Carla Abarca Arquitecta
PORTFOLIO
Arquitecta Carla Abarca
Contact N: Carla Abarca del Carpio
WORK EXPERIENCE
C: (+51) 992280123
Project Manager | DECHINI DSE Ingeniería | 2019
@: ca.abarq@gmail.com
Project management of Hampton by Hilton Hotel and Offices Tower (LEED certified) achieving cost optimization.
: Carla Abarca del Carpio
Innovation and Quality Coordinator | DDP | 2018 Project Coordination of prime Offices and housing projects. Quotation, selection and acquisition of finishes for offices.
AREAS OF EXPERTISE
Project Manager| Grupo Mediapro | 2017 - 2018
◘ Sustainable Architecture
◘ LEED Certified Projects
Project development of International Broadcast Centre, Panamerican Games LIMA 2019, achieving cost efficiency.
◘ Project Management
◘ Procurement Process
◘ Building Engineering
◘ Building Materials
◘ Normativity control
◘ Contract management
LANGUAGES Spanish English Italian French
SKILLS 2D & 3D MODEL
Project Architect | Gi Group (Italy) | 2015 Project coordination of sustainable project for Expo 2015, optimizing the energy efficiency of the project by 20%.
SUSTAINABLE DESIGN
Technical Office Coordinator | Mace | 2012 - 2014
EDUCATION Universidad del Pacífico| Lima, Perú | 2017 Project Management Specialization Diploma
Universidad Politecnico di Milano | Italia | 2013 - 2015 Master of Science in Architectural Engineering
Universidad Católica de Santa María | Perú | 2010 Architecture Degree
Management of Retail, Offices, collective housing projects. Achievement of time-cost optimization of projects.
ANIMATION SOFTWARES
Project Architect | 51-1 Arquitectos | 2011 - 2012 Design and development of townhouse condominium complexes projects, achieving local government license.
Technical Supervisor Architect | VAIAA SAC | 2011
ENGINEERING SOFTWARES
Technical coordination for the implementation of SODIMAC Home Store Center, achieving time and cost optimization.
LICENSES & CERTIFICATIONS
AWARDS & HONORS
INTERESTS
IELTS Certification | British Council
Gold Scholarship | Politecnico di Milano, Italy
Architecture | Graphic design, freehand drawing, photography, travelling, painting.
Overall band score 6.5
Autodesk Revit Architecture 2012 | U. Nacional de Ing. Certification of completion Course
Architect of Record | Colegio de Arquitectos del Perú Consejo Nacional, CAP Nº 13623
CONTENTS
01 | Hotel Hampton by Hilton, Piura 02 | Torre del Parque II, San Isidro 03 | Oficinas DDP La Mar 550, Miraflores 04 | Multifamiliar San Borja Norte 717
Duration: 2 years of Master in Architectural Engineering
Master Thesis| Politecnico di Milano University, Italy Redevelopment of South Harbour, Guggenheim of Helsinki
Thesis| Universidad Católica Santa María Cultural Center in Yanahuara Monumental Zone, Arequipa.
05 |Edificio Multifamiliar Boulevard 286, San Borja 06 |Redevelopment of South Harbor: Guggenheim of Helsinki 07 |Technical School Cesare Correnti
Comunication | Presentation skill, languages, cultures. Organization | Management of time and cost, leadership, information management Sports | Table tennis, gymnastics, athletics, basketball, fronton. Health & care | Child care, pet care, music.
08 | Italia Pavillion: Expo Milano 2015
09 | Cernusco in Movement, Multipurpose building 10 | El Rancho: Condominio de Viviendas 11 | El Polo: Condominio de Viviendas
HOTEL HAMPTON BY HILTON PROYECTO HOTELERO| PIURA| 2019| 6,535 m2
VISUALIZATION OF KEY SPACES
DEFINITION OF MAIN FACADES AND ACCESIBILITY OF THE BUILDING
Concept
TORRE DEL PARQUE II OFICINAS PRIME | SAN ISIDRO LEED CERTIFICATION | 2019 | 30,146 m2
VISUALIZATION OF KEY SPACES
MAIN FACADES AND ACCESIBILITY OF THE BUILDING
OFICINAS DDP LA MAR 550 OFICINAS BOUTIQUE| MIRAFLORES| 2018 | 1,558 m2
VISUALIZATION OF KEY SPACES
DEFINITION OF MAIN LOBBY AND DIRECTORATE GENERAL ENTERPRISE OFFICE
Renders
SAN BORJA NORTE 717 VIVIENDAS PRIME| SAN BORJA| 2018 | 6,347 m2
VISUALIZATION OF COMMON AREAS
SAN BORJA NORTE 717
BOULEVARD 286 VIVIENDAS PRIME | SAN BORJA| 2018 | 6,560 m2
VISUALIZATION OF COMMON AREAS
BOULEVARD 286
REDEVELOPMENT OF SOUTH HARBOR: GUGGENHEIM OF HELSINKI INTERNATIONAL COMPETITION | HELSINKI | 2016 |12,100 m2
VISUALIZATION OF KEY PUBLIC SPACES
DEFINITION OF MAIN PEDESTRIAN STREET AND VALORIZATION OF THE WATERFRONT 1
Helsinki Cathedral
2
Helsinki Square
3
Helsinki City hall
4
Palace Square
5
Uspeskin Cathedral
6
Esplanade
7
Kauppatori
N
15
4 15
3 8 8 10
T 6
8
9
Harbour Boulevard
9
Multipurpose platform
10
Seating shelter
11
Market hall
17 14
14 8
T 12
Guggenheim Museum
13
Artistic garden
14
Deck promenade
15
Olympia Terminal
16
Square
17
Public Sauna
18
Pedestrian and bike Bridge
19
Bycicle stop
20
New Ferry stop
19
16
8
15
12
20 13
18
15
Guggenheim of Helsinki
VISUALIZATION OF KEY SPACES
EASTERN ELEVATION
WESTERN ELEVATION
GALLERIES ILLUMINATION:
Sustainable Innovations
ETFE FOIL SYSTEM FOR THE ATRIUM ROOF AND GREEN ROOF TERRACE WITH INSULATED SKYLIGHTS
Natural ventilation + Heat recovery ventilation (Air change & Cooling)
Greenhouse effect
Operable skylight
Extract air
Natural ventilation Supply air
<
Natural ventilation Supply air
<
Ground heat exchanger
TECHNICAL SCHOOL CESARE CORRENTI REFURBISHMENT COMPETITION | MILAN | 2015 | 6,960 m2
VISUALIZATION OF KEY PUBLIC SPACES
DEFINITION OF MASTER PLAN
1
2
3
Views
SOLAR ANALYSIS SPRING EQUINOX 21ST MARCH 10:00 AM
SUMMER SOLSTICE 21ST JUNE 10:00 AM
AUTUMN EQUINOX 21ST SEPTEMBER 10:00 AM
WINTER SOLSTICE 21ST DECEMBER 10:00 AM
ITALIAN PAVILION - EXPO 2015 ARCHITECTURAL COMPETITION | MILAN |2015|11,958 m2
VISUALIZATION OF KEY PUBLIC SPACES
DEFINITION OF MAIN PIAZZA WITH A RAMP AND A CENTRAL ATRIUM
CONCEPT
“FEEDING THE PLANET, ENERGY FOR LIFE” DESIGN STRATEGIES 1. SHAPE FACTOR OPTIMIZATION, INTRODUCING A CENTRAL ATRIUM WITH AN OPERABLE GLAZED ROOF FOR NATURAL ILLUMINATION AND
VENTILATION.
2. DEFINITION OF SHADING SOUTHERN, WESTERN AND EASTERN BALCONIES FOR MITIGATION OF SUMMER OVERHEATING.
SUSTAINABLE STRATEGIES • DURING SUMMER DAY: CROSS VENTILATION, THROUGH AN OPERABLE ATRIUM
ROOF.
• DURING WINTER: HEAT RECOVERY SYSTEM PLUS CLOSING THE ATRIUM FOR GREENHOUSE EFFECT PRODUCTION
• IN 4 FACADES: HYDROPONIC WALLS FOR ATMOSPHERIC HEATING REDUCTION AND ENVIRONMENT HUMIDIFICATION IN SUMMER.
• IN THE 5TH FACADE: GREEN ROOF IN ORDER TO RETAIN PRECIPITATION IN WINTER AND SOLAR PANELS TO ENERGY PRODUCTION.
ACTIVE PHYTOREMEDIATION WALL SYSTEM VENTILATED OUTSIDE AIR IS PROVIDED INTO
THE BUILDING BY THE HVAC SYSTEM. OXYGEN IS USED UP AND TOXINS ARE ADDED AS THE AIR IS AFFECTED BY PEOPLE AND OTHER CONTRIBUTORS. AS THE POLLUTED AIR MOVES THROUGH THE PHYTOREMEDIATI ON WALL THE ROOT RHIZOMES DIGEST THE TOXINS AND REPLENISH THE OXYGEN. THEN CLEAN AIR IS RETURNED TO THE INTERIOR ENVIRONMENT.
ACTIVE PHYTOREMEDIATION WALL SYSTEM
THE AMPS, IS A BIOMECHANICAL HYBRID
CO2
O2
O2 HO2
HO2
O2 HO2
DUST PARTICLES
O2 HO2
SYSTEM, WHICH PRODUCES "FRESH AIR" BYORECIRCULATING AIR ACROSS THE PLANT RHIZOSPHERE, REDUCING ENERGY CONSUMPTION AND THE COST OF MECHANICAL SYSTEMS. FACADE OF THE FUTURE
THE ELECTROACTIVE DYNAMIC DISPLAY SYSTEM (EDDS) HAS THE POTENTIAL TO ACTIVELY RECONFIGURE ITS BASIC PATTERNS IN RESPONSE TO ENVIRONMENTAL FLOWS.
CERNUSCO IN MOVEMENT ARCHITECTURE COMPETITION | CERNUSCO L. | 2014
CONCEPT THE THEME “CERNUSCO IN MOVEMENT” IS CONCEIVED UNDER THE IDEA OF DYNAMIZE THE PUBLIC REALM DEFINING THREE NEW PUBLIC SPACES:
1. THE CULTURAL CORRIDOR
(LINKING THE SCHOOL AND LIBRARY WITH THE SITE)
2. THE GREEN PARK (CONNECTING THE VALUABLE LANDSCAPE WITH THE BUILDING)
3. VITTORIA SQUARE (INTEGRATING THE HISTORICAL CONTEXT WITH THE SITE)
THIS MULTIPURPOSE BUILDING CONNECTS A BIG PARK WITH A GYM AND A TERRACE, LINKING BOTH LEVELS BY A BRIGDE AND GREEN RAMP, BOTH PROVIDES GREAT VIEWS TOWARDS THE PARK, BELOW THE
RAMP A CAFETERIA WITH AN EXPANSION ON THE PARK, AT THE SAME TIME WORKS AS A HALL FOR AN UNDERGROUND CONFERENCE
ROOM, WHILE EXHIBITION AREAS ARE DIRECTLY CONNECTED WITH
VITTORIA SQUARE.
EL RANCHO 51-1ARCHITECTS|COLLECTIVE HOUSING|PERU|2013
VISUALIZATION OF KEY SPACES
THE PROJECT PROGRAM INCLUDES: 116 APARTMENTS AND 11 TYPOLOGIES: BOTH PENTHOUSES AND TOWNHOUSES
(DUPLEX AND FLATS) OF 3 AND 4 BEDROOMS (FROM 195M2 TO 495M2 OF BUILT AREA) SPREAD IN 6 BLOCKS + 2 UNDERGROUND PARKING LEVELS + 1 PRIVATE PARK INCLUDING SWIMMING POOL AND MINI GOLF
EL POLO 51-1ARCHITECTS|COLLECTIVE HOUSING|PERU|2013
Exterior view
Interior view
Carla Abarca del Carpio ca.abarq@gmail.com 2019