CCM 2021 State Legislative Program

Page 4

ENERGY AND ENVIRONMENTAL MANAGEMENT 1. Virtual Net Metering Credit Cap a. Eliminate the Virtual Net Metering Credit Cap (CGS 16-244u). Such change should include the requirement that electric distribution companies allow “unassigned” VNM credits to be applied to future bills on a month-to-month basis, known as “banking,” as expressed in CGS 16-244u(c). b. In order to maximize underutilized land, CCM suggests that once the cap has been eliminated, provide preferential consideration for projects proposed to be placed on “preferred” sites (i.e., landfills, brownfields, etc.). 2. Allow any town or city to establish a Stormwater Authority to offset costs of implementing the current MS4 General Permit. 3. Community Choice Aggregation a. Require a study of community choice aggregation (CCA) programs by the Commissioner of Energy and Environmental Protection. CCM would recommend a study to identify and highlight the differences between CCA and municipal aggregation, including: 1. In CT, municipal aggregation (of residents in town) is opt in – the town must obtain consent of the resident to allow it to

4 | CCM 2021 State Legislative Program


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.