Prime Opportunity to Start Construction on a Brand New Build with Approved Permits 2.5 Acres | Price Upon Request Permit Approved Plans for a 7,000 sq. ft home with in ground pool Presented By: Courtney Adamski, 831.915.3913 DRE#01444609 39 Encina, Carmel Valley
Room
2 Encina 39 Encina DR VE, Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED aTE: SSUED D TE: SKETc nUMBER: LiVinG ROOM Antique Biscuit Tile White Wash Wood Ceiling Lounge Chair Rug LIVING ROOM FLOOR PLAN White Cabinets & Natural Oak Shelves Sofa - Natural Color Sofa - Crypton Fabric Coffee Table White Plaster Walls Wall Sconce Chandelier Solid and Pattterned Throw Pillows Wood Console D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 STUDY BATH 120 BEDROOM 119 GARAGE FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR STORAGE CABINET DESK DESK DESK DESK FIREPLACE WEST HALL 149 20' 2" 16' 7" ENTRY 108 SOFA WINDOW SEAT CABINETCABINET VANITY VANITY BENCHSHELF BATH 2 129 BENCH EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 FR. R. MINI BAR 39 Encina Interior Design Concept Living Room 3 Encina 39 Encina DR VE, Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED aTE: SKETcH nUMBER: K TcHEn White Quartz or Marble Counter Stool Natural Oak Cabinets
Antique
Biscuit Tile White Wash Wood Ceiling Glass Backsplash Metal Mosaic Backsplash Waterworks - Henry Col lection Kitchen Faucet (Nickel finish) Navy Blue Cabinets @ Island Pendant Baskets and Books Area Butcher Block KITCHEN - FLOOR PLAN Waterworks - 35” Clayburn Farmhouse Kitchen Sink D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 109 BEDROOM 113 W.I.C 115 W.I.C 114 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER CABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK STORAGE CABINET DESK DESK FIREPLACE FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 CABINET VANITY VANITYSHELF BATH 2 129 BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH BBQ AREA 124 FR. R. MINI BAR Kitchen Date: 07/27/2021 4 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED aTE: SSUED D TE: SKETc nUMBER: FaM LY ROOM Antique Biscuit Tile White Wash Wood Ceiling Wood Chair Gray Wood Chair White with Ottoman White Plaster Walls Built - in Wood Window Seat Built in Wood Console & Shelves Coffee Table Sconce Blue Wood Accent Wall Rug Solid and Pattterned Throw Pillows FAMILY ROOM FLOOR PLAN BEDROOM 3 106 BEDROOM 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 1 116 FAMILY ROOM 105PANTRY 104 R. W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER COFFEE BAR DESK DESK DESK DESK FIREPLACE SOFA WINDOW SEAT CABINETCABINET BENCHVANITY VANITY VANITY VANITY BENCHSHELF SHELF BATH 2 129 FR. R. Family Room Date: 07/27/2021 5 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED aTE: SSUED D TE: SKETcH nUMBER: DininG ROOM DINING ROOM FLOOR PLAN RugAntique Biscuit Tile White Wash Wood Ceiling Chandelier Dining Chair Dining Chair Wood Dining Table Browns and Whites White Plaster Walls D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 1 116 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER CABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK FIREPLACE FIREPLACE WEST HALL 149 20' 2" 16' 7" ENTRY 108 CABINET VANITY VANITY VANITY VANITYSHELF SHELF BATH 2 129 BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH BBQ AREA TRASH/GENERATOR ENCL. 137 FR. R. MINI BAR Dining
Date: 07/27/2021 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 cOVER PaGE Encina Interior Design Concept COLOR PALETTE
Mini Bar-Powder Room
Laundry Room
Date: 07/27/2021 6 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 SHEET REF: REV SED D TE: SSUED aTE: SKET H UMBER: PanTRY pantry/coffee bar floor plan Natural Oak Shelves & Navy Blue Cabinets Glass Backsplash Metal Mosaic Backsplash Pull Out Cabinets Natural Oak Shelves & White Cabinets White Plaster Walls & Ceiling Open Shelves for easy arragment of Jars, Baskets & Boxes. Antique Biscuit Tile White Wash Wood Ceiling @ Coffee Bar Wall Sconce Waterworks - Normandy Undermount - Bar Sink (Nickel) Incorporate Pull Out cabinets for a bigger capacity Waterworks - Bond Tandem Bar Faucet (Nickel) BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER DRESSER DW. CL. COFFEE BAR DESK DESK DESK DESK 20' 2" x 16' 7" ENTRY 108 SOFA WINDOW SEAT CABINETCABINET VANITY VANITY BENCHSHELF BATH 2 129 BENCH EAST HALL 172 DINING ROOM 174 FR. R. MINI BAR 39 Encina Interior Design Concept Pantry Date: 07/27/2021 7 Encina 39 Encina DRiVE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED D TE: SSUED D TE: SKET H nUMBER: Mini BaR - POWDER ROOM powder room floor plan Waterworks Normandy Undermount - Bar Sink (Nickel) Waterworks - Bond Tandem - Bar Faucet (Nickel) Mirror Backsplash Natural Oak Cabinets Mini BAR- floor plan Metal - Open Shelves (Nickel) to match Plumbing Fixtures Single Panel Mirror Backsplash White Quartz or Marble Countertop Antique Biscuit Tile Floor White Plaster Walls & Ceiling Folding Stool Toto Neorest Toilet or Similar Natural Oak Vanity With Baskets Shelf Waterworks Universal Undermount Sink Waterworks - Henry three Hole Deck Mounted Faucet (Nickel) Rectangular Mirror Wall Sconce Marble Mosaic Backsplash D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 BATH 1 116 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 CABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 CABINET VANITY VANITY VANITY SHELF BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH BBQ AREA FR. R. MINI BAR D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 1 116 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK DESK DESK FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 SOFA WINDOW SEAT CABINETCABINET BATH 2 129 BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH FR. R. MINI BAR
Date: 07/27/2021 8 Encina 39 Encina DRiVE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED aTE: SSUED D TE: SKETcH nUMBER: STUDY MUD ROOM Study Mud Room FLOOR PLAN Baskets Area Wood Chair Desk Chair Wood Desk Open Book Shelf White Plaster Ceiling Hooks & Bench Area Table Lamp White Plaster Ceiling Antique Biscuit Tile Hardwood Light Natural Finish Floor @ Office Chair Built in White Cabinets D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 113 W.I.C 115 W.I.C 114 BATH 1 116 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 CABINETCABINET BENCHVANITY VANITYSHELF BATH 2 129 BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH TRASH/GENERATOR ENCL. 137 FR. R. MINI BAR Study-Mud Room Date: 07/27/2021 14 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED D TE: SSUED aTE: SKET H UMBER: LaUnDRY ROOM Laundry room floor plan Porcelain Field Floor White Upper Cabinets Natural Oak Shelves White Plaster Walls & Ceiling Natural Oak - Base Cabinets D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 116 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK DESK DESK FIREPLACE FIREPLACE WEST HALL 149 20' 2" 16' 7" ENTRY 108 SOFA WINDOW SEAT CABINETCABINET BENCHVANITY VANITY VANITY VANITY BENCHSHELF SHELF BATH 2 129 BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH BBQ AREA 124 TRASH/GENERATOR ENCL. 137 FR. R. MINI BAR
Date: 07/27/2021 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 cOVER PaGE Encina Interior Design Concept COLOR PALETTE
Interior
Date: 07/27/2021 9 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED aTE: SSUED D TE: SKETcH nUMBER: MaSTER BEDROOM Hardwood Light Natural Finish Floor White Wash Wood Ceiling Fabric Panel Bed Daybed Nightstand White Plaster Walls Chair Leather Chair Sofa Rug CoffeeTable Chandelier Table Lamp Wall Sconce MASTER BEDROOM FLOOR PLAN D W LN. CL. BEDROOM 3 106 BEDROOM DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. LIVING ROOM 101 LAUNDRY 123 W.I.C 127 DRESSERDRESSER DW. COFFEE BAR DESK DESK FIREPLACE FIREPLACE 20' 2" x 16' 7" 108 SOFA WINDOW SEAT CABINETCABINET VANITY SHELF BATH 2 129 BENCH DESK FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH BBQ AREA 124 FR. R. MINI 39 Encina
Design Concept Master Bedroom Date: 07/27/2021 10 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED DaTE: SSUED aTE: SKETc nUMBER: MaSTER BaTHROOM Waterworks Universal Undermount Sink (White) Waterworks Henry three Hole Deck Mounted Faucet (Nickel) Tatum Wall Mirror Wall Sconce (Nickel) Natural Oak Floating Vanity White Quartz or Marble Countertop Gray 24” x 24” Tile Floor Waterworks - .25 Bathtub Waterworks - .25 Bathtub (Nickel) Master Bathroom Floor plan Hexagon Recycled Glass Mosaic Tile -Backsplash Lantern Waterworks -Transit Valve (Nickel) Waterworks - Univresal 10 inch Head Shower (Nickel) White Plaster Walls & Ceiling Toto Neorest Toilet or Similar D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127DRESSER MUD ROOM 130 DW. CL. COFFEE BAR STORAGE CABINET DESK FIREPLACE FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 SOFA WINDOW SEAT CABINET VANITY VANITY BENCHSHELF BATH 2 129 BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH BBQ AREA 124 FR. R. MINI BAR Master Bathroom Date: 07/27/2021 11 Encina 39 Encina DRiVE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED D TE: SSUED D TE: SKET H UMBER: DRESSinG ROOM Dressing Room Floor Plan Hardwood Light Natural Finish Floor White Plaster Walls & Ceiling Laundry Baskets Chandelier Leather OttomanStool Floor Mirror Rug Drawers & Adjustable Shelves Incorporate Led Strip Lights D W BOOK SHELF LN. CL. STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 DRESSER CABINET DRESSER MUD ROOM 130 DW. CL. COFFEE WORK BENCH STORAGE CABINET DESK DESK FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 CABINET BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH TRASH/GENERATOR ENCL. 137 FR. R. MINI BAR Dressing Room Date: 07/27/2021 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 cOVER PaGE Encina Interior Design Concept COLOR PALETTE
Interior
Guest Bathrooms
Date: 07/27/2021 12 Encina 39 Encina DRiVE, caRMEL VaLLEY, ca 93924 Scale: @ 11” x 17” Drawn By: MB Job: 2021 SHEET REF: REV SED D TE: SSUED aTE: SKET H UMBER: G RLS BEDROOMS GIRLS BEDROOMS FLOOR PLAN Queen Bed Dresser Nightstand Table Lamp Pendant Drawers and Adjustable Shelves White Plaster Walls & Ceiling Rug Hardwood Light Natural Finish Floor Hanging Chair Desk Chair Wood Desk Table Lamp BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 1 116 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER DW. COFFEE BAR DESK DESK DESK DESK FIREPLACE SOFA WINDOW SEAT CABINETCABINET BENCHVANITY VANITY VANITY VANITY BENCHSHELF SHELF BATH 2 129 EAST HALL 172 BBQ AREA 124 FR. R. 39 Encina
Design Concept Guest Bedrooms Date: 07/27/2021 13 Encina 39 Encina DRiVE, caRMEL VaLLEY, ca 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 SHEET REF: REV SED D TE: SSUED DaTE: SKET H nUMBER: G RLS BaTHROOMS
GIRILS
BATHROOMS FLOOR PLAN Waterworks Universal Undermount Sink (White) Waterworks Henry three Hole Deck Mounted Faucet (Nickel)Waterworks -Transit Valve (Nickel) Waterworks Univresal 10 inch Head Shower (Nickel) Baskets and Towels Area Linear Wall Sconce Glass Mosaic @ ShowerNiche Rectangular Mirror (Nickel) White Wood Boards Accent Wall Light Grey Vanity White Quartz or Marble Countertop Vanity Chair Rectngular Mirror Toto Neorest Toilet or Similar White Matte Tile @ Shower Norwalk Floor Deco Mix Light Grey Cabinets to Match Vanity White Quartz or Marble Countertop D W BOOK SHELF LN. CL. BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 1 116 STUDY 122 DRESSING ROOM 121 MASTER BATH 120 MASTER BEDROOM 119 GARAGE 126 FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 DRESSERDRESSER CABINETCABINET MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK WEST HALL 149 20' 2" x 16' 7" ENTRY 108 SOFA WINDOW SEAT BENCHVANITY VANITYSHELF BENCH DESK EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BENCH TRASH/GENERATOR ENCL. 137 FR. MINI BAR
BBQ AREA BBQ area floor plan Date: 07/27/2021 15 EncinA 39 EncinA DR VE, cARMEL VALLEY, cA 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 SHEET REF: REV SED ATE: SSUED D TE: SKETc nUMBER: Natural Oak Cabinets Buechel Stone, Fon Du Lac Rustic @ Fireplace Concrete Countertop Concrete FloorWaterworks Henry Col lection Kitchen Faucet (Nickel finish) White Wash Wood Ceiling Waterworks - Kerr Stainless Steel Kitchen Sink Outdoor Coffee Table Outdoor Dining Chair Outdoor Dining Table Wicker Outdoor Chair Fan Pendant D W BOOK SHELF LN. CL. BEDROOM 3 106 BEDROOM 4 109 BEDROOM 1 112 BEDROOM 2 113 W.I.C 115 W.I.C 114 BATH 1 116 BATH BEDROOM FAMILY ROOM 105PANTRY 104 KITCHEN 103 R. POWDER ROOM 118 LIVING ROOM 101 LAUNDRY 123 W.I.C 125 W.I.C 127 DRESSER DRESSERDRESSER CABINETCABINET DRESSER MUD ROOM 130 DW. CL. COFFEE BAR WORK BENCH STORAGE CABINET DESK DESK DESK DESK FIREPLACE FIREPLACE WEST HALL 149 20' 2" x 16' 7" ENTRY 108 SOFA WINDOW SEAT CABINETCABINET BENCHVANITY VANITY VANITY VANITY BENCHSHELF SHELF BATH 2 129 BENCH EAST HALL 172 FIREPLACE SOUTH HALL 173 DINING ROOM 174 BBQ AREA 124 FR. R. MINI BAR Barbecue Area Date: 07/27/2021 Encina 39 Encina DR VE, caRMEL VaLLEY, ca 93924 Scale: @ 11” 17” Drawn By: MB Job: 2021 cOVER PaGE Encina Interior Design Concept COLOR PALETTE
Full Plans Available Upon Request
Grading, Slope & Drainage Plan
403' ROOF MAIN HOUSE 423' 1/2" D 413' HF GC 10.1 SCREENED UNCONDITIONED SPACE 10.1 CHIMNEY W/ CAP SPARK ARRESTOR CHIMNEY W/ CAP & SPARK ARRESTOR EXTERIOR LIGHT FIXTURE CLERESTORY WINDOWS A3.6 G1.9 2' 1/2" 17' 1" 10 EXHAUST FAN 22.8 403' ROOF MAIN HOUSE 423' 1/2" MAXIMUM HEIGHT LIMIT D 413' E A.N.G. CHIMNEY W/ CAP SPARK ARRESTOR EXTERIOR LIGHT FIXTURE A3.6 G1.9 21.4 EXHAUST FAN 21.1 Job: ARCHITECTURAL Drawn By: Scale: REVISION @ 30x42 1/4" 1'-0" 39 ENCINA, LLC. 39 ENCINA DR. CARMEL VALLEY, CA 93924 EXTERIOR ELEVATIONS A3.0 MB 2021 BUILDING DEPARTMENT SUBMITTAL 5/9/2022 1/4" 1'-0"1 SOUTH ELEVATION 1/4" 1'-0"2 NORTH ELEVATION NATURAL STONE WALLS CORRUGATED GALV. STEEL ROOF AND GUTTERS MONTEREY TAUPE VERTICAL BOARD BATT HARDIE PANEL WALLS WEATHERED BRONZE ALUMINUM WINDOWS DOORS NATURAL CEDAR POSTS DOUGLAS FIR BEAMS KEYNOTE LEGEND 10.1 CRC R1003.9 CHIMNEYS SHALL EXTEND NOT LESS THAN FEET HIGHER THAN ANY PORTION OF BUILDING WITHIN FEET, BUT SHALL BE NOT LESS THAN FEET ABOVE THE HIGHEST POINT WHERE THE CHIMNEY PASSES THROUGH THE ROOF. 21.1 CRC R337.5.4 ROOF GUTTERS ROOF GUTTERS SHALL BE PROVIDED WITH THE MEANS TO PREVENT THE ACCUMULATION OF CRC R337.7.4 OPEN ROOF EAVES THE EXPOSED ROOF DECK ON THE UNDERSIDE OF UNENCLOSED EAVES SHALL BE APPROVED NONCOMBUSTIBLE MATERIAL, IGNITION-RESISTANT MATERIAL, ONE LAYER OF 5/8” TYPE GYPSUM BOARD, OR EXTERIOR PORTION OF AN APPROVED ONE HOUR WALL ASSEMBLY. 21.4 CRC R337.8 EXTERIOR WINDOWS, SKYLIGHTS AND DOORS EXTERIOR WINDOWS AND EXTERIOR GLAZED DOORS SHALL BE MULTI-PANE GLAZING WITH MINIMUM OF ONE TEMPERED PANE, GLASS LOCK UNITS, HAVE FIRE RESISTANCE RATING OF MINUTES WHEN TESTED ACCORDANCE WITH NFPA 257, OR MEET THE RE 0' 2'4' 423' 1/2" 2 A3.7 CHIMNEY W/ CAP & SPARK ARRESTOR EXTERIOR LIGHT FIXTURE TRELLIS FROSTED GLASS 3A 8A7A5B5A4A TYP. A8.3 TYP. ROOF MAIN HOUSE 423' 1/2" 110 413' 5 SOLAR PANELS CHIMNEY W/ CAP & SPARK ARRESTOR EXTERIOR LIGHT FIXTUREEXTERIOR LIGHT FIXTURESCREENED UNCONDITIONED SPACE 22.7 Job: ARCHITECTURAL Drawn By: Scale: REVISION Use of these plans and specifications shall be restricted original site for which they were prepared and publication th ereof expressly limited to such use. Reproduction or public ation by any method, whole or part, prohibited. Title to the plans and specifications remains with the architect wit hout prejudice. Visual contact with these plans and specificat ions shall constitute prima facie evidence of the acceptance @ 30x42 5/9/2022 10:41:02 1/4" 1'-0" 39 ENCINA, LLC. ENCINA DR. CARMEL VALLEY, CA 93924 EXTERIOR ELEVATIONS A3.1 MB 2021 BUILDING DEPARTMENT SUBMITTAL 5/9/2022 1/4" 1'-0" WEST ELEVATION 1/4" 1'-0"2 EAST ELEVATION NATURAL STONE WALLS CORRUGATED GALV. STEEL ROOF AND GUTTERS MONTEREY TAUPE VERTICAL BOARD BATT HARDIE PANEL WALLS WEATHERED BRONZE ALUMINUM WINDOWS DOORS NATURAL CEDAR POSTS DOUGLAS FIR BEAMS KEYNOTE LEGEND OF BUILDING WITHIN 10 FEET, BUT SHALL BE NOT LESS THAN FEET ABOVE THE HIGHEST 22.7INFINITY DRAIN S-AS SERIES 8' 39 Encina Building Department Drawings Exterior Elevations
DRIVEWAY GUEST HOUSE DETACHED POOL SETBACK 10' SETBACK10' THE LEGAL REQUIREMENTS OBSERVE COVENANTS, CONDITIONS AND RESTRICTIONS WHICH THE ATTENTION OF THE ARCHITECT. SURVEYS GROUP INC. DATED 09/26/2017 AND SPECIAL REQUIREMENTS THE PERMIT. CULTURAL, ARCHAEOLOGICAL, HISTORICAL OR PALEONTOLOGICAL RESOURCES NOTIFICATION: "STOP WORK WITHIN METERS (165 FEET) OF UNCOVERED RESOURCE GRADING SHALL BEGIN WITHIN DAYS OF VEGETATION REMOVAL THA AREA HALL OSION. (MCC 16.08.300 EFFORT APPLIED TO THE FILL AREAS. BRIS, SCARIFIED AND ALL EXISTING FILLS SHALL BE APPROVED BY THE SOILS ENGINEER EMOVED BEFORE ANY EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE CIVIL ENGINEER, THE SOILS ENGINEER, THE ENGINEERING GEOLOGIST THE TESTING AGENCY CORRECTIVE MEASURES, NECESSARY, SHALL SUBMITTED TO COUNTY BUILDING SERVICES ELEVATION OF FIELD DENSITY TESTS. SUMMARIES OF FIELD AND LABORATORY RESULTS AND THE INTENDED USE AND COMPLETION OF WORK ACCORDANCE WITH THE JOB SPECIFICATIONS. INCLUDING FINAL REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE OUTLINED THE MEETING. THEIR REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE UTLINED THE MEETING. GEOTECHNICAL CERTIFICATION: PRIOR TO FINAL INSPECTION, THE APP GRADING GENERAL NOTES ENVIRONMENTAL SERVICES TO ENSURE NECESSARY SEDIMENT CONTROL ARE PLACE AND DURING CONSTRUCTION, THE OWNER/APPLICANT SHALL SCHEDULE INSPECTION WITH RMAENVIRONMENTAL SERVICES TO INSPECT DRAINAGE DEVICE INSTALLATION, HAVE BEEN COMPLETED TO THAT POINT. MAINTENANCE AND EFFECTIVENESS BMP’S INSTALLED, AND TO VERIFY THAT POLLUTANTS NSPECTION, THE PRIOR TO FINAL INSPECTION, THE OWNER/APPLICANT SHALL SCHEDULE GEOTECHNICAL CERTIFICATION PRIOR TO FINAL INSPECTION, THE APPLICANT SHALL PROVIDE LETTER GEOTECHNICAL ENGINEER INSPECTION SCHEDULE Drawn By: Scale: REVISION 30x42 indicated 39 ENCINA, LLC. ENCINA DR. GRADING/SLOPE MAP & DRAINAGE PLAN G1.7 BUILDING DEPARTMENT SUBMITTAL 5/9/2022 1/16" 1'-0" GRADING SLOPE DRAINAGE PLAN GRADING ESTIMATES GRADING CUT 2,623CU.YDS. ALL CUT TO BE BALANCED ON SITE TRUE 8'16'32' LINE (E) 2.55:12 (E) GRADE 7% ANG PROPOSED FILL (MAX SLOPE) 21% ANG LINE GRADE 3.47:12 NOTE: (E) GRADE 7% ANG PROPOSED FILL (MAX SLOPE) 29% ANG Drawn By: Scale: REVISION @ 30x42 1/8" 1'-0" 39 ENCINA, LLC. ENCINA DR. FOOTING SETBACK SECTIONS G1.9 BUILDING DEPARTMENT SUBMITTAL 5/9/2022 1 GRADING CROSS SLOPE SECTION 1/8" 1'-0" GRADING CROSS SECTION
Courtney Adamski Broker Associate | DRE#01444609 831.915.3913 CAdamski@CarmelRealtyCompany.com www.CourtneyAdamski.com For more information on this property please contact: 831-622-1000 • info@carmelrealtycompany.com