LINKED LAZARAT
i
a
A path to reconnection
i
a
LINKED LAZARAT A path to reconnection
CONTEXT
ALBANIA
GJIROKASTËR REGION
i
a
LINKED LAZARAT
CONTEXT GJIROKASTËR
A path to reconnection
UNESCO WORLD HERITAGE SITE
28.673 INHABITANTS
36.000 TOURISTS IN THE LAST SIX MONTHS INSTAT
i
a
LINKED LAZARAT
CONTEXT LAZARAT
A path to reconnection
PREVIOUS MASS PRODUCTION OF CANNABIS
4.200 INHABITANTS
DEVALUED CULTURAL HERITAGE
i
a
LINKED LAZARAT A path to reconnection
PROBLEMS
PROBLEMS TRAUMA COLLECTIVE RELATED TO PAST POLICE INTERVENTION
Collective trauma related to past police intervention AFFLICTED FAMILIES WITH IMPRISONED RELATIVES Afflicated families with imprisoned relatives COMMUNITY’S BAD REPUTATION FOR ITS PAST Community’s bad reputation for its past
LACK OF NEW ECONOMIC OPPORTUNITIES Lack of new economic AFTER THE
opportunities after the police POLICE INTERVENTION intervention
NO BALANCE BETWEEN No balance between Gijrokastër
GIJROKASTËR and Lazarat AND LAZARAT
SOURCE: Agjencia Kombëtare e Planifikimit të Territorit
i
a
LINKED LAZARAT A path to reconnection
OBJECTIVES
PROMOTE THE SOCIAL INCLUSION OF THE LAZARAT
COMMUNITY USING
UNTAPPED CULTURAL HERITAGE AS A TRIGGER
THROUGH RESEARCH AND INNOVATIVE INTERVENTION
RE-INTEGRATE THE
LAZARAT COMMUNITY INTO THE
ECONOMIC MAINSTREAM OF THE
GJIROKASTËR REGION
SOURCE: Agjencia Kombëtare e Planifikimit të Territorit
i
a
LINKED LAZARAT
THE ANCIENT PATH
A path to reconnection
FICUS CARICA
BEKTASHI SHRINE
BENCHES
INTERACTIVE PANELS
VIEW POINT
LAZARAT GJIROKASTER
COMMUNIST ERA BUNKER
ALIPASHA BRIDGE
i
a
LINKED LAZARAT A path to reconnection
THE ANCIENT PATH
i
a
LINKED LAZARAT A path to reconnection
THE ANCIENT PATH
i
a
LINKED LAZARAT
ACTIVITIES
A path to reconnection
WORKING PACKAGES FIND LOCAL SUPPLIERS AND WORKERS
WP1
PRELIMINARY ACTIVITIES
WP2
COMMUNITY ENGAGEMENT
WP3
WP4
WP5
WP6
INTERVENTION ON THE ANCIENT PATH
ORGANIZATION OF OPENING EVENT
HIRING TWO PEOPLE, A TECHNICIAN AND A GUARDIAN (WORKER) ORGANIZE A MEETING WITH THE LOCAL MUNICIPALITY AND OBTAIN PERMITS OF INTERVENTION ORGANISE A MEETING WITH THE STAKEHOLDERS
PROMOTION OF THE NEW CULTURAL PATH
SHORT-TERM MONITORING SOURCE: 1life.co.uk
i
a
LINKED LAZARAT
ACTIVITIES
A path to reconnection
WORKING PACKAGES
WP1
PRELIMINARY ACTIVITIES
WP2
COMMUNITY ENGAGEMENT
WP3
WP4
WP5
WP6
INTERVENTION ON THE ANCIENT PATH
ORGANIZATION OF OPENING EVENT
“COMMUNITY ON A MAP” TOOL WITH HIGH SCHOOL STUDENTS AND THEIR GRANDPARENTS iNSPECTION OF PATH WITH THE CHILDREN ACQUISITION OF DATA AND MAPS HIGHLIGHT BANESA E BOTE MONUMENT AND SET OF REMOVABLE EXHIBITION
PROMOTION OF THE NEW CULTURAL PATH
SHORT-TERM MONITORING SOURCE: slideshare.net
i
a
LINKED LAZARAT
ACTIVITIES
A path to reconnection
WORKING PACKAGES SIGNAGE AT START END OF THE PATH
WP1
PRELIMINARY ACTIVITIES
WP2
COMMUNITY ENGAGEMENT
WP3
WP4
WP5
WP6
INTERVENTION ON THE ANCIENT PATH
ORGANIZATION OF OPENING EVENT
DESIGN AND PRODUCTION OF 5 INFORMATION PANELS HIRE TWO LOCAL WORKERS TO INSTALL THE ITEMS IN THE REST AREAS TREE PLANTING BY PRIMARY SCHOOL CHILDREN WITH IMPRISONED RELATIVES IN THE REST AREAS OF THE PATH
PROMOTION OF THE NEW CULTURAL PATH
SHORT-TERM MONITORING SOURCE: visit-gjirokastra.com
i
a
LINKED LAZARAT
ACTIVITIES
A path to reconnection
INCLUDE THE NEW PATH ON THE GJIROKASTËR MUNICIPALITY AND VISIT GJIROKASTËR WEBSITES
WORKING PACKAGES
PRINTING AND DISTRIBUTION OF FOLDABLE TOURISTIC MAPS WITH LAZARAT AND THE NEW PATH INCLUDED
WP1
WP2
WP3
WP4
WP5
WP6
PRELIMINARY ACTIVITIES
INTERVENTION ON THE ANCIENT PATH
ORGANIZATION OF OPENING EVENT
COMMUNITY ENGAGEMENT
PROMOTION OF THE NEW CULTURAL PATH
SHORT-TERM MONITORING
PUBLISHING OF ARTICLES ON LOCAL AND REGIONAL NEWSPAPERS
i
a
LINKED LAZARAT
ACTIVITIES
A path to reconnection
WORKING PACKAGES OFFICIAL OPENING CEREMONY
WP1
WP2
WP3
WP4
WP5
WP6
PRELIMINARY ACTIVITIES
INTERVENTION ON THE ANCIENT PATH
ORGANIZATION OF OPENING EVENT
COMMUNITY ENGAGEMENT
ORGANIZATION OF PERFORMANCES OF POLYPHONIC MUSIC ALONG REST AREAS
PROMOTION OF THE NEW CULTURAL PATH
SHORT-TERM MONITORING SOURCE: invest-in-albania.org
i
a
LINKED LAZARAT
ACTIVITIES
A path to reconnection
WORKING PACKAGES
WP1
PRELIMINARY ACTIVITIES
WP2
COMMUNITY ENGAGEMENT
ORGANIZATION OF TWO MEETINGS BETWEEN STAKEHOLDERS (AFTER 5TH AND 10TH MONTH) PAY A PROFESSOR FROM GJIROKASTER’S UNIVERSITY TO EVALUATE THE PROJECT. (FROM THE 5TH TO THE 10TH MONTH) NUMBER OF QR CODE SCANS
WP3
WP4
WP5
WP6
INTERVENTION ON THE ANCIENT PATH
ORGANIZATION OF OPENING EVENT
PROMOTION OF THE NEW CULTURAL PATH
SHORT-TERM MONITORING SOURCE: bmwi.de
i
a
LINKED LAZARAT
TIMELINE
A path to reconnection
1
WP1 WP2 WP3 WP4 WP5 WP6
2
3
4
5
6
7
8
9
10 (MONTHS)
i
a
LINKED LAZARAT A path to reconnection
PROMOTION
i
a
LINKED LAZARAT
TARGET
A path to reconnection
5% OF SLOW TOURISTS
CA. 50 YOUNG STUDENTS WITH AFFLICTED FAMILIES 2 TO 5 LOCALS UNEMPLOYED
i
a
LINKED LAZARAT
PARTNERS
A path to reconnection
GJIROKASTËR MUNICIPALITY
ROLE: PERMISSIONS LONG-TERM MANTAINANCE PROMOTIONAL MATERIAL OPENING EVENT SECURITY KNOWLEDE AND SKILLS: CONTEXT
VISIT GJIROKASTRA
POLICY MAKING MUHAMET GJOLLESHA HIGH SCHOOL
HUMAN RESOURCES
i
a
LINKED LAZARAT
PARTNERS
A path to reconnection
GJIROKASTËR MUNICIPALITY
ROLE: PROMOTING THE PROJECT AND THE EVENTS ON THEIR WEBSITE KNOWLEDE AND SKILLS: HERITAGE SITES CONNECTION WITH TOUR OPERATORS AND LOCAL FACILITIES
VISIT GJIROKASTRA
MUHAMET GJOLLESHA HIGH SCHOOL
i
a
LINKED LAZARAT
PARTNERS
A path to reconnection
GJIROKASTËR MUNICIPALITY
ROLE: ORGANIZE WORKSHOPS WITH YOUNG STUDENTS AND THEIR RELATIVES ORGANIZE INSPECTION ORGANIZE TREE PLANTING KNOWLEDE AND SKILLS: PEDAGOGICAL METHODS
VISIT GJIROKASTRA
ORGANISING ACTIVITIES WITH YOUNG STUDENTS MUHAMET GJOLLESHA HIGH SCHOOL
i
a
LINKED LAZARAT
STAKEHOLDERS
A path to reconnection
ADVOCATES
LEAD PARTNER
LOCAL DIRECTORY FOR MONUMENT CONSERVATION
PROJECT TEAM
REGIONAL DIRECTORY OF EDUCATION
PARTNERS GJIROKASTËR MUNICIPALITY
MEDIA PARTNER
VISIT GJIROKASTRA MUHAMET GJOLLESHA HIGH SCHOOL
EXTERNAL EXPERTS
i
a
A path to reconnection
LOCAL NEWSPAPER
SUPPLIERS
EXPERT ON LOCAL TOURISM
LOCAL CARPENTRY
RESTORATION ADVISOR
LOCAL WORKERS
LOCAL PROJECT MANAGER
DONOR
LOCAL GUARDIAN PROJECT EVALUATOR
POLISOCIAL
FINANCIAL ADVISOR
MATERIAL FLOW MUTUAL
INFO FLOW
ONE-WAY
FINANCIAL FLOW
i
a
LINKED LAZARAT
BUDGET
A path to reconnection
115.380
FOR 10 MONTHS OF WORK
49%
HUMAN RESOURCES
19%
23%
2%
MISSIONS EQUIPMENT MATERIALS
2%
DISSEMIN. & COMMUN.
5%
MISCELL.
i
a
LINKED LAZARAT A path to reconnection
RISKS AND MITIGATION
RISKS
MITIGATION STRATEGIES
FINANCIAL INCOMES COMING FROM THE INTERVENTION BEING USED FOR GJROKASTER CITY INSTEAD LAZARAT
PROMOTION OF PERIODIC WORKSHOPS FOR LAZARAT LOCALS SENSITIZING ON THE VALUE OF CULTURAL HERITAGE
EXCLUSION OF LAZARAT LOCALS IN THE MANAGEMENT AND EMPLOYMENT OPPORTUNITIES GENERATED MUNICIPALITY NOT MAINTAINING THE INTERVENTION
COMMUNITY REPRESENTATIVES SELECTED AS CULTURAL HERITAGE EXPERTS FOSTERING CONVERSATION BETWEEN LAZARAT AND GJIROKASTER CULTURAL HERITAGE EXPERTS TO PARTICIPATE IN PERIODIC MEETINGS
“Linked Lazarat: a bridge to social inclusion ”
SOURCE: malenki.ch
THANK YOU
i
a
LINKED LAZARAT A path to reconnection