CARL VALDEZ LANDSCAPE ARCHITECTURE SELECTED WORKS
TRAIL OF MEMORY Term Winter 2017 | Project Haunted Houses : Healing Landscapes | Location Brandon, MB, Canada Course Studio 4 individual project | Instructor Dr. Karen Wilson Baptist
The Trail of Memory, a conceptual idea of an interpretive path that subtly represents the history of the site using landscape design and vegetation through a journey, aims to serve as part of the survivors’ healing process towards hope and release from all the scars left by the residential schools. A dome building with an open hole in the ceiling, will serve as the heart of the healing lodge. Along the walls of the building, names of the victims will be engraved and will serve as a memorial space for them. The space between the wall and the path will serve as a space for prayer and commemoration of the residential school victims. The design of the building aims to be a simple and subtle representation of hope and looking into the future by taking in the beauty of the surrounding landscape, looking away from the place where the school used to stand. Located inside the building is a museum where visitors can learn about the history of the Brandon Industrial Residential School, and a community centre for people, both survivors and visitors, can come together and help each other through the process of healing and reconciliation.
FREEDOM openness / prairie
CONTROL narrow / dark / rough
CONFUSION winding / dense / high canopy
HOPE openness / high vantage point
entrance
library + rooms
event space
ceremonial space
memorial wall
interpretive path
ECHOES OF THE VOID Term Winter 2018 | Project Regional Studio | Location Fort Qu’Appelle, SK, Canada Course Studio 4 individual project | Instructor Brenda Brown, Ryan Coates, Rob Zonneveld
entrance
gravel path
opening
The site is an abandoned delta in Fort Qu’Appelle in Sasksatchewan. The abandoned delta used to be part of Echo Creek that once flowed into Echo Lake before it was diverted to flow into Mission Lake in the 1980’s. The delta used to be a source of living and a place for natural diversity. However, the diversion of the creek destroyed its ecosystem. A place once full of stories and life and was considered an important site in the community is now dead and bandoned.The concept of Echoes of the Void is to use the a strong narrative in developing a new connection between the abandoned delta and the people of Fort Qu’Appelle. The relationship of the people with the delta and the effects of its destruction to the community of Fort Qu’Appelle is analogous to the myth The Legend of the Qu’Appelle Valley by E. Pauline Johnson wherein the death of the young Cree protagonist’s lover changed his perspective about the the ‘beautiful vale’. The design aims to deliver an open interpretation of the different stories with the narrative as the common language, while subtly conveying the relationship between the destruction of the once important landscape and human interventions.
wetland
YEAR 1
YEAR 10
willow forest
YEAR 20
dark & mossy understory
viewing point
small oxbow
abandoned meander
The 160 meter long wooden boardwalk leads to the main terminus of the interpretive wetland trail – a 10 meter high elevated platform overlooking Echo Lake and the rolling hills of the Qu’Appelle Valley. This stretch of the trail elevates the users upon the abandoned landscape revealing them to the beach ridge that lines up the lake caused by the deposition of sediments that destroyed the delta, as well as the significant relationship of people with water. The funnelling wind from the lake and the high elevation brings forth a sublime experience as you are revealed to life and death – a metaphor of the death scene in the myth wherein the lover’s death causes the man to change his perspective about the beautiful valley. The design aims to deliver an open interpretation of the different stories, while subtly conveying the relationship between the destruction of the once important landscape and human interventions.
aspen forest
elevated platform
wetland
claude glass installation
beach ridge
Echo Lake
CONVERGENCE Term Fall 2016 | Project Dwelling Precinct Life - Resilient City | Location Winnipeg, MB, Canada Course Studio 3 group + individual project | Instructor Dr. Richard Perron & Leanne Muir
The project dealt with revitalizing the Weston and Dufferin Industrial railyards. These industrial areas served as important economic nodes of the city of Winnipeg. Neighbourhoods grew around them to house workers and businesses. However, as the city’s economic focus shifted to other areas, the railyards have become a barrier that separates the north end to the rest of the city. The concept of Convergence imagines the site on two fronts which aims to provide a cultural, social, and economic center for the city, specifically for the north end that has been separated from the rest of the city because of this ‘barrier;. This place will provide a place for Winnipeggers to come together, removing this divide that has been established by the industrial yards. The place will include sports and recreational facilities, food services, public markets, cultural spaces, and affordable residential and educational centres which will reconnect the north both to its surrounding neighbourhoods and to the rest of the city with the help of a new light rail system using the remnants of the old railyard that will connect to other important nodes in the city. Bike paths and a rapid transit system will also help improve the accessible of the other from different parts of the city. The convergence of different cultures within the site will reflect the unique diversity of culture that the city possesses.
ECOLOGICAL
RECREATIONAL
functions
CULTURAL
green spaces
pedestrian + cycling
SOCIAL
amenities
EDUCATIONAL
For the individual part of this project, I chose to focus on the design detail of the plaza that my group proposed. This will serve as a cultural hub for the city where remnants of old the old railyard will be preserved throug the form of shipping containers that will house local businesses and parklets for shoppers. A water drainage feature with water flowing from the ecological area will serve as an attraction to the site. A public market which becomes indoor and outdoor depending on the season will be housed in an old railyard shop. Lastly, an ‘active trail’ will serve as a connecting / transitional space between the nearby industrial and forested areas. The site aims to have these spaces work together to encourage social cohesion and the celebration of Winnipeg’s diversity.
indoor market outdoor flea market
event space
active trail
CULTURAL ‘ART BOXES’ ‘Art boxes’ which are stacks of shipping containers containing art from different cultures within glass boxes. As shoppers walk along the promenade, these art pieces would be visible above them which would promote the diverse culture that the city has.
community garden
RIVER OF TEARS Term Winter 2019 | Project Urban Studio | Location Thunder Bay, ON, Canada Course Studio 4 individual project | Instructor Dr. Alan Tate
FRAMEWORK
The River of Tears Memorial Park aims to commemorate the lives of the Indigenous kids of Thunder Bay that have died or gone missing within its vast network of waterways, as well as remove the notion that the rivers of the city have become places for death and violence by reconnecting the community back to the the water and revealing its importance - water as life. The memorial park aims to invite people in through a plaza and gathering space, offer a public-to-private transitional place of journey to the water where visitors could interact with it and allow for memorial ceremonies & rituals, and lastly, reveal a secluded place for people to be isolated from the city and contemplate. A series of Northern Pin Oak marker trees located on the other side of the floodway from the memorial aims to represent the lives of the children that have been taken away. A water feature that leads the eye to the marker trees across the water framed by native prairie grass aims to add a temporal element to the memorial by working with the seasonal change in water levels, creating a space for people that adapts with the regular flooding within the site.
Kamnistiquia
Neebing-McIntyre
recovered bodies
nodes of reconnection
reconnection with land & water
RILL + STEPS
PRAIRIE GRASS
WATER FEATUERE
MODEL + ISOLATED SPACE
LAWN AREA
MAIN PATH
JAPANESE TREE LILAC Syringa reticulata
NORTHERN PIN OAK Quercus ellipsoidalis INDIANGRASS Sorgahstrum nutans
Most of the Indigenous children who have gone missing within the city’s waterways went missing in the months of May and November. This story is subtly revealed through the water feature located at the highest point of the park which aims to be a dynamic gathering space and a play area that works with the conditions of the floodway’s rising and receding water levels. The
months when the water level is the highest in the floodway coincides with the months of the year the children have gone missing. A catchment basin at the end of the rill adjacent to the water collects water from the floodway. At low water levels, the feature is a seating area. During high water levels, it becomes a water feature, creating a temporal element to the space.
+187 m highest point +185 m maximum water level (spring & fall) may
nov
may
nov
may
GENERAL PATTERN OF PRIMARY WATER LEVELS
nov
may
+183 m minimum water level (summer & winter)
MAIN PATH + LAWN AREA
WATER FEATURE + RED TREES
STEPS + RILL
LOOKING BACK
HETCH HETCHY AQUEDUCT PARK Term MLA Thesis + Practicum Project | Location Menlo Park, CA, USA Research Adviser Dr. Karen Wilson Baptist | Internal / External Adviser Brenda Brown / Alexandra Boese
The park is designed to be experienced on a pedestrian level with various site elements and distant views working with each other to create a meaningful experience that unfolds the history and importance of the Bay’s tidal marshlands. As one walks towards the Bay using a series of paths and boardwalks, the dynamic forces of the water reveal the shifting coastline through overlapping timelines and how materials reacts to its slow but certain movement inland. The rusty metal on the aqueduct pipes, the decaying wood planks of abandoned salt pond infrastructure and farm houses, the wires and poles of nearby power lines, and the diverse plant life of California’s coast - as these materials respond to the Bay water, the landscape changes – becoming the chronograph itself. And as the chronograph is revealed, curiosities are heightened, raising awareness about the Bay, the tidelands, and the rising sea levels.
existing public access
existing industrial elements
proposed access / paths
pedestrian / community engagement
chronograph / wetland
GATEWAY WINDING PATHS + MEADOW
PROMENADE EXISTING WETLAND
THRESHOLD EXISTING LEVEE
Plaza (Gateway) Existing Wetland + Boardwalk (Promenade) YEAR 0 / CURRENT 6m
Existing Levee (Threshold)
marker tree
5m
king tide (~2m)
4m 3m 2m
water level: 1.5m
1m ~700m (not to scale)
6m 5m 4m 3m 2m 1m YEAR 2100
The end of the century marks the ultimate return of the Bay within the site. By 2100, the water level will have increased by 1.5 to 3m which would completely submerge a significant part of the park. Moss start to inhabit the crevices of decaying materials. Similarly, rust start to take over the metal structures that characterize the site. The Bay levels out with the top of the levee structure, over topping it and completely breaking through the land . The marker tree then becomes constantly submerged in salt water and dies, marking the destruction of the park and signifying that the Bay has completely taken back the land. The remnant of the marker tree, and ultimately the elements that once made-up the site, denotes the shifted coastline and the new edge of the Bay. The only part of the site that will remain will be the Bay lookout as it becomes the site for contemplation and memorialization of a lost landscape. king tide (~2m)
water level: 3m
PLAZA + PERGOLA + RESTORED NATIVE GRASSLAND gateway
existing overhead power lines
plaza open space aqueduct pipes
native grass area
BAY LOOKOUT threshold
rail bridge swing structure
Dumbarton Highway Bridge Dumbarton Rail Bridge aqueduct pipes
rail bridge remnants from 1998 fire
RESEARCH / GIS MAPPING
MARE ISLAND NAVAL SHIPYARD
SHILOH WIND POWER PLANT
BENICIA REFINERY
SUISIN BAY
SAN PABLO BAY
125,410
SHELL REFINERY
CHEVRON REFINERY
SAN FRANCISCO’S EMBARCADERO
NF
SA
SAN FRANCISCO
Y BA 20km
URBAN AREAS WETLANDS
INDUSTRIAL AREAS
WETLANDS AT RISK
bay area urban areas and wetlands at risk
127,647
10
155,805
0km
RAILROADS
bay area roads, rails, highways, ports, airports and industries
1,013,240
0
ROADS + HIGHWAYS
NASA AMES RESEARCH CENTER
SEAPORTS&AIRPORTS
AY OB ISC
SILICON VALLEY AREA
NC RA NF SA
O ISC
POPULATION
230,504
NC
RA
SAN FRANCISCO INTERNATIONAL AIRPORT
OAKLAND
1,000,000
OAKLAND INTERNATIONAL AIRPORT
162,954
PORT OF OAKLAND
PACIFIC OCEAN
ROADS + HIGHWAYS
440,646
873,965
PORT OF RICHMOND
SAN JOSE
PERSONAL / PROFESSIONAL WORKS
SITE & LANDSCAPE PLAN DRAWINGS VECTORWORKS / AUTOCAD 1
2
3
4
5 LEGEND
A
BASKETBALL COURT
ORCHARD VIEW BLVD.
SEPARATE COSTING
A
WEST STAIRS PLAN
M
CONCRETE LANDING
BOTTLE FILLING STATION
STABILIZED AGGREGATE PATH ARMOURSTONE RETAINING WALL
CONCRETE SKATE SPOT APPROXIMATE LOCATION OF NEW BACKSTOP
B
B CHLORINE FILL STATION
COMMUNITY CENTRE COLONNADE
EXISTING BASEBALL DIAMOND
EXISTING POOL
M
EXTENT OF BUILDING BELOW EXISTING COMMUNITY GARDEN
CONCRETE PAD FOR POOL MAINTENANCE ACCESS
EXISTING SOCCER PITCH
BENCHES
M
M
RELOCATED FENCE AND GATE
OLA LIGHTING, TYP.
OFF LEASH AREA (2000 m2)
LOW METAL FENCE WITH CUSTOM METAL PANELS, 900mm HIGH
DOG EQUIPMENT
OFF LEASH AREA FENCE
PATH LIGHTING, TYP.
ENGINEERED WOOD FIBER ACCESSIBLE PATHWAY
CIP CONCRETE PATH
DOUBLE GATE
MAINTENANCE GATE
CURVED WOOD BENCH
75mm HT. CURB
ECOLOGICAL HERITAGE INTERPRETIVE FENCE LOW POST & PADDLE FENCE
M
STEP AND TACTILE WARNING STRIP
5000
M
PATH LIGHING, TYP.
00
CIP CONCRETE PATH
FUTURE RAMP AND AMPHITHEATRE
30
MODIFIED GUARD ON EXISTING CURB
M
FEATURE LIGHTING, TYP.
M
EXTENT OF FUTURE CONCRETE PAD
CURVED WOOD BENCH
MEMORY STONE, TYP.
M
POLLINATOR GARDEN
INTERPRETIVE SIGNAGE M
400
MEMORY STONE, TYP.
FUTURE PERGOLA / SHADE STRUCTURE
CIP CONCRETE PATH
EXISTING BIKE RACKS TO BE REMOVED AND HANDED OVER TO OWNER
M
ECOOGICAL HERITAGE INTERPRETIVE POSTS
EXISTING COMMUNITY CENTRE
400
0
SOUTH PLAN
0
M
5000
RELOCATED DOG FOUNTAIN
00
M
EXISTING STAIRS, LANDING, RAILING & WING WALL
EXISTING FIELD HOUSE
EXISTING CONCRETE PAD
FUTURE PERGOLA / SHADE STRUCTURE
M
40
BENCHES TYP.
4000
EXISTING VENT/AREAWAY
ROSELAWN AVENUE
00
EXISTING COMMUNITY CENTRE
NEW BASEBALL FENCE
3000
EXISTING SHED
21
EGLINTON AVENUE
CONCRETE UNIT PAVING LOW POST & PADDLE FENCE
M
C
EXISTING SOCCER PITCH
M
FUTURE FIREPIT AREA
C
GATHERING AREA EXISTING TENNIS COURTS AND HOCKEY RINK
BOTTLE FILLING STATION VEHICULAR ACCESS GATE EXISTING ARENA
M
MEMORY STONE, TYP.
MODIFIED PARKING BARRIER
BENCHES, TYP. EXISTING LAWN
RELOCATED SOCCER PITCH 9000
EXISTING CONCRETE PATH
9000
RELOCATED POSTS
RELOCATED POSTS
1
2023-11-
All Work sha Code latest is jurisdiction. D unless they ha The Contracto discrepancies DO NOT SCA Copyright © 2
EXISTING WADING POOL T
2024-02-
2024-01-
NO.: DATE:
10500
EXISTING PLAYGROUND
3 2
CIP CONCRETE PATH EXISTING EAST PATH
REINSTATE IRRIGATION SYSTEM
NORTH PLAN
D
D
ARCHITECT SE
Eglinton Park Revitalization Carl Valdez at PLANT Architect Inc. (with Eric Klaver, Julie Ourceau, Taylor Kirsh)
LANDSCAPE ARCHITECT SE
CONSTRUCTION DOCUMENTATION DRAWINGS VECTORWORKS / AUTOCAD FORMED METAL PANEL WITH WATERJET CUT PATTERN 1800MM CUSTOM LINK BENCH
INTERPRETIVE METAL PANEL, MIN. 50% TRANSPARENCY
A
SECTION
2
3
4
5
GREASE FITTING, TWO UNITS TYP.
P5 P2
P4
HEXAGONAL CONCRETE UNIT PAVERS
FINISHED GRADE
METAL RING FASTENER 100 DIA CEDAR RAIL
ENGINEERED WOOD FIBER FINISHED GRADE
INTERPRETIVE PANELS
FINISHED GRADE
WIRE MESH REINFORCING
300
CONCRETE PAD
5mm THICK FORMED METAL PANEL WITH WATERJET CUT PATTERN. MIN. 50% TRANSPARENCY
300
300
B
TYP.1200
Aamoo
Mason Bee
Aamoo
Aamoo
Horned Bee
Green Sweat Bee
Aamoo
Aamoo
Mining Bee
Aamoo
Bumble Bee
Carpenter Bee
Beetle
Luna Moth
Moowijigesi
Memengwaan
Animikiidokam
Baltimore Checkerspot Butterfly
Oojiii
Scale: 1:10
4
5
EQ.
Scale: 1:100
COMPACTED LIMESTONE SCREENING
1200
MIN. 1200
3
A
A4
EAST-WEST PATH
D4
CONCRETE FOOTING COMPACTED LIME STONE SCREENING
B
TAPER MULCH EDGE
EAST-WEST PATH
OFF-LEASH AREA
25 MPa, 5-7% AIR ENTRAINMENT CONCRETE FOOTING
P12 HEAVY DUTY CONCRETE
B4
Scale: 1:10
2
A
660
CONCRETE CURB
POLLINATOR GARDEN
MIN. 1200
1
P11 CONCRETE PAD FOR BENCHES / MEMORY STONES
B3
159.64
159.39
FINISHED GRADE
254 mm DIA. x 13 mm GALV. STEEL BASE PLATE
DOG OFF-LEASH AREA
Scale: 1:10
FINISHED GRADE
FINISHED GRADE
FACE OF RISER
TACTILE WARNING STRIP
B2
Scale: 1:10
100
158.86 SUBGRADE
DOG OFF-LEASH AREA
Scale: WOOD 1:100 FIBER P10 ENGINEERED
150
FINISHED GRADE
GRANULAR ‘A’ BASE
STAIR TREAD, MATERIAL VARIES
PLAN - TOP OF STAIRS
D1
SUBGRADE
EXISTING BASEBALL DIAMOND
P3 100
CONCRETE PAVING
1500
300
PREFABRICATED TACTILE WARNING STRIP AT END TO BE CUT TO FIT STEP TREAD. THRU HOLES MATCHING EXISTING SIZE TO BE MADE FOR ANCHORING
EXISTING GRASSED SLOPE
B1
4 M24-3 x 915 mm THREADED RODS WITH ADJUSTING NUTS, TOP & BOTTOM
GRANULAR ‘A’ BASE
1500 MIN.
300 TYP.
150
SUBGRADE
159.75
P3 P1
PERMEABLE UNIT PAVING
2900
PREFABRICATED TACTILE WARNING STRIPS TO BE ANCHORED TO CONCRETE
GEOTEXTILE
19mm DIA. CLEAR STONE BASE, SLOPE TO SUBDRAIN
B
PERMEABLE CONCRETE NEW BASEBALL UNIT PAVING FENCE
PERMEABLE CONCRETE UNIT PAVING
CHAIN LINK GATE
MULCH PAVING
EXISTING BLEACHERS
MIN. 1200
EQ
540 TYP.
POST AND PADDLE DOG OFF-LEASH ENCLOSURE
180
EQ
200
FINISHED GRADE
B1 L-500
45
P12
75
P11
FORMED METAL PANEL WITH WATERJET CUT CONCRETE PAVING PATTERN
MULCH
CURVED WOODEN BENCH P10
POST TOP LIGHTING
75
Scale: 1:10
505
P9 DECORATIVE STONE PAVING
A5
Scale: 1:10
75
P8 STABILIZED AGGREGATE PAVING
A4
Scale: 1:10
720
P7 PERMEABLE UNIT PAVING
A3
150 DIA CEDAR POST
DOG OFF-LEASH METAL PANEL BOLTED INTO RING ENCLOSURE
150 DIA CEDAR POST
900
P2/P4/P6 HEAVY DUTY CONCRETE - EXPOSED AGGREGATE Scale: 1:10
163.10
B
Hoverfly
BENCH
METAL RING 1600FASTENER MAX 114 OD GALV. STEEL INSERT, WELDED THROUGH PLATE
EQ.
ON SLAB
2000 O.C. MAX
ON GRADE
6100
ON SLAB
127 OD GALV. STEEL SLEEVE
D4 L-510
5 1200
ON GRADE
SUBGRADE
EXISTING TREE A2
3mm A PLAT COM PAINTE STEE
METAL RING STURCURE 3mm THICK
150 DIA CEDAR POST
PROPOSED TREE BY OTHERS
1200
SUBGRADE
4 75
DRAINAGE BOARD TO CONNECT TO CATCH BASIN
SUBGRADE
HEAVY DUTY CHAIN FROM PIN TO SLEEVE, WELD IN PLACE
3
VARIES
RIGID INSULATION AS NEEDED DRAINAGE BOARD TO CONNECT TO CATCH BASIN
NOTE: REFER TO STRUCTURAL FOR REINFORCING.
Scale: 1:10
METAL PANEL BOLTED INTO METAL RING
FORMED METAL PANEL WITH WATERJET CUT PATTERN. MIN. 50% TRANSPARENCY
ON SLAB
P1/P3/P5 LIGHT DUTY CONCRETE
50 mm WIDE CONSPICUITY TAPE, 3m SCOTCHLITE 983-21 FLUORESCENT
5 mm WELD
100
80 100-200
SLOPE TO SUBDRAIN
RIGID INSULATION AS NEEDED
300
300
GRANULAR 'A' BASE
GEOTEXTILE
NOTE: REFER TO STRUCTURAL FOR REINFORCING.
A1
53mm DIAMETER CLEAR CRUSHED LIMESTONE SUBBASE
SUBGRADE
PROPOSED TREE
3
840
ON GRADE
WASHED 19mm DIAMETER OPEN GRADED CLEAR CRUSHED LIMESTONE BASE
SLOPE
EXISTING ROOF SLAB AND BUILDUP
SUBGRADE
2
GRANULAR ‘A’ BASE EXISTING ROOF VARIES SLAB AND BUILDUP
300 RIGID INSULATION AS NEEDED
DRAINAGE BOARD TO CONNECT TO CATCH BASIN
2
HEAVY DUTY CHAIN LOCKABLE PIN
FINISHED GRADE
GEOTEXTILE
VARIES
WIRE MESH REINFORCING
80
80
150
GRANULAR 'A' BASE
GEOTEXTILE
1
19mm ø CLEAR CRUSHED STONE
FINISHED GRADE
3 10200 CENTRAL SPINE PATH
UNFOLDED ELEVATION OFPATH INTERPRETIVE PANELS AND POSTS @ DOLA CENTRAL SPINE C4
E4
A
P9
STABILIZED AGGREGATE
FINISHED GRADE
160.78
SPINE PATH
HIGH PERFORMANCE BEDDING
CONCRETE BASE
180
WIRE MESH REINFORCING
200 MAX.
EXPOSED AGGREGATE CONCRETE SEE L-401 FOR FINISH
P8
P3
PERMEABLE JOINT AGGREGATE
P6
FINISHED GRADE
EXISTING ROOF SLAB AND BUILDUP
P3
100 100 MIN 50 200 MAX
P1
EXERCITATION ULLAMCO LABORISNISI UT ALIQUIP EX EA COMMODO CONSEQUAT. DUIS AUTE IRURE DOLOR IN
2
158.90
20 mm REBAR PIN THROUGH BOTH Scale: 1:100 PIPES. BEND ONE END AT 90° TOScale: 1:100 PROVIDE 100 mm HANDLE. DRILL HOLE OTHER END TO ACCEPT HEAVY DUTY PADLOCK(S). PADLOCKS SUPPLIED BY CONTRACTOR UNTIL PERFORMANCE ACCCEPTANCE.
1
A
A CONCRETE. SEE L-401 FOR FINISH
DO EIUSMOD TEMPOR INCIDIUNT UT LABORE ET DOLORE MAGNA ALIQUA. UT ENIM AD MINIM VENIAM, QUIS NOSTRUD
PLAN
DOMED CAP TYP.
Scale: 1:100
1
OFFICIA DESERUNT MOLLIT ANIM ID EST LABORXUM. LOREM IPSUM DOLOR SIT AMET, CONSECTETUR ADIPISCING ELIT, SED
17280
DECORATIVE ENCLOSURE AT EXISTING COMMUNITY GARDEN
C1
00
CILLUM DOLORE EU FUGIAT NULLA PARIATUR. EXCEPTEUR SINT OCCAECAT CUPIDATA NON PROIDNT, SUNT IN CULPA QUI
POLLINATOR GARDEN BEYOND BENCH
75
COMMUNITY GARDEN ENCLOSURE
TION OF COLLONADE
160.86
NISI UT ALIQUIP EX EA COMMODO CONSEQUAT. DUIS AUTE IRURE DOLOR IN REPREHENDERIT IN VOLUPTATE VELIT ESSE
800 TYP.
75
2560 PATH
EXISTING PAVING
LABORE ET DOLORE MAGNA ALIQUA. UT ENIM AD MINIM VENIAM, QUIS NOSTRUD EXERCITATION ULLAMCO LABORIS
75
COLLONADE
855
1
GEOFOAM WHERE NECESSARY
2120 PATH
1200
LOREM IPSUM DOLOR SIT AMET, CONSECTETUR ADIPISCING ELIT, SED DO EIUSMOD TEMPOR INCIDIUNT UT LABORE ET DOLORE MAGNA ALIQUA. UT
150 TYP.
Ashkibag
2900
Monarch Butterfly
SPINE PATH
Hummingbird
INTERPRETIVE FENCE
US
L-530
100
N S TAT
220
WOME
EXISTING GRASS INTERPRETIVE POSTS W/ NAMES OF POLLINATOR SPECIES CONCRETE PAVING
B3
EXISTING GRASSED SLOPE RINK DASHER CEDAR POST BEYOND, TYP. BOARDS & CHAIN 2400 TYP. LINK FENCE
L-530EXISTING HOCKEY
CONCRETE PAVING D E N IE D
B2
POST TOP LIGHTING
505
163.00
SPINE PATH
EXISTING TREES
GARAGE SLAB
Naanookaashiins
EXISTING RAISED PLANTER
EXISTING COMMUNITY CENTRE MEMORY STONE
PROPOSED TREE BY OTHERS
OFF-LEASH ENCLOSURE EXISTING TREE CURVED WOODEN BENCH POST TOP LIGHTING
OFF-LEASH ENCLOSURE
Doodoowesii
EXISTING TREES
White Lined Sphinx Moth
2050 TYP.
METAL PLANTER
EXISTING COMMUNITY CENTRE COLONNADE
COMPACTED LIMESTONE SCREENING
600
PB1 CONCRETE PAVING
P1
P3
PB2
P5
CONCRETE PAVING
SOD
C FINISHED GRADE
P1
P3
MULCH
P5
FINISHED GRADE
FINISHED GRADE
CONCRETE PAVING
P1
P3
P5
CONCRETE PAVING
PERMEABLE UNIT PAVING
P7
P2
P4
PB2
P6
SOD
FINISHED GRADE
FINISHED GRADE
CONCRETE PAVING
P2
P4
PB1
P6
C
FINISHED GRADE
100
150
100
800 100
100
100
WRAP BASE IN GEOTEXTILE AT ENDS
3
A1
2024-01-05 75% CD FOR CLASS B COSTING 2023-11-21
HEAVY DUTY CONCRETE PAVING AT PLANTING BED Scale: 1:10
CEDAR POST AND METAL PANEL @ COMM. GARDEN
B1 PERMEABLE CONCRETE UNIT PAVING
P7
P10
FINISHED GRADE
FINISHED GRADE
POLLINATOR GARDEN BEYOND
D
PB1
P7
ENGINEERED WOOD FIBER
FINISHED GRADE
200
P10
FINISHED GRADE
C
D
FINISHED GRADE ENGINEERED WOOD FIBER
VEHICLE GATE ACCESS
WRAP BASE IN GEOTEXTILE
P1
INTERPRETIVE PANELS BEYOND
C
P2
P3
P4
P5
P6
P11
B4
CONCRETE UNIT PAVING AT ENGINEERED WOOD FIBER
B5
Scale: 1:10
ENGINEERED WOOD FIBER AT SOD Scale: 1:10
158.75
MATERIALS:
ADDRESS:
BLUE
WORDING.
25mm EXPANSION JOINT WITH FLEXIBLE SEALANT P1
P3
P5
ENGINEERED WOOD FIBER
P2
P10
P4
P6
EXISTING CONCRETE PAVING, SUBGRADE TBD
ENGINEERED WOOD FIBER
PROPOSED HEAVY DUTY CONCRETE PAVING. SEE L-401 FOR FINISH
158.80
FINISHED GRADE
FINISHED GRADE
P1
P10
P3
P5
PROPOSED LIGHT DUTY CONCRETE PAVING. SEE L-401 FOR FINISH FINISHED GRADE
FINISHED GRADE 20
FINISHED GRADE 20
SLOPED LANDSCAPED AREA, 3:1 MAX
P8 FINISHED GRADE 50
CENTRAL GATHERING AREA
200 Eglinton Ave W FINISH: Toronto, ON M4R 1C3
C
PAI PROJECT NUMBER:
INSTALLATION:
EXPANSION JOINT
PERSPECTIVE
CENTRAL SPINE PATH
LENGTH: 54.38” (138.1cm)
DEPTH: 18.38” (46.7cm)
E3
PLANTING BED
3
3.5'
CENTRAL SPINE
1189 x 841 (A0)
P2
P4
EXISTING UNIT PAVING
Scale: 1:10
4
C5
LIGHT DUTY CONCRETE AT ENGINEERED WOOD FIBER
L-510
All Work shall conform to the applicable local Building Code latest issue, and all other relevant authorities with jurisdiction. Do not use these drawings for construction unless they have been signed and sealed by the Architect. The Contractor shall verify all dimensions and report any discrepancies to the Architect prior to start of construction. DO NOT SCALE DRAWINGS. Copyright © 2021
Scale: 1:10
3
5
18 3/16" 462mm
2
3
HEAVY DUTY CONCRETE AT ENGINEERED WOOD FIBER
LETTERING TO BE NEGATIVE CONTRAST SANDBLASTED W/ STANDARD COLOR BLACK STAIN. REFER TO SPECIFICATION FOR WORDING.
ISSUE/REVISION:
18 3/8" 467mm
Scale: 1:!0
2
C4
PREFABRICATED CONCRETE STONE BENCH BY MANUFACTURER
54 3/8" 1381mm
DECLARED POTLACH AND OTHER CULTURAL CEREMONIES ILLEGAL
CONCRETE PAD
TOP VIEW
P3
HEXAGONAL CONCRETE UNIT PAVERS
CONCRETE PAVING
P2
P4
D
P12
P6
P6
300
FINISHED GRADE
FINISHED GRADE
D
1:20
SIDE VIEW
ADJACENT CONCRETE PAVING
CONCRETE BASE
2645
RETAINED SOIL
PRECAST CONCRETE STONE
5
INTERPRETIVE SIGNAGE EXPANSION JOINT 610 ADJACENT CONCRETE PAVING
TUNNEL HOUSE™ GYMS FOR4DOGS® -DL-TH2-RPW: TUNNEL HOUSE 54" H- RPW (LG/XL) TYPE - PLAN
ALL RIGHTS RESERVED - GYMS FOR DOGS®
REVISION DATE 07/18/2023
PROTECTED BY COPYRIGHT ©2023 CADDETAILS.COM LTD.
CADdetails.com
5017-129
1:20
ALL RIGHTS RESERVED - GYMS FOR DOGS®
PROTECTED BY COPYRIGHT ©2023 CADDETAILS.COM LTD.
REVISION DATE 07/18/2023 CADdetails.com
ARCHITECT SEAL:
80
D
ASSOC I RIO
METAL PLANTER D1ARCHITECTS MEMORY Scale: N.T.S. STONES
ONT A
100
ION AT
300
5017-063
1090
MANUFACTURER NOTES: - SAFE ZONE: PLACE EITHER NATURAL MULCH OR WOOD CHIPS OR TRAIL MIX AS A SURROUNDING SURFACE FOR THE PLAY CONCRETE BASEEQUIPMENT. IT IS RECOMMENDED A SAFE ZONE OF 3' ON THE SIDES AND 4-5' IN FRONT AND BACK OF PRODUCTS. DO NOT USE RUBBER 17 R64 50 5 PRODUCTS, THEY ARE UNSAFE FOR PETS MULCH OR ANY RUBBER - MAKE SURE THE CLIMBING AND WALKING PRODUCTS WITH RAMPS, PLATFORMS AND WALKING SURFACES (HILL CLIMB(S), BRIDGE CLUB, BALANCE BEAM) ARE IN THE SHADE. IT IS IMPORTANT THESE PRODUCTS ARE PLACED IN A SHADY ENVIRONMENT DURING SUMMER ±890 IN MONTHS OR ANY MONTH WHEN THE TEMPERATURES MAY REACH 70° OR HIGHER. DO NOT PUT RAMPS, PLATFORMS, WALKING BEAMS ±320 DIRECT SUNLIGHT. 2530 NOTES: PRECAST CONCRETE 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. STONE 2. DO NOT SCALE DRAWING. 3. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY EXPANSION JOINT THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER 5017-129
GYMS FOR DOGS® - DL-HC-RPW: CLIMB 32" H - RPW (LG/XL) TYPE 3 - HILL PLAN
- All drawings, specifications, design and details on this page remain the property of Maglin Site Furniture Inc. and may not be used without Maglin authorization. ELEVATION 1:10 - Details and specifcations may vary due to continuing improvements of our prroducts.
D WRAP BASE IN GEOTEXTILE AT ENDS
4
JUMP HURDLES
T 800 716 5506 F 877 260 9393 300 www.maglin.com sales@maglin.com
VARIES
FINISHED GRADE
FRONT VIEW
SIDE VIEW
NOTES: 1. SAFE ZONE: OPTIONAL SAFE ZONE SURFACING CAN BE USED AROUND AND UNDER THE PLAY EQUIPMENT, IT IS RECOMMENDED A SAFE ZONE OF 3' ON THE SIDES AND 4'-5' IN FRONT AND BACK OF PRODUCTS. WE RECOMMEND A CYPRESS OR CEDAR WOOD SHRED STYLE MULCH (NOT CHUNK STYLE MULCH) DO NOT USE RUBBER MULCH, THEY ARE UNSAFE FOR PETS IF INGESTED. 2. IT IS RECOMMENDED SPECIFYING THE RULES SIGNAGE BY GYMS FOR DOGS ON PARK RULES & BEST GUIDELINES. EQ.BRIDGE 3. MAKE SURE THE CLIMBING AND EQ WALKING PRODUCTS WITH RAMPS, PLATFORMS AND WALKING SURFACES (HILL CLIMB(S), 1995ARE PLACED IN A SHADY ENVIRONMENT DURING CLUB, BALANCE BEAM) ARE IN THE SHADE. IT IS IMPORTANT THESE PRODUCTS SUMMER MONTHS OR ANY MONTH WHEN THE TEMPERATURES MAY REACH 70° OR HIGHER. DO NOT PUT RAMPS, PLATFORMS, WALKING BEAMS IN DIRECT SUNLIGHT. 4. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 5. DO NOT SCALE DRAWING. 6. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 7. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 8. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER 5017-063.
°
P5
54"
2 11
P3
LIGHT DUTY CONCRETE PAVING AT EXISTING CONCRETE PAVING
RESET EXISTING UNIT PAVERS AS NECESSARY FOR LINE & LEVEL
PROPOSED HEAVY DUTY CONCRETE PAVING. SEE L-401 FOR FINISH
P1
C3
TOP VIEW
44"
7'
FRONT VIEW
Scale: 1:100
SHEET SIZE: 2024-02-12 ISSUED FOR TENDER
NO.: DATE:
LANDSCAPED SLOPE AT STABILIZED AGGREGATE Scale: 1:10
ADJACENT CONCRETE PAVING
PERSPECTIVE
CENTRAL SPINE PATH
SECTION 1:10
2 2024-01-05 75% CD FOR CLASS B COSTING SHEET No.: 1 2023-11-21 100% DESIGN DEVELOPMENT
EXPANSION 25mm EXPANSION JOINT JOINT WITH FLEXIBLE WITH FLEXIBLE SEALANT SEALANT
TYPE 2 - PLAN 1:20
TOP VIEW
1265
DATE:
2024-02-12
1
158.97
TYPE 1 - PLAN 1:20
WEIGHT: 167.36lbs (75.9kg)
As Noted
1
EXPANSION JOINT 1400
0
HEIGHT: 18.19” (46.2cm)
Scale: 1:100
ENGINEERED WOOD FIBER AT PLANTING BED
PINK
Planter comes pre-assembled and can be installed freestanding, or surface mounted. A plug in the middle can be removed if drainage is desired.
SCALE:
CENTRAL GATHERING AREA
Scale: 1:10
GREEN
PAVING DETAILS
127mm X 76mm METAL EDGE RESTRAINT
STABILIZED AGGREGATE AT SLOPED LANDSCAPE
PRECAST CONCRETE STONE EQ.
1705
BLUE
R168
E
WRAP BASE IN GEOTEXTILE
NUTMEG
EQ. RED
ADJACENT CONCRETE PAVING
CONCRETE SLAB WITH LIGHT SANDBLAST FINISH
PARKING LOT TO SPECIFY: EXISTING Select MPL-1500-00008
SHEET TITLE:
WRAP BASE IN GEOTEXTILE GEOTEXTILE
150
PROPOSED LIGHT DUTY CONCRETE PAVING. SEE L-401 FOR FINISH
STONE
780
All steel components are protected with E-Coat rust proofing. Corten The Maglin Powdercoat System provides a durable finish on all metal surfaces.
21082
CENTRAL SPINE PATH
FINISHED GRADE MULCH CENTRAL SPINE PATH
WRAP GEOTEXTILE BASE IN GEOTEXTILE
C1
CONCRETE PAVING PRECAST CONCRETE EXPANSION JOINT EXISTING SOD
PRE-DRILLED HOLES FILLED W/ EPOXY
The planter’s outer structure is made from formed steel. Liner is made from galvanized steel.
STABILIZED AGGREGATE
C2
7'
GYMS FOR DOGS® 3815 RIVER CROSSING PKWY SUITE 100 INDIANAPOLIS, IN 46240 PHONE: (800) 931-1562 EMAIL: sales@GymsForDogs.com www.GymsForDogs.com CONCRETE BASE
SELECT DESIRED RECYCLED POLY WOOD-LIKE FINISH:
CONCRETE BASE
POST TOP LIGHTING
EQ.
1080
STANDARD COLOR BLACK STAIN. TAUPEREFER TO SPECIFICATION FOR
3/8" DIA. NON-CORROSIVE ANCHOR
300
PROPOSED LIGHT-DUTY CONCRETE PAVING. SEE L-401 FOR FINISH
FINISHED GRADE
E1
EQ.
CONTRAST SANDBLASTED W/
Eglinton Park Phase 1 Implementation
PB1 P10
E
STONE BENCH BY MANUFACTURER
NUTMEG LETTERING TO BE NEGATIVE
PROJECT NAME:
LANDSCAPED SLOPE AT TOP ARMOURSTONE RETAINING
P10
SELECT DESIRED RECYCLED PREFABRICATED CONCRETE POLY WOOD-LIKE FINISH:
FINISHED GRADE
200
CONCRETE UNIT PAVING AT PLANTING BED Scale: 1:10
VARIES
B3
Scale: 1:10
TAPER EDGE OF MULCH
158.95 ENGINEERED WOOD FIBER
C
5/8"-11 THREADED INSERT FOR PINNING BENCH DOWN BY MANUFACTURER
S ILLEGAL
LANDSCAPE ARCHITECT SEAL:
GYMS FOR DOGS® 3815 RIVER CROSSING PKWY SUITE 100 INDIANAPOLIS, IN 46240 PHONE: (800) 931-1562 EMAIL: sales@GymsForDogs.com www.GymsForDogs.com
RED
CONCRETE UNIT PAVING AT SOD
B2
PREFABRICATED CONCRETE STONE BENCH BY MANUFACTURER
300
VARIES
HEAVY DUTY CONCRETE PAVING AT CONCRETE UNIT PAVING B1 EXISTING TREES Scale: 1:10
VARIES
3/8" DIA. NON-CORROSIVE ANCHOR
EQ.
ONT A
CONCRETE PAVING
LISA RAPOPORT LICENSE 5181
INTERPRETIVE POSTS BEYOND
POST TOP LIGHTING
Scale: 1:10
PRE-DRILLED HOLES FILLED W/ EPOXY
40
CURVED WOODEN BENCH
FEATURE LIGHTING
WRAP GEOTEXTILE BASE IN GEOTEXTILE
WRAP BASE IN GEOTEXTILE AT ENDS
INTERPRETIVE POSTS @ POLLINATOR GARDEN
CONCRETE SLAB WITH LIGHT SANDBLAST FINISH
R5
150
1500 SERIES
ASSOC Legacy I # MLP1500-MPR-R4 RIO OF 150 ARCHITECTS ION AT
127mm X 76mm METAL EDGE RESTRAINT
127mm X 76mm METAL EDGE RESTRAINT
CONC. UNIT PAVING 150
B3
Scale: 1:10
5/8"-11 THREADED INSERT FOR PINNING BENCH DOWN BY MANUFACTURER
MPL-1500-00008
ARCHITECT SEAL:
MULCH WRAP BASE IN GEOTEXTILE AT ENDS
CEDAR POST AND METAL PANEL @ OFF-LEASH AREA
B2
B
SOD
PB2
040
FINISHED GRADE
PERMEABLE CONCRETE UNIT PAVING
105
PB2
Scale: 1:20
R2
P7
6.1m IN
46"
FINISHED GRADE
HEXAGONAL CONCRETE UNIT PAVING
1125
PERMEABLE UNIT PAVING
P7
1225
P6
3.5'
P4
EQ
P2
50
CONCRETE PAVING
Scale: 1:10
TAPER EDGE OF MULCH
TOP OF SOD ROOTFLUSH MAT FLUSH TO FINISHED TO FINISHED GRADE GRADE
B
±380
A5
Scale: 1:10
EQ.
HEAVY DUTY CONCRETE PAVING AT SOD
A4
Scale: 1:10
830
A3
Scale: 1:10
910
LIGHT DUTY CONCRETE PAVING AT CONCRETE UNIT PAVING
A4
Scale: 1:20
All Work shall conform to the applicable local Building Code latest issue, and all other relevant authorities with jurisdiction. Do not use these drawings for construction unless they have been signed and sealed by the Architect. The Contractor shall verify all dimensions and report any discrepancies to the Architect prior to start of construction. DO NOT SCALE DRAWINGS. Copyright © 2021
3.5'
A2
Scale: 1:10
LIGHT DUTY CONCRETE PAVING AT PLANTING BED
100 150 100 VEHICULAR GATE ELEVATION
A2
Scale: Actual Size
100% DESIGN DEVELOPMENT ISSUE/REVISION:
900 MIN.
A1
LIGHT DUTY CONCRETE PAVING AT SOD
VEHICULAR GATE HINGE POST
2024-02-12 ISSUED FOR TENDER
2 1
NO.: DATE:
OF
D1
D2
DOG EQUIPMENT
D4
Scale: N.T.S.
LISA RAPOPORT LICENSE 5181
Scale: AS SHOWN
LANDSCAPE ARCHITECT SEAL:
CONCRETE UNIT PAVING AT EXISTING UNIT PAVING Scale: 1:10
D3
Eglinton Park Revitalization Carl Valdez at PLANT Architect Inc. (with Eric Klaver, Julie Ourceau, Taylor Kirsh)
HEAVY DUTY CONC. EXPOSTED AGGREGATE AT HEAVY DUTY CONC. Scale: 1:10
PROJECT NAME:
P1
Eglinton Park Phase 1 Implementation
25mm CHAMFER
300
ADDRESS:
395
D2
FINISHED GRADE
200 Eglinton Ave W Toronto, ON M4R 1C3 PAI PROJECT NUMBER:
21082
SHEET TITLE:
1
150
LIGHT DUTY CONCRETE AT HEAVY DUTY CONCRETE Scale: 1:10
0 MAX
D1
2-1/2" DIA. THROUGH BOLTS
SITE ANALYSIS DIAGRAMS ILLUSTRATOR / VECTORWORKS / ANALOGUE
Site Analysis
Existing Parks & Green Spaces 5-10-15 Minute Walk Distances Findings: • All four parks are wellconnected to motorist and pedestrian routes. • Etobicoke Centre Park connects directly to the new Civic Centre plaza across Dundas St. • Etobicoke Centre Park is the most active park in terms of proximity to circulation. • Six Points Expansion Park is an intimate park connected to the existing park space.
Site Analysis
• There is a visual link between Dunkip Park & Linear Park across the intersection (along the former Dundas street alignment.)
Preliminary Program Fits: Magnet Park 20
Findings: • Urban edges create an opportunity for social interaction. • Protected or buffered areas create opportunities for active recreation. • Areas from within the park with views outward create opportunities for passive recreation and seating opportunities to enjoy views. • Areas within the park with inward focus and gentle slopes create an opportunity for active recreation. • Noise in the parks can be managed with buffer zones by sound masking or by introducing programs that are themselves noisy. • Areas of parks with steep slopes should be made accessible.
Six Points Parks Etobicoke Centre Park Carl Valdez at PLANT Architect Inc. (with Mary Tremain, Zeynep Benk, Tanya Pande) 21
40
3D MODELLING + RENDERING SKETCHUP / LUMION
HIGHCROFT RESIDENCE Carl Valdez at Travis Van Liere Studio
VILLA ROCOCO RESIDENCE Carl Valdez at Travis Van Liere Studio
BRANDING + PLACEMAKING RHINO / SKETCHUP / ILLUSTRATOR
Project Name:
C
FOUNDATION
CD CD
CABLE OR METAL TO CREATE SENSE OF ENCLOSURE
ALTERNATE LIGHT COLUMN BRANDING FOR VISIBILITY IN BOTH DIRECTIONS.
Location:
NOTRE
Consultant:
WOODEN HEADERS TO BRING WARMTH TO ARBOUR
litt
ALTERNATING SIDES OF COLUMNS TO CREATE SENSE OF ARBOUR WITH MINIMAL FOUNDATIONS
•
■
•
•
•
landsc
Sheet Title:
'
Project Manager:
Darcy Project ID:
17-
LIGHT COLUMNS BECOME STRUCTURE FOR ARBOUR, ALTERNATING SIDES TO REDUCE QUANTITY OF FOUNDATIONS PLAN 1 :50
LIGHT COLUMN LAYOUT 1 :75
ELEVATION 1 :50
WEST END CROSSING Carl Valdez at Little Bluestem L&A (w/ Darcy Granove & Tayler Bishop)
Date:
2019
GIS MAPPING & DATA ANALYSIS QGIS / ARCGIS / PHOTOSHOP
MINNEAPOLIS DOWNTOWN INVENTORY RESEARCH Carl Valdez at Travis Van Liere Studio (w/ Marla Brown, Yiyuan Shao, Sonali Devarajan)
DIGITAL COLLAGE PHOTOGRAPHY + PHOTOSHOP
THE EMERGING CITY Carl Valdez (Thesis + Practicum)
COLLAGE EXPLORATIONS Carl Valdez (Thesis + Practicum)
CARL VALDEZ
(952) 258 - 9964 carl2882@live.ca IG: Carl.Valdez / LinkedIn: Carl Valdez