2022 Portfolio I CARLA LANDA

Page 1

SELECTED WORKS 2014-2022

CARLA A. LANDA

carla.a.landa@gmail.com l 313.694.4764


Resume

Contact

3803 Rice Boulevard Houston, TX 77005

Carla A. Landa

ROSSETTI Associates Master’s of Architecture, Taubman College

www.lalanda.com carla.a.landa@gmail.com

education

professional

Masters of Architecture, 2015 Taubman College of Architecture and Urban Planning

Project Designer, ROSSETTI, 2016-Current Detroit, Michigan (WFH Houston, Texas) Greenbay Training Facility, 2021 Grosse Pointe War Memorial, 2020 Quiddiya Aquatic Center Competition, 2019 Las Colinas Cloud Event Center, 2019 Calgary Event Center, 2019 Panthers Training Facility, 2018 Phoenix Midway Foodcourts, 2018 RiverEast Masterplan, 2017 Florida Panthers Masterplan, 2017 Miami Open, HardRock Stadium, 2016 Monroe Block Masterplan, 2016 OCM Renovation, 2016

Bachelors of Art in Architecture , 2010 Minor in Fine Arts, Drawing Concentration Clemson University Studies in Architecture and Urbanism, 2009 Universitat Polytecnica de Cataluyna, Barcelona

s

Ideated, designed and worked with architectural, urban planning and environmental graphic teams to realize planning, programming and design for different sports and entertainment venue types.

SKILLS & SOFTWARE

Go-to-resource for leadership developing quick turnaround project proposals, feasibility studies and supportive illustrations.

Revit Rhino AutoCad

Collaborated with technical team & consultants for efficient design translation ensuring design intent is achieved from inception to completion.

Grasshopper Photoshop Illustrator

Developed contract documentation drawings and details on high design areas of projects.

In Design Enscape (Revit, Rhino) Lumion (Revit, Rhino)

Project Designer, SIFT Studio, 2015-2016 Ann Arbor, Michigan

BlueBeam New Forma

The Force of Things, Darmstad 2016 CHI- Design Competition, 2015 Tap, Research Through Making Grant, 2015

Fluent: Spanish, English Basic: Italian

04


Resume

awards Worked with multidisciplinary team of engineers, musicians and composers as as space and object lead designer for an Electro-Acoustic Object Opera to be preformed in Darmstrad, Germany. Tasks involved producing virtual and physical models and draings for research and final design.

Detroit Design Core, Design Core’s City of Design Challenge Grant, Prototype Development, 2017 s Acadia 2015, Conference & Exhibition Exhibition and projects catalog publication, Protean Atmospheres FULL - 2015 Architecture Student Show, University of Michigan Project Selected: Protean Atmospheres

Designer, Stoss Landscape Urbanism, 2013 Boston, Massachusets Movement of Main Competition, 2013

Honorable Mention I CityVisions Competition Rio de Janeiro 2013, 4.7: A Geographic Stroll Around the Horizon

s

Assisted initial design proposal of winning entry Light-Play! for Urban Design Competition. Tasks were partial 3D modeling of proposal and final section elevation of the project.

3rd Place I d3 Natural Systems 2010 Competition, Sustainable World Category, Reciprocity

Research Assistant, UofM, 2014 Ann Arbor, Michigan

Honorable Mention I Self-Sufficient City International Architectural 2009, Reciprocity

A Geographic Stroll Around the Horizon, Rio City Vision Competition

publications

s

Collaborated as part of a group of lead designers in a proposal for CityVisions 2013 Rio de Janeiro Competition. Developed concept, narrative and tested and produced experimental drawings for competiiton entry proposal.

Ross, Alex. “Infrasound Opera.” The New Yorker, 30 Oct. 2017. Guallart, Vicente. “Self-Sufficient City” Actar; 1 edition. Pages 98-100, publication of Reciprocity, 2010

Intern, AION Studio, 2011 Sicily, Italy Barrio Campo Housing Development, Competition, 2011 Arcadia Hotel Room Competition, 2011

City Vision. “Special Mention: A Geographic Stroll around the Horizon 4.7” Issue 9, Cityvision Magazine. Pages 120-121. 1 Jan. 2013

s

05


06


contents

PROFESSIONAL SPORT/ EVEN T VENUES

Quiddiya Aquatic Centre Competition Las Colinas Cloud Event Center Panthers Training Center Greenbay Packers NFL Training Facility Grosse Pointe War Memorial

08 10 16 18 22 24 28 30 40 42

URBAN

Detroit Monroe Blocks Competition OCM Renovation Panther Arena Masterplan

50 52 58 60 64 66

TACTICAL

Phoenix Raceway Foodcourts

66 68

The Nine at Hard Rock Stadium

72 74

EXPERIMENTAL In The Thicket, LightUp Livernois Festival Detroit Design Festival: ROTATE, PUSH , PLAY The Force of Things: An Object Opera

78 80 84 86 86 88

ACADEMIC 96 98 108 110

THESIS- Ritual Rooms Protean Atmospheres

07


profes


ssional


PROFESSIONAL WORK

QUIDDIYA AQUATIC CENTRE

QUIDDIYA, SAUDI ARABIA COMPETITION WINNING PROPOSAL 2019 I ROSSETTI At the apex of the Tuwaiq escarpment in Quiddiya, the Aquatic Centre emerges from the earth encapsulating an elixir that inspires athletes to dream and achieve what they never believed possible. The building is a wellspring of water and energy, both of and in contrast to the what is at first visible in its arid landscape. As visitors enter they are greeted with a expansive view. An open concourse wraps around the top of a 3,250-seat spectator bowl. 10


QUIDDIYA AQUATIC CENRRE

11


PROFESSIONAL WORK

WATER + LAND

Reimagining the flow of water above the WATER + LAND desert landform

Reincarnating the flow of water above the desert landform.

WATER ACTIVATION Piercing surface to create ‘whirlpools’ which enable programmatic opportunities, vertical circulation and light wells within the building.

TRANSFORMATION Water shapes and *erodes* landform into plinth.

WATER ACTIVATION

TER + LAND carnating the flow of r above the desert form.

Piercing surface to ACTIVATION create “whirpools’ enable WATER programmatic opportunities, vertical circulation Piercing surface to create and light wells withint the building

‘whirlpools’ which enable programmatic opportunities, vertical circulation and light wells within the building.

TRANSFORMATION Water shapes and *erodes* landform into plinth.

SITE FORCES Building edge capped and pulled in relationship to criical site features (plaza entry, wellness park/iconic bridge, viewshed to escarpment)

TRANSFORMATION

TER ACTIVATION cing surface to create irlpools’ which enable grammatic opportunities, tical circulation and light ls within the building.

Water shapes and erodes the land. The TRANSFORMATION liquid roof is supported by a complimentary Water solid shapes plinth. and *erodes*

landform into plinth.

SITE FORCES Building edge capped and pulled in relationship to criical site features (plaza entry, wellness park/iconic bridge, viewshed to escarpment)

SITE FORCES

TRANSFORMATION Water shapes and *erodes* landform into plinth.

Building edge capped and pulled in relationship to SITE criticalFORCES site features.

Building edge capped and pulled in relationship to criical site features (plaza entry, wellness park/iconic bridge, viewshed to escarpment)

12

SITE FORCES Building edge capped and pulled in relationship to criical site features (plaza entry, wellness park/iconic bridge, viewshed to escarpment)


QUIDDIYA AQUATIC CENRRE

13


PROFESSIONAL WORK

00- EVENT LEVEL

SPECTATOR AMENITIES CONCOURSE VIP ATHLETE MEDIA SERVICE BACK OF HOUSE 0

01- MAIN CONCOURSE LEVEL

5 1

14

20 m 10


QUIDDIYA AQUATIC CENRRE

15


PROFESSIONAL WORK

16


QUIDDIYA AQUATIC CENRRE

PERMANENT STADIA 3250 SEATS

EXPANDED STADIA 6000 SEATS

PHASE CHANGE STRATEGIES Emphasize thermal composition and diurnal load shifting

ENERGY REDUCTION STRATEGIES Displacement ventilation and high performance facade

PASSIVE SOLAR STRATEGIES Improve occupant thermal comfort with relevant shading devices

WATER CONSERVATION STRATEGIES Recover and filter condensate and greywater to make-up pool water

17


PROFESSIONAL WORK

LAS COLINAS CLOUD IRVING CONVENTION CENTER

1/ 4

N

WA

LK )

MUSIC FACTORY

6 STORY PARKING DECK (WITH LINER RESIDENTAIL OVER RETAIL)

MI

THE TEXICAN HOTEL

I (5

ARENA IRVING CONVETION CENTER

M

LE

DART STATION

PR

OM

EN

AD

E

LAKE CAROLYN WL

LAKE CAROLYN WALK

AS CO L IN AS VD BL

PRO

ME

FUTURE DEVELOPMENT (OFFICE, RETAIL PODIUM)

MIXED USE BUILDING (CONVENTION, RETAIL, HOTEL, CO-LAB)

NA

DE

DA RT ST AT IO

N

FUTURE DEVELOPMENT (OFFICE, RETAIL PODIUM)

PAR

KW AY

TO

WESTIN HOTEL

MIXED USE BUILDING (CONVENTION, RETAIL, CO-LAB)

LAS COLINAS CLOUD

LAS C O

LINAS

BOULE

VARD

FUTURE DEVELOPMENT (HOTEL)

(PERFORMANCE CENTER)

MIXED USE BUILDING (CONVENTION, HOTEL, RETAIL, CO-LAB)

FUTURE DEVELOPMENT

LAKE CAROLYN

TOYOTA MUSIC FACTORY

MONTERRA LAS COLINAS

TO WILLIAMS SQUARE

IRVING, TEXAS FEASIBILITY & MASTERPLAN STUDY 2019 I ROSSETTI

Las Colinas Cloud was a six month long concept & feasibility study of a multi-use event venue as a node in a multi-use development site in Irving, Texas. The Venue would create a third leg in the existing distric but bring a new type of entertainment mainly focused around e-sports. The identity of the building and site developed around the concept of a lenticular cloud, talking to the virtual nature of events to be hosted, the layered nature of the bowl and the relationship of the water to the town and the site in specific.

18


LAS COLINAS CLOUD- VENUE OF THE FUTURE

SITE

The layered tiers are pulled to create an habitable exterior that connects to the main arteries and lake, extending beyond its building perimeter and enhancing the qualities of the lake.

MULTI-USE

The arena is hyper flexible and able to swift between typical and most ideal configurations for different type of sports, theater and gathering hall.

19

LAYERED

As a cloud formation the arena speaks to the multi-layer and overal of tiers in the bowl and circulation as well as the digital aspect of the events to be hosted


PROFESSIONAL WORK

ACCESS STAIR FOR PERFORMANCES HIGH ROOF

201' - 0"

EXTERIOR LED SURFACE ON SPHERE ROOF 172’ - 10”

28' - 2"

HIGH ROOF 201’ - 0”

ROOF

172' - 10"

LED INTERIOR SURFACE

BALCONY 03 158’ - 10”

SPHERE BALCONY 02 146’ - 1”

SUITES

BALCONY 01 134’ - 1”

STAGE LIFT

MAIN CONCOURSE 121’ - 7”

SPHERE STRUCTURE BY SPITZ ENGINEERING EVENT LEVEL 100’ - 0”

LOBBY

RETRACTABLE SEATING

A SECTION

20


LAS COLINAS CLOUD- VENUE OF THE FUTURE

SOI CONFIGURATION CONFIGURATION 01 01

CONFIGURATION CONFIGURATION 01 01

FIELD FIELD SPORTS SPORTS

CONCERT CONCERT

LACROSSE I INDOOR FOOTBALL I INDOOR SOCCER LACROSSE I INDOOR FOOTBALL I INDOOR SOCCER

MAIN MAIN EVENT EVENT

10,200 10,200

MAIN EVENT MAIN EVENT

FLOOR FLOOR SEATS SEATS

940 +940 1,350 + 1,350

FLOOR SEATS FLOOR SEATS

LOWER BOWL LOWER BOWL

4,0304,030

LOWER BOWL LOWER BOWL

8,300 8,300

TIER 1

TIER 1

1,330

1,330

1,3001,300

TIER 2

TIER 2

1,300

1,300

1,2501,250

TIER 3

TIER 3

1,250

1,250

6’-8”

6’-8” 7’2”

6’-8” 3 Ht.: 9.00"

7’2”

6’-8”

6’-8”

6’-8” 7’2”

7’2”

14

2

14

Ht.: 10.50" Height Above Perf. Elev. = 17'-1.50" Ht.: 10.50" Height Above Perf. Elev. = 17'-1.50" 13 13 Ht.: 10.00" Depth: 33.00"Distance To Base Point = 73'-5.62" Ht.: 10.00" Depth: 33.00"Distance To Base Point = 73'-5.62" 12 12 Ht.: 10.00" Depth: 33.00" Ht.: 10.00" Depth: 33.00" C-Value: 2.10" 11 C-Value: 2.10" 11 Ht.: 10.00" Depth: 33.00" Ht.:0.50" 10.00" Depth: 33.00" Const. Const. Tolerance: 0.50" 10 10 Tolerance: Depth: 33.00" Ht.: 10.00" Depth: 33.00" Ht.: 10.00" Seated Depth in Row: 5.00" Seated Depth in Row: 5.00" 9 9 Depth: 33.00" Ht.: 10.00" Depth: 33.00" Ht.: 10.00" Standing Depth in Row: 18.00" Standing Depth in Row: 18.00" 8 8 Depth: 33.00" Depth: 33.00" Ht.: 9.50" Ht.: 9.50" 7 7 Seated Eye Ht: 44.00" Seated Eye Ht: 44.00" Depth: 33.00" Depth: 33.00" Ht.: 9.50" Ht.: 9.50" 6 6 Rake Angle: 16.31 Deg. Rake Angle: 16.31 Deg. Depth: 33.00" Depth: 33.00" Ht.: 9.50" Ht.: 9.50" 5 5 Depth: 33.00" Depth: 33.00" Ht.: 9.50" Ht.: 9.50" 4 4 Depth: 33.00" Depth: 33.00" Ht.: 9.00" Ht.: 9.00" 3 Depth: 33.00" Depth: 33.00" Ht.: 9.00" 2 Depth: 33.00" Ht.: 9.00" 1

Depth: 33.00" Ht.: 9.00" 1 Ht.: 80.00" Depth: 33.00" Depth: 33.00"

Ht.: 80.00" Depth: 33.00" Depth: 33.00"

14 VENUE 14 VENUE OF THEOF FUTURE THE FUTURE | IRVING | IRVING EVENTEVENT CENTER CENTER

12 12 VENUE VENUE OF THE OF THE FUTURE FUTURE | IRVING | IRVING EVENT EVENT CENTER CENTER

CONCERT

STNEV E 5-1

10,200

MEDIUM CONFERENCE

FIELD SPORTS

2X STN EV3,000 E2

8,300

CONFIGURATION CONFIGURATION 02 02

CONFIGURATION CONFIGURATION 01 01

BASKETBALL BASKETBALL

E-SPORTS E-SPORTS MAIN MAIN EVENT EVENT

6’-8”

0 4,420

1,3301,330

6’-8”

0 4,420

1 TIER TIER 1 2 TIER TIER 2 3 TIER TIER 3

10,500 10,500

MAIN EVENT MAIN EVENT

7,730 7,730

FLOOR FLOOR SEATS SEATS

2,5902,590

FLOOR SEATS FLOOR SEATS

780

780

LOWER BOWL LOWER BOWL

4,0304,030

LOWER BOWL LOWER BOWL

3,550

3,550

TIER TIER 1 1

1,3301,330

TIER 1

TIER 1

TIER TIER 2 2

1,3001,300

TIER 2

TIER 2

1,140

1,140

TIER TIER 3 3

1,2501,250

TIER 3

TIER 3

1,090

1,090

1,170

1,170

AUX. EVENT AUX. EVENT FLOOR AREA FLOOR AREA

12,000 SF 12,000 SF 1,000

6’-8”

6’-8” 7’2”

6’-8”

6’-8”

1,000

7’2”

6’-8” 6’-8”

6’-8”

7’2”

7’2”

6’-8”

CAPACITYCAPACITY

15 VENUE 15 VENUE OF THEOF FUTURE THE FUTURE | IRVING | IRVING EVENTEVENT CENTER CENTER

11 11 VENUE VENUE OF THE OF THE FUTURE FUTURE | IRVING | IRVING EVENT EVENT CENTER CENTER

E-SPORTS

7,730

MAIN EVENT MAIN EVENT

MAIN MAIN EVENT EVENT 38,500 38,500 SF SF 3,2003,200

91

AUX. AUX. EVENT EVENT 12,000 12,000 SF SF

650

650

3,550

3,550

TIER 1

TIER 1

1,140

1,140

1,090

1,090

12,000 SF 12,000 SF

EXHIBIT- BANQUET 46,400 SF- 3,800 SEATING

6’-8”

6’-8”

6’-8”

17 17 VENUE VENUE OF THE OF THE FUTURE FUTURE | IRVING | IRVING EVENT EVENT CENTER CENTER

1,000

6’-8”

1,000

7’2”

6’-8”

6’-8”

6’-8”

6’-8”

CAPACITYCAPACITY

7’2”

1,170

TIER 2 TIER 3

AUX. EVENT AUX. EVENT

1,0001,000

7’2”

1,170

TIER 2 TIER 3

FLOOR AREA FLOOR AREA

STNEV E 5-1

7,600 7,600

FLOOR SEATS FLOOR SEATS LOWER BOWL LOWER BOWL

7’2”

CAPACITY CAPACITY

SOIRANECS DEDIVID

TENNIS TENNIS

EXHIBIT EXHIBIT-BANQUET -BANQUETFLOOR FLOOR FLOOR FLOOR AREAAREA

STNE4X V E900 5-1

CONFIGURATION CONFIGURATION 02 02

CONFIGURATION CONFIGURATION 02 02

CAPACITY CAPACITY

SNOITA RUGIFNOC LWOB SMALL CONFERENCE

BASKETBALL

10,500

16 VENUE 16 VENUE OF THEOF FUTURE THE FUTURE | IRVING | IRVING EVENTEVENT CENTER CENTER

STNEV E 2

360 PERFORMANCE

TENNIS

TNE VE 1 6,900

7,600

91

91

9102.50.40 I ERUTUF EHT FO EUNEV | SANILOC SAL

21

53


PROFESSIONAL WORK

EVENT PLAZA

TO EAST ENTRY

PRODUCTION STUDIO PRODUCTION STUDIO 4986 SF

NORTH ENTRY

HOME TEAM LOCKER ROOM / LOUNGE

RETAIL

1288 SF

RETAIL 3782 SF

NORTH SERVICE CORRIDOR 2009 SF

NORTH ENTRY

SERVICE/ LOADING

STAR ROOM

1324 SF

951 SF

PRESS TOILETS

PRESS WORKROOM

QUAD 2 MAIN ELECTRICAL

252 SF

ADMIN

1067 SF

ADMIN OFFICE

798 SF

2984 SF

QUAD 1 ELEVATORS

FIRE PUMP ROOM

TIN

G

186 SF

QUAD 1 PANEL STORAGE

QUAD 2 PANEL STORAGE

397 SF

397 SF

249 SF

TO EAST ENTRY

KE

SECURITY MEP

F& B

TIC

MENS TOILET

348 SF

GUEST SERVICE

450 SF

WOMENS TOILETSSTORAGE

347 SF

276 SF

648 SF

494 SF

QUAD 2 ELECTRICAL DISTRIBUTION

168 SF

GENERAL STORAGE

FIRE COMMAND CENTER

4259 SF

348 SF

282 SF

TRASH

NORTH CORRIDOR

TICKETING

1148 SF

1502 SF

1180 SF

SPONSOR ACTIVATION TELESCOPIC SEATING STRUCTURE

MARSHALLING 9672 SF

RETAIL RETAIL

LOADING DOCK

2531 SF

0, 0

TELESCOPIC SEATING STRUCTURE

18563 SF

TELESCOPIC SEATING STRUCTURE

OPERAB LE PARTITION

DOMESTIC WATER ENTRY 728 SF

EAST PARTITION STORAGE 249 SF

RETAIL RETAIL

EVENT LEVEL CONCOURSE

5293 SF

26248 SF

B

GAS ENTRY 421 SF

DATA CENTER / DAS 2492 SF

TELESCOPIC SEATING STRUCTURE

SOUTH CORRIDOR

FOOD SERVICE

1501 SF

5600 SF

SHARED TRAINING

MEP

GUEST SERVICE

QUAD 4 PANEL STORAGE 397 SF

MENS TOILETS

WOMENS TOILETS

QUAD 3 PANEL STORAGE

825 SF

397 SF

665 SF

EMERGENCY GENERATOR

FOOD STORAGE IN MEZZ ABOVE

571 SF

348 SF

369 SF

OFFICALS

OFFICALS

610 SF

510 SF

F& B 829 SF

5310 SF

WEST ENTRY 1777 SF

SPONSOR ACTIVATION

SOUTH SERVICE CORRIDOR 3042 SF

QUAD 4 ELECTRICAL

QUAD 3 ELECTRICAL DISTRIBUTION

189 SF

WEST ENTRY

AUX LOCKER 1

AUX LOCKER 2

AUX LOCKER 3

AUX LOCKER 4

AUX LOCKER 5

AUX LOCKER 6

AUX LOCKER 7

809 SF

680 SF

711 SF

741 SF

772 SF

802 SF

881 SF

RAMP UP

A

659 SF

EMERGENCY POWER DISTRIBUTION

QUAD 3 MAIN ELECTRICAL

857 SF

1522 SF

LAKE CAROLYN

RETAIL RETAIL

UNEXCAVATED

4496 SF

SPLASH PAD REFLECTING POOL BOARDWALK FLOATING GARDENS

open to below

CONCESSION 592 SF

RESTAURANT RESTAURANT 4074 SF

MAIN CONCOURSE 60741 SF

MEP

BAR

MEP

563 SF

358 SF

313 SF

TOILETS

TOILETS

1067 SF

1067 SF

CONCESSION

TOILETS 519 SF

CONCESSION 882 SF

SPONSOR ACTIVATION

CONCESSION

37751 SF

MAIN CONCOUR SE TERRACE

542 SF

EAST ENTRY

BAR

368 SF

MAIN CONCOURSE TERRACE

SCREEN

EAST ENTRY 984 SF

BAR

GUEST SERVICE

392 SF

392 SF

882 SF

PODIUM PLAZA

GUEST SERVICE

F&B SUPPORT

CONCESSION

37751 SF

1127 SF

984 SF

SPONSOR ACTIVATION

B

EAST ENTRY

567 SF

F&B SUPPORT 1127 SF

RAMP DOWN

BAR

368 SF

MEP

CONCESSION

548 SF

882 SF

SPHERE SERVICE

open to below

1067 SF

TOILETS

1182 SF

3554 SF

358 SF

1067 SF

RESTAURANT

4074 SF

BAR

MEP 539 SF

TOILETS

882 SF

RESTAURANT

TOILETS 524 SF

CONCESSION

open to below

RESTAURANT RESTAURANT

819 SF

3554 SF

TOILETS 957 SF

PLANNING + DESIGN

E

P

F

NG

957 SF

TOILETS

MEP

592 SF

M H

’05=”1 J L

SN

BAR

60741 SF

FOOR HGIH

K

L J

NS

M H

GN

F

P

E

Q

D

R

C

S

B

A

HIGH ROOF HIGH ROOF 201' - 0"

BAR

"0 - '102

K

819 SF

Q

CONCESSION

D

358 SF

R

358 SF

C

MAIN CONCOUR SE

S

548 SF

MEP

563 SF

SNOITCES GNIDLIUB

CONCESSION

1”=50’ B

NGISED + GNINNA LP

RAMP DOWN

BUILDING SECTIONS A

1067 SF

CONCESSION

659 SF

TOILETS

TOILETS

A

ROOF ROOF

FOOR

"01 - '271

172' - 10"

30 YNOCLAB

BALCONY 03 BALCONY 03

20 YNOCLAB

BALCONY 02 BALCONY 02

TOILETS

659 SF

158' - 10"

open to below

"01 - '851 "1 - '641

146' - 1"

BALCONY 01 BALCONY 01

10 YNOCLAB

"1 - '431

134' - 1"

MEP

121' - 7"

LEVEL TNEVE

539 SF

MEP

MAIN CONCOURSE MAIN CONCOURSE

313 SF

ESRUOCNOC NIAM

"7 - '121

EVENT EVENTLEVEL LEVEL

7 EW

FOOR

30 YNOCLAB

"01 - '851

20 YNOCLAB

"1 - '641

10 YNOCLAB

"1 - '431

9 5

10 4

11 3

12 2

13 1

524 SF

LANIDUTIGNOBULKHEAD L FOR SECTION PARTITIONS B TRANSFORMABLE CEILINGS

14

LED BOARD

open to below

FOOR HGIH

"0 - '102

"01 - '271

86

22

1182 SF

WE 7

SPHERE SERVICE

68

open to below

5 9

567 SF

4 01

BAR

3 11

519 SF

2 21

TOILETS

1 31

542 SF

DRAOB DEL

41

CONCESSION

SGNILIEC ELBAMROFSNA RT

TOILETS

LONGITUDINAL SNOITITRAP ROF DA EHKLU B

1067 SF

100' - 0"

TOILETS

"0 - '001

HIGH ROOF

201' - 0"

ROOF

172' - 10"

BALCONY 03

158' - 10"

BALCONY 02

146' - 1"

BALCONY 01

134' - 1"


RNTER CENTER + DREAMLAND + DREAMLAND + DREAMLAND

NARIOS RIOS ARIOS

DESIGN: EVENT CENTER + DREAMLAND DESIGN: DESIGN: EVENT EVENT CENTER CENTER + DREAMLAND + DREAMLAND

SCENARIOS SCENARIOS SCENARIOS

LAS COLINAS CLOUD- VENUE OF THE FUTURE

CONFIGURATIONS FIGURATIONS NFIGURATIONS + PROJECTED + PROJECTED + PROJECTED CAPACITIES CAPACITIES CAPACITIES EVENT CONFIGURATIONS + PROJECTED CAPACITIES EVENT EVENT CONFIGURATIONS CONFIGURATIONS + PROJECTED + PROJECTED CAPACITIES CAPACITIES

* ** * *** * * * ** * **

* **

APACITY 0VENT ITY CAPACITY CONCERT/ CONCERT/ CONCERT/ E-SPORT E-SPORT E-SPORT 1_EVENT 01_EVENT LEVEL LEVEL LEVEL PORTS 0SSPORTS

AGE NTER R STAGE CONFIGURATION STAGE CONFIGURATION CONFIGURATION

LITIES SACILITIES USEDUSED FOR USED PERFORMER FORFOR PERFORMER PERFORMER

* **

CITY FLAT FLOOR APACITY 01_EVENT CAPACITY FLAT FLAT FLOOR FLOOR VENT 01_EVENT LEVEL LEVEL LEVEL

_TIER ER 1TTIER 01 01 FLOOR 04_TIER 04_TIER 02 02 02 FLAT FLOOR FLAT FLOOR

CES IUM SPACES FOR SPACES VIP FOR FOR VIP VIP RKETPLACE PLACE MARKETPLACE OPEN OPEN OPEN

* * ** * * * ** * ** * *** ** ******

* * * * * * * ** * * *SOLID STAINLESS STEEL PANELS ** * ** * ** *

+/- 8,000 +/- +/8,000 CAPACITY 8,000 CAPACITY CAPACITY CONCERT/ CONCERT/ CONCERT/ E-SPORT E-SPORT E-SPORT +/- +/CAPACITY 800800 CAPACITY CAPACITY PER PER SPACE PER SPACE SPACE +/- 3,200 +/- +/3,200 CAPACITY 3,200 CAPACITY CAPACITY PER PER SPACE PER SPACE SPACE 01_EVENT 01_EVENT 01_EVENT LEVEL LEVEL LEVEL 01_EVENT 01_EVENT 01_EVENT LEVEL LEVEL LEVEL 02_MAIN 02_MAIN 02_MAIN CONCOURSE CONCOURSE CONCOURSE LEVEL LEVEL LEVEL 02_MAIN 02_MAIN 02_MAIN CONCOURSE CONCOURSE CONCOURSE LEVEL LEVEL LEVEL +/- 800 01_EVENT 01_EVENT 01_EVENT LEVEL LEVEL LEVEL 02_MAIN 02_MAIN 02_MAIN CONCOURSE CONCOURSE CONCOURSE LEVEL LEVEL LEVEL +/- 6,500 +/- +/6,500 SPORTS 6,500 SPORTS SPORTS (6 EVENT (6 EVENT (6 SPACES) EVENT SPACES) SPACES) (2 EVENT (2 EVENT (2 SPACES+ EVENT SPACES+ SPACES+ BACKSTAGE) BACKSTAGE) BACKSTAGE) (2) THEATERS (2) THEATERS (2) FULL-SERVICE THEATERS W/FULL-SERVICE W/ W/ F&B F&BF&B END STAGE END END USE ENTRY USE USE ENTRY PLAZA ENTRY PLAZA &PLAZA PRE-FUNCTION & PRE-FUNCTION & PRE-FUNCTION AREAS AREAS AREAS USESTAGE ENTRY USESTAGE USE ENTRY PLAZA ENTRY PLAZA &PLAZA PRE-FUNCTION & PRE-FUNCTION & PRE-FUNCTION AREAS AREAS AREAS DIVIDE FULL-SERVICE DIVIDE BOWL DIVIDE BOWL INTO BOWL INTO 6TOURNAMENTS INTO 6TOURNAMENTS 6TOURNAMENTS +/- 10,700 CONCERT/ E-SPORT +/- 8,000 CAPACITY CONCERT/ E-SPORT +/- 800 CAPACITY PER SPACE LARGE LARGE BACKSTAGE LARGE BACKSTAGE BACKSTAGE AREA AREA AREA LEVEL 01_EVENT LEVEL 02_MAIN CONCOURSE 01_EVENT LEVELCONCERT/ 02_MAIN CONCOURSE LEVEL 01_EVENT LEVEL +/-CAPACITY +/10,700 10,700 CAPACITY CAPACITY CONCERT/ E-SPORT E-SPORT +/- +/8,000 8,000 CAPACITY CAPACITY CONCERT/ CONCERT/ E-SPORT E-SPORT +/- +/800 800 CAPACITY CAPACITY PER PER SPACE SPACE 01_EVENT 01_EVENT LEVEL LEVEL 02_MAIN 02_MAIN CONCOURSE CONCOURSE LEVEL LEVEL 01_EVENT 01_EVENT LEVEL LEVEL 02_MAIN 02_MAIN CONCOURSE CONCOURSE LEVEL LEVEL 01_EVENT 01_EVENT LEVEL LEVEL TEAM FACILITIES TEAM FACILITIES FACILITIES BECOMES BECOMES BECOMES PERFORMER PERFORMER PERFORMER SPACE SPACE SPACE TEAMTEAM FACILITIES TEAM FACILITIES FACILITIES BECOME BECOME BECOME PERFORMER PERFORMER PERFORMER SPACE SPACE SPACE +/- TEAM 8,000 +/- 6,500 SPORTS (6 EVENT SPACES) +/-SPORTS +/8,000 8,000 SPORTS SPORTS +/- +/6,500 6,500 SPORTS SPORTS (6 EVENT (6 EVENT SPACES) SPACES) TEAMTEAM FACILITIES TEAM FACILITIES FACILITIES BECOMES BECOMES BECOMES PERFORMER PERFORMER PERFORMER SPACE SPACE SPACE CENTER STAGE CONFIGURATION CENTER CENTER STAGE STAGE CONFIGURATION CONFIGURATION TEAM FACILITIES USED FOR PERFORMER TEAM TEAM FACILITIES FACILITIES USED USED FORFOR PERFORMER PERFORMER

+/3,200 CAPACITY PER SPACE 01_EVENT LEVEL 02_MAIN CONCOURSE LEVEL +/+/3,200 3,200 CAPACITY CAPACITY PER PER SPACE SPACE 01_EVENT 01_EVENT LEVEL LEVEL 02_MAIN 02_MAIN CONCOURSE CONCOURSE LEVEL LEVEL (2 EVENT SPACES+ BACKSTAGE)

(2 EVENT (2 EVENT SPACES+ SPACES+ BACKSTAGE) BACKSTAGE) (2) W/ END USE ENTRY PLAZA & PRE-FUNCTION AREAS USESTAGE ENTRY PLAZA &END PRE-FUNCTION AREAS FULL-SERVICE F&B DIVIDE BOWL INTO 6TOURNAMENTS (2)THEATERS THEATERS (2) THEATERS W/ W/ STAGE END USE USE ENTRY ENTRY PLAZA PLAZA & PRE-FUNCTION & PRE-FUNCTION AREAS AREAS USESTAGE USE ENTRY ENTRY PLAZA PLAZA & PRE-FUNCTION & PRE-FUNCTION AREAS AREAS FULL-SERVICE FULL-SERVICE F&BF&B DIVIDE DIVIDE BOWL BOWL INTO INTO 6TOURNAMENTS 6TOURNAMENTS LARGE BACKSTAGE AREA LARGE LARGE BACKSTAGE BACKSTAGE AREA AREA TEAM FACILITIES BECOMES PERFORMER SPACE TEAM FACILITIES BECOME PERFORMER SPACE TEAM TEAM FACILITIES FACILITIES BECOMES BECOMES PERFORMER PERFORMER SPACE SPACE TEAM TEAM FACILITIES FACILITIES BECOME BECOME PERFORMER PERFORMER SPACE SPACE TEAM FACILITIES BECOMES PERFORMER SPACE TEAM TEAM FACILITIES FACILITIES BECOMES BECOMES PERFORMER PERFORMER SPACE SPACE

* **

** * * ** * ** *** ** * CURTAIN WALL * ***** * * ********* * * * * * * * ****** ****** ** *** * ** *** *** ** ************ * * * * * * * ** * ** * ** * ** * ** * * ** * * * * * * * * * * * * ** ** * ** * *** +/- 6,000 CAPACITY +/- +/6,000 6,000 CAPACITY CAPACITY 02_MAIN 02_MAIN 02_MAIN CONCOURSE CONCOURSE CONCOURSE LEVEL LEVEL LEVEL 01_EVENT 01_EVENT 01_EVENT LEVEL LEVEL LEVEL 01_EVENT 01_EVENT 01_EVENT LEVEL LEVEL LEVEL 02_MAIN 02_MAIN 02_MAIN CONCOURSE CONCOURSE CONCOURSE LEVEL LEVEL LEVEL 03_TIER 03_TIER 03_TIER 01 04_TIER 01 0102 04_TIER 04_TIER 04_TIER 02 02 05_TIER 05_TIER 05_TIER 03 03 03THE 03_TIER 03_TIER 03_TIER 01 01 01 05_TIER 05_TIER 05_TIER 03 03 03 04_TIER 04_TIER 02 02 CONCOURSE CONCOURSE CONCOURSE SERVES SERVES AS SERVES PREFUNCTION AS PREFUNCTION AS PREFUNCTION PUBLIC PUBLIC PLAZA PUBLIC PLAZA AND PLAZA BOARDWALK AND AND BOARDWALK BOARDWALK BOWL BOWL BECOMES BOWL BECOMES BECOMES A INTIMATE A 02 INTIMATE A INTIMATE 360 360 360 HOST HOST AN HOST EVENT AN EVENT ANINEVENT THE IN IN THE AREA AREA AREA +/-5,000 5,000 CAPACITY FLAT FLOOR +/CAPACITY FLAT FLOOR OPEN OPEN TOTHEATER OPEN PUBLIC TOVIP PUBLIC TO PUBLIC +/- +/6,000 6,000 CAPACITY CAPACITY IMMERIVE IMMERIVE IMMERIVE ENVIRONMENT ENVIRONMENT ENVIRONMENT PREFUNCTION PREFUNCTION PREFUNCTION AREA AREA AREA 01_EVENT 01_EVENT LEVEL LEVEL 02_MAIN 02_MAIN CONCOURSE CONCOURSE LEVEL LEVEL PREMIUM PREMIUM PREMIUM SPACE SPACE BECOMES SPACE BECOMES BECOMES VIP VIP THEATER THEATER 01_EVENT 01_EVENT LEVEL LEVEL MARKETPLACE MARKETPLACE MARKETPLACE & RETAIL & RETAIL & OPEN RETAIL OPEN SPHERE SPHERE SPHERE BECOMES BECOMES BECOMES ABOXES BROADCAST ABOXES BROADCAST ABOXES BROADCAST / MEDIA / MEDIA / MEDIA MARKETPLACE MARKETPLACE MARKETPLACE OPEN OPEN OPEN E-SPORT E-SPORT E-SPORT CLUB/PREMIUM CLUB/PREMIUM CLUB/PREMIUM AREAS AREAS AREAS +/5,000 CAPACITY FLAT FLOOR SPHERE SPHERE SPHERE BECOMES BECOMES BECOMES AOPEN SCOREBOARD A SCOREBOARD A SCOREBOARD +/6,000 CAPACITY 01_EVENT LEVEL 02_MAIN CONCOURSE LEVEL 01_EVENT LEVEL ROOM ROOM ROOM RETAIL RETAIL STORES RETAIL STORES OPEN STORES OPEN OPEN 03_TIER 03_TIER 01 01HIGH-END 04_TIER 04_TIER 02 04_TIER 04_TIER 02 02RESTAURANT 03_TIER 03_TIER 01 01A 02 05_TIER 05_TIER 03 03 CONCOURSE CONCOURSE SERVES SERVES AS PREFUNCTION AS PREFUNCTION FLAT FLAT FLOOR FLOOR BOWL BOWL BECOMES INTIMATE A INTIMATE 360 360 HIGH-END RESTAURANT RESTAURANT OPENOPEN OPEN 03_TIER 01 FLOOR 04_TIER 04_TIER 02 HIGH-END 03_TIER 01BECOMES 05_TIER 03 CONCOURSE SERVES AS PREFUNCTION FLAT AREA AREA BOWL BECOMES A 02 INTIMATE 360 IMMERIVE IMMERIVE ENVIRONMENT ENVIRONMENT RESTAURANT RESTAURANT RESTAURANT & BAR & OPEN BAR & BAR OPEN OPEN

**

02_MAIN 02_MAIN 02_MAIN CONCOURSE CONCOURSE CONCOURSE LEVEL LEVEL LEVEL 04_TIER 04_TIER 04_TIER 02 02 02

05_TIER 05_TIER 05_TIER 03AREA 03 03 PRE-FUNCTION PRE-FUNCTION PRE-FUNCTION AREA OPEN AREA OPEN FOR OPEN FORFOR ACCESS ACCESS TO ACCESS SPHERE TO SPHERE TO SPHERE 01_EVENT 01_EVENT LEVEL LEVEL MARKETPLACE MARKETPLACE MARKETPLACE OPEN OPEN FOR OPEN INTERMISSION FOR FOR INTERMISSION INTERMISSION 02_MAIN 02_MAIN CONCOURSE CONCOURSE LEVEL LEVEL SPHERE SPHERE SPHERE BECOMES BECOMES BECOMES XXXX XXXX XXXX

01_EVENT 02_MAIN CONCOURSE LEVEL 03_TIER 03_TIER 01LEVEL 01 05_TIER 05_TIER 03 03 04_TIER 04_TIER 02 02 03_TIER 01 PUBLIC PUBLIC PLAZA PLAZA AND AND BOARDWALK BOARDWALK HOST HOST AN AN THE IN THE RESTAURANT RESTAURANT RESTAURANT & EVENT BAR OPEN BAR &IN BAR OPEN OPEN 05_TIER 03&EVENT 04_TIER 02

PUBLIC PLAZA AND BOARDWALK OPEN OPEN TOVIP PUBLIC TO PUBLIC HOST AN EVENT IN THE PREFUNCTION PREFUNCTION AREA AREA PREMIUM SPACE SPACE BECOMES BECOMES VIP THEATER THEATER MARKETPLACE MARKETPLACE & RETAIL & RETAIL OPEN OPEN SPHERE SPHERE BECOMES BECOMES ABOXES BROADCAST ABOXES BROADCAST / MEDIA / MEDIA MARKETPLACE MARKETPLACE OPEN OPEN E-SPORT E-SPORT CLUB/PREMIUM CLUB/PREMIUM AREAS AREAS AREA SPHERE SPHERE BECOMES BECOMES A SCOREBOARD A SCOREBOARDPREMIUM OPEN TOTHEATER PUBLIC IMMERIVE ENVIRONMENT PREFUNCTION AREA VIP MARKETPLACE & RETAIL OPEN ROOM ROOM SPHERE BECOMES ABOXES BROADCAST / MEDIA MARKETPLACE OPEN E-SPORT CLUB/PREMIUM AREAS SPHERE BECOMES A SCOREBOARD PREMIUM SPACE BECOMES RETAIL RETAIL STORES STORES OPEN OPEN ROOM HIGH-END HIGH-END RESTAURANT RESTAURANT OPEN OPEN RETAIL STORES OPEN RESTAURANT RESTAURANT & BAR & BAR OPEN OPEN HIGH-END RESTAURANT OPEN IRVING IRVING EVENT EVENT CENTER CENTER | VENUE | VENUE OF OF THE THE FUTURE FUTURE RESTAURANT & BAR OPEN IRVING EVENT CENTER | VENUE OF THE FUTURE

NTER NT CENTER CENTER | VENUE | VENUE | VENUE OF THE OF OF THE FUTURE THE FUTURE FUTURE UTILIZE UTILIZE PREMIUM PREMIUM SPACES SPACES FOR FOR VIP VIP MARKETPLACE MARKETPLACE OPEN OPEN

** *

PERFORATED STAINLESS STEEL PANELS

UTILIZE PREMIUM SPACES FOR VIP MARKETPLACE OPEN

23

02_MAIN 02_MAIN CONCOURSE CONCOURSE LEVEL LEVEL 02_MAIN CONCOURSE LEVEL 04_TIER 04_TIER 02 02

05_TIER 05_TIER 03 03 04_TIER 02 PRE-FUNCTION PRE-FUNCTION AREA AREA OPEN OPEN FORFOR 05_TIER 03 PRE-FUNCTION AREA OPEN FOR ACCESS ACCESS TO SPHERE TO SPHERE MARKETPLACE MARKETPLACE OPEN OPEN FOR FOR INTERMISSION INTERMISSION SPHERE SPHERE BECOMES BECOMES XXXX XXXX ACCESS TO SPHERE MARKETPLACE OPEN FOR INTERMISSION SPHERE BECOMES XXXX RESTAURANT RESTAURANT & BAR & BAR OPEN OPEN RESTAURANT & BAR OPEN


PROFESSIONAL WORK

PANTHERS TRAINING FACILITY G HAROLD MARTIN DR. WAR MEMORIAL AUDITORIUM

ROLLER HOCKEY RINKS

HOLIDAY PARK GYMNASIUM

DROP-OFF ZONE

HOLIDAY PARK SOCIAL CENTER

PLAYER PARKING

TEAM PARKING

FT. LAUDERDALE, FLORIDA

FEASIBILITY-DESIGN DEVELOPMENT 2019 I ROSSETTI GH

AR

OL

The War Memorial Panthers Training facility is a 114,000 SF public-private venue project located at the heart of one of the few and largest public parks in the City of Ft. Lauderdale. We worked with the Panthers to create a multi-use ice hockey center which would work parallel to the enhancements to the historical War Memorial Auditorium. The goal of the design was to enhance the concept of partnership between the park, the panthers, the War Memorial Auditorium and a Clinic Sponsor.

DM

AR TIN

DR

.

24


WAR MEMORIAL PANTHERS TRAINING FACILITY

DRIVERS

OVERLAP TO ENGAGE

INVITE TO CONNECT

CINCH TOGETHER

OVERLAP TO ENGAGE

INVITE TO CONNECT

CINCH TOGETHER

EXPRESS

1. COMMUNITY ICE SPORTS

4. WAR MEMORIAL AUDITORIUM

3. CLINIC SPONSOR

2. PANTHERS NHL

DRIVERS

25

EXPRESS


PROFESSIONAL WORK

A

B

A

C

B

D

E

C

F

D

G

E

H

F

AG

J BH

CJ

MATERIAL KEYNOTES

MATERIAL KE

1

1

A1

TRASH

ELECTRICAL DISTRIBUTION ROOM

2

2 LOADING/ STORAGE WAR MEMORIAL SUPPORT

COMMUNITY ICE RINK

FLOOR PLAN LEGEND (NEW) 2 HOUR FIRE SEPARATION ROOM NAME

FLOOR PLAN

ROOM, SEE A-621

ROOM NAME

ZAMBONI

2-HR INFILL/ FIRESTOP ALL OPENINGS & PENETRATIONS AT ALL [E] WALLS ABUTTING NEW CONSTRUCTION

CONCESSION CLUB LOCKER B2

LOCKER 08 LOCKER 07

LOCKER 05

ARCADE

LOCKER 03

SKATE RENTAL

EVENT ROOM

WAR MEMORIAL EXISTING

ELECTRICAL

4

EVENT ROOM

CLUB LOCKER A2

CLUB LOCKER A1

SEATING AREA

EVENT ROOM

AUX LOCKER 01 MAINTENANCE

ZAMBONI

AUX LOCKER 02

SECURITY/ GUEST SERVICES

RESTAURANT BOH

5

5

RESTAURANT

LINE OF OPEN TRELLIS STRUCTURE ABOVE

EVENT ROOM

SYNTHETIC ICE

EVENT ROOM

2

4

ICEPLANT

COMMUNITY OFFICES

HALL OF HEROES

(2) 2-HR WALLS NOTED ABOVE SHALL ACT AS A FIREWALL PER FBC §706

LOCKER 01

WAR MEMORIAL WAR MEMORIAL EXISTING EXISTING

CLUB LOCKER B1

TRAINING ROOM

LOCKER 06

2-HR MASONRY WALL TO BE CONSTRUCTED TO THE UNDERSIDE OF PEMB ROOF (TYPICAL OF ALL WALLS OF NEW CONSTRUCTION ABUTTING [E] WAR MEMORIAL BUILDING); WALL TO BE SELF-SUPPORTING (GRAVITY), LATERALLY BRACED TO PEMB STRUCTURE

LOCKER 04

3

LOCKER 02

3

LINE OF OPEN TRELLIS STRUCTURE ABOVE

GRAB & GO

1

SHARED ICE RINK

LOBBY LINE OF METAL PANEL CANOPY ABOVE

LINE OF METAL PANEL CANOPY ABOVE

6

6

KINGSPAN BENCHMARK COLUMN WRAPS

PRO SHOP

PRESS

EQUIPMENT OFC/ LOUNGE

HEALTHCARE FACILITY

SHOWERS

LOCKER ROOM

EQUIPMENT WORKROOM

KINGSPAN BENCHMARK COLUMN WRAPS

EXAM RECOVER/ CRYO HYDROTHERAPY

STEAM

SHOOTING RANGE

DOCTOR

HEALTHCARE FACILITY

SAUNA ICE MACHINE TEAM SERVICES FILM

STRENGTH OFFICE

7

TRASH COLLECTION

ADMIN/ BULLPEN

LOADING

KITCHEN

PLAYER DINING

LAUNDRY/ DRYING

EQUIPMENT STORAGE FUTURE OFFICE

PLAYER ENTRY

8

A

B A

C B

D C

E D

F E

A1 SECTION

26

TRAINING/ FLEX AREA

FUTURE OFFICE TRAINERS' OFFICE

HOCKEY OPERATIONS

4

8/20/2020 9:15:23 AM

C:\ROSSETTI\RevitProjects\2019_1007 FLPAN-Arch_Pricing_detached_carlalanda.rvt

LOBBY COACHES LOCKER ROOM

F

WEIGHT ROOM

8

8/20/2020 9:15:23 AM

WAR ROOM

C:\ROSSETTI\RevitProjects\2019_1007 FLPAN-Arch_Pricing_detached_carlalanda.rvt

HEALTHCARE TENANT

7

TREATMENT/ MASSAGE

G

H AG

J BH

CJ


DESIGN INTENT- ENTRY LOBBY C

D

D

E

E

F

F

G

G

WAR MEMORIAL PANTHERS TRAINING FACILITY

H

H

J

PRECEDENT IMAGES

J

K

K

MATERIAL KEYNOTES MATERIAL KEYNOTES

a. MONOLITHIC TERRAZZO STAIRS

b. CUSTOM WOOD PANELED RAILING SYSTEM

1

1

PROJECT

A1

STAIRS - MONOLITHIC TERRAZZO STAIRS (image a) - CABINETRY GRADE HARDWOOD PLYWOOD PANELS W/ CUSTOM REVEALS FOR GUARDRAIL (image b) - WRAP WOOD PANELING TO UNDERSIDE OF STAIR -FLOOR MOUNT STAINLESS STEEL HANDRAIL

PROJECT

WAR WAR MEMORIAL MEMORIAL PANTHERS PANTHERS TRAINING TRAINING FACILITY FACILITY POLISHED CONCRETE FLOOR - W/ 1/4” ZINC TERRAZZO ACCENT STRIPS TERRAZZO FLOOR - W/ 1/4” ZINC TERRAZZO ACCENT STRIPS

2

2

GUARDRAIL - CABINETRY GRADE HARDWOOD PLYWOOD PANELS W/ CUSTOM REVEALS - WRAP WOOD PANELING TO UNDERSIDE OF MEZZANINE

800 NE 8th St 800 NE 8th St Fort Lauderdale,Fort FL Lauderdale, 33304 FL 33304 RUBBER FLOOR TERRAZZO FLOOR - CONSULTANT W/ 1/4” ZINC TERRAZZO ACCENT STRIPS

CONSULTANT FLOOR PLAN LEGEND FLOOR (NEW)PLAN LEGEND (NEW)

c. PLATFORM STEPS -OVERSIZED LANDING TO DOUBLE AS PLATFORMS FOR SEATING

ROOM NAME

ROOM NAME ROOM, SEE A-621

1 MAIN ENTRY

3

COMMUNITY OFFICES

AR MEMORIAL EXISTING

COMMUNITY OFFICES

SYNTHETIC ICE CONCESSION

2 ARCADE

2019.10.07 | ROSSETTI

ROCK CLIMBING WALL - PLYWOOD FACETED WALL PANELS (image d)

EVENT ROOM

a. METAL COLUMN ENCLOSURES

b. PLYWOOD FACETED WALL PANELS

METAL COLUMN ENCLOSURE - ALUMINUM COMPOSITE PANELS W/ MATTE FINISH TO MATCH METAL PANELS (image a)

SYNTHETIC ICE

METAL PANEL - ALUMINUM COMPOSITE PANELS W/ MATTE FINISH - MANUF: ALPOLIC MATERIALS - THICKNESS: 3MM

CONCESSION

ARCADE 3

PROFESSIONAL SEALPROFESSIONAL SEAL

4

4

GLAZING SYSTEM SEATING AREA

EVENT ROOM

EVENT ROOM EVENT ROOM

EVENT ROOM

N O

SEATING AREA

C M O I N N ST R A P U R N R C O TI Y T E O FO L N R I C M O I N N ST R A U R C TI Y O N

EVENT ROOM EVENT ROOM

3

HALL OF HEROES WALL - PLYWOOD FACETED WALL PANELS W/ PRINTED GRAPHICS (image c & d)

WAR MEMORIAL PANTHERS TRAINING FACILITY #2009.004

PRECEDENT IMAGES EVENT ROOM

ROOM, SEE A-621

PR T E FO L R I

28

PLATFORM STEPS (image c) - FORMED TERRAZZO

2 HOUR FIRE SEPARATION 2 HOUR FIRE SEPARATION

DESIGN INTENT- CLIMBING WALL & HALL OF HEROES

© 2018 ROSSETTI

© 2018 ROSSETTI

# DESCRIPTION 1 Preliminary Pricing

RESTAURANT

DESIGN INTENT- 2ND FLOOR COMMUNITY AREA

RESTAURANT

5

5

1 c. PRINTED GRAPHICS ON PLYWOOD

# DESCRIPTIONDATE GLAZING 1 Preliminary 10/07/19 - 8’-0”H GLAZINGPricing @ OFFICE AREA

DATE

10/07/19

GUARDRAIL - CABINETRY GRADE HARDWOOD PLYWOOD PANELS W/ CUSTOM REVEALS - WRAP WOOD PANELING TO UNDERSIDE OF MEZZANINE (see previous page) POLISHED CONCRETE FLOOR - W/ 1/4” ZINC TERRAZZO ACCENT STRIPS

d. ROCK CLIMBING WALL

2 ENTRY/ HALL OF PLYWOOD BUILT-IN SEATING AREAS

INTEGRATED PLANTERS

29

PLYWOOD BUILT-IN BENCHES INTEGRATED W/ PLANTERS

WAR MEMORIAL PANTHERS TRAINING FACILITY #2009.004

CONCESSION AREA - PLYWOOD CEILING 2019.10.07 | ROSSETTI - POLISHED CONCRETE FLOOR - TILE WALLS

ALCOVE W/ CAFE SEATING -CLAD W/ PLYWOOD FLOOR, WALL, CEILING & BUILT-IN MILLWORK BANQUETTES

PRESS

6

6

PRESS

KEY PLAN

HEALTHCARE FACILITY

TRAINING/ FLEX FUTURE OFFICE AREA

FUTURE OFFICE

LOBBY

LOBBY

PLYWOOD BUILTIN SEATING AREA INTEGRATED W/ PLANTERS

KEY PLAN

A

TRAINING/ FLEX AREA

A

B

B

4 HOCKEY OPERATIONS

7

HOCKEY OPERATIONS

7

D

8’-0”H GLAZING

FUTURE OFFICE

FUTURE OFFICE

SHEET TITLE

POLISHED CONCRETE FLOOR W/ VINYL GRAPHICS

DESIGN INTENTPLAYERS VINYL GRAPHICS ON FLOOR / WALLENTRANCE / CEILING DESIGN INTENT- PLAYERS ENTRANCE DESIGN INTENT- PLAYERS ENTRANCE

PLYWOOD ALCOVES

C

D

D

E

E

F

F

D

C

b. WOOD SLAT WALL

a. GRAPHIC WALLCOVERING

b. WOOD SLAT WALL

G

2019.004

b. WOOD SLAT WALL

a. GRAPHIC WALLCOVERING

G

8

PROJECT #

WAR MEMORIAL PANTHERS TRAINING FACILITY #2009.004 a. GRAPHIC WALLCOVERING

H

H

SHEET # J

J

K

SHEET TITLE

Composite Floor Composite Plan - LV-02 Floor Plan - LV-02 POLISHED CONCRETE FLOOR

3 CONCESSION/ SEATING AREAS 8

31

C

CUSTOM WOOD RAILING SYSTEM

K

- W/ 1/4” ZINC TERRAZZO ACCENT STRIPS POLISHED CONCRETE FLOOR - W/ 1/4” ZINC TERRAZZO ACCENT POLISHED CONCRETE FLOOR STRIPS -RECEPTION W/ 1/4” ZINCDESK TERRAZZO ACCENT 0 1" 0 2" STRIPS - MILLWORK FACE TO BE STONE & VENEER TO MATCH SLAT WALL RECEPTION DESK Scale Varies # TO --PROJECT MILLWORK MILLWORK TOP FACE TOBE BESTONE STONE & RECEPTION DESK 2019.10.07 | ROSSETTI VENEER TO MATCH SLAT WALL MILLWORK TOP FACETO TOBE BESTONE STONE & -- MILLWORK 30x42 VENEER TO MATCH SLAT WALL - MILLWORK TOP TO BE STONE

2019.004 SHEET #

A-102 A-102 PENDANT LIGHT FIXTURES -HUNG IN 2-STORY SPACE

GRAPHIC WALLCOVERING - GYP. BD. TO BE LEVEL 5 FINISH - VINYL WALLCOVERING W/ CUSTOM GRAPHIC WALLCOVERING GRAPHIC - GYP. BD.(image TO BE a) LEVEL 5 FINISH WALLCOVERING -GRAPHIC VINYL WALLCOVERING W/ CUSTOM - GYP. BD.(image TO BE a) LEVEL 5 FINISH GRAPHIC - VINYL WALLCOVERING W/ CUSTOM GRAPHIC (image a)

GUARDRAIL - CABINETRY GRADE HARDWOOD PLYWOOD SLATS TO MATCH SLAT GUARDRAIL WALL - CABINETRY GRADE HARDWOOD -GUARDRAIL WRAP WOOD SLAT TO UNDERSIDE PLYWOOD SLATS TO MATCH SLAT OF MEZZANINE - CABINETRY GRADE HARDWOOD WALL SLATS TO MATCH SLAT -PLYWOOD WRAP WOOD SLAT TO UNDERSIDE WALL WOOD SLAT WALL OF MEZZANINE WRAP WOODGRADE SLAT TO UNDERSIDE - CABINETRY HARDWOOD OF MEZZANINE PLYWOOD SLATS WOOD SLAT WALLW/ 1/4” REVEALS WRAP SLAT GRADE WALL TO UNDERSIDE OF -- CABINETRY HARDWOOD 2ND FLOOR CEILING WOOD SLAT WALL PLYWOOD SLATS W/ 1/4” REVEALS bSLAT & c) GRADE - WRAP CABINETRY HARDWOOD -(image WALL TO UNDERSIDE OF PLYWOOD SLATS W/ 1/4” REVEALS 2ND FLOOR CEILING TERRAZZO FLOOR - WRAPbSLAT TO UNDERSIDE OF (image & c) WALL -2ND W/ 1/4” ZINC TERRAZZO ACCENT FLOOR CEILING STRIPS (image b & c) TERRAZZO FLOOR

c. WOOD SLAT CEILING c. WOOD SLAT CEILING c. WOOD SLAT CEILING

30 30 30

PENDANT LIGHT FIXTURES -HUNG IN 2-STORY SPACE PENDANT LIGHT FIXTURES -HUNG IN 2-STORY SPACE

WAR MEMORIAL PANTHERS TRAINING FACILITY #2009.004 WAR MEMORIAL PANTHERS TRAINING FACILITY #2009.004 WAR MEMORIAL PANTHERS TRAINING FACILITY #2009.004

27

- W/ 1/4” ZINC TERRAZZO ACCENT TERRAZZO FLOOR STRIPS - W/ 1/4” ZINC TERRAZZO ACCENT

STRIPS 4 PLAYER ENTRY

2019.10.07 | ROSSETTI 2019.10.07 | ROSSETTI 2019.10.07 | ROSSETTI

1"

2"

Scale Varies

30x42


PROFESSIONAL WORK

C

C

A4 WEST ELEVATION- MAIN ENTRY/ HEALTH SPONSOR VOLUME

G4 NORTH ELEVATION- HEALTH SPONSOR VOLUME

A

B

B

A8 EAST ELEVATION- ICE RINK VOLUMES

28


WAR MEMORIAL PANTHERS TRAINING FACILITY

079200.C 079200.C 079200.C 079200.C

084500.A 084500.A 084500.A 084500.A

2'-9 1/4" 2'-9 1/4"

079200.C 079200.C 079200.C 079200.C

2'-9 1/4" 1/4" 2'-9

133419.S 133419.S 133419.S 133419.S

075400.A 075400.A 075400.A 075400.A

2'-9 1/4" 2'-9 1/4"

133419.S 133419.S 133419.S 133419.S

084500.A 084500.A 084500.A 084500.A

133419.R 133419.R 133419.R 133419.R

133419.R 133419.R 133419.R 133419.R

5'-0" 5'-0"

5'-0" 5'-0"

061000.B 061000.B 061000.B 061000.B

133419.S 133419.S 133419.S 133419.S

133419.S 133419.S 133419.S 133419.S

5'-0" 5'-0"

5'-0" 5'-0"

5'-0" 5'-0"

5'-0"

5'-0"

6'-0" 6'-0"

6'-0" 6'-0"

6'-0" 6'-0"

092900.A 092900.A 092900.A 092900.A

133419.P 133419.P 133419.P 133419.P

074216.A 074216.A 074216.A 074216.A

COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY ROOF ROOF ROOF ROOF ROOF ROOFROOF ROOF 34' - 34' 0" - 0" 34' 34'- -0"0" 34' 34'-- 0" 0"34' 34'--0" 0"

10" 10" 10" 10"2"

4" 4"

2"

2"2"10" 10"

10" 10" 2" 2"

5'-0"

5'-0"

5'-0" 5'-0"

5'-0" 5'-0"

5'-0" 5'-0"

5'-0"

5'-0" 5'-0"

5'-0" 5'-0"

5'-0" 5'-0"

133419.S 133419.S 133419.S 133419.S

133419.S 133419.S 133419.S 133419.S

133419.P 133419.P 133419.P 133419.P (BEYOND) (BEYOND) (BEYOND) (BEYOND)

133419.P 133419.P 133419.P 133419.P (BEYOND) (BEYOND) (BEYOND) (BEYOND)

17' -- 3" 3" 17'

17' -- 3" 3" 17'

079200.A 079200.A 079200.A 079200.A

072100.H 072100.H 072100.H 072100.H

051200.J 051200.J 051200.J 051200.J 051200.J 051200.J 051200.J 051200.J 6"x4"x3/8" 6"x4"x3/8" 6"x4"x3/8" 6"x4"x3/8" CONT. CONT.CONT. CONT. GALZ. GALZ.GALZ. GALZ.

7 1/2"7 1/2"771/2" 1/2"

088000 088000088000 088000

084413.E 084413.E 084413.E 084413.E

5'-0" 5'-0"

5'-0" 5'-0"

061600.G 061600.G 061600.G 061600.G

061600.G 061600.G 061600.G 061600.G

072100.H 072100.H 072100.H 072100.H

072100.H 072100.H 072100.H 072100.H

071326.A 071326.A 071326.A 071326.A

071326.A 071326.A 071326.A 071326.A

2' - 0"

2" 2" 2'-0" 2'-0"

042000.A 042000.A 042000.A 042000.A

055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 10 GA 10S.S. GA 10 10 S.S. GA GAS.S. S.S. 10 10GA GA S.S. 10 S.S. 10GA GAS.S. S.S. BASE BASE PLATE BASE BASE PLATE PLATE PLATE BASE BASE PLATE BASE PLATE BASEPLATE PLATE

LEVEL LEVEL 01LEVEL LEVEL 01 01 01 7' - 0"7' - 0"7'7'- -0"0"

LEVEL LEVELLEVEL 01 LEVEL 01 01 01 7'7'--0" 0" 7'7'--0" 0"

LEVEL LEVELLEVEL 01 LEVEL 01 01 01 7'7'--0" 0" 7'7'--0" 0"

8"

4"

2" 2"

042000.A 042000.A 042000.A 042000.A

2'-0" 2'-0"

5'-0"

5'-0" 5'-0" 2'-0" 2'-0"

2'-0"

4" 4"

3" 3" 3" 3" 088000 088000 088000 088000

084413.E 084413.E 084413.E 084413.E

1" CMU 1" CMU FACE 1"1" CMU FACE CMU OFFSET FACE FACE OFFSET OFFSET 1" 1" OFFSET CMU CMU 1" 1"FACE FACE CMU CMUOFFSET FACE OFFSET FACEOFFSET OFFSET FROM FROM GRID FROM FROM GRID LINE, GRID LINE, GRID TYPLINE, TYP LINE, FROM FROM TYP TYP FROM GRID GRID FROMLINE, LINE, GRID GRIDTYP TYP LINE, LINE,TYP TYP

8" 8"

8" 8" 4" 4"

4"

8"4" 4"

8" 8"

8"4"

LEVEL LEVEL 01LEVEL LEVEL 01 01 01 7' - 0"7' - 0"7'7'- -0"0"

3" 771/2" 1/2" 3"3"771/2" 1/2"

1/16" 2'2'. . 1/16" 2' . 1/16" 1/16" 2' . 2'2'2' .1/2" .2'. .

1/2" 2'2'. . 1/16" 1/16" 1/2" 1/2"

2' 1/16" 2' 1/16" ..

2'2'. . 1/2" 1/2"

1/2" 1/2"

4' - 0"4' - 0"4'4'- -0"0"

A PANTHER’S VOLUME ELEVATION/ SECTION

LEVEL LEVEL 01LEVEL LEVEL 01 01 01 7' - 0"7' - 0"7'7'- -0"0"

1'-4" 1'-4"

1'-4" 1'-4"

1'-4" 1'-4"

1'-4"

5'-0"

072100.H 072100.H 072100.H 072100.H 2" 2"

079200.C 079200.C 079200.C 079200.C 061600.G 061600.G 061600.G 061600.G

072100.H 072100.H 072100.H 072100.H

2"

079200.C 079200.C 079200.C 079200.C 061600.G 061600.G 061600.G 061600.G

071326.A 071326.A 071326.A 071326.A 071326.A 071326.A 071326.A 071326.A 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 10 GA 10S.S. GA 10 10 S.S. GA GAS.S. S.S. 10 10GA GA S.S. 10 S.S. 10GA GAS.S. S.S. BASE BASE PLATE BASE BASE PLATE PLATE PLATE BASE BASE PLATE BASE PLATE BASEPLATE PLATE

3"

LEVEL LEVEL 02LEVEL LEVEL 02 02 02 22' - 22' 6" - 6" 22' 22'- -6"6"

15' -- 0" 0" 15'

061600.G 061600.G 061600.G 061600.G

072100.H 072100.H 072100.H 072100.H

15' - 0"

061600.G 061600.G 061600.G 061600.G

071326.J 071326.J 071326.J 071326.J

2' .

17' - 3"

076200.A 076200.A 076200.A 076200.A

079200.A 079200.A 079200.A 079200.A

2' -- 0" 0" 2'

076200.A 076200.A 076200.A 076200.A

051200.J 051200.J 051200.J 051200.J 051200.J 051200.J 051200.J 051200.J 6"x4"x3/8" 6"x4"x3/8" 6"x4"x3/8" 6"x4"x3/8" CONT. CONT. CONT. CONT. GALZ. GALZ. GALZ. GALZ.

071326.J 071326.J 071326.J 071326.J

2' .

17' 17' -- 3" 3"

17' - 3"

084500.A 084500.A 084500.A 084500.A 084500.D 084500.D 084500.D 084500.D

076200.A 076200.A 076200.A 076200.A

15' 15' -- 0" 0"

5'-0" 5'-0"

LEVEL LEVELLEVEL 02 LEVEL 02 02 02 22' 22'-- 6" 6"22' 22'--6" 6"

15' -- 0" 0" 15'

042000.P 042000.P 042000.P 042000.P

076200.A 076200.A 076200.A 076200.A

2'-0"

2'-0" TYP TYP 2'-0"

VARIES, VARIES, SEE SEE ELEVATIONS ELEVATIONS

VARIES, SEE SEE ELEVATIONS ELEVATIONS VARIES, 2'-0" TYP TYP 2'-0"

2'-0" TYP

VARIES, SEE SEE ELEVATIONS ELEVATIONS VARIES,

VARIES, SEE 2'-0" ELEVATIONS TYP

2" 2"

042000.J 042000.J 042000.J 042000.J

LEVEL LEVELLEVEL 01 LEVEL 01 01 01 7'7'--0" 0" 7'7'--0" 0"

1'-4"

071326.J 071326.J 071326.J 071326.J

042000.J 042000.J 042000.J 042000.J

042000.A 042000.A 042000.A 042000.A 042000.A 042000.A 042000.A 042000.A 8" GROUTED 8" GROUTED 8"8"GROUTED GROUTED 8" 8"GROUTED GROUTED 8" 8"GROUTED GROUTED SOLID, SOLID, TYP SOLID, SOLID, TYP TYP TYP SOLID, SOLID,SOLID, SOLID, TYP TYP TYP TYP

1'-10" 1'-10"

2" 2" 1'-10" 1'-10"

1'-10"

1'-10"

4" 4"

1'-10" 1'-10"

LEVEL LEVEL 01LEVEL LEVEL 01 01 01 7' - 0"7' - 0"7'7'- -0"0"

8" 8"

4"

4"

8" 8" 4" 4"

8" 8"

8"

4" 8" 4"

055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 055000.M 10 GA 10S.S. GA 10 10 S.S. GA GAS.S. S.S. 10 10GA GA S.S. 10 S.S. 10GA GAS.S. S.S. BASE BASE PLATE BASE BASE PLATE PLATE PLATE BASE BASE PLATE BASE PLATE BASEPLATE PLATE

2" 2"

071326.A 071326.A 071326.A 071326.A 2"

072100.H 072100.H 072100.H 072100.H

071326.A 071326.A 071326.A 071326.A

2"

061600.G 061600.G 061600.G 061600.G

072100.H 072100.H 072100.H 072100.H

VARIES, SEE ELEVATIONS 2'-0" TYP TYP 2'-0"

042000.A 042000.A 042000.A 042000.A 042000.A 042000.A 042000.A 042000.A SOLID SOLID TOP SOLID SOLID TOP PIECE, TOP PIECE, TOP TYP PIECE, PIECE, TYP SOLID SOLID TYP TYP SOLID TOP SOLID TOPPIECE, PIECE, TOP TOPPIECE, PIECE, TYP TYP TYP TYP

1" CMU 1" CMU FACE 1"1" CMU FACE CMU OFFSET FACE FACE OFFSET OFFSET 1" 1" OFFSET CMU CMU 1" 1"FACE FACE CMU CMUOFFSET FACE OFFSET FACEOFFSET OFFSET FROM FROM GRID FROM FROM GRID LINE, GRID LINE, GRID TYPLINE, TYP LINE, FROM FROM TYP TYP FROM GRID GRID FROMLINE, LINE, GRID GRIDTYP TYP LINE, LINE,TYP TYP

061600.G 061600.G 061600.G 061600.G

6" 6"

084500.A 084500.A 084500.A 084500.A 084500.D 084500.D 084500.D 084500.D

2' -- 0" 0" 2'

042000.P 042000.P 042000.P 042000.P

2"

RADIUS RADIUS EDGE RADIUS RADIUS EDGE TYP EDGE EDGE TYP RADIUS TYP RADIUS TYP RADIUS RADIUS EDGE EDGETYP EDGE TYP EDGETYP TYP

042000.A 042000.A 042000.A 042000.A

6" 6"

14'-2" 14'-2"

14'-2" 14'-2"

14'-2" 14'-2"

14'-2"

14'-2"

LEVEL LEVEL 02LEVEL LEVEL 02 02 02 22' - 22' 6" - 6" 22' 22'- -6"6"

051200.K 051200.K 051200.K 051200.K 051200.K 051200.K 051200.K 051200.K 4"x4"x3/8" 4"x4"x3/8" 4"x4"x3/8" CONT. 4"x4"x3/8" CONT. CONT. CONT. 4"x4"x3/8" 4"x4"x3/8" 4"x4"x3/8" 4"x4"x3/8" CONT. CONT.CONT. CONT. GALZ. GALZ. GALZ. GALZ. GALZ. GALZ.GALZ. GALZ.

042000.A 042000.A 042000.A 042000.A

6"6"

15' - 0"

072100.H 072100.H 072100.H 072100.H

6"

4" 2' - 0" 4"

061600.G 061600.G 061600.G 061600.G

072100.H 072100.H 072100.H 072100.H

084500.F 084500.F 084500.F 084500.F

133419.S 133419.S 133419.S 133419.S

5'-0" 5'-0"

LEVEL LEVELLEVEL 02 LEVEL 02 02 02 22' 22'-- 6" 6"22' 22'--6" 6"

5'-0"

061600.G 061600.G 061600.G 061600.G

084500.F 084500.F 084500.F 084500.F

133419.S 133419.S 133419.S 133419.S

1/2" 1/2"

LEVEL LEVEL 02LEVEL LEVEL 02 02 02 22' - 22' 6" - 6" 22' 22'- -6"6"

5'-0" 5'-0"

079200.A 079200.A 079200.A 079200.A

084500.F 084500.F 084500.F 084500.F 084500.E 084500.E 084500.E 084500.E

5'-0" 5'-0"

079200.A 079200.A 079200.A 079200.A

COMMUNITY COMMUNITY COMMUNITY COMMUNITY ROOF ROOF ROOF ROOF 34' - 34' 0" - 0" 34' 34'- -0"0"

084500.A 084500.A 084500.A 084500.A

084500.F 084500.F 084500.F 084500.F 084500.E 084500.E 084500.E 084500.E

5'-0"

076200.A 076200.A 076200.A 076200.A

1/2" 1/2"

1/2" 1/2"

1/2"

1/2"

076200.A 076200.A 076200.A 076200.A

6"

2" 2"

084500.A 084500.A 084500.A 084500.A

5'-0" 5'-0"

4" 4"

5'-0"

4"4"

5'-0" 5'-0"

4"

5'-0"

4"

5'-0"

074216.A 074216.A 074216.A 074216.A

133419.S 133419.S 133419.S 133419.S

10'-0 1/4" 10'-0 1/4"

074216.A 074216.A 074216.A 074216.A

074216.A 074216.A 074216.A 074216.A

1/2" 1/2"

1/2" 1/2"

133419.S 133419.S 133419.S 133419.S

092900.A 092900.A 092900.A 092900.A COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY COMMUNITY ROOF ROOF ROOF ROOF ROOF ROOFROOF ROOF 34' - 34' 0" - 0" 34' 34'- -0"0" 34' 34'-- 0" 0"34' 34'--133419.P 0" 0" 133419.P 133419.P 133419.P

133419.S 133419.S 133419.S 133419.S

10'-0 1/4" 1/4" 10'-0

133419.S 133419.S 133419.S 133419.S

6'-0"

6'-0"

072100.C 072100.C 072100.C 072100.C

1/2" 1/2"

072100.C 072100.C 072100.C 072100.C

1/2"

092900.A 092900.A 092900.A 092900.A

10'-0 1/4" 10'-0 1/4"

092900.A 092900.A 092900.A 092900.A

4" 4" TYP TYP 4" 4" TYP TYP

4" 4" TYP TYP 4" 4" TYP TYP

10'-0 1/4"

075400.D 075400.D 075400.D 075400.D

10'-0 1/4"

075400.F 075400.F 075400.F 075400.F 133419.W 133419.W 133419.W 133419.W

075400.D 075400.D 075400.D 075400.D

1/2"

4" TYP 4" TYP 4"4" TYP TYP

075400.F 075400.F 075400.F 075400.F 133419.W 133419.W 133419.W 133419.W

077100.A 077100.A 077100.A 077100.A

061000.B 061000.B 061000.B 061000.B

4" TYP 4" TYP 4"4" TYP TYP

4"

061000.L 061000.L 061000.L 061000.L 075400.A 075400.A 075400.A 075400.A

075400.F 075400.F 075400.F 075400.F 133419.W 133419.W 133419.W 133419.W

8" 8"

061000.L 061000.L 061000.L 061000.L 075400.A 075400.A 075400.A 075400.A

075400.F 075400.F 075400.F 075400.F 133419.W 133419.W 133419.W 133419.W

5'-0" 5'-0"

5'-0" 3'-0" 3'-0"

3'-0" 3'-0"

3'-0" 3'-0"

133419.S 133419.S 133419.S 133419.S

4" 8" 4"

133419.S 133419.S 133419.S 133419.S

3'-0"

3'-0"

074216.Q 074216.Q 074216.Q 074216.Q

5'-0"

077100.A 077100.A 077100.A 077100.A 074216.Q 074216.Q 074216.Q 074216.Q

8" 8"

061000.B 061000.B 061000.B 061000.B

074216.Q 074216.Q 074216.Q 074216.Q 133419.EE 133419.EE 133419.EE 133419.EE

2' 8" 2' -- 0" 0" 8" 4" 4"

077100.A 077100.A 077100.A 077100.A

061000.B 061000.B 061000.B 061000.B

074216.Q 074216.Q 074216.Q 074216.Q 133419.EE 133419.EE 133419.EE 133419.EE 2'-9 1/4"

061000.L 061000.L 061000.L 061000.L

061000.B 061000.B 061000.B 061000.B

075400.A 075400.A 075400.A 075400.A

077100.A 077100.A 077100.A 077100.A

TOP TOP OF ROOF TOP OF TOP ROOF OF OFROOF ROOFTOP TOPOF OF TOP TOP ROOF ROOF OF OFROOF ROOF 49' - 49' 0" - 0" 49' 49'- -0"0" 49' 49'-- 0" 0"49' 49'--0" 0"

077100.A 077100.A 077100.A 077100.A

061000.L 061000.L 061000.L 061000.L

061000.B 061000.B 061000.B 061000.B

2'-9 1/4"

TOP TOP OF ROOF TOP OF TOP ROOF OF OFROOF ROOFTOP TOPOF OF TOP TOP ROOF ROOF OF OFROOF ROOF 49' - 49' 0" - 0" 49' 49'- -0"0" 49' 49'-- 0" 0"49' 49'--0" 0" 077100.A 077100.A 077100.A 077100.A

1/16" 1/16"12"1/16" 1/16" 12" 1/16" 12" 1/16" 12"

4'4'--0" 0" 4'4'--0" 0"

B ICE RINKS VOLUME ELEVATION/ SECTION

C

071326.J 071326.J 071326.J 071326.J

1/16" 1/16" 1/16" 40" 1/16" 40"1/16" 1/16" 12" 12"40" 40" 1/16" 1/16" 1/16" 12" 12" 1/16" 4" 1/16" 1/16" 4" 1/16" 1/16" 40" 4" 40" 4" 34" 40" 40" 34" 1/16" 1/16" 34" 34"4" 4" 1/16" 1/16" 1/16"1/16" 4"4" 24" 1/16" 1/16" 24" 34" 1/16" 34" 24" 1/16" 24" 34" 12" 34" 1/16" 1/16" 12" 1/16" 1/16" 1/16"12" 1/16" 12"24" 1/16" 24" 1/16" 1/16" 1/16" 1/16" 1/16" 42" 24" 24" 42" 1/16" 12" 1/16" 12" 42" 42" 1/16" 1/16" 1/16" 12" 12"1/16" 6" 1/16" 1/16" 1/16" 6" 1/16"42" 20" 42" 6"6" 20"42" 42" 20" 20" 1/16" 1/16"

C HEALTH SPONSOR VOLUME ELEVATION/ SECTION

A

A5 SOUTH ELEVATION- PANTHERS VOLUME

B

A2 NORTH ELEVATION- ICE RINK VOLUME

29

6" 6"1/16" 1/16"

6"6"20" 20"

20" 20"


PROFESSIONAL WORK

GREEN BAY PACKERS TRAINING FACILITY

GREENBAY, WISCONSIN

SCHEMATIC- CONSTRUCTION DOCUMENTATION 2022 I ROSSETTI

The addition to the Packers Football Training Facility was two-fold. The consolidation of the location of different user spaces and relationships between them create a space that the packers can call home. Maximizing daylight and direct relationships between players and staff create a facility with a united team culture and team pride. 30


GREEN BAY PACKERS TRAINING FACILITY

TEAM UNDERGROUND PARKING

GAME DAY PARKING

LAMBEAU FIELD TRAINING CAMP BICYCLE WALK

GAME DAY PARKING

TRAINING FIELDHOUSE

TEAM UNDERGROUND PARKING

OUTDOOR PRACTICE FIELDS

TRAINING CAMP FIELDS

PLAYER FAN

SERVICE

TEAM VEHICULAR VISITOR VEHICULAR SERVICE

PLAYER SHARED

STAFF/ COACHING

1,600 FT

FOOTBALL OPERATIONS COMMUNICATIONS COACHING VIDEO/ IT COACHING/ STAFF LOCKERS PLAYER POSITION MEETING ROOMS AUDITORIUM TRAINING AREAS LOUNGE/ KITCHENETTE ATRIUM LOBBY

PUBLIC

TRAINING FACILITY ADDITION

VISITOR PARKING

680 FT

31


PROFESSIONAL WORK

3

1

2

2 1

1. LOBBY/ ATRIUM 2. LOUNGE 3. COACH/ STAFF LOCKER ROOM

32


GREEN BAY PACKERS TRAINING FACILITY

33


PROFESSIONAL WORK

A

B

CA

DB

EC

FD

GE

GENERAL N ALL EXT. EX PAINTED W 099600

1

1

V

V 1' - 2" FACE OF GLAZING

A

A

B

B

C

C

D

D

E

1' - 2" FACE OF GLAZING

E

F

F

G

G

H

H

7' - 6"

088000.G

"

1' - 1 3/4" 1' - 1 3/4"

ALIGN

R

3"

055000.P SLOTTED CONNECTION

Level 01 Level061053.J 01 136' - 0" 136' - 0" 084113.D

1/2"

1' - 2 1/2" 1' - 2 1/2"

1 1/4"

061053.J

079200.C

079200.C 088000.A

079200.C 061053.A 072100.H THICKNESS VARIES

051200.L GALVANIZED 3/16" / 12"

074213.G 051200.A CHANNEL FORMED FROM WELDED PLATE SECTIONS; GALVANIZED AND PAINTED 088000.A

074213.R

084413.E

076200.A 087100.A

087100.A 076200.A

FLOOR CLOSER

087100.A 073300.L

1 1/4"

Level 01 136' - 0"

4

PER MANUFACTURER

PER MANUFACTURER

034500.C034500.C

265000.A 265000.A

034500.D034500.D

SEE DETAIL C8 / A-334 FOR CONTINUATION OF MEMBRANE

033000.J 033000.J

A4A4 Section Section @ Exterior @ Exterior StepsSteps A3 Canopy at Main Entrance

A8 SECTION @ EXTERIOR STEPS A-335

SEE DETAIL C8 / A-334 FOR CONTINUATION OF MEMBRANE

A3 SECTION @ ENTRY CANOPY

A3 Canopy at Main Entrance

SCALE:SCALE: 1 1/2" =11'-0" 1/2" REF: = 1'-0"A-051 REF: A-051 A-312 A-312

A-335

SCALE: 1 1/2" = 1'-0" REF: A-331

5

SCALE: 1 1/2" = 1'-0" REF: A-331

26.8 26.8 1' - 8" 1' - 0"

1' - 8"

1' - 0"

042000.J 042000.J

042000.G042000.G

042000.K 042000.K

5

042000.A 042000.A

072726.A 072726.A 072100.H072100.H 042000.Z 042000.Z

042000.W042000.W 4

BOTTO

099600.A

6" 1/4"

1/4"

6"

051200.L GALVANIZED

087100.A

1 1/4"

4

034500.B 034500.B

061053.C

053100.B 054000.A 072100.B

073300.L 1 1/4"

3

051200.L

061053.J

084126.A 087100.A FLOOR CLOSER

6"

084126.A 087100.A 6"

3/16" / 12"3/16" / 12"

051200.L

084413.E

2 1/2" 1/4"

2 1/2" 1/4"

3/16" / 12"3/16" / 12"

3

PNT-04 092900.A 061053.F

5 1/4"

1"

057000.H 2"X3"X1/8" STEEL ANGLE

T = 1' - 1 T3/4" = 1' - 1 3/4" 1/2"

7'

084413.E

075423.B 075423.T

146' - 1"

3

057000.H ALIGN 2"X3"X1/8"1' - 2 1/2" 1' - 2 1/2" STEEL ANGLE

8"+/-

8"+/-

2

3"

061053.J 084113.D

ALIGN BOTTOM ALIGN OF FIXTURE BOTTOM W/ OF FIXTURE W/ BRICK CRS'GBRICK CRS'G

2

061053.J 051200.L GALVANIZED

057000.F R

1' - 4 1/2"

3' - 0"

3' - 0"

265000.A 265000.A 3

079200.C 061053.A 072100.H THICKNESS VARIES

PNT-04 092900.A 061053.F

057000.F

055000.P SLOTTED CONNECTION

5 1/4"

4"

1' - 4"

R3

084413.E

061053.J 051200.L GALVANIZED

088000.G 7' - 2"

1"

"

055213.C055213.C , 1 5/8" O.D., , 1 5/8" O.D., GALV., PNT-14 GALV., PNT-14

6' - 3"

1' - 4 1/2"

1

1' - 8"

R 3"

R3

1

1' - 8"

26' - 3"

R 3"

2

042000.O042000.O

4

042000.G042000.G

042000.S 042000.S

072100.C072100.C

042000.R042000.R

230000.K 230000.K

079200.C079200.C 079200.C079200.C

HOLD FLASHING HOLD FLASHING BACK 1/4"BACK 1/4"

0'-4"

6

5 071326.A 071326.A

071326.J 071326.J

7

079200.C079200.C

Level 01 Level 01 136' - 0" 136' - 0"

047200.A 047200.A

G6G6 Mechanical Mechanical Penetration Penetration @ South @ South Ramp Ramp SCALE:SCALE: 1 1/2" =11'-0" 1/2" REF: = 1'-0"A-310 REF: A-310 A-312 A-312

7

26.8 26.8

042000.C042000.C 071326.A 071326.A , EXTEND, EXTEND ~2" ~2" ABOVE CONCRETE ABOVE CONCRETE PAVING PAVING

6

042000.A 042000.A

TEAM 072726.A072726.A 079200.A 079200.A ATRIUM 047200.A047200.A

033000.N033000.N

lity/GBT-arch.rvt

033000.C033000.C

lity/GBT-arch.rvt

6

TEAM079200.C079200.C CORRIDOR 047200.D047200.D

LOBBY CORRIDOR

SEE H6 / A-201 FOR HEIGHT

SEE H6 / A-201 FOR HEIGHT

5

1' - 3 5/8" 1' - 3 5/8"

0'-4"

042000.C042000.C 6 042000.O042000.O 076200.N076200.N 071326.F 071326.F

LOBBY

34

042000.J 042000.J 042000.K 042000.K

042000.Z 042000.Z 042000.S 042000.S 042000.R042000.R 042000.O042000.O


C3 Lobby- Detail @ AMP-01 Soffit

D3 Lobby- Detail @ Bridge 1

042000.Z 042000.O

ATRIUM LOBBY

A-403

Roof 168' - 6"

072100.H 051200.M 042000.S 146' - 0" 042000.C 042000.R 051200.K 072100.L 079200.C Drawing inspiration from the hard 265000.F 057000.F 042000.C

092900.A (BEYOND) PNT-08 051200.A (BEYOND) 8"

E5 Opening Head @ North Punched Openings Opportunity to commission

18.7 A-334

D4

16.3

4"

079200.C

230000.P

A-403

073300.LLevel092216.A 02 152' 092900.A - 0" 230000.P

073300.X

1/2"

054000.A 6"

073300.B

073300.R

265000.A 061053.F PNT-08

10' - 0"

073300.B

6"

2 1/8"

6 5/8"

092900.L BLACK

A-334

4"

047200.A 1 1/2" 051200.K 042000.Z 042000.S 042000.R 042000.O

18.7

E 4 1/2"

054000.A 8"

A-334

SCALE: 1 1/2" = 1'-0" REF: A-401

A-403

3" MAX Level 01

061053.A 057000.F 1/8" STEEL PLATE MTL-01

1' - 4"

136' - 0"

E6 Plan Detail @ Metal Panel North SCALE: 1 1/2" = 1'-0" REF: A-402

CONCEPTUAL DESIGN PACKAGE | JUNE 25, 2021

2"

042115.A

A-403

G

054000.A 8"

FLOOR FINISH PERIMETER BEYOND 092900.A

SCALE: 1 1/2" = 1'-0" REF: A-333 8 1/8"

E

C8 Plan Detail @ Gyp. Bd.

BEYOND 057300.C

F ALIGN 061053.F 057000.F MTL-01 1/8" STEEL PLATE

C

A-334 1/2"

G

054000.A

REF: A-403

042000.R

SHEET TITLE

7

136' - 8"

072726.A 072100.H 047200.D 047200.A 033000.N

Level 01 8 136' - 0"

2019-050

057000.F 1/8" STEEL PLATE MTL-01

Wall Base @ Staff Locker

SHEET TITLE

135' - 4"

Entrance SHEET #

- Pla Elevations, De

SCALE: 1 1/2" = 1'-0" 10" 092900.E 1/8" MILLWORK POST REGLET

J

Entrance - Plan, Elevations, Deta 18.7

PROJECT #

MTL-01 BEYOND

A-334

K

092900.E 1/8" MILLWORK POST TERMINATION

J8

ALIGN

A-334

REFER TO ELECTRICAL

092900.A PNT-08

A-403

E

H

2019-050 Wall Base @ Staff Locker SCALE: 1 1/2" = 1'-0"

F

SCALE: 1 1/2" = 1'-0" REF: A-402

G

35

SHEET #

A-334

K

PNT-09

H8 Atrium- Ceiling Transition LV01 Office Corr. A-403

SCALE: 1 1/2" = 1'-0" REF: A-402

H

EXISITNG LAMBEAU LINK

057000.F MTL-01 1/8" STEEL PLATE

057000 2"x3"x1/8" STEEL ANGLE

J

F8 Atrium- Ceiling Transition LV01 Mtg. Corr.

SCALE: 1 1/2" = 1'-0" REF: A-121

D

J8

SCALE: 1 1/2" = 1'-0" REF: A-333 EXIT SIGN,

1 1/2"

092900.M MWPT12550

PROJECT #

057000 2"x3"x1/8" STEEL ANGLE MTL -01

E8 Plan Detail- Stair Door Jamb A-403

SCALE: 1 1/2" = 1'-0" REF: A-401

079200.A 054000.C

PNT-09

1 1/2"

1/8" TYP.

8

G8 Base and Sill @ Stair Egress

4 1/2"

135' - 4"

SCALE: 3" = 1'-0"

061053.F

A-334

H

KEY PLAN 2 1/2" TYP.

Level 01

3' - 0" O.C. 136' - 0" TYP.

1 1/2" 051200.K GALVANIZED 047200.A 042000.S

H6

5 7/8"

057000.F MTL-01 1/8" STEEL PLATE

6 098436.A

047200.D 047200.A

A-403

Level 01 136' - 0"

SCALE: 1 1/2" = 1'-0" REF: A-333

F 061053.A

061053.G 055000.M MTL -01

1' - 4 7/8"

A-403

A-334

KEY PLAN

2 1/2" 033000.N TYP.

THIS PACKAGE IS FOR CONCEPT ONLY | NOT FOR FABRICATION 18.7

DOOR THRESHOLD AND ANCHOR SYSTEM

G8 Base and Sill @ Stair Egress

138' - 0" 12" O.C. TYP.

10"

079200.A 081113.B

6

H6 Atrium - Bridge Ceiling MTL-01 Plate Detail

SCALE: 1 1/2" = 1'-0" REF: A-401

084413.M

042000.A 042000.D 042000.J

5

146' - 0"

042000.Z 047200.A 072726.A 042000.S 042000.O 072100.H 7 SCALE: 1 1/2" =042000.S 1'-0" REF: A-121 042000.R 136' - 8" 042000.R COUNTERSUNK 072726.A 072100.C CREWS TYP. 138' - 0" 072100.H

057000.F MTL -01 092900.M MWP12550

F6 Atrium- Ceiling Transition LV02

088000.AA-403

1 Construction Documen

061053.A 1 1/2" 092216.C 1/4" STEEL PLATE MTL-01 051200.K GALVANIZED

042115.A

DOORPNT-01 THRESHOLD AND 092900.B ANCHOR SYSTEM

SCALE: 1 1/2" = 1'-0"

# DESCRIPTION

1' - 2"

H5 Section @ Projection Wall

088000.A

11 3/8" FACE OF GLAZING

061053.F 057000.F 1/8" STEEL PLATE MTL-01

E8 Wall Base @ North Window Opening

8 Section @ Atrium Frame

042000.A

16.3

A-403

SCALE: 1 1/2" = 1'-0" REF:

PROVIDE COUNTER SUNK FASTENER

092900.A

072100.H

079200.C 042000.C 042000.G 072100.H 072726.A 042000.K 042000.A 042000.Z 072726.A 042000.O 072100.H 042000.S 042000.R A-333 072100.C

O.4 1' - 2"

084413.M

092900.A 042115.A 042000.E Level 01 054000.A 136' - 0" 8"

A-334

092216.A 6"

072100.C © 2020 ROSSETTI 033000.D Level 02 152' - 0"

Niche Header @ Staff Locker

PNT-08

G6 Wall Transition @ Level 02

4 1/2"

1/2" = 1'-0" REF:

042000.C

2' - 3 1/2" FACE OF BRICK

047200.B 042000.A 138' - 0" 072726.A

J5

092900.A PNT-08

5

Niche Header @ Staff Locker

098436.B CONCEAL FASTENER

047200.D 047200.C 072100.L 042000.O 055000.J 051200.K

1265 Lombard Green Bay, W

146' - 0"

079200.A 042000.K 042000.A 042000.O 042000.S 054000.N 072100.L 051200.M 042000.R 054000.A 6" A-333 051200.K

O.4

072100.H 072726.A

047200.A

SCALE: 1 1/2" = 1'-0" REF: A-402 A-334 A-403 SCALE: 1 1/2" = 1'-0" REF: A-333

Level 01 136' - 0"

B

SCALE: 1 1/2" = 1'-0"

11 3/8" FACE OF GLAZING

E8C7 Detail Metal Panel Opening WallPlan Base @@ North Window

054000.A 6"

FACE OF THIN BRICK (BEYOND)

1 1/2"

16.3

061053.G 136' - 8" 057000.F 8 1/8" 6 5/8" MTL-01 EXPERIENTIAL GRAPHIC DESIGN AND ACTIVATION | 042000.A 057000.H GREEN BAY PACKERS TEAM FACILITY | 2019_050 072726.A 2"x3"x1/8" STEEL ANGLE 265000.A 072100.H REF: LIGHTING 061053.F 042000.E 092900.A 057000.F 054000.A Level 01 1/8" STEEL PLATE 6" 136' - 0" MTL-01

8 1/2"

073300.K

D

A-334

A-334

061053.A 092900.B 057000.H 4"x3"x1/4" SCALE: 1 STEEL ANGLE MTL -01

6"

MTL-01

6' - 0"

073300.C

057000.H 073300.X 2"x3"x1/8" 073300.B STEEL ANGLE MTL- 01 073300.B

PNT-01

1 7/8"

073300.L

10 1/4"

18.7

G6 Wall Transition @ Level 02

E8 WALL SECTION @ NORTH WINDOW OPENING

Level 01 073300.R 136' - 0"

230000.Z 073300.K 033000.C 033000.N

D

2' - 3 1/2" FACE OF BRICK

051200.L

054000.A 6"

22

5"

MTL-01 073300.B (BEYOND) 076200.A

2 3/8"

055000.J

J5

F5 Lobby-Bridge Detail 2

PER MANUFACTURER

6"

2" x 2" x 1/8" STEEL TEE MTL-01

4 1/2"

8 1/2"

073300.C 061053.A 073300.B 079200.C 054000.R

057000.F MTL-01 061053.F

088000.G6 5/8" 2 1/8" 084413.E 042000.V 072100.C 047200.B 138' - 0" 057000.J

042115.A

054000.A 8"

087100.A

051200.K

illuminated light sculpture.

6"

18.7

084126.A

079200.C 042000.R 042000.C 042000.G 072100.H 042000.C 072726.A

1' - 2"

Level 02 152' - 0"

047200.D 042000.A TZ-02 047200.C 1 1/2" 072726.A 072100.L 072100.H Level 01 042000.O 136' - 0" 042000.S 055000.J 042000.C 051200.K 042000.G 042000.C 042000.R 072100.H 079200.C Level 02 072726.A - 0" 1152' 1/2" = 1'-0" REF: A-401 A-403 SCALE: 042000.A

CPT-06B Level 01 136' - 0"

2' - 0 3/4"

1/2"

084413.E

SCALE: 1 1/2" = 1'-0" REF: A-402

079200.C

2' - 0" FACE OF BRICK

REF: A-401 042000.W

1 1/2" 061053.C 051200.K 1' - 2" GLAZING JOINT 1' - 2 7/8" 057000.H 042000.Z FACE OF GLAZING FACE OF CAST STONE 2" X 3" X 1/8" SEALANT, BLACK 042000.S 092900.G STEEL ANGLE 042000.R 088000.G 092900.J MTL-01 084413.E 042000.O MTL-01 BEYOND 042000.V 136' - 8" 072100.C

C6 Plan Detail @ Interior Glazing

076200.A 230000.Z 057000.F 1/8" STEEL 033000.C PLATE 088000.G MTL -01033000.N

ce

3

16.3

5"

Level 01 136' - 0"

079200.C

11 3/4"

042000.R

@ Frame Base

4"

4 1/2"

092216.A 092900.A

079200.C

061053.G 057000.F 1/8" STEEL PLATE MTL-01

SCALE: 1 1/2" = 1'-0" REF: A-333

061053.A

8' - 6 1/8"

7 1/4"

1'042115.A - 2 7/8" Possibly internally FACE OF CAST STONE

E5 Opening Head @ North Punched Openings

092900.H A-334 092900.K 054000.A 092900.A

088000.G 084413.E

SCALE: 3" = 1'-0"

2"

1 1/2"

2"

098436.A 051200.A 8" 054000.D 042115.A 057000.F MTL -01 1/8" STEEL PLATE

A-403

▪ Acrylic or glass

1'1'--2" 2" FACE FACEOF OFGLAZING GLAZING 1' - 7 1/8"

- 0"

3" TYP.

MTL-01

6" TYP.

1"

Materiality SCALE: 1 1/2" = 1'-0" REF: A-333 084413.E ▪ Blackened steel (in keeping with stair and wall 054000.A Atrium- Detail 8" panel details) 088000.G 4 1/2"

2"

095123.B

072100.L 2" local artists. 079200.C 265000.F

051200.L

RAILING 042000.S

2' - 0"

8"+/-

095133.C

wall 1/2"

4"

The art piece could be sculpture of ceiling hung pendants. 051200.K

042000.O 042000.S 072726.A 072100.L 042000.K 051200.M 042000.S 042000.R 051200.K 042000.C

042000.A 057000.H 072726.A STEEL ANGLE 072100.H TO MATCH

1' - 3 7/8" FACE OF CMU

055000.J

O.4

042000.C 042000.G

061053.A

FLOOR FINISH hung PER SCHEDULE

SCALE: 1 1/2" = 1'-0"

PROVIDE COUNTERSUNK SCREWS, TYP

054000.D 061053.J 084113.D

057000.H 2"x3"x1/8" STEEL ANGLE

Wall Parapet @ Staff Locker

054000.A 6"

092900.B 16.3

051200.K

051200.M 146' - 0"a utilized as either

A-334

042000.A

SCALE: 1 1/2" = 1'-0"

1' - 4"

1/4"

AIR TRANSFER AREA 2' - 9"

042000.W 042000.R

GRAPHIC DESIGN SUGGESTIONS

J3

072726.A

G4 Top of Wall @ Mech Screen

Concept: work and preparation done not only on the field but in MTL -01 the film rooms, on061053.F the marker boards, and in the 042000.Z 084413.E 092900.L playbooks the 3D sculpture is 042000.O intended as an abstract 088000.G representation great plays in Packers history. 042000.W 1' - 2" FACE OF GLAZING

072100.H

1' - 3 7/8" FACE OF CMU

A-334

O.4

054000.E

042000.C

FACE OF BRICK

042000.A 042000.W A-403 SCALE: 1 1/2" = 1'-0" REF: A-401 072726.A 042000.R

SCALE: 1 1/2" = 1'-0" REF: A-331

047200.D 042000.K

092900.A PNT- 08 ON GYP BD. 2' - 0"

16.3

SCALE: 1 1/2" = 1'-0" 092900.B

4"

FACE OF BRICK

1' - 4"

FACE OF CMU (12")

CONSULTANT

CONCRETE SUSPENDED SLAB CONCRETE MASONRY UNIT MORTAR STEEL REINFORCEMENT BAR THIN BRICK VENEER STRUCTURAL STEEL FRAMING 3 COLD FORMED METAL FRAMING SYSTEM STEEL TRACK STEEL BOX HEADER FURRING CHANNEL BRACING CONSULTANT ANCHOR CLIP LevelPLATE 02 STEEL 152' - 0" METAL DECORATIVE SOLID METAL PLATE PERFORATED METAL STEEL ANGLE STEEL T BAR STEEL ANGLE PROFESSIONAL SEAL WOOD BLOCKING PRESERVATIVE-TREATED WOOD BLOCKING 3 PRESERVATIVE-TREATED PLYWOOD PLYWOOD SHIM MINERAL-WOOL BATT INSULATION JOINT SEALANT HOLLOW METAL DOOR FRAME BENT ALUMINUM TRIM STOREFRONT MULLION 4 INTERIOR ALL-GLASS ENTRANCE SYSTEM DOOR HARDWARE-SEE DOOR SCHEDULE NON-STRUCTURAL METAL FRAMING STEEL RUNNER TYPE X GYPSUM BOARD (U.N.O.) PROFESSIONAL SE METAL BEADED EDGE TRIM EXTRUDED ALUMINUM TRIM ACOUSTICAL SEALANT MULLION MATE BRAKE FORMED MULLION MATE END CAP © 2020 ROSSETTI GASKET WITH ADHESIVE ON BOTH SIDES FLUSH ALUMINUM BASE REGLECT REVEAL/JOINT # DESCRIPTION CEILING GRID SYSTEM (HEAVY DUTY) 1 Construction Documents ACOUSTICAL4BACKING CARPET TRANSITION (REFER TO TRANSITION DE ACOUSTICAL METAL PANEL CEILING SYSTEM ACOUSTICAL METAL PANEL WALL SYSTEM SPOT DIFFUSER LIGHT FIXTURE

Wall Parapet @ Staff Locker

042000.G

061053.F

057000.F SCALE: 1 1/2" = 1'-0" MT-01 1/8" STEEL PLATE

042000.C 7 3/8" 8" C3 WALL SECTION @1' - ATRIUM CEILING EDGE

A-334

2"

G4 Top of Wall @ Mech Screen A-334

J3

075423.S 053100.B

9' - 6"

16.3

R

075423.D 072100.B 075423.M

079200.C

057000 2"x1"x1/8" STEEL ANGLE

057000.F MTL-01 1/8" STEEL PLATE

057300.C

5 3/8"

1 5/8"

1"

061053.F

072100.H 042000.S 042000.C 042000.R

098436.A 098436.B PNT-08

1' - 11 5/8"

SCALE: 1 1/2" = 1'-0"

033000.D 042000.A 042000.D 042000.J 042115.A 047200.D 051200.A 054000.A 054000.C 054000.D 042000.E 054000.E 054000.N 054000.R 055000.M 057000 057000.F 042000.G 047200.B 057000.G 057000.H 042000.K 079200.C 057000.J 042000.C 057300.C 072100.H 061053.A 047200.D 072726.A 061053.C 042000.A 061053.F 061053.G 061053.J 042000.E 072100.C 079200.A 081113.B 081118.G 084113.D 084126.A 042000.G 087100.A 092216.A 042000.K 092216.C 042000.C 092900.A 072100.H 092900.B 072726.A 092900.E 072726.A 042000.A 042000.K 092900.G 092900.H 042000.S 092900.J 092900.K 042000.C 092900.L 092900.M 042000.R 095123.B 095133.C 096813.B 042000.C 098436.A 098436.B 079200.A 230000.T 265000.A

O.4

075423.T

042000.A 061053.F

092900.M 1/8" MILLWORK POST TERMINATION

042000.A 3" 072726.A MAX.

4 3/4"

1' - 0"

098436.A 061053.F 057000.F MTL-01

047200.B

079200.C

075423.B

057000.F MTL-01

J

Level 02

2 - 0" MATERIAL152' KEYNOTES

095133.C

075423.G

051200.L 054000.A 042000.G 051200.G 047200.D 076200.A 042000.K 047200.B 042000.C Mechanical Roof 072100.H 186' - 0" 072726.A WD-03

088000.G 8" FACE OF BRICK

ALIGN 6" TYP.

2"

057300.C

C2 Top of Curtain Wall @ North Wall

P

4 3/4"

057000.F MTL-01 079200.C

H

P

076200.B 075423.S 053100.B 075423.E

061053.C

075423.B 079200.C 061600.A

084413.E

1' - 7 3/8" 1' - 6"(12") FACE OF CMU FACE OF GLAZING

A-334

187' - 0" VIF

172' - 3"

5 3/8"

057000.F MTL-01

075423.D 072100.B 075423.M

089119.C 047200.B 187' - 7 1/2" MechanicalVIF Roof 186' - 0" 077200.E

5/8"

EQ

ALIGN

16.3

042000.S 042000.R

2' - 2" MTL-01

16.3

7 3/4"

EQ

SCALE: 1 1/2" = 1'-0"

MAX.

075423.T

051200.G 076200.A

1' - 4"

042000.O

MTL-02

075423.G 3"

051200.L 054000.A

O.4

1' - 4"

1' - 4"

1' - 6" OVERLAPPING MTL-01/02

A-334

PNT-09 095133.C 095123.B

075423.B 061600.A

187' - 0" VIF

084413.E 047200.A 088000.G 042000.Z

C2 Top of Curtain Wall @ North Wall

265000.A REF: LIGHTING

Level 02 152' - 0"

079200.C

1' - 6" FACE OF GLAZING

T CHANICAL

051200.M 053100.B 054000.A

Green Packer Facility

1265 Lombardi A Green Bay, WI 5

1' - 4"

E 16.3

6"

PROJECT

4"

3"

042000.Z 061600.A 072726.A 042000.O 072100.B 042000.S 042000.C 042000.R 072100.B 057000.G 054000.A MTL-02 172' - 3" 042000.G

5/8"

047200.A D

VAPOR RETARDER FOAM BACKER ROD CUT EDGE SEALANT ROOF INSULATION G SUBSTRATE BOARD COVER BOARD PREFINISHED SHEET METAL CONTINUOUSFLASHING Level 02 076200.B COUNTER FLASHING 076200.B 152' - 0" 077200.E SHIP'S LADDER 075423.E 079200.A JOINT SEALANT 057000.G 075423.B

3' - 8" MTL-01

2' - 0" FACE OF BRICK

265000.F

1

SEAM PLATE GREEN BAY PACKERS TRAINING FACILITY TPO ROOFING MEMBRANE

9'-0"'

C

16.3

092216.A 092900.A 230000.A 230000.P 230000.Z

073300.X 075423.B 075423.D 075423.E 075423.G 075423.M 096813.B 075423.S 075423.T 057000.H 076200.A MTL-01

1/2"

16.3 B

042000.Z 047200.A 047200.B 047200.C 047200.D 051200.G 051200.J 051200.K 051200.L

OPERABLE DOOR UNIT DOOR GLAZING VISION GLASS, GT-1 1" INSULATED GLAZING UNIT SIGHTPROOF EXTERIOR LOUVER SCREEN NON-STRUCTURAL METAL FRAMING TYPE X GYPSUM BOARD (U.N.O.) 2 HVAC EQUIPMENT RADIANT HEAT UNIT SNOW MELT SYSTEM, SEE SHEET M-201 FOR EXTENTS LED STRIP LIGHT (CONCEALED)

ALIGN

042000.C 072100.B 054000.A 042000.G

073300.C 076200.B 073300.K 077200.E 073300.L 079200.A 073300.R

084413.M 088000.A 088000.D 088000.G 089119.C

4" TYP.

042000.R 051200.M 042000.S 053100.B 042000.V 054000.A 042000.W

GLASS-MAT GYPSUM SHEATHING TPO ROOFING MEMBRANE GLASS-FIBER BATT INSULATION VAPOR RETARDER MINERAL-WOOL BATT INSULATION FOAM BACKER ROD RIGID INSULATION CUT EDGE SEALANT THERMAL BREAK MATERIAL ROOF INSULATION FLUID-APPLIED MEMBRANE SUBSTRATE BOARD AIR/VAPOR BARRIER COVER BOARD FULLY ADHERED EPDM ROOFING PREFINISHED SHEET METAL MEMBRANE FLASHING ROOF INSULATION COUNTER VAPORFLASHING RETARDER SHIP'S LADDER FLASHING MEMBRANE JOINT SEALANT COVER BOARD

ALIGN

061600.A 072726.A 072100.B

061600.A 075423.B 072100.B 075423.D 072100.C 075423.E 072100.H 075423.G 072100.L 075423.M 072726.A 075423.S 075423.T 073300.B 076200.A

1' - 8" OVERLAPING MTL 01/02

2' - 0" FACE OF BRICK

CONCRETE MASONRY UNIT CAST STONE TRIM FACE BRICK CAST STONE SILL GROUT CAST STONE ANCHOR VENEER ANCHOR STEEL CHANNEL HORIZONTAL MASONRY JOINT STEEL BENT PLATE REINFORCEMENT STEEL ANGLE COPPER-LAMINATED FLASHING WITH STEEL HOLLOW STRUCTURAL S.S. DRIP EDGE SECTION CELL (HSS) VENT BOLT CONNECTION CAVITY DRAINAGE MATERIAL STEEL ROOF DECK THERMAL BREAK COLD FORMEDLINTEL, METAL FRAMING MASONRY GROUT SOLID SYSTEM TERMINATION BAR CAST STONE PANEL CAST STONE TRIM CAST STONE SILL CAST STONE ANCHOR STEEL CHANNEL STEEL BENT PLATE F STEEL ANGLE ALIGN TOP OF STEEL ANGLE STEEL STRUCTURAL (CONT.) W/ TOPHOLLOW OF SLAB SECTION (HSS) ALIGN089119.C 187' - 7 1/2" BOLT CONNECTION VIF STEEL ROOF DECK COLD FORMED METAL 077200.E FRAMING SYSTEM 061053.C

1' - 8" MTL-01

042000.A 047200.B 042000.C 047200.C 042000.E 047200.D 042000.G 051200.G 042000.K 051200.J 051200.K 042000.O 051200.L

2' - 0"

16.3

J


PROFESSIONAL WORK

ATRIUM

SECTION

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

J

K

MATERIAL KEYNOTES

TUAL DESIGN PACKAGE | JUNE 25, 2021

THIS PACKAGE IS FOR CONCEPT ONLY | NOT FOR FABRICATION

1

1

081118.A 084126.A 092900.A 092900.L MATERIAL 099123 081118.A 265000.A 084126.A 092900.A 092900.L 099123 O.4 265000.A

A8

V

L

A-403

265000.A REF: LIGHTING

A-403

M

F6

N

N.6

N.9

O

AMP-01

J INTERIOR ALUMINUM STOREFRONT SYSTEM INTERIOR ALL-GLASS ENTRANCE SYSTEM TYPE X GYPSUM BOARD (U.N.O.) FLUSH ALUMINUM BASE KEYNOTES INTERIOR PAINTING INTERIOR ALUMINUM STOREFRONT SYSTEM LIGHT FIXTURE INTERIOR ALL-GLASS ENTRANCE SYSTEM TYPE X GYPSUM BOARD (U.N.O.) FLUSH ALUMINUM BASE INTERIOR PAINTING P.1 LIGHT FIXTURE

K

1

PROJECT 1

P

A8

V

L

A-403

265000.A REF: LIGHTING D4 A-419

A-403

M

F6

N

N.6

N.9

O

O.4

AMP-01

P.1

P

265000.A REF: LIGHTING AMP-02

8' - 6"

081118.A

081118.A

081118.A

EQ 081118.A EQ

8' - 6"

D

E

7' - 0"

CENTER ON EQMIDDLE OF EQ OPENING MTL-01 TYP. CENTER ON MIDDLE OF OPENING

7' - 0"

1

F

9' - 0"

A-402

C6

A-403

D3

A-403

D3

H8

A-403

A-403

265000.A BEYOND, TYP. 1' - 6"

3' - 0"

1' - 9"

1' - 3"

3' - 0"

3' - 0"

16.3

D3

A-403 9' - 10 1/2" LANDING

A-403

3' - 0" TYP.

D8

A-404

A-433

PNT-01

PNT-01 3' - 0"

1' - 6"

9' - 0"

PNT-01

1' - 9"

1' - 3"

PNT-01

3' OPEN - 0" TO 3' - 0" BEYOND

P

ALL STEEL EDGES TO 2' - 10" BE GRINDED SMOOTH, TYP

P.1

5' - 4"

1' - 6"

PNT-01

C8

A-403

081118.A EQ

081118.A EQ

J

P

D4

PNT-01

OPEN TO BEYOND

A-491

4' - 0"

SEE PLAN

SEE PLAN

5' - 2"

PNT-01

A-403 C8 A-403

7' - 8"

6' - 6"

D4

O.4

P.1

MTL-02 BEYOND 5' - 8"

1' - 6"

O

O.4

Level 02 152' - 0"

K2

3' - 0"

Level 02 152' - 0"

3' - 0" TYP.

MATERIAL KEYNOTES

CENTER ON EQ MIDDLE OFEQ OPENING 033000.P 051200.C 3' - 0" F8 054000.A A-403 055113.B CENTER ON MIDDLE OF 055113.D OPENING 055213.C 057000.F F8 057000.G A-403 057000.H 057300.C 061053.C 061053.D OPEN TO 078100.A BEYOND 084126.A 092900.A 096813.B

EQ CONCRETE FILL STEEL BEAM MTL-01 COLD FORMED METAL FRAMING SYSTEM 3' - 0" METAL STAIR PAN TYP. STEEL STAIR SUPPORT STEEL PIPE/TUBE RAIL SOLID METAL PLATE MTL-01 PERFORATED METAL STEEL ANGLE STEEL ANGLE PRESERVATIVE-TREATED WOOD BLOCKING WOOD FRAMING PNT-01 PNT-01 CONCEALED CEMENTITIOUS SPRAYED FIRE-RESISTIVE MATERIAL INTERIOR ALL-GLASS ENTRANCE SYSTEM TYPE X GYPSUM BOARD (U.N.O.) CARPET TRANSITION (REFER TO TRANSITION DETAILS)

PNT-01

OPEN TO BEYOND

A-1G1

10' - 8"

4' - 0"

O

E8

N.9

A-491

N.9

N.6

SEE PLAN

SEE PLAN

5' - 2"

7' - 8" AMP-01 PNT-08

18.7

N.6

F2 Lobby Stair- Section 2

N

6' - 6" PER GRAPHICS SCOPE

A-404

SCALE: 1/4" = 1'-0"

SEE PLAN

3' - 4"

SEE PLAN

7' - 0"

M

C3

10' - 8"

A-403

16.3

N

092900.A PNT-01 TYP.

3' - 4"

M

AMP-01 PNT-08

A-403

PER GRAPHICS SCOPE

L

7' - 0"

C3

L

3' - 4"

H5

PROJECT

A-402 9' - 4"

J4 A-402

8' - 8"

EQ

MTL-01 TYP.

SCALE: 1/4" = 1'-0"

1 1/2" TYP. 1 1/2" TYP.

MTL-01 MTL-02

2' - 8"

3' - 0" TYP.

ALIGN

A-402 MTL-01

MTL-01

PNT-01

MTL-01 MTL-01

MTL-01

2' - 8"

PNT-01

9' - 4"

0" 5'3'--0" TYP.

9' - 4"

092900.A PNT-01 TYP. 092900.L

E3

A-401

7' - 0"

092900.A PNT-01 TYP. 092900.L

2' - 2" Level 01 136' - 0"

7' - 4"

3' - 4"

2' - 2"

7' - 4"

3' - 4"

3' - 4" 18.7

A-404

3' - 0" TYP.

7' - 0"

SCALE: 1 1/2" = 1'-0"

1 Construction Doc

1 Construction Doc

MTL-01 5

PROFESSIONAL SEAL

MTL-01 1/2" REVEAL BETWEEN MTL-01 PLATES

BR-01

F3

PNT-08 ON GYP BEHIND MTL-01 EQ EQ EQ 1/2" REVEAL BETWEEN MTL-01 PLATES

EQ

EQ

EQ

H5

A-403

AMP-01

D4

18.7

A-404

16.3

AMP-01

1 1/2" TYP.

Level 02 152' - 0"

Level 02 152' - 0" 3' - 10"

9' - 6"

092900.A PNT-01 AT PROJECTION AREA

9' - 0"1' - 10 1/2"

Level 02 152' - 0"

FINISH FLOOR PER SCHEDULE

D3

A-403

2' - 8 1/2" +/-

D3

A-403

E6

A-403

MTL-02 MTL-01

MTL-01 MTL-01

MTL- 01 PLATE

16' - 10"

1' - 7" 6"

6" 1' - 7"

OPEN TO 16' - 10" BEYOND

1' - 7" 6"

OPEN TO BEYOND

MTL-02 3' - 0" TYP.

MTL- 01 Level 02 PLATE 152' - 0"

057300.C MTL-01 055213.C HANDRAIL, MTL-01

6" 1' - 7"

Level 01 136' - 0"

ALIGN TOP OF STEEL ANGLE (CONT.) 3' -W/ 0"TOP OF SLAB

ALIGN TYP.

6"

092900.A PNT-01 AT PROJECTION AREA

4"

1' - 10 1/2"9' - 6"

1' - 6" 1 1/2" TYP.

A8 Partial Metal Panel Elevation

9' - 0"

1 1/2" TYP.

7' - 9 3/8"

1 1/2" TYP.

COUNTERSUNK SCREWS, TYP.

1 1/2" TYP.

2' - 8 1/2" +/-

E6

A-403

1' - 1 1/2"

36

051200.C 078100.A

MTL-01

REFER TO DOOR SCHEDULE

2' - 6 1/2"

2' - 6 1/2"

057000.G MTL-02

J4 A-404

SEE A-404

A-402

Level 01

Level 01

Atrium Elevation Looking North 136' - 0" 136' - 0" SCALE: 1/4" = 1'-0"

Atrium - North Elevation Copy 1 © 2020 ROSSETTI SCALE: 1/4" = 1'-0" Atrium Elevation Looking North

J5

6

# DESCRIPTION SCALE: 1/4" = 1'-0"

DATE

1 Construction Documents

09/30/2021

6

SEE F5/A-403 FOR SUPPORT AND BLOCKING FLOOR FINISH PER SCHEDULE SEE F5/A-403 FOR SUPPORT AND BLOCKING

3"X3"X1/4" STEEL T

MTL - 02

Level 01 136' - 0"

4

J5 A-402

3"X3"X1/4" STEEL T

096813.B 057300.C MTL-01 CONTINUOUS

MTL-01 SEE A-404

084126.A

MTL - 02 AMP-03 PNT-08

COUNTERSUNK SCREWS, TYP.

SCALE: 1/4" = 1'-0"

AMP-03 PNT-08

5 084126.A

BR-01 AT WALL BEYOND PNT-08 ON GYP. AT WALL BEYOND 084126.A BR-01 AT WALL BEYOND PNT-08 ON GYP. AT WALL BEYOND

F4 Lobby - West Elevation

092900.L

18.7 H5

A-403

EQ

Level 01 136' - 0"

18.7

8' - 0" LANDING

EQ

084126.A

MTL-02

A-401

F8

A-404

F3

PNT-08 ON GYP. AT WALL BEYOND

A-403

© 2020 ROSSETTI

# DESCRIPTIO

3' - 0" TYP.

092900.L PNT-08 ON GYP. AT WALL BEYOND

D4 Section @ Lobby Stair Base

© 2020 ROSSETTI

Level 02 152' - 0"

# DESCRIPTIO

Level 02 152' - 0"

PNT-01

084126.A 3' - 4"

Level 02 152' - 0" 3

Level 02 152' - 0"

PNT-08 ON GYP BEHIND MTL-01

BR-01

A8

3' - 0" MTL -02

EQ EQ EQ

ty/GBT-arch.rvt rs Team Facility/GBT-arch.rvt

4

F5

A-401

5' - 0"

7

8

MTL-01 MTL-02 MTL-02

A-402

EQ

8 Risers @ 6.85" = 4' - 0" 20 Risers @ 6.85" = 12' - 0"

D4

A-404

PNT-01

PROFESSIONAL

V

A-403

MTL-01

PNT-01

7

6

MTL-01

E6

A-403

A8

REF: A-331

MTL-02

3' - 0"

HANDRAIL (BEHIND)

KEY PLAN

5

FLOOR FINISH PER SCHEDULE

Level 02 152' - 0"

KEY PLAN

Level 02

057300.C 152' - 0" 6" LONG STEEL ANGLE CENTERED ON STEEL T BAR Level 02 152' - 0"

ALIGN CEILING SEAM TO CENTER BALLUSTER , TYP. SEE R.C.P HANDRAIL SUPPORT 057000.G 1/2" REVEAL MOUNTED ALIGN CEILING BETWEEN MTL-01 DIRECTLY ONTO CENTER SEAM PLATES STEEL BALLUSTER TEE, , TYP. MTL-01SEE R.C.P PNT-08 ON GYP 054000.A BEHIND MTL-01 6" 1/2" REVEAL BETWEEN MTL-01 057000.F 084126.A PLATES MTL -01 057300.C PNT-08 ON GYP 3"x2"x1/4" BEHIND MTL-01 STEEL ANGLE

3" MAX.

7

7

1/8" SOLID STEEL PLATE MTL-01

1/8" SOLID STEEL PLATE 3"X2"X1/4" MTL-01 STEEL ANGLE MTL-01

3"X2"X1/4" STEEL ANGLE MTL-01

055213.C HANDRAIL, MTL-01

STL. BM (BELOW)

3/4" PLYWOOD 1/8"SOLID STEEL PLATE MTL-01

6"

3 7/8"

1 1/2" TYP. 20 THREADS @ 11.125"= 18' - 6 1/2"

MTL-01 MTL-01 BEYOND PNT-01

MTL-01

B ELEVATION ATRIUM NORTH 5

CENTER ON MTL-01OF MIDDLE OPENING

EXIT

092900.L

6

EQ

E6

A-403

PROFESSIONAL

Atrium Elevation Looking South

F5

F5

3

01 Atrium Elevation Looking South Level 136' - 0" 2 1265 092900.L Avenue SCALE: 1/4" = 1'-0" REF:Lombardi A-331 5' - 0" V Green Bay, WI 54304

A-403 A-403

265000.A BEYOND,

092900.L

6

EQ

A-491

3' - 0"

Level 01 136' - 0"

092900.L

ALIGN

265000.A BEYOND,

PNT-01

5' - 0"

6"

4

EQ

3' - 2" MTL- 02

PNT-01

A-403

A-404

A-404 MTL-02

3' - 10" OVERLAPPING MTL-01/02

1' - 10 3/4"

PNT-01

E8

PNT-01

MTL-01

9' - 0"

061053.C 5 061053.D

057000.F MTL-01

MTL-01 ALL EXPOSED STEEL, TYP

EXIT

054000.A 055213.C HANDRAIL, MTL-01

3' - 0" MTL-01 TYP. TYP.

7' - 0"

5

EQ

3' - 0" 055113.B EQCENTER ONEQ MIDDLE033000.P OF OPENING

EQ

9' - 0"

3' - 0"

TOP OF STRINGER (CANT'D)

PNT-01

CARD READER

CONSULTANT

3

4

A8

7' - 0"

3

EQ

PNT-01

C3

B6

F8

A8

ALIGN 8' - 8"

EQ

WD-02 057000.G MTL-02 3' - 0" EQTYP.

CARD READER

CONSULTANT

A-403 A-491 3' - 0" TYP.

1265 Lomb Green Bay, CONSULTANT

MTL-01 PLATE AB-01

A-403

E8

PNT-01

MTL-01

Level 02 152' - 0"

1265 Lomb Green Bay,

Green Bay Packers Team Facility

AMP-01 PNT-01

4

MTL-01 PLATE AB-01

1

9' - 4"

J4

2

A-403

EQ

PNT-01

3' - 4"

K2

A-1G1

4

WD-02

2

H5 MTL-01 A-403

EQ

K

E8

5' - 8"

A-403

092900.L 099123 PNT-01 TYP. 092900.A PNT-01 TYP.

7' - 8"

PNT-01

2' - 9 3/8" TYP.

092900.L 099123 PNT-01 TYP.

A ELEVATION ATRIUM SOUTH

2

A-403

D3

SIM

A4

265000.A BEYOND, TYP. 2"x3"x1/4" STEEL TEE, MTL-01

7' - 8"

D3

C7

1' - 0" 6 THREADS @ 11.125"= 5' 6 3/4" C7 A-403

A-402

5' - 4"

3"x3"x1/4" STEEL ANGLE, MTL-01

EQ

H

A-403 (REFER TO STRUCT.)

A8

3"x2"x1/4" STEEL 2' - 10" ANGLE, MTL-01

MTL-01

AMP-02 081118.A G

MTL-01

D3

H8

A-403

MTL-01 TYP.

A8

3

081118.A

A-403

2

3

081118.A

081118.A

C

7 RISERS @ 6.85 = 4' - 0"

B

081118.A

A-403

MTL-01

ALIGN

A

081118.A

C6

D4

A-419

2

Green Packe Green Facili Packe Facili PROJECT

265000.A REF: LIGHTING

1/8" MILLWORK 3/4" PLYWOOD POST REGLET 1/8"SOLID STEEL PLATE MTL-01

(REFER TO STRUC)

SHEET TITLE

6

Lobby - Ele

FLOOR FINISH PER SCHEDULE EOS

SHEET TITLE

GUARDRAIL STRINGER

Lobby - Ele 8


EQ

ALIGN 1 5/8"

1"

6" TYP.

098436.A 061053.F 057000.F MTL-01

PAINT EXPOSED PNT-09

C6

A-403

1' - 6" OVERLAPPING MTL-01/02

MTL-01 TYP.

MTL-01

D3

D3

H8

D3

A-403

A-403

A-403

C7

OPENING

A-403

MTL-01

F8

A-403

265000.A BEYOND, TYP. 1' - 6"

3' - 0"

1' - 9"

1' - 3"

3' - 0"

4

3' - 0"

A8

A-402

N.9

O

1' - 1 3/8"

A-403 MTL-01

PNT-01

PNT-01

SEE PLAN

7' - 0"

2' - 2"

SEE PLAN

5' - 2"

7' - 4"

D4

A-403

3' - 4"

7' - 8"

6' - 6"

D3 Lobby- Detail @ Bridge 1

18.7

01 Soffit

H5

N.6

N

A-403

AMP-01

AMP-01 PNT-08

A-403

1' - 1 3/8" 084126.A 092900.G 081118.G 1"x1 1/2"x1/8" PNT-03 ALUMINUM CHANNEL, 081118.G PNT-03 (BEYOND) FINISH PER PNT-03 SCHEDULE

SEE PLAN

63' - 0"

2' - 6 1/2"

TYP.

A-403

D3

A-491

1' - 10 1/2"

TL-01 1/2" YP.

9' - 0"

402

A-403

NT-01

16' - 10"

1' - 7" 6"

PNT-08 ON GYP BEHIND MTL-01

BR-01 PNT-01

061053.A 1"

2"

SCALE: 1/4" = 1'-0"

1/2"

A-402

C

D

7

MTL-02

6 5/8"

2 1/8"

6"

Level 02 152' - 0"

MTL-01

E6

A-403

ALIGN CEILING SEAM TO CENTER BALLUSTER , TYP. SEE R.C.P

MTL-01

057000.J 2" x 2" x 1/8" STEEL TEE MTL-01

1/2" REVEAL BETWEEN MTL-01 PLATES PNT-08 ON GYP BEHIND MTL-01

054000.A 6"

084126.A REFER TO DOOR SCHEDULE

Level 01 136' - 0"

CK levation

D

D

Glazing

061053.C 057000.H 2" X 3" X 1/8" STEEL ANGLE MTL-01

Level 01 136' - 0"

E8 Atrium- Bridge Elevation

D ELEVATION ATRIUM BRIDGE A-402

4 1/2"

1/8" SOLID STEEL PLATE MTL-01

3"X2"X1/4" STEEL ANGLE MTL-01

F

084126.A 087100.A TZ-02SEE A-404

G

A-403

2 3/8"

18.7

265000.A 092900.L 061053.F BLACK PNT-08

1"

A-403

10 1/4"

A-403

18.7 KEY PLAN

A8 Section @ Atrium Frame 3/4" PLYWOOD 1/8"SOLID STEEL PLATE MTL-01

A-403

SCALE: 1 1/2" = 1'-0" REF: A-401 092900.L BLACK

1/8" MILLWORK POST REGLET

A

8

A-402

G

A8

B

Level 01 136' - 0"8

H

A

A-403

SCALE: 1 1/2" = 1'-0" REF: A-402

061053.G 055000.M MTL -01

C8 Plan Detail @ Gyp. Bd. A-403

J

K

SCALE: 1 1/2" = 1'-0" REF: A-401

C8

FLOOR FINISH PERIMETER BEYOND

SCALE: 1 1/2" = 1'-0" REF: A-401092900.A 1' - 2" 8 1/8"

C

A-403

H5

B

F6 Atrium- Ceiling Transition LV02 A-403

37

SCALE: 1 1/2" = 1'-0" REF: A-401

18.7

12" O.C. TYP.

4 1/2"

E8 P A-403

SC

1

E8 P A-403

SC

COUNTERSUNK CREWS TYP. D

C 061053.A 057000.F 1/8" STEEL PLATE MTL-01

1' - 4"

057300.C

1

SCALE: 1 1/2" = 1'-0" REF: A-401

042115.A

092900.A PNT-01 092900.B

ALIGN 061053.F 057000.F MTL-01 1/8" STEEL PLATE BEYOND

Section @ Projection Wall Detail@@ Gyp. Bd. SECTION ATRIUM PROJECTION A-402H5 WALLPlan A-403 SCALE: 1 1/2" = 1'-0" REF: A-121 SHEET #

SC

6 5/8"

4 1/2"

D 098436.A 061053.A ALIGN 092216.C 061053.F 1/4" STEEL PLATE MTL-01 057000.F MTL-01 1/8" STEEL PLATE

2"

30x42

061053.F 057000.F 1/8" STEEL PLATE BEYOND MTL-01 057300.C 061053.A 054000.A 8"

8 1/8"

PNT-08 (North)

Lobby - Elevations and Details 1' - 4 7/8" PROVIDE COUNTER SUNK 0 1" FASTENER 2019-050

FLOOR FINISH PERIMETER BEYOND 042115.A 092900.A

4 1/2"

PROJECT #

SectionFRAMES @ Atrium Frame A8 WALL SECTION @ ATRIUM SOUTH

SCALE:

061053.G 055000.M

054000.A 6" 098436.B CONCEAL FASTENER

054000.A 6" SHEET TITLE

8 1/8"

K

SCALE: 1 1/2" = 1'-0" REF: A-402MTL -01

054000.A 1' - 4 7/8" 8"

Level 01 136' - 0"7

092900.A PNT-08 FACE OF THIN BRICK (BEYOND)

6"

C7 Plan Detail @ MetalA-402 Panel

6

A-401

SCALE: 1

061053.A 092900.B 054000.A 057000.H 8" 4"x3"x1/4" J STEEL ANGLE MTL -01

Level 01 136' - 0"

061053.G 1' - 2" 057000.F MTL-01 057000.H SHEET TITLE 061053.F 2"x3"x1/8" Lobby - Elevations and Details 057000.F STEEL ANGLE 265000.A 1/8" 1/2" = 1'-0" REF: A-402 REF:STEEL LIGHTING 061053.F PLATE 092900.A 057000.F MTL-01 0 1" 2" 054000.A 1/8" STEEL PLATE 8 054000.N 6" MTL-01 061053.A PROJECT # 2 1/8" 6 5/8" 042115.A 054000.A 2019-050 4 1/2" 30x42 8" 054000.A SHEET # 6"

C7 Plan Detail @ Metal Panel

(South)

E6 Plan Detail @ Metal Panel North 6 5/8"

SCALE: 1

051200.A 6"

8

H

E6 P

1' - 2"

A-403

18.7

F5 Lobby-Bridge Detail 2

3" MAX

8 1/8"

061053.F

D4 Atrium- Detail @

081118.A

CONSULTANT

D4 Atrium- Detail @

054000.A 6"

5

057000.H 2"x3"x1/8" STEEL ANGLE FACE OF THIN MTLBRICK01 1/2"(BEYOND) = 1'-0" REF:

MTL-01 PLATE AB-01

J4

Level 01 136' - 0"

SCALE: 057000.F 2 3/8"SCALE: 1/4" =PNT-08 1'-0" A-402 MTL-01

A-402

051200.A 6"F 072100.C

054000.C 054000.D 054000.E 054000.N 054000.A 8" 054000.R 4 1/2" SCALE: 3" = 1'-0" RE A-403PLATE 055000.M STEEL FLOOR FINISH PNT-01 CARD PNT-01 READER PER SCHEDU 057000 DECORATIVE METAL 3 042115.A 057000.F SOLID METAL PLATE 057000.G PERFORATED METAL 2" Level 01 057000.H STEEL ANGLE 6 5/8" 2 1/8" 6" 136' - 0" 092900.L 3' - 4" 9' - 4" 5' - 0" STEEL T BAR 061053.G 057000.J 18.7 057300.C STEEL ANGLE 4" 11 3/4" 057000.F Atrium Elevation Looking South 1/8" STEEL 061053.A WOOD BLOCKING PROFESSIONAL SEAL A-402 SCALE: 1/4" = 1'-0" REF: A-331 098436.A V PLATE PROJECT 061053.C PRESERVATIVE-TREATED WOOD BLOCKIN 054000.A 098436.B MTL-01 061053.F PRESERVATIVE-TREATED PLYWOOD 8" 057000.J 4 1/2" PNT-08 2" PLYWOOD xA-403 2" x 1/8" SCALE: 3" = 1'-0" 061053.G RE STEEL 061053.J SHIMTEE MTL-01 092900.H 4 092900.K MINERAL-WOOL BATT INSULATION 042115.A 072100.C 054000.A 054000.A 6" 079200.A JOINT SEALANT 092900.A 081113.B HOLLOW METAL 6DOOR 5/8" FRAME 2 1/8" 6" 081118.G BENT ALUMINUM TRIM 061053.G 084113.D STOREFRONT MULLION 061053.C Level 02 © 2020 ROSSETTI 4" 11 3/4" 057000.F 152' - 0" GLAZING JOINT 057000.H 084126.A INTERIOR ALL-GLASS ENTRANCE SYSTEM 1/8" STEEL 1265 Lombardi Avenue # DESCRIPTION DATE SEALANT, BLACKPLATE X 3" X 1/8" 1 Construction Documents 09/30/2021 2" DOOR 087100.A HARDWARE-SEE DOOR SCHEDULE Green Bay, WI 54304 092900.G STEEL ANGLE MTL-01 092216.A NON-STRUCTURAL METAL FRAMING 057000.J 092900.J MTL-01 092216.C RUNNER 2" STEEL x 2" x 1/8" MTL-01 BEYOND STEEL MTL-01 BOARD (U.N.O.) 092900.A TYPETEE X GYPSUM 092900.B 092900.H 5 092900.B METAL BEADED EDGE TRIM 092900.K 054000.A 081118.A 054000.A 092900.E CONSULTANT 6" EXTRUDED ALUMINUM TRIM 084126.A 092900.A 092900.G ACOUSTICAL SEALANT 4 1/2" 092900.H MULLION MATE 092900.A 092900.J BRAKE FORMED MULLION MATE END CAP 061053.C A-403 SCALE: 1 1/2" = 1'-0" REF: A-402 042115.A 092900.K GASKET WITH ADHESIVE ON BOTH SIDES GLAZING JOINT 057000.H Level 01 054000.A 092900.L FLUSH ALUMINUM BASE SEALANT, BLACK 136' - 0" 2" X 3" X 1/8" 054000.E SEE A-404 8" REGLECT 092900.G STEEL ANGLE 092900.M REVEAL/JOINT 092900.J MTL-01 18.7 095123.B CEILING GRID SYSTEM (HEAVY DUTY) Atrium Elevation Looking North MTL-01 BEYOND 095133.C ACOUSTICAL BACKING A-402 SCALE: 1/4" = 1'-0" 042115.A 096813.B CARPET TRANSITION (REFER TO TRANSITI 054000.A 6 8" 098436.A ACOUSTICAL METAL PANEL CEILING SYST 4 1/2" PROFESSIONAL SEAL 098436.B ACOUSTICAL METAL PANEL WALL SYSTEM 4 1/2" A-403 SC 230000.T SPOT DIFFUSER 061053.G 265000.A LIGHT FIXTURE 092900.A A-403 SCALE: 1 1/2" = 1'-0" REF: A-402 057000.F 8 1/8" 6 5/8" 042115.A MTL-01 054000.A 054000.A KEY057000.H PLAN 8" 2"x3"x1/8" 6" 092216.A STEEL ANGLE 6" 265000.A 18.7 072100.C REF: LIGHTING 061053.F 092900.A 033000.D 057000.F042115.A 054000.A 054000.A Level 02 1/8" STEEL PLATE © 2020 ROSSETTI 7 8" 6" MTL-01 (South) 152' - 0" 4 1/2" (North) # DESCRIPTION 10 1/4" DATE 6" 2 1/8" 6 5/8" 1 Construction Documents 09/30/2021

084126.A

057000.H 1/8" MILLWORK POST REGLET 2"x3"x1/8" MTL-01 STEEL ANGLE (BEYOND) MTL- 01

Level 02 152' - 0"

E6 P

Level 02 152' - 0"

G8 AtriumRail265000.A Connection 061053.F J5 Bridge Atrium Elevation Looking North

061053.A FLOOR FINISH PER PER SCHEDULE MANUFACTURER REF: ARCH LIGHTING

092900.A 042115.A 054000.A 8"

A-403

Level 02 152' - 0"

1/8"SOLID STEEL PLATE MTL-01

1"

REF: ARCH LIGHTING

G8 Atrium- Bridge Rail Connection

SCALE: 1/4" = 1'-0"

E

042115.A

061053.G 057000.F MTL-01 0.H

MTL - 02

12/20/2021 10:49:09 PM

REF: A-401

4

057000.F 1/8" STEEL PLATE MTL -01 MTL-01 (BEYOND)

061053.A 057000.F MTL-01 054000.R 061053.F 3/4" PLYWOOD

061053.A

SEE F5/A-403 FOR SUPPORT AND BLOCKING

12/20/2021 10:49:09 PM

D3

A-403

1' - 7" 6"

072100.C

SCALE: 1/4" = 1'-0" 084126.A

E

2' - 6 1/2"

3' - 0" TYP.

Level 02 152' - 0"

061053.G 057000.F MTL- 01 PLATE 1/8" STEEL PLATE MTL-01

057000.H STEEL ANGLE TO MATCH RAILING

061053.A FLOOR FINISH PER SCHEDULE 054000.R

CONCRETE SUSPENDED SLAB 061053.A CONCRETE MASONRY UNIT FLOOR FINISH MORTAR STEEL REINFORCEMENT BARPER SCHEDU THIN BRICK VENEER STRUCTURAL STEEL FRAMING 2" COLD FORMED METAL FRAMING SYSTEM STEEL TRACK STEEL BOX HEADER FURRING CHANNEL BRACING 061053.A ANCHOR CLIP

C6 Plan Detail @ Interior Glazing

SEE F5/A-403 FOR SUPPORT AND BLOCKING

PROVIDE COUNTERSUNK SCREWS, TYP

H5

A-403

095133.C

18.7

033000.D 042000.A 042000.D 057000.F 1265 Lombardi Avenue 042000.J Green Bay, WI 54304MTL -01 042115.A 061053.F 051200.A 092900.L 054000.A

J5

Level 01 136' - 0"

Atrium Elevation Looking South Level 02 SCALE: 1/4" = 1'-0" REF: A-331 152' - 0" V

1/8" SOLID STEEL PLATE MTL-01

9 1/4" 3"X2"X1/4" STEEL ANGLE RE: STRUCTURAL MTL-01

BR-01 AT WALL BEYOND PNT-08 ON GYP. AT WALL BEYOND

A-402

136' - 0"

BIM 360://Green Bay Packers BIM Team 360://Green Facility/GBT-arch.rvt Bay Packers Team Facility/GBT-arch.rvt

SCALE: 3" = 1'-0"

2' - 8 1/2" +/-

042115.A

A-402

Level 01 136' - 0"

D4 Atrium- Detail @ Frame Base A-403

J4

3

057000.F 1/8" STEEL PLATE 092900.L MTL -01

SCALE: 1 1/2" = 1'-0" RE

C6 Plan Detail @ Interior Glazing

PNT-01

5' - 0"

054000.A 6"

PNT-08 ON GYP BEHIND MTL-01

E8 Atrium- Bridge Elevation

3"X3"X1/4" STEEL T

AMP-03 PNT-08

4 1/2"

9' - 4"

L

1/2" REVEAL BETWEEN MTL-01 PLATES

CPT-06B

18.7 AMP-01

3' - 4"

1"

2

Level 02 152' - 0"

6' - 0"

MTL-01

EQ EQ SCHEDULE REFER TO DOOR

092900.L

B

BR-01 AT WALL BEYOND PNT-08 ON GYP. AT WALL BEYOND

7 1/4"

084126.A 7' - 0"

ALIGN CEILING SEAM TO CENTER BALLUSTER , TYP. SEE R.C.P

Level 01 136' - 0"

B8PROJECTION Atrium- West ElevationWALL Level 01 C ELEVATION

3' - 4"

A-403

057000.H 2"x3"x1/8" 7 STEEL ANGLE

EQ

FLOOR FINISH PER SCHEDULE

PNT-08 ON GYP. AT WALL BEYOND

- 4"

4"

CARD READER

084126.A F3 A-401

4"

A-402

PNT-01

2

Green Bay Packers Team Facility

EQ

MTL-01

1/2" REVEAL BETWEEN MTL-01 PLATES

OPEN TO BEYOND

EQ

Elevation

054000.D 061053.J 084113.D 092900.B MTL-01

MTL-01 6" 1' - 7"

EQ

Level 02 152' - 0"

3' - 0" TYP.

E6

1/4"

092900.L

A8

MTL-01

MTL- 01 PLATE

2' - 8"

ALIGN

9' - 6"

MTL-01

057000.F MTL -01 E6 A-403 061053.F

F5

MTL-02

A-403

EQ

1

061053.A A-401 F3

PNT-01

084126.A 3"X3"X1/4" STEEL T 092900.G 1"x1 1/2"x1/8" MTL - 02 ALUMINUM CHANNEL, PNT-03 9 1/4" FINISH PER RE: STRUCTURAL SCHEDULE

MTL-02

Level 02 152' - 0"

EQ

C3

SCALE: 1 1/2" = 1'-0" REF: A-401

MTL-02 092900.A PNT-01 AT PROJECTION AREA

1/4"

A-403

A8

AB-01

1/2" REVEAL BETWEEN MTL-01 PLATES

18.7

PER GRAPHICS SCOPE

2' - 8 1/2" +/-

TYP.

EQ WD-03 4 1/2" 061053.F

PNT-08 ON GYP BEHIND MTL-01

BR-01

AMP-03 PNT-08

E8

T-01

M

7 1/4" 3' - 0"

MTL-01

OPEN TO BEYOND

092900.A 3' - 4" PNT- 08 ON GYP BD.

10' - 8"

EQ

4"

1' - 11 5/8"

3' - 4"

E8

A-491

3' - 0" TYP.

1 7/8"

092900.A PNT-01 TYP. 092900.L

061053.F 057000.F PNT-08 ONMT-01 GYP. AT6 WALL BEYOND 1/8" STEEL K2092900.L A-1G1 PLATE

PNT-01

C8

A-403

MTL-01

MTL-01

057000 2"x1"x1/8" STEEL ANGLE

PNT-01

081118.A

1/2"

5/8" MTL-01

057000.F MTL-01 1/8" STEEL PLATE

3' - 0"

OPEN TO BEYOND

9' - 4"

092900.M D3 CENTER ON 1/8"A-403 MILLWORK MIDDLE OF OPENING POST F8 TERMINATION A-403

D3

A-403

C7

061053.F

A-402

3' - 0"

PNT-01

A8

061053.A AMP-02 MTL-01 098436.A 051200.A 8" H5 054000.D A-403 042115.A 057000.F MTL -01 1/8" STEEL PLATE MTL-01 PLATE

F5

A-403

1 7/8"

1' - 3"

MTL-01 PNT-01

EXIT

081118.G (BEYOND) PNT-03

EQ 3' - 0"

A-403

3" MAX.

2' - EQ 8"

5

1 1/2"

1' - 9"

E6

A-403

D3

H8

A-403

265000.A BEYOND,

081118.A MTL-02

081118.G PNT-03

MTL-01

CENTER ON MIDDLE OF OPENING

MTL-01 TYP.

3' - 0"

MTL-01

3' - 0"

3' - 0" TYP.

081118.A

MTL-02

C6

A-403

ALIGN

EQ

1/4"

1 1/2"

A-403 A-491

081118.A EQ

6" TYP.

E8

PNT-01

MTL-01

A8

EQ

P.1

265000.A REF: LIGHTING

PNT-01

EQ

O.4

AMP-01

7' - 0"

L

MTL-01

EQ

3' - 0" TYP.

9' - 6"

N.6

057300.C

098436.A 051200.A C3 8" A-403 054000.D 042115.A 057000.F P MTL -01 057000.F 1/8" STEEL 3" MTL-01 PLATE TYP.057300.C

MTL-01

5

- 4" PLAN INTERIOR3'ALL-GLASS ENTRANCESEE SYSTEM TYPE X GYPSUM BOARD (U.N.O.) FLUSH ALUMINUM BASE INTERIOR PAINTING LIGHT FIXTURE

MTL-01

N

M PER GRAPHICS SCOPE

1' - 8" MTL-01 1' 2"- 7 1/8" 8"+/-

A8

A-403

081118.A 10'084126.A - 8" 092900.A 092900.L 099123 265000.A

6' - 6"

N

2"

7' - 8"

AMP-01 PNT-08

3' - 8" MTL-01 8' - 6 1/8"

5' - 2"

MTL-01

SEE PLAN

N.6

2' - 0"

-403

SEE PLAN

N.9

057000.F MTL-01 M

2' - 2" MTL-01

F6

A-491

4' - 0"

O

EQ

9'-0"'

5' - 8"

K

6' - 0"

1' - 6"

O.4 092900.A PNT-01 TYP.

095123.B INTERIOR ALUMINUM STOREFRONT SYSTEM

1' - 7 1/8"

J

K2

A-1G1

MATERIAL KEYNOTES

2" 8' - 6 1/8"

H

E8

AMP-02

MTL-01

G

D4

7' - 8"

6" 3" TYP. TYP. 095133.C

A-403

F

A-403

092900.L 099123 PNT-01 TYP.

PNT-01

OPEN TO BEYOND

PNT-01

E

PNT-01

C8

10' - 0"

D

PNT-01

OPEN TO BEYOND

10' - 0"

PNT-01

A-403

J Green Bay092900.L P Packers Team Facility MATERIAL KEYNOTES

H

P

081118.A

PNT-01

PNT-01

P.1

1/4"

057000.H MTL-01 092900.A CONTINUOUS (BEYOND) Level 02 PNT-08 152' - 0" 081118.A 081118.A 051200.A (BEYOND) 8" 057000.G EQ EQ MTL-02 095133.C 3" 3' - 0" CENTER ON MAX. 095123.B MIDDLE OF

ALIGN

081118.A

A-403

O.4

265000.A REF: LIGHTING

4

057000.G MTL-02

G Roof 168' - 6"

O AMP-01 096813.B

N.9

D3 Lobby- Detail @

057000.F MTL -01 061053.F

1

SCALE: 1 1/2" = 1'-0" REF:PROJECT A-331

1"

Level 02 152' - 0"

081118.A

EQ

N.6

A-403

4"

D4

NTER ON DDLE OF PENING

F

N

ALIGN TOP OF STEEL ANGLE (CONT.) W/ TOP OF SLAB

A-419

081118.A

A-403

M

A-403

6"

C3 Lobby- Detail @ AMP-01 Soffit

1/4"

E

F6

3"

K

INTERIOR ALUMINUM STOREFRONT SYSTEM INTERIOR ALL-GLASS ENTRANCE SYSTEM TYPE X GYPSUM BOARD (U.N.O.) FLUSH ALUMINUM BASE INTERIOR PAINTING LIGHT FIXTURE

4"

L

081118.A 084126.A 092900.A 092900.L 099123 265000.A

1' - 8" OVERLAPING MTL 01/02 2" 8"+/AIR TRANSFER AREA 2' - 9"

D 265000.A REF: LIGHTING

J

MATERIAL KEYNOTES

1/2"

18.7 A8

H

PLATE

1/2"

092900.A (BEYOND) PNT-08 051200.A (BEYOND) 8"

057000.F MTL-01

SCALE: 1 1/2" =1/8" 1'-0" RE STEEL

2"

G

PAINT EXPOSED PNT-09

061053.F

A-403

2"

F

3

D3 Lobby- Detail @

2"

E

ALIGN

D

3" MAX.

SCALE: 1 1/2" = 1'-0" REF: A-331

ALIGN

C

REFER TO RCP FOR LOCATIONS

1 5/8"A-403

1"

6" TYP. Roof 168' - 6"

AIR TRANSFER AREA 2' - 9"

B

C3 Lobby- Detail @ AMP-01 Soffit

ALIGN

PROVIDE OPENING IN ACOUSTICAL BLANKET FOR MEP FIXTURES

057000.F MTL-01 1/8" STEEL PLATE

2"

18.7

061053.F

GREEN BAY PACKERS TRAINING FACILITY

REFER TO RCP FOR LOCATIONS

3

7 3/4"

EQ

057000.F MTL-01 057300.C 3" MAX.

1' - 0"

EQ

PROVIDE OPENING IN ACOUSTICAL BLANKET FOR MEP FIXTURES

4" TYP.

EQ

ALIGN

5/8"

2

098436.A 061053.F 057000.F MTL-01 057000.F MTL-01

2' - 2" MTL-01

PNT-09 095133.C 095123.B

1' - 0"

REF: LIGHTING

REF: MECHANICAL

057000.F MTL -01 092900.M MWP12550

2 1/2" TYP.

3' - 0" O.C. TYP.

2 1/2" TYP.

1/8" TYP.

092900.M MWPT12

H6 Atrium - Bridge Ceiling MTL-01 Plate Detail A-403

SCALE: 3" = 1'-0"

REF: A-403

18.7


PROFESSIONAL WORK

LOUNGE

38


6" 6"

21.8 21.8

21.7 21.7

21.6 21.6

3' 3' -- 0" 0"

11

M M

057300.D 057300.D

TYP.

GREEN BAY PACKERS TRAINING FACILITY 079500.A 079500.A

6" 6"LONG LONGSTEEL STEEL ANGLE ANGLE CENTERED CENTEREDON ON STEEL STEELTTBAR, BAR, BEYOND BEYOND

EDGE EDGEOF OFSLAB SLAB RE: RE:STRUCTURAL STRUCTURAL

MTL-02 MTL-02 OVERLAPPING OVERLAPPING MTL-01 MTL-01

057300.D 057300.D CONTINUOUSLY CONTINUOUSLYFASTENED FASTENED (1 (1SIDE SIDEONLY) ONLY)TO TOALLOW ALLOW FOR FORREQUIRED REQUIREDMOVEMENT MOVEMENT

057300.C 057300.C 057300.D 057300.D

057300.C 057300.C

057300.D 057300.D 057300.B 057300.B 3" 3"xxRAILING RAILING MANUFACTURER MANUFACTURER STEEL STEELTEE, TEE,MTL-01 MTL-01

057300.C 057300.C COUNTINUOUS COUNTINUOUS EDGE EDGEOF OFSLAB SLAB RE: RE:STRUCTURAL STRUCTURAL

CONTINUOUS CONTINUOUS 057300.B 057300.B

3'3'--0" 0" TYP. TYP.

3" 3" MAX. MAX.

3' 3' -- 0" 0"

22

3' -- 0" 3' 0" TYP.

CONTINUOUS CONTINUOUS ANGLE, ANGLE, BEYOND BEYOND Level Level02 02 152' 152'--0" 0"

D

E

M

G

C

D

E

C

D

E

3

66

A-434 A-434 A-434 A-434

3" 3"

C

D

3"

C

D

3"

C

D

3"

C

D

3"

C

D

C

D

C

D

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

6" 6" 3' - 0"3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' -3'0"- 0"3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' 6" - 0" 3'6" - 0" 6" 3' 6" - 0" 6" MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01

2 3/4" 3/4" 2

TYP.

057300.B 057300.C 064023.Y

9' -- 0" 0" 9'

PROJECT PNT-02 PNT-02 PROJECT

2

M

2

054000.A 054000.A

2

061053.G 061053.G

2

AMP-02 AMP-02

2

064023.Y 064023.Y

057300.C 064023.X 064023.X 2 WB-03 WB-03COUNTINUOUS EDGE OF SLAB 2 RE: STRUCTURAL

GYP GYPBEYOND BEYOND

CONSULTANT

WD-03 WD-03

3

CONSULTANT

WD-03 WD-03 EXTEND EXTEND4" 4"AT ATTHE THETOP TOPAND AND 3 BOTTOM, BOTTOM,6" 6"AT ATTHE THESIDES SIDES TO TOAVOID AVOIDVISIBILITY VISIBILITYBEHIND BEHIND THE THETV TV 3

COUNTERSUNK

CONSULTANT SCREW, TYP 3' - 0"

TYP CONSULTANT

F2 Plan Detail at Railing

CONSULTANT

3

3' - 6"

A-435 A-435

SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0"REF RE

LL

WD-03 WD-03

Green Bay, WI 54304 1265 Lombardi Avenue Green Bay, WI 54304 1265 Lombardi Avenue CONSULTANT WD-03 WD-03 057300.DWI 54304 Green Bay, 1265 Lombardi Avenue 057300.B 3" x RAILING Green Bay, WI 54304 1265 Lombardi Avenue CONSULTANT MANUFACTURER STEEL TEE, MTL-01 Green Bay, WI 54304 CONSULTANT PNT PNT-08 -08

2

A-435

E R

FINISH FINISHALL ALL EXPOSED EXPOSEDEDGE EDGE TYP TYP

064023.X 064023.X

SCALE: 1 1/2" = 1'-0" 3 REF: A-436

064023.Y 064023.Y

C2 C2 Ra ngRailing P an D

PROFESSIONAL SEAL

3 3

EQ

PROFESSIONAL SEAL

3

A-435 C

A

PROFESSIONAL SEAL

RAILING PLAN & ELEVATION M

092216.A 092216.A

PROFESSIONAL SEAL PROFESSIONAL SEAL

4

260000.B 260000.B RE: RE:ELECTRICAL ELECTRICAL

M L

M

N.9

064023.O 064023.O

M M M

061053.C 061053.C PROVIDE PROVIDEWOOD WOOD BLOCKING BLOCKING AT AT WB-03 PARTITIONS PARTITIONSBETWEEN BETWEEN STUDS, STUDS,WB-03 TYP TYP

2' - 3 1/2"

2' - 3 1/2" 11"

2' - 3 1/2"

11"

2' - 3 1/2"

AMP-02 11"

2' - 3 1/2"

© 2020 ROSSETTI

4

WB-03

M

WD-03 WD-03

PROFESSIONAL SEAL

4

Construction Documents ©1 2020 ROSSETTI

4

061053.F

A-435

© 2020 ROSSETTI

5 3/4" x 3' 3/4"- 0" WB-03 CONTINUOUS TYP PROFILE 3/4" x 3/4" WB-03 054000.A CONTINUOUS 5 PROFILE 3/4" x 3/4" WB-03 CONTINUOUS 061053.G 064023.X 064023.X 5 3/4" x 3/4" WD-06 WD-06 PROFILE CONTINUOUS ADHERED ADHERED TO TO 5 PROFILE 5/8" 5/8"PLYWOOD PLYWOOD 3/4" x 3/4"

© 2020 ROSSETTI

L

DATE

09/30/2021

PNT-02

© 2020 ROSSETTI

4

3/4" x 3/4" WB-03 WD-03 WD-03 CONTINUOUS PROFILE WB-03

# DESCRIPTION

DATE

1 Construction Documents

09/30/2021

1 Construction Documents

09/30/2021

© 2020 ROSSETTI

# DESCRIPTION

DATE

# DESCRIPTION

DATE

A-434

A-435 SCALE: SCALE: 1 1/2" = 1'-0" REF: A-4311 1/2" = 1'-0" REF: A-431

E E

F

ALLOW ALLOW1/2" 1/2" SPACE SPACEFOR FOR MOUNTING, MOUNTING,TYP TYP

RB-04

3/4" 3/4"xx3/4" 3/4" CONTINUOUS CONTINUOUS PROFILE PROFILE WD-06 WD-06 ADHERED ADHEREDTO TO

A-435 C

5/8" 5/8"PLYWOOD PLYWOOD SCALE: 1

N.9

N

4"

RB-02 RB-02

E8 Section Section at at Lounge Lounge TV TV Wall Wall

G8 Section Section at at Lounge Lounge Wall Wall

7' - 6"

HH

WOOD

7' - 6 1/2"

1" 1" 1" 1"

F

A

A

7' - 6"7' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6"

2' - 2"

SCALE: 1 1/2" = 1'-0" REF: A-431

REF: A-436

4' - 9"

C8 Section Section at at Fuel Fuel Bar Bar Pantry Pantry

E8 Section DDetail at Lounge Sink CCabinet E8 E8 D C E8 Section Detail at Lounge Sink Cabinet E8 Section Detail at Lounge Sink Cabinet E8 Section Detail at Lounge Sink Cabinet E8 Section Detail at Lounge Sink Cabinet E8 Section Detail at Lounge Sink Cabinet E8 Section Detail at Lounge Sink Cabinet A8atSection at Fuel Bar Sink Cabinet E8 Section Detail LoungeDetail Sink Cabinet A-434

SCALE: 1" = R 1'-0"

B

4"

G8 Section DDetail at Lounge Pantry G8 G8 D G8 Section Detail at Lounge Pantry G8 Section Detail at Lounge Pantry G8 Section Detail at Lounge Pantry G8 Section Detail at Lounge Pantry G8 Section Detail at Lounge Pantry G8 Section Detail at Lounge Pantry C8atSection Fuel Bar Pantry G8 Section Detail LoungeatPantry A-434

SCALE: 1 1/2" = 1'-0" REF: A-431 G

J8 J8 J8 J8 J8 J8 J8 J8 J8 J8 A-434

H

A-434 NORTH KITCHENETTE WALL SECTION SCALE: SCALE: 1 1/2" A-435 = 1'-0" REF: A-4311 1/2" = 1'-0" REF: A-431 G

C

Lounge & Fuel Bars - Details D D Lounge & Fuel Bars - Details Lounge & Fuel Bars - Details Lounge & Fuel Bars - Details Lounge & Fuel Bars - Details 2019-050 Lounge & Fuel Bars - Details Lounge & Fuel Bars - Details 2019-050 Lounge & Fuel Bars - Details 2019-050

1' - 6"

A8 Section Section Detail Detail at at Fuel Fuel Bar Bar Sink Sink Cabinet Cabinet

A-435 C

A

SCALE: 1 1

WD-03 WD-03

C3 C3 Section Sec on De a

2' -- 6" 6" 2'

A3 A3 Pa a Partial Ra ngRailing E eva Elevation on

7' - 2"

PROVIDE COUNTERSUNK SCREWS, TYP

2' - 3 1/2"

9' - 6"

2' - 3 1/2"

4' - 9"4' - 9" 4' - 9" 4' - 9" 4' - 9" 4' - 9" 4' - 9"

2' - 3 1/2"

H3 Railing P

054000.A

Level 01 136' - 0"

WD-03 WD-03

# DESCRIPTION

4

061053.G 061053.G

WD-02 3/4" THICK

W

PROFESSIONAL SEAL

4

061053.F 061053.F

9' - 6"9' - 6" 9' - 6" 9' - 6" 9' - 6" 9' - 6" 9' - 6"

1' - 5"

SCALE: 1

PROFESSIONAL SEAL TV TVMOUNTING MOUNTINGBRACKET BRACKET 4 MOUNTED MOUNTEDON ONBLOCKING, BLOCKING, RE: RE:AV AVDRAWINGS DRAWINGS

PNT-02 M 11"

064023.F 057300.B 064023.F 064023.X 064023.Y WD-03 064023.X 064023.Y 3/4" x 3/4" WD-03 CONTINUOUS 064023.X PROFILE 064023.Y WD-03 064023.X 3/4" x 3/4" 064023.Y WD-03 CONTINUOUS 064023.A 064023.X 064023.A PROFILE 3/4" x 3/4" PLAM-01 064023.Y PLAM-01 WD-03 CONTINUOUS PROFILE 064023.Y 3/4" x 3/4" CONTINUOUS PROFILE 3/4" x 3/4" CONTINUOUS PROFILE 3/4" x 3/4" 2' - 8" CONTINUOUS PROFILE WOOD 3/4" x 3/4" WOOD CONTINUOUS BLOCKING BLOCKING PROFILE 3/4" x 3/4" CONTINUOUS PROFILE

2' - 3 1/2"

PROJECT

1

D

H

A-434

Section Detail at Lounge Bench D D Section Detail at Lounge Bench Section Detail at Lounge Bench Section Detail at Lounge Bench Section Detail at Lounge Bench Section Detail at Lounge Bench Section Detail at Lounge Bench SCALE: 1 1/2" = 1'-0"at REF: A-431 at Section Lounge TV Wall Section Detail Lounge Bench J K 092216.A

A-434 2019-050 A 434 A 434 2019-050 A-434 2019-050 A-434 2019-050 A-434 2019-050 A-434 A-434 G8 Section at Lounge Wall E8 A-434 SOUTH ENTERTAINMENT WALL SECTION A-434

SCALE: SCALE: 1 1/2" =A-435 1'-0" REF: A-431 1 1/2" = 1'-0" REF: A-431 E

J

W

061053.C WPROVIDE WOOD BLOCKING AT GYP BD PARTITIONS BETWEEN STUDS, TYP

061053.C

K

SHEET #

A-435

F

123661.B 1/8" MITERED RADIUS PENCIL EDGE, TYP

7

39

9' - 0"

A-434

3"

064023.X 057300.B WD-03 064023.X 057300.B 064023.Y WD-03

2' - 3 1/2"

PROJECT

1

4' - 4"

A-434

SCALE: 1

C

2' - 3 1/2"

PROJECT

1

G

Level Level01 01 136' 136'--0" 0"

2' - 6"

A-434

3"

057300.B 064023.X 057300.C WD-03

PROJECT PROJECT

1' - 6"1' - 6" 1' - 6" 1' - 6" 1' - 6" 1' - 6" 1' - 6"

C8 Section at MMicrowave Cabinet C8 w C C8 M w C C8 M w C C8 Section at Microwave Cabinet C8 Section at Microwave Cabinet C8 Section at Microwave Cabinet C8 Section at Microwave Cabinet C8 Section at Microwave Cabinet C8 Section at Microwave Cabinet

2' - 3 1/2"BLACK BLACK MELAMINE MELAMINE 2' - 3 1/2" INTERIOR INTERIOR

Green Bay Bay Green Green Bay Packers Team Green Bay Railing Plan Plan Deta Deta Packers Team Packers Team H3 Railing Green Bay Facility Packers Team Green Bay Fac y Fac yBay Packers Team Green Facility Packers Team Green Bay Facility Packers Team Green Bay Facility Packers Team 1265 LombardiBay Avenue Green m Facility Green Bay, Packers Team m WI 54304 G W Facility Packers Team G W Avenue 1265 Lombardi Facility Green Bay, WI 54304 1265 Lombardi Avenue Facility Green Bay, WI 54304 1265 Lombardi Avenue

1"

1' - 6"

BETWEEN STUDS, TYP 093013.B PROVIDE TL-05 WOOD BLOCKING 260000.B 092900.D AT GYP BD PARTITIONS 061053.C 2' - 8" BETWEENTL-05 STUDS, TYP RE: ELECTRICAL 093013.B PROVIDE WOOD BLOCKING 092900.D AT GYP BD PARTITIONS 064023.A 1' - 6" 2' - 8" 061053.C BETWEEN STUDS, TYP WD-05 093013.B PROVIDE TL-05 WOOD BLOCKING 260000.B 092900.D AT GYP BD PARTITIONS 061053.D 1' - 6" 061053.C 093013.B BETWEENTL-05 STUDS, TYP RE: ELECTRICAL PROVIDE WOOD BLOCKING 260000.B 061053.C AT GYP BD PARTITIONS 064023.A 1' - 6" RE: ELECTRICAL BETWEEN STUDS, TYP WD-05 PROVIDE WOOD BLOCKING 260000.B AT GYP BD PARTITIONS 061053.D 064023.A 1' - 6" ELECTRICAL BETWEEN STUDS, TYP RE: WD-05 BLACK 260000.B 064023.A MELAMINE 1' - 6" 061053.D RE: ELECTRICAL WD-05 INTERIOR 260000.B 064023.A 1' - 6" 061053.D RE: ELECTRICAL WD-05 BLACK 260000.B 064023.A 1' - 6" MELAMINE 061053.D RE: ELECTRICAL INTERIOR WD-05 BLACK 260000.B 064023.A MELAMINE 061053.D RE: ELECTRICAL INTERIOR WD-05 BLACK 064023.A MELAMINE 061053.D WD-05 INTERIOR BLACK MELAMINE 061053.D INTERIOR BLACK MELAMINE INTERIOR BLACK MELAMINE INTERIOR BLACK MELAMINE 1/2" = 1'-0" INTERIOR D

PNT-02

057300.B SCALE: 1 1/2" = 1'-0" REF: A-431 057300.C 054000.A

F

1

EQ

C3 Section Detail at Lounge Platform A-435

1 1

7" 7"

EQ

057300.B 057300.C 054000.A

2' - 3 1/2"

1

K

057300.E

057300.E 057300.C 054000.A

2' - 7"

M

3"

RB-04

PROJECT

K

9' - 6"

AS NEEDED 057300.E 054000.A 054000.U AS NEEDED 057300.E 054000.U AS NEEDED061053.C 061053.C 057300.E 057300.C 054000.A 054000.U PROVIDE PROVIDEWOOD WOOD AS NEEDED BLOCKING BLOCKINGAT ATGYP GYP 057300.E 054000.A 054000.U BD BDPARTITIONS PARTITIONS BETWEENSTUDS, STUDS, AS NEEDED BETWEEN 057300.C 057300.E 054000.U 054000.A 054000.U TYP TYP 3 AS NEEDED 057300.B 057300.C 057300.E 054000.A

2'2'--4" 4" CLEAR CLEARPULL PULL 2'2'--3" 3"

K

1"

A-434

3"

3' - 0" TYP.

1 1/2"

1

1"

A-434

3"

K

1"

A-434

2' - 3 1/2"

K

CONTINUOUS SLOT DIFFUSER Expansion Joint RE:MECHANICAL

2' - 7"2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7"

A-434

2' - 3 1/2"

1 1/2"

A-434

2' - 8"

SCALE: 1 1/2" = 1'-0" REF: A-431 M 092900.D SCALE: 1 1/2" = 1'-0" REF: A-431 093013.B TL-05 2' - 8" M 061053.C SCALE: 1 1/2" = 1'-0" REF: A-431 PROVIDE WOOD BLOCKING AT GYP BD PARTITIONS 2' - 8" M 092900.D 093013.B TL-05 SCALE: 1 1/2" = 1'-0" REF: TYP A-431 BETWEEN STUDS, 092900.D 061053.C 2' - 8" M 093013.B TL-05 SCALE: 1 1/2" = 1'-0" REF: A-431 PROVIDE WOOD BLOCKING 092900.D AT GYP BD PARTITIONS 2' - 8" M 061053.C SCALE: 1 1/2" = 1'-0" REF: A-431 BETWEEN STUDS, TYP 093013.B TL-05 PROVIDE WOOD BLOCKING 092900.D AT GYP BD PARTITIONS 2' - 8" M 061053.C

2' - 8"

1 1/2"

A-434

3"

061053.F 054000.A

4' - 4"

3"

WD-02 3/4" THICK

2

EQ EQ

K

9' - 0"

3"

M

SCALE: 1

2' - 10"

3"

2' - 3 1/2"

1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"

SCALE: 1 1/2" = 1'-0"

2' - 3 1/2"

77

BIM 360://Green 360://Green Bay Bay Packers Packers Team Team Facility/GBT-arch.rvt Facility/GBT-arch.rvt BIM 9/30/2021 PM 9/30/2021 4:38:00 4:38:00 PM 2' - 10" 2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"2' - 10" 2' - 10"

A-434

REF: A-436

061053.C 061053.C

4

1 1/2" 1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"

C6 Typical Base Cabinet Detail C6 C D C6 C D C6 C D C6 Typical Base Cabinet Detail C6 Typical Base Cabinet Detail C6 Typical Base Cabinet Detail C6 Typical Base Cabinet Detail C6 Typical Base Cabinet Detail C6 Typical Base Cabinet Detail

4"

4"

3"

SCALE: 1" = 1'-0" 2' - 3 1/2"

A-435

STEEL ANGLE

1 Construction Documents AMP-02 09/30/2021 © 2020 ROSSETTI 2' - 3 1/2" # DESCRIPTION DATE 11" 265000.A 2' - 3 1/2" Construction Documents 09/30/2021 ©1 2020 ROSSETTI 057000.F 2' - 3 1/2" WD-03 WD-03 WD-03 WD-03 # DESCRIPTION DATE 11" 2' - 3 1/2" MTL-01 057000.F 1 Construction Documents 09/30/2021 PROVIDE # DESCRIPTION DATE PROVIDE AMP-02 MTL-01 COUNTERSUNK 2' - 3 1/2" 265000.A 11" 1' - 5" COUNTERSUNK 1 Construction Documents 09/30/2021 SCREWS, TYP PROVIDE 057000.F TYP 064023.O SCREWS, PNT-01 11" 2'2'--4" 4" COUNTERSUNK CONTINUOUS 265000.A MTL-01 1'BLACK - 5" 064023.Y 057000.F TYP 064023.F 5 PROFILE CLEAR 1' - 6" SCREWS, MELAMINE CLEAR PROVIDE 3/4" x 3/4" 057000.F WD-03 WD-03 PROVIDE 092900.A MTL-01 064023.X INTERIOR COUNTERSUNK CONTINUOUS 265000.A 061053.G 061053.G 064023.A MTL-01 1' - 5" COUNTERSUNK 057000.F SCREWS, PROFILE 3/4" x 3/4" WB-03 5 PROVIDE 057000.F 064023.O WD-05 TYP BLACK BLACK SCREWS, BLACK PROVIDE TYP 092216.A 092216.A 092216.A MTL-01 CONTINUOUS COUNTERSUNK 265000.A MELAMINE MELAMINE MTL-01 MELAMINE 1'BLACK - 5" COUNTERSUNK 057000.F TYP 064023.F PROFILE 5 SCREWS, MELAMINE INTERIOR INTERIOR PNT-08 INTERIOR PROVIDE 057000.F 064023.O EQ EQ SCREWS, PROVIDE TYP MTL-01 4 INTERIOR PNT -08 064023.A GYP COUNTERSUNK 265000.A MTL-01 5 1'BLACK - 5" COUNTERSUNK 057000.F 064023.F 5 MTL-01 TYP GYP BEYOND BEYOND 057000.F SCREWS, MELAMINE WD-05 PROVIDE 064023.O BLACK SCREWS, 092216.A PROVIDE TYP BEYOND MTL-01 1/8" INTERIOR 1' - 3" 064023.A COUNTERSUNK 265000.A MELAMINE MTL-01 WOOD WOOD PNT-02 1'BLACK - 5" COUNTERSUNK 057000.F TYP WD-03 064023.F CLEAR SCREWS, PROVIDE MELAMINE INTERIOR WD-05 BLOCKING BLOCKING 057000.F TYP 064023.O BLACK SCREWS, PROVIDE 1/8" MTL-01 COUNTERSUNK INTERIOR 265000.A 064023.A MELAMINE MTL-01 1'BLACK - 5" 88 2' - 8" COUNTERSUNK 057000.F RB-02 RB-02 MTL-01 064023.F SCREWS, 064023.P MELAMINE INTERIOR 057000.F TYP WD-05 TYP 064023.O BLACK RB-02 RB-02 WD-03 SCREWS, BEYOND PROVIDE MTL-01 1'BLACK - 3" MTL-01 INTERIOR MTL-01 064023.A MELAMINE 6 4" AT THE TOP AND EXTEND 057000.F COUNTERSUNK 265000.A MTL-01 064023.F BEYOND CLEAR MELAMINE INTERIOR WD-05 DRAWINGS BOTTOM, 6" AT THE SIDES 064023.O BLACK SCREWS, PROVIDE TYP RE: LIGHTING BEYOND MTL-01 1'BLACK - 3" TO AVOID VISIBILITY BEHIND 064023.A 1'1'--2" 2" 1'1'--1" 1" MELAMINE 1'1'--COUNTERSUNK 2" 2" 1'1'--1" 1" 061053.C 10" INTERIOR CONTINUOUS CONTINUOUSBASE BASE-3" 3" 3" 3" MTL-01 064023.F 064023.P PNT-02 265000.A CLEAR THE TV MELAMINE INTERIOR 064023.O WD-05 CONTINUOUS CONTINUOUSBASE BASE-SCREWS, TYP PROVIDE WOOD BLACK REFER REFERTO TOFINISH FINISH BEYOND 7" MTL-01 UNDER CABINET 1'BLACK - 3" INTERIOR 092900.D REFER TO TOFINISH FINISH 064023.A 6 BLOCKING ATREFER GYP BD MELAMINE SCHEDULE SCHEDULE 064023.F BEYOND LIGHTING, MTL-01 064023.P CLEAR MELAMINE SCHEDULE SCHEDULE PARTITIONS BETWEEN INTERIOR WD-05 BLACK COORDINATE BEYOND WITH 093013.B MTL-01 INTERIOR 1' - 3" STUDS, TYP 064023.A 061053.C 6 10" TL-05 MELAMINE MILLWORKER BEYOND 265000.A MTL-01 064023.P CLEAR INTERIOR BLACK PROVIDE WOOD BASE - REFER TO RE:WD-05 ELECTRICAL BEYOND A-435 A-435 SCALE: SCALE: 111/2" 1/2"092900.D ==1'1'-0" 1'-0" REF: A-431 A-431 UNDER A-435 A-435 SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0" REF: REF: A-431 A-431 A-435 A-435 SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0"REF: REF: A-431 A-431 A-435 A-435 SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0"REF: REF: A-431 A-431 CABINET MTL-01 WOOD SCHEDULE BLOCKING - 3" REF: MELAMINE BLOCKING AT GYP BD FINISH 061053.C 6 CONTINUOUS AA 10" 061053.C BB CC DD EE FF GG LIGHTING, BEYOND 265000.A MTL-01 064023.P CLEAR WOOD BLOCKING INTERIOR PARTITIONS BETWEEN PROVIDE WOOD BASE - REFER TO PROVIDE COORDINATE WITH 093013.B BEYOND WOOD BLOCKING 098411.B CABINET MTL-01 STUDS, TYPAT GYP BD - 3" BD PARTITIONS UNDER BLOCKING FINISH SCHEDULE AT1'GYP 061053.C 6 10" 092900.D MILLWORKER CONTINUOUS TL-05 LIGHTING, MTL-01 BEYOND 064023.P CLEAR STUDS, TYP 265000.A PARTITIONS BETWEEN BETWEEN PROVIDE RE: ELECTRICAL 064023.P WOOD BASE - REFER TO COORDINATE WITH BEYOND 093013.B UNDER CABINET MTL-01 1' - 3" STUDS, TYPAT GYP BD 092900.D 098411.A BLOCKING FINISH SCHEDULE 061053.C 6 10" 061053.C MILLWORKER CONTINUOUS VARIES TL-05 KEY PLAN PNT-01 AMP-02 LIGHTING, BEYOND CLEAR 265000.A 064023.P AP-02 PARTITIONS BETWEEN PROVIDE WOOD BLOCKING PROVIDE WOOD RE: ELECTRICAL BASE - REFER TO RE: PLANS COORDINATE WITH 098411.B 093013.B CABINET MTL-01 STUDS, TYPAT GYP BD 092900.D AT GYP BD PARTITIONS UNDER BLOCKING FINISH SCHEDULE 061053.C 6 10" 061053.C MILLWORKER CONTINUOUS TL-05 061053.C LIGHTING, 2' -TYP 8" 064023.P BEYOND 265000.A BETWEENWOOD STUDS, PARTITIONS BETWEEN 064023.P WOOD PROVIDE BLOCKING PROVIDE RE: ELECTRICAL BASE - REFER TO VARIES COORDINATE 098411.B 093013.B 123661.C MTL-01 UNDER CABINET 123661.C 6 2' -WITH 8" 098411.A STUDS, TYPAT GYP BD 092900.D AT GYP BD PARTITIONS MILLWORKER 6 BLOCKING FINISH SCHEDULE CONTINUOUS 061053.C 10" 061053.C KEY PLAN RE:VARIES PLANS TL-05 BEYOND LIGHTING, 1/8" MITERED AP-02 1/8" MITERED BETWEENWOOD STUDS, TYP 265000.A PARTITIONS BETWEEN 061053.C BASE - REFER TO 064023.P WOOD PROVIDE BLOCKING PROVIDE RE: ELECTRICAL RE: PLANS COORDINATE WITH 098411.B 1' - 6" 093013.B RADIUS PENCIL UNDER CABINET 064023.O RADIUS PENCIL 098411.A STUDS, TYPAT GYP BD FINISH SCHEDULE 092900.D 061053.C 061053.C AT GYP BD PARTITIONS 10" BLOCKING 061053.C VARIES PLAN 061053.C MILLWORKER TL-05 EDGE, TYP 2' -TYP 8"093013.B LIGHTING, BRACKET EDGE, TYP 265000.A 092900.A TV MOUNTINGKEY AP-02 BETWEENWOOD STUDS, PARTITIONS BETWEEN PROVIDE 064023.P WOOD PROVIDE BLOCKING PROVIDE WOOD VARIES RE: ELECTRICAL RE: PLANS 123661.C WITH MOUNTED ON BLOCKING, 098411.B UNDER CABINET TL-04COORDINATE 093013.B 123661.C 092900.D 098411.A STUDS, TYPAT GYP BD BLOCKING AT GYP BD PARTITIONS MILLWORKER BLOCKING AT GYP 061053.C RE:VARIES PLANS KEY PLAN 061053.C LIGHTING, TL-05 092216.A RE: AV DRAWINGS 2'061053.C -TYP 8" 1/8" MITERED 1/8" MITERED AP-02 PARTITIONS BETWEEN BETWEEN STUDS, BD PARTITIONS 092900.D 064023.P PROVIDE WOOD BLOCKING VARIES RE: ELECTRICAL RE: PLANS COORDINATE WITH 093013.B RADIUS PENCIL 123661.C 098411.B 064023.O RADIUS PENCIL 7 123661.C STUDS, TYP BETWEEN STUDS, 098411.A AT GYP BD PARTITIONS MILLWORKER 061053.C RE:VARIES PLANS TL-05 KEY PLAN EDGE, TYP 061053.C EDGE, TYP 092216.A 2'061053.C -TYP 8" 1/8" MITERED 1/8" MITERED TYP AP-02 061053.F BETWEENWOOD STUDS, RE: ELECTRICAL 064023.P PROVIDE BLOCKING VARIES RE: PLANS RADIUS PENCIL 123661.C 098411.B (South) (North) 064023.O RADIUS PENCIL EQ EQ 123661.C 2' 4" 098411.A 061053.C AT GYP BD PARTITIONS RE:VARIES PLANS KEY PLAN EDGE, TYP 061053.C EDGE, TYP 2'061053.C -TYP 8"061053.C 1/8" MITERED 1/8" MITERED CLEAR PULL AP-02 BETWEEN STUDS, PROVIDE WOOD BLOCKING 064023.P PROVIDE WOOD BLOCKING 064023.P VARIES RE: PLANS 098411.B 5 RADIUS PENCIL 7 123661.C 260000.B 064023.O RADIUS PENCIL 2' - 3" 123661.C AT GYP BD PARTITIONS 098411.A AT GYP BD PARTITIONS 061053.D RE:VARIES PLANS KEY PLAN EDGE, TYP 061053.C EDGE, TYP RE: ELECTRICAL 2'061053.C -TYP 8"BETWEEN STUDS, TYP 1/8" MITERED 1/8" MITERED BETWEEN STUDS, AP-02 1 1/2" 064023.P VARIES RE: PLANS (South) (North) RADIUS PENCIL 7 123661.C 064023.F 064023.O RADIUS PENCIL 123661.C 098411.A 061053.F VARIES KEY PLAN RE: PLANS WD-03 WD-03 064023.A EDGE, TYP 061053.C EDGE, TYP 2'061053.C - 8" 1/8" MITERED AP-02 1/8" MITERED 064023.P RE: PLANS VARIES WD-05 PENCIL (South) (North) RADIUS PENCIL 7 123661.C 064023.O RADIUS WD-02 123661.C 061053.D 061053.C 061053.C RE: PLANS EDGE, TYP 2' - 8" EDGE, TYP 1/8" MITERED 1/8" MITERED 1 1/2" 061053.C PROVIDE WOOD 064023.P VARIES 064023.A 123661.C 064023.F (South) (North) 123661.B RADIUS PENCIL 7 123661.C 064023.O RADIUS PENCIL 061053.F BLOCKING AT 061053.D WD-03 RE: PLANS 064023.A 2' - 4" BLACK EDGE, TYP 1/8" MITERED 1/8" MITERED EDGE, TYP 1/8" MITERED 1 1/2" PARTITIONS BETWEEN 061053.C 061053.C 064023.P MELAMINE CLEAR WD-05 PENCIL RADIUS PENCIL RADIUS PENCIL 064023.F 064023.O 064023.O (South) (North) RADIUS 7 TYP SHEET TITLE WD-02 STUDS, 061053.F 061053.D INTERIOR 064023.A EDGE, TYP EDGE, TYP EDGE, TYP 265000.A 1 1/2" 064023.A 064023.P 1 1/4" 064023.P WD-05 064023.F (South) (North) 7 WD-02DRAWINGS BLACK RE: LIGHTING W061053.F WD-03 061053.D 2' - 4" 064023.A WD-03 MELAMINE 1 1/2" CLEAR 064023.A 064023.P 7 WD-05 INTERIOR 7 064023.F (South) (North) WD-02 SHEET TITLE PNT-02 061053.F WD-03 061053.D 2' - 4" 064023.O 064023.A WOOD 1 1/2" 1 1/4" WD-03 CLEAR 064023.A 064023.P 064023.P (South) (North) WD-05 064023.F 064023.F BLACK 064023.P WD-02 SHEET TITLE BLOCKING 061053.F WD-03 061053.D 2' - 4" WOOD 064023.A MELAMINE WOOD BLOCKING 1 1/2" 064023.P 1 1/4" RB-02 BLOCKING CLEAR 064023.A 064023.P INTERIOR WD-05 064023.F BLACK WD-02 SHEET TITLE 0' 16' 32' 1 1/2" 061053.F 061053.D 064023.O WD-03 2' - 4" 064023.A MELAMINE WD-03 WOOD 1 1/2" 8 1 1/4" CLEAR 064023.A 064023.P INTERIOR 064023.F WD-05 BLACK BLOCKING WD-02 061053.F SHEET TITLE WD-03 WD-03 064023.O WD-03 WOOD 064023.A 2' - 4" Scale: 1/16" = 1'-0" 064023.A MELAMINE PROJECT # WD-03 WOOD BLOCKING WOOD 064023.X BLOCKING 1 1/4" RB-02 CLEAR 064023.A 064023.P WD-05 INTERIOR PLAM-01 WD-02 BLACK BLOCKING 0' 16' 32' WD-06 SHEET TITLE 064023.O WD-03 WOOD 2' - 4" MELAMINE ADHERED WD-03 WOOD BLOCKING WOOD CONTINUOUS BASE 8 TO BLOCKING RB-02 064023.A 3" 1 1/4" CLEAR 064023.P INTERIOR 3" 064023.A 3" CONTINUOUS BASE 5/8" PLYWOOD BLACK 30x42 BLOCKING 0' 16' 32' REFER TO FINISH SHEET TITLE WD-03 2' - 4" 064023.O Scale: 1/16" = 1'-0" WOOD REFER TO FINISH 2' - 4" PROJECT # MELAMINE PLAM-01 SCHEDULE WD-03 WOOD BLOCKING WOOD 8 CLEAR BLOCKING 1 1/4" RB-02 SCHEDULE 064023.P CLEAR INTERIOR BLACK SHEET TITLE BLOCKING 0' 16' 32' SHEET # 064023.O Scale: 1/16" = 1'-0" WOOD PROJECT # 061053.G MELAMINE CONTINUOUS BASE WD-03 WOOD BLOCKING WOOD 3" 8 1 1/4" RB-02 BLOCKING 064023.P 3" 3" CONTINUOUS BASE INTERIOR BLACK 30x42 BLACK REFER TO FINISH BLOCKING 0' 16' 32' 092216.A 064023.O Scale: 1/16" = 1'-0" WOOD A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 REFER TO FINISH MELAMINE PROJECT # MELAMINE SCHEDULE CONTINUOUS BASE WD-03 WOOD BLOCKING WOOD 3" 8 E F G H J K BLOCKING RB-02 SCHEDULE INTERIOR 3" 3" CONTINUOUS BASE INTERIOR 30x42 REFER TO FINISH BLOCKING 0' 16' 32' 064023.O SHEET # 064023.O Scale: 1/16" = 1'-0" WOOD REFER TO FINISH PROJECT # SCHEDULE WD-03 WOOD CONTINUOUS BASE WOOD BLOCKING 3" 8 BLOCKING RB-02 SCHEDULE 3" 3" CONTINUOUS BASE 30x42 BLOCKING REFER TO FINISH 0' 16' 32' SHEET # WOOD A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 Scale: 1/16" = 1'-0" REFER TO FINISH WOOD PROJECT # SCHEDULE WOOD WOOD CONTINUOUS BASE BLOCKING E F G H BLOCKING J RB-02 3" K 8 SCHEDULE BLOCKING 6 2' 8" 3" 3" CONTINUOUS BASE BLOCKING 30x42 0' 16' 32' REFER TO FINISH SHEET # A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 Scale: 1/16" = 1'-0" REFER TO FINISH PROJECT # SCHEDULE 8 CONTINUOUS BASE 8 RB-02 E F G H J K 3" SCHEDULE 3" 3" CONTINUOUS BASE RB-02 30x42 REFER TO FINISH SHEET # # Scale: 1/16" = 1'-0" A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 REFER TO FINISH PROJECT SCHEDULE CONTINUOUS BASE E F G H J 3" K SCHEDULE 3" 093013.B 3" CONTINUOUS BASE 30x42 REFER TO FINISH SHEET # A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 REFER TO FINISH 1' - 2" 1' - 2" 1' - 1" SCHEDULE CONTINUOUS BASE CONTINUOUS BASE G TL-04 3" K 3" 3" E F3" H J SCHEDULE 3" CONTINUOUS BASE CONTINUOUS BASE 30x42 REFER TO FINISH REFER TO FINISH SHEET # A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 A-434 SCALE: 1 1/2" = 1'-0" REF: A-431 REFER TO FINISH REFER TO FINISH SCHEDULE SCHEDULE E F G H J K SCHEDULE 092900.D SCHEDULE

4"

2'2'- 3" - 8" 2' - 4" CLEAR 2' - 4" CLEAR 2' - 3" 2' - 4" CLEAR 2' - 3" BLACK 2' - 4" MELAMINE CLEAR 2' - 3" INTERIOR 2' - 4" CLEAR 2' - 3" BLACK MELAMINE 2' - 4" INTERIOR CLEAR 2' - 3" BLACK 2' - 4" MELAMINE CLEAR INTERIOR 2' - 3" BLACK MELAMINE 2' - 3" INTERIOR BLACK MELAMINE INTERIOR BLACK MELAMINE INTERIOR BLACK MELAMINE INTERIOR BLACK MELAMINE REF: A-431 INTERIOR

4"

092900.D

2' - 8" 2' - 4" CLEAR 2' - 8"

4"

093013.B TL-05 093013.B 092900.D TL-05 093013.B 092900.D TL-05 093013.B 092900.D TL-05

M092900.D

A-435

4"

A-434

A3 Partial Railing Elevation

4"

A-434

061053.C 061053.C PROVIDE PROVIDEWOOD WOODBLOCKING BLOCKING AT ATGYP GYPBD BDPARTITIONS PARTITIONS BETWEEN BETWEENSTUDS, STUDS,TYP TYP

4"

A-434

092900.D 092900.D 092216.A 092216.A

2' - 10"

A-434

1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"

A-434

SCALE: 1 1/2" = 1'-0" REF: A-431 2' - 8" M SCALE: 1 1/2" = 1'-0" REF: A-431 093013.B M SCALE: TL-05 1 1/2" = 1'-0" REF: A-431 2' - 8" M092900.D SCALE: 1 1/2" = 1'-0" REF: A-431 093013.B 2' - 8" M SCALE: TL-05 1 1/2" = 1'-0" REF: A-431 093013.B 2' - 8" M092900.D SCALE: TL-05 1 1/2" = 1'-0" REF: A-431 093013.B 2' - 8" M092900.D TL-05

1' - 1 1' 1' - 1 1/2" 1' - 1 1/2" 1' - 1 1/2" 1' - 1 1/2" 1' - 1 1/2" 1' - 1 1/2" - 1 1/2" 1/2"

A-434

LINEAR 054000.A V.I.F.DIFFUSER RE: MECHANICAL 054000.A LINEAR 1 1/2" DIFFUSER RE: MECHANICAL LINEAR DIFFUSER RE: MECHANICAL LINEAR DIFFUSER MECHANICAL LINEAR 1/2" = RE: 1'-0" REF: A-436 054000.U DIFFUSER AS RE:NEEDED MECHANICAL LINEAR DIFFUSER RE: MECHANICAL LINEAR 057300.E 054000.U DIFFUSER AS NEEDED RE: MECHANICAL 054000.U

C2 Railing Plan Detail at

2' 10" 2' -- 10" 2' - 6"

M

2' - 6"2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6"

SCALE: 1 1/2" = 1'-0" REF: A-431

2' - 10" 2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"

A-434

093013.B 093013.B TL-04 TL-04

092216.A 092216.A

054000.A LINEAR DIFFUSER RE: MECHANICAL 054000.A

4' 4" 4' -- 4"

C4 Section Detail at Undercounter Equipment C4 D U m C4 D U m C4 D U m C4 Section Detail at Undercounter Equipment C4 Section Detail at Undercounter Equipment C4 Section Detail at Undercounter Equipment C4 Section Detail at Undercounter Equipment C4 Section Detail at Undercounter Equipment C4 Section Detail at Undercounter Equipment

2'2'--8" 8"

RE: MECHANICAL LINEAR 054000.A 057300.E DIFFUSER 054000.U RE: MECHANICAL LINEAR AS NEEDED 057300.E DIFFUSER 057300.B 054000.U RE: MECHANICAL 054000.A AS NEEDED 057300.E 054000.U 054000.A AS NEEDED 057300.E 057300.B 054000.U 054000.A AS NEEDED 057300.E 057300.B 054000.U 054000.A AS NEEDED 057300.C 057300.B 054000.U 3"x2"x1/4" 054000.A MTL-01 AS NEEDED 057300.B STEEL ANGLE 054000.U 054000.A AS NEEDED 057300.C 057300.B 3"x2"x1/4" 3' - 0" 054000.A MTL-01 ALLOW 057300.C TYP 1/2" 057300.B STEEL ANGLE SPACE FOR 3"x2"x1/4" MOUNTING, MTL-01 057300.C 057300.B TYP STEEL ANGLE 3"x2"x1/4" ALLOW 1/2" MTL-01 057300.C SPACE FOR STEEL ANGLE 3"x2"x1/4" MOUNTING, 092900.A ALLOW 1/2" MTL-01 057300.C TYP SPACE FOR 123661.B 123661.B STEEL ANGLE 3"x2"x1/4" 064023.X MOUNTING, 1/8" 1/8" MITERED MITERED ALLOW 1/2" MTL-01 N.9 WB-03 057300.C TYP RADIUS RADIUS PENCIL PENCIL SPACE FOR STEEL ANGLE 3"x2"x1/4" 064023.Y 092900.A EDGE, EDGE,MOUNTING, TYP TYP 1/2" ALLOW 057300.C MTL-01 TYP SPACE FOR STEEL ANGLE 3"x2"x1/4" 064023.X 092900.A MOUNTING, MTL-01 ALLOW 1/2" WB-03 3/4" x 3/4" TYP STEEL ANGLE SPACE FOR CONTINUOUS 064023.X 064023.Y 092900.A MOUNTING, PROFILE ALLOW 1/2" WB-03 TYP SPACE FOR 064023.P 064023.P 064023.X 064023.Y 092216.A 092900.A MOUNTING, ALLOW 1/2" 3/4" x 3/4" WB-03 TYP SPACE FOR CONTINUOUS 064023.X 064023.Y 111/2" 1/2" MOUNTING, 092900.A PROFILE 1/8" WB-03 3/4" x 3/4" TYP CONTINUOUS 064023.X 064023.Y 092216.A 092900.A PROFILE 064023.A 064023.A 3/4" x 3/4" WB-03 CONTINUOUS PLAM-01 PLAM-01 064023.X 064023.Y 092216.A 092900.A PNT-01 AMP-02 1/8" PROFILE 3/4" x 3/4" WB-03 CONTINUOUS 064023.X 064023.Y 092216.A 1/8" WB-03 PROFILE 3/4" x 3/4" CONTINUOUS 064023.Y 092216.A 1/8" 3/4" PROFILE 092900.A x 3/4" CONTINUOUS 092216.A 092216.A 1/8" PROFILE 3/4" x 3/4" CONTINUOUS 092216.A 064023.O 064023.O 1/8" PROFILE

2'2'--8" 8"

092900.A 092900.A

3' - 6"3' - 6" 3' - 6" 3' - 6" 3' - 6" 3' - 6" 3' - 6"

057300.E

Level 01 136' - 0" Level 01 136' - 0" Level 01 136' - 0" Level 01 136' - 0" Level 01 136' - 0" Level 01 136' - 0" Level 01 136' - 0" 123661.C 1/8" MITERED RADIUS PENCIL EDGE, TYP 123661.C 1/8" MITERED RADIUS PENCIL 123661.C EDGE, TYP 1/8" MITERED RADIUS PENCIL 123661.C EDGE, TYP 1/8" MITERED 064023.P RADIUS PENCIL 123661.C EDGE, TYP 1/8" MITERED 064023.O RADIUS PENCIL 123661.C EDGE, TYP 1/8" MITERED 064023.P RADIUS PENCIL 123661.C EDGE, TYP 1/8" MITERED 064023.A 064023.P 064023.O RADIUS 123661.C WD-05 PENCIL EDGE, TYP 1/8" MITERED 064023.P 064023.F 064023.O RADIUS PENCIL EDGE, TYP 064023.A 064023.P 064023.O WD-05 064023.A 064023.F 064023.P 064023.O WD-05 064023.A 064023.F 064023.P 064023.O WD-05 WOOD BLOCKING 064023.A 064023.P 064023.F 064023.O WD-05 064023.A 064023.O 064023.F WOOD BLOCKING WD-05 064023.A 064023.F WOOD BLOCKING WD-05 CONTINUOUS 064023.A 064023.F BASE - REFER TO WD-05 WOOD BLOCKING FINISH SCHEDULE 064023.F WOOD BLOCKING CONTINUOUS BASE - REFER TO WOOD SCHEDULE BLOCKING FINISH CONTINUOUS

PROVIDE ADDITIONAL SUPPORT FOR FRONT METAL FRAMING AT LINEAR DIFFUSER. COORDINATE PROVIDE ADDITIONAL LOCATIONS WITH SUPPORT FOR FRONT SUPPLY PLENUM AT METAL FRAMING PROVIDE ADDITIONAL BOXES. DIFFUSER. REFER TO MECH LINEAR SUPPORT FOR FRONT COORDINATE METAL FRAMING AT PROVIDE ADDITIONAL LOCATIONS WITH LINEAR DIFFUSER. SUPPORT FOR FRONT SUPPLY PLENUM COORDINATE METAL FRAMING AT PROVIDE ADDITIONAL BOXES. REFER TO MECH LOCATIONS WITH LINEAR DIFFUSER. SUPPORT FOR FRONT SUPPLY PLENUM COORDINATE METAL FRAMING AT PROVIDE ADDITIONAL BOXES. REFER TO MECH LOCATIONS WITH LINEAR DIFFUSER. SUPPORT FOR FRONT SUPPLY PLENUM COORDINATE METAL FRAMING AT PROVIDE ADDITIONAL BOXES. REFER TO LOCATIONS WITH MECH LINEAR DIFFUSER. SUPPORT FOR FRONT SUPPLY PLENUM COORDINATE METAL FRAMING AT PROVIDE ADDITIONAL BOXES. REFER TO MECH LOCATIONS WITH LINEAR DIFFUSER. SUPPORT FOR FRONT SUPPLYFRAMING PLENUM AT COORDINATE METAL BOXES. DIFFUSER. REFER TO MECH LOCATIONS WITH LINEAR SUPPLY PLENUM COORDINATE BOXES. REFER TO MECH LOCATIONS WITH SUPPLY PLENUM BOXES. REFER TO MECH

057300.D DIFFUSER 054000.A RE: MECHANICAL LINEAR 057300.D 057300.E DIFFUSER RE: MECHANICAL LINEAR DIFFUSER RE: MECHANICAL LINEAR 057300.E DIFFUSER 054000.U RE: MECHANICAL LINEAR AS NEEDED 057300.E DIFFUSER

PNT-02 PNT-02

Level 01 136' - 0"

PNT-01 PNT-01

057300.D 054000.A LINEAR 057300.D DIFFUSER 054000.A RE: MECHANICAL 057300.D 054000.A LINEAR

CONTINUOUS SLOT DIFFUSER 265000.A 265000.A RE:MECHANICAL RE: RE:LIGHTING LIGHTINGDRAWINGS DRAWINGS

1

AMP-02 AMP-02

054000.A EDGE OF SLAB RE: STRUCTURAL 054000.A 057300.C 057300.D 054000.A

EQ EQ J COLD FORMED METAL FRAMING SYSTEM

055000.P

055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE PLATE MATERIAL KEYNOTES J

7' -- 2" 2" 7'

55

057300.D 054000.A

057300.D

054000.A

2' - 2"2' - 2" 2' - 2" 2' - 2" 2' - 2" 2' - 2" 2' - 2"

3' - 0"3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"

3' - 0"

ATTACHED DIRECTLY TO STEEL CONCEALED STEEL POST. MOUNTING BRACKET 092900.A 055000.P 2' - 8" RE: PLAN FOR LOCATION ATTACHED DIRECTLY TO FOOD PNT-02 STEEL CONCEALED STEEL POST. 055000.R MOUNTING BRACKETSERVICE 055000.P RE: PLAN FOR LOCATION EQUPMENT ATTACHED DIRECTLY TO STEEL CONCEALED STEEL POST. 055000.R 092900.A MOUNTING BRACKET 055000.P RE: PLAN FOR LOCATION PNT-02 ATTACHED DIRECTLY TO STEEL CONCEALED FOOD STEEL POST. 055000.R 092900.A MOUNTING BRACKETSERVICE 055000.P EQUPMENT RE: PLAN FOR LOCATION FOOD PNT-02 ATTACHED DIRECTLY TO STEEL CONCEALED SERVICE STEEL POST. 055000.R 092900.A MOUNTING BRACKET 055000.P EQUPMENT RE: PLAN FOR LOCATION FOOD PNT-02 ATTACHED DIRECTLY TO STEEL CONCEALED STEEL POST. MOUNTING BRACKETSERVICE 055000.R 092900.A EQUPMENT RE: PLAN FOR LOCATION ATTACHED DIRECTLY TO FOOD PNT-02 STEEL POST. SERVICE 055000.R 092900.A RE: PLAN FOR LOCATION EQUPMENT FOOD PNT-02 055000.R SERVICE 092900.A EQUPMENT FOOD PNT-02 SERVICE 092900.A EQUPMENT FOOD PNT-02 SERVICE EQUPMENT

057300.D 054000.A

057300.D

054000.A

054000.U STUD KICKER MATERIAL KEYNOTES J

054000.A COLD METAL FRAMING SYSTEM 057000.F SOLID FORMED METAL PLATE 054000.U STUD MATERIAL KEYNOTES 057300.B STEELKICKER T BAR J 054000.A COLD FORMED METAL FRAMING SYSTEM 055000.P STEEL ANGLE 057300.C STEEL ANGLE 054000.U STUD KICKER 055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE PLATE MATERIAL KEYNOTES 057300.D PERFORATED PANEL INFILL (MTL-02) J METAL 054000.A COLD METAL FRAMING SYSTEM 055000.P STEEL ANGLE 057000.F SOLID FORMED METAL 057300.E SOLID METAL PLATE PANEL INFILL (MTL-01) 054000.U STUD KICKER 055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE 057300.B STEEL T BAR D E PLATE MATERIAL KEYNOTES J 061053.C PRESERVATIVE-TREATED WOODSYSTEM BLOCKING 054000.A COLD METAL FRAMING 055000.P STEEL ANGLE PLATE 057000.F SOLID FORMED METAL 057300.C STEEL ANGLE 061053.D WOOD FRAMING 054000.U STUD 055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE PLATE 057300.B STEELKICKER T BAR 057300.D PERFORATED METAL PANEL INFILL (MTL-02) MATERIAL KEYNOTES 061053.F PRESERVATIVE-TREATED PLYWOOD 054000.A COLD FORMED METAL FRAMING SYSTEM 055000.P STEEL ANGLE 057000.F SOLID METAL PLATE 057300.C STEEL ANGLE 057300.E SOLID METAL PANELCABINETS INFILL (MTL-01) 064023.A PLASTIC-LAMINATE 054000.U STUD 055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE PLATE MATERIAL KEYNOTES 057300.B STEELKICKER T BAR 057300.D PERFORATED METAL PANEL INFILL (MTL-02) 061053.C PRESERVATIVE-TREATED WOOD BLOCKING 064023.F ADJUSTABLE 054000.A COLD METAL FRAMING SYSTEM 055000.P STEEL ANGLESHELF 057000.F SOLID FORMED METAL PLATE 057300.C STEEL ANGLE 057300.E METAL PANEL INFILL (MTL-01) 061053.D WOOD FRAMING 21.6 SOLID 064023.H BLOCKING 054000.U STUD 055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE PLATE 057300.B STEELKICKER T BAR 057300.D PERFORATED METAL PANEL INFILL (MTL-02) 061053.C WOOD BLOCKING 061053.F PRESERVATIVE-TREATED PLYWOOD 054000.A COLD FORMED METAL FRAMING SYSTEM 064023.O CABINET HARDWARE 055000.P STEEL ANGLE 057000.F SOLID METAL PLATE 057300.C STEEL ANGLE 057300.E SOLID METAL PANELCABINETS INFILL (MTL-01) 061053.D WOOD FRAMING 064023.A PLASTIC-LAMINATE 054000.U STUD KICKER 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM 055000.R PARTIAL HEIGHT WALL SUPPORT WITH BASE PLATE 057300.B STEEL T BAR 057300.D PERFORATED METAL PANEL INFILL 061053.C WOOD BLOCKING 061053.F PRESERVATIVE-TREATED PLYWOOD LL(MTL-02) 064023.F ADJUSTABLE SHELF 055000.P STEEL ANGLE 064023.S PLASTIC LAMINATE 057000.F SOLID METAL PLATE 057300.C STEEL ANGLE 057300.E SOLID METAL PANELCABINETS INFILL (MTL-01) 061053.D WOOD FRAMING 064023.A PLASTIC-LAMINATE 064023.H BLOCKING 055000.R PARTIAL HEIGHTWALL WALLPANEL SUPPORT WITH BASE PLATE 064023.X WOOD VENEER 057300.B STEEL T BAR 057300.D PERFORATED METAL PANEL INFILL (MTL-02) 061053.C PRESERVATIVE-TREATED WOOD BLOCKING 061053.F PLYWOOD 064023.F SHELF 064023.O CABINET HARDWARE PNT-02 PNT-02 ADJUSTABLE 057000.F SOLID METAL PLATE 064023.Y MOUNTING HARDWARE 057300.C STEEL ANGLE 057300.E SOLID METAL PANELCABINETS INFILL (MTL-01) 061053.D WOOD FRAMING 064023.A PLASTIC-LAMINATE 064023.H BLOCKING 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM 057300.B STEEL T BAR METAL 092216.A NON-STRUCTURAL METAL FRAMING 057300.D PERFORATED INFILL (MTL-02) 061053.C WOOD BLOCKING 061053.F PRESERVATIVE-TREATED PLYWOOD 064023.F ADJUSTABLE SHELF PANEL 064023.O CABINET HARDWARE 064023.S PLASTIC LAMINATE 057300.C STEEL ANGLE 092900.A TYPE X GYPSUM BOARD (U.N.O.) 057300.E SOLID METAL PANEL INFILL (MTL-01) 061053.D WOOD FRAMINGPULL, 064023.A PLASTIC-LAMINATE CABINETS 064023.H BLOCKING 064023.P DOOR/DRAWER MOCKETT DP3BAM 064023.X VENEERMETAL WALL PANEL 057300.D WOOD 057300.D PERFORATED PANEL INFILL (MTL-02) 092900.D CEMENTITIOUS BACKER UNITS 061053.C WOOD BLOCKING 061053.F PRESERVATIVE-TREATED PLYWOOD 064023.F ADJUSTABLE SHELF 064023.O CABINET HARDWARE 064023.S PLASTIC LAMINATE 064023.Y MOUNTING HARDWARE 057300.E SOLID METAL PANEL INFILL (MTL-01) 093013.B CERAMIC WALL TILECABINETS SYSTEM 061053.D WOOD FRAMING 064023.A PLASTIC-LAMINATE 064023.H BLOCKING 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM 064023.X WOOD VENEER WALL PANEL 092216.A NON-STRUCTURAL METAL FRAMING 061053.C PRESERVATIVE-TREATED WOOD BLOCKING 098411.A ACOUSTICAL PANEL CONTINUOUS 061053.F PRESERVATIVE-TREATED PLYWOOD 064023.F ADJUSTABLE SHELF 064023.O CABINET HARDWARE 064023.S PLASTIC LAMINATE 064023.Y MOUNTING HARDWARE 092900.A TYPE XFRAMING GYPSUM BOARDSYSTEM (U.N.O.) 061053.D WOOD 098411.B INTERLOCK MOUNTING 064023.A PLASTIC-LAMINATE CABINETS 064023.H BLOCKING 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM ANGLE, 064023.X WOOD VENEER BACKER WALL PANEL 092216.A NON-STRUCTURAL METAL FRAMING 092900.D CEMENTITIOUS UNITS 061053.F PRESERVATIVE-TREATED PLYWOOD 123661.B SYNTHETIC STONE 064023.F ADJUSTABLE SHELF(SST-01) 064023.O CABINET HARDWARE 064023.S PLASTIC LAMINATE 064023.Y MOUNTING HARDWARE 092900.A TYPE X GYPSUM BOARD (U.N.O.) BEYOND 093013.B CERAMIC WALL TILE SYSTEM 064023.A CABINETS AMP-02 AMP-02 PLASTIC-LAMINATE 123661.C SYNTHETIC STONE (SST-02) 064023.H BLOCKING 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM 064023.X WOOD VENEER WALL PANEL 092216.A NON-STRUCTURAL METAL FRAMING 092900.D CEMENTITIOUS BACKER UNITS 098411.A ACOUSTICAL PANEL 064023.F ADJUSTABLE SHELF 260000.B DUPLEX RECEPTACLE 02 X GYPSUM 064023.O CABINET HARDWARE 064023.S Level PLASTIC LAMINATE 064023.Y MOUNTING HARDWARE 092900.A TYPE BOARD (U.N.O.) 093013.B CERAMIC WALL TILE SYSTEM 098411.B INTERLOCK MOUNTING SYSTEM 064023.H BLOCKING 265000.A LIGHT 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM 064023.X VENEER WALL PANEL 092216.A NON-STRUCTURAL METAL FRAMING - 0" FIXTURE 092900.D 152' WOOD CEMENTITIOUS BACKER UNITS 098411.A ACOUSTICAL PANEL 123661.B SYNTHETIC STONE (SST-01) 064023.O CABINET HARDWARE 064023.S PLASTIC LAMINATE 064023.Y MOUNTING HARDWARE 092900.A TYPE X GYPSUM BOARD (U.N.O.) 093013.B CERAMIC WALL TILE SYSTEM 098411.B INTERLOCK MOUNTING SYSTEM 123661.C SYNTHETIC STONE (SS 064023.P DOOR/DRAWER PULL, MOCKETT DP3BAM 064023.X WOOD VENEER WALL PANEL 092216.A NON-STRUCTURAL METAL FRAMING 092900.D CEMENTITIOUS BACKER UNITS 098411.A ACOUSTICAL PANEL 123661.B SYNTHETIC STONE (SST-01) 064023.S PLASTIC LAMINATE 6" LONG STEEL 064023.Y MOUNTING HARDWARE 092900.A TYPE X GYPSUM BOARD (U.N.O.) 093013.B CERAMIC WALL TILE SYSTEM 098411.B INTERLOCK MOUNTING SYSTEM 123661.C SYNTHETIC STONE (SST-02) 064023.X WOOD VENEER WALL PANEL 092216.A NON-STRUCTURAL METAL FRAMING 092900.D CEMENTITIOUS BACKER UNITS ANGLE 098411.A ACOUSTICAL PANEL 123661.B SYNTHETIC STONE (SST-01) 260000.B DUPLEX RECEPTACLE 079500.A 064023.Y MOUNTING HARDWARE 092900.A TYPE GYPSUM BOARD (U.N.O.) 093013.B CERAMIC WALL TILE SYSTEM 098411.B INTERLOCK MOUNTING SYSTEM 123661.C SYNTHETIC STONE (SST-02) CENTERED ONXFIXTURE 265000.A LIGHT 092216.A NON-STRUCTURAL METAL FRAMING 092900.D CEMENTITIOUS BACKER UNITS 098411.A ACOUSTICAL PANEL 123661.B SYNTHETIC STONE (SST-01) 260000.B DUPLEX RECEPTACLE STEEL T BAR, 092900.A TYPE X GYPSUM BOARD (U.N.O.) WD-03 WD-03 093013.B CERAMIC WALL TILE SYSTEM 098411.B INTERLOCK MOUNTING SYSTEM 123661.C SYNTHETIC STONE (SST-02) 265000.A LIGHT FIXTURE 057300.D 057300.C 092900.D CEMENTITIOUS BACKER UNITS BEYOND 098411.A ACOUSTICAL PANEL 123661.B SYNTHETIC STONE (SST-01) 260000.B DUPLEX RECEPTACLE CONTINUOUSLY FASTENED CONTINUOUS 093013.B CERAMIC WALL TILE SYSTEM 098411.B INTERLOCK MOUNTING SYSTEM 123661.C SYNTHETIC STONE (SST-02) 265000.A FIXTURE (1 SIDE ONLY)LIGHT TO ALLOW 098411.A ACOUSTICAL PANEL(SST-01) 123661.B SYNTHETIC STONE 260000.B DUPLEX RECEPTACLE FORPNT-08 REQUIRED MOVEMENT 057300.B MTL-02 PNT-08 098411.B INTERLOCK MOUNTING SYSTEM 123661.C SYNTHETIC STONE (SST-02) 265000.A LIGHT FIXTURE GYP GYP 123661.B SYNTHETIC STONE (SST-01) OVERLAPPING 260000.B BEYOND BEYOND DUPLEX RECEPTACLE 123661.C SYNTHETIC STONE (SST-02) 265000.A LIGHT FIXTURE MTL-01 260000.B DUPLEX RECEPTACLE 265000.A LIGHT FIXTURE

21.7

057300.C 057300.D

2' - 10"

MOUNTING BRACKET 2' - 8" ATTACHED DIRECTLY TO STEEL POST. 055000.P 2' - 8" RE: PLAN FOR LOCATION STEEL CONCEALED

MOUNTING BRACKET 055000.P M 055000.R 2' - 8"

9/30/2021 4:38:00 PM

M

055000.P 2' - 8" STEEL CONCEALED

BIM 360://Green Bay Packers Team Facility/GBT-arch.rvt

M

2' - 8"

1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"1 1/2"

M

2' - 10"

M

N.9 N.9

2' - 10" 2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"

2' - 8"

2' - 10" 2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"2' - 10"

M

1 1/2"

M

057300.C 057300.D

21.8

1' - 2"

2' - 8"

057300.C 057300.D H

057300.C 057300.D

SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0"REF: REF: A-431 A-431

2 3/4"

M

A-435 A-435

3' - 0"

(CONT.) W/ TOP OF SLAB

057300.C H

C3 Section Section Detail Detail at at Lounge Lounge Platform Platform

057300.C MTL-01 057300.D FLUSH PROVIDE CONTINUOUS MOUNTED BOLTS 057300.C 057300.E MTL-01 057300.C 057300.D 6" LONG FLUSH PROVIDE CONTINUOUS STEEL ANGLE MOUNTED BOLTS 057300.C MTL-01 CENTERED 057300.D FLUSH PROVIDE CONTINUOUS ON STEEL BOLTS 057300.C 057300.E MOUNTED MTL-01 057300.C T BAR 6" LONG FLUSH 057300.D PROVIDE CONTINUOUS STEEL ANGLE 057300.C 057300.E MOUNTED BOLTS PNT-02 PNT-02 MTL-01 057300.C CENTERED 057300.D 6" LONG FLUSH PROVIDE CONTINUOUS ON STEEL STEEL ANGLE 057300.C 057300.E MOUNTED BOLTS MTL-01 057300.C T BAR CENTERED 6" LONG FLUSH PROVIDE CONTINUOUS ON STEEL STEEL ANGLE 057300.C 057300.E MOUNTED BOLTS T BAR CENTERED 6" LONG FLUSH PROVIDE ON STEEL STEEL ANGLE MOUNTED BOLTS 057300.C 057300.E T BAR CENTERED 6" LONG ON STEEL STEEL ANGLE 057300.C 057300.E T BAR CENTERED 6" LONG ON STEEL STEEL ANGLE 057300.C 057300.E T BAR CENTERED 6"054000.A LONG AMP-02 AMP-02 ON STEEL STEEL ANGLE 057300.D T BAR CENTERED ON STEEL T 054000.A BAR

AS SCHEDULED RE: STRUCTURAL N.9 N.9 M FLOOR FINISH ALIGN TOPALIGN OF STEEL ANGLE (CONT.) W/ TOP OF SLAB RE: STRUCTURAL AS SCHEDULED PROVIDE ADDITIONAL ALIGN TOPALIGN OF STEEL ANGLE FLOOR FINISH (CONT.) W/ TOP OF SLAB SUPPORT FOR FRONT AS SCHEDULED METAL FRAMING ATALIGN TOPALIGN 2' 2' 8" 8" OF STEEL ANGLE FLOOR FINISH LINEAR DIFFUSER. (CONT.) W/ TOP OF SLAB AS SCHEDULED COORDINATE PROVIDE ADDITIONAL ALIGN LOCATIONS WITH SUPPORT FOR FRONT SUPPLYFRAMING PLENUM AT 057300.DMETAL PROVIDE ADDITIONAL BOXES. REFER TO MECH LINEAR DIFFUSER. SUPPORT FOR FRONT CONTINUOUS COORDINATE METAL FRAMING AT ADDITIONAL ANGLE, PROVIDE LOCATIONS WITH LINEAR DIFFUSER. SUPPORT FOR FRONT BEYONDSUPPLY PLENUM COORDINATE METAL FRAMING AT PROVIDE ADDITIONAL BOXES. REFER TO MECH Level 02 DIFFUSER. LOCATIONS WITH LINEAR SUPPORT FOR FRONT 152' - 0" SUPPLY PLENUM COORDINATE PNT-01 PNT-01 METAL FRAMING AT PROVIDE ADDITIONAL BOXES. REFER TO MECH LOCATIONS WITH LINEAR DIFFUSER. SUPPORT FOR FRONT 6" LONG SUPPLY STEEL PLENUM COORDINATE FRAMING AT ANGLE METAL PROVIDE ADDITIONAL BOXES. REFER TO MECH LOCATIONS WITH LINEAR CENTERED SUPPORT FOR FRONT 1'1'--6" 6" ON DIFFUSER. SUPPLY PLENUM COORDINATE STEEL TMETAL BAR, FRAMING AT 092900.A PROVIDE ADDITIONAL BOXES. REFER TO MECH 092900.A LOCATIONS WITH BEYONDLINEAR DIFFUSER. SUPPORT FOR FRONT 092216.A 092216.A SUPPLY PLENUM AT 2 COORDINATE METAL FRAMING REFER TO MECH LOCATIONS WITH LINEAR DIFFUSER. MTL-02 BOXES. EQ EQ EQ EQ SUPPLY PLENUM COORDINATE OVERLAPPING REFER TO MECH LOCATIONS WITH MTL-01 BOXES. SUPPLY PLENUM BOXES. REFER TO MECH

057300.C 057300.D H

057300.C 057300.D

6"

AS SCHEDULED RE: STRUCTURAL ALIGN TOPALIGN OF STEEL ANGLE FLOOR FINISH (CONT.) W/ TOP OF SLAB AS SCHEDULED RE: STRUCTURAL

054000.U 054000.U

3' - 0"

M

ALIGN TOPALIGN OF STEEL ANGLE M FLOOR FINISH (CONT.) W/ TOP OF SLAB SCALE: 1" 1" == 1'-0" 1'-0" REF: REF: A-436 A-436 A-435 A-435 SCALE: AS SCHEDULED RE: STRUCTURAL 1 M FLOOR FINISH ALIGN TOPALIGN OF STEEL ANGLE

C

3' - 0"

A3 Partial Partial Railing Railing Elevation Elevation

RB-04 G RB-04

M

057300.D FLUSH PROVIDE MOUNTED BOLTS 057300.C MTL-01 057300.D CONTINUOUS

ALIGN TOP OF STEEL ANGLE (CONT.) W/ TOP OF SLAB

G

M

3' - 0"3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 MTL-02 OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING OVERLAPPING MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01 MTL-01

M

M

057300.D B 057300.C MTL-01 057300.B CONTINUOUS MTL-01

A ALIGN TOP OF STEEL ANGLE F FLOOR FINISH 057300.C (CONT.) W/ TOP OF SLAB RE: STRUCTURAL AS SCHEDULED MTL-01 ALIGN 3'3'--0" 0" RE: STRUCTURAL TYP TYP FLOOR FINISH

3' - 6"

F

M

44

3' 3' -- 6" 6"

F

RE: STRUCTURAL

M

1' 1' -- 2" 2"

M

H

C

1/2" 1/2" TYP TYP

C

EQ EQ H 057300.C H

B 057300.B MTL-01

TYP.

G

K

1' - 2"

054000.A G 054000.A

M

K

A-435 A-435 SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0"REF: REF: A-436 A-436

2 3/4"

M

F

F2 Plan Plan Detail Detail at at Railing Railing

6"

M

F

E

MATERIAL KEYNOTES J

3' - 0"

F

E

D

J

H

3' - 0"

E

D

C

A 057300.C MTL-01 9'9'--6"6"

H

3"

D

C

SCALE: SCALE: 111/2" 1/2" == 1'-0" 1'-0"REF: REF: A-436 A-436

MAX.

C

G WD-02 WD-02 3/4" 3/4"THICK THICK G 061053.F 061053.F

3' - 6"

G

A-435 A-435

M

PERFORATED METAL

F

METAL

F

E

7' -- 6 6 1/2" 1/2" 7'

E

D

6"

D

C

COUNTERSUNK COUNTERSUNK SCREW, SCREW,TYP TYP

3'3'--0" 0" TYP TYP

C2 Railing Railing Plan Plan Detail Detail at at Expansion Expansion Joint Joint

C

33

3'3'--0" 0" TYP. TYP.

111/2" 1/2"

4" 4"

111/2" 1/2"

METAL PERFORATED METAL 3' - 0"

V.I.F. V.I.F.

057300.E 057300.E

4" 4"

CONTINUOUS CONTINUOUS SLOT SLOTDIFFUSER DIFFUSER RE:MECHANICAL RE:MECHANICAL

064023.P 1 1/2"

064023.A

1' - 1"

SCALE: 1 1/2" = 1'-0" REF: A-431 G


PROFESSIONAL WORK

LOCKER ROOM

C

C

D

1" 4"

4"

1"

1"

1"

123661.A 123661.A SS-01SS-01

1/2"

1/2"

105116.J 105116.J 105116.C 105116.C 105116.E 105116.E

1' - 1"1' - 1"

3' - 10 1/2"

BLACK BLACK FINISH FINISH CONTINUOUS CONTINUOUS GLASS GLASS CLIP, CLIP, TOP AND TOP BOTTOM AND BOTTOM OF GLASS OF GLASS

105116.G 105116.G GL-02,GL-02, TO BETO REPLACABLE BE REPLACABLE 123661.A 123661.A PANEL PANEL BEYOND BEYOND SS-01SS-01 1 1/2"1 1/2" 1/2" 1/2"UPH-02 UPH-02

3

19 19

19.219.2

3 3/4"

3 3/4"

105116.E 105116.E

GRAPHIC GRAPHIC TRANSLUCENT TRANSLUCENT FILM FILM (GRAPHICS (GRAPHICS SCOPE) SCOPE)

WD-03 WD-03 APPLIED APPLIED TO TO CONCEAL CONCEAL LOCKER LOCKER TO LOCKER TO LOCKER SEAMSEAM

1"1/2" 1/2"

105116.L 105116.L UPH-02 UPH-02 123661.A 123661.A SS-01SS-01 WD-03 WD-03 RECESSED RECESSED FINGER FINGER PULL PULL VENTILATION VENTILATION SLOTS SLOTS 105116.K 105116.K RB-03RB-03

1/4"

1/4"

1' - 3 1/2"

105116.A 105116.A WD-03 WD-03 105116.C 105116.C DIVIDER DIVIDER SHELF SHELF 123661.A 123661.A SS-01SS-01

105116.G 105116.G GL-02GL-02

1/2" MIN. 2 1/2" 1/2" MIN. 2 1/2" 1' - 3 1/2"

3"

SCALE: SCALE: 3/4" 3/4" = 1'-0" = 1'-0" REF:REF: A-411 A-411 A-412 A-412

EQ

123661.A 123661.A SS-01SS-01

1"

B3 B3

EQ

265000.A 265000.A REF: REF: LIGHTING LIGHTING

105116.C 105116.C

B3 COACHES LOCKER SECTION Locker Locker CoachesCoachesSection Section

40

EQ

EQ

105116.J 105116.J

1"

3"

105116.K 105116.K RB-03RB-03

3

EQ

1"

1" R

105116.A 105116.A COACHES COACHES LOCKER LOCKER SECTION SECTION PERSPECTIVE PERSPECTIVE PULLOUT PULLOUT LOCKER LOCKER WD-03 WD-03

1"

EQ

EQ

R

1/2"

123661.A 123661.A SS-01SS-01

1/2"

FACEFACE OF PANEL OF PANEL BEYOND BEYOND WD-03 WD-03 105116.L 105116.L UPH-02 UPH-02

EQ

EQ

2 3/4"

10"

105116.C 105116.C SCHWINN SCHWINN 33766/768 33766/768

EQ

2 3/4"

1 1/2"1 1/2" 1' - 6"1' - 6"

10' - 0" (REFER TO SPEC 105116 - WOOD LCKRS SPEC)

1/2" 1/2"

1' - 8"

5 1/2"5 1/2"

1"

105116.C 105116.C

105116.A 105116.A WD-03 WD-03

2

E

105116.A 105116.A WD-03 WD-03

1

105116.C 105116.C SCHWINN SCHWINN 33766/768 33766/768 057000.F 057000.F MTL-01 MTL-01

2

E

1/4" 1/4" TYP. TYP.

3' - (REFER 1' - 8" 10 1/2" TO SPEC 105116 - WOOD 10" LCKRS SPEC) 10' - 0"

1

1' - 8"

105116.A 105116.A WD-03 WD-03 265000.A 265000.A REF: REF: LIGHTING LIGHTING

D

1"

B

1' - 8"

B

1"

A

1"

A

3' - 0"3' - 0"

STAFF STAFF LOCKER LOCKER SECTIO S

Level Level 01 01 136' - 136' 0" - 0"

D3 COACHES LOCKER SECTION D3 D3Locker Locker CoachesCoachesElevation Elevation SCALE: SCALE: 3/4" 3/4" = 1'-0" = 1'-0" REF:REF: A-411 A-411 A-412 A-412

Q.1 Q.1

P TL-06TL-06

WD-03 WD-03

P


1' -

TL-03 ON SHOWER BACK WALLS

G3 Women Coaches' Locker Room Plan

RCP

A-411

3

SCALE: 1/4" = 1'-0"

16.3

15

GREEN BAY PACKERS TRAINING FACILITY

9' - 7 5/8"

2"

CPT-06A CPT-06B

C5

A-414

TV

10 1/2"

10 1/2"

A8

16' - 2 3/8"

A-412

G8

6' - 8 3/4"

EQ EQ

B8

TL-06

TL-08 AT BENCHES

E8 A-414 STEAM LL58

C8

A-412

KEY PLAN

TA-13B 5' - 10"

EQ

EQ

RT

7

TL-02 AT COLUMN

P.1

EQ

TL-03 AT SHOWER BACK WALLS, TYP.

STAFF SHOWERS LL56

J8

A-491

TL-06

A-414

STAFF LOCKER ROOM LL64 E8 JC LL55

T T T T

C5

A-414

A-412

A8

6

BOILER LM53.1

TL-02

1' - 8"

CPT-06B TL-01

TA-10

3' - 7"

EQ EQ EQ

TL-06 15' - 4"

F7

TL-07 TL-01

A-414

TA-07

TA-07A TA-07C TA-05A

5' - 0"

TA-10B

TA-07C

TA-13

C8

2"

J8

A-415 MEN LOCKER ROOM ENTRY LL52

EQ

EQ

TA-05A TA-07C TA-07A

A-414

E3

EQ

EQ

TA-05A

1' - 9"

2' - 4"

2"

10 1/2"

15' - 6"

RT

4' - 6" TV

TA-05A

TOILETS LL54

TL-06

F8

093013.E

2"

TL-03

GROOMING LL69

A-415

J7

TA-10

5

9' - 6 5/8"

D3

A-412

TL-02

A5

A-414

1 DD Progre 2 Design De 3 CD Progre

TA-05A

J5

A-414

J5

H7

P

1' - 8"

D5

A-412

# DESCR

C7 TL-06

5' - 0"

G5

CPT-06B TL-01 A7 A-412 093013.E

A-414

B5

© 2020 ROSS

TA-05A

5' - 4 3/4"

J8

A-412

10 .0

COACHES LOCKER ROOM LL53

EQ

17

4

C8

A-415

TA-10

2"

Q.1

17.011

17.011

A8 B3

A-412 A-415

PROFESSIO

EQ

A-412

F3

A-412

J8

EQ

SHEET TITL

REFER TO SPECIFICATION SECTION 132416

EQ

EQ

Staff & C Plan, RC

EQ

EQ

SAUNA LL57

G8

A-333

E

F

H8 Men's Staff & Coaches' Locker Room Plan

G

F

G

H

105116.A WD-03 105116.C

105116.A WD-03

2' - 0"

105116.A WD-03 057000.F MTL-01

105116.C SCHWINN 33766/768

105116.C

105116.C DIVIDER SHELF 123661.A SS-01 105116.J 105116.C 105116.E 105116.G GL-02 GRAPHIC TRANSLUCENT FILM (GRAPHICS SCOPE)

123661.A SS-01 WD-03 APPLIED TO CONCEAL LOCKER TO LOCKER SEAM

EQ

123661.A SS-01 WD-03 RECESSED FINGER PULL VENTILATION SLOTS 105116.K RB-03

105116.J

SOLID METAL PLATE DOOR HARDWARE-SEE DOOR SCHEDULE WOOD LOCKER WITH WOOD FACED DOOR WOOD LOCKER HARDWARE COAT ROD GLASS-BACK PAINTED NAME PLATE CONTINUOUS FINISH BASE SEAT PADDING/UPHOLSTERY SOLID SURFACE (SS-01) LIGHT FIXTURE NOT USED COUNTERTOP MOUNTED SOAP DISPENSER SURFACE MOUNTED PAPER TOWEL GLASS MIRROR W/ FRAME - REFER TO ARCH LIGHTING (26"x50"-R2" CORNERS)

SHEET #

A-41

K

1

PROJECT

Gree Pack Facil

TA-17

105116.E

2

123661.A SS-01 WD-03 APPLIED TO CONCEAL LOCKER TO LOCKER SEAM

1265 Lom Green Ba

105116.L UPH-02 123661.A SS-01 WD-03 RECESSED FINGER PULL VENTILATION SLOTS 105116.K RB-03

STAFF LOCKER SECTION PERSPECTIVE

E3

E3 STAFF LOCKER SECTION Locker Staff- Section A-412

REF: A-411

P

C5

A-414

19.2

A8

A-414

SCALE: 3/4" = 1'-0"

19

REF: A-411

CONSULTANT

Level 01 136' - 0"

2' - 0"

WD-03

057000.F 087100.A 105116.A 105116.C 105116.E 105116.G 105116.J 105116.K 105116.L 123661.A 265000.A TA-02 TA-03 TA-04 TA-06B

J

2019-05

K

105116.G GL-02

Level 01 136' - 0"

TL-06

105116.A SS-01 DIVIDER SHELF

MATERIAL KEYNOTES

PROJECT #

105116.C SCHWINN 33766/768

105116.L UPH-02

Coaches- Elevation

" = 1'-0"

EQ

3 3/4"

105116.A WD-03

8' - 0" REFER TO SEC B3 A-412

EQ

265000.A REF: LIGHTING 10' - 0" (REFER TO SPEC 105116 - WOOD LCKRS SPEC)

EQ

J

SCALE: 1/4" = 1'-0"

1"

E

H

A-411

TUNNEL

om RCP

8

F3 STAFF LOCKER ELEVATION F3 Locker Staff- Elevation A-412

SCALE: 3/4" = 1'-0"

G5

TL-03 TA-06B

A-414

41

18.7 TL-06

3

REF: A-411

P

Q.1 TL-06

TL-06


PROFESSIONAL WORK

GROSSE POINTE WAR MEMORIAL

RENOVATED FRIES ADDITION ORIGINAL 1962 ASSEMBLY USE 1 STORY W/ BASEMENT 17’ HEIGHT 9,991 SF

RUSSELL ALGER HOUSE 1910 CS COMMUNITY SERVICE DISTRICT BUSINESS USE 2 STORY W/ BASEMENT 35’ HEIGHT 6,552 SF

ARTS WING 1977

WAR MEMORIAL ADDITION 2022 ASSEMBLY USE 1 STORY 2 26’ HEIGHT 11,002 SF

BUSINESS USE 1 STORY W/ BASEMENT 17’ HEIGHT 5,026 SF

GROSSE POINTE FARMS, MICHIGAN DESIGN DEVELOPMENT, 2020 I ROSSETTI

The Grosse Pointe War Memorial addition transforms into an all encompassing civic memorial that enhances legacy of its history, memory of community members and celebration of events. The formality of the historic architecture is used to define the new, creating a contemporary space influenced by its historic context. Originally build in 1910, the Alger House was designed by notorious architect Charles Platt and landscape architect Ellen Shipman. The house was designed with an axis that connect the rooms and gardens creating a spine with magnificent views of Lake St. Claire, this Axis was recreated and rotated in the addition reconnecting the lost and now direct access from the front of the property to the lake.

42


GROSSE POINTE WAR MEMORIAL LAKE ST. CLAIR

LAKE ST. CLAIR

LAKE ST. CLAIR

ENFINLADE

ENFINLADE

ENFINLADE

BROKEN CONNECTION ENFINLADE

1910

1962

2022

ALGER RUSSELL HOUSE PRIVATE RESIDENCE

WAR MEMORIAL AUDITORIUM/ ART WING RENOVATION

WAR MEMORIALADDITION COMMUNITY SPACES

ENFINLADE: PERIMETER AXIS, CONNECTION & VIEWS TO LAKE ST. CLAIR

BROKEN AXIS AND SITE CONNECTION LAKE ST. CLAIR

NEW ENFINLADE: RECONNECTED AXIS & PUBLIC CONNECTION TO LAKE ST. CLAIR

43


PROFESSIONAL WORK

C

D

E

F

G

H

J

K

MATERIAL KEYNOTES

4" 3/8"

SCALE: 3" = 1'-0"

3 1/2"

57000

1'-5"

D2 Detail @ Roof Expansion Joint A-401

3/4"

4"

9 1/2"

3 3/8"

e-Function Expansion Joint

092900.A 092900.E

1/2" 1'-1 1/2"

1/2"

3/8"

5/8"

57000 061000.A 064023.U 064200.A 84113 84126 084423.C 088000 088000.D 092216.A 092900.A 092900.E 092900.F 092900.G 102238.E

DECORATIVE METAL WOOD BLOCKING HIGH-DENSITY FIBERBOARD WOOD VENEER WALL PANEL ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS ALL-GLASS ENTRANCES AND STOREFRONTS FRAMING

1

PROJECT

GLAZING, GT-01 NON-STRUCTURAL METAL FRAMING TYPE X GYPSUM BOARD (U.N.O.) EXTRUDED ALUMINUM TRIM SOUND ATTENUATION BLANKETS ACOUSTICAL SEALANT SUSPENSION SYSTEM

Grosse Pointe War Memorial

3 5/8"

84126 57000 092900.A 064200.A

2"

1'-5"

1 1/2" EQ

D2

A-401

088000.D

2 064023.U

4 1/2"

2 1/2"

084423.C

CONSULTANT

84113

F3 A-401

D6 TYP Ballroom Wall Detail

Plan Detail @ Exterior Glazing

A-401

SCALE: 1 1/2" = 1'-0"

3

SCALE: 1 1/2" = 1'-0" REF: A-123

PROFESSIONAL SEAL

WD-03 TYPICAL AT COLUMNS

092900.E 4 WB-02

F4 A-401

Community Room - West Elevation SCALE: 1/4" = 1'-0"

REF: A-124

©

2018 ROSSETTI

# DESCRIPTION

Entry Circulation Washroom Circulation Service Circulation

DATE

1 Define Set 2 Permit Issued for SetConstruction

WD-03

08/04/20

10/29/20 11/12/20

WC-01 5

SHIPMAN GARDEN OVERLAY Using the Ellen Shipman Garden and Golden Section as references, the ceiling creates and omni directional pattern that evokes the coffering affect from the Alger house. The Bevel units are constructed using a plaster like material (GFRG) Evoking a sense of the spectacular, while integrating heating and cooling and lighting 092900.E

Alger Bldg LV-01 696' - 3"

WB-02

F6 A-401

Community Room - East Elevation SCALE: 1/4" = 1'-0"

REF: A-124

WD-02

6

WD-02

MTL-02 WD-02

MTL-02

WD-02

9' - 0"

MTL-02

088000

088000

SCULPTURE (BY OWNER)

WB-01

D7 Pre-Function #1 - South Elevation A-401

SCALE: 1/4" = 1'-0"

H7 Pre-Function #1 - West Elevation A-401

REF: A-123

SCALE: 1/4" = 1'-0"

7

REF: A-123

A1

A-401

WD-03 TYPICAL AT COLUMNS

L-01

SHEET TITLE

Ballroom, Community Room and Pre-Function #1

WC-01 WALL COVERING ON GYP.

0'

4'

8'

8 WD-03

SCALE: 1/4" = 1'-0" C

PROJECT #

Scale: 1/4" = 1'-0"

2019-051

C8 Main Ballroom - West Elevation

A-401

32 Lake Shore Road Grosse Pointe Farms, MI 48236

061000.A

30x42

SHEET #

REF: A-123

D

E

F

G

H

44

J

K

A-401


GROSSE POINTE WAR MEMORIAL

MAIN BALL ROOM 4840 ft²

MAIN BALL ROOM 4840 ft²

KITCHEN

MENS WR

PRE-FUNCTION #1

FAMILY WR

MENS WR

PRE-FUNCTION #1

STAFF WR

WOMENS WR

MULTI PURPOSE COMMUNITY ROOM 3050 ft²

FAMILY WR

MULTI PURPOSE COMMUNITY ROOM 3050 ft²

SERVICE AREA

STAFF WR

Overlapping of guest at entry and pre-function Leverage outdoor spaces adjacent to event spaces. Pre-function could be closed off to Main event space.

MULTI PURPOSE COMMUNITY ROOM 3050 ft²

SERVICE AREA

STAFF WR

Secondary Event space guest would have to access washrooms at level 00 Main entry should happen off of the piazza

MULTI PURPOSE COMMUNITY ROOM 3050 ft²

SERVICE AREA

Overlapping of guest at entry and pre-function Leverage outdoor spaces adjacent to event spaces. Pre-function could be closed off to Main event space.

45

STAFF WR

SERVICE AREA

MEMORIAL COLONNADE PRE-FUNCTION #2

4 EVENTS

FAMILY WR

WOMENS WR

MEMORIAL COLONNADE PRE-FUNCTION #2

3 EVENTS

FAMILY WR

KITCHEN

MENS WR

PRE-FUNCTION #1

WOMENS WR

MEMORIAL COLONNADE PRE-FUNCTION #2

MAIN BALL ROOM 4840 ft²

KITCHEN

MENS WR

PRE-FUNCTION #1

WOMENS WR

MEMORIAL COLONNADE

1-2 EVENTS

MAIN BALL ROOM 4840 ft²

KITCHEN

PRE-FUNCTION #2

6 EVENTS

Overlapping of guest at entry and pre-function Pre-function should stay open for circulation


PROFESSIONAL WORK

ARCHITECTURAL PRECAST 3 1/2 X 4 1/2 X 1/4 PAINTED STEEL ANGLE RIGID FOAM INSULATION INSULATED STEEL FRAMED GLASS SYSTEM

ARCHITECTURAL PRECAST

ENLARGED MEMORIAL COLONNADE PLAN DETAIL

A8 ENLARGED MEMORIAL COLONNADE ELEVATION

46


GROSSE POINTE WAR MEMORIAL

TEXTURED PRECAST GLAZING

TEXTURED PRECAST GLAZING

47


D

E

A

F

B

E

092900.A

G

H

G

H

C

F

J

D

K

E

J

F

G

K

092900.F 092216.A

1

1

1 1

1

064200.A 092900.A 092900.G

V U

T

R

Q

B

P

L

P

L

H

F C

H

D

F

D

V

U

S

R

Q

N

A-401

M

K

J

D

C

B A14

A

B A14

A

102238.E 064200.A

A13 A12

A11

A10

E A13 A12

A11

A10

A9 A9

A8

F

A8

A2 Detail @ Pre-Function Door Header B2 Detail @ Pre-Function Expansion Joint

A8

A-301 2

C

G

E

A6

A-301

SCALE: 3" = 1'-0"

D

C

A-401

B

A13 A12

A

A11

A10

A6

A5

A7

A6

A5

G

D2 Detail @ Roof Expansion Joint

A3

A-301

SCALE: 3" = 1'-0"

A7

A-401

A9

E5

A-311

072400

B6

18

A-401

18

A-401

E5

ADDITION MEMORIAL ROOF LV (125'5") 721' - 1"

A4

A3

A2

A8

A7

A6

A5

A4

A3

D2

2 2

034100 088000.D

072400

C8 C8

1'-10"

13'-6"

CONSULTANT CONSULTANT

13'-0"

084423.C

1'-3"

A8

A-311

1'-3" 11'-0"

A-401

3

2'-4"

11'-0"

F3

3

2'-4"

#2 - REFLECTION ROOM 202

Plan Detail @ Exterior Glazing SCALE: 1 1/2" = 1'-0"

B2

A-401

THEATER PRE-FUNCTION 101

8"

PROFESSIONAL SEAL A2

2"

LEVEL 1 (86'-6") 682' - 2"

PROFESSIONAL SEAL

A-401

8"

LEVEL 1 (86'-6")

FRIES 682' BLDG-STAGE LV (80'-0") 2" 675' - 8"

FRIES BLDG STAGE LV (80'-0") 675' - 8"

A2 EAST ELEVATION

A2 East Elevation _

4

SCALE: 3/32" = 1'-0" REF: A-101 A4 Section Through Hospitality_ A4 Section Through Hospitality_

A-201

B

V

F

G

H

A

B

B

C

C

D

D

E

E

F

F

V

T 5" S

U

T

U

5"

R

S

S

Q

R

R

P N

Q

Q

N

P N

M

ML

M

L

K

K

K

J

H

G

GF

J

H

G

F

J

E

D

E

E

C

D

D

1' - 11 5/8"

C

C

B A14

B

A14A

B A14

A

A13 A12

1

2

A11

3

A13 A12

A10

4

A11

A9

7

A10

A9

A8

A7

10

A8

11

A7

A6

14

A6

A4

ADDITION MEMORIAL ROOF LV (125'5") 721' - 1"

2'-6"

5'-6"

710' - 7"

FRIES BLDG ROOF LV (115'-2") 710' - 10"

FRIES BLDG PARAPET LV (116'8") 712' - 4" FRIES BLDG ROOF LV (115'-2") 710' - 10"

Detail @Detail Precast @ Columns Precast Columns A4 Elevation A4 Elevation EMBED PLATE TO MOUNT RAILS

3" = 1'-0"

A-312

071416.A

A-3123" =SCALE: SCALE: 1'-0" 3" = 1'-0"

A6 North Elevation _ A-312

2'-10 1/8"

A2

A3

Alger Bldg LV-01 696' - 3"

A-301

A5

A6

A7

2' - 4 1/4"

A9

A10

220000.B

10'-0"

1'-11"

1 3/4"

A-401

1'-5"

LEVEL 2 F.F. 072400 034500(100'-2.5")

695' - 10 1/2"

072400

LEVEL 2 (100'-0") 695' - 8"

4"

1' - 8"

2"

092400.B

4' - 0"

10"

EXISTING

7 1/2"

A6

1/2" SCALE: = 1'-0" 1 1/2" = 1'-0"

A12 A13

073300.Y

A4

088000.E

220000.B

073300.Y

D

1' - 8"

4' - 0"

4' - 0"

4' - 0"

B

2" 4"

1' - 8"

2"

4' - 0"

054000.A

054000.A

061100.C1

061100.C1

092400.B

092400.B 073300.Y 075323.A

075323.A 079500.A 073300.YNOTE 1 075323.A042000.A

075323.T

075323.T053100.C

NOTE 2

093033.A

0.5

8 EXISTING LIMESTONE CORNICE PROJECT #

075323.A

075323.A

061600.A 075323.M

061600.A 075323.M

NOTE 1

NOTE 1

8

A

Building Sections

084423.G 061000.G

PROFESSIO 0' 16'

Sca 16'

0'

2019-051

Sca

PROJECT #

2019-051

J

K

J

K

SHEET # SHEET #

4

A-302 A-302

©

F

2018 ROSSE G

1 Define Set 2 Permit Issued for SetC

092900.A

092900.A

054000.A

054000.A

NOTE 3 5

A8

4 1/4"

E

F

G

7 1/2"4 1/4" 3 3/4"7 1/2"

H

J

K

L

3 3/4" INTEGRATED LIGHT INTEGRATED LIGHT FIXTURE RAIL @FIXTURE RAIL @ EACH GOLUMN EACH GOLUMN LINE - SEE LINE - SEE LIGHTING FOR LIGHTING FOR FIXTURE TYPE FIXTURE TYPE

M

N

P

Q

R

S T

U

V

Alger Bldg LV-01 696' - 3" RECESSED FIN TUBE HEATING

Alger Bldg LV-01 Alger Bldg LV-01 696' - 3" D5696' - 3" D5 A-312 A-312 LEVEL 2 F.F. LEVEL 2 F.F. (100'-2.5") NOTE 3 (100'-2.5") NOTE 3 695' - 10 1/2" 695' - 10 1/2"

072400

088000.D

F7

A-312

SECTION CUT AT COLUMN REFERDRAIN TO A.611REFER TO A.611 TO SHOW FOR WOOD FLOORING FOR WOOD FLOORING SECTION CUT AT SPANDREL 075323.A DRAIN AT COLUMN 075323.A BEYOND 079500.A 079500.A

NOTE 1 042000.A

NOTE 1 042000.A

053100.C

053100.C

NOTE 2

NOTE 2

6 SECTION CUT AT SECTION COLUMN CUT AT COLUMN TO SHOW DRAIN TO SHOW DRAIN SECTION CUT AT SECTION SPANDREL CUT AT SPANDREL DRAIN AT COLUMN DRAIN BEYOND AT COLUMN BEYOND 034500.A

034500.A

NOTE 2

A-312

E

WALL CAVITY

A-3121 1/2" SCALE: SCALE: = 1'-0" 1 1/2"F = 1'-0"

G

7

H

4' - 0"

GRANULAR FILL

6"

6"

B

A-312

GRADE

Detail Section @Detail Terrace @ Terrace D7 Section D7SECTION D7 DETAIL @TERRACE

SCALE: 1/2" = 1'-0"

A-3121/2"SCALE: SCALE: = 1'-0" 1/2" = 1'-0"

A-312

A-3121/2"SCALE: SCALE: = 1'-0" 1/2" = 1'-0"

SHEET TITL GRADE

GRADE

F8 Wall Section @ Terrace/Ballroom A-312

C A

A

D B

B

SCALE: 1/2" = 1'-0"

E C

C

REF: A-301

F D

D

48

E

8 COORDINATE DEPTH COORDINATE DEPTH WITH STRUCTURE WITH STRUCTURE

F8 WALL SECTION AT TERRACE/ BALLROOM

F8 Wall F8 Section Wall @ Section Terrace/Ballroom @ Terrace/Ballroom

G E

Exterior E Details

EXISTING GRADE / FILL

COORDINATE DEPTH WITH STRUCTURE

8

11/11/2020 10:30:00 AM

11/11/2020 10:30:00 AM

BIM 360://Grosse Pointe War Memorial/GPWM_Arch.rvt

8

1'-1 A-401

EXISITNG STUCCO, CLEANED PREP AND PAINT

075323.H

Mem

034500.A

A-312

" = 1'-0"

092400.B

J5

071326.A 034100 072100.C

Ballroom @ Ballroom - Sill Detail - Sill Detail F7 Glazing F7 @Glazing

SCALE: 1 1/2" = 1'-0"

D

D7 Section Detail @ Terrace Enlarged ElevationElevation @ Terrace @ Terrace A7A7Enlarged A7 ENLARGED ELEVATION @ TERRACE

d Elevation @ Terrace

084500.D 088000.D

CONSULTAN 088000.E

7 4' - 0"

7

C

079200.C 079500.A 084423.B 084423.C 084423.G 084423.M

LEVEL 1 (86'-6") 682' - 2"

Sections A10Building A11 SHEET TITLE

NOTE 1

A-312 D5 A-3121 1/2" SCALE: SCALE: = 1'-0" 1 1/2" = 1'-0"

F7 Glazing @ Ballroom - Sill Detail

A

075323.H

A-301

NOTE 2

A-312

075323.A LEVEL 2 (100'-0") 695' - 8"

075323.M 32 Lake 075323.T 076200 P Grosse

2

A-301

A9

SCALE: 3/32" = 1'-0"

A-312 LEVEL 2 F.F. (100'-2.5") NOTE 3 088000.D 695' - 10 1/2" 055000.P 084423.B REFER TO A.611 FOR WOOD FLOORING

A4

SCALE: 3/32" = 1'-0" REF: A-103

BIM 360://Grosse Pointe War Memorial/GPWM_Arch.rvt

8/10/2020 12:12:55 PM

A-201

A8

E

8 FRIES MEZZ LV (91'9") 687' - 5"

A7

Ballroom @ Ballroom - Header-Detail Header Detail F5 Glazing F5 @Glazing

A-312

A8 West Elevation _

079200.C 084423.M

D

Alger Bldg LV-01 696' - 3"

073300.Y 088000.D 055000.P 220000.B 084423.B

A4

A-312

A-201

INTEGRATED LIGHT FIXTURE RAIL @ EACH GOLUMN LINE - SEE LIGHTING FOR FIXTURE TYPE

A14

073300.X 073300.X Alger Bldg LV-01 Alger Bldg LV-01 696' - 3" 696' - 3"

A-312 LEVEL 2 (100'-0") 695' - 8"

072100.C 073300.X 073300.Y

073300.X

3 3/4"

SCALE: 1 1/2" = 1'-0"

088000.D 055000.P 084423.B

075323.T

072400

071416.A

F6 West Memorial Elevation

RECESSED LIGHT RECESSED LIGHT FIXTURE FIXTURE 092900.A

A-301

4" 2"

H

LEVEL 2 (100'-0") 695' - 8"

C

054000.A 3" RECESSED 3" RECESSED ROLLER SHADEROLLER SHADE

1' - 8"

REF: A-123

LEVEL 3 (114'-11") 710' - 7"

SHEET A1TITLE

A6

061000.G

H

SCALE: 1/4" = 1'-0"

055000.P 061000.G 061100.C 061600.A 071326.A

FRIES BLDG PARAPET LV (11 712' - 4"

# DESCRIP

4 1/4"

2"

2.5°

G

A-401

Section @Detail Terrace @ Spandrel Terrace Spandrel D5 Section D5 Detail A B C - Header Detail F5 Glazing @ Ballroom

075323.A

084423.G

C8 Main Ballroom - West Elevation

EXISTING

A5

075323.H

8"

042000.W

B

061100.C1 1' - 8"

A4 079200.C 084423.M

8"

042000.W

FRIES BLDG PARAPET LV (116'8") 712' - 4" FRIES BLDG ROOF LV (115'-2") 710' - 10"

G

F 084423.B 084423.B LEVEL 2 F.F. NOTE 1 (100'-2.5") EXISITNG STUCCO, EXISITNG STUCCO, 695' - 10 1/2" CLEANED CLEANED PREP AND PAINT PREP AND PAINT

13' - 0"

8"

092400.B

061600.A 092400.L 075323.M 092400.B

092400.L Alger Bldg LV-01 Alger Bldg LV-01 696' - 3" 696' - 3"

A

A-312

A3

15

ADDITION MEMORIAL ROOF LV (125'5") 721' - 1"

GL-01

FRIES BLDG PARAPET LV (116'8") 712' - 4"

F

2.5°

088000.E 075323.H 084423.C 075323.A

SCALE:TYP. 1 1/2" = 1'-0" REF: A-301 CEILING SECTION A1 BEVEL

A11

A2

071326.A 072100.C

061000.G 088000.E 084423.C

ADDITION MEMORIAL ROOF LV (125'5") 721' - 1"

A1 Typical Bevel Ceiling Section EXISTING

15

054000.A

ADDITION MEMORIAL ROOF L 721' - 1"

9' - 0"

1 3/4"

071326.A 072100.C

2'-3 5/8"

Gros War

A3

A-312 A-3123" =SCALE: 1'-0" 3" = 1'-0" A-401 SCALE: SCALE: 1/4" = 1'-0" REF: A-123

2'-3 5/8"

042000.A 042000.W

PROJECT 053100.C

10"

11'-2"

3'-6" 4'-6"

079200.C 084423.M

1

034500.A

1

Community Room - East Elevation

Detail Plan @#1 Detail Ballroom @ Elevation Ballroom Glazing Joint Glazing Joint G3 G3 Pre-Function - South D7Plan

SCALE: 3" = 1'-0"

084423.G

054000.A 1/2"x1 5/8" ALUMINUM 1/2"x1 5/8" BARALUMINUM MT-01 BAR MT-01

2"

3'-6" 1'-11"

1'-10"

2

092400.B

2 1/2"x@2" ALUMINUM 2 1/2"x@2" ALUMINUM 073300.X LV-01 MT-01 - MOUNTED TUBE Alger MT-01Bldg - MOUNTED TUBE 696' 3" TO EMBED IN PRECAST TO-EMBED IN PRECAST

072400

3' - 1"

3

092400.L

3/8"x3/8" ALUMINUM 3/8"x3/8" BARALUMINUM MT-01 BAR MT-01SCALE: A-312 A-3121

A8

1/2"x1 5/8" ALUMINUM BAR MT-01

2' - 4 1/4" 3' - 1"

A3

SCALE: 1 1/2" = 1'-0"

034500 6

G3 Plan Detail @ Ballroom Glazing Joint

15

042000.A 1 Define Set A3 A2 042000.W MASONRY LINTEL RECESSED FIN RECESSED FIN FLOOR DECK 053100.C STEEL 088000.D TUBE HEATING TUBE HEATING 054000.A COLD FORMED METAL FRAMING 072400 SYSTEM 5 STEEL ANGLE EXISTING 055000.P STEELEXISTING COLUMN, STEEL DEMO COLUMN, DEMO CLADDING061000.G ANDCLADDING CLEAN, PREP ANDAND CLEAN, PAINT PREP AND PAINT 5 061100.C1 061600.A GLASS-MAT GYPSUM SHEATHING 071326.A MODIFIED BITUMINUS SHEET WATERPROOFING 071416.A COLD-FLUID APPLIED WATERPROOFING 072100.C MINERAL-WOOL BATT INSULATION 073300.X PLAZA PAVER Alger Bldg LV-01 073300.Y ADJUSTABLE PAVER SUPPORT 696' - 3" PEDESTAL 057300 075323.A ADHERED MEMBRANE ROOFING 034100 SYSTEM 075323.H METAL TERMINATION BARS 075323.M ROOF INSULATION ENTRY 075323.T COVER BOARD VESTIBULE 200 6 076200 ENTRY A-401 SCALE: = 1'-0" ROD REF: A-124 079200.C SEALANT 1/4" AND BACKER VESTIBULE 079500.A INTERIOR FLOOR JOINT SYSTEM 200 6 G3 G3 084423.B STEEL REINFORCEMENT A-312 A-312 084423.C FRAMING 084500.D 084500.D 084423.G CONCEALED FLASHING 084423.M HEAVY GAUGE BRAKE METAL CLOSURE 084500.D ALUMINUM FRAMING 088000.D GLAZING, GT-01 088000.E GLAZING, GT-02 092400.B EXTERIOR PORTLAND CEMENT PLASTERWORK 088000.D 088000.D 092400.L J SCREED 092900.A TYPE X GYPSUM BOARD (U.N.O.) 220000.B ROOF DRAIN SHEET SPECIFIC NOTES

A4

J

# DESCRIPTION

© 2018 ROSSETTI

092400.L 092900.A 7 1. EXISTING STRUCTURE TO REMAIN. VERIFY CONDITION MATCHES DRAWING INTENT 220000.B SSS SSS 2. EXISITNG STUCCO ON CMU. SHEET SPECIFIC SHEET NOTES SPECIFIC NOTES A-201 SCALE 3. EXISTING PIPE COLUMN TO REMAIN. CLEAN SURFACES AND PREP FOR PAINT 7 ACCORDING TO SPECIFICATION 097000 INTERIOR PAINT ON FERROUS METAL 1. EXISTING STRUCTURE 1. EXISTING TOSTRUCTURE REMAIN. VERIFY TO R 2. EXISITNG STUCCO 2. EXISITNG ON CMU. STUCCO ON CMU. 3 3. EXISTING PIPE 3. COLUMN EXISTINGTO PIPE REMAIN. COLUMN CLEAN TO 1'-11 3/8" F5 ACCORDING TOACCORDING SPECIFICATION TO SPECIFICATIO 097000 INTER 0.53:12 A-312

088000

A-3123" =SCALE: SCALE: 1'-0" 3" = 1'-0"

1/2"x1 5/8" ALUMINUM 1/2"x1 5/8" BARALUMINUM MT-01 BAR MT-01

FRIES BLDG PARAPET LV (116'8") 712' - 4"

6

SSS

5/8"x2" ALUMINUM 5/8"x2" BARALUMINUM MT-01 BAR MT-01

Alger Bldg LV-01 Alger Bldg LV-01 073300.Y 696' - 3" 696' - 3"

ADDITION MEMORIAL ROOF LV (125'5") 721' - 1"

BIM 360://Grosse Pointe War Memorial/GPWM_Arch_backup.rvt

A4

EQ

4"

4"

7

2 1/2"x@2" ALUMINUM TUBE MT-01 - MOUNTED TO EMBED IN PRECAST

EQ

084423.C

A-312

VERTICAL POSTVERTICAL TO POST TO ALIGN AT COLUMN ALIGN AT COLUMN GRID AND MID-POINT GRID AND MID-POINT

D5 Section Detail @ Terrace Spandrel A-312

3/8"x3/8" ALUMINUM BAR MT-01

3' - 6"

3' - 6"

5

2'-10 1/8"

5

EQ EQ 1/2"x1 5/8" ALUMINUM BAR MT-01

4

3" RECESSED ROLLER SHADE

VERTICAL POST TO ALIGN AT COLUMN D5GRID AND MID-POINT A-312 5/8"x2" ALUMINUM BAR MT-01 TYP RAILING SECTION TYP RAILING SECTION

D5

EQ

SSS

EMBED PLATE TO EMBED MOUNT PLATE RAILS TO MOUNT RAILS RECESSED LIGHT FIXTURE 071416.A 071416.A

TYP RAILING SECTION 3/32" = 1'-0" REF: A-102 A-201 SCALE:

EQ

7 088000.E

11'-0"

6 on Detail @ Precast Columns

MTL-02

11' - 0"

C

088000.D

1/4"

1'-8"

4"

13'-0"

3/4"

076200

8

REF: A-124 2'-3 5/8"

SSS

LIGHTING INTO INTEGRATED INTO Alger Bldg LV-01LIGHTING INTEGRATED 042000.W RAIL POST 696' - 3"RAIL POST D E 084423.B LEVEL 2 F.F. 8 (100'-2.5") EXISITNG STUCCO, WELDED MOUNTED BASE PLATE MOUNTED 695' - 10 1/2" D WELDED BASE PLATE E 1'-5" CLEANED TO TOP OF SPANDREL TO TOP OF SPANDREL PREP AND PAINT 088000.D 076200 076200

072400

4"

1'-8"

B

C

4 1/2" 1/4" 1/4"

SCALE: 3/32" = 1'-0" REF: A-101

1'-8"

4

1/8" 1/2" 1/8"

A

4

3/4"

WELDED BASE PLATE MOUNTED TO TOP OF SPANDREL

18'-10"

6"

10

4"

WD-02

A-312

2"

SCALE: 1/4" = 1'-0"

4' - 0"

4"

3'-6"

088000.E 034100 034100

11

2" 1' - 8"

A-401

3'-6 1/8"

14

084500.D

Detail Plan @Detail Precast @ Corners Precast Corners E3 Plan E3 A7 Pre-Function #1 - North Elevation

1' - 8" 4"

3'-6"

15

LIGHTING INTEGRATED INTO RAIL POST

B

7

2"

BB

8

3/4"

4" 1' - 8"

3'-6 1/8"2.5°

2" A-3021' - 8" 2"

4' - 0"

CC

A-201

3'-6"

SCALE: 3" = 1'-0"

1/4"

3/4"

3/4"

3/4" 11"

1' - 4"

11"

A-312 A4

4 1/2"

1/8"

E5 South Elevation _

E3 Plan Detail @ Precast Corners

SSS

9 5/8"

8

A

2" 1/8"

4"

A7

2" A-302

A-3123/4"SCALE: SCALE: = 1'-0" 3/4" = 1'-0"

3/4"

3/4"

2"

4' - 0"

Detail Plan @Detail Terrace @ Terrace A3 Plan A3 A-312

2"

J

© 2018 ROSSETTI

CONCRETE UNIT

SCALE: 1/4" = 1'-0" REF: A-124# DESCRIPTION CONCRETE MASONRY UNIT

A7

F6

G3

A-312

FRIES BLDG STAGE LV (80'-0") 675' - 8"

10.5°

BIM 360://Grosse BIM 360://Grosse Pointe War Pointe Memorial/GPWM_Arch.rvt War Memorial/GPWM_Arch.rvt

3/4"

4"1' - 7 1/4" 1' - 8" 4" 4' - 0"

1' - 8"

EE

8/6/20208/6/2020 1:55:33 PM 1:55:33 PM

3/4" = 1'-0"

1' - 7 1/4"

LEVEL 1 (86'-6") 682' - 2"

A-312

11'-0"

REF: A-101

3

4"

4' - 0" 2" 1' - 8"

11/11/2020 10:30:23 AM

REF: A-101

SCALE: 1/8" = 1'-0"

1' - 8"

BIM 360://Grosse Pointe War Memorial/GPWM_Arch.rvt

SCALE: 1/8" = 1'-0"

A-302

2"

2 1/2"

A-302 3

etail @ Terrace

2 1/2"

A7 SECTION THROUGH MEMORIAL

A7 Section Through Memorial_ A7 Section Through Memorial_

5

1/8" 1/2" 1/8"

SSS

SCALE: 3/32" = 1'-0"

1' - 4"

SSS

A-201

2"

CIRCULATION 100

E3

1/2" JOINT @ 1/2" JOINT @ CONCRETE BELOW CONCRETE BELOW

3'-6 1/8"

1' - 8"

1/8" 1/2" 1/8"

4" 4' - 0"

1/4"

11"

1' - 4"

6"

7

1' - 7 1/4"

2 1/2"

A5 Terrace East Elevation FRIES BLDG STAGE LV (80'-0") 675' - 8"

AUD. 4" 1/4" E3 FOYER A-312

STAIR/ CIRCULATION

CIRCULATION 100

4 1/2"

6

033000

1/2" JOINT @ CONCRETE BELOW

6'-6"

FRIES BLDG STAGE LV (80'-0") 675' - 8"

034100 MEMORIAL

A-3123/4"SCALE: SCALE: = 1'-0" 3/4" = 1'-0" 10'-0"

1/8"

057300

2 1/2"

2"

2 1/2"

11'-2"

6'-6"

E3

A-312

6"

STAGE LV (80'-0")

LOWER TERRACE

1 3/4"

LOWER TERRACE 198

MEMORIAL COLONNADE 201

034500.A 034500.A SCALE: 3/4" = 1'-0" REF: A-302

2 1/2"

11'-2"

LOWER TERRACE 198

LEVEL 1 (86'-6") 682' - 2"

7

LEVEL 2 (100'-0") 695' - 8"

A-401

A-312

2

LEVEL 1 (86'-6") 682' - 2"

FRIES BLDG LEVEL 1 (86'-6") 682' 675' - 2" - 8"

SCALE: 3/4" = 1'-0"

4'-6"

A-312

CONTROL JOINT CONTROL JOINT

11'-2"

2

LEVEL 2 (100'-0") 695' - 8"

MEMORIAL COLONNADE 201

H

1 Define Set Community Room MATERIAL - West Elevation KEYNOTES MATERIAL KEYNOTES

A2 ARCHITECTURAL PRECAST

A-401

24'-0"

E1 Plan Detail @ Ballroom Wall Section @ Pre-Function Doors A5 TypGlazing E1 Plan E1 Detail Plan @Detail Ballroom @ Ballroom Glazing Glazing

LEVEL 2 (100'-0") 695' - 8"

6

4

088000.D

8"

2'-4"

LEVEL 2 (100'-0") 695' - 8"

6

UPPER 034500.A TERRACE CONTROL JOINT

3"

11'-2"

072400

18'-10"

088000.D

17'-2"

FRIES BLDG PARAPET LV (116'8") 712' - 4" FRIES BLDG ROOF LV (115'-2") 710' - 10"

A3034500.A CC

BB

1' - 11 5/8"

6"

5

FRIES BLDG PARAPET LV (116'8") 712' - 4" FRIES BLDG PARAPET LV (116'8") 3 (114'-11") 712' LEVEL - 4"

1' - 11 5/8"

1'-5"

MEMORIAL ROOF LV (125'5")

ADDITION MEMORIAL ROOF LV (125'5") 721' - 1"

H

F4

A4

15

A-302

1' - 11 5/8" 1'-5"

1' - 11 5/8"

G

A5 A5

EXISTING STEEL COLUMN, DEMO A-302 CLADDING AND CLEAN, PREP AND PAINT

A-301

1

5 ADDITION 721' - 1"

K

MATERIAL KEYNOTES

8

RECESSED FIN TUBE HEATING

A8

1

G

REF: A-102

U

3 5

J

17'-2"

A

V

E

10"

SCALE: 1/8" = 1'-0"

4

D

9 3/8"

A-302

C

REF: A-102

1' - 11 5/8"

SCALE: 1/8" = 1'-0"

24'-0"

A-302

5'-3"

4

4

5'-3"

4

GLAZ GLAZ DIME

84113

11'-0"

11'-1" 11'-1"

PRE-FUNCTION #1 204

THEATER PRE-FUNCTION 101

11'-0"

033000

1'-3"

7"

057300 034100

PRE-FUNCTION #2 - REFLECTION ROOM 202 PRE-FUNCTION

MULTI PURPOSE COMMUNITY ROOM MULTI 203 PURPOSE COMMUNITY ROOM 203

088000.D 088000.E 093033.A

4 1/2"

3

13'-6"

LEVEL 2 (100'-0") 695' - 8"

11'-4" 7"

MAIN BALLROOM 205

6"

LEVEL 2 (100'-0") 695' - 8"

PRE-FUNCTION #1 204

11'-4"

088000.D

11'-2"

LEVEL 2 (100'-0") 695' - 8"

3

8'-3"

A7

A-312

11'-2"

3

A1

A-401 MAIN BALLROOM 205

8'-3"

17'-2"

11'-2"

17'-2"

5'-6"

LV (116'8")

6'-0 1/2"

BLDG PARAPET FRIES FRIES BLDG ROOF LV (115'-2") 712' - 4" 710' - 10"

033000 32 Lake Shore Road CAST 034100 PREC Grosse Pointe Farms, MI 48 034500 32 Lake Shore Road PREC 057300 DECO Grosse Pointe Farms, MI 48 072400 DIRE

088000.D

A-311

9'-5" 1'-3"

5'-6"

FRIES BLDG PARAPET LV (116'8") 712' - 4"

MATERIAL KEYN

57000

A2

A-311

FRIES BLDG ROOF LV (115'-2") 710' - 10"

Grosse Point Grosse Point War Memoria War Memoria 1/2"

H

4" 3/8"

B6

9'-5"

A-311

FRIES BLDG PARAPET LV (116'8") 712' - 4"

LEVEL 1 (86'-6") 682' - 2"

A2

A-401

1

2

A3

SCALE: 3" = 1'-0"

2

2

A4

9 1/2"

Q

3 3/8"

R

4"

T

2 1/2"

A

V U

9 5/8"

PROFESSIONAL WORK

PROJECT PROJECT

3/8"

8'-9"

D

C

PRPR EL EL IM IM IN IN A A R R Y Y

C

B

N N O O T T FO FO R R C C O O N N ST ST R R U U C C TI TI O O

B

A

7'-4"

A

A-312

H A-3121/2"SCALE: SCALE: = 1'-0" 1/2" REF:= A-301 1'-0" REF: A-301 F

F

G

2019-051 SHEET #

J G

PROJECT #

A-31

K H

H

J

J


GROSSE POINTE WAR MEMORIAL

49


ICE ICEAND AND BEVERAGE BEVERAGE 221 221

C C C C

MAIN MAINBALLROOM BALLROOM 205 205

D D

C C

DD

PROFESSIONAL WORK

MENS MENSWR WR 209 209

11

A-405 A-405

EJ EJ

22

33

PRE-FUNCTION PRE-FUNCTION #1 #1 204 204

44

A-401 A-401

22

FAMILY FAMILYWR WR 210 210

4' - 6" 1' - 11" 4' - 6" 1' - 11"

A-301 A-301

BB EJ EJ

A14 A14

28' - 1" 28' - 1" 7' - 3" 7' - 3"

E.J. E.J.

1' - 11" 4' - 6" 1' - 11" 4' - 6"

4' - 0" 4' - 0"

CC

STAFF STAFFWR WR 212 212

AA

4' - 1" 4' - 1"

55

11

4'4'- -5"5"

A-406 A-406

4'4'- -7"7"

4'4'- -6"6"

4'4'- -6"6"

4'4'- -6"6"

4'4'- -7"7"

4'4'- -5"5"

6'6'- -7"7" 13' - 0" 13' - 0"

COAT COATRM RM 208 208

JC JC 213 213

WOMENS WOMENSWR WR 211 211

5'5'- -0"0"

A12 A12

2" 2"

A-404 A-404

6' - 4" 6' - 4"

22

11

CIRCULATION CIRCULATION 214 214

9' - 10" 9' - 10"

2" 2"

EGRESS EGRESSSTAIR STAIR 207 207

A13 A13

UP UP

E.J. E.J.

A-403 A-403

11

A11 A11

D D

22

23' 23'- 0" - 0"

5'5'- -0"0"

SERVICE SERVICEAREA AREA 215 215 867 867ft²ft²

A10 A10

7' - 6" 7' - 6"

36' - 1" 36' - 1"

68' - 6" 68' - 6"

MULTI MULTIPURPOSE PURPOSE COMMUNITY COMMUNITY ROOM ROOM 203 203

11

A-301 A-301

10' 10'- 0" - 0"

6' - 0" 6' - 0"

A9 A9

22

A-406 A-406

4'4'- -7"7"

4'4'- -6"6"

4'4'- -6"6"

4'4'- -6"6"

4'4'- -7"7"

4'4'- -5"5"

6'6'- -7"7"

13' 13'- 7" - 7"

F F

TRASH TRASH&& BOTTLES BOTTLES 217 217 122 122ft²ft² 9'9'- -1"1"

A7 A7

4" 4"

4'4'- -5"5"

12' - 2" 12' - 2"

A

A8 A8 LIQUOR LIQUOR STORAGE STORAGE 216 216 182 182ft²ft²

4" 4"

7' - 0" 7' - 0" 6' - 4" 6' - 4"

MEMORIAL MEMORIAL COLONNADE COLONNADE 201 201

A-403 A-403

A6 A6

ATS ATS

12' 12'- 8" - 8"

ATS ATS

29' - 4" 29' - 4"

33

15' 15'- 0" - 0"

21' - 3" 21' - 3"

55

33

PRE-FUNCTION PRE-FUNCTION #2 #2 202 202

44

A5 A5

ELEC ELEC 220 220 3 3

EVENT EVENTSTORAGE STORAGE 218 218 608 608ft²ft²

A4 A4 3' - 0" 3' - 0"

37' - 8" 37' - 8"

42' 42'- -10" 10"

3'3'- -0"0"

6'6'- -0"0"

A3 A3

3' - 0" 3' - 0"

ENTRY ENTRY VESTIBULE VESTIBULE 200 200

8' - 6" 8' - 6"

8' - 0" 8' - 0"

FF

A2 A2

F8 F8 Level Level02 02Plan Plan--New NewAddition Addition SCALE: 1/8" 1/8"==1'-0" 1'-0" REF: REF:A-201 A-201 A-124 A-124 SCALE:

CC

DD

EE

50

FF

GG

HH


088000

1

WDP-01

3

WDP-03

GROSSE POINTE WAR MEMORIAL

WDP-02A WB-03 GB-02

G2 Coat Closet_South Elevation

Coat Closet_East Elevation

A-402

SCALE: 1/4" = 1'-0"

WITH PNT-01 INTERIOR LIGHT SLOT AND LIGHT WELL

SCALE: 1/4" = 1'-0" A5

A-723

A4

A-402

EQ PANELS

A

B

C

D

E

F

G

H

AD

BE

CF

DG

EH

FJ

GK

H

MATERIAL KEYNOTE C

1/2"

1

F3

B

8'-11 1/2"

A

MATERIAL KEYNOTES

WD-02

1

Sim

A

C

A-401

A

B

D

B

C

D

F

D

E

G

F

H 061000.L

072100.C 072100.H 075323.A

PC-01

REFER TO DOOR SCHEDULE

1/2"

B

15

071326.A 088000.E 061000.L 061000.B 079200.C

076200.E

084423.M

15

084423.D

FRIES BLDG PARAPET LV (116'8") 712' - 4"

2 3

DOOR OPENING

2

061600.A 15

FRIES BLDG ROOF LV (115'-2") SCALE: 710' - 10" 1 1/2" =

084423.G

084423.G

084423.G

061000.A 075323.H

061000.A 054000.A 075323.H

061000.A 075323.H

1'-0"

LEVEL 3 (114'-11") 710' - 7"

061600.A 075323.M

A-313

A-313 SCALE: 1 1/2" = 1'-0"

4 5

WDP-01

054000.A

A-313

2

072100.C 072100.H 075323.A 075323.H 075323.M 076200.E 079200.C 075323.M 084423.B 084423.D 084423.G 055000.P 084423.M 088000.D 088000.D 075323.M 088000.E 092216.A 092400.B

A4

FRIES BLDG PARAPET LV (116'8") 712' - 4"

3

092900.A

4

054000.A

054000.A

A-313

092900.A

SCALE: 1/8" E7 = 1'-0" Exterior Glazing @ Pre-Function #2 - Callout 1 A-313

A-313

1

SCALE: 1 1/2" = 1'-0"

WDP-03

A-313

6 1/2"

1

5

A-313

Conservatory LV-02 707' - 8"

SCALE: 1 1/2" = 1'-0"

WB-03

A-313 SCALE: 1 1/2" = 1'-0"

1

SCALE: 1 1/2" = 1'-0"

©

Conservatory LV-02 707' - 8"

E3

084423.B 088000.D

SCALE: 1 1/2" = 1'-0" 035300.A

15

092216.A

092216.A

092900.A

092900.A

1 Issued fo

Permit S

6 1/2"

6 1/2"

1

084423.B 088000.D

A-313

042000.A 033000.B

A-313 SCALE: 1 1/2" = 1'-0"

A-402

SCALE: 1 1/2" = 1'-0"

084423.B 088000.D 035300.A 042000.A 033000.B 072100.H

Alger Bldg LV-01 696' - 3"

LEVEL 2 F.F. (100'-2.5") 695' - 10 1/2" LEVEL 2 (100'-0") 695' - 8"

Memorial Colonnade - South Elevation KEY PLAN

042000.A 033000.B

SCALE: 1/4" = 1'-0"

084423.B 088000.D

084423.B 088000.D

6

084423.B 088000.D

035300.A

035300.A

035300.A

072100.H

072100.H

072100.H

042000.A 033000.B

042000.A 033000.B

042000.A 033000.B

Alger Bldg LV-01 696' - 3"

A-313

KEY PLAN

at Pre-Function Section Detail #2 Glazing at Terrace Door E8 Section DetailC8

te War Memorial/GPWM_Arch.rvt

A

C

B

A-313

AD

BE

8

A-313 SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0"

CF

Exterior Envelope Sections and Details

E8 Section Detail at Pre-Function #2 Glazing A-313

SCALE: 1 1/2" = 1'-0"

D

WDP-02A DG

51

E

A-313

H8 Detail at BOH Exterior A-313 8

SCALE: 1 1/2" = 1'-0"

at BOH Section Exterior Detail at Pre-Function #2 Glazing H8 Detail E8 F

G

SCALE: 1A-313 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

EH

FJ

WDP-01

SHEET TITLE

C GLAZING SECTION DETAIL

C8 Section Detail at Terrace Door

LEVEL 2 F.F. (100'-2.5") 695' - 10 1/2" LEVEL 2 (100'-0") 695' - 8"

7

WDP-02 7

8

1

6

035300.A

J5

15

072100.H

6

7 8

2018 ROS

# DESC

SCALE: 1 1/2" = 1'-0"

072100.H

A-313

7

11/11/2020 10:30:06 11/11/2020 AM 10:30:06 AM

6 1/2"

H6 Detail @ BOHH6 Parapet Detail @ BOH Parapet

SCALE: 1 1/2" = 1'-0"

E7 Exterior Glazing @ Pre-Function #2 - Callout 1 E7 Exterior Glazing E7@ Exterior Pre-Function Glazing #2 @ - Callout Pre-Function 1 #2 - Callout 1

A-406 6 7

BIM 360://GrosseBIM Pointe 360://Grosse War Memorial/GPWM_Arch.rvt Pointe War Memorial/GPWM_Arch.rvt te War Memorial/GPWM_Arch.rvt

DATE

10/29/20

11/12/20 4

5

15

8

PROFESS

2018 ROSSETTI

6 1/2"

A-313

092900.A

PNT-05

C

FRIES BLD ROOF LV (115'-2 710' - 1

5

MTL-01

B

FRIES BLD BLD ROOFFRIES LV (115'-2 CONSULT PARAPET 710' - 1L (116'8 712' -

SCALE: 1 1/2" = 1'-0"

E7 Exterior Glazing @ Pre-Function #2 - Callout 1

15

FRIES BLD 071416.A ROOF LV (115'-2 072100.A 710' - 1 092400.B

SCALE: 1 1/2" = 1'-0"

1

SCALE: 1 1/2" = 1'-0"

32 Lak Grosse

1 Issued for Construction

E7 Exterior Glazing @ Pre-Function #2 - Callout 1

Conservatory 092216.A LV-02 707' - 8" 092900.A

15

092216.A

A-313

FRIES BLD PARAPET L 071326.A (116'8 061000.L 061000.B 071416.A 712' 2 072100.A 092400.B

071416.A 3 072100.A 092400.B

# DESCRIPTION

H6 Detail @ BOH Parapet

092216.A

6 PRE-CAST CONCRETE STRUCTURAL COLUMNS

C8 Section Detail at Terrace Door

FRIES 1 BLD PARAPET L (116'8 712' -

Permit Set

092900.A

Gro Wa

H6 Detail @ BOH Parapet

Conservatory LV-02 707' - 8"

Conservatory LV-02 707' - 8"

092216.A

5 6

PROJECT

H6 Detail @ BOH Parapet

©

G4 Detail at Fountain 15

1

075323.M

4

A-402

1

32 Lake Shore Road Grosse Pointe Farms, MI 48236

075323.M

A-313

SCALE: 1 1/2" = 1'-0"

B DETAIL AT FOUNTAIN

H

PROFESSIONAL SEAL 071416.A 072100.A 092400.B

061600.A 075323.M

Conservatory LV-02 707' - 8"

SCALE: 1 1/2" = 1'-0"

1

CONCRETE FLOOR TOPPING 071326.A CONCRETE MASONRY UNIT 061000.L COLD FORMED METAL FRAMING 061000.B SYSTEM STEEL ANGLE WOOD BLOCKING FIRE-RETARDANT-TREATED WOOD 071326.A BLOCKING 061000.L FIRE-RETARDANT-TREATED 061000.B PLYWOOD GLASS-MAT GYPSUM SHEATHING MODIFIED BITUMINUS SHEET WATERPROOFING COLD-FLUID APPLIED WATERPROOFING EXTRUDED POLYSTYRENE BOARD 1 INSULATION MINERAL-WOOL BATT INSULATION RIGID INSULATION ADHERED MEMBRANE ROOFING SYSTEM METAL TERMINATION BARS CONSULTANT 071326.A ROOF INSULATION 061000.L COPING 061000.B 076200.E AND BACKER ROD SEALANT STEEL REINFORCEMENT BRACKET CONCEALED FLASHING HEAVY GAUGE BRAKE METAL CLOSURE GLAZING, GT-01 GLAZING, GT-02 NON-STRUCTURAL METAL FRAMING EXTERIOR PORTLAND CEMENT PLASTERWORK TYPE X GYPSUM BOARD (U.N.O.)

075323.A 075323.M

6 1/2"

PC-01

A4

FRIES BLDG ROOF LV (115'-2") 072100.C 710' - 10"

H6 Detail @ BOH Parapet

SKIM COAT PLASTER WITH VENITIAN 5 FINISH

GB-02

061600.A 071326.A

FRIES BLDG ROOF LV (115'-2") 710' - 10"

A4 Section at terrace A4 door Section - Callout at terrace 1 door - Callout 1

SCALE: 1 1/2" = 1'-0"

088000.D

FRIES BLDG ROOF LV (115'-2") 710' - 10"

LEVEL 3 (114'-11") 710' - 7"

K

CONCRETE FOUNDATION WALL

055000.P 061000.A 061000.B

072100.A

071326.A

075323.A

061600.A

033000.B 035300.A 042000.A 054000.A

076200.E

SCALE: 1/4" = 1'-0"

072100.C

075323.M

GLAZING, GT-01 GLAZING, GT-02 NON-STRUCTURAL METAL FRAMING EXTERIOR PORTLAND CEMENT PLASTERWORK TYPE X GYPSUM BOARD (U.N.O.)

H

MATERIAL KEYNOTE

071416.A

084423.D

A-402

075323.A

3

4

A4 Section at terrace door - Callout 1

SCALE: 1 1/2" = 1'-0"

A4 Section at terrace door - Callout 1 A-313

LEVEL 3 (114'-11") 710' - 7"

054000.A

G

061000.L

STEEL REINFORCEMENT BRACKET CONCEALED FLASHING 055000.P HEAVY GAUGE BRAKE METAL 088000.D 1CLOSURE

092900.A 071326.A 061000.L 061000.B

Grosse Pointe War Memorial

Memorial Colonnade - North Elevation

084423.D 054000.A 071326.A

072100.C

071326.A

A4 Section at terrace door - Callout 1 A-313

075323.M A4

084423.M

FRIES BLDG PARAPET LV (116'8") 712' - 4"

PROJECT J

ADHERED MEMBRANE ROOFING SYSTEM METAL TERMINATION BARS 055000.P ROOF INSULATION 088000.D COPING 076200.E SEALANT AND BACKER ROD

055000.P

088000.E 071416.A 079200.C072100.A 084423.M092400.B

061600.A 079200.C 075323.M 084423.M

084423.D

FRIES BLDG PARAPET LV (116'8") LEVEL 712' - 4"3 (114'-11") 710' - 7"

FRIES BLDG ROOF LV (115'-2") 710' - 10"

075323.A 088000.E

088000.D

079200.C

FRIES BLDG PARAPET LV (116'8") 712' - 4"

J4

055000.P

088000.E

15

075323.M

LEVEL 3 (114'-11") BLDG 710' - FRIES 7" ROOF LV (115'-2") 710' - 10"

3 4

072100.C 075323.A 084423.G 061600.A 076200.E 061000.A 075323.M 075323.H

075323.A

3

FRIES BLDG PARAPET LV (116'8") 712' - 4"

072100.C

084423.G 061000.A 075323.H

FRIES BLDG ROOF LV (115'-2") 710' - 10"

088000.D A4 088000.E 092216.A 092400.B

084423.M 084423.G 084423.D 061000.A 071326.A 075323.H

071326.A

2"

1/2"

079200.C 072100.C

A4

WB-01

084423.M

C

088000.E 071326.A

088000.D

15 079200.C

FRIES BLDG PARAPET LV (116'8") 712' - 4"

A REFLECTION ROOM SECTION

075323.H 075323.M 076200.E 079200.C A4 084423.B 084423.D 084423.G 084423.M

084423.D

055000.P

088000.E

15

072100.A

1

1

PLYWOOD GLASS-MAT GYPSUM SHEATHING MODIFIED BITUMINUS SHEET KEYNOTES MATERIAL WATERPROOFING COLD-FLUID APPLIED WATERPROOFING EXTRUDED POLYSTYRENE BOARD INSULATION MINERAL-WOOL BATT INSULATION 076200.E RIGID INSULATION

061600.A 071326.A

1 1 2

2

A-313

E

GL-01

071416.A

1/2"

out 1

CONCRETE FOUNDATION WALL CONCRETE FLOOR TOPPING CONCRETE MASONRY UNIT COLD FORMED METAL FRAMING SYSTEM STEEL ANGLE WOOD BLOCKING FIRE-RETARDANT-TREATED WOOD BLOCKING F G FIRE-RETARDANT-TREATED

055000.P 061000.A 061000.B

MTL-02 E

C

MATERIAL KEYNOTE 033000.B 035300.A 042000.A 054000.A

H8 A-313

GK

SCALE: 1 1/2" = 1'-0"

0'

32'

Scale: 1/16" = 1'-0"

PROJECT #

2019-051 H Detail at BOH Exterior SCALE: 1 1/2" = 1'-0" SHEET #

A-313

7

16'

H

30x42

WDP-03

SHEET TI

Exterio Details

7" STEP

B

8

PROJECT


PROFESSIONAL WORK

MONROE BLOCKS MASTERPLAN One World Trade Center (New York City)

Willis Tower (Chicago)

Empire State Building (New York City)

John Hancock Center (Chicago)

First Bank Tower (Toronto)

Eiffel Tower (Paris)

Chrysler Building (New York City)

Transamerica Pyramid (San Francisco)

700 600 500 400 300 200 100

Renaissance Center (1977) 727 ft.

One Detroit Center (1993) 619 ft.

Penobscot Building (1928) 565 ft.

Guardian Building (1929) 495 ft.

Book Tower (1926) 475 ft.

150 W. Jefferson (1989) 456 ft.

Cadillac Tower (1927) 438 ft.

One Woodward Ave. (1963) 430 ft.

Greektown Casino Hotel (2009) 348 ft.

Monroe Blocks [Proposal] 508 ft.

PH

OL

ND

RA

MO

NR

T

OE

EE

AV E

.

STR

T

ES

TT

E AY AF

EL

FA R

ME

R

PH

OL

ND

RA

S

MO

NR

OE

VE DA

AV E

.

BA TE

R

T

AR DW

ME

EE

STR

O WO

FA R

FARMER

WOODWARD AVE

BATES

WOODWARD AVE

CADILLAC SQUARE

DETROIT, MICHIGAN DESIGN COMPETITION, 2016 i ROSSETTI

TEAM Daniel Soleski, Design Principal, Deena Fox, Project Manager, Aaron Taylor, Senior Designer In Collaboration with STOSS

52


MONROE BLOCKS MASTERPLAN

53


PROFESSIONAL WORK

54


MONROE BLOCKS MASTERPLAN

RESIDENTIAL SWIM TERRACE/ BOTANICAL GARDEN

WINTER GARDEN

RESIDENTIAL: GROWING GARDENS

CULTURE TERRACE

CIVIC PROMENADE

MAIN PODIUM

CADILLAC SQUARE

BASE PROGRAM BASE BASE PROGRAM PROGRAM BASE PROGRAM BASE PROGRAM RESIDENTIAL BASE PROGRAM RESIDENTIAL RESIDENTIAL PARKING PARKING PARKING RESIDENTIAL RETAIL RESIDENTIAL BASE PROGRAM RETAIL RETAIL PARKING COMMERCIAL RESIDENTIAL PARKING COMMERCIAL COMMERCIAL RETAIL PARKING RETAIL COMMERCIAL RESIDENTIAL RETAIL COMMERCIAL

GROSS SF 0

100,000

200,000

300,000

0 0

100,000 100,000

200,000 200,000

300,000 300,000

255,000 sf (300 units)100,000 0

200,000 200,000

300,000 300,000

200,000

300,000

0 255,000 sf (300 units) units)100,000 255,000 420,000 sf sf (300 (1200 spaces) 0

420,000 420,000 255,000 100,000 255,000 100,000 100,000 420,000 200,000 255,000 0 420,000 200,000 200,000 100,000 420,000 100,000 200,000 255,000 100,000 200,000

sf sf sf sf sf sf sf sf sf sf sf sf

100,000

(1200 spaces) (1200units) spaces) (300 (300 units) (1200 spaces) (300 units) 100,000 (1200 spaces)

CAMPUS MARTIUS

(1200 spaces)

420,000 sf sf (1200 spaces) 200,000

RETAIL

100,000 sf

COMMERCIAL

200,000 sf

PROPOSED PROGRAM RESPONSE PROPOSED PROGRAM RESPONSE PROPOSED PROGRAM RESPONSE 100,000

PROPOSED PROGRAM TOTAL 1,994,0500SF RESPONSE 0

OE

NR

MO

CA D

IL

LA C

SQ U

AR

E

E. AV

P

P

P

LOOKING AHEAD GREEN SPACE LOOKING AHEAD AHEAD LOOKING LOOKING AHEAD LOOKING AHEAD RESIDENTIAL LOOKING AHEAD RESIDENTIAL RESIDENTIAL RESIDENTIAL PARKING RESIDENTIAL LOOKING AHEAD PARKING PARKING RESIDENTIAL RETAIL RETAIL PARKING RETAIL COMMERCIAL PARKING RESIDENTIAL COMMERCIAL RETAIL COMMERCIAL PARKING CULTURAL RETAIL CULTURAL COMMERCIAL CULTURAL RETAIL COMMERCIAL GREEN SPACE PARKING CULTURAL GREEN SPACE COMMERCIAL GREEN SPACE CULTURAL RETAIL GREEN SPACE CULTURAL GREEN SPACE COMMERCIAL GREEN SPACE CULTURAL GREEN SPACE

GROSS SF GROSS SF GROSS SF

400,000

500,000

600,000

700,000

400,000 400,000

500,000 500,000

600,000 600,000

700,000 700,000

400,000 400,000

500,000 500,000

600,000 600,000

700,000 700,000

400,000

500,000

600,000

700,000

400,000

500,000

600,000

700,000

500,000

600,000

700,000

500,000 500,000

600,000 600,000

700,000 700,000

GROSS SF

200,000

300,000

(300 units)

PARKING COMMERCIAL

0 PROPOSED PROGRAM PROPOSED PROGRAM RESIDENTIAL 0 GROSS SF 0 PROPOSED PROGRAM RESIDENTIAL RESIDENTIAL PARKING 0 PARKING PARKING RESIDENTIAL RETAIL RESIDENTIAL PROPOSED PROGRAM RETAIL RETAIL PARKING COMMERCIAL RESIDENTIAL PARKING 0 COMMERCIAL COMMERCIAL RETAIL CULTURAL PARKING RETAIL CULTURAL CULTURAL COMMERCIAL GREEN RESIDENTIAL RETAIL SPACE COMMERCIAL GREEN SPACE SPACE CULTURAL GREEN PARKING COMMERCIAL CULTURAL GREEN SPACE RETAIL CULTURAL GREEN SPACE COMMERCIAL GREEN SPACE CULTURAL

GROSS SF SF GROSS

RESPONSE RESPONSE RESPONSE

GROSS SF 200,000

300,000

100,000 100,000

200,000 200,000

300,000 300,000

100,000 100,000

200,000 200,000

100,000

RESPONSE 100,000

GROSS SF SF GROSS

400,000 400,000

400,000 GROSS SF GROSS ADD UNITS TO CBD -SF 430 UNITS 300,000 300,000 ADD UNITS

400,000 400,000 UNITS

TO CBD --SF 430 UNITS GROSS ADD UNITS TO CBD 430

430,000 SF500,000 600,000 700,000 600,000 700,000 430,000 SF 430,000 SF500,000 NOT ENOUGH PARKING - 2300 TOTAL SPACES/ 802,475 SF

300,000 400,000 500,000 600,000 SPACES/ 802,475 700,000 NOT NOT ENOUGH PARKING PARKING -- 2300 2300 TOTAL TOTAL SPACES/ 802,475 SF SF ADD UNITS TO CBD - 430 UNITS 430,000 SFENOUGH ADD UNITS TO CBD - 430 UNITS 430,000 SF GROSS SF NOT ACCOMMODATE CORPORATE HQ - 635,000 SFENOUGH PARKING - 2300 TOTAL SPACES/ 802,475 SF ADD UNITS TO CBD 430 UNITS 430,000 SF NOT ENOUGH PARKING 2300 TOTAL SPACES/ 802,475 SF 200,000 300,000 400,000 500,000 600,000 700,000 ACCOMMODATE CORPORATE CORPORATE HQ HQ -- 635,000 635,000 SF SF ACCOMMODATE 120,000 SF ADD CULTURAL CATALYST - 100,000 SF NOT ENOUGH PARKING - 2300 TOTAL SPACES/ 802,475 SF 120,000 SF ADD CULTURAL CULTURAL CATALYST CATALYST -- 100,000 100,000 SF SF ADD ACCOMMODATE CORPORATE HQ - 635,000 SF 180,000 SF ADD UNITS TO CBD - 430 UNITS 430,000 SF 120,000 SF ACCOMMODATE CORPORATE HQ - 635,000 SF

120,000 SF 120,000 SF SF 120,000

200,000

180,000 SF ADD CULTURAL CATALYST - 100,000 SF 180,000 SF NOT ACCOMMODATE CORPORATE HQ - 635,000 SFENOUGH PARKING - 2300 TOTAL SPACES/ 802,475 SF ADD CULTURAL CATALYST - 100,000 SF SF 120,000 SF 180,000 ADD CULTURAL CATALYST - 100,000 SF 180,000 SF 180,000 SF

ACCOMMODATE CORPORATE HQ - 635,000 SF

ADD CULTURAL CATALYST - 100,000 SF GROSS SF

180,000 SF 0

100,000

200,000

300,000

0 0

100,000 100,000

200,000 200,000

300,000 300,000

0 0

100,000 100,000

0

100,000

0

100,000

200,000 200,000

300,000 300,000

200,000

300,000

GROSS SF SF GROSS GROSS SF GROSS SF GROSS SF

400,000

500,000

400,000 400,000 400,000 400,000

500,000 500,000

700,000

600,000 600,000

700,000 700,000

ADD TOWER 600,000

CONVERT500,000 PARKING CONVERT PARKING

600,000 ADD TOWER ADD TOWER

400,000

500,000

CONVERT PARKING PARKING DEMAND REDUCTION THROUGH TRANSIT ALTERNATIVESCONVERT PARKING GROSS SF PARKING PARKING DEMAND DEMAND REDUCTION REDUCTION THROUGH THROUGH TRANSIT TRANSIT ALTERNATIVES ALTERNATIVES CONVERT500,000 PARKING 200,000 300,000 400,000 PARKING DEMAND REDUCTION THROUGH TRANSIT ALTERNATIVES PARKING DEMAND REDUCTION THROUGH TRANSIT ALTERNATIVES CONVERT PARKING PARKING DEMAND REDUCTION THROUGH TRANSIT ALTERNATIVES CONVERT PARKING 221,600 SF CONVERT CONVERT PARKING PARKING 221,600 SF 221,600 SF

180,000 SF

600,000

CONVERT500,000 PARKING

PARKING DEMAND REDUCTION THROUGH TRANSIT ALTERNATIVES CONVERT PARKING 221,600 SF 180,000 180,000 SF SF CONVERT PARKING 221,600 SF

600,000

ADD TOWER ADD TOWER ADD TOWER 600,000 CONVERT PARKING ADDCONVERT TOWER PARKING CONVERT PARKING CONVERT PARKING CONVERT PARKING CONVERT PARKING

180,000 SF CONVERT PARKING 221,600 SF 180,000 SF 180,000 SF

CONVERT PARKING 221,600 SF

55180,000 SF

CONVERT PARKING

700,000 700,000 700,000

700,000

+ + + + + +


PROFESSIONAL WORK

LP DO

N RA T

NR OE

EE TR

AV E.

HS

R

MO

R

RESIDENTIAL ACCESS

R 2,0

T

ES

TT

E AY AF

RE

EL

TA IL

00

FA R

ME

SF

R

R

B.R

6,5

00

GA R

SF

B.R

DE

5,30

N

0S

F

R R

R

.

PA RK

VE DA

OE

BA TE S

ME

SF

T EE

AR DW

AV E

STR

O WO

TA IL

00

R

NR

PH OL

G

RE

2,6

FA R

R

ND

LO AD IN

RA

R

IN G

MO

R

B.R

R

6,400SF

B.R

FARMER

5,700SF

R R RE 2,0

TA IL

00

B 6, .R 60

SF

LOADING

GROCERY 15,200SF

BATES

WOODWARD AVE

150

00 GROUND FLOOR PLAN

MO NR OE

AV E.

T EE STR PH OL ND RA

ME

FA R

BA TE S

ME

T EE STR PH OL ND RA

E AV RD WA OD WO

RES IDE NT 50,8 IAL 00 SF CO ND O

R

AV E.

R

FARMER

PARKING 155,600SF

BATES

WOODWARD AVE

OFFICE 26,500SF

-01 LOWER LEVEL PLAN (-13’)0

50

100

CADILLAC SQUARE

08 BRIDGE LEVEL PLAN (125’)

150

56

T

ES

TT

E AY AF

EL FA R

MO NR OE

100

OFFICE ACCESS CADILLAC SQUARE

WOODWARD AVE

50

F

EX PA ISTIN RK IN G O.C GR .M AM . P

0

WOODWARD AVE

0S


MONROE BLOCKS MASTERPLAN

TOP PODIUM LEVEL PLAN: 125FT

MMOO NNRR OOEE SSTT ..

AV E. MO NR OE

TT EEEE SSTTRR PPHH OOLL NNDD RRAA

T EE STR PH OL ND RA

F FA AR RM ME ER R

ME

2020 ,0,0 0000 SS FF

CCUU LLTT LLAA UURREE BB

FFA AR RM ME ER R

BBAA TTEE SS

SF

BA TE S

PA R 36 KI ,80 N G 0

R

MMOO NNRR OOEE SSTT ..

SF

MO NR OE

AV E.

ME

T EE STR PH OL ND RA

EE AAVV RRDD WWAA OODD WWOO FA R

TT EEEE SSTTRR PPHH OOLL NNDD RRAA

CU LT F URE 14 AB ,80 . 0

TE MP . 9,0 RE 00 SF TA IL

R

STT TE S ETTE AYET AFFAY LA E EL

ALL TTASF ENN 0000SF RRE16 ,5,5 16

FA R

FARMER FARMER

FARMER

OFFICE OFFICE 32,700SF 32,700SF

F&B

11,800SF

LAN: 160FT

WOODWARD WOODWARDAVE AVE

WOODWARD AVE

BATES

BATES BATES

WOODWARD WOODWARD AVE AVE

WOODWARD AVE

50

CADILLAC SQUARE

0 0

50 50

100 100

150 150

118

CADILLAC CADILLAC SQUARE SQUARE

OFFICE 04 TOP PODIUM FLOOR PLAN (75’’)

03 PODIUM FLOOR PLAN (+30’)

LOADING/PARKING RESIDENTIAL

MONROE BLOCKS MASTERPLAN

RETAIL ND

RA

CULTURAL

E

TT

E AY AF

ME

R

MO MO NR NR OE OE MO AV AV NR E. E. OE AV E.

AV E MO NR OE

EL

R

ER

S

ME

BA TE

R

FA RM FAE RRM

BA TE S BA TE S

BA TE S

R

MO MO NR NR OE OE MO AV AV NR E. E. OE AV E.

MO NR OE

AV E

ME

FA R

ER

FARMER

FARMER FARMER

FARMER

RESTAURANT

3,200SF

RESTAURANT

20,000SF

50

CADILLAC SQUARE

0 50 14 BRIDGE UPPER LEVEL PLAN (160’) 0 50

100

150

100 100

150 150

BATES BATES

3,200SF

WOODWARD WOODWARD AVE AVE WOODWARD AVE

BATES WOODWARD AVE

0

3,200SF RESTAURANT

WOODWARD AVE WOODWARD AVE

BATES

WOODWARD AVE

OFFICE WOODWARD AVE

T EE STRT T EE PH EE TR OL TR H S ANDPH S R OL ND RA

P OL

ND RA

T EE STR PH OL ND RA

VE DA ARAVE VE D A ODW RD WO WA OD WO

AR DW

FA R

32 ROOF (209’)

ERPLAN

57

T ES

T ST ET TE AY ET AF AY AF EL

EL

EL

FA RM FAER RM

ME

T

ES

TT

E AY AF

T

FA R

EE STRT T EE PH EE STR DOL STR PH RAN LPH O ND RA

T EE STR PH OL ND RA

O ND CO10,500SF

FA R

ST

OL

GREEN SPACES

O WO

0

T

ES

TT

E AY AF

EL

CADILLAC SQUARE

CADILLAC SQUARE CADILLAC SQUARE


PROFESSIONAL WORK

58


HIGHLY REFLECTIVE PANEL

OPEN PANEL

SOLID WHITE PANEL

FRIT GLASS

TRANSLUCENT GLASS

GLASS

MONROE BLOCKS MASTERPLAN

D05

A04

D02

A04

D05

A04

D05 D03

A04

A02

C02

C05 C03

C04

A03 A05

A02

C04 B01

C01

D01

D01

D02

A05

D05

B05

D02

D05 D03

D02

D05

C05

D05

D05 D03

A05

A02

A02

A01

C02

C01

4

B0

A05

A04

D01

C03

C03

C04

A01

C02

B01

C04

B01 D01

B04

B01

C01

D01

B04

A04 B05

A05

D05

C05

D05

C04

A01 C01

B01 B04

D01

C03

B04 B03

A01

B01

MATERIAL PANELIZATION PERCENTAGE GRADIENT

A03 A02

SOLID GRAY PANEL A01

B01

REFLECTIVE GLASS 50%

REFLECTIVE GLASS 40%

SOLID GRAY PANEL 45% Solid white panel 5%

WHITE PANEL Solid gray panel

48% 12%

B03WHITE SOLID PANEL

A03 TRANSLUCENT GLASS

B02

A02

REFLECTIVE GLASS 30% TRANSLUCENT Solid white panel

56% 14%

A01

B01

REFLECTIVE GLASS 20% FRIT GLASS Translucent

B03 GLASS

FRIT GLASS

D02

64% 16%

GLASS Frit glass

59

A03

B02

REFLECTIVE GLASS 2% 72% 18%

A02

REFLECTIVE GLASS 1% GLASS Frit glass

D02

96% 3%

D03

A04

FACADE PATTERN & SCRIPT The imposed Woodward City Plan with its triagulated pattern became a glazing system. The pattern was essential for the design as it was one of the ways the intent of the design was scalable to the facade. With a grasshopper script I was able to produce a complex gradiation in the glazing system where each program within the building was associated with a percentage of glazing patterns ranging from highly reflective to completely transparent. A03

B05

B02

D03

B02

A, B, C ,D panel dimensions are equivalent only rotated and mirrored D01

C01

C05

A04

A04 B03 HIGHLY REFLECTIVE GLASS

A

D03

A02 C02

C02

A01

A03

D02

A02

A01

B02

A05

A03

B02

A01

B03

A04 B05

D03

A01

C03

D02

B03 B02

B03

D02

A04

A01

A01

C02

C05

C01

C02

C05

A04

A02

C04

D05 D03

A04 B05

D02

C05

A04

A02

D02

A03

B02

A05

A05

A05

D02

A05

B04

A03

D02 D03

D01

B03

A04

B05

A03 B05

B01 D01

B04

A04

A01

B05

B02

B01

C01

C03

D03 A04 A03

4 A0

B0

B02

A01 C01

C04

C05

C03

D01

C04

D05

A04

C02

B03

D01

B04

A03

C05

A04

B02

B01

C01

B03

C03

C04

A01

A04

A04

A04

C02

C05

A04

C02

B01 4

A01 C01

A02

A05

C03

C04

B02

C03

D05 D03

A03

A04

D03

A02

D01

B03 B04

C03

D05

A03 A05

C02

A05

A04

C03

C05

D02

A02

A05

D03 A02

D02

A04

B04

A02

C04

B05

A05

B01

B03

C05

D03 A04 A03

D01

C01 D02

B02

D01

A03 B05

A04

C03

A04

B04 B03

B02

B01

A01

A01

A01 C01

C02

A03 A05

A02

C05

D03 A04

D05 C05

A04

B03 B04 B05

A05

B05

B02

B01

A03

C04 C03

B05

B03 B04

D03

4

A01

D02

56% 14%

D01

C0

C05 C04 C03

D01

D01

TRANSLUCENT Solid white panel C01

C02

D03

A02

D02

C02

A04

A03 A05

D01

30%

B0 5

D03

MATERIAL PANELIZATION PERCENTAGE GRADIENT C01 C02

C04

D02

A04

D03

D01

REFLECTIVE GLASS

A05

A02


PROFESSIONAL WORK

ONE CAMPUS MARTIUS LIBRARY PARK

.

T TIO RA

E AV

FARM

ER S

T.

OE

AVE .

G

D

MO

DW AR

NR

W OO

AV E

.

CAMPUS MARTIUS PARK

DETROIT, MICHIGAN FEASIBILITY, 2016 I ROSSETTI One Campus Martius is positioned at the heart of the city. This pivotal location provides an opportunity to integrate Quicken Loans, Meridian Health and the community of Detroit into a porous campus with a distinct global identity for public and private users. The new One Campus Martius will serve as an amenity for all, promoting health, technology and physical and social connectivity. Campus Martius will promote urban connectivity by offering a porous, metropolitan pedestrian experience with a lush, civic streetscape.

60


OCM- RENOVATION

Flags to be relocated. Location, TBD

1.

3.

EXISTING PODIUM Massive, solid & austere Entries into atrium are small and hidden.

4. 5.

2.

primary atrium entrance

WOODWARD AVE.

C.M.

secondary entrance

MONROE AVE.

1. Demo aluminum arch along facade (typ.) 2. Demo awning at storefront glazing(typ.) 3. Demo granite column enclousure along facade (typ.) 4. Demo storefront glazing along facade (typ.) 5. Demo curtain wall system and infill front wedge with floor slab

primary primaryprimary atriumatrium entrance atrium entrance entrance

WOODWARD AVE. WOODWARD AVE. WOODWARD WOODWARD AVE. AVE.

porousporous retail colonnade porous retail colonnade retail colonnade

C.M. C.M. C.M. CAMPUS MARTIUS

primary primaryprimary atriumatrium entrance atrium entrance entrance

MONROE MONROE AVE. MONROE AVE. AVE. MONROE AVE.

61

PROPOSED PODIUM Exposed, grand & light. Visible, multiple entries and promenade create a an inviting and usable public space around and within the building.


PROFESSIONAL WORK

LEVEL 01

PU MP

ELE C

PROPOSED PROGRAM

JA

N

TE

BR

CIRCULATION

LE

DO CKS

CONTROLLED SPACE

EA KR M

UPS

FIR E

PROGRAMMED SPACE

BACK OF HOUSE

DO CK

ASH

DAYCARE

08. OFFICE RECEPTION

08.

OFFICE RECEPTION

09.

ESCALATORS

ELE C

FITNESS CENTER

07.

H BO R TT

WN

TE

TE

LE

LE

ELE C

06.

ELE C

TE

DO

UP

09. ESCALATORS 01. RETAIL (3280 SF)

LE

OFFICE

04. COFFEE SHOP (4700 SF)

TE

05.

D CLERY AN

COFFEE SHOP

H STOR R

RESTAURANT/CAFE

04.

PAR

03.

01. RETAIL (6900 SF)

LE

CALEXICO

ELE C

RETAIL

02.

KIN

02. CALEXICO (3920 SF)

01.

TR

G

RAM P

RM

LIG HTI NG

GAS

CONTROL POINT

01. RETAIL (20000 SF)

L 01

LEVEL 02

PROPOSED PROGRAM BRIDGE TO PARKING

PROGRAMMED SPACE CONTROLLED SPACE CIRCULATION BACK OF HOUSE CONTROL POINT 06. FITNESS CENTER (25590 SF)

01.

RETAIL

02.

CALEXICO

03.

RESTAURANT/CAFE

01. RETAIL (2420 SF)

04.

COFFEE SHOP

01. RETAIL (11450 SF)

05.

OFFICE

09. ESCALATORS

06.

FITNESS CENTER

07.

DAYCARE

08.

OFFICE RECEPTION

09.

ESCALATORS

07. DAYCARE + BRIDGE (5800 SF + 5120 SF)

DO

WN

UP

OPEN TO BELLOW

OPEN TO BELLOW OPEN TO BELLOW

01. RETAIL (20000 SF)

L 02

62


OCM- RENOVATION

LEVEL 03

PROPOSED PROGRAM

PROGRAMMED SPACE OPEN TO BELLOW

CONTROLLED SPACE CIRCULATION BACK OF HOUSE CONTROL POINT

01.

RETAIL

02.

CALEXICO

03.

RESTAURANT/CAFE

04.

COFFEE SHOP

05.

OFFICE

06.

FITNESS CENTER

07.

DAYCARE

08.

OFFICE RECEPTION

09.

ESCALATORS

06. FITNESS CENTER (16600 SF)

05. OFFICE (19000 SF)

DO

WN

09. ESCALATORS

07. DAYCARE (1650 SF)

OPEN TO BELLOW

OPEN TO BELLOW

OPEN TO BELLOW

09. ESCALATORS

UP

03. RESTAURANT/CAFE (6300 SF) L 03

LEVEL 04

PROPOSED PROGRAM

PROGRAMMED SPACE OPEN TO BELLOW

CONTROLLED SPACE CIRCULATION BACK OF HOUSE CONTROL POINT

01.

RETAIL

02.

CALEXICO

03.

RESTAURANT/CAFE

04.

COFFEE SHOP

FITNESS CENTER

07.

DAYCARE

08.

OFFICE RECEPTION

09.

ESCALATORS

UP

OFFICE

06.

09. ESCALATORS

L 04

03. RESTAURANT/CAFE OUTDOOR DECK (4700 SF)

63

DOWN

OPEN TO BELLOW

05.


PROFESSIONAL WORK

64


OCM- RENOVATION

A 100 % A 100 % A 100 %

B 33% B 33%

primary atrium entrance primary atrium entrance

WOODWARD AVE. WOODWARD AVE. B 100% B 100% 6” EXTRUSION 6” EXTRUSION

C 0% C 0%

primary atrium entrance

primary atrium entrance primary atrium entrance

CAMPUS MARTIUS CAMPUS MARTIUS

W 0% W 0%

MONROE AVE. MONROE AVE.

B 100%

0” 0”

6” EXTRUSION

WOODWARD AVE.

W 0% 0”

EXPOSED VOLUME SCRIPT Gradient brick extrusion script was developed to emphasise a curtain exposing the interiority of the building.

65


PROFESSIONAL WORK

PANTHERS ARENA MASTERPLAN

TYPICAL URBAN BLOCK

TYPICAL ARENA “MEGA BLOCK”

INVERTED BOWL

INVERTED BOWL ENHANCED URBAN BLOCK

FT LAUDERDALE, FLORIDA FEASIBILITY & MASTERPLAN STUDY 2018 I ROSSETTI The client approached us to develop a concept design for a multi-purpose arena in the heart of Ft. Lauderdale City. Working with our urban planning team we identified site opportunities and developed a concept for a mixed use block with the arena as a its anchor. The proposal uses an inverted bowl concept with a smaller footprint and maintain the site viable 360 days of the year at the same time creating a unique urban experience.

66


PANTHERS ARENA MASTERPLAN

TO CENTRAL BUS STATION & BRIGHTLIGHT STATION

BROWARD BLDV.

ENTRY PLAZA

DROP-OFF

RETAIL 56,000 SF

PARKING

9 STORIES, 90 SPACES PER FLOOR

ANDREWS AV.

PLAZAS + URBAN STREETSCAPE ELEMENTS

RAILROAD CORRIDOR

PUBLIC SPACE

KEY LOCATION FOR MURAL

A. 20 STORIES, 200-300 KEYS B. 12 STORIES, 120 KEYS

STREETCAR STATION

HOTEL A

HOTEL

ARENA 7,000 SEATS

PARKING GARAGE

STRANAHAN PARK

SHARED STREET

SERVICE

LOADING, WASTE MANAGEMENT HOTEL B

ARENA ENTRANCE

BROWARD COUNTY MAIN LIBRARY ENTRY PLAZA

ENTRY PLAZA

TO RIVERWALK

TO SECOND STREET RETAIL

67

SECOND STREET


PROFESSIONAL WORK

PHOENIX RACEWAY FOODCOURTS

PHOENIX, ARIZONA SCHEMATIC- DESIGN DEVELOPMENT 2018 I ROSSETTI

The Midway Design was the last phase of the project that spanned over 7 years. The major renovations to the Raceway was the relocation of the start/finish line so that everyseat would be bale to have direct view to it. With a low budget we were able to use some tactical urbanism techniques to enhance circulation and create ammenities along the midway.

68


PHOENIX RACEWAY MIDWAY DESIGN AND FOODCOURTS

5 GATE CANYON 1 1 CANYON

PIT ROAD THE PIT

4 GATE PREMIUM ENTRY

START LINE

15 AC

PREMIUM ENTRY

PREMIUM ENTRY

3 GATE

CANYON 2 2 CANYON TUNNEL ENTRY

GATE 2

DAYCARE CENTER

GATE 5

MIDWAY ENTRY 12% @ 5,400

FIRE HYDRANT LIGHT POLES ISM CONNECT KIOSKS ISM TOTEMS LANDSCAPED AREAS DISPLAY AREAS FANATICS F+B AREAS

GATE 5 MIDWAY ENTRY 12% @ 5,400

UP

UP

FIR

E

LA

NE

THE PIT

T

CANYON 1 F+B

2

OASIS 1

FIR

E

LA

NE

DISPLAY C

1

“TU

3

RN 5

1

CANYON 1 T

OME

WAY ENTRY % @ 9,900

FOOD COURT CANYON 1

CHAMPIONS GRID TING TICKE ING BUILD

MIDWAY ENTRY 44% @ 19,800

.

16 Tents 1 35’ Trailer

START & FINISH LINE

DISPLAY G.1

PREMIUM ENTRY

PREMIUM ENTRY

BEER GARDEN

3

“T

UR

DISPLAY G.2

RIP RD

CANYON 2 F+B

MIDWAY USEABLE AREA 573,765

DISPLAY A

DRAG ST

OASIS 2

3 Tents 1 75’ Trailer

PREMIUM ENTRY

PREMIUM ENTRY

GATE 3 ACTIVATION

GATE 3

BEER GARDEN 7 Tents

TOTAL DISPLAY AREA REQUIRED 196,675 SF TOTAL DISPLAY AREA PROVIDED 214,646 SF

DISPLAY D

DISPLAY D

Notes 2/ 10*10 Tent 2/ 35’ Trailer 2/ Portable

3 Tents 2 35’ Trailers

UP

E

NAD

2

GATE 4 MIDWAY ENTRY 22% @ 9,900

4

5

” PR

GATE 4

POS MIDWAY

20 Tents

GATE 3 MIDWAY ENTRY 44% @ 19,800

tics

Fana

4

Display Area H 10489 SF

PREMIUM ENTRY

N5

”P

RO

ME

ADA ENTRY

T

CANYON 2

FOOD COURT CANYON 2

NA

DE

HOSPITALITY BUILDING COORPORATE HOSPITALITY

5

GATE 2

PREMIUM ENTRY

TUNNEL ENTRY

DISPLAY E

T MIDWAY ENTRY 22% @ 9,900

SCALE 1”=160’ 0’

69

40’

80’

120’

160’


PROFESSIONAL WORK

EXISTING FOOD TENTS CLUSTERS

SERVICE SERVICE AREA AREA

35’TRAILER

35’TRAILER 35’TRAILER

35’TRAILER

R R ILE ILE RA 5’TRA 3 35’T R R E E IL IL RA 5’TRA 3 35’T

35’TRAILER 35’TRAILER 35’TRAILER 35’TRAILER

15’

15’

15’

15’

15’

15’

15’

15’

MARQUEE MARQUEE

SHADED SHADED SEATING SEATING AREA AREA

EXISTING

SERVICE SERVICE AREA AREA

AIL ER

AIL ER

35 ’TR

35 ’TR

R ILE

R ILE

RA 35

R

R

ILE

ILE

RA

RA

’T

’T

35

35 35

R

R

ILE

ILE

RA

RA

’T

’T

35

70

R

SHADED SHADED SEATING SEATING AREA AREA

SHADED SHADED SEATING SEATING AREA AREA

ILE

R

ILE

RA

15’

15’

RA

’T

’T

35

MARQUEE MARQUEE 15’

15’

’T 35

RA

’T 35

R IL ILE RA 5’TRA 3

35’T

35’TRAILER R5’TRAILER

3 RAIL5’TRAIL ER ER

35’T

R R ILE ILE RA 5’TRA 3

35’T ER


PHOENIX RACEWAY MIDWAY DESIGN AND FOODCOURTS

TENTS

(PLUG INS)

FOOD QUEING MIDWAY PROMENADE (FIRE LANE)

SEATING AREA

71


053100.D 051200.F 053100.D

051200.N 051200.A

051200.F 051200.N 051200.A

Canyon 1 Food Court Canyon 1 FoodPerspective Court Perspective -A3Food Canyon 2 FoodSim CourtOpp Sim Opp Canyon 2A-055 Court

A3

A-055

Scale: Ref:

3

F

Scale: Ref:

3

A-

PROFESSIONAL WORK F

G

H

J

A-056

54' - 4 7/8"

7' - 9"

CANOPY STRUCTURE, VENDOR FACADE AND FOOTINGS TO BE SLOPE 1/4" PER 1'-0" ENGINEERED BY MANUFACTURER

14' - 11"

F8

053100.D

14' - 11"

TV

7' - 9"

14' - 7 1/8"

10' - 0"

10' - 0" 20' - 0"

7' - 2"

TV

4

SLOPE 1/4" PER 1'-0"

5

270000.D 051200.D

POP-UP VENDER TENT

033000.J 051200.A 051200.D 051200.F 051200.N 053100.D 074213.AB 220000.H 260000.A 260000.T 270000.D

54' - 4 7/8"

7' - 2"

260000.A WALL WASHER

Material Keynotes:

053100.D

A-056

4

VENDOR FACADE AND LOUVER

K

F8

260000.A (2) EA BEAM

SLOPE 2" PER 1'-0"

E

SLOPE 2" PER 1'-0"

D

14' - 7 1/8"

CONTROL JOINT STEEL COLUMN STEEL PIPE COLUMN STEEL CHANNEL STEEL HOLLOW STRUCTURAL SHAPE (HSS) STEEL ROOF DECK A3 CONCEALED FASTENER METAL WALL SIDING A-056 HOSE BIBB LIGHT VENDER FIXTURE FACADE AND LOUVER POLE MOUNTED LIGHT FIXTURE VENDER POP-UP TENT SPEAKER

1

Project

SITE SIGNAGE

Ra

A5

TV

A-056 A-056

A8

83' - 8"

TV

260000.T FESTOON LIGHTING 260000.A (2) EA BEAM

10' - 0"

A-05

A3

SLOPE 1/4" PER 1'-0"

A-056 053100.D

10' - 0"

VENDER FACADE AND LOUVER

20' - 0"

260000.T FESTOON LIGHTING

VENDER POP-UP TENT

TV

6

TV

051200.D

5

074213.AB 053100.D

2

C2 A-056

TV

A-056

TV

7SLOPE

1/4" PER 1'-0"

27' - 9 1/2"

053100.D

Canyon 1 Food Court Reflected Ceiling Plan Canyon 2 Food Court Sim Opp Scale: 1/16" = 1'-0" Ref: A-211

7602 Avon

F3

SLOPE 2" PER 1'-0"

14' - 11"

7' - 2"

6

7' - 9"

83' - 8"

051200.A

A-056

053100.D SLOPE 1/4" PER 1'-0"

Cons 260000.T 65' - 10 5/8"

FESTOON LIGHTING

C3

A7

A-056

8

A-056

051200.D

9/12/2018 4:14:23 PM

051200.N

C:\ROSSETTI\RevitProjects\PIR-Arch_pattydickman1373.rvt

051200.F

F3

A-056

A8

053100.D

A-055

C2

A5 A-056

Canyon 1 Food Court Roof Plan Canyon 2 Food Court Sim Opp

A8

A-055

F8

A-055

Scale: 1/8" = 1'-0" Ref: A

B

C

D

Canyon 1 Food Cou Canyon 2 Food Cou Scale: 1/8" = 1'-0" Ref: A-051

3

E

F

C2 A-056

PAINTED ASPHALT 7

A-056

27' - 9 1/2"

16' - 9 3/8"

F8

053100.D

9/12/2018 4:14:23 PM

A8

A-055

A7

A-056

A-056 PROVIDE CONDUIT FOR FUTURE POWER AND DATA

Canyon 1 Food Court Roof Plan Canyon 2 Food Court Sim Opp Scale: 1/8" = 1'-0" Ref:

A3

No. 1 2 3 4

A-056 B

C

D

'10

TV

0"

VENDER POP-UP TENT

37°

5 '10

10' - 0"

0"

21' - 0"

SLOPE 2" PER 1'-0"

14' - 11" 7' - 9"

C3

074213.AB 8

0"

TV

65' - 10 5/8"

A

SITE SIGNAGE

4

220000.H

0"

'10

C:\ROSSETTI\RevitProjects\PIR-Arch_pattydickman1373.rvt

7' - 9"

"

-1

0"

17' - 6"

-3

3'

051200.A

F3 A-056

SLOPE 1/4" PER 1'-0"

'10

21' - 7"

1'

7' - 2"

10' - 0"

VENDER FACADE AND LOUVER

Profes

54' - 4 7/8"

10' - 0" 20' - 0" 29' - 6"

A5

TV

A-056

0"

A8

21' - 0"

10' - 0" TYP CJ SPACING

SAW-CUT CONCRETE PAVING

23°

10' - 6" TYP CJ SPACING

TV

113' - 6"

'10

A-056

TV

R 30'-0

6

"

19.2°

34' - 4" R 26'-0" TV

033000.J

EXPOSED AGGREGATE CONCRETE PAVING

21' - 0"

19°

(4) AT CANOPY FOR APsSEE LOW VOLTAGE

39.5 °

Key Pla

C2 x6 6

A-056

TV

x29

TV

15 .3

°

29' - 5"

7

z

17' - 6"

PROVIDE CONDUIT FOR FUTURE POWER AND DATA

1"

0"

-1

'-

Sheet T

10

7' - 9"

F3 A-056

0"

10

'-

1'

Ca

220000.H 10' - 0" 65' - 10 5/8"

C3 A-056

72

A7 A-056

Canyon 1 Food Court Plan -

PAINTED ASPHALT

8

Project

2016

Sheet n


260000.T FESTOON LIGHTING

6' - 4"

PAINTED ASPHALT

16' - 9 3/8"

2' - 6"

7' - 9"

10' - 7"

4' - 0" TV

21' - 0"

TV TV

F3

Section @ Sponsor Wall

MIN 6'-8" AFF

x6 6

A-056

E

F

0" '-

POP-UP VENDOR TENT

0"

1

22

43

Sheet Title

10

A-056

POP-UP VENDOR TENT D

61

1"

'-

7' - 9"

F3

5 z1

051200.A

-1

10

TV

B

7

051200.A

C 1'

Scale: 1 1/2" Ref: A-055

A

051200.F

SIGNAGE PANEL 051200.F

SIGNAGE PANEL

Section

Scale: 1 1/2" = 1'-0" Ref: A-055

° 15 .3

21' - 0"

033000.E

F3

19°

10' - 6" TYP CJ SPACING

21' - 0"

113' - 6"

10' - 0"

2' - 6"

17' - 6"

10' - 7"

10' - 0"

4' - 0" 2' - 10"

TV

A3

A-056

033000.K

A-056 Key Plan

A-056

17' - 6"

033000.R

PAINTED ASPHALT PAVING

6

39.5 °

Scale: 1/4" = 1'-0" Ref: A-055

PROVIDE CONDUIT FOR FUTURE POWER AND DATA

PAINTED ASPHALT PAVING

DRIP EDGE CANOPY MANUFACTURER) HOLD 6" BELOW TOP OF PAVING

Scale: 1/4" = 1'-0" Ref: A-055

Section @ End Canopy

A3

074213.K

074213.K CONCRETE FOOTING (BY

CONCRETE FOOTING (BY CANOPY MANUFACTURER) HOLD 6" BELOW TOP OF PAVING

19.2°

A-056

29' - 5"

4

051200.A W-SHAPE COLUMN

051200.A W-SHAPE COLUMN

23°

A-056

C2 A-056

053100.A

270000.D

0"

1/2" = 1'-0" -055

054000.B

Section @ End Canopy

EXPOSED AGGREGATE CONCRETE PAVING

(4) AT CANOPY FOR APsSEE LOW VOLTAGE

C3

C3

054000.K

270000.D

5

260000.A

R 30'-0"

033000.J

CLOSURE PLATE Description Date 04/17/18 260000.A 05/08/18 07/05/18 051200.N 09/12/18

ASI 040 ASI 041 ASI 048 ASI 052

051200.N

SAW-CUT CONCRETE PAVING

R 26'-0"

Scale: 1/2" = 1'-0" Ref: A-055

er Facade Detail

051200.G CLOSURE PLATE

'10

TV

Vender Facade Detail

A-056

051200.F

0"

10' - 0" TYP CJ SPACING

074213.AB051200.G

No. 1 2 3 4

053100.D

A-056

34' - 4"

A3

A3

A5

051200.N

051200.F

'10

29' - 6"

051200.F 053100.D PURLIN, BEYOND

A-056

A8 TV

BACK KS

37°

09/12/18

1' - 0"

0"

10' - 0" 20' - 0"

A-056

051200.F

'10

10' - 0"

SEAT BACK PLANKS

00.K3 ND

053100.D

PROVIDE CONDUIT FOR FUTURE POWER AND DATA

SLOPE 2" PER 1'-0"

051200.F

051200.K BEYOND SITE SIGNAGE

00.U OVABLE

3

21' - 7"

074213.AB

4

SLOPE 2" PER 1'-0"

'-0" ES @ 14 EQ SPAC

053100.D

TV

0.W

Scale: 1/4" = 1'-0" Ref: A-055

051200.F PURLIN, BEYOND

1' - 0" 074213.K

14'-0" ACES @ 3 EQ SP

220000.H

0"

0"

055000.U REMOVABLE STOP

AGE L

-1

'10

0.U D STOP

A-056

SIGNAGE PANEL

055000.W

3'

0"

0.W

051200.A

074213.AB

053100.A

TOP OF PAVING

Section @ Center Canopy '10

00.B

C2

Professional Seal

Scale: 1/4" = 1'-0" Ref: A-055

"

055000.U FIXED STOP

00.A APE

CONCRETE FOOTING (BY CANOPY Section @ Center Canopy MANUFACTURER) HOLD 6" BELOW

-3

00.G CAP

C2

A-056 1'

051200.B

074213.K

051200.A W-SHAPE COLUMN

54' - 4 7/8"

10' - 0"

055000.W

FFE-TV

x29

F8

051200.A W-SHAPE

2

2' - 10"

1' - 6"

A-056

CONCRETE FOOTING (BY CANOPY MANUFACTURER) HOLD 6" BELOW

3

PHOENIX RACEWAY TOP MIDWAY DESIGN AND FOODCOURTS OF PAVING

270000.D

8"

' - 4"

051200.G END CAP

051200.N

260000.T FESTOON LIGHTING

8"

Scale: 1/16" = 1'-0" Ref: A-211

051200.A W-SHAPE COLUMN

260000.A

10' - 0"

A-055

SLOPE 1/4" PER 1'-0"

FFE-TV Consultant

051200.G CLOSURE PLATE

MIN 6'-8" AFF

Food Court Ceiling Plan Canyon 2 Food Court Sim Opp

1' F3 - 6"

1' - 6"

7602 South Avondale Blvd 270000.D Avondale, Arizona 85353

051200.F

SLOPE 1/4" Canyon 1 PER 1'-0"Reflected

8' - 0" TO CL OF TV

1' - 6"

051200.N

053100.D

8' - 0" TO CL OF TV

SLOPE 1/4" PER 1'-0"

Canyon Food Court Plans

220000.H 10' - 0" 65' - 10 5/8"

C3

A7

A-056

F8

A-055 E

5

A5

Canyon 1 Food Court Plan Canyon 2 Food Court Sim Opp

SEAT BACK PLANKS 8

PAINTED ASPHALT

A-056 SEAT BACK PLANKS

Project Number

2016-019

Sheet number

Scale: 1/8" = 1'-0" Ref: A-051

F

A-055

© 2017 ROSSETTI

Canyon 1 Vender Facade Elevation G

H

J

K

Scale: 1/8" = 1'-0" on 1 VenderA-056 Facade Elevation Ref:

1/8" = 1'-0" -055

A-055

260000.A

C3 C3 A-056

53100.D

260000.A

A-056

SLOPE 1/4" PER 1'-0"

SLOPE 1/4" PER 1'-0"

053100.D

074213.AB

053100.D

053100.D

POP-UP VENDOR TENT

POP-UP VENDOR TENT

051200.F

51200.F

074213.AB

051200.N

51200.N

60000.A

260000.A

70000.D

270000.D

6

A

B

C

D

E

F

20' - 0" 1' - 0"

3 EQ SPACES @ 18' - 0"

1' - 0"

SLOPE 1/4" PER 1'-0"

053100.D

051200.F 051200.G CLOSURE PLATE

1

SLOPE 1/4" PER 1'-0"

C2

A-056

2' - 6"

051200.A W-SHAPE

2

051200.B

FFE-TV

051200.A W-SHAPE COLUMN CONCRETE FOOTING (BY CANOPY MANUFACTURER) HOLD 6" BELOW TOP OF PAVING

Section @ Center Canopy Scale: 1/4" = 1'-0" Ref: A-055 3 EQ SPA

055000.U FIXED STOP

055000.U REMOVABLE STOP

10' - 7"

CES @

14'-0"

SLOPE 2" PER 1'-0"

053100.D

SIGNAGE PANEL 055000.W

051200.F PURLIN, BEYOND

1' - 0"

055000.W

Scale: 1/8" = 1'-0" Ref: A-055

4' - 0"

A-056

051200.G END CAP

Canyon 1 Food Court South Elevation Looking North

10' - 0"

1/8" = 1'-0" -055

1' - 6"

074213.K

on 1 Food Court South Elevation Looking North

A7

1' - 6"

270000.D MIN 6'-8" AFF

8' - 0" TO CL OF TV

6' - 4"

1' - 6"

260000.A

051200.N

260000.T FESTOON LIGHTING

074213.AB

053100.D

051200.F

051200.F 051200.G CLOSURE PLATE 260000.A

051200.N

051200.K BEYOND

051200.A W-SHAPE COLUMN

CONCRETE FOOTING (BY CANOPY MANUFACTURER) HOLD 6" BELOW TOP OF PAVING

SLOPE 2" PER 1'-0"

SLOPE 2" PER 1'-0"

051200.N

260000.A

051200.F

270000.D

053100.A

FFE-TV

C2

051200.N 051200.F 053100.A

A3

A-056

A-056

260000.A

Scale: 1/2" = 1'-0" Ref: A-055

051200.F

C3

053100.DA-056

C2

F3

Section @ End Canopy Scale: 1/4" = 1'-0" Ref: A-055

051200.N

A-056

270000.D

FFE-TV

SLOPE 2" Vender Facade Detail PER 1'-0"

A-056

4

260000.A

SIGNAGE PANEL

Scale: 1 1/2" = 1'-0"

POP-UP VENDER TENT

053100.D

051200.F 051200.A

Section @ Spon

Ref: A-055 051200.F

SLOPE 2" PER 1'-0"

A3 A-056

074213.K

PAINTED ASPHALT PAVING

8"

SEAT BACK PLANKS

3

10' - 0"

2' - 10"

7

270000.D

POP-UP VENDOR TENT

051200.N

270000.D

73

260000.A

051200.A

270000.D

053100.D 074213.AB

SEAT BACK PLANKS

051200.A 053100.D


PROFFESIONAL WORK

THE NINE MIAMI HARD ROCK STADIUM

MIAMI, FLORIDA

GATEWAY

R

H

RC

PO

ND

SC

HOSPITALITY

CE

PORCH

l

cia so r n, ie tio rr ta ba en al es ic pr ys re ph tic r, tis ato ar dic in

AP E FENCE

ARTFUL BOUNDA RY

FENCE

LA

FE N

H RC

PO

E

NC FE

y

wa

th

pa

YE

a

m

E APn, l SC tio rfu D eta lo N s veged, co LluAciounicur

FO

ce on pla cti ng ra eri te g th l in llin ga cia _te so ory st

FOYER

e m ntr e om y ex xer en thre pe ior t o sh rie to f old nc in tra e te ns rio itio r n

DESIGN PROPOSAL I 2016 I ROSSETTI

74

The client approached the office with the intent of renovating their VIP entry to the suites which were just above connected with a pair of escalators. The design’s intent hidges on concepts of familarity to typologies and a deconstructionist process to arrive at something new that would be a calling card of the suites above and set the tone for the entertainment to come. In the end this entry becomes more than a place of transition but a smaller part of the social event that is about to take place.


THE NINE, HARD ROCK STADIUM

NINELOCATION

PROJECT LOCATION BAR

PROJECT LOCATION POP-UP RETAIL

UP TO

THE NINE

VALET

DROP OFF- PICK UP

OFFERING: TO ALIGN WITH LIFESTYLE OFFER VALET SERVICE INCLUDING CAR WASHING

H A R D R O C K S TA D I U M

|

2

FEBRUARY 2018 | ROSSETTI

MIAMI DOLPHINS

WOOD PANELS

FORM IMAGE

PRINTED VYNIL

LACE FENCE FLOOR GRAPHIC

75


PROFFESIONAL WORK

76


THE NINE, HARD ROCK STADIUM

PORCH

GRAPHIC LANDSCAPE

PATHWAY

PORCH FIGURES

PATHWAY

FENCE

GRAPHIC LANDSCAPE

77


experim 78


mental 79


EXPERIMENTAL WORK

IN THE THICKET LIGHT UP LIVERNOIS Detroit Design Festival 2018

M

A

R

K

E

T

O

M

A

R

K

E

T

M

A

R

K

E

T

T

N

O

PREVIOUS LIVERNOIS FABRIC

H

A

E

V

E

N

H E F I T Z TG ERA LD A N EI G H BO RH O O D

V

E

V

E

S to p e l S t . VACANT

O

N

T

H

E

A

BUILDING MASS

VACANT

MARKET ON THE AVE

VACANT

G rov GROVE e Av e .

F lo reFLORENCE n ce S t.

AVE.

ST.

MARKET BOOTHS STAGE

PARKING

FOOD TRUCKS

FRAMING SHOP

LIVE 6 ACTIVATED SPACE

BIKESHOP

PICNIC TABLES M

A

R

K

E

T

O

N

T

H

E

A

V

E

PARKING

L i v e r n o i s AVENUE Av e . LIVERNOIS

DETROIT, MICHIGAN DESIGN, FABRICATION & PARTIAL FUNDING, 2018 U N I V ERS I T Y O F DET RO I T M ERCY

80

IN COLLABORATION WITH Elizabeth Stanfel, Rana Malik and Live 6


IN THE THICKET- MARKET IN THE AVE.

OCCUPIED VOLUME occupation

STREET FACING MASS street facing volume street facing volume

occupation

81

entropy ENTROPYFORMentropy ACTIVATION


EXPERIMENTAL WORK

REFLECTIVE INSULATION STRIPS ALUMINUM TUBE FRAME LIVERNOIS CORRIDOR “THE FASHION AVENUE”

OUTDOOR PILLOWS PLAYGROUND NETTING & PULLEY MECHANISM

8X8 VOLUME MODULE

82

VACANCY OF LAND OVERGROWN, RESILIENT, NATIVE, DOMESTIC


IN THE THICKET- MARKET IN THE AVE.

ALUMINUM PIPE FITTING PULLEY WIRE

PULLEY

ZIP TIE PLAYGROUND NETTING

SHEER FABRIC

PIPE BRACKET

WIRE

PENETRATOR GROUND ANCHOR

PENETRATOR GROUND ANCHOR

83


EXPERIMENTAL WORK

84


IN THE THICKET- MARKET IN THE AVE.

3

4 5

7

6 11

8 1

9

2

1

STEEL PIPE FRAME Schedule 40 1-1/2” D 10’(17) 10’6” (8) 13’9” (2) 10’11” (2) 2’ (4)

2

PENETRATOR GROUND ANCHOR WITH PIPE BRACKET 18” Penetrator (8) 2” U Bracket (8) 3/8” Bolt (8) 3/8” Nut (8) 3/8” Washer (8)

3

4 5

6

SLIP ON 3 WAY 90 DEGREE CONNECTOR 1-7/8” (8) SLIP ON TEE CONNECTOR 1-7/8” (2) SLIP ON ADJUSTIBLE ANGLE WYE 1-7/8” (8) 4WAY 90 DEGREE CONNECTOR 1-7/8” (4)

85

7

8

CABLE TO CABLE FERRULE ATTACHMENT AT CANOPY Cable (500LF) 1/8” Ferrule (68) EYE BOLTED CARIBENER ALIGNMENT 3/8” Eye Bolt (4) 3/8” Nut (4) 3/8” Washer (4) 3/8” Caribener (4)

9

CABLE TO BOLTED PULLEY TO CARIBENER TO FERRULE DETAIL AT NET 1/8” Cable (500LF) 3/8” Bolt (4) 3/8” Nut (4) 3/8” Washer (4) 3/16” Pulley (4) 3/8” Ferrule (2)

10

HEAVY DUTY ZIP TIE ATTACHMENT FROM NET TO PIPE AT NET PERIMETER 50LB Load at grid 10” (300)

11

SHEER FABRIC FINS AT CANOPY -CONTINUOUS Various dimensions (34)


EXPERIMENTAL WORK

ROTATE, PUSH, PLAY Detroit Design Festival 2017

Miami Proposal December 2016 ROSSETTI DETROIT, MICHIGAN Kirk Phillips, Design Lead DETROIT DESIGN FESTIVAL PUTT PUTT Michael Shea, COMPETITION, 2017 Project Manager Carla Landa, Designer TEAM: Rana Malik, Elizabeth Stanfel, Lauren Mcquiston and Adam Smith

86


ROTATE, PUSH, PLAY

HOLE

TEE

TEE

HOLE

HOLE

TEE

START

87

ROTATE

REARRANGE


EXPERIMENTAL WORK

THE FORCE OF THINGS

DARMSTAD, GERMANY PREMIERED DARMSTAD SUMMER COURSES FOR NEW MUSIC PERFORMANCE, 2016

TEAM: Ashely Fure (composer), Adam Fure (architect) , ICE

88


THE FORCE OF THINGS

94 PEOPLE

94 PEOPLE

122 PEOPLE / 80 PILLOWS

49 PEOPLE

a

89

122 PEOPLE / 80 PILLOWS

157 PEOPLE

49 PEOPLE


]

EXPERIMENTAL WORK

The Force of Things is a music theater piece that explores the animate vitality of matter. Investigating ideas of entropy and the innate drama of natural phenomena, the piece stages a series of musico-dramatic events centered not on humans, but on objects.

e)

Narrative emerges through the gradual or sudden evolution of objects through Staged inside a ring of live, perfomed and different states, some natural (entropy) & COLLAPSE I some anthropomorphic (objects falling“ECLIPSE projected sound, this forty five minute VOICES ENTER BURNING FIELD” EACH OTHE “ECLIPSE & COLLAPSE INTO FIELD OF VOICES ENTER love). piece positions itself at the experiental BURNINGin FIELD” EACH OTHER RISING WATER diagetic-nondiagetic (tension) diagetic non-diagetic global breathing boundary between immerisve clean dirty diagetic-nondiagetic (tension) non-diagetic non-diagetic mounting) visual The Force of visual-visceral clean visceral dirty live performance. installation and Things (preassure defiesdirty the false flesh sphere visual-visceral (preassure mounting) visual visual heavy passivity of matter, casting latex, mud light flesh sphere light flesh apparent obscured apparent heavy light obscured light and oil as active, Audience members sit beneath a canopy high independent low agents. high apparent obscured apparentlow apparent field) anthropomorphic anthropomorphic environmental high (anthropomorphic low high low (rising)but of hanging objects that transform Humans are framed not above anthropomorphic anthropomorphic environmental “ECLIPSE “ECLIPSE “ECLIPSE “ECLIPSE “ECLIPSE & &“ECLIPSE “ECLIPSE & “ECLIPSE & COLLAPSE & COLLAPSE COLLAPSE & COLLAPSE COLLAPSE INTO COLLAPSE INTO INTO COLLAPSE INTO INTO COLLAPSE INTO COLLAPSE INTO FIELD FIELD FIELD INTO OF INTO FIELD FIELD OF OF FIELD FIELD OF OFOFFIELD OFFIELD OF OF VOICES VOICES VOICES ENTER VOICES VOICES VOICES ENTER ENTER VOICES ENTER ENTER ENTER VOICES ENTER VOICES ENTER ENTER BURNING BURNING BURNING BURNING FIELD” BURNING BURNING FIELD” FIELD” BURNING FIELD” BURNING FIELD” BURNING FIELD” EACH FIELD” EACH EACH OTHER FIELD” EACH EACH OTHER OTHER EACH OTHER EACH OTHER OTHER EACH OTHER EACH OTHER RISING OTHER RISING RISING WATER RISING RISING WATER WATER RISING RISING WATER WATER WATER RISING WATER RISING WATER WATER contained in a&“ECLIPSE we of&&FIELD” things and foces. through, hang lifeless then stretch into

global breathing

(anthropomorphic field)

diagetic-nondiagetic diagetic-nondiagetic diagetic-nondiagetic diagetic-nondiagetic diagetic-nondiagetic diagetic-nondiagetic (tension) diagetic-nondiagetic (tension) (tension) diagetic-nondiagetic (tension) (tension) (tension) (tension) (tension) diagetic diagetic diagetic diagetic diagetic diagetic diagetic diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic globalglobal global breathing breathing global breathing global global breathing breathing global breathing breathing global global breathing breathing cleanclean clean clean cleanclean clean cleandirty dirty dirty dirty dirtydirty dirtydirty visual-visceral visual-visceral visual-visceral visual-visceral visual-visceral (preassure visual-visceral (preassure (preassure visual-visceral mounting) (preassure visual-visceral (preassure mounting) mounting) (preassure mounting) (preassure mounting) (preassure mounting) mounting) mounting) visualvisual visual visual visualvisual visual visual visceral visceral visceral visceral visceral visceralvisceral visceral flesh flesh flesh flesh fleshflesh fleshflesh sphere sphere spheresphere sphere spheresphere sphere heavy heavy heavy heavy heavy light light light light light lightlightheavyheavy light light light light lightlight lightlight field l ambient fieldlight l active focus l heavy ambient focus l active apparent apparent apparent obscured apparent apparent obscured obscured apparent obscured obscured apparent obscured apparent obscured obscured apparent apparent apparent apparent apparent apparent apparent apparent obscured obscured obscured obscured obscured obscured obscured obscured "water falls" "things awaken" "abscent monster sings" high focus high high high low high high low low low low low lowfield low l"ground high high high high highhigh highhighhigh high low lowlow low focus lowlowl ambient field l active low low focus l active l active active responds" (anthropomorphic (anthropomorphic (anthropomorphic (anthropomorphic (anthropomorphic field) (anthropomorphic field) field) (anthropomorphic (anthropomorphic field) field) field)anthropomorphic field)anthropomorphic field)field) anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic " (anthropomorphic in a landscape" "in a body" "looking for a body" "crawling out of ground skin" anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic environmental environmental environmental environmental environmental environmental environmental environmental “ECLIPSE & COLLAPSE INTO "things awaken" "abscent monster sings" "ground responds" "rapid environmental shift" "ground + sky collapse VOICES ENTER

"in a body"

BURNING FIELD”

"looking for a body" "crawling out of ground skin" sound, objects musicnon-diagetic tied to objects diagetic not music, noglobal breathing

music tied to objects

non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic dirty dirty dirty dirty dirtydirty dirtydirty visualvisual visual visual visualvisual visual visual flesh flesh flesh flesh fleshflesh fleshflesh focuslight l light active field l active light light light light lightlight apparent apparent apparent apparent apparent apparent apparent apparent "ground + sky coll "rapid environmental shift" focus ambient lowl (rising) low low (rising) (rising) lowlow (rising) (rising) low (rising) lowlow (rising) (rising) "ground cowers" environmental environmental environmental environmental environmental environmental environmental into each other FIELD"water OFenvironmental rises"

[ LANDSCAPE ] [ FORMATION ] [ EMERGENCE ] [ ACTIVATION ] [ ALTERATION ] [ EMERGENCE ] [ ACTIVATION ] [ ALTERATION ] [ COLLAPSE ] [ ASCENSION ]

[ FORMATION ]

ts

op

palpitating, translucent skins. Drips of liquid fall to rhythms that sync into orchestrated textures; a continually transforming perceptual space. Humans are absent from this landscape, and

EACH OTHER

"ground cowers" into each other" music & objects weave together music independent diagetic-nondiagetic (tension) dirty independent music independent music &object objects visual-visceral (preassure mounting)

[ COLLAPS

RISING WATER

music independent music & object non-diagetic clean dirty object independent collapse back toge music & objects music independent ambient sound visual visceral weave together visual flesh sphere flesh object independent object independent collapse back together heavy light droplets light Water droplets light Water Whisper tubes Voices trapped in stages Change in appearance Synchronized dro apparent obscured apparent obscured apparent high low high low (rhytmic) Localized singing Biological objects (solid-transparent, light objects low (rising) field lfield field ambient ll ambient ambient field field field lWhisper l ambient ambient field l ambient l ambient fieldtubes field l ambient l ambient field lfield field active ll active active field field field ll active active field l active l active field field l active focus l active focus focus l ambient llfocus ambient focus ambient focus ll ambient ambient focus l ambient l focus ambient focus l ambient focus l ambient focus lfocus active ll focus active focus active focus ll active active focus l active l focus active focus l active focus l active focus lfocus active ll focus active focus active focus ll active active focus l active l focus active focus l active field l active lfield field active ll active active field field field ll Sound active active field l active l active field field l active focus l active focus lfocus ambient ll focus ambient focus ambient focus ll ambient ambient focus l ambient l focus ambient focus l ambient l ambient Voices trapped in stages Change in appearance Synchronized drop of only above (anthropomorphic field) anthropomorphic anthropomorphic environmental environmental "water "water "water falls""water "water falls" falls" "water falls" "water falls" falls" "water falls" "water "things falls" falls" "things "things awaken" "things "things awaken" awaken" "things "things awaken" awaken" awaken" "things awaken" "things "abscent awaken" "abscent "abscent awaken" monster "abscent "abscent "abscent monster monster sings" "abscent monster monster sings" sings" monster "abscent monster "abscent sings" sings" sings" monster "ground sings" monster "ground "ground sings" responds" "ground "ground sings" responds" "ground responds" "ground responds" responds" responds" "ground responds" "rapid "ground "rapid "rapid responds" environmental responds" "rapid "rapid environmental environmental "rapid environmental "rapid environmental environmental shift" "rapid environmental shift" shift" "rapid environmental shift" shift" "ground environmental shift" "ground shift" "ground + sky "ground shift" "ground +"ground +collapse shift" sky sky "ground collapse collapse ++ sky sky + sky "ground collapse collapse +"ground collapse sky collapse + sky + sky collapse "water collapse "water "water rises""water "water rises" rises" "water rises" "water rises" rises" "water rises" "water rises" rises"

[ LANDSCAPE [ LANDSCAPE [ LANDSCAPE [ LANDSCAPE [ LANDSCAPE ][ LANDSCAPE ][ LANDSCAPE [ ]FORMATION ][ FORMATION ] [ FORMATION []FORMATION [] FORMATION ] [ FORMATION ][ FORMATION [ ]EMERGENCE ][ EMERGENCE ] [ EMERGENCE [ ]EMERGENCE [] EMERGENCE ][ EMERGENCE []EMERGENCE [ ACTIV ] [] ACTIV ][ATION ACTIV [ ACTIV ]ATION [ ]ACTIV ]ATION [ATION ACTIV ][ ATION ACTIV [ ALTERATION ] [ATION ] ALTERATION ATION ] [ ALTERATION [ ]ALTERATION []ALTERATION ][ ALTERATION []ALTERATION [] COLLAPSE ] [ COLLAPSE ] [ COLLAPSE ][ COLLAPSE ][ ]COLLAPSE []COLLAPSE [ COLLAPSE ][]ASCENSION [] ASCENSION [] ASCENSION [ ]ASCENSION [ ASCENSION ] [ ]ASCENSION [ ASCENSION ]] ] ] ]

Water droplets Stageobjects surfaces palpitate (solid-transparent, Void revealed (?) covered in geological many to one) Culmination o Small objects drop & stop Biological (rhytmic) Localized light objects Backwards water " in a""landscape" in in aa landscape" landscape" "" in in " ain a landscape" landscape" a" landscape" in a landscape" " in "asinging in landscape" a landscape" "in a "in body" "in aa body" body" "in "in"in aa body" body" a"in body" a body" "in"looking a"in body" a"looking "looking body" for"looking "looking a "looking body" for for aa"looking body" for forfor aa"looking body" body" a"crawling for body" "looking a"crawling "crawling body" for out afor "crawling "crawling body" aof "crawling out out body" ground "crawling of of out ground out ground out skin" "crawling of of ground of ground "crawling out skin" skin" ground of out ground skin" skin" skin" out of "ground ground of skin" "ground "ground ground cowers" skin" "ground "ground skin" cowers" "ground cowers" "ground cowers" cowers" cowers" "ground cowers" "ground into cowers" cowers" each into into other" each each into into into other" other" each each into each other" other" each other" intoother" into eacheach other" other" Screen &body" rumbles substance Conflict may not be physical slow change ob Stage surfaces palpitate Void revealed (?)ripples covered (biological) in geological many toShadow one) of parts Culmination of Still ground (geological) Appears as music body Identification stops short of Two processes: spectacle &sound Screen falls or goe Darkness sound,sound, sound, not music, sound, sound, not not sound, music, music, no not not sound, objects not music, music, no nomusic, sound, objects not objects sound, no no music, no not objects objects objects music, not no music objects music, no music music tied objects nototied music tied objects music objects music to totied objects tied objects music tied to to objects to objects tied music objects music music to tied objects music music &tied toobjects objects & music & to music objects objects music weave & &music objects & objects weave weave together objects & music together weave together objects weave music weave & together together objects weave &together objects music together weave music music independent weave together independent music independent music together music independent independent music independent independent music independent music independent music music independent independent music independent music music independent independent music independent independent music music independent music independent music music & objects & music & music objects objects music & &music objects & objects objects & music objects music & objects & ambient objects ambient ambient sound ambient ambient sound sound ambient ambient sound sound ambient sound ambient sound sound (biological) & rumbles Shadow of parts substance Conflict may not be physical slow change object Screen still, dormant objectobject object independent independent object independent object object independent independent object independent object independent independent object independent object object independent independent object independent object object independent independent object independent object independent object independent collapse independent collapse collapse backcollapse collapse together back back collapse together together collapse back back back together together collapse back together collapse together back back together together Ambient lighting] (subtle) Screen palpitates Violent shaking ofobject screensnaming human field change (geological) Appears as body Identification of Two] processes: spectacle Screen falls slack [ LANDSCAPE [ FORMATION stops ] [short EMERGENCE [ ACTIVATION ] [&ALTERATION ] or goes [ COLLAPSE ] [ ASCENSION ] Caustic lighting Disperced Spotlights to still Screen magnifies ground Groundrealm fo human fieldof l ambient field l active focus l ambient focus active focus l active field l active l ambient Screen palpitates WaterWater Violent shaking screensnaming human field change Water droplets Water Water droplets droplets Water droplets Water droplets droplets Water droplets Water droplets Water droplets Water Water droplets Water Water droplets droplets Water droplets Water droplets droplets Water droplets Water droplets Whisper droplets Whisper Whisper tubes Whisper Whisper Whisper tubes tubes Whisper tubes tubes tubes Whisper Voices tubes Whisper Voices Voices trapped tubes Voices tubes Voices trapped trapped Voices inlresponds" Voices stages trapped trapped in trapped in stages stages Voices trapped in in Voices stages in stages trapped stages Change intrapped stages Change Change ininstages Change appearance in Change Change in stages in appearance appearance Change in in appearance in appearance Change appearance inChange appearance Synchronized in appearance inSynchronized Synchronized appearance Synchronized Synchronized Synchronized drop Synchronized drop drop of focus Synchronized of of drop drop Synchronized drop of ofdrop ofSound of drop Sound Sound drop only of Sound Sound above only of only Sound above above Sound only only only above above Sound only above Sound above onlyonly above above "water falls" "things awaken" (rhythmic "abscent monster sings" "ground "rapid environmental shift" "ground + sky collapse "water rises" intensity) Water as caustic lighting activity struggle Disperced Spotlights to still Screen magnifies ground Groundrealm fo human (rhytmic) (rhytmic) (rhytmic) (rhytmic) (rhytmic) (rhytmic) (rhytmic) (rhytmic) Localized (rhytmic) Localized Localized singing Localized Localized Localized singing singing Localized singing Localized singing Localized singing Biological singing Biological Biological singing Biological Biological objects Biological objects objects Biological objects objects Biological objects Biological objects (solid-transparent, objects (solid-transparent, (solid-transparent, objects (solid-transparent, (solid-transparent, (solid-transparent, (solid-transparent, (solid-transparent, (solid-transparent, light objects light light objects objects light light light objects objects light objects objects lightlight objects Backwards objects Backwards Backwards Backwards Backwards water Backwards water water Backwards water water Backwards water Backwards water water water " in a landscape" "in a body" "looking for singing a body" "crawling out of ground skin" "ground cowers" into each other" Skyrealms indefferent Small Small Small objects Small Small objects objects Small drop objects objects Small drop drop & objects stop Small objects & & drop drop stop stop Small drop objects & & drop stop Stage stop & objects stop & Stage Stage drop surfaces stop drop & Stage Stage surfaces surfaces stop Stage & palpitate stop surfaces Stage surfaces surfaces palpitate palpitate Stage surfaces palpitate palpitate Stage palpitate surfaces palpitate surfaces Void Void palpitate revealed Void palpitate revealed revealed Void Void Void (?) revealed revealed Void revealed (?) (?) revealed Void (?) (?) Void covered (?) revealed (?) covered revealed covered in (?) covered covered geological covered in (?) in geological geological covered in in in geological geological covered geological in covered geological in geological many in geological many many to one) many to many to many one) one) to to many to one) one) one) many to one) many to Culmination one) to Culmination Culmination one) Culmination Culmination of Culmination of Culmination of of Culmination of of Culmination of Still ofofground Still Still of ground ground Still Still Still ground ground ground Still ground StillStill ground ground (rhythmic intensity) Water as caustic lighting activity struggle sound, not music, no objects music tied to objects music & objects weave together music independent music independent music & objects ambient sound Screen Screen Screen ripples Screen Screen ripples ripples Screen Screen ripples ripples ripples Screen ripples Screen (biological) ripples (biological) (biological) ripples (biological) (biological) &(biological) rumbles & (biological) & rumbles rumbles (biological) & & rumbles rumbles &(biological) rumbles & rumbles Shadow & rumbles Shadow Shadow & rumbles of Shadow Shadow parts Shadow of of parts parts Shadow of of of parts parts Shadow parts of Shadow parts of substance parts ofsubstance substance parts substance substance substance substance Conflict substance substance Conflict Conflict may Conflict Conflict may not Conflict maybe Conflict not not may may physical may be beConflict not not physical physical may not Conflict be bebe not physical physical may physical be may slow not physical slow not be slow change physical be change change slow slow physical object slow change change slow object object change change slow object object object slow change object Screen change object Screen Screen still, object Screen Screen dormant still, still, Screen dormant dormant Screen still, still, still, dormant dormant Screen still, dormant Screen dormant still,still, dormant dormant planet Skyrealms ofIdentification indefferent object independent object independent collapse back together Darkness Darkness Darkness Darkness Darkness Darkness Darkness Darkness Darkness (geological) (geological) (geological) (geological) (geological) (geological) (geological) (geological) (geological) Appears Appears Appears asAppears Appears body Appears as as body body Appears as asas body body Appears Identification body as Appears body Identification Identification as body Identification as Identification Identification stops body stops stops shortIdentification stops short stops short ofstops Identification of of Two short short stops short processes: Two Two of of stops short ofprocesses: processes: stops Two Two of short Two processes: processes: short spectacle Two processes: of spectacle spectacle of processes: Two&Two spectacle spectacle processes: spectacle & & processes: Screen spectacle Screen Screen & & falls spectacle & Screen Screen spectacle & or falls falls Screen goes or or Screen &falls falls goes goes slack falls & or Screen orScreen falls slack or slack goes goes Screen goes orfalls slack slack goes slack falls or slack goes or goes slack slackactivity amplifies sky planet Ambient Ambient Ambient lighting Ambient Ambient Ambient lighting lighting (subtle) Ambient lighting lighting (subtle) (subtle) lighting Ambient lighting Ambient (subtle) (subtle) (subtle) lighting (subtle) Screen lighting Screen (subtle) Screen palpitates (subtle) Screen Screen palpitates palpitates Screen Screen palpitates palpitates palpitates Screen palpitates Violent Screen Violent Violent palpitates shaking palpitates Violent Violent shaking shaking Violent ofViolent shaking screensshaking of shaking of screensViolent screensshaking of of Violent of screensscreensshaking screensofshaking screensnaming ofnaming naming screensof human screensnaming naming human human naming naming human human human naming human naming human field change field field change change field field field change change field change change fieldfield change change Water droplets Water droplets Whisper tubes Voices trapped in stages Change inhuman appearance Synchronized drop of Sound only above Paper chandeliers change (rhytmic) singing Biological objects (solid-transparent, light water Caustic Caustic Caustic lighting Caustic Caustic lighting Caustic lighting Caustic lighting lighting lighting Caustic lighting Caustic Disperced lighting Disperced Disperced lighting Spotlights Disperced Disperced Disperced Spotlights Spotlights Disperced Spotlights Spotlights Disperced Spotlights Disperced Spotlights Spotlights Spotlights to stillto toLocalized still stillto to to still still still to still Screen toScreen Screen still toamplifies magnifies still Screen Screen magnifies magnifies Screen Screen ground magnifies magnifies magnifies ground ground Screen magnifies Screen ground ground Groundmagnifies ground magnifies ground GroundGroundrealm ground GroundGroundGroundrealm realm ground fo Groundhuman realm realm fo forealm human human Groundfo fo realm Groundfo human human human realm foobjects human realm fo human fo human Backwards Screen sky activity Small objects drop & stop Stage surfaces palpitate Void revealed (?) covered in geological many to one) Culmination of Still ground (rhythmic (rhythmic (rhythmic intensity) (rhythmic (rhythmic (rhythmic intensity) intensity) (rhythmic intensity) intensity) intensity) (rhythmic (rhythmic intensity) Water Water Water intensity) as intensity) caustic Water Water as asWater caustic caustic lighting as Water asas caustic caustic lighting lighting caustic Water as Water caustic lighting lighting as lighting caustic as lighting caustic activity lighting activity activity lighting activity activity activity activityactivity activity struggle struggle struggle struggle struggle struggle struggle struggle struggle Screen ripples (biological) & rumbles Shadow of parts substance Conflict may not be physical slow change object Screen still, dormant Sky-processes: SkySkyrealms realms realms SkySkyof Skyindefferent realms realms of Skyof realms indefferent indefferent of SkyofScreen of indefferent indefferent Skyindefferent realms offalls realms indefferent indefferent ofslack indefferent Darkness (geological) Appears as body Identification stops short of Two spectacle & realms orof goes planet planet planetplanet planet planet planetplanet planet Ambient lighting (subtle) Screen palpitates Violent shaking of screensnaming human field change Caustic lighting Disperced Spotlights to still Screen magnifies ground Screen Groundrealm fo human Screen Screen amplifies Screen Screen amplifies amplifies Screen sky Screen amplifies amplifies amplifies activity sky sky Screen amplifies activity activity Screen sky sky sky amplifies activity activity activity amplifies sky activity sky sky activity activity (rhythmic intensity) Water as caustic lighting activity struggle Paper Paper Paper chandeliers Paper Paper chandeliers chandeliers Paper chandeliers Paper chandeliers change chandeliers Paper change change chandeliers Paper change change chandeliers change chandeliers change change change Sky- realms of indefferent planet Screen amplifies sky activity Paper chandeliers change

Paper chandeliers change

field

active

diagetic

dirty

visceral focus

ambient

field

non-diagetic

clean

visual

sphere

light

apparent

high

environmental

environmental non-diagetic clean visual sphere light apparent high spectacle combinedspectacle environmental environmental environmental environmental environmental environmental environmental environmental spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle non-diagetic non-diagetic non-diagetic non-diagetic non-diagetic clean non-diagetic clean clean non-diagetic clean non-diagetic clean clean visual clean visual visual clean visual visual clean visual sphere visual sphere sphere visual sphere sphere visual sphere light sphere light light sphere sphere light light light apparent light apparent apparent light apparent apparent light apparent high apparent high high apparent apparent high high high high environmental high high activeactive activeactive active activeactive active fieldfield field field fieldfield non-diagetic fieldfield environmental non-diagetic clean visual sphere light apparent high spectacle combined combined combined combined combined combined combined combined combined active field combined spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle sonic sonicsonic sonic sonic sonic sonicsonic sonic sonic sonic spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle spectacle visual anthropomorphic visual visual visual visualvisual visual visual diagetic dirty visceral flessh heavy obscured visualvisual low visual anthropomorphic diagetic dirty visceral flessh heavy obscured low anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic anthropomorphic diagetic dirty visceral flessh heavy obscured diagetic diageticdiagetic diagetic diagetic dirty diagetic dirty diagetic dirty dirty diagetic dirty visceral dirty visceral dirty visceral visceral dirty visceral flessh visceral flessh visceral visceral flessh flessh flessh heavy flessh heavy flessh heavy heavy flessh heavy obscured heavy obscured heavy obscured obscured heavy obscured obscured low low low obscured obscured low lowlow lowanthropomorphic lowanthropomorphic low anthropomorphic

flessh

ambient

focus ambient focusfocus focusfocus focusfocus focus focus ambient ambient ambient ambient ambient ambient ambient ambient biological

heavy

obscured biological

low

geological

anthropomorphic

biological biological biological biological biological biological biological biological biological geological biological geological geological geological geological geological geological geological geological geological

90

geological


THE FORCE OF THINGS

.5

4m

115

cm

3.5

22

cm

cm

.5

12

68

.2

m

cm

56

Stages Concept Drawings Floor Plan Non-Narrative Structure Diagram: Sonic vs Visual

91


EXPERIMENTAL WORK

THEATER TRUSSES

SUSPENDED STRUCTURE

OBJECT CANOPY

WINCHES, OBJECTS & SCREENS

GROUND STAGE & SEATING

92


THE FORCE OF THINGS ETUDES FROM THE ANTHROPOCENE

46

Premiered on February 4th, 2016, at Miller Theater in New York, NY.

FOAM COATING

A distillation, in proscenium form, of the full-scale immersive installation opera. Human and non-human forces tangle together, tune to each other and wrench away, in a play of push and pull, tension and release, construction and collapse. The 10’ X 10’ silicone hide is CASTED SILICONE suspended by winches from platforms designed to function as movable stands, winch mechanisms and structure.

2X CASTED SILICONE

Photograph Hide Close Up S02_Hide moving up abrutly Players & Machine Full Hide

SILICONE & FOAM

SILICONE & PAINT

PAPER & ALUM

Material Tests Photographs Formal Studies

93


EXPERIMENTAL WORK

94


THE FORCE OF THINGS

95


acade 96


emic 97


ACADEMIC WORK

RITUAL ROOMS Ritual Rooms is a series of pseudo spaceobjects programmed for three different familiar uses: eating, bathing and sleeping. Using the space of the domestic the images here presented put forth material propositions for both subjects and objects. “Lacan proposed the model of a premirror stage body a ‘corpse morcele’ literally a morcellated body that at the moment of the mirror stage participates in a drama impelled towards a spatial identification of the self with regard to its reflection. In this model the mirror is construed as a lure that machines the fragmented phantasms of the pre-narcissistic body into what lacan calls ‘a form that [is] orthopedic of its totality” 1

Much can be argued for the persistance in architectural discourse and rethoric of buildings as a totalizing organizational tools, with grand agendas of order. In a post-digital disciplinary context this thesis seeks to bring forth an agency in architecture outside of prescripted order but a fragmented mediation in subject formation. Through image- figure and form- the thesis provokes the reconfiguring of spatial boundaries in the three ritual, through the recasting of the relationships between self and other, self and body and self and space. In these “rituals”, convention dictates a fairly strict division between the grotesque and the delightful: the blooding slaughter

98

that provides meat for formal dinning, the bodily flith washed away through beautification, and the animalism of pleasure couched as romance. Ritual Rooms tests the erasure of these boundaries. Erasure not as deletion; but rather a refiguration of traditional thesholds challenging-at least partially and temporarily- recognition of, and thus participation within, the rituals. If social convention and habit keep the carnality of the body at a distance, as habit is written into form, a change to ‘image’ preassures change in the habits that unfold within and against it. Through the refigurations of the body in space, the body fragmented slips into, next to and within direct a quasi architectural body with both their entanglements and signification flickers. In the three “rooms” the object-subject relationships are refigured at three scales: approach, threshold and inhabitation.

THESIS PROJECT 2014-2015

IN COLLABORATION WITH Luke Rondel, Adam Fure & Ellie Abrons (Studio Instructors) CRITICS: Monica Ponce de Leon, David Ruy, Andrew Holder Kristin Laballet


RITUAL ROOMS

Wine Glass Studies: Above- DRAWINGS OF MALFORMATIONS IN DIFFERENT FORMS OF “CUP” Below- PHOTOGRAH STUDIES OF CUP 1, 5

99


ACADEMIC WORK

100


RITUAL ROOMS

01- BEDROOM STUDY 02-CUBE MALFORMATION MODELS: Plastic, Chocolate & Honey 03-Caravaggios’ John the Baptist MATERIAL DIAGRAM Left: 3D MODEL OF EATING SHED/STOOL

101


ACADEMIC WORK

102


RITUAL ROOMS

103


ACADEMIC WORK

104


RITUAL ROOMS

105


ACADEMIC WORK

106


RITUAL ROOMS

107


ACADEMIC WORK

108


RITUAL ROOMS

109


ACADEMIC WORK

PROTEAN ATMOSPHERES

GRADUATE STUDIO FALL 2014 I STUDENT SHOW, AIA ACADIA 2016

IN COLLABORATION WITH Jonathan Lain, Meredith Miller (Studio Instructior) Grounding the ephemeral cloud and rainbow, making them material and tangible. through immance- being contained in new mediums. 110


PROTEAN ATMOSPHERES

111


ACADEMIC WORK

#0092ff #00d824 #ff6d00 #db0073 w-flange

D1.0 LAYERING OF PAINT AROUND W-FLANGE

D1.0

112


PROTEAN ATMOSPHERES

113


ACADEMIC WORK

stage 01

STAGE stage 01 01

stage 02

stage 02 02 STAGE

stage 03

STAGE stage 03 03

formation

FORMED formation

Castellanus Castellanus

114


PROTEAN ATMOSPHERES

115


carla.a.landa@gmail.com l 313.694.4764

THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.