Oil & Gas Technology Autumn 2023

Page 18

FUTURE DIGITAL TWIN

Rosebank field to progress in the UK Equinor and Ithaca Energy have taken the final investment decision to progress Phase 1 of the Rosebank development on the UK Continental Shelf (UKCS), investing $3.8 billion. The North Sea Transition Authority (NSTA) granted consent for the development of the field on 27 September. “Developing the Rosebank field will allow us to grow our position as a broad energy partner to the UK, while optimising our oil and gas portfolio, and increasing energy supply in Europe. Rosebank provides an opportunity to develop a field within the UK Continental Shelf which will bring significant benefits to Scotland and the wider UK,” says Geir Tungesvik, executive vice president Projects, Drilling and Procurement at Equinor. The Rosebank field is located around 130 kilometres north-west of Shetland in approximately 1,100 metres of water depth. Total recoverable resources are estimated at around 300 million barrels of oil, with Phase 1 targeting estimated 245 million barrels of oil.

16

Exploration and Production International. This development further strengthens our international business, and we look forward to collaborating closely with our partner and suppliers to develop and operate Rosebank with the lowest possible carbon footprint while bringing the maximum value to society in the shape of UK investment, local jobs and energy security.” The Rosebank oil and gas field is being developed in compliance with the North Sea Transition Deal, an agreement between the UK government and the offshore industry. It acknowledges that whilst there is a continued, though over time reducing need for oil and gas, the remaining demand for oil and gas must be met with the lowest emissions possible.

The field will be developed with subsea wells tied back to a redeployed Floating Production Storage and Offloading vessel (FPSO), with start-up planned in 2026-2027. Oil will be transported to refineries by shuttle tankers, while gas will be exported through the West of Shetland Pipeline system to mainland Scotland.

The FPSO has been designed to be electrification ready and Equinor is collaborating with government and industry to pursue a regional solution for power from shore to Rosebank and nearby fields to minimise carbon emissions from production.

“We are pleased to move forward with the Rosebank field together with Ithaca Energy,” says Philippe Mathieu, executive vice president for

According to an independent socioeconomic report by Wood Mackenzie and Voar Energy, Rosebank is estimated to create £8.1 billion of total direct

investment over the lifetime of the field, of which 78% is likely to be invested in UK-based businesses. It is expected to support around 1,600 jobs during the height of the construction phase of the project, and it will continue to support approx. 450 UKbased jobs during the lifetime of the field. “We know that the world needs to transition to new, cleaner energy systems and our broad energy investments into the UK support this. And while we do this there is going to be a continued need for oil and gas, which currently meets 76 percent of the UK’s energy needs. Our decision to progress the Rosebank development is the result of work and collaboration by our employees, partners, government, regulators, and other stakeholders to ensure that this development can help meet this ongoing need, with the lowest carbon footprint


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Digital Twins in the Oil and Gas Industry

2min
pages 50-51

The value of avoiding uncertainty in the ground

3min
pages 48-49

De-mystifying digital twins for oil and gas

5min
pages 44-47

A proven path to maximizing trust, confidence and returns on your digital investments

3min
pages 42-43

Incremental digital transformations that reduce time to value

1min
page 41

Advanced Analytics Solutions Drive

4min
pages 38-40

The role of generative AI in the oil and gas sector

4min
pages 36-37

It is time we focused on digital transformation – not just technology

2min
pages 34-35

Enhancing Greece’s strategic and commercial position through natural gas storage capacity development

3min
pages 32-33

Simone Kranendonk: “At the ETCA campus, we have everything we need to make a real impact on the energy transition”

3min
pages 30-31

Journey to a more sustainable future

3min
pages 28-29

DIGITAL TWIN Keeping an eagle eye on oil & gas assets

3min
pages 26-27

Optimising production capabilities with additive manufacturing

2min
pages 24-25

Transmitting safely from the danger zone

2min
pages 22-23

Succeed in the Oil & Gas Industry with These Five Digital Trends

2min
pages 20-21

Rosebank field to progress in the UK

3min
pages 18-19

The Aluminium TwixBeam THE SMART BEAM IN SCAFFOLDING

1min
page 17

SLB Launches first-of-its-kind, easy-toinstall methane measurement instrument

2min
pages 16-17

Chevron CEO talks boosting oil production amid record demand

1min
page 14

ADNOC Takes FID on World’s First Project That Aims to Operate with Net Zero Emissions

2min
page 14

services contract with Petrobras

0
pages 12-13

Production start for Statfjord Øst project

1min
page 12

Aramco to enter global LNG business by acquiring stake in MidOcean Energy

0
page 12

Baker Hughes announces major gas technology equipment order for Venture Global LNG

1min
pages 10-11

bp’s Archaea Energy achieves major milestone, brings online first of its kind renewable natural gas plant

2min
page 10

More gas from Gina Krog with Eirin

2min
page 8
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.