 62 9 m
60 00 m
5000 mm
m
m
Above: Building option 3 - Single U building Scale 1:5000
A 2
Above: Building option 4 - Single unit sub-divided Scale 1:5000
CANNER SLIPWAY BUSINESS PARK - 2. NEW SLAB & BUILDING OPTIONS Scale: As shown @ A3 Paper size
DRAWING TITLE:
DRAWING NAME:
Vehicle access on waterside front
GD7-NEWLYN-CSW-DRA-001-Rev02
PROJECT:
20770 mm
10759 mm
GENERAL ARRANGEMENT PLANS
Building footprint: 1,631m2
Above: Building option 2 - 2 Buildings opposite
DRAWN BY: G Duff
Scale 1:1000
CANNER SLIPWAY AREA DEVELOPMENT
Above: Building option 1 - Single U building
Light vehicle and pedestrian access around building perimeter
DATE: 23:08:17
m 2 m 794
Scale 1:1000
21 49 7 m
31 50 m
m
m
Light vehicle and pedestrian access around building perimeter
m
49 04 8 m
Above: Plan showing proposed new slab area
3150 mm
3150 mm
CLIENT:
14564 mm
CONSULTANT:
Building footprint: 492m2 + 803m2 =1,295m2
64773 mm
Slab area: 2,228m2
Building footprint: 1,582m2
31 50 m
33448 mm
m 47382 m
NEWLYN HARBOUR AUTHORITY
CANNER SLIPWAY AREA DEVELOPMENT
Above: Building option 5 - 7 Units Scale 1:1000
Sheet 2 of 6 REV: 02
CONSULTANT:
CLIENT:
NEWLYN HARBOUR AUTHORITY
CANNER SLIPWAY AREA DEVELOPMENT
Above: Photo of existing area from the top of the slipway viewing towards the marina
DRAWN BY: G Duff
CANNER SLIPWAY AREA DEVELOPMENT GENERAL ARRANGEMENT PLANS
DRAWING TITLE:
DRAWING NAME:
Above: Building option 5 seen from a similar viewpoint
GD7-NEWLYN-CSW-DRA-001-Rev02
PROJECT:
DATE: 23:08:17
Not to scale
Not to scale
A 3
CANNER SLIPWAY BUSINESS PARK - 3. VIEW OF EXISTING AREA & OPTION 5 BUILDING FROM TOP OF SLIPWAY Scale: As shown @ A3 Paper size
Sheet 3 of 6 REV: 02
CANNER SLIPWAY AREA DEVELOPMENT VIEW 2
Solar panels on south side of each unit roof
DRAWN BY: G Duff DRAWING TITLE:
DRAWING NAME:
GENERAL ARRANGEMENT PLANS
GD7-NEWLYN-CSW-DRA-001-Rev02
PROJECT:
VIEW 3
CANNER SLIPWAY AREA DEVELOPMENT
VIEW 3
DATE: 23:08:17
CONSULTANT:
CLIENT:
NEWLYN HARBOUR AUTHORITY
VIEW 1 (shadows shown on all views as 8th June at 13:30)
VIEW 2
A 4
CANNER SLIPWAY BUSINESS PARK - 4. ALTERNATIVE VIEWS OF OPTION 5 BUILDING LAYOUT Scale: As shown @ A3 Paper size
Above: Plan on site showing Views Not to scale
VIEW 1
Sheet 4 of 6 REV: 02
CANNER SLIPWAY AREA DEVELOPMENT 6796 mm
5000 mm
Longest pile 8100mm
Scale 1:200
10kW of solar on each unit south facing side of roof
Davit crane on corner of pile wall
A 5
CANNER SLIPWAY BUSINESS PARK - 5. ORTHOGRAPHIC ELEVATIONS ON DEVELOPMENT Scale: As shown @ A3 Paper size
CANNER SLIPWAY AREA DEVELOPMENT GENERAL ARRANGEMENT PLANS
Piles shown stepping up in bays along the wall face as the penetraVon required reduces.
DRAWING TITLE:
Scale 1:200
DRAWING NAME:
Above: Elevation on development perpendicular to pile face running alongside the existing slipway
GD7-NEWLYN-CSW-DRA-001-Rev02
PROJECT:
6000 mm
DATE: 23:08:17
8 No Total x 120m2 individual factory units Shown with roller shuRers on both ends
DRAWN BY: G Duff
Above: Elevation on development from marina perpendicular to long pile face
CONSULTANT:
CLIENT:
NEWLYN HARBOUR AUTHORITY
1000 mm
Spacings between units to enable vehicle access if necessary
Sheet 5 of 6 REV: 02
1. Project Name confirmed as ‘Canner Slipway Development’. All drawing sheet names and >tles amended to reflect this development name.
2. Various other views on this layout amended appropriately based on new Op>on 5 buildings layout. 3. Solar panels shown on all south facing roofs. Approximately 10kW of solar possible on each unit.
CANNER SLIPWAY AREA DEVELOPMENT
A 6
CANNER SLIPWAY BUSINESS PARK - 6. TRACKING DESIGN CHANGES Scale not applicable
DRAWING TITLE:
DRAWING NAME:
GENERAL ARRANGEMENT PLANS
GD7-NEWLYN-CSW-DRA-001-Rev02
PROJECT:
DATE: 23:08:17
4. Vans shown parked on the south area of the plot. Addi>onal trucks shown on the views to demonstrate space for this vehicle type.
DRAWN BY: G Duff
1. Buildings layout Op>on 5 modified to include 3 separate building blocks made up of the general single 120m2 unit size. Buildings moved around to suit client’s expected use. Vehicle a c c e s s a r o u n d t h e q u a y w a l l maintained.
CLIENT:
REVISION 2 - Following client comments 14:08:17
CONSULTANT:
REVISION 1 - Following client review 13:06:17
NEWLYN HARBOUR AUTHORITY
CANNER SLIPWAY AREA DEVELOPMENT
Sheet 6 of 6 REV: 02